SAUDI ARABIAN OIL COMPANY (Saudi Aramco)GENERAL INSTRUCTION MANUAL
G. I. NUMBER Approved
2.702
ISSUING ORG.: POWER DISTRIBUTION DEPARTMENT
ISSUE DATE
4/1/2003REPLACES
2/27/91
SUBJECT : MOVING DRILLING RIGS, HIGH CLEARANCE EQUIPMENT / LOADS,OR OPERATING CRANES UNDER OR NEAR POWER-LINES
APPROVAL
IYKPAGE NUMBER
1 OF 9
*CHANGE **ADDITION NEW GENERAL INSTRUCTION COMPLETE REVISION
CONTENT
This General Instruction (GI) outlines the requirements for moving drilling rigs, high clearance equipment and loadsunder, or operating cranes near, overhead power-lines to avoid power-line contact. The text includes:
1.0 Purpose2.0 Scope3.0 References4.0 Definitions5.0 General Requirements
6.0 Responsibilities7.0 Rig Moves8.0 Crane Operations9.0 Moving Oversized Equipment10.0 Approvals
Attachments:1A - Pre-Rig Move Checklist1B - Pre-Rig Move Checklist (Contractors)2 - Oversized Equipment Pre-Move Checklist
1.0 PURPOSE
The purpose of this GI is to protect personnel and high clearance equipment moving under, or operating near,overhead power-lines and to prevent damage to power-lines or unscheduled interruption of the power supplyduring such operations.
2.0 SCOPE
This General Instruction shall apply to all Saudi Aramco proponent departments and contractor companiesmoving high clearance equipment and loads under, or operating equipment near, power-lines, regardless of
power-line location, voltage rating, or the type of equipment involved. This GI does not apply to moving mobilecranes along roadways where overhead power-line crossing heights are posted and/or equipped with telltalesindicating safe overhead clearance.
3.0 REFERENCES
Abbreviations:
ANSI: American National Standards InstituteASME: American Society of Mechanical Engineers
GI: General Instruction
The Standards and references listed below shall apply to this G.I. It shall be the responsibility of SaudiAramco proponent organizations and contractors to be familiar with the most current version of thereferenced publications. (ASME standards are adopted by ANSI):
3.1 ASME B30.5 Mobile and Locomotive Cranes
3.2 ASME B30.23 Personnel Lifting Systems3.3 GI 2.100 Work Permit System3.4 GI 7.027 Crane Suspended Personnel Platforms (Manbasket) Operations
-
7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf
2/9
-
7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf
3/9
-
7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf
4/9
-
7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf
5/9
SAUDI ARABIAN OIL COMPANY (Saudi Aramco)GENERAL INSTRUCTION MANUAL
G. I. NUMBER Approved
2.702
ISSUING ORG.: POWER DISTRIBUTION DEPARTMENT
ISSUE DATE
4/1/2003REPLACES
2/27/91
SUBJECT : MOVING DRILLING RIGS, HIGH CLEARANCE EQUIPMENT / LOADS,OR OPERATING CRANES UNDER OR NEAR POWER-LINES
APPROVAL
IYKPAGE NUMBER
5 OF 9
*CHANGE **ADDITION NEW GENERAL INSTRUCTION COMPLETE REVISION
LINE VOLTAGE ABSOLUTE LIMIT OF APPROACH
Up to 250,000 volts 6.1 meters (20 feet)
Over 250,000 volts 7.6 meters (25 feet)
8.2.3 If the crane operation includes lifting near energized power-lines, it shall be considered a critical lift andrequires an approved Critical Lift Plan as per GI 7.028. The Critical Lift Plan shall be prepared by aRigger-I or rigging competent person with PDD participation and co-signed by the facility proponentdepartment and PDD.
8.2.4 Crane lifts near energized power-lines shall not be performed in wind speeds exceeding 32 km/h (20mph 17.4 knots), unless otherwise specified by the crane manufacturer. No crane lift shall be
performed if the Wet Bulb humidity is above 80%.
