Site Progress for Mid February
Date: 02-12-09
By: Gene Lynch
Duplex Filter RemovalFor Lube Oil Flush.
Engine 6
Duplex Filter Removal & Inspection. Engine 6
02-06-09
Crank Web Deflection/Engine 6 02-06-09
Engine Alignment/Engine 6 02-09-09
Alignment/Engine 6
Alternator Alignment/Engine 6
Alternator Alignment/Engine 6
Alternator Alignment/Engine 6
Lube Oil Flush ConnectionEngine 6
Power Block ABuilding Erection
Sub Transformer
Station Transformer A
Neutral Grounding Resistor
Station Transformer AMedium Line Termination
Power Block A
Power Block A Radiator Cooling Water Piping Fabrication
HT/LT Cooling Water Piping
Inside Block A
Power Block AEngine 6 Side
Engine 6 IntakeExhaust
Power Block A
Overall Site 02-11-09
Sub Station 02-11-09
Tank Farm Fabrication Shop 02-11-09
Paint Shops & Steel Lay Down Yard 02-11-09
West Side of Power Block A 02-11-09
Security Headquarters 02-11-09
Road Detour To Keep Civilian Traffic Away FromFront Entrance To Site. 02-11-09
Power Block B ExhaustStack Foundations 02-12-09
Covering for Sub Base Pourof Thermal Boilers. 02-12-09
West Wall Construction forPower Block C 02-12-09
North Wall ConstructionPower Block C 02-12-09
Shelter Being Erected for the 5th Engine FoundationPour for Power Block C. 02-12-09
Afghan Water Truck 02-12-09
Tower Erection 02-08-09
Tower Erection 02-01-09
Tower Erection 02-02-09
Material Air DropAt 100MW Site
Aborted Air Drop Due To Ground Conditions
Golf In Kabul For The Adventurous Type
Local Fruit Stand
Local Village NearSite
Local Vegetable Shop
Local School HouseNear The Site
Local Transport Plenty Of Room
WOW