To the Chief Executive Officer This is an application for [select onl y one option] This applition is for the catego/categories of prescribed pmises [Refer to DER's Guidance Statement: Licensing and wos val pcess for fuher information on aivities which will be subject to works approvalnicensing. INSTRUCTIONS 0 Works approval 0 Works approval including clearing of native vegetation (Clearing Permit) 0 Concurrent works approval and licence or registration 0 Licence Registration number:[ Works approval number: [ Renewal Licence number: [L8101/2004/3] 0 Amendment Licence or works approval number: [ 0 Registration (works approval already obtained) Works approval number:[ ] 0 Application for a clearing permit already submitted Clearing permit application number: [ ] Single catego of prescribed premises (specify category number): [23] 0 Multiple categories of prescribed premises (specify category numbers): [ ] 0 All activities on the premises within category of prescribed premises of Schedule 1 to the Environmental Protection Regulations 1987 have been specified above (tick if Yes) The applicaon fo must completed wi all infoaon ached. This fo is a sto uiment under secon 6(1 )(a} for wos appl applications, section 57(1 }(a) for licence applicaons, and gulation 58 of e vinmenl Pton Rulaons 1987for regison. an application fo has en submid which is incple or materially incoct, e CEO will decline to deal with e application under e EP Act and advise e Applicant accoingly. Inscons set out in is guideline to cp e applicaon fo a genel In na. A fence to 'you' In these Instructions is a nce to e Applicant. Wos approval only applies for new wos appvals. For wos approvals for existing pmises, plse select 'Amendment'. Concurnt applicaons for works appl and licence (or gisttions) are encouged. This means a single application is submid. Applicanʦ sking fuher lnfoatlon lang to uimenʦ under e EP Act a commended to view e Act through e Ste w Publisher ( w .slp.wa.gov.au) F premises whe acvities ll wiin mo an one go of prescribed premises, ALL categories must licensed and Idened. This applies r exisng liceed pmises sking mnewal or amendment, as well as new licens premises. Guideline and application form for applications (March 2016 V 3) 1

Transcript of 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design...

Page 1: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

To the Chief Executive Officer

This is an application for [select only one option]

This application is for the category/categories of prescribed premises

[Refer to DER's Guidance Statement: Licensing and works approval process for further information on activities which will be subject to works approvalnicensing.

INSTRUCTIONS

0 Works approval

0 Works approval including clearing of native vegetation (Clearing Permit)

0 Concurrent works approval and licence or registration

0 Licence

Registration number:[

Works approval number: [

IZI Renewal Licence number: [L8101/2004/3]

0 Amendment Licence or works approval number: [

0 Registration (works approval already obtained) Works approval number:[ ]

0 Application for a clearing permit already submitted Clearing permit application number: [ ]

1Zl Single category of prescribed premises (specify category number): [23]

0 Multiple categories of prescribed premises (specify category numbers): [ ]

0 All activities on the premises within category of prescribed premises of Schedule 1 to the Environmental Protection Regulations 1987 have been specified above (tick if Yes)

• The application fonn must be completed with all infonnation attached. This fonn is a statutory requirement under section 54(1 )(a} for works approval applications, section 57(1 }(a) for licence applications, and regulation 58 of the Environmental Protection Regulations 1987for registration.

• If an application fonn has been submitted which is incomplete or materially incorrect, the CEO will decline to deal with the application under the EP Act and advise the Applicant accordingly.

• The Instructions set out in this guideline to complete the application fonn are general In nature.

• A reference to 'you' In these Instructions is a reference to the Applicant.

• Works approval only applies for new works approvals. For works approvals for existing premises, please select 'Amendment'.

• Concurrent applications for works approval and licence (or registrations) are encouraged. This means a single application is submitted.

• Applicants seeking further lnfonnatlon relating to requirements under the EP Act are recommended to review the Act through the State Law Publisher (www.slp.wa.gov.au)

• For premises where activities fall within more than one category of prescribed premises, ALL categories must be licensed and Identified. This applies for existing licensed premises seeking mnewal or amendment, as well as new licensed premises.

