- Purpose
- Main sequences
- Resources (manpower and GSE), including location
-Main activities of the assembly and integration of the subsystems
-Final integration and tests
E U S O - B A L L O O N D E S I G N R E V I E W, 1 8 . 1 2 . 2 0 1 2 , C N E S T O U L O U S E
Sylvie Dagoret-CampagneLAL, Orsay,Baptiste Mot,IRAP, Toulouse
The EUSO-BALLOON AIT-Development plan
1
CDR – 18.12.2012
AIT Development plan and GSE 2
EUSO-BALLOON, a Highly Modular instrument
4 subsystems :• « electrical » (DP,PDM,DP)• 1 mechanical,
DP : 11 components (boards),
PDM : 5 components (boards),
PWP : 1
Each component under the responsibility (design, fabrication, procurement) of different laboratories world wide spread.
Phase B Phase C&D • Need AIT/AIV procedures• Need resource evaluation• Need time evaluation (planning)
AIT Development plan and GSE 3
Main sequences of Integrations
CDR – 18.12.2012
EC-Unit Integration: MATRA-LAL
Electronic Integration:
LAL
Data processing Integration:INFN-Naples
PDM integration:APC
Optics Tests:RIKEN-JP/UAH-
US tests
Full electronics intgration:
APCInstrumentIntegration:B.I.S CNES
Mechanics assembly:
B.I.S CNES
FinalTests:B.I.S CNES
time
AIT Development plan and GSE 4
Manpower for AIT
Full Instrument AIT
:B. Mot/IRAP
Mechanical AIT : G. Roudil/IRAP
Electronic AIT : M Dupieux/IRAP
Optical AIT : C. Catanalo/IRAP
AQ AIT : TBD / IRAP
CDR – 18.12.2012
PDM-AIT : P. Barrillon/S. Dagoret /LAL
H. Miyamoto/L
ALS. Blin/LAL C.
Moretto/LAL APC Team
DP AIT : G.
Osteria/INFN
Naples-INFN
Rome-INFN BARI-INFN IAAT-
Tuebingen
Full integration :
Subsystem/ electronic integration :
DP integration :
AIT Development plan and GSE 8
ComponentPre-assembly
Component test
EC-Unit
HVPS
EC-ASIC
PDM-B
Pre-Integration
Assembly
IntegrationTests &Validation
PAECM2
PAECM1
THV1
THV2
TECA2
TECA1
TPD1..N
IEC1
IEC2
IEC3
IEL1
IEL2
AP1
AP2
AP3
CAPHEEC1
TrigPDM
CAKIEC1
CDR – 18.12.2012
PDM AIT activities sequence
AIT Development plan and GSE 9
PDM AIT activities list
CDR – 18.12.2012
Test name component comment duration location whocomponent pre-assembly
PAECM1 MAPMTPhoton collection efficiency and gain measurement for each channel 1 month for 36 units APC APC & LAL
PAECM2 MAPMT Sorting to fit an EC 1 hour APC APCTHV1 HVPS cable reference THV2 HVPS HV tuning (depending on PMT gains) APC APCComponent Tests
TECU1 EC-Unit static test under HV, normal air pressure 1 hour LAL LALTECU2 EC-Unit static test under HV, low pressure 12 hours APC LALTECA1 EC-ASIC visual inspection 1 hour LAL LALTECA2 EC-ASIC electronic test bench 1 week for 6 units LAL LAL
TPD1 PDM-BElectrical mechanicalcompatibilitie 1 day Korea SKKU
TPD2 PDM-B Power supply tests 1 day Korea SKKUTPD3 PDM-B ASIC configuration 1 day Korea SKKUTPD4 PDM-B ASIC readout TBD Korea SKKUTPD5 PDM-B Trigger functionality tests TBD Korea SKKUTPD6 PDM-B HVPS switch control tests TBD Korea SKKUTPD7 PDM-B DP (or CCB) interfaces TBD Korea SKKUTPD8 PDM-B HK logic and interface tests TBD Korea SKKUPre-Integration
IEC1 EC-Unit+HVPS static test under HV, normal air pressure 1 hour per EC unit APC APC&LALIEC2 EC-Unit+HVPS statistic test under HV, low pressure 12 hour / EC-Unit APC APC&LAL
IEC3 EC-Unit+HVPS+EC-ASIC light on EC-Unit+ EC-ASIC red by Test-EC-ASIC10 days assembly+15 days tests APC APC&LAL
IEL1 PDM PDM-B readout external computer LAL APC&LALIEL2 PDM+DP link CCB+PDM-B 1 week LAL APC&LAL
AIT Development plan and GSE 10
PDM-AIT Activities list
CDR – 18.12.2012
Test name component comment duration location who
