ZAIN Transmission Project Preliminary Acceptance Test Manual
KINGDOM OF SAUDI ARABIA
OSN3500 Preliminary Acceptance Test (PAT) Document
HUAWEI TECHNOLOGIES CO., LTD
ZAIN Transmission Project Preliminary Acceptance Test Manual
INTRODUCTION This document specifies the Preliminary Acceptance Test approach for the ZAIN OptiX OSN3500 Project.
ZAIN Transmission Project Preliminary Acceptance Test Manual
Table of Contents OPTIX SDH Transmission PAT
TEST TABLE ........................................................................................................................................... 4 1.1 INSTALLED EQUIPMENT INSPECTION (BY DISTRICT) ........................................................................ - 4 - 1.2 QUALITY INSPECTION (BY DISTRICT) ............................................................................................. - 5 - 1.3 SINGLE STATION BASIC ITEMS TEST ............................................................................................... - 6 -
1.3.1 Power-on Function of the Rack (By District) ......................................................................... - 6 - 1.3.2 Average Optical Power Transmitted (By District) .................................................................. - 7 - 1.3.3 Actual Received Optical Power (By District) ......................................................................... - 8 - 1.3.4 E1 Tributary Test and Cabling Test (By District) .................................................................... - 9 - 1.3.5 E3/STM-1e Tributary Test and Cabling Test (By District) ..................................................... - 10 - 1.3.6 Tributary Unit Protection (E1/E3/STM-1e) (By District) ...................................................... - 11 - 1.3.7 Power Input Unit Protection (By District) ............................................................................ - 12 - 1.3.8 Fan Rotational Speed Automatically Adjustment (By District) .............................................. - 13 - 1.4 Network Management Function Test ....................................................................................... - 14 - 1.4.1 Configuration Management (By TO) .................................................................................... - 14 - 1.4.2 Alarm Management (By TO) ................................................................................................ - 14 - 1.4.3 Security Management (By TO) ............................................................................................. - 14 -
APPENDIX 1-TEST INSTRUMENTS............................................................................................... - 15 -
APPENDIX 2- ABBREVIATION ....................................................................................................... - 15 -
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 4 - of 15
Test Table
1.1 Installed Equipment Inspection (By District) Slot Bar number Board Type Remarks
OptiX OSN3500 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Host software version
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 5 - of 15
1.2 Quality Inspection (By District) Serial.
No. Name of item Standards & requirements Test results
1 Cabinets
(1) Location for installing cabinets meets requirement (as floor plan)
(2) Cabinets installed stably (3) Cabinets neatly arranged (4) Markings of cabinets in readiness (5) All fixtures fastened & not loose
2 Cable wiring
(1) Route and binding technology of internal optical fiber meet requirement (ODF cable arrangement)
(2) Route and binding technology of trunk cable meet requirement
(3) Power cable neatly arranged
3 Ground wire
(1) Connecting method of ground wire up to standard (2) Route and binding technology of ground wire meet requirement
4 Power supply
(1) No short circuit between internal power wire and ground (2) Route and layout of power line arranged neatly
(3) Connector of DC power line meets requirement
5 Labels The labels are arranged clearly
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 6 - of 15
1.3 Single Station Basic Items Test
1.3.1 Power-on Function of the Rack (By District)
Test Sub-item Power-on function of the rack
Equipment No. Power Provided
by user (V) Voltage between NEG1(-) and RTN1(+) (V)
Voltage between NEG2(-) and RTN2(+) (V)
Result
Requirements: PW-I,II required range should be –38.4…-72V Remark:
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 7 - of 15
1.3.2 Average Optical Power Transmitted (By District)
Test Sub-item Average optical power
transmitted
Equipment No. Slot Unit Name Port No. Optical module
type Test Value (dBm)
Result
Requirements:
Optical Interface Board Type
Optical Transmitting Optical Power
(dBm) Optical Interface
Board Type
Optical Transmitting Optical Power
(dBm) Optical Interface
Board Type
Optical Transmitting Optical Power
(dBm) I-64.1 -6 to -1 L-16.1 -2 to 3 L-4.1 -3 to 2 I-64.2 -5 to -1 L-16.2 -2 to 3 L-4.2 -3 to 2
S-64.2a -5 to -1 Le-16.2 2 ~ 5 I-1 -15 to -8 S-64.2b -1 to 2 V-16.2 10~13 S-1.1 -15 to -8 L-64.2b 10 to 13 U-16.2 12~15 L-1.1 -5 to 0 V-64.2a 10 to 13 I-4 -15 to -8 L-1.2 -5 to 0 S-16.1 -5 to 0 S-4.1 -15 to -8
Remark:
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 8 - of 15
1.3.3 Actual Received Optical Power (By District)
Test Sub-item Actual received optical power
Equipment No. Slot Unit Name Port No. Optical
module type Test value (dBm)
Result
Requirements:The actual received optical power at the receiving interface side of optical board should be 3dB’s larger than the sensitivity index of this optical board and 5dB’s less than its minimum overload index, the best value of actual received optical power can be in the middle of both the sensitivity index and the minimum overload index.
