01-OSN 3500 Preliminary Acceptance Test Table V4.03

15
ZAIN Transmission Project Preliminary Acceptance Test Manual KINGDOM OF SAUDI ARABIA OSN3500 Preliminary Acceptance Test (PAT) Document HUAWEI TECHNOLOGIES CO., LTD

Transcript of 01-OSN 3500 Preliminary Acceptance Test Table V4.03

Page 1: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Manual

KINGDOM OF SAUDI ARABIA

OSN3500 Preliminary Acceptance Test (PAT) Document

HUAWEI TECHNOLOGIES CO., LTD

Page 2: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Manual

INTRODUCTION This document specifies the Preliminary Acceptance Test approach for the ZAIN OptiX OSN3500 Project.

Page 3: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Manual

Table of Contents OPTIX SDH Transmission PAT

TEST TABLE ........................................................................................................................................... 4 1.1 INSTALLED EQUIPMENT INSPECTION (BY DISTRICT) ........................................................................ - 4 - 1.2 QUALITY INSPECTION (BY DISTRICT) ............................................................................................. - 5 - 1.3 SINGLE STATION BASIC ITEMS TEST ............................................................................................... - 6 -

1.3.1 Power-on Function of the Rack (By District) ......................................................................... - 6 - 1.3.2 Average Optical Power Transmitted (By District) .................................................................. - 7 - 1.3.3 Actual Received Optical Power (By District) ......................................................................... - 8 - 1.3.4 E1 Tributary Test and Cabling Test (By District) .................................................................... - 9 - 1.3.5 E3/STM-1e Tributary Test and Cabling Test (By District) ..................................................... - 10 - 1.3.6 Tributary Unit Protection (E1/E3/STM-1e) (By District) ...................................................... - 11 - 1.3.7 Power Input Unit Protection (By District) ............................................................................ - 12 - 1.3.8 Fan Rotational Speed Automatically Adjustment (By District) .............................................. - 13 - 1.4 Network Management Function Test ....................................................................................... - 14 - 1.4.1 Configuration Management (By TO) .................................................................................... - 14 - 1.4.2 Alarm Management (By TO) ................................................................................................ - 14 - 1.4.3 Security Management (By TO) ............................................................................................. - 14 -

APPENDIX 1-TEST INSTRUMENTS............................................................................................... - 15 -

APPENDIX 2- ABBREVIATION ....................................................................................................... - 15 -

Page 4: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 4 - of 15

Test Table

1.1 Installed Equipment Inspection (By District) Slot Bar number Board Type Remarks

OptiX OSN3500 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Host software version

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 5: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 5 - of 15

1.2 Quality Inspection (By District) Serial.

No. Name of item Standards & requirements Test results

1 Cabinets

(1) Location for installing cabinets meets requirement (as floor plan)

(2) Cabinets installed stably (3) Cabinets neatly arranged (4) Markings of cabinets in readiness (5) All fixtures fastened & not loose

2 Cable wiring

(1) Route and binding technology of internal optical fiber meet requirement (ODF cable arrangement)

(2) Route and binding technology of trunk cable meet requirement

(3) Power cable neatly arranged

3 Ground wire

(1) Connecting method of ground wire up to standard (2) Route and binding technology of ground wire meet requirement

4 Power supply

(1) No short circuit between internal power wire and ground (2) Route and layout of power line arranged neatly

(3) Connector of DC power line meets requirement

5 Labels The labels are arranged clearly

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 6: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 6 - of 15

1.3 Single Station Basic Items Test

1.3.1 Power-on Function of the Rack (By District)

Test Sub-item Power-on function of the rack

Equipment No. Power Provided

by user (V) Voltage between NEG1(-) and RTN1(+) (V)

Voltage between NEG2(-) and RTN2(+) (V)

Result

Requirements: PW-I,II required range should be –38.4…-72V Remark:

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 7: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 7 - of 15

1.3.2 Average Optical Power Transmitted (By District)

Test Sub-item Average optical power

transmitted

Equipment No. Slot Unit Name Port No. Optical module

type Test Value (dBm)

Result

Requirements:

Optical Interface Board Type

Optical Transmitting Optical Power

(dBm) Optical Interface

Board Type

Optical Transmitting Optical Power

(dBm) Optical Interface

Board Type

Optical Transmitting Optical Power

(dBm) I-64.1 -6 to -1 L-16.1 -2 to 3 L-4.1 -3 to 2 I-64.2 -5 to -1 L-16.2 -2 to 3 L-4.2 -3 to 2