Guideline and application form for applications (March 2016 V 3) 1

Page 2: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

COMPLETION MATRIX The matrix below explains what sections are required to be completed for differe nt types of appl ications.

Application Form Section New Application/ Renewal Amendment Registration

Part 1 Applicant details- section 1.1 • • •

Part 1 section 1.2 onwards • N/A 11

Part 2 Premises • N/A 11

Part 3 Proposed Activities • N/A 11

Part 4 Other Approvals • N/A 11

Part 5 Fit and competent operator • N/A N/A

Part 6 Public health and environmental • N/A 11 risks

Part 7 Siting and location • N/A N/A

Part 8 - not in use

Part 9 Submission of any other relevant • If required . If required. information

Part 10 Proposed fee calculation • • N/A

Part 11 Submission of application • • •

Acknowledgement and signature • • •

Attachment 1A: Proof of Applicant status • N/A N/A

Attachment 1 8: ASIC Company Extract • N/A N/A

Attachment 2: Map for proposed premises • N/A 11

Attachment 3A: Proposed activities • N/A 11

Attachment 38: Map for proposed area to • N/A N/A be cleared (only applicable if clearing is proposed)

Attachment 4: Other approvals • N/A 11

Attachment 5: Fit and competent operator • N/A N/A

Attachment 6: Public health and • N/A l:l environment risks

Attachment 7: Siting and location • N/A fj,

Attachment 9: Other relevant information If required. N/A If required.

Attachment 10: Proposed fee calculation • N/A N/A

Attachment 11: Request for exemption If required. N/A If required. from publication

Key: • Must be submitted

To the extent changed/required in relation to the amendment N/A Not required with application, but may be requested subsequently depending on DER records

"If requlmrt" are sections for · " , .... to determine.

Guideline and application form for applications (March 2016 V3) 2

Page 3: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

Part 1. Applicant details

1.1 Applicant name lnghams Enterprises Pty Limited (full legal name}

ACN (if applicable} 008 447 345

1.2 Directors details (if applicant is a small proprietary company}

1.3 Registered business address (Registered with ASIC}

1.4 Address for correspondence

1.5 Contact person details Name Mark Low

Position Feedmill Manager

Telephone

Email

1.6 Authorised representative Name (if any)

Telephone

Email

1.7 Applicanfs representative Name

(if any} Telephone

Email

1.8 Occupier status Registered proprietor on certificate of title IZI

[One of the options must be Lease holder (please specify} D

selected and if you have Public authority that has care, control or management of the land D been asked to specify,

please provide details] Other {please specify - for example, joint venture operating entity or contractor. Note contractual arrangements will need to be provided to evidence land owner's consent to occupancy arrangements. If D contractual arrangements are not finalised, reason why occupancy consent will be granted will need to be provided.)

Proof of occupier status

1.9 [Instructions set out in Attachment 1A completed D Attachment 1A]

ASIC Company Extract

1.1 0 [Instructions set out in Attachment 1 B completed D Attachment 1 B)

Guideline and application form for applications (March 2016 V3) 3

Page 4: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

INSTRUCTIONS

• Your full legal name must be inserted. Business names are not accepted. If a small proprietary company, the Directors' full names must also be provided.

• A proprietary Is defined by ASIC as small for a financial year If It satisfies at least two of the following paragraphs:

the consolidated revenue for the financial year of the company and any entities it controls is Jess than $25 million

the value of the consolidated gross assets at the end of the financial year of the company and any entitles it controls is less than $12.5 million, and

the company and any entities it controls have fewer than 50 employees at the end of the financial year.

• The address for correspondence can be the same as the registered business address.

• Details for a contact person must be provided (where you are an individual, you would be the contact person).

• Details for any authorised representatives must be provided (e.g. consultant) but only If you authorise that person to represent you and that person can be contacted by the Department in relation to your application.

• Details of the occupation of the premises must be provided. One of the options must be selected and if you have been asked to specify, please provide details. For example, if 'lease holder' has been selected, please specify the type of lease-e.g. pastoral lease, mining lease, general lease.

• You must provide proof of ownership In Attachment 1.1nstructlons are set out in Attachment 1.