Optical Interface
Board Type
Optical Receiving Sensitivity(BER of 1*10-12) (dBm)
Optical Receiving minimum overload Optical Power (dBm)
Optical Interface
Board Type
Optical Receiving Sensitivity(
BER of 1*10-12) (dBm)
Optical Receiving minimum overload Optical Power (dBm)
Optical Interface
Board Type
Optical Receiving Sensitivity(BER of 1*10-12) (dBm)
Optical Receiving minimum overload Optical Power (dBm)
I-64.1 -11 -1 L-16.1 -27 -9 L-4.1 -28 -8 I-64.2 -14 -1 L-16.2 -28 -9 L-4.2 -28 -8
S-64.2a -18 -8 Le-16.2 -28 -9 I-1 -23 -8 S-64.2b -14 -1 V-16.2 -25 -9 S-1.1 -28 -8 L-64.2b -14 3 U-16.2 -34 -18 L-1.1 -34 -10 V-64.2a -25 -9 I-4 -23 -8 L-1.2 -34 -10 S-16.1 -18 0 S-4.1 -28 -8
Remark:
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 9 - of 15
1.3.4 E1 Tributary Test and Cabling Test (By District)
Test Sub-item E1 Tributary Test and Cabling Test
Equipment No. Slot Test port Result
Requirements: Remark:
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 10 - of 15
1.3.5 E3/STM-1e Tributary Test and Cabling Test (By District)
Test Sub-item E3/STM-1e Tributary Test
and Cabling Test Equipment No. Slot Test port Result
Requirements: Remark:
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 11 - of 15
1.3.6 Tributary Unit Protection (E1/E3/STM-1e) (By District)
Test Sub-item Tributary Unit Protection
Equipment No. Working Slot Protection slot Switch-over Time Result
Requirements: Remark:
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 12 - of 15
1.3.7 Power Input Unit Protection (By District)
Test Sub-item Power Input Unit Protection
Equipment No. Working Slot Protection slot Result
Requirements: Remark:
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 13 - of 15
1.3.8 Fan Rotational Speed Automatically Adjustment (By District)
Test Sub-item Fan Rotational Speed Automatically Adjustment
Equipment No. FAN NO. Test results
Requirements: Remark:
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 14 - of 15
1.4 Network Management Function Test
1.4.1 Configuration Management (By TO)
Class Item Test results
Configuration management
Define network element
Configure service
Clock configuration
Time configuration
1.4.2 Alarm Management (By TO)
Class Item Test results
Alarm Management
View current alarm
View history alarm
Alarm level setting
1.4.3 Security Management (By TO)
Class Item Test results
Security Management NE user level configuration
NMS user login
Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:
ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:
OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 15 - of 15
Appendix 1-Test instruments
Name of instrument and equipment Type SDH tester ME3620 SDH/PDH tester MP1550A SDH/PDH tester ANT-20E SDH/PDH tester ANT-20 SDH/PDH tester HP37717C Data Network Analyzer SmartBits600 PDH tester PF140 PCM bit error analyzer YG.BERT2 Optical power meter PMS-1 Variable optical attenuation OLA-15B Multi-meter Laptop
Appendix 2- Abbreviation
PAT: Preliminary Acceptance Test TO: Transmission Operation group in ZAIN which managed