S-64.2a -5 to -1 Le-16.2 2 ~ 5 I-1 -15 to -8 S-64.2b -1 to 2 V-16.2 10~13 S-1.1 -15 to -8 L-64.2b 10 to 13 U-16.2 12~15 L-1.1 -5 to 0 V-64.2a 10 to 13 I-4 -15 to -8 L-1.2 -5 to 0 S-16.1 -5 to 0 S-4.1 -15 to -8

Remark:

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 8: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 8 - of 15

1.3.3 Actual Received Optical Power (By District)

Test Sub-item Actual received optical power

Equipment No. Slot Unit Name Port No. Optical

module type Test value (dBm)

Result

Requirements:The actual received optical power at the receiving interface side of optical board should be 3dB’s larger than the sensitivity index of this optical board and 5dB’s less than its minimum overload index, the best value of actual received optical power can be in the middle of both the sensitivity index and the minimum overload index.

Optical Interface

Board Type

Optical Receiving Sensitivity(BER of 1*10-12) (dBm)

Optical Receiving minimum overload Optical Power (dBm)

Optical Interface

Board Type

Optical Receiving Sensitivity(

BER of 1*10-12) (dBm)

Optical Receiving minimum overload Optical Power (dBm)

Optical Interface

Board Type

Optical Receiving Sensitivity(BER of 1*10-12) (dBm)

Optical Receiving minimum overload Optical Power (dBm)

I-64.1 -11 -1 L-16.1 -27 -9 L-4.1 -28 -8 I-64.2 -14 -1 L-16.2 -28 -9 L-4.2 -28 -8

S-64.2a -18 -8 Le-16.2 -28 -9 I-1 -23 -8 S-64.2b -14 -1 V-16.2 -25 -9 S-1.1 -28 -8 L-64.2b -14 3 U-16.2 -34 -18 L-1.1 -34 -10 V-64.2a -25 -9 I-4 -23 -8 L-1.2 -34 -10 S-16.1 -18 0 S-4.1 -28 -8

Remark:

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 9: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 9 - of 15

1.3.4 E1 Tributary Test and Cabling Test (By District)

Test Sub-item E1 Tributary Test and Cabling Test

Equipment No. Slot Test port Result

Requirements: Remark:

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 10: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 10 - of 15

1.3.5 E3/STM-1e Tributary Test and Cabling Test (By District)

Test Sub-item E3/STM-1e Tributary Test

and Cabling Test Equipment No. Slot Test port Result

Requirements: Remark:

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 11: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 11 - of 15

1.3.6 Tributary Unit Protection (E1/E3/STM-1e) (By District)

Test Sub-item Tributary Unit Protection

Equipment No. Working Slot Protection slot Switch-over Time Result

Requirements: Remark:

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 12: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 12 - of 15

1.3.7 Power Input Unit Protection (By District)

Test Sub-item Power Input Unit Protection

Equipment No. Working Slot Protection slot Result

Requirements: Remark:

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 13: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 13 - of 15

1.3.8 Fan Rotational Speed Automatically Adjustment (By District)

Test Sub-item Fan Rotational Speed Automatically Adjustment

Equipment No. FAN NO. Test results

Requirements: Remark:

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 14: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 14 - of 15

1.4 Network Management Function Test

1.4.1 Configuration Management (By TO)

Class Item Test results

Configuration management

Define network element

Configure service

Clock configuration

Time configuration

1.4.2 Alarm Management (By TO)

Class Item Test results

Alarm Management

View current alarm

View history alarm

Alarm level setting

1.4.3 Security Management (By TO)

Class Item Test results

Security Management NE user level configuration

NMS user login

Huawei Representative O& M contractor Witness* ZAIN Representative Signature: Signature: Signature: Name: Name: Name: Phone #: Phone #: Phone #: I.D #: I.D #: I.D #: Date: Date: Date:

Page 15: 01-OSN 3500 Preliminary Acceptance Test Table V4.03

ZAIN Transmission Project Preliminary Acceptance Test Table Site NO/Name: Rack Position: Shelf Location:

OSN 3500 Preliminary Acceptance Test Table V4.03 Page - 15 - of 15

Appendix 1-Test instruments

Name of instrument and equipment Type SDH tester ME3620 SDH/PDH tester MP1550A SDH/PDH tester ANT-20E SDH/PDH tester ANT-20 SDH/PDH tester HP37717C Data Network Analyzer SmartBits600 PDH tester PF140 PCM bit error analyzer YG.BERT2 Optical power meter PMS-1 Variable optical attenuation OLA-15B Multi-meter Laptop

Appendix 2- Abbreviation

PAT: Preliminary Acceptance Test TO: Transmission Operation group in ZAIN which managed