    SAUDI ARABIAN OIL COMPANY (Saudi Aramco)GENERAL INSTRUCTION MANUAL

    G. I. NUMBER Approved

    2.702

    ISSUING ORG.: POWER DISTRIBUTION DEPARTMENT

    ISSUE DATE

    4/1/2003REPLACES

    2/27/91

    SUBJECT : MOVING DRILLING RIGS, HIGH CLEARANCE EQUIPMENT / LOADS,OR OPERATING CRANES UNDER OR NEAR POWER-LINES

    APPROVAL

    IYKPAGE NUMBER

    1 OF 9

    *CHANGE **ADDITION NEW GENERAL INSTRUCTION COMPLETE REVISION

    CONTENT

    This General Instruction (GI) outlines the requirements for moving drilling rigs, high clearance equipment and loadsunder, or operating cranes near, overhead power-lines to avoid power-line contact. The text includes:

    1.0 Purpose2.0 Scope3.0 References4.0 Definitions5.0 General Requirements

    6.0 Responsibilities7.0 Rig Moves8.0 Crane Operations9.0 Moving Oversized Equipment10.0 Approvals

    Attachments:1A - Pre-Rig Move Checklist1B - Pre-Rig Move Checklist (Contractors)2 - Oversized Equipment Pre-Move Checklist

    1.0 PURPOSE

    The purpose of this GI is to protect personnel and high clearance equipment moving under, or operating near,overhead power-lines and to prevent damage to power-lines or unscheduled interruption of the power supplyduring such operations.

    2.0 SCOPE

    This General Instruction shall apply to all Saudi Aramco proponent departments and contractor companiesmoving high clearance equipment and loads under, or operating equipment near, power-lines, regardless of

    power-line location, voltage rating, or the type of equipment involved. This GI does not apply to moving mobilecranes along roadways where overhead power-line crossing heights are posted and/or equipped with telltalesindicating safe overhead clearance.

    3.0 REFERENCES

    Abbreviations:

    ANSI: American National Standards InstituteASME: American Society of Mechanical Engineers

    GI: General Instruction

    The Standards and references listed below shall apply to this G.I. It shall be the responsibility of SaudiAramco proponent organizations and contractors to be familiar with the most current version of thereferenced publications. (ASME standards are adopted by ANSI):

    3.1 ASME B30.5 Mobile and Locomotive Cranes

    3.2 ASME B30.23 Personnel Lifting Systems3.3 GI 2.100 Work Permit System3.4 GI 7.027 Crane Suspended Personnel Platforms (Manbasket) Operations

  • 7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf

    2/9

  • 7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf

    3/9

  • 7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf

    4/9

  • 7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf

    5/9

    SAUDI ARABIAN OIL COMPANY (Saudi Aramco)GENERAL INSTRUCTION MANUAL

    G. I. NUMBER Approved

    2.702

    ISSUING ORG.: POWER DISTRIBUTION DEPARTMENT

    ISSUE DATE

    4/1/2003REPLACES

    2/27/91

    SUBJECT : MOVING DRILLING RIGS, HIGH CLEARANCE EQUIPMENT / LOADS,OR OPERATING CRANES UNDER OR NEAR POWER-LINES

    APPROVAL

    IYKPAGE NUMBER

    5 OF 9

    *CHANGE **ADDITION NEW GENERAL INSTRUCTION COMPLETE REVISION

    LINE VOLTAGE ABSOLUTE LIMIT OF APPROACH

    Up to 250,000 volts 6.1 meters (20 feet)

    Over 250,000 volts 7.6 meters (25 feet)

    8.2.3 If the crane operation includes lifting near energized power-lines, it shall be considered a critical lift andrequires an approved Critical Lift Plan as per GI 7.028. The Critical Lift Plan shall be prepared by aRigger-I or rigging competent person with PDD participation and co-signed by the facility proponentdepartment and PDD.

    8.2.4 Crane lifts near energized power-lines shall not be performed in wind speeds exceeding 32 km/h (20mph 17.4 knots), unless otherwise specified by the crane manufacturer. No crane lift shall be

    performed if the Wet Bulb humidity is above 80%.

