2012 LoA Verification Plan & Status
Contractor Director Planned Dates Status
1. Attila Dogan (ADS) OND 24th to 31st Mar completed
2 Vanguard (VRSS) UWD 21st to 28th Apr completed
3 GS Eng & Constr GD 05th to 12th May completed
4 Shaher United UID 19th to 26th May completed
5 United Gulf (UGER) UWD 09th to 16th Jun completed
6 Dar Al Sahra UWD 23rd to 27th Jun Starting
7 Arabian Industries OSD 14th to 21st Jul As planned
8 WGCC OSD 25th Aug to 1st Sep As planned
9 Bauer Nimr OSD 08th to 15th Sep As Planned
10 Shivani UWD 22nd to29th Sep As Planned
![Page 2: 0 2012 LoA Verification Plan & Status ContractorDirectorPlanned DatesStatus 1.Attila Dogan (ADS) OND24 th to 31 st Marcompleted 2Vanguard (VRSS) UWD21.](https://reader036.fdocuments.in/reader036/viewer/2022082506/5697c02f1a28abf838cda5e8/html5/thumbnails/2.jpg)
2
2012 LoA: Mid year Findings Analysis
HEMP
LSR
Road
Sfty
Inc
mng
tSta
ff
Perf r
pt
Sub-c
ont
Asset
int
Health Env
0
1
2
3
4
5
6
7
8
9
10
ADS
VRSS
GS Eng
Shaher
UGER
Series6
Series7
Series8
LOA Element
Sco
re
AREAS OF LOW EBS
![Page 3: 0 2012 LoA Verification Plan & Status ContractorDirectorPlanned DatesStatus 1.Attila Dogan (ADS) OND24 th to 31 st Marcompleted 2Vanguard (VRSS) UWD21.](https://reader036.fdocuments.in/reader036/viewer/2022082506/5697c02f1a28abf838cda5e8/html5/thumbnails/3.jpg)
3
2012 LoA: Mid year Findings Analysis
ISSUE REMARKS
Sub contractor Management Poor prequalification and monitoring. (Of understanding - once approved by PDO, no need to prequalify)
Competence Assessment & Assurance Expectations here are not clear with contractors
Identifying & Assessing HSE critical Positions Meaning of HSE critical positions is not clear with contractors
Compliance to training Matrix Updating and implementing action plans to close gaps
Compliance with FTW as per SP 1230 Term FTW & expectations - not very clear to contractor
Mixing terms of HEMP and updating Mixing of terminologies, poor coverage of applicable hazard, underrating risks
Waste management Wrong application of consignment notes and waste not segregated at source
EMERGED COMMON AREAS OF CONCERN WITH CONTRACTORS
![Page 4: 0 2012 LoA Verification Plan & Status ContractorDirectorPlanned DatesStatus 1.Attila Dogan (ADS) OND24 th to 31 st Marcompleted 2Vanguard (VRSS) UWD21.](https://reader036.fdocuments.in/reader036/viewer/2022082506/5697c02f1a28abf838cda5e8/html5/thumbnails/4.jpg)
4
2012 LoA: Mid year Findings Analysis
ISSUE REMARKS
HSE Controls for non-self supervising contractors (mode2&3?) need to be clarified
Current HSE controls are mainly geared for Self managing contractors
Small but High/Medium HSE risk contracts may not be audited during their lifecycle with PDO.
Some found not to have been audited at all since engagement
Checking of Omanisation percentage In some contracts Omanis are not very visible
Harweel Area Emergency Planning may not meet expectations.
Escape routes first leads towards Harweel station. Contractor staff are not provided with Extra BA as provided to PDO staff
On extension the extended contracts continue with the use of old documents. Same Terms and Conditions.
C09 requires application of updated documents.
FTW for PDO staff – is it done??
PDO LEARNED LESSONS