8.2.5 Use of a personnel platform (manbasket) near an energized power-line shall be done as a last resort and
shall not to be used, unless all other options (scaffolding, manlifts, etc.) have been explored and foundunacceptable. The use of a personnel platform (manbasket) shall be considered a critical lift andrequires an approved Critical Lift Plan as per GI 7.028. Use shall be approved through PDDs
concurrence on the work permit. (Refer to GI 7.027 and 7.028)
8.2.6 Operation of the crane boom or personnel platform (Manbasket) over power-lines shall be approvedwith PDDs concurrence on the work permit.
8.2.7 Electrical system protective devices that automatically re-energize the circuit after a power-line contactoccurrence shall be blocked or disengaged to inhibit this function.
8.2.8 Load control, when required, shall utilize non-conductive taglines near energized power-lines.
8.2.9 Non-conductive barricades shall be used during the crane lift near an energized power-line to restrictaccess to the crane work area for personnel other than lifting crew. All combustible and flammablematerials shall be removed from the vicinity of the energized power-line.
8.2.10 No one shall be permitted to touch the crane or the load near energized power-lines, unless the Rigger-I or a competent person indicates it is safe to do so.
8.2.11 Use of a crane to move loads near an energized power-line shall be considered as a last resort and theyshall not to be used unless all other options (forklifts, flatbed trucks, skids, etc.) have been explored and
found unacceptable. If a crane must be used, it shall be considered a critical lift and requires anapproved Critical Lift Plan, as per GI 7.028. Use shall be approved through PDDs concurrence on thework permit. (Refer to GI 7.027 and 7.028)
9.0 MOVING OVERSIZED EQUIPMENT
The proponent department shall prepare a Move Plan that shall include drawings, showing the overalldimensions of the equipment mounted on the vehicle and the proposed route to be taken. If the route is to
cross under power-lines, a PDD representative shall be included in the development and approval of theMove Plan. Clearances shall conform to those listed in paragraph 5.1.1. Prior to the move, the proponent
department shall prepare and obtain PDDs concurrence on the Oversized Equipment Pre-Move Checklist(Attachment 2).
-
7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf
6/9
-
7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf
7/9
SAUDI ARABIAN OIL COMPANY (Saudi Aramco)GENERAL INSTRUCTION MANUAL
G. I. NUMBER Approved
2.702
ISSUING ORG.: POWER DISTRIBUTION DEPARTMENT
ISSUE DATE
4/1/2003REPLACES
2/27/91
SUBJECT : MOVING DRILLING RIGS, HIGH CLEARANCE EQUIPMENT / LOADS,OR OPERATING CRANES UNDER OR NEAR POWER-LINES
APPROVAL
IYKPAGE NUMBER
7 OF 9
*CHANGE **ADDITION NEW GENERAL INSTRUCTION COMPLETE REVISION
Saudi Aramco 12/02
Rig: Old Location: New Location:
Expected Move Date: Rig Rig & Camp
Rig Foreman/Drilling Dept.:
ROAD INSPECTION SURVEY:
1 Road Condition:Paved Skid (Marl) Up / Down Hill Tight Turns
2
No Defects
3
Power-line
4 Yes No 5
Is the road clear and safe for the move? No
Electric Power Outage Required
Comments:
Inspected By:
cc: Supt./SATD
Supv. Rig Move Support Unit
Supv.Rig Move & HH Unit
PDD, Dispatcher
Rig File
Supv. Rig Move/SATD
Road Map Provided: Highest Equipment
Corrective action to be taken:
Estimated Duration:
Lowest Clearance
Yes
_____________ ______________________________________
If no, specify what and why:
Bridge Sign Board Highway Crossing
Mud
Road Obstruction:
Prepared by:
Under Construction
Deep Sand
Road Defects:
Deep Ruts
Rig Move Support Unit / SATD
Attachement "1A" G.I. 2.702
Distance: _____ KM
Phone: Charge No.:
RIG PRE-MOVE CHECKLIST (SAUDI ARAMCO)
Date:________
PDD Service DispatcherConvoy Leader/SATD
_________Meters
______________
_________Meters
Drilling Rig ForemanWell Sites Rep.
____________Date: ___________________________________ ____________
-
7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf
8/9
-
7/25/2019 0002_702 Operating Cranes under_near Powerlines_4.1.2003.pdf
9/9