Part 2. Premises

2.1 Premises legal description (whole or part to be specified)

[Land description: volume and folio number, lot or location number(s), Crown lease or reserve number, pastoral lease number or mining tenement number of all properties, as shown on title details registered with Landgate]

2.2 Local government authority area

[City, Town or Shire]

2.3 GIS coordinates

[GIS coordinates must be provided where cadastre are not used as the premises boundary]

2.4 An aerial photograph and map of premises

Attachment 2 completed [Instructions set out in Attachment 2]

Guideline and application form for applications (March 2016 V3)

D

4

Page 5: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

Part 3. Proposed activities (including clearing)

3. 1 Description/overview

[Instructions set out below Attachment 3A completed D and in Attachment 3A]

3.2 Estimated operating period (based on estimated infrastructure life)

3.3 Proposed date for commencement of works

3.4 Expected production

3.5 Design capacity

3.6 Throughput (in addition to 3.4 or 3.5)

3.7 Proposed clearing area (hectares and/or number of trees) - only required if application includes clearing I

3.8 Proposed method of clearing (if applicable)

3.9 Period within which clearing is proposed to be undertaken (e.g. May 2 015- June 2 015) (if applicable)

3.10 Map of area proposed to be cleared (if applicable)

Attachment 38 completed D [Instructions set out in Attachment 3B]

INSTRUCTIONS

• You must provide the scope, size and scale of all prescribed activities of Schedule 1 to the Environmental Protection Regulations 1987 including the maximum design capacity and the expected production capacity.

• You must identify emission discharge points.

• You must also provide infonnation on any other activity undertaken on the Premises if activity poses a risk to public health or the environment

• You only need to provide infonnation on the processes or operations of prescribed activities if they are unique or non-industry standard processes or operations. Instructions are set out In Attachment 3A.

• If you are applying for a clearing penn it you must provide the period within which clearing is proposed to be undertaken (e.g. May 2015 - June 2015) and a description of the method by which it will be undertaken.

4.1

4.2

4.3

4.4

4.5

4.6

4.7

Is the proposal a Major Resource Project (formerly known as a State Development Project)? D

Major Resource Projects include mining and petroleum activities or infrastructure projects which support mining and petroleum activities.

Has the proposal been referred to the Environmental Protection Authority?

Is the proposal subject to any Ministerial conditions under the Environmental Protection Act 1 986?

Has the proposal been referred or assessed under the Environment Protection and Biodiversity Conservation Act 1999 (Commonwealth)?

Has the proposal obtained all relevant planning approvals?

Has the proposal obtained all other necessary statutory approvals?

Has consultation been undertaken with parties considered to have a direct interest in the proposal?

D D

D D

D D

D D

D D

D D

Guideline and application form for applications (March 2016 V3)

D

D

D

D

D

D

D

5

Page 6: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

4.8 Other Approvals

[Instructions set out in Attachment 4]

Part 5. Fit and competent operator

Attachment 4 completed

Note: Under this section, DER will undertake an Internal due diligence of the applicant's fitness and competency based on DER's compllance records.

D

If you wish to provide additional information for DER to consider in making this assessment, you may provide that information in Attachment 11 (where it will not be published except where an application has been made, and only In accordance with, the Freedom of Information Act 1992).

No Yes

5. 1 Has the applicant held or been part of a small proprietary company that has held a previous licence or works approvals?

D D If yes, specify name of company and/or licence or works approval instrument number in Attachment 5.

5.2 If Yes to 5.1 or where the applicant wishes to provide additional information for DER's consideration, Attachment 5 completed.

Note: For an applicant that is a small proprietary company, each director must complete this section D as an individual, and include their previous history as directors of other small propriety companies.

Part 6. Public health and environmental risks

No Yes

6.1 Is there an emission to air from the activities that poses a risk to public health or the D D environment?

(includes emissions from stacks, chimneys, baghouses, blow offs, dust, noise and odour emissions)

6.2 Is there an emission to surface water from the activities that poses a risk to public health D D or the environment?

(includes end of pipe or outfall emissions to river, lakes, estuary or seas and pollution from containment overflow)

6.3 Is there an emission to land from the activities that pose a risk to public health or the D D environment?

(includes point source emissions to groundwater including direct aquifer reinjection or deep well injection, as well as emissions to land through irrigation and infiltration and seepage pits.

