. - .. PD-lh8uJ QUARTERLY PERFORMANCE REPORT Governance and Local Democracy (GOLD) Project Contractor: Contract Number: Reporting Period: ARD, Inc. 492-0471-C-00-5089-00 July 1 - September 30, 2000 SECTION I - CONTRACTOR'S REPORT 1. Background The Governance and Local Democracy (GOLD) Project is designed to support improved systems of local governance emanating from a dynamic relationship between the governmental and non- governmental sectors. The project's demand-driven and assisted self-reliance modes of operation, coupled with its dual emphasis on improved local government performance and popular participation in public affairs, represents the state-of-the-art in promoting democratic local governance systems. The Project produces a Quarterly Progress Report that contains contractual information and a brief overview of progress. As a management tool, this document examines project issues and concerns and includes suggestions for courses of action. Over time, these reports provide interested parties with a quick understanding of the project's achievements at the field level. 2. Expected Results The expected results, or performance objectives, are drawn from the contract' and are met by responding to partner local government- and civil society-demands through a strategy of "assisted self-reliance." On 29 June 1999, USAID and ARD, Inc. signed an amendment to the initial contract. The intent of this amendment was for the project to remain within the basic parameters of the project. The significant difference is that the project is to rapidly enable a significant number of new LGUs to take advantage of the lessons learned during the first phase of the project, the new PACD has been set as 31 March 1999. Throughout the course of this quarter ARD continued working on the modified contract requirements to achieve a rapid rollout of GOLD lessons learned during the extension period. The expected results of the GOLD Project are articulated as: Local government units (LGUs) will achieve substantially more effective governance with broad participation. "Effective local governance" is defined for the GOLD Project's performance criteria as: Strengthened participatory mechanisms that provide effective coordination and communication among local government officials and the non-governmental sector including local NGOs, POs, prcfeS2ic!ls! org?_nizaticris, busine'ss associa+:ons, 2t:. Cltiz3ns able tc participate in and influence governance, and local governments must be able to mobilize public participation when required. Local governments must be more responsive in the three priority action areas of the GOLD project-Resource Mobilization and Management, Development Investment Prioritization and 1 See The Governance and Local Democracy Project, Contract Number AID 492-0471-C-OO·5089-00. Office of Regional Procurement. USAID-Manila, May, 1995. modified 29 June 1999. I!.Z!EI UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT m GOVERNANCE AND LOCAL DE»ocnACY PRoJEcT/GOLD

Transcript of .. PD-lh8uJ ~ gq~

Page 1: .. PD-lh8uJ ~ gq~

. -.. PD-lh8uJ ~ gq~ /~

QUARTERLY PERFORMANCE REPORT Governance and Local Democracy (GOLD) Project

Contractor: Contract Number: Reporting Period:

ARD, Inc. 492-0471-C-00-5089-00 July 1 - September 30, 2000

SECTION I - CONTRACTOR'S REPORT 1. Background

The Governance and Local Democracy (GOLD) Project is designed to support improved systems of local governance emanating from a dynamic relationship between the governmental and non­governmental sectors. The project's demand-driven and assisted self-reliance modes of operation, coupled with its dual emphasis on improved local government performance and popular participation in public affairs, represents the state-of-the-art in promoting democratic local governance systems.

The Project produces a Quarterly Progress Report that contains contractual information and a brief overview of progress. As a management tool, this document examines project issues and concerns and includes suggestions for courses of action. Over time, these reports provide interested parties with a quick understanding of the project's achievements at the field level.

2. Expected Results

The expected results, or performance objectives, are drawn from the contract' and are met by responding to partner local government- and civil society-demands through a strategy of "assisted self-reliance." On 29 June 1999, USAID and ARD, Inc. signed an amendment to the initial contract. The intent of this amendment was for the project to remain within the basic parameters of the project. The significant difference is that the project is to rapidly enable a significant number of new LGUs to take advantage of the lessons learned during the first phase of the project, the new PACD has been set as 31 March 1999.

Throughout the course of this quarter ARD continued working on the modified contract requirements to achieve a rapid rollout of GOLD lessons learned during the extension period. The expected results of the GOLD Project are articulated as:

• Local government units (LGUs) will achieve substantially more effective governance with broad participation. "Effective local governance" is defined for the GOLD Project's performance criteria as:

• Strengthened participatory mechanisms that provide effective coordination and communication among local government officials and the non-governmental sector including local NGOs, POs, c00~erat~ves, prcfeS2ic!ls! org?_nizaticris, busine'ss associa+:ons, 2t:. Cltiz3ns :1iu3~ ~~; able tc participate in and influence governance, and local governments must be able to mobilize public participation when required.

• Local governments must be more responsive in the three priority action areas of the GOLD project-Resource Mobilization and Management, Development Investment Prioritization and

1 See The Governance and Local Democracy Project, Contract Number AID 492-0471-C-OO·5089-00. Office of Regional Procurement. USAID-Manila, May, 1995. modified 29 June 1999. I!.Z!EI ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT m GOVERNANCE AND LOCAL DE»ocnACY PRoJEcT/GOLD ~

jmenustik
Rectangle
jmenustik
Rectangle
Page 2: .. PD-lh8uJ ~ gq~

:td Quarter 2000 Performance Report 2 ~~~~~~==~~----------------------------------------­

Promotion and Environmental Planning and Management-in accordance with the 1991 Local Government Code.

• An effective communications system will be established that includes: the sharing of information among local governments, policy studies to probe critical issues confronting local governments and to inform decision makers, promotion of more effective media coverage of local government issues and the actions of local governments, and periodic Rapid Field Appraisals (RFAs) to monitor the implementation of the Local Government Code.

3a. GOLD's Core Activities

GOLD's technical assistance enables local governments to better take advantage of the resources and authorities provided in the 1991 Local Government Code. Specifically, GOLD's core activities focus on providing the following outputs towards achieving the project's performance objectives.

Objective of the Services A Local Government Unit (LGU) Support Services Team is being contracted under the Governance and Local Democracy (GOLD) Project to provide assistance to selected local governments and communities to achieve effective systems of local governance, attain self­reliance and be active partners of the national government in the pursuit of the country's development agenda. The Team will also be responsible for policy studies and a variety of information collection and dissemination activities. The objectives will include:

1. Help achieve decentralization objectives through the development of participative, competent, responsive, accountable, and self-reliant local governments

2. Assist local governments to strengthen their financial positions 3. Help LGUs identify and achieve replicable development and service delivery performance

benchmarks 4. Increase private sector investment and participation 5. Assist LGUs with environmental management systems 6. Help institutionalize a system of communication, replication, and information sharing 7. Support the formulation and implementation of policy reforms

Each of these objectives has been the focus of concerted effort on the part of the team during the proceeding four years. The activities carried out in this quarter designed to ensure sustainable achievement of each of these objectives are described below.

3b. Current Buy-ins

There are no buy-ins to the contract.

3c. Subcontractor Activity

Six subcontractors were included in the original contract proposal and approved by the USAID/Philippines Mission. . . 1. Orient Integrated Development Consultants, Inc. (OIDCI) is a Filipino owned and operated

consulting firm and ARD's principal local subcontractor. OIDCI's core expertise includes integrated area and regional based development, institutional and local-level development, and environmental resource management. OIDCI currently provide technical area specialists (forest management, solid waste, tree crops, tree enterprise, land use planning, urban environmentalism, natural resource management, and legal) that operate in all LGUs covered by the GOLD project.

-~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

~ ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

< .<

Page 3: .. PD-lh8uJ ~ gq~

, : :t" Quarter 2000 Performance Report 3 2. PADCO, Inc., provides services in the field of urban development, urban planning, shelter

policy and programs, public finance and management, and geographic information systems (GIS). PADCO has provided specific technical consulting assistance related to local finance to the GOLD project. Current involvement is limited to one local consultant on GIS.

4. Performance in Meeting Project Targets

Targets set forth for the third quarter of the Sixth Annual Work Plan were generally accomplished.2

The primary activities of the quarter centered on continuing the implementation of the LGUs activities initiated during the previous quarter. This quarter saw continued progress in most LGUs. In September, however, there were cutbacks in the level of support to some LGUs due primarily to the effects of the earlier USAID budget cut. However, the project continued to assist more LGUs than were targeted in the 6th Annual Plan due to the wide range of rollout strategies employed. There is also strong evidence that LGUs appreciate the assistance enough to hire former GOLD consultants directly after their ARD contracts have expired. LGUs have continued to commit more than 200% of the total cost of GOLD rollout activities. Environment and MIS programs have recorded the greatest level of LG U cost sharing support.

Our Performance Measurement activities moved ahead apace during the quarter. Both the 101h RFA and the final quantitative indicators surveys were completed during the quarter. Both reports will be completed by mid-4th Quarter.