Assembly
AP1 9 EC-Units+PDM-Framemechanical integration and screwing 1 day APC LAL
AP29 EC-Units+6 EC-ASIC+PDM-Frame
mechanical integration and screwing 1 day APC LAL
AP39 EC-Units+6 EC-ASIC+HVPS+PDM-Frame cabling 1 week APC APC
AP4
9 EC-Units+6 EC-ASIC+HVPS+PDM-B+PDM-Frame
mechanical integration and cabling 1 week APC LAL
Calibration
CAPHEEC1 EC-Units+EC-ASIC
Photon counting calibration (Test-EC-ASIC) 3 weeks APC APC&LAL
CAKIEC1 EC-Units+EC-ASICKI channels calibration (Test-EC-ASIC) 3 weeks APC APC&LAL
Validation
TrigPDM PDM + light sourceapply a fast moving light spot few days APC APC&LAL
SWLOG PDM + light sourceapply a variable light source few days APC APC&LAL
AIT Development plan and GSE
DP-AIT Activities list
ID512
Test name component comment duration location who
ID1 LVPS+HK+CPU
1-2 monthes Naples
IAAT and INFN
(NA-BA-Roma2)
and Korea
ID2 LVPS+HK+CPU+GPS+CLK SPI tests
ID3LVPS+HK+CPU+GPS+CLK+CCB
ID4LVPS+HK+CPU+GPS+CLK+CCB CCB through SPI
ID5LVPS+HK+CPU+GPS+CLK+CCB
CCB through Spacewire
ID6LVPS+HK+CPU+GPS+CLK+CCB+PDM-B
…ID1 ID5
CDR – 18.12.2012
AIT Development plan and GSE 13
Computer
PDM board
EC-ASICboard
Power supply Logic
analyzer
NI(PC interface)
Multimeter
Charge injection
EC-ASIC board
ASIC
PDM board
Pre-Integration EC-ASIC and PDM-B
CDR – 18.12.2012
EC-HV
EC-DYNODE
HVPS2
HVPS1
MA
PM
T
EC-ANODE
EC-ASIC
PDM-B
IR-CAM
Batteries
PWP
LVP
S-D
P1
LVP
S-D
P2
LVPS-PDM
LVP
S-H
K
HK
CCB
CLKB
GPSR
CPU
DST
SIREN
CNES Telemetry
EXT
Bat Controller
TLS
Sensors
Motors
SPACEWIRE/PCI
EC-Front
EC-Back
DPINTERFACES TESTED UP TO NOW FOR HARDWARE
DP PDM
AIT Development plan and GSE 16
Optical AIT Activities list
Test name component comment duration location who
TOP1 Lenses 1,2,3 acceptance tests 1 week/lens IKEGAMI RIKEN
TOP2 Lenses 1+2+3 performances tests 1 month Alabama UAH
TOP3 Lenses 1+2+3
validation tests for integrated instrument TBD CNES IRAP
TOP 1 TOP 2
CDR – 18.12.2012
CDR – 18.12.2012
AIT Development plan and GSE 18
Activities- Task forms
• All activities are referred by an acronym,
• Each activity is performed in a sequence of AIT-AIV of a subsystem of of the instrument
• They are tracked in activity forms by AIT managers
• Description :• Component,• Configuration,• GSE,• Task details, procedures, results
Example of description of a task
AIT Development plan and GSE 19
Final AIT-AIV
Resp : IRAP location : CNES
1. Overview of Integration Phases
2. Sequence of integrations
3. Global tests
4. Transport and flight campaign preparation
5. Flight campaign #1
CDR – 18.12.2012
AIT Development plan and GSE 20
1.SEQUENCE FOR INTRUMENT INTEGRATION
CDR – 18.12.2012
Preliminary
+ IR-CAM Assembly
AIT Development plan and GSE 22
3.TRANSPORT AND FLIGHT-CAMPAIGN PREPARATION
CDR – 18.12.2012
Preliminary
AIT Development plan and GSE 24CDR – 18.12.2012
Conclusions
• Main phases of AIT identified :• Subsystems• Instrument (Final),
• Many activities identified for subsystem AIT and their component integration,• Test procedures assessed,• Some activities can be done in parallel, some in sequences.• Merging points.
• Activities are inserted in a sequence of AIT of the subsystems,• Types of activities:
• Component tests, pre-integration, assembly, integration, tests and validation, calibration.
• Resources in manpower for AIT distributed, location of the activities, including the management.
• Resources in GSE listed,• Timing estimated,• Activities follow-up:
• AIT-AIV will be controlled and tracked by the AIT managers using activities forms.