6.4 Is there a risk of other Incidents arising from the activities that pose a risk to public health D D or the environment?

(includes risk of a pollution incident or unplanned event related to hazardous materials or dangerous goods stored, used or handled)

6.5 Is there waste accepted, stored or recycled on the premises? D D

Waste type must be described with reference to Landfill Waste Classification and Waste Definitions 1996 (as amended December 2009) or the Environmental Protection (Controlled Waste) Regulations 2004. Detail must be provided on storage type (e.g. hardstand, containment infrastructure), capacity and containment features (lining, bunding).

6.6 Public health and environmental risks

Attachment 6 completed D [Instructions set out in Attachment 6]

Guideline and application form for applications (March 2016 V3) 6

Page 7: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

INSTRUCTIONS

• You must provide detail on source (e.g. kiln stack), contam inants (e.g. particulates) and quantity (mglm3) of the emission. Instructions are set out in Attachment 6.

• All material sources of emissions where there Is a risk to pub l ic health or the environment, and for which there Is a receptor must be Identified. This includes where you may consider this to be a low risk.

• The risk to public health or the environment and proposed controls are to be specified.

Part 7. S iting and location

7.1 Are there sensitive receptors located within specified separation distances from the premises?

No Yes

0 0

In considering sensitive receptors and separation distances refer to DER's Guidance Statement: Separation Distances.

7.2 Are the premises located within or adjacent to any Specified Ecosystems such as wetlands, surface water, groundwater or terrestrial areas?

In considering Specified Ecosystems refer to DER's Guidance Statement: Environmental Siting.

7.3 Siting and Location

[Instructions set out in Attachment 7}

Attachment 7 completed

Specified Ecosystems are defined in DER's Guidance Statement: Separation Distances.

Part 8. Assessment Framework- DO NOT COMPLETE: THIS SECTION NOT ACTIVE

8 1

8.2 All e ning assessments requi t:; und 1 r ,uidance Statement: Assessment Framewo and underpinning emission guidelines com lete 1.

8.3

8.5

[I ut in Attachment co 1pleted

Part 9. Submission of any other relevant information

9 Additional information Attachment 9 completed submitted

Supplementary documentation submitted

List title of supplementary document/s in Attachment 9

Part 10. Proposed fee calculation

1 0.1 All information and data used for the calculation of proposed fees provided.

D

D

No es

No Yes

0 0

0 0

Detail of costs of works must include site works (e.g. levelling and drainage), construction works, plant and equipment hire and labour.

Guideline and application form for applications (March 2016 V3) 7

Page 8: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

1 0.2 Fee details

[Instructions set out in Attachment 1 0]

Attachment 10 completed

INSTRUCTIONS

Fee calculators are available online to assist In completing this section.

• Licence fee calculator: www.der.wa.gov.au/LicenceFeeCalculator.

• Works approval fee calculator: www.der.wa.gov.au/WorksapprovaiFeeCalculator.

Part 11. Submission of application

All information considered exempt from public disclosure has been separately placed in Attachment 11. Grounds for claiming exemption in accordance with Schedule 1 to the Freedom of Information Act 1992 must be specified.

A full electronic copy has been submitted via:

[email protected]

A full hard copy has been sent to:

APPLICATION SUBMISSIONS Department of Environment Regulation Locked Bag 33 Cloisters Square PERTH WA 6850

Acknowledgement and signature

I,

Mlt/Vl.. (name)

LOw Ff:.L..rtJ ""' ' Ll fv1 A-N� ell (position)

I confirm I am authorised on behalf of the applicant to submit this application.

D

I confirm that the information contained in this application is true and correct and I acknowledge that knowingly providing information which is false or misleading in a material particular commits an offence under section 112 of the Environmental Protection Act 1986 and may incur a penalty of up to $5 0, 000.

I acknowledge that this application (excluding Attachment 11) is a public document and may be published. I confirm that information considered exempt from public disclosure has been placed in Attachment 11 with reasons as to why the information should be exempt in accordance with the grounds specified In Schedule 1 to the Freedom of Information Act 1992.