Our institutionalizaton eiforts gained considerable ground during the quarter. The Civil Service Commission has indicated its readiness to take full ownership of PSEP in October. GOLD completed its Orientation on Alternative Financing Modes for NEDA. The Bureau of Local Government Finance completed training in TOP1 and the Barangay and Teacher's RPT orientation workshops. The Liga ng mga Barangay received support for the implementation of several regional workshops and trainings for Barangay officials. The LGU Information Systems Plan manual was completed and handed over to the NCC. GOLD completed its assistance support to the Local Government Academy.

Our most intense institutionalization work remains the development of our network of the Centers for Local Governance. These six institutions have all formally created separate units within the larger institutions to support local governance training, study, and facilitation. The six CLGs have now increased to eight with the addition of CREMDEC (Cebu) and MSU/Marawi under the tutelage of Ateneo de Davao and MSU/liligan respectively.

Documentation of the GOLD processes will be the focus of the coming quarter. Most project activities will be ended by December 2000 with all programs completing a final report and supporting activity documentation.

The following tables contained details for each of its objective program areas. Table 1 provides an overview of accomplishments and constraints in each program areas. Table 2 explicitly compares planned and actual performance during the July to September 2000 interval. Table 3 details the documents produced with project resources during the quarter. Table 4 lists all workshops held. Table 5 identifies some of the critical upcoming events for the third quarter. Table 6 identifies pOints of synergy between the GOLD and USAID and other donor project working on issues related to local governance.

2 The 6th Annual Work Plan (revised) covers the period from January 2000 through December 2000 and includes the three-month reporting period covered in this quarterly report. I!ml!J ~~ UNrrED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT lR) GoVERNANCE ANt> LOCALl>EJI<>aUCy -=r-/GOLD

Ift'iW'

Page 4: .. PD-lh8uJ ~ gq~

~y_d~Q=~~rl~e~r2~o~oo~p=erl~o~rm~an~c=e~R~ep~O~rl~ __________________ . _________________________________ .4

5. Statement of Work

Revisions to the Statement of Work contained in the contract revision were explained in detail in the Second Quarter 1999 Report.

6. Synergy with USAID and other donor activitie~

During this Quarter, ARD continued its efforts to expand and enhance its relationships with and support to other USAID/Manila projects and Offices. In addition, ARD/GOLD provided assistance to other donors engaged in local governance efforts in the Philippines and elsewhere in Asia. Table 6 provides a brief synopsis of these activities.

7. Administrative Information: Contract Data

Expenditures (Last three rnonths) Curnulative expenditures as of 9/30100 Remaining obligated contract balance TOTAL PROJECT VALUE

Illi!:!I!J ~ UNtTED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT Iiij'iiI

$ 967,086 $ 17,876,211 $ 1,546,948 $ 19,423,159

m GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

.. '

Page 5: .. PD-lh8uJ ~ gq~

, !

3 d Quarter 2000 Performance Report 5

Table 1 Third Quarter 2000 GOLD Program Performance

Objective One PARTICIPATION UNIT

Major Trends

• There is a growing trend among the teachers, professors and Deans of academic based Centers for Local Governance to learn the ToP Methods and apply them in their classroom teaching and module designing.

• The Centers for Local Governance are consistently conducting designl faCilitation services and training LGUs and other organizations as a result of GOLO's effort in transferring the Technology of Participation basic courses and other ToP applications through the different Manuals of Procedures.

Gaps and Bottlenecks Strengths and Advantages

• Some additional capacity building! trainings for the Centers for Local Governance were cancelled due to limited project resources.

I!ml!J .. ~~ UNffED STATES AGENCY FOR JNTERNATIONAL DEVELOPMENT

'IiYW

• LGUs can access technical assistance from strategically based local CLGs. LGUs don't need to look far for technical assistance support.

• Manuals of Procedures integrated the best field experiences in various technical assistance:

!. Barangay Participatory Planning and Budgeting , : . Real Property Taxation for Barangay and School

Officials

". Municipal Environment Planning • Quick Investment Promotions

.. • MUniCipal Clusters Investment Promotions • CLGs are the repositories of the GOLD Manuals of

Procedures. • Integration of Barangay Participatory Planning and

Budgeting Workshop in the Masteral Courses of the academic-based CLGs is open to everybody.

Enrollees:

BSU 11 AdeNU 15 AdeOU 11 OWC-T 18 MSU-IIT -none(47 Signed for next term) MSU- Marawi - 103

• Outside the formal masteral course, two (2) (AdeNU and AdeOU) of the eight (8) Centers for Local Governance are offering the Barangay Participatory Planning and Budgeting as Public Offering for interested civil servants. These are short term seminar courses for 2-3 days duration that is open to the public.

lR) GOVERNANCE AND Loc.u. DEMOCRACY PRoJEcT/GOLD

I

Page 6: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report 6 ~~~~~~==~~-----------------------------------------

Objective One PARTICIPATION UNIT

Recent Accomplishments 1. The Participation Unit has succeeded in its objectives of transferring technologies to the local areas

through the CLGs. The CLGs are now equipped to do the GOLD trainings on their own.

2. The Participation Unit delivered the following trainings:

Trainings Clients 1. ToP 1 1 . Local Chief [xecutives

2. Civil Service Commission 3. Local Government Academy 4. Development Academy of the Philippines

2. ToP 2 1 . Ateneo de Davao University 2. MSU- lligan Institute of Technology 3. Development Academy of the Philippines

3. RPT for Barangay 1. Bureau of Local Government Finance Officials 2. Liqa nq mqa Baranqay

4. RPT for School Officials 1. Bureau of Local Government Finance

3. CR[MDEC was set up as a sister Center for Local Governance of Ateneo de Davao University. MOA has been signed between CREMDEC and Ateneo de Davao University to seal the partnership.

4. Manuals of Procedures

• Barangay Participatory Planning and Budgeting Workshop was finalized, reproduced and distributed to CLGs and Liga ng mga Barangay.

• Pilot tested the Barangay Officials Participatory Workshop for Real Property Tax and School Officials Participatory Workshop for Real Property Tax manuals in 5 municipalities in Bohol and with the Liga ng mga Barangay members. Final editing in process.

• Municipal Cluster Investment Manual and Quick Investment Manual approved by technical program.

5. Directory of Trainng of Trainers (ToT) graduates and Technology of Participation (ToP 1) by province was completed.

6. Others:

I!!'!:!lilI

• Facilitation of the Bonds Workshop for Department of Finance and other Financial Institutions; • Co-designed, co-facilitated and produced the Manual of Procedures for the Regional consultation

for Local Government Code Proposed Amendments; • Designed and facilitated the GOLD Project Staff Assessment Workshop.

~ UNITED STATES AGENCY FOR INTERNA TfOHAL DEVELOPMENT ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD Ifi'i'iiI

Page 7: .. PD-lh8uJ ~ gq~

i : ~ Quarter 2000 Performance Report

Objective One SERVICE OUALITY IMPROVEMENT (SOl) PROGRAM

Major Trends The third quarter saw the full-blown implementation of the PSEP in all of the 22 LGU sites, with 6 more LGUs finally starting their respective PSEP workshops in July and August.

A good number of LGUs have already submitted the workshop outputs of the PSEP components they have completed thus far all of which shall be made part of the documentation proceedings at the end of the GOLD Project.

Again, the enthusiasm of all Local Chief Executives and the LGU-beneficiaries was evident in the telephone calls made to the SOl Team, as well as the endorsement letters accompanying the workshop outputs. However, the pulling out of the GOLD PSEP Trainers later in the third quarter sent some mild shocks to the LGUs primarily because the withdrawal of GOLD assistance will mean spending the LGUs own resources and also because they must already have felt so comfortable with the presence of the GOLD Trainers. With some carefully-worded explanations in writing, the LGUs realized the constraints of the GOLD Project and were able to go on with the PSEP with the use of the ARD/GOLD-trained LGU Trainers. A few LGUs hired the services

I of the GOLD PSEP Trainers who conducted the first two PSEP components for them.

Gaps and Bottlenecks

l!ml!lI .~ UNrrED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

IifiiiJ

Strengths and Advantages

• The presence of ARD/GOLD-trained LGU Trainers who took over the reins in the different LGU PSEP sites after the decision to pull out all GOLD consultants from the field. Without these trainers, PSEP would have had difficulty in cutting down field operations and its accompanying cost.

• The continuing support of ARD Management to the SOl Team despite the current financial and time constraints.

• The cooperation and enthusiasm of the LGUs in submitting PSEP workshop outputs making it easy for the SOl Team to monitor the progress of implementation of PSEP in the different sites.

.• The enthusiasm of CSC Management in the institutionalization of the PSEP through the tum-over of the Program from ARD to esc.

~ GOVERNAHCE.ANOL0C4LDEJ.lOCRACYPRoJEcrIGOLD

7

Page 8: .. PD-lh8uJ ~ gq~

:jd Quarter 2000 Performance Report 8 ~~~~~~~~~-----------------------------------------

Objective One SERVICE QUALITY IMPROVEMENT (SQI) PROGRAM

Recent Accomplishments

The following are the major accomplishments of SOl for the period July to September 2000.

