TBT-COM-H-113-A How DNA-Blast Software can bring benefits in Vibration control By Dr Thierry BERNARD An extract from Thierry BERNARD paper presented An extract from Thierry BERNARD paper presented @ EFEE @ EFEE Conference, Conference, 10 10 - - 12 September 2003, Prague, Czech Republic 12 September 2003, Prague, Czech Republic

description

Voladura de rocas y control vibracional de la voladura. Uso de software.

Transcript of 02 DNA-Blast Software Lafarge Vibration Control

  • TBT-COM-H-113-A

    How DNA-Blast Software canbring benefits in Vibration control

    By Dr Thierry BERNARD

    An extract from Thierry BERNARD paper presented An extract from Thierry BERNARD paper presented @ EFEE@ EFEE Conference, Conference, 1010--12 September 2003, Prague, Czech Republic12 September 2003, Prague, Czech Republic

  • TBT-COM-H-113-A

    DNA-Blast Advanced Software for Vibration control

    Lafarge Contes case study (Vibration control)

    CONTENT

  • TBT-COM-H-113-A

    DNADNA--BlastBlast

    Advanced Software for Vibration control

  • TBT-COM-H-113-A

    QUALITIR screen shotsDNA-Blast Software

  • TBT-COM-H-113-A

    DNA-Blast SoftwareVibration optimisation process

    InputSingle Hole Seismic record

    Mathematical ProcessSeed wave simulationFrequency analysis

    OutputIniation Sequence for

    minimum vibrationFFT

    BenefitsRegulation compliance

    ( ) ( ) dtx Ntj2etNX +

    =

  • TBT-COM-H-113-A

    Blast designadjustment

    DNA-Blast SoftwareOptimisation process

    Blast Seismic Trace

    CHOIX DE LA CHARGE UNITAIRE

    0

    50

    100

    150

    200

    250

    300

    0 75 150

    225

    300

    375

    450

    525

    600

    675

    750

    825

    900

    975

    105011

    2512

    0012

    7513

    5014

    2515

    0015

    7516

    50

    Distance (en m)

    C

    h

    a

    r

    g

    e

    (

    e

    n

    k

    g

    )

    5.00

    4.00

    3.50

    3.00

    2.50

    2.00

    1.50

    1.00

    0.75

    0.50

    Vitesse

    en mm/s

    Charge Optimisation

    Single Hole Trace

    Drilling pattern

    DNA Blast Engine

    Objective selection

    Delay Optimisation

  • TBT-COM-H-113-A

    DNADNA--Blast Blast SoftwareSoftware

    Lafarge Contes case study about Vibration control

  • TBT-COM-H-113-A

    DNA-Blast SoftwareCase study : Lafarge Site

    Lafarge quarry in the South of France

    Located in Contes village20 km far from Nice

  • TBT-COM-H-113-A Usine de Contes

    Carrire de Pont de Peille

    LAFARGE

    CIMENTS

    DNA-Blast SoftwareCase study : Lafarge Site

  • TBT-COM-H-113-A

    DNA-Blast SoftwareCase study : Lafarge Site

  • TBT-COM-H-113-A

    DNA-Blast SoftwareCase study : Lafarge Site

  • TBT-COM-H-113-A

    DNA-Blast SoftwareCase study : Typical production blast

    Borehole diameter : 89 mmBench height : 10 & 19 mBurden 3 m / Spacing 3.5 m2 to 4 decks per holeAverage charge per delay : 19 kg

  • TBT-COM-H-113-A

    DNA-Blast SoftwareCase study : Typical overburden blast

    Borehole diameter : 89 mmBench height : 6 to 10 mBurden 3 m / Spacing 3.5 m2 to 3 decks per holeAverage charge per delay : 6 to 16 kg

  • TBT-COM-H-113-A

    DNA-Blast SoftwareCase study : Vibration statement

    PPV evolutionImportant reduction through years

    PPV / Years

    R2 = 0.2951

    91 92 92 93 94 95 96 97 98 99 00 01 02

    P

    P

    V

    (

    m

    m

    /

    s

    )

    Average PPV Divided by 6

  • TBT-COM-H-113-A

    DNA-Blast Software Case study : Complains history

    PPV

    Complains

    100 %

    1991

    PPV

    Complains

    70 %

    1992

    PPV

    Complains

    30 %

    1994

    PPVC

  • TBT-COM-H-113-A

    In 2002, there is only one or two complaining phone call per year

    DNA-Blast Software Case study : Vibration history vs Complains

  • TBT-COM-H-113-A

    DNA-Blast Software Case study:Vibration history vs Initiation systems

  • TBT-COM-H-113-A

    DNA-Blast Software Case study : Charge per Delay Optimisation

  • TBT-COM-H-113-A

    Electronic Detonators UsedDELTADET system

  • TBT-COM-H-113-A

    DNA-Blast Software CONCLUSION

    DNA-Blast software gives the following benefits to lafarge:Decrease PPV by 6 that suppressed

    neighbours complains about vibrations and consequently allowed Lafarge to extend the site

    Optimise the use of electronic detonators that allowed to increase the charge per delay and gave to Lafarge a cheapper cost per ton.

  • TBT-COM-H-113-A

    Advanced Softwarefor

    a Million Dollar Benefit

    www.tbtech.fr