I acknowledge that subsequent information provided in relation to this application will be a public document and may be publish unless written notice has been given to the Department of Environment Regulation by the applicant, at the time the information is provided, claiming that the information is considered exempt from public disclosure.

I acknowledge that the decision to not publish information will be at the discretion of the Department of Environment Regulation and will be made consistently with the provisions of the Freedom of Information Act 1992.

Date

(Signature)

Guideline and application form for applications (March 2016 V3) 8

Page 9: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

ATTACHMENT CHECKLIST

y th t h "ded II f th tt h • •

Attachment 1A: Proof of Applicant status

"fi d b I

You must provide copies of certificate of title, lease or other instruments evincing proof of occupier status.

Attachment 1 B: ASIC Company Extract

You must provide a company extract (showing current company information only) from ASIC.

Attachment 2: Map for proposed premises

You must provide an aerial photograph of sufficient scale showing the proposed premises.

You must also provide a map of the proposed premises, identifying:

(a) layout of key infrastructure and buildings, clearly labelled; and

(b) lot boundaries,

No Yes

0 0

No Yes

0 0

with a north arrow, clearly marking the area in which the activities are carried out and of reasonable clarity and visible scale.

Attachment 3A: Proposed activities

You must provide details of proposed activities, identifying:

(a) scope, size and scale, including details as to frequency, production and design capacity;

(b) key infrastructure and equipment;

(c) unique or non-industry standard processes or operations; and

(d) emissions discharge points.

Attachment 38: Map for proposed area to be cleared (only applicable i f clearing is proposed)

No Yes

0 0

No Yes

0 0

You must provide an aerial photograph or map of sufficient scale showing the proposed clearing area and premises boundary or

if you have facilities a digital map on CDROM of the area to clear as an ESRI shapefile with the following properties:

•Geometry type : polygon shape

•Coordinate system: GDA 1994 (Geographic latitude/longitude}

Datum: GDA 1994 (Geocentric Datum of Australia 1994)

Attachment 4: Other approvals

No

0

Yes

0

You must provide details of other approvals specified in section 4 of this application, including copies of relevant decisions and any consultation undertaken with interested parties.

No Yes

0 0

Guideline and application form for applications (March 2016 V3) 9

Page 10: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

Attachment 5: Fit and competent operator

You must specify name of the small proprietary company/companies that you have been involved in that have previously held a licence or works approval instrument, or provide the licence or works approval instrument number.

Attachment 6: Publ ic health and environment risks

No Yes

0 0

You must provide details of public health and environment risk (including risks you have assessed as low), identifying:

(a) Source of emissions, Specific emissions, Receptors and proximity and Proposed controls. Providing details of specific emission quantities may not be relevant for some emissions such as odour, noise and dust or emissions arising from incidents or unplanned events.

(b) Waste type (including waste generated onsite), quantity, storage and location of waste which relate to activities that fall within the category of prescribed premises in Schedule 1 to the Environmental Protection Regulations 1987.

Set out below is a suggested format for specifying waste types.

Waste Type Quantity Storage Location

You must provide a map showing siting and location of the premises to a 5km radius including identification of distances to sensitive receptors. Calculation of distance should be made in accordance with the Guidance Statement: Environmental Siting and the Guidance Statement Separation Distances.

Should the premises be in locations identified through Guidance Statement: Environmental Siting, further information including depth to groundwater, water quality and beneficial uses must be provided.

Applicants seeking to submit further information may include information in Attachment 9.

Where supplementary documentation is submitted, please specify name of documents below.

Attachment 10: Proposed fee cal c u lation

In the form provided: see following Attachment.