• Completion of the conduct of the first two PSEP components, namely the Service Vision and Values Workshop (SV&SV) and the Service Audit Workshop (SAW) in six (6) LGUs, as follows: Provinces of Camarines Norte, Siquijor, and Eastern Samar; Pagadian City; and the Municipalities of Pandan, Antique and New Corella, Davao del Norte.

• Completion of the conduct of the third PSEP component, the Service Improvement Workshop (SIW) in nine (9) LGUs, as follows: Provinces of Palawan, Siquijor, and Eastern Samar; Cities of Iriga and Pagadian; and Bohol Clusters of Municipalities and the Municipalities of Canaman and Tigaon, Camarines Sur and Pandan Antioque.

• Completion of the conduct of the Basic Customer Service Skills (BCSS) Training in twelve (12) LGUs as follows: Provinces of Camarines Norte, Negros Oriental, Siquijor, and Eastern Samar; Cities of Iriga, Roxas, Pagadian, and Dipolog; and Bohol Clusters of Municipalities and Municipalities of Baao, Camarines Sur, Concepcion, Iloilo, and Pandan, Antique. The Civil Service Commission also completed its BCSS Training on August 17 and 18.

• Completion of GOLD technical assista~c", on the Cebu City Organizational Strengther.;ng with the conduct of the final conference participated in by the GOLD 00 Consultant and the Cebu City Coordinating Committee.

• Completion of the conduct of the Training of Performance Raters for the Provincial Government of Nueva Vizcaya. Said training was intended to be conducted only once by the SOl Consultants, but Governor Rodolfo Agbayani requested for a second batch in view of the encouraging results of the first batch.

• Completion of the draft Naga City Citizen's Guidebook which was developed through a series of Writeshops conducted by the SOl Program Manager.

l!!E!:I ~ UNlTED $TATES AGENCY FOR INTERNATIONAL DEVELOPMENT

Ifii'iil ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 9: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report

Objective One LOCAL PARTICIPATORY PLANNING-BUDGETING-MONITORING SUPPORT PROGRAM

Program Objective: Strengthening linkages with the Uga ng mga Barangay, Regional Development CouncilslNEDA, NGOs and concerned National Government Agencies (NGAs) for the replication and institutionalization of the participatory local planning-budgeting-monitoring process developed and installed by the GOLD Project;

Assist in the development of the secretariat and technical support capability of the Uga National Secretariat;

Assist LGUs in developing their capabilities to formulate/update their land use/physical framework plan that will serve as basis for their detailed land use plans and zoninq ordinance. Major Trends

• Growing interest of the Uga ng mga Barangay chapters in conducting provincial/city assemblies focusing discussions on planning-budgeting activities;

• Growing demand for orientationlT A on the GOLD participatory CLUP preparation process; .• Continuing efforts of GOLD LGUs to link with other LGUs, NGOs and other Uga chapters to Improve

and/or continue to run the LPPBM rocess. Gaps and Bottlenecks Strengths & Advantages

• Continued difficulty given the technical rigor, time • required and HLRB guidelines for CLUP preparation vis-a.-vis the limited GOLD T A approach and TA delivery period and the LGU's difficulty of organizing and convening municipal technical working groups for CLUP preparation I activities. •

• Continued reluctance of NGAs to allow LGUs to experiment/adapt guidelines to suit their situation in the conduct of activities and compliance to requirement (e.g. AIP/20% development expenditure limitations, CLUP form and approach)

• Lack of capability of the Uga national secretariat ,. to respond to the growing interest/demand of the Uga chapters for capability enhancement courses for Punong Barangay

Increasing capability of the Uga secretariat to respond to chapter/lower level needs for assistance, with the complementation of efforts provided by the more active chapter staffs to the nation a! secretariat.

Growing interest and support of NGOs and NGAs for barangay activities, providing the Uga with additional source/augmentation for resources (e.g., DOH funding of heaHh consultations, PBSP funding for barangay database and counterpart to assemblies and trainings).

Developed/growing competence and availability of the CLGs to design and facilitate the workshops in the CLUP process and to design and run the PB courses.

Objective One

I!ImII • ~~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT ~ GoVERNANCE AND Loc..u. OEJrocRACY PRoJEcT IGOLD 'Wi'ii'

9

Page 10: .. PD-lh8uJ ~ gq~

3'" Quarter 2000 Performance Report 1 0

LOCAL PARTICIPATORY PLANNING-BUDGETING-MONITORING SUPPORT PROGRAM I

Recent Accomplishments

1. Liga Support • Conduct of the Barangay Executive Course (BEC) for Mandaue City Liga chapter; • Continued provision of staff support (through the Program Officer and the Barangay Operations

Specialist) for Liga National Secretariat and secretariat services (process documentation, workshop design and facilitation) for the Liga Board, Liga National Assembly and REO meeting/workshop in Oct. and provincial chapter assemblies for Davao and Marinduque provinces;

• Provision of designing support for the DOH -Liga regional cluster consultations on health; • Continued linkaging with NGAs and NGOs and other entities on Barangay concerns, indulging the

development of the Barangay database system with PI3SP and with DBM on barangay budgeting; • Provision of equipment support for the National secretariat; • Enhancement of the BPBW process with the use of GIS and the incorporation of RPTS concerns in the

process; • Conduct of secretariat training course for the National Liga secretariat and regional/provincial/city

chapter staffs, focusing on defining the roles of the secretariat and enhancing secretariat service delivery systems.

2. CLUP • Completed technical sessions on the remaining aspects of CLUP preparation/updating for municipalities

of 2 requesting provinces and 1 LG U cluster; • Conducted/continued talks with the DILG/Regionallnteragency Steering Committees (RIASC) and with

the HLRB Regional offices in Regions 1 and 2 for the complementation of efforts in TA provision, with HLRB1 agreeing to provide TA in zoning ordinance preparation, conduct of public hearings and providing resource persons for technical sessions in La Union;

• Coordinated with LGA for the conduct of orientation sessions and participatory CLUP process walk­through for Region 6,8 and 5;

• On-going provision of TA support activities to selected individual municipalities within the 3 sites.

3. Other accomplishments • Provision of assistance for designing activities TA package for Tuguegarao City to be provided by NV as

resource LGU for barangay planning-budgeting and OD activities to develop/improve the city's vertically and horizontally integrated planning-budgeting process;

• Conduct of project performance review of the Executive departments of Naga City to review the cluster visions and priorities in preparation for the LDC viSioning and investment planning activities.

Objective Two

IlmE1 ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

'iifiiI ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 11: .. PD-lh8uJ ~ gq~

,

:t" Quarter 2000 Performance Report 11

RESOURCE MOBILIZATION AND MANAGEMENT Program Objectives

• Increase the amount of financial resources available to local communities and improve local technical and administrative capabilities to manage such resources;

• Transform the real property tax system through process innovation;

• Provide a means to LGUs to help them improve the quality of information available to Council members and the public on the LGUs financial condition (FTMS)

Major Trends

• In view of the imminent reduction of the IRA, local officials are increasingly looking at the potential of generating revenues from local sources, particularly the real property tax;

• BLGF adoption of GOLD initiated tools in their program of work, specifically regional offices;

• Facilitation of GOLD initiated workshops by BLGF Regional Offices Staff.

Gaps and Bottlenecks Strengths and Advantages

• Lack of enthusiasm and support of some local • DOF's and BLGF's strong support and interest to officials on GOLD RPTIS software. Purchase of the GOLD initiated tools. hardware requirements for the RPTIS has been delayed, thereby affecting the customization and installation of the software.

Recent Accomplishments

• Technical Assistance to Bataan Province 1 . Diagnostic review of the real property tax system of the province. 2. Presentation/validation of results of diagnostic review. 3. Completed 90 % of the programming for billing and collection system and completed 50% for the

assessment system of the RPTIS software.

• Technical Assistance to Negros Oriental 1. Conducted the writeshop for curriculum development. The writeshop aims to integrate real property tax

lessons in the elementary and secondary curricula. 2. Completed the customization and installation of the RPTIS software for the municipality of Sibulan. 3. Handed-over the management and administration of the system to the municipality of Sibulan and the

province of Negros Oriental. 4. Closure of RPTS technical assistance as of September 19, 2000.

• Capiz RPTS Improvement Program 1. Conducted the writeshop for curriculum development. The writeshop aims to integrate real property tax

lessons in the elementary and secondary curricula. 2. Conducted the Social Marketing Planning and Design Workshop for Provincial and Municipal Treasurers

and Assessors and their staff. The workshop aims to train local treasurers and assessors and their staff. The workshop aims to train local treasurers and assessors package their tax information campaigns.

3. Conducted Barangay Participatory Workshop on RPT the Municipality of Mambusao. BLGF Region VI co-facilitated the workshop with the Province.

