Prepared for City of Palm Coast, Florida April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan

Transcript of Prepared for City of Palm Coast, Florida April 28, 2015 Stormwater Detention Facilities for...

Page 1: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Prepared for City of Palm Coast,

Florida

April 28, 2015

Stormwater Detention Facilitiesfor City-Wide Stormwater Management Master Plan

Page 2: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

To anticipate the need for additional services and infrastructure to provide opportunities for mixed use development with goods, services, and employment.

Goal 1 Expansion

Page 3: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

Section Numbers

Sections Already Modeled

Sections Being Modeled

City of Palm Coast Modeling Status

1 2 3 4 5 6 7 8 9 10 11

12 13 14 15 16 17 18 19 20 21 22

23 24 25 26 27 28 29 30 31 32 33

34 35 37 39 57 58 59 60 63 64 65

81

Page 4: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

City of Palm Coast Modeling Status

Page 5: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

Section 35 High water levels due to

Constrictions at London Drive, US 1 (to Hulett Branch) I-95 (to Mulberry Creek)

Home flooding predicted in < 1 % of homes (all in Bird of Paradise area)

Number of homes below City standard for 100-year event = 11 %

Secondary drainage deficiencies - 10 year event = 2

Modeling Results

Page 6: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

Section 35 (“B” Section) – Level of Service

Deficient secondary roads = 2

Secondary drainage deficiencies

Page 7: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

“B” Section (Section 35) Improvements - 2014Ditch and Pipe Modifications

(Bunker Hill Drive to Burnaby Lane)

2014 Program Results

Page 8: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

Section 37 High water levels due to

Constrictions at London Drive, US 1 (to Hulett Branch) I-95 (to Mulberry Creek)

No home flooding predicted Number of homes below City standard for 100-year

event = 9 % Secondary drainage deficiencies - 10 year event = 6

Modeling Results

Page 9: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

Section 37 (“L” Section) – Level of Service

Deficient secondary roads = 6

Secondary drainage deficiencies

Page 10: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

“L” Section (Section 37) Improvements - 2015Ditch and Pipe Modifications

(Lindsay Drive to Lancelot Drive)

2015 Program Results

Page 11: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

Sections 35 & 37 – Recommended Capital Improvements

Possible Detention Storage Locations ~100-acft required in total

Page 12: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

System Performance Evaluation For Homes:

Home flooding evaluated relative to base flood (i.e., 100-year storm)City has required 1 foot of freeboard above 100-year elevation

Level of Service Evaluations

Freeboard

Page 13: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

Model Results

Level of Service Improvement:Homes below 100-year City standard reduced by 63 %Homes remaining below 100-year City standard = 4 %All secondary deficiencies eliminated

Page 14: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

Recommended Improvement Plans based on Modeling Results for Section 35 and Section 37

Section 35 Improvements:Ditch and Pipe Improvements

Design Completed Construction Completed

Section 37 Improvements:Ditch and Pipe Improvements

Design CompletedConstruction is 50% Complete

Floodplain Storage CreationProposed areas include three general locations along the Belleaire canal waterway in Section 37.Design, Permitting, and Construction Services proposed.

Page 15: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015

Next Step for Implementation Section 37 Floodplain Storage Permitting and Design Services

Scope of Services is in two Phases:

Phase 1:Initial survey, environmental, and geotechnical services Provide preliminary layout of proposed design (30% Plans)

Phase 2:Finalizing proposed design Prepare construction plans and permitting

Staff recommends approving a work order forSection 37 Floodplain Storage Permitting and Design

Page 16: Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Singhofen & Associates, Inc. April 28, 2015