Attachment 11: Request for exemption from publ ication

In the form provided: see following Attachment

Guideline and application form for applications (March 2016 V3)

No Yes

0 0

No Yes

0 0

No Yes

0

No Yes

0 0

10

Page 11: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

Attachment 10: Proposed fee calculation

Summary of proposed fees

Proposed works approval fee (see Schedule 3 of the Environmental Protection Regulations 1987)

Fee component Proposed fee

Cost of works: $ $

Proposed licence fee (see Schedule 4 of the Environmental Protection Regulations 1987)

Part 1 Component

Part 2 Component

Part 3 Component

Total proposed licence fees: I $

Note: (1) DER has fee calculators available on its website: -Licence: www.der.wa.qov.au/licenceFeeCalculator; and -Works approval: www.der.wa.gov.auMiorksA�:mrovaiFeeCalculator.

(2) Different Fee Units apply for different fee components. Fee Units may also have different amounts depending on the period in which the calculation is made.

Detailed breakdown of proposed licence fees

Premises component

Proposed licence fee: Part 1 Premises (see Part 1 of Schedule 4 of the Environmental Protection Regulations 1987)

Premises: f+ f'JI rvl A-L Pf:-�J) M kfV V , ':. A (TI.) IV N�

Sub total bg'S'-f·rl $

Discharges to air, onto land, into waters

Proposed licence fee: Part 3 Discharges to air (see Part 3 of Schedule 4 of the Environmental Protection Regulations 1987)

Discharges to air Discharge

Discharges to air Discharge

quantity quantity

Carbon monoxide :2..· 7b9 Nickel

Oxides of nitrogen 1·29.7 Vanadium

Sulphur oxides 0 ·03-b Zinc

Particulates (PM1o and PM2.s) () ·2.4-IJ. Vinyl chloride

Volatile organic compounds 0 ·1�/ Hydrogen sulphide

Inorganic fluoride Benzene carbon oxysulphide

Aluminium Carbon disulphide

Arsenic Acrylates

Chromium Beryllium

Cobalt Cadmium

Copper Mercury

Lead TDI (toluene-2, 4-di-iso-cyanate)

Manganese MDI (diphenyl-methane di-iso-cyanate)

Molybdenum Other waste

Subtotal /f7· )� $ j)· Guideline and application form for applications (March 2016 V3) 11

Page 12: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Industry Licensing System - Department of Environment Regulation

Government of Western Australia Department o1 Environment RegulaUon

Fee start date

fees calculator 06/07/2016

Application Page 3 of 5

Licence Fees

Page 1 of 1

If you are applying for a licence or submitting your annual licence fee information you must provide the following details in accordance with the Environmental Protection Regulations 1987. puidance on calculating licence fees is available on the OER website.

ft'tll supporting information, workings, calculations and assumptions made in the fee calculations should be attached on Application Page 4. DER officers may reject fee applications or request resubmissions if information is missing or incomplete, for example, if some of the prescribed waste components have not been appropriately considered. It is the applicant's or

icensees responsibility to ensure that their fee application is appropriate and complete. Rejected applications and resubmission requests could delay your application and may incur penalty

ees

Premises f ......... ........ .. .................... ... ......... ; ........ ................................ , .. ... Premises Component(s)

Category

23 - Animal feed manufacturing

Selection required

Total Premises Component(s)

Part 2Waste

Waste Type

004 - No Emissions Incur a Fee

Selection required

Total Waste Component(s):

Part3Waste Discharges to Air:

Wasle Type

111 - C�ttbon Monoxide

121- Oxides of Nitrogen

123 - Particulates

131 - Volatile Organic Compounds (VOC)

122 - Sulphur Oxides

Selection required

Total Air Component(s):

�lscharges to Water: Wasle Type

003- No Emissions Incur a Fee

Selection requored

Total Water Component(s):

Discharges to Land:

Waste Type

002 - No Emissions Incur a Fee

Selection required

Total land Component(s):

otal Fee

Total Licence Fee

Capacity Range

More than 1 00 000 tonnes per year

Select category first

$6854.58

Amount

Not applicable

Select waste type first

$0.00

Localion I Qualifier

Anywhere In Western Australia

SWan Coastal Plain or Metropolitan Region

Swan Coaslal Plain or Metropolilan Region

SWan Coaslal Plain or Metropolitan Region

SWan Coastal Plain or Metropolitan Region

Select waste lype first

$157.53

Location I Qualifier

Not applicable

Select wasle type first

$0.00

Location I Qualifier

Not applicable

Select waste type first

$0.00

$7012.11

Back 1 Exit 1 Continue 1

(C) Copyright 2007 Deparbnent of Environment Regulation

Units

g/min

glmin

glmin

g/min

g/min

Units

kg/day

Units

kg/day

https://ils.der.wa.gov.au/#FeesExampleL

Discharge

2.769

3.287

0.244

0.181

0.036

Discharge

0

Discharge

0

Fee

$6854.58

Fee

$0.00

Fee

$0.00

$157.53

$0.00

$0.00

$0.00

Fee

$0.00

Fee

$0.00

� � � � �

Add'