Ob'ective Two RESOURCE MOBILIZATION AND MANAGEMENT

Im!:!EJ A:I~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT ~ GOVERNANCEANDLOCALDafOCR.4CYPRo./EcT/GOLD

'Iij'iii

Page 12: .. PD-lh8uJ ~ gq~

sa Quarter 2000 Performance Report 12 Accomplishments (continuation)

4. Demonstration of the RPTIS software. 5. Completed the data gathering and 80% of the systems design of the software.

• Cotabato RPTS Program 1. Conducted Social Marketing Planning and Design Workshop for Provincial and Municipal Treasurers

and Assessors and their staff. The workshop aims to train local treasurers and assessors package their tax information campaigns.

2. Cross-visit to the Province of Bulacan and the Municipality of Sibulan for a demonstration of a functioning real property tax information system software.

3. Closure of RPTS technical assistance in the province as of October 6, 2000.

• BLGF-GOLD Collaboration 1. ToP1 Training for BLGF Central and Regional Offices Staff. 2. Orientation training and facilitation of Barangay and Teachers Participatory Workshops in five municipa­

lities in the Province of Bohol of selected BLGF central and regional office staff.

• Financial Trend Monitoring System Final draft of the Guidebook complete.

• Technical Notes The eight TNs are on varying stages of accomplishments: 1 with final copy printed; 3 are due for technical editing; 1 with draft manuscript almost complete and 3 are still with the consultant for completion.

• Manuals of Procedures The four Manuals of Procedures for Participatory Workshops on Real Property Taxation are in varying stages of accomplishments: two have completed·the finai lay-out and are due for final editing and 2 have completed the initial lay-outing work and are due for technical editing.

Objective Two MANAGEMENT INFORMATION SYSTEMS

I!!mll ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT 'Wj'iil

ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 13: .. PD-lh8uJ ~ gq~

3'" Quarter 2000 Performance Report 13

Program Objective • Support selected GOLD extension sites that demonstrate strong initiative in building their instttutional and

technical capabilities to develop, install, implement and maintain their own computer-based management information systems as support to the goal of putting in place an efficient, effective, and transparent processes and operations.

Critical Program Success Indicators • Trained each new GOLD Extension site on Information System Planning. • In-house MIS staff in each of these new GOLD extension sites organized and trained to implement the

LGU's MIS program. • The needed computer hardware and software procured by Partner sites. • Developed computer-based systems - such as the Personnel Management Information System (PMIS),

Real Property Tax Information System (RPTIS), and/or Fund Management Information System (FMIS) -installed for implementation in those sites that have expressed willingness to adopt one of them.

• Links between the new sites and Bulacan and Negros Oriental forged for the former's access to PMIS or RPTIS, or FMIS, respectively.

• Trained each new GOLD Extension site on Information System Planning the GOLD GIS sites in the process of developing GIS application.

• Provide supplemental technical training on GIS operation. • Provided technical training on organizational issues.

Major Trends • Growing appreciation, awareness or interest by LGU management and personnel of computerization for

efficient government operations. •• Increasing realization among LGUs of the need to form full-time MIS units and build the technical capability

of the LGU organization on computer operations. • Growing LGU awareness of what computerization entails in terms of budget, time and effort. • Willingness of LGU leadership to invest on their computerization initiatives, especially in terms of hardware

and software acquisition, but on a staggered basis. • More software vendors are approaching Local Government Units, many of them Canadian. Received

communications and materials from people selling GeoMax and Geomatica.

i Gaps and Bottlenecks !. Inertia in some LGU sites on data build-up

requirements has delayed testing and debugging of adopted systems.

• Slow hardware procurement process in Capiz has greatly delayed RPTIS adoption.

• Hardware procurement was still a problem in all sites, even when political support was strengthened (as in the case of Nueva Vizcaya). Maybe future USAID assistance can focus on the cumbersome bureaucratic processes involved in LGU procurement procedures.

• The province of Nueva Vizcaya, Albay and Bulacan Production Teams problems, issues and concern were not adequately addressed by the Management Groups.

I!!Z!l!J ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

Ii\YiiI

Strengths and Advantages • Willingness of most LGU sites to spend on

hardware and software. • Strong support from local chief executives of most

sites. • The dedication and commitment of the GOLD

team of system analyst/programmers.

..f'R) GOVERNIcNCEANOLOCALDEMocRACYPRo.IEcT/GOLD

Page 14: .. PD-lh8uJ ~ gq~

~3_d~Q~u=arl~e=r~2=OO=O~Pe=rl=o~rm~an=c=e~R=ep~o=rl~ ____________________________________________________ --L14

Objective Two MANAGEMENT INFORMATION SYSTEMS

Recent Accomplishments

MIS Recent Accomplishments • PM IS installation completed in Misamis Oriental; RPTIS installation completd in Bohol, Sibulan and

Palawan. • The Guidebook on Information Systems Planning has been completed, reproduced, and distributed. • The FMIS has been formally handed over to Negros Oriental Provincial Government; and its features and

functionally have been demonstrated before representatives from selected LGU MIS sites. • Technical support for remaining PMIS and RPTIS sites reaching a range of 80% to 90% completion. • Technical support for FMIS has started in earnest in Bulacan and Nueva Vizcaya.

Geographic Information System

• Nueva Vizcaya - technical aSSistance/training on software development and installation was provided (total of two weeks). Local staff have successfully collaborated with the MIS Specialist to produce the initial modules for their Fund Management Information System.

• Capiz and Bohol - 15 participatory barangay planning-budgeting workshops using the new workshop design, integrating MBN data presented through maps and charts into the process. Same design has been shared with Bohol PPDO staff, and used in their own workshop in Barangay Tanday, Municipality of Corella.

• Bulacan - 2 meetings were held to discuss request for evaluation of RPTIS-GIS linkage. Results of these meetings went into formulation of proposed PAR for Bulacan GIS.

• Butuan City/CARAGA - two workshops completed, one for inventory of GIS components, overviewbf the Application Development Process, and another for strategic planning and review of some spatial operations.

• Naga City and Albay - City and Provincial Staff have worked together to produce GIS data sets, as well as Requirements Documents for some needed software customization. Additional assistance was given to Naga City on Visual Basic and Avenue programming. Progress monitoring meetings were held in both LGUs.

• This produced a) proposed Organizational Structure, Position Titles, and Qualification Standards for GIS facilities; and b) an Association of GIS Practitioners. GIS staff from Capiz, Albay, Cebu, Bulacan, and Nueva Vizcaya participated in these workshops.

• Cavite City staff underwent three sets of technical training sessions in Cebu City, as part of the Deployment phase of their own G IS applications.

• In the first week of September, project assessment sessions were held in Naga City and Capiz, in anticipation of early closure of the GOLD project.

I!!l:lIlII ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT ID GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD IifiiiI

Page 15: .. PD-lh8uJ ~ gq~

:{d Quarter 2000 Performance Report 15

Objective Three PERFORMANCE MEASUREMENT

Major Trends: (Based on the recently concluded 10" RFA where the theme was to find out the impact of decentralization at the community level)

In Local Development Planning and Implementation • With limited available resources, immediate concerns are addressed with tangible results and citizen

participation • There is faster allocation of resources within the LGUs control • Influence of external factors lead to broader development projects • Stronger participation resulting to sustained implementation of barangay programs and projects • There is enhanced transparency in local governance

In Local Legislation and Enforcement • External factors such as influence of national government agencies, donor agencies, civil, society are

effective catalysts in the enactment of relevant legislation that address social development issues, concerns and priorities.

• Barangay legislation mostly address the most basic needs

In Resource Generation and Allocation • There is preference for infrastructure in the allocation of the 20% Development Fund • There are available external resources for projects in the barangays that help augment its resources • Barangays which explore other fund sources are able to implement other priority projects • Some barangays try to exercise taxing powers which leads to increase in tax consciousness

In Service Delivery • Improvements in service delivery felt at the barangay level is due to efforts of NGAs and higher level LGUs • Improvement in service delivery is due to efforts of barangay themselves. • In effect, there resulted higher public feeling of the presence of government and GO-NGOIPO collaboration

in service delivery • Due attention is given to neglected and marginalized sectors such as women, the elderly and children

Gaps and Bottlenecks

Constraints in institutionalizing the RFA at Ateneo School of Government.

The significance of applying the ToP in drawing a , synthesis from the provincial reports needs to be , deeply appreciated and understood by the Ateneo

School of Government (SoG). It is crucial for SoG to understand that it is precisely in the application of ToP methods that makes the RFA a unique data gathering method. It is through the use of ToP techniques that consultants are able to pull-out a synthesized picture of the nation as a whole from the disparate provincial or regional reports.

! While recommendations drawn from the findings of I the 1 at" RFA were validated and enhanced at the

public presentation, it is unsure if the findings of the 1 at" RFA on the impact of decentralization at the grassroots level will make a dent (if any at all), on policy making and policy makers because of

, lackluster attendance in the Public Presentation.