    8.2.5 Use of a personnel platform (manbasket) near an energized power-line shall be done as a last resort and

    shall not to be used, unless all other options (scaffolding, manlifts, etc.) have been explored and foundunacceptable. The use of a personnel platform (manbasket) shall be considered a critical lift andrequires an approved Critical Lift Plan as per GI 7.028. Use shall be approved through PDDs

    concurrence on the work permit. (Refer to GI 7.027 and 7.028)

    8.2.6 Operation of the crane boom or personnel platform (Manbasket) over power-lines shall be approvedwith PDDs concurrence on the work permit.

    8.2.7 Electrical system protective devices that automatically re-energize the circuit after a power-line contactoccurrence shall be blocked or disengaged to inhibit this function.

    8.2.8 Load control, when required, shall utilize non-conductive taglines near energized power-lines.

    8.2.9 Non-conductive barricades shall be used during the crane lift near an energized power-line to restrictaccess to the crane work area for personnel other than lifting crew. All combustible and flammablematerials shall be removed from the vicinity of the energized power-line.

    8.2.10 No one shall be permitted to touch the crane or the load near energized power-lines, unless the Rigger-I or a competent person indicates it is safe to do so.

    8.2.11 Use of a crane to move loads near an energized power-line shall be considered as a last resort and theyshall not to be used unless all other options (forklifts, flatbed trucks, skids, etc.) have been explored and

    found unacceptable. If a crane must be used, it shall be considered a critical lift and requires anapproved Critical Lift Plan, as per GI 7.028. Use shall be approved through PDDs concurrence on thework permit. (Refer to GI 7.027 and 7.028)

    9.0 MOVING OVERSIZED EQUIPMENT

    The proponent department shall prepare a Move Plan that shall include drawings, showing the overalldimensions of the equipment mounted on the vehicle and the proposed route to be taken. If the route is to

    cross under power-lines, a PDD representative shall be included in the development and approval of theMove Plan. Clearances shall conform to those listed in paragraph 5.1.1. Prior to the move, the proponent

    department shall prepare and obtain PDDs concurrence on the Oversized Equipment Pre-Move Checklist(Attachment 2).

  • 7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf

    6/9

  • 7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf

    7/9

    SAUDI ARABIAN OIL COMPANY (Saudi Aramco)GENERAL INSTRUCTION MANUAL

    G. I. NUMBER Approved

    2.702

    ISSUING ORG.: POWER DISTRIBUTION DEPARTMENT

    ISSUE DATE

    4/1/2003REPLACES

    2/27/91

    SUBJECT : MOVING DRILLING RIGS, HIGH CLEARANCE EQUIPMENT / LOADS,OR OPERATING CRANES UNDER OR NEAR POWER-LINES

    APPROVAL

    IYKPAGE NUMBER

    7 OF 9

    *CHANGE **ADDITION NEW GENERAL INSTRUCTION COMPLETE REVISION

    Saudi Aramco 12/02

    Rig: Old Location: New Location:

    Expected Move Date: Rig Rig & Camp

    Rig Foreman/Drilling Dept.:

    ROAD INSPECTION SURVEY:

    1 Road Condition:Paved Skid (Marl) Up / Down Hill Tight Turns

    2

    No Defects

    3

    Power-line

    4 Yes No 5

    Is the road clear and safe for the move? No

    Electric Power Outage Required

    Comments:

    Inspected By:

    cc: Supt./SATD

    Supv. Rig Move Support Unit

    Supv.Rig Move & HH Unit

    PDD, Dispatcher

    Rig File

    Supv. Rig Move/SATD

    Road Map Provided: Highest Equipment

    Corrective action to be taken:

    Estimated Duration:

    Lowest Clearance

    Yes

    _____________ ______________________________________

    If no, specify what and why:

    Bridge Sign Board Highway Crossing

    Mud

    Road Obstruction:

    Prepared by:

    Under Construction

    Deep Sand

    Road Defects:

    Deep Ruts

    Rig Move Support Unit / SATD

    Attachement "1A" G.I. 2.702

    Distance: _____ KM

    Phone: Charge No.:

    RIG PRE-MOVE CHECKLIST (SAUDI ARAMCO)

    Date:________

    PDD Service DispatcherConvoy Leader/SATD

    _________Meters

    ______________

    _________Meters

    Drilling Rig ForemanWell Sites Rep.

    ____________Date: ___________________________________ ____________