0 500 1,000 Meters Legend - Forestry and Land Scotland · 2019. 8. 7. · - remove LP as a...
Transcript of 0 500 1,000 Meters Legend - Forestry and Land Scotland · 2019. 8. 7. · - remove LP as a...
±0 1,000500 Meters
This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office, Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Forestry Commission PGA 100025498 - 2012.
Infected pine regeneration- carry out cleaning to reduce effect of DMB on pine regeneration
Tay Forest DistrictTentsmuir Forest PlanAnalysis and Concept Map (map 3)Scale (A3): 1:25,000Date: February 2012
Pine stands suffering from DNB- change thinning regime to remove 50% of infected crop - continue to monitor the progress sign of the disease- look for alternative species for restocking- remove LP as a component
Morton Lochs area- leased from FCS by SNH
Extensive waymarked trail networklinking key areas of the forest- review in next 5 years- improve visitor zones during thinning programme
Wet areas not suitable for commercial crop- manage the natural regeneration,include in CCF
Beech regeneration spreading into the forest- carry out a programme of control to check further spread
Invasive rhododendron- eradicate rhododendron from this area and prevent its spread to other forest areas
Busy forest barrier- improve approach to forest barrier to increasethroughput on busy days- review operation of barrier equipement
Informal routes and paths under increasing pressure-lidentify and improve most used links
Forest car park/HUB- develope existing facilities to improvequality of visitor experience- look at alternative areas for car parking- scope out potential for bussiness consessions in car park
Existing forest cover and naturalregeneration on the coastal strip- maintain and enhance mobile dunesby progressive removal of regeneration- further dune restoration to be considered in the future - begin a longterm commitment to remove invasive buckthorn from dunes
Ice house- programme regular maintenance to stabilise structure and preserve long term- continue to manage USAM and SAM as RER
Pedestrian access from Tayport- improve entrance access route to forest in conjunction with key partners
Forest drains form - key part of neighbours drainage systems- continue a programme of drain maintenance- remove crop from drain edges durring thinning to allow better access
Poor quality and low productionof Sitka spruce component- remove Sitka spruce as part of ongoing thinning- continue to clean Sitka spruce regeneration as this arises
!. Car park
Legend
Road segmentsStands infected by DNB
Management area