I!mEl -~~ UNrrED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

Iii'i'ii'

Strengths and Advantages

• Despite initial shock experienced by Ateneo School of Government in running the entire RFA (technical and administrative) for the first time, the School is still willing to run another RFA (although probably and most likely tailored to suit SoG's academic orientation)

• Centers for Local Governance where most of the RFA consultants are based do have the capability to continue RFA tradition in their respective jurisdictions. In fact, they have greater advantage since most of the CLGs were also trained quantitative data gathering methods as well.

.J\{) GOVEllNAHCE AND LOCAl. OE.IIoCRACY PRoJEcT/GOLD

Page 16: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report 16 Ob'ective Three

PERFORMANCE MEASUREMENT

Recent Accomplishments: Indicators Effort for USAID and RFA • Trends on survey data beginning in 1995·2000 for each GOLD sites (disaggregated and all GOLD sites

(aggregated) is now complete and will be a significant input in the Performance Measurement Program Terminal Report.

• One of the GOLD sites research institutions, Nueva Vizcaya State Institute of Technology won best research award with a prize of P 100,000 from the Philippine Council of Agricultural Research and Development using the indicators data for Nueva Vizcaya from 1995·1999. The research is entitled "Winning through Participatory Public Presentation

• Conducted the 10'h Rapid Field Appraisal Public presentation

I!mIlI ~ UNrrED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Ift'/'iiI

Page 17: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report 17

Obiective Four INVESTMENT PRIORITIZATION AND PROMOTION

Trends

• Increasing interest in alternative financing modes as follow through to project development activity. To date seven of the LGUs assisted in project development (Cagwait, Agusan Norte, Camiguin, Misamis Oriental, Polangui, Sta Teresita, Alfonso Lista, Rizal) have expressed keen interest in BOT and issuance of bonds. The NEDA Regional offices have been actively promoting the three alternative financing modes that were subject of an orientation seminar in Manila recently.

• Increased interest in project development. NEDA Regions IV and XIII (Caraga) reported upsurge of requests from LGUs for assistance in project development.

• Increasing interest of funding institutions and programs in fast tract project development training techniques. Those interested include the CBRM, LGA, LOGOFIND and ADB-PDF.

• Five new (Aklan, Leyte, Iloilo, Negros Oriental and Surigao Norte) requests for assistance in eco-tourism suggest that this area of concern may need more serious attention

• High interest rates is making privatization a better mode of financing local projects.

Gaps and Bottlenecks Strengths and Advantages

• In Davao del Sur, uncooperative LGU staff were • A dedicated consultant team having a unity of encoutered causing inefficiencies in the delivery of philosophy and experience. The team can be technical assistance T A funds were therefore mobilized on very short notice. diverted to the more enthusiastic LGUs. • Project Development Templates greatly

• High T -bill rates is making project financing through facilitated the finalization of project bonds an expensive alternative. development work. The templates have beer.

• Reduced GOLD budget, thereby limiting the range tested in three project sites. of assistance during the last few months.

Recent Accomplishments • Completion of seven (7) Program Activities (PAR) during the quarter. These are: Tiwi Investment

Promotion, Davao del Sur Investment Promotion, Naga City Investment Board, Ateneo de Manila Course in Project Development, Strengthening of NEDA Region X PDAC, Strengthening of NEDA Caraga PDAC, Polangui Waterworks Project Development.

• Assistance to the Bohol privatization effort resulting in the turn-over of water and power utilities faciltties to the joint venture

• Measurable impact of effort to advocate alternative financing modes. The effort which covered only the month of August, resulted in two firm commitments to use an alternative financing mode (one BOT and one bond float) for project implementation and five expressions of interest to do so. Successful tum-over of planning workshop design for the NEDA Region IV's Countryside Program for Children Phase V. The design has been adopted in NEDA Region XIII and the Department of Social Welfare and Developmenfs region IV office. The latter's field staff have been trained in ToP and the use of the said planning design.

• Generated the interest of at least two institution's programs, in the GOLD project development process. These programs are the LOGOFIND under the Municipal Development Fund Office of the Department of Finance and the Asian Development Bank's Capacity Building in Local Government Unit Financing Program. In addition, Director of NEDA's Regional Development Coordination Staff verbally requested that the process be introduced in all the other NEDA regional offices.

• Successful completion of the Orientation on Alternative Financing Modes for LGUs which was held in Manila for NEDA Regionai Offices and NEDA National Staff. The learnings and documented outputs of the orientation workshop were immediately used or disseminated in two events organized by the participating NEDA regional offices.

• Successful launching of the joint NEDA Regions X and XIII Investment Forum. The forum was attended by major financing institutions and networks. At least ten LGUs with completed project studies participated in the event.

I!m!!l .-~~ UNrrED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT ~ GOVERNAHCE ANoLOCAl DEMOCRACYPRoJEcTIGOLD

IftYii'

Page 18: .. PD-lh8uJ ~ gq~

~3_d~Q~u=arl~e=r~2=Oo=o~P=erl~o~rm~an~c=e~R=e~po=rl~ ____________________ . ________________________________ --L18

Objective Five ENVIRONMENTAL MANAGEMENT

Major Trends • The DENR does not have yet a discrete Technical Assistance Program for LGUs. As a result, selected

local DENR officers have on their own initiative entered into partnership with their LGUs to start new programs. The sustainability of these personalized initiatives are always under threat due to frequent personnel rottions.

• Manila-based NGOs and the National Flagship Program continues to forge a win-win agreement combining "zero waste" approaches with sanitary landfills. This could serve as model for other Local Government who must deal with polarized views on how to approach the problem.

• Local Governments are increasing their investment in training as partly evidenced in the continued high registration rates to self-paying seminars and sharing sessions sponsored by the Philippine Wastershed Coalition or the Solid Waste Management of the Philippines.

• Several of GOLD-assisted LG Us have become new sites for educational tours by both GOLD and non­GOLD LGUs.

Gaps and Bottlenecks Stren!~ths and Advantages

• The Peace and Order situation in Mindanao has • The multi-sectoral participation of the academe, NGOs, NGAs, and LGUs in the selected environmental projects have enabled the LGUs to carry-out the agreed activities even with limited budgets.

prevented timely implementation of agreed upon activities in most Mindanao sites. A good number of these LGUs have nonetheless worked out ways to take advantage of the remaining months of GOLD Technical Assistance.

• '. In each cluster, some constituent LGUs are unable to sustain their interest and investment. They are usually those whose LCEs have not proactively participated in submitting proposals to GOLD. As a result these LGUs have no clear budgets and attendance to sessions is inconsistent.

• The level of program stages (from zero to advanced programs already in place) of each municipality in a cluster differs. This creates some dissatisfaction among those municipalities in a cluster that have achieved comparatively advanced levels of competence.

I!li!!I!l ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

'ftYiiI

• Willingness of the LGUsin the cluster to co:host activities and pay a registration fee to subsidize their meals and accommodation.

• The leadership support (either financial and! or technical) being provided by several Provincial Governments have encouraged many municipalities to be more aggressive in pursuing their environmental projects.

• The environment Team has earned credibility among most GOLD assisted LGUs. An increasing number of LGUs have begun active negotiations for availing their services aftrer GOLD.

• The financial and technical commitments made by the Provincial Government to assist the municipalities proved to be very useful especially in the launching of the various environmental programs.

• Some LGUs within each cluster are demonstrating outstanding leadership. They are able to apply immediately doable improved practices that serve as model for the cluster.

ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 19: .. PD-lh8uJ ~ gq~

:r Quarter 2000 Performance Report 19

Ob'ective Five ENVIRONMENTAL MANAGEMENT

Recent Accomplishments

• As of 30 September 2000, the GOLD Environment Team is providing technical assistance to 41 inter-LGU clusters involving approximately 180 LGUs from various parts of the country in implementing their chosen environmental projects. Of this number, 10 are original GOLD sites and 31 are new inter-LGU clusters. A cluster is a group of LGUs who have agreed to jointly avail of training and technical services from GOLD. It usually consists of the Provincial Government and between three to five constituent municipalities.

• Twelve (12) inter-LGU clusters have completed all their agreed key activities including Resource Management Appraisal, Review of Management Options, Consensus Building, Strategic Action Planning, Policy and IEC modules. The rest of the clusters continue to undertake the final agreed upon tasks which usually revolve around program preparation, policy formulation, IEC and skills training.

• The GOLD Environment Team also provided short term training to selected LGUs like Zamboanga del Sur for their Coastal Resources Management and Watershed Management; Municipality of Abra de lIog, Mindoro Occidental for their Watershed Management; and Davao del Sur for their Watershed Management program.

• The GOLD Project, together with the US-AEP, assisted the Solid Waste Management Association of the Philippine (SWAPP) in the conduct of two training events for LGUs entitled: Training Course on Preparing and Mobilizing an Effective Solid Waste Management Program. GOLD provided the key trainors. The dates and venues were: July 24-28 (Traders Hotel, Manila) and August 28-September 1 (Cebu Midtown, Cebu City). GOLD and US-AEP are also assisting SWAPP in this event. Preparation am now unde~:;ay for a national sharing conference called SW APPCON 2000 to be held in November 22-24.