� Add]

� Add I

8/06/2016

Page 13: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

Proposed licence fee: Part 3 Discharges onto land or into waters (see Part 3 of Schedule 4 of the Environmental Protection Regulations 1987)

Discharges onto land or into waters Discharge quantity

1. Liquid waste that can potentially deprive (a) biochemical oxygen demand (in receiving waters of oxygen (for each kilogram the absence of chemical oxygen fV I L discharged per day) - demand limit)

(b) chemical oxygen demand (in the absence of total organic carbon MI.-limit)

(c) total organic carbon Nil-

2. Biostimulants (for each kilogram discharged (a) phosphorus NIL per day)-

(b) total nitrogen «1L

3. Liquid waste that physically alters the (a) total suspended solids (for each characteristics of naturally occurring waters- kilogram discharged per day) NIL-

(b) surfactants (for each kilogram NIL discharged per day)

(c) colour alteration (for each platinum cobalt unit of colour above the (VI/_ ambient colour of the waters in each megalitre discharged per day)

{d) temperature alteration (for each 1"C above the ambient temperature of the waters in each f-Ill.-megalitre discharged per day) -

(i) in the sea south of the Tropic of Capricorn

(ii) in other waters

4. Waste that can potentially accumulate in the (a) aluminium, arsenic, cadmium, environment or living tissue (for each kilogram chromium, cobalt, copper, lead, /'fiL discharged per day) - mercury, molybdenum, nickel,

vanadium and zinc

(b) pesticides /.II L

(c) fish tainting wastes f\[tl.-

(d) manganese NIL-

5. E coli bacteria as indicator species (in each (a) 1 000 to 5 000 organisms per 100 megalitre discharged per day) - ml ji/IL.-

(b) 5 000 to 20 000 organisms per 1 00ml NtL

(c) more than 20 000 organisms per ,'VI L 100ml

6. Other waste {per kilogram discharged per (a) oil and grease WI I.-day)-

(b) total dissolved solids N I L

(c) fluoride f'.{ll..-

(d) iron NIL

(e) total residual chlorine f\{(1.-

(f) other fi'IL---

Subtotal $

Guideline and application form for applications (March 2016 V3) 12

Page 14: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

Information and data used to calculate proposed fees

The detailed calculations of fee components, including all Information and data used for the calculations are provided in the specified annexures to this application.

Proposed fee for works approval Annexure No

Details for cost of works

Proposed fee for licence Annexure No

Part 1: Premises b85'+. s-g Part 2: Waste types I 1�7. f� Part 3: Discharges to air, onto land, into waters 0 '()�

Prescribed fee for clearing pennit (only required If clearing deviates or extends from that proposed in works approval or licence application)

Please indicate the clearing permit application fee

Area Permit:

D $50 for an area of less than one hectare

D $100 for an area between one hectare and 10 hectares

D $200 for an area of more than 1 0 hectares

Purpose Permit:

D A $200 fee is required for all purpose permit applications

Guideline and application form for applications (March 2016 V3) 13

Page 15: 0 IZI 1Zl - der.wa.gov.au · and folio number, lot or location number(s), Crown ... 3.5 Design capacity 3 ... D D D D D D D D D D D D

Department of Environment Regulation

Attachment 11: Request for exemption from publication

Information which you consider should not be published on the grounds for claiming exemption in accordance with Schedule 1 to the Freedom of Information Act 1992 must be specified in this Attachment.

NOT FOR PUBLICATION IF GROUNDS FOR EXEMPTION ARE DETERMINED