· Web viewThe position of the proposed pile will be set out by survey team in accordance with...
Transcript of · Web viewThe position of the proposed pile will be set out by survey team in accordance with...
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
FACULTY OF ENGINEERING
UNIVERSITY OF RUHUNA
INDUSTRIAL TRAINING REPORT SUBMITTED IN PARTIAL FULFILMENT OF THE DEGREE OF BACHELOR OF SCIENCE IN ENGINEERING
15th November 2010
ABC consultants pvt ltd
(From 26th January 2015 to 24th April 2015)
RANASINGHE A.B.C. (RU/E/2011/000)
PREFACE
This report was prepared in relation to the Industrial Training Program for Engineering Undergraduates conducted by University of Ruhuna. The training period was 12 weeks at ABC Consultants (Pvt.) Ltd.
...
.
Ranasinghe A.B.C
RU/E/2007/000
Department of Civil and Environmental Engineering,
University of Ruhuna.
ACKNOWLEDGEMENT
I would like to thank some persons and organizations who really helped me during the training period. .
Ranasinghe A.B.C
RU/E/2011/000
Department of Civil and Environmental Engineering,
University of Ruhuna.
CONTENTS
Chapter 1 Training organization
1
1.1 Structure of the organization
2
Chapter 2 Technical Detail
4
LIST OF TABLES
2.1
Project Details.
4
2.2
Training Schedule
5
LIST OF FIGURES
1.1
Organization Structure
2
2.1
Map of
4
..
Chapter One
Introduction to the Training Establishment
1.1 Company Profile..
1.2 Organization Structure
(Team LeaderDeputy Team LeaderSenior Geotechnical EngineerSenior Material EngineerSenior Design EngineerHighway EngineerFinancial ManagerFinancial ManagersAdministrative StaffTechnical OfficersOffice AssistantsDriversTranslatorsConstruction EngineersDesign EngineersProject Planning EngineerPlanning EngineersGeotechnical EngineersSafety managers)Staff of the ABC Consultants mainly consists of Japanese as well as the Sri Lankan employees. According to the project company keep a separate head office and subordinate offices with the qualified staff.
(Figure 1.1: Organization Structure)
Chapter Two
Technical Details
2.1 Introduction to Project.
(Figure 2.1: Map of )
2.2 Introduction to the work site.
Project Details
Project Name:
Client: ..
Contractor:
Consultant: ..
Engineer: ..
..
(Describe the technical details Do the sectioning as you wish)2.3 Soft Ground Treatment
Due to the nature of soft layer in the site, soft ground improvement works are necessary for limiting settlement of the embankments after formation and for enhancing stability of the embankments. Type A, Type C, Type C, Type I and Type H adopted for ground improvement works
..
2.4 Pilling..
The outer circular highway project to the city f Colombo is 11km long, of which 1032 nos of 1500mm diameter bored piles will be constructed by the winch machine.
2.4.1 Setting out pile position
The position of the proposed pile will be set out by survey team in accordance with approved pile layout plans and related construction drawings. The procedure for setting out will be as follows
..
(Table 2.4: Compliance Values for Support Fluid)
Property to be Measured
Test Method and Apparatus
Compliance values measured at 20C
As supplied to Pile
Samples from the pile prior to placing concrete
Density
Mud Balance
Less than 1.10 g/ml
Less than 1.15 g/ml
Viscosity
Marsh Cone
30 to 70 seconds
Less than 90 seconds
2.5 Concreting
Reinforced concrete structures are use in site mainly for piles, pile caps, piers, abutments, culverts and for bridges. Concrete is a mixture of cement, water, fine and coarse aggregate and admixtures
.
(Figure 2.46:Slump Cone Test) (Figure 2.42: Aggregate Bins)
2.6 Laboratory Tests
2.6.1.3 California Bearing Ratio Test (CBR) (BS 1377 Part 4)
(Figure 2.60: Graph of load vs penetration)
(Load on test specimen at 2.5mm penetration x 100%...............eq(5)Load on standard crushed stone at 2.5mm penetration)
Calculations: CBR1 = .
Chapter Three
(Describe the Management Details Do the sectioning as you wish)Management Details
3.1 Management Techniques
.
3.2 Labor Management
3.3 Site Documents
3.6 Financial Management
.
..
3.7 Safety Management
..
Chapter Four
Summary and Conclusions
4.1 Summary
During 12 weeks of my training experience in ABCs Pvt. Ltd, I was able to involve with site work, laboratory work as well as the administrative and office work.
4.2 Conclusions
At the University, we were taught many theories and given chances to do several practical, experiments and tests to understand the concepts.
References
Engineering Civil, http://www.engineeringcivil.com
About Civil, http://www.aboutcivil.com
ELE International, http://www.ele.com
Sathyakumar, A. R., (2007), Concrete Technology, Oxford University Press, New Delhi
(Appendix 1Design and Specifications)
(P2)Design of beam F1B2 (300*650)
(P1) (E) (D) (C) (B) (A)
AB
BC
CD
DE
gk
qk
gk
qk
gk
qk
gk
qk
SW
4.7
4.7
4.7
4.7
From slabs
1
3.1
3.1
3.3
3.3
5.3
5.3
4.5
4.5
2
2.4
2.4
2.5
2.5
5.3
5.3
3.4
3.4
Total
10.2
5.5
10.5
5.8
15.3
10.6
12.6
7.9
max
23.1
24
38.4
30.3
min
10.2
10.5
15.3
12.6
P1
P2
Gk
Qk
Gk
Qk
Gk
Qk
Gk
Qk
SW
3.51
3.51
3.51
3.51
From slabs
1
4.71
4.71
4.25
4.25
6.92
6.92
5.7
5.7
2
4.99
4.99
4.48
4.48
6.8
6.8
5.5
5.5
Total
13.21
9.71
12.24
8.73
17.23
13.72
14.71
11.2
max
178.16
255.62
min
69.55
96.38