• The GOLD Environment Team assisted Coalition in the design and facilitation of two training courses entitled: Information, Education and Communication (lEG) Training in July 12-14 at Cebu City and Localized Watershed Management Program in August 8-10 at Davao City. GOLD provided the key trainors and resource persons.

• The Philippine Watershed Management Coalition (PWMC) and Solid Waste Management Association of the Philippines (SWAPP) with the Environment Team developed a project development strategy to obtain external support to sustain the technical services that they can provide to LGUs.

• Together with the Development Investment and Promotions (DIPP), the Environment Team provided technical assistance to the Local Government Academy and the Project office of the Community Based Resources Management project in Developing customized workshop design for project development that CBRM assisted LGUs can use as guidance.

• Selected GOLD Environment Team members assisted Bohol prepare the scope and action programs for the drafting of the Implementing Rules and Regulations of Bohol Environment Code particularly for forest and coastal resources management.

m!.!!!lI -.~ UNrrED STATES AGENCY FOR fNTERNAnONAL DEVELOPMENT .L\{) GOVERNANCE AND LOCAL OEJIOCRACY PRO.IE.CT /GOLD 'ftlW'

Page 20: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report 20

Objective Six COMMUNICATION, REPLICATION, AND FEEDBACK SYSTEMS

Program Objectives Develop appropriate communication systems for information sharing by local governments, NGOs and NGO networks, Leagues, and NGAs involved in Local Government Code implementation.

Major Trends • Increase in requests for copies of Local Governance Technical Notes for use in training and LGU operations;

• Development of the Local Governance Network or LOGOnet web site into a Web Ring that serves as a central repository of information on local governance and a routing service for all members' initiatives and resources;

• Increased interest of LGUs and citizens in developing both institution-based and community-based monitoring and feedback mechanisms in pilot GOLD sites;

• Development of a generic design on Participatory Evaluation that aims to build LGU capability in conducting Participatory Evaluation for the different interventions it is providing/implementing;

• Additional requests from Regional NGAs (e.g., NEDA) for technical assistance and training in social marketing needed in various phases of project development.

Gaps and Bottlenecks Strengths and Advantages

• Need to find sponsor institutions that will sustain • Highly skilled Communications Unit staff who can the update and uploading of the LOGOnet web produce high-quality communication tools and site. availability of hardware and software to support

• Need to determine the contents of the GOLD media production.

I Project CD.

• Need to lirm up schedules with LGUs for the • Organization of a Web Site Team and their training' conduct of the workshops which are relevant to in web site development primarily using FrontPage. the completion of the CMFM Guide

• Continuing efforts of GOLD programs to define their communication support needs and identify specific communication tools that will facilitate information sharing and replication both in GOLD and non-GOLD sites covered by the GOLD extension.

• Availability of working models and practices that work in GOLD sites on improved LGU operations which can be extracted and abstracted for replication in other LGUs throughout the country.

• Photographer hired to produce pictures for multi-media communication products.

• Strong interest of Local Government Units on acquiring the technology on participatory evaluation and citizen's monitoring and feedback mechanism.

mmI ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

'iflW ill GOVERNANCE AND LOCAL. DEMOCRACY PROJECT/GOLD

Page 21: .. PD-lh8uJ ~ gq~

3'd Quarter 2000 Performance Report 21

Objective Six COMMUNICATION, REPLICATION, AND FEEDBACK SYSTEMS

Accomplishments

Local Governance Technical Notes: Technical writing, design, layout, copy editing, and technical editing of nineteen Local Governance Technical Notes for submission to the Editorial Board and USAID SOs, namely: one on Policy, three on Environmental Management, three on Real Property Tax, five on Health, four on Communications, and three on the Documentation of Health Technical Assistance to Cotabato.

Local Governance Network or LOGOnet Web Site: Assistance to the DCOP I in designing, developing, and meeting with prospective corporate sponsors for the LOGOnet web site to ensure its sustain ability after GOLD. Together with the DCOP I, the Communications Team was able to secure the commitment of Globe Telecoms to host LOGOne!. Copy edited and uploaded written materials submitted by programs for the web site explaining the importance of GOLD programs to local governments and communities, and how GOLD approaches, tools, and resources can help. New updates to the Oracle newsletter, Legislative updates, Policy page, and Internet Resources page were also uploaded.

Development Investment Program: Social marketing workshops were conducted for NEDA officers from Regions 4 & 10 at Orchid Garden Hotel, Manila; for NEDA-Region 13/CARAGA in Butuan City; and for newly appointed Municipal Assessors and Treasurers conducted at the Center for Continuing Legal Education, College of Law, Ateneo de Manila.

Citizens' Monitoring and Feedback Mechanism. The following were the Program's major achievements during the quarter: provIsion of technical assistance for the development of Naga City Citizen's Handbook intended to provide information to the public on accessing services from the LGUs; development, testing and finalization of a mariual on Participatory Evaluation; and workshop design for the community-based and institution-based Citizen's Monitoring and Feedback Mechanism

Local Finance: Social Marketing Workshops were conducted for newly appointed Municipal Assessors and Treasurers in collaboration with the Center for Continuing Legal Education, College of Law, Ateneo de Manila.

JJm!!J ''4tif- UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

Ift'iWi

Page 22: .. PD-lh8uJ ~ gq~

----_._---_ .. _--.. _._-_._---------------

3 d Quarter 2000 Performance Report 22

Objective Seven POLICY SUPPORT

Program Objectives

• Undertake demand-driven policy studies and interventions in areas of national importance upon request from local governments, the Leagues and national government agencies that seek to sustain gains and address potential impediments to the progress of decentralization and local governance.

Major Trends

• Sustained interest from private sector, local government leagues and civil society organizations to engage national government and Congress in a meaningful policy dialogue affecting decentralization and local autonomy.

• Continued threats to gains of decentralization via legislation and executive actions.

• Existence of strong local governance network and venues for policy exchange.

• The leadership of Senator Aquilino O. Pimentel Jr., Chair of the Senate Committee on Local Government to champion the filing and nationwide public hearings of an omnibus bill amending the 1991 Local Government Code.

• Increasing interest of the NGO and donor community to be part of a web-based information network.

Gaps and Bottlenecks Strengths and Advantages

• Senator Pimentel postponed the scheduled • Existence of strong established policy networks regional public hearings on SB 2064 due to that ARO-GOLO can tap into, with national budgetary constraints. government (both legislative and executive

• Election fever rising up. Concerns both at the branches), various leagues of LGUs and their national and local levels are gearing towards Secretariais, major blocs in civil society (NGOs, upcoming election in 2001. There were no more Private Sector, academe), donor agencies substantial movements in the legislative process. (Donor's Forum) and others.

• Election fever rising up. Concerns both at the national and local levels are gearing towards upcoming election in 2001. Civil society to ensure those governance issues are considered as election issues.

Recent Accomplishments: Roundtable Discussion Series • Forum on Establishing the Operating Framework and Monitoring Mechanisms for the Municipal Bond

process was initiated by the OOF last July 11,2000. A collaborative effort with AGILE, LGUGC and CPPSP. • Roundtable Series on the IRA cut, headed by th.e Local Governance Policy Forum.

Legislative Tracking and Analysis • Soft launching of the web-based Legislative Tracking System or the People's Access to Legislation

(PASSAGE) Project. Web address is www.passage.org.ph • First quarterly analysis submitted by the Ateneo Center for Social Policy and Public Advocacy.

Related Activity • The L T AS Project was dovetailed with the LOGOnet project, a web-based networking activity among key

-players' in the' Philippine local governance fieid. Explorarory meetings were initiated by ,I.'RD wit~GOLD partners, leagues and donor community.

• Budget Watch project. A multi-sectoral tracking project of the budget cycle initiated by the LGPF.

Support for the Leagues/Civil Society on the Amendments to the 1991 Local Government Code • Provided technical support, i.e. facilitation and resource persons in the regional public hearings of Senate

Bill 2064 in Region 1 and CAR, as requested by Senator Aquiino O. Pimentel, Jr.

-~ UNfTEO"STATESAGENCY FOR INTERNATIONAL DEVELOPMENT ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD Ifi'iill

,

Page 23: .. PD-lh8uJ ~ gq~

3'" Quarter 2000 Performance Report 23

Table Two Comparison of 6th Plan Targets and Outputs Achieved

Objective One PARTICIPATION

6th Plan Activity Cumulative target for first 3'·

quarters of 6th plan Status of outputs achieved

ToP 2 Training 2 trainings Exceeded target by two (2) more traininas

ToT 2 traininqs Accomplished ToP 1 No Target (CLGS are now Completed the special request for Top1

implementing ToP1 Trainings - not Trainings of the Dev't Academy of the anymore ARD/GOLD) Philippines, Civil Service Commission,

Local Government Academy and of the Local Chief Executives

MEPW 2 trainings One (1) has been completed and the other MEPW training was moved to Oct. ,2000

BPPBW 2 trainings One (1) training was completed and the 2nd BPPBW training was cancelled due to budget cuts. DWC-T did a BPPBW training for its teachers in Bohol.

I School Officials 2 trainings One (1) training was completed and the Participatory Workshop other training was moved to Oct. 2000

j for Real Pro~erty Tax_ , Barangay Officials , 2 trainings I Accomplished : Participatory Workshop

for Real Property Tax Quick Investment , 2 trainings Proposed Budget for Training is on hold

; Promotions Municipal Cluster ' 2 trainings Proposed Budget for Training is on hold

, Investment Promotions

Individual PAR Status Report

PAR Current Site Number PAR Title Completion

Status MAK 0800-002 Participation -Administration 73% MAK 0801-008 Manual of Procedures for ToP1 Traininq of Trainers 70% MAK 0802-008 ToP 2: How to Design ToP Events 66% MAK 0802-009 Traininq of Trainers 100% MAK 0802-010 Local Participatory Plannina-Budqetinq Workshop 100% MAK 0802-011 Municip_al Environment Planning Workshop 69% MAK 0804-007 StrengtheninQ Atenso de NaQa - CLG 69% MAK 0804-008 StrenQtheninq Bulacan State University - CLG 79% - .-MAK 0804-009 Strenqtheninq Gerry Roxas Foundation - CLG 17% MAK 0804-010 Strengthening SOPREX - CLG 75% MAK 0804-011 Strengthening Atsneo de Davao - CLG 75% MAK 0804-012 StrenQtheninq Divine Word ColleQe - CLG 81 % MAK 0805-001 ORID Boook for LCEs 45%

I!mliJ -'~ UNfTED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT .tRJ GOVERNANCE. ANO LOCAL DaIOCRACY PRoJECT/GOLD ~

Page 24: .. PD-lh8uJ ~ gq~

:Jd Quarter 2000 Performance Report 24

Objective One Local Participatory Planning-Budgeting (LPPB) Program

stn Plan Activity 3na Quarter target Actual 3ra Quarter Results Comprehensive Land Use 2 LGUs completed CLUP TA La Union- TA focused to pilot municipality Planning Process (Sudipen) CLUP final report being

prepared; Metro Naga- Technical sessions are ongoing; Nueva Vizcaya - Discontinued; Southern Leyte - All technical sessions completed; Participatory CLUP Process Manual for Facilitators, ongoing

Support to the Liga ng mga 1 Barangay Exec. Course; 1 BEC conducted in Mandaue City; Direct Barangay Secretariat; Barangay database pilot secretariat support provided (Municipal networking installation; Project Office and Barangay Operations

Liga Secretariat Manual of Specialist); 1 Secretariat course completed systems and procedures (Subic); 1 Provincial Assembly assisted;

Secretariat Manual - ongoing; BEC Manual for Facilitators/Participants - completed

Support to the ROC Support for PBM functions CLOSED enhancement

Status of Program Activities (PAR)

Site PAR Number PAR Title Status La Union LAU-0505-001 Preparation of Municipal Completed technical session on

Comprehensive and Sustainable Land Situational Analysis and Visioning; Use Framework Plans for the Other technical sessions Municipalities of La Union discontinued due to LGU's decision

to focus TA to 1 pilot municipality (Sudipen); CLUP final report being prepared.

Metro Naga NAG-0505-002 Metro Naga Land Use Planning All MTWG technical session completed; Metro planning activities ongoing with Situational Analysis and Visioning completed

Nueva N UV -0505-003 Capability Building for Municipal T A discontinued due to lack of Vizcaya Comprehensive Land Use Planning interest of LGU

for Nueva Vizcaya Southern SL T -0505-004 COMPASS Program Participatory All technical sessions for Municipal Leyte Planning Workshops and Training of TWG completed

Facilitators Liga ng MAK- 0504-001 Support to Liga ng mga Barangay 2 capability building trainings mga . conducted; continued direct Baranqay secretariat support

Im!Iil ~ UNfTED$TATE$ AGENCY FOR INTERNATIONAL DEVELOPMENT ID . GovERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

IWj'iil

Page 25: .. PD-lh8uJ ~ gq~

:r Quarter 2000 Performance Report 25

Objective One SOl SIn Plan Targets Versus Actual Performance

Site Objective Activity Title Indicators Status Area

MAK 0703-019 Public Service 1 course 4'" and last PSEP-ToT class Excellence Program conducted during the first quarter Training of Trainers (PSEP-ToT)

CNT 0703-024 PSEP for LGU 5 LGUs to have 125%; 6 LGUs have completed SIQ 0703-021 Departments conducted the first the conduct of the SV&SV and ESM 0703-022 two PSEP SAW components; 9 LGUs have PAG 0703-032 components completed the SIW and 12 LGUs ANT 0703-028 have conducted the BCSS DVN 0703-029

NEG 0703-038 PSEP for Hospitals! 2LGUs 100%; PSEP for the Negros MOR 0703-031 Health Sector of a Oriental Integrated Hospitals and

Province the Misamis Oriental Hospital and Health-related Departments have completed the conduct of the first 2 PSEP components

I I

I PSEPIBCSS 2 clusters Activities cancelled due to financial , for ENROs and time constraints

j BCSS for LGUs 10 LGUs No independent BCSS class was I

conducted since all BCSS requests have been upgraded to full PSEP. which includes BCSS ,

~ PSEP Networking , Second meeting Activity cancelled due to financial and time constraints

I Program Management . SQI 3"' Quarterly i

MAK 0700-004 ' 100% completed (Quarterly Report) Report

m::ImI --411- UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT ~ GoVERNANCE AND LOCAL DaIocRACY PRoJEcT/GOLD Ift'iW'

Page 26: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report

Site Nueva Vizcaya

Nueva Vizcaya

Bulacan

Palawan

Tagaytay City

Baao, Camarines Sur

Camarines Norte

I

Canaman, Camarines Sur

Iriga City

Naga City Naga City

Naga City

Tigaon, Camarines Sur

Capiz Province

Roxas City

Concepcion, Iloilo

Pan dan, Antique

cluster of

IlmI!I

SERVICE QUALITY IMPROVEMENT Status of PARs as of September 30, 2000

PAR Code Activitv Title NUV-0703-025 PES-Training of Raters

NUV-0703-027 PES - Facilitators Manual Development

BUL-0703-016 PSEP for LGU Departments and Hospitals

PAL-0703-011 PSEP

T AG-0703-01 0 PSEP for LGU Departments and Hospitals

CSR-0703-015 PSEP

CNT -0703-024 PSEP

CSR-0703-020 PSEP

CSR-0703-013 PSEP

NAG-0703-009 PSEP NAG-0703-026 Organizational

StrengtheninQ NAG-0703-039 Development of

Citizen's Guidebook

CSR-0703-023 PSEP

CAP-0703-012 PSEP

CAP-0703-0 14 PSEP

ILO-0703-017 PSEP

ANT-0703-028 PSEP

BOH-0703-030 PSEP

Status/Percentage Status 100%; Training of Performance Raters completed. 30%; Final draft for submission by the first week of October 2000. 58%; 1" 2 components and BCSS completed. SIW will be conducted on October 12-13, 2000. 79%; 1" 3 components and BCSS completed. Implementation of SIRs on-going. 79%%; 1" 3 components and BCSS completed for health group and non-health group. Implementation of SIRs on-going. 79%; 1" 3 components and BCSS completed. Implementation of SIRs on-going. 79%; l' 3 components and BCSS completed. Implementation of SIRs on-going. 79%; l' 3 components and BCSS completed. Implementation of SIRs on-

_going. 79%; l' 3 components and BCSS completed. Implementation of SIRs on-going.

100%; PSEP Workshops completed. 90%; Final report for submission by October 15, 2000. 31 %; 1" draft of the Guidebook almost complete. Copy of final draft to be forwarded to ARD. 79%; 1" 3 components and BCSS completed. Implementation of SIRs on-going. 57%; l' 2 components completed. Retrieval of survey questionnaire done. 64%; l' 2 components and BCSS completed. Retrieval of survey questionnaire and analysis of feedback data completed. 58%; 1 s 2 components and BCSS completed. Retrieval of survey questionnaire on-going. 79%; 1 s 3 components and BCSS completed. Implementation of SIRs on-going.

85%; l' 3 components and BCSS com leted. Celebration of

~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT ID GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD 'Wj'iiI

26

Page 27: .. PD-lh8uJ ~ gq~

municipalities)

Cebu City

Negros Oriental

Negros Oriental

Siquijor

Eastern Samar

! Dipolog City i I Pagadian City I I I Misamis Oriental

I Tanaub City Villanueva, Misamis Oriental New Corella, Davao del Norte Civil Service Commission

ARD

ARD

ARD

ARD

I!ml!lI

CEB-0703-018

NEG-0703-033

NEG-0703-038

SI0-0703-021

ESM-0703-022

DIP-0703-034

PAG-0703-032

MOR-0703-031

I TGB-0703-036 I MOR-0703-035 I I DVN-0703-029

I MAK-0703-037

MAK -0700-003

MAK-0703-019 i

MAK-0702-001

MAK-0700-004

i

Reoraanization

PSEP for LGU Deoartments

PSEP for Hospitals

PSEP

PSEP

, PSEP

PSEP

PSEPfor LGU Department and Hospitals

: BCSS PSEP

PSEP

PSEP

BCSS-ToT

PSEP-ToT

PSOAW Facilitators Manual

SOl Manaaement

-~~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

Ift'iii'

ua er e ormance epo :i" Q rt 2000 P It R rt 27

Accomplishment will be towards end of October 2000. 83%; Final report to be submitted on or before October 15, 2000. 64%; l' 2 components and BCSS completed. SIW to be conducted on October 17-18, 2000. 64%; l' 2 components and BCSS completed. SIW to be conducted on

! October 12-13, 2000. 79%; 1 SI 3 components and BCSS completed. Implementation of SIRs on-going. SIW to be conducted on October 9-10, 2000. 70%; l' 3 components completed. Celebration of Accomplishments will be conducted towards end of October 2000. 64%; l,j 2 components and BCSS

; completed. SIW to be conducted on , October 10-11, 2000.

79%; l' 3 components and BCSS ; completed. Implementation of SIRs

on- oin . 54%; l' 2 components completed for health and non-health groups.

Closed as of June 30, 2000.

54%; lSI 2 comoonents comoleted.

48%; 1 st component completed. , 60%' l,j 2 components and BCSS

completed. Conduct of SIW is on October 19-20, 2000. 100%; Completed. PAR Closed as of June 30, 2000. 100%; Completed. PAR Closed as of June 30, 2000. 100%; Completed. Only 15 copies have been reproduced for distribution to CLGs, ARD Mom!. and USAID.

63%; On-aoina.

Annual Plan tar ets

JR) GoVERNANCEANDLOCALDEJIOCRACYPt«J.;a;:r/GOLD

I

r

I ,

i i

r

Page 28: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report ::>8

6th Plan Activity Cumulative target for first 3

quarters of 6th plan Status of outputs achieved RPTS Initiate 4 LGUs from the original 5 Initiated 4 LGUs Assist pioneer LGUs in cascading lessons Complete assistance to 2 LGUs Activity close-out for 1 LGU

RPTIS Technical Initiate 8 LGUs Initiated technical assistance to only 1 Assistance LGU due to budgetary constraints,

Activity close-out for 8 LG Us technical assistance on-going.

FTMS Complete piloting in 3 LGUs Completed piloting in 3 LGUs

Manual revised, published and Final draft of the Guidebook almost ~esented to leagues and BLGF complete Manual distributed to LGUs Not completed

5 Provinces, 5 cities and 10 No adapters municipalities adapters

Manuals of Procedures Complete 4 Manuals of Procedures 2 Manuals of Procedures almost for R PT Tools complete Technical Notes on RPT Complete 7 Technical Notes 1 TN with final copy printed

3 for technical editinq BLGF/DOF MOA on replication of lessons No MOA signed Collaboration learned from GOLD RPTS Sites

ToP1 Training for BLGF Personnel Conducted ToP1 Training for BLGF Personnel

ToT for ToP1 of selected BLGF Personnel

--BLGF facilitated Facilitated 1 CBW; 5 Barangay and 5 CBW/BarangaylTeachers workshops Teachers Workshops

Proqram Mnqt. Quarterly Report Quarterly Report

I!li!:!I£I ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT IiYj'ii1

ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 29: .. PD-lh8uJ ~ gq~

Site PAR # NEGROS ORIENTAL 1101-004

BATAAN 1101-005

PALAWAN 1101-006

CAPIZ 1101-007

COTABATO 1101-008

i MAKATI 1103-001

, MAKAT!. 1104-001

..

MAKATI 1104-002

MAKATI 1104-003

MAKATI 11104-004 !

I

MAKATI 1100-002

l!ml!J

:i" Quarter 2000 Performance Report 29

RESOURCE MOBILIZATION PAR status report

PAR title Real Property Tax System Program

Real Property Tax System Proqram Real Property Tax Information System Real Property Tax System Program Real Property Tax System Program

Financial Trend Monitoring Svstem Program Manual of Procedures for Barangay Part. Workshop on RPT Manual of Procedures for Teachers and School Officials

I Workshop on RPT ! Manual of Procedures on CBW for RPT Manual of Procedures for Administrative Remedies-RPT

Proqram Manaqement

Current status 100% Completed Activity closed-out as of September 19, 2000 63% Completed

95% Completed

53% Completed

100% Completed Activity closed-out as of October 6, 2000 76% Completed

90% Completed

90% Completed

I

! 64% Completed , ,

I 64% Completed I !

.~~ UNfTED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

IftYiiI

Page 30: .. PD-lh8uJ ~ gq~

:td Quarter 2000 Performance Report ~O ~~~~~~~~~~ ___________________________________________ ~v

Objective TwcI MIS PROGRAM THIRD QUARTER OUTPUT/RESULTS

Activity Deliverable Status

Completion of FMIS Complete installation in 4 FMIS presented and handed over to Negros software development provinces Oriental; and installation, testing, training,

customization are ongoing in Sohol, Sulacan, and Nueva Vizcaya (time and resource constraints have kept the team from installinq the system in Saranqani).

Preparation of Guidebook N/A Final version reproduced and distributed on Information Systems Planninq for LG U IS Planning training for Follow up in 10 LGUs All new sites without ISPs have been selected sites covered during the first training.

LAN building for LGUs N/A Selected sites agreed to assume responsibility without GOLD support due to resource constraints

RPTIS installation Support 1 LGUs Support completed in Sohol, Sibulan, and Palawan; Support started in Capiz

FMIS installation Support 3 LG Us Support is in advance stage of implementation in Sohol, Sulacan and Nueva Vizcava -

PMIS installation (added Support on-going in San Fernando City; activity due to requests nearing completion in remaining four (4) from five selected sites) sites (La Union, Moncada, Laguna, and

Quezon GIS Application 7 Applications Developed Accomplished - 11 Application Developed Development

Inter-LGU network on GIS Initial Meeting Supported Initial Meeting of GIS Practitioners' Association held in Naga

mm::I ~ UNITED STATES AGENCY FOR fNTERNA TlONAL DEVELOPMENT IWj'iiI

ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 31: .. PD-lh8uJ ~ gq~

Site Objective Area

MAK 0600-002

MAK 0601-002 (changed to 0601-006)

NEG 0601-005

SAR 0601-DUM

SOH 0602-005

I PAT 0602-006

MAK 0603-001

I LAG I 0605-001

I i

QUE .0605-002

i MOR • 0605-003

LAU 0605-004

TAR 0605-005

SFC 0605-006

I 1

mmJ

3 d Quarter 2000 Performance Report 31

MIS PROGRAM INDIVIDUAL PAR STATUS REPORT

ActivityTitie Indicators MIS/GIS Orientation of and assistance to Management requesting LGUs; coordination of Support Activities consultant activities; admin

support work; monitoring of PAR implementation

FMIS installation in FMIS installed and users trained Bohol, Nueva Vizcaya, and Sulacan Completion of - Accounting, Treasury and FMIS Software Budgeting modules completed; DeveloiJment - Integration of three modules

completed. Adoption of FMIS - FMIS installed, tested, and in the Province of implemented. Sarangani - Users trained Adoption of RPTIS - RPTIS installed, tested, and in Sohol implemented;

- Users trained Adoption of RPTIS - RPTIS installed, tested, and in the Municipality implemented. of Pateros

- Users trained IS Plan Guidebook - IS Plan Guidebook completed; Preparation and - Conduct of training on ISP Training Preparation Adoption of PMIS - PM IS installed, tested, and in the Province of implemented. Laquna - Users trained Adoption of PMIS - PM IS installed, tested, and in the Province of implemented. Quezon - Users trained

I Adoption of PMIS - PMIS installed, tested, and " in the Province of implemented. I Misamis Oriental - Users trained I Adoption of PMIS - PMIS installed, tested, and I in La Union implemented. , Province - Users trained I Adoption of PMIS - PMIS installed, tested, and

in Moncada, implemented. Tarlac - Users trained Adoption of PMIS - PMIS installed, tested, and

I in San remando ; implemented. City, La Union I - Users trained

Status/lssue - 80% complete; - On budget spending

- Adoption activities nearing completion in Sohol; ongoing in Nueva Vizcaya and Sulacan Completed

T A deferred for post-Project institutionalization initiatives Completed

76% complete

Completed

90% complete

73% complete;

Closed

83% complete

82% complete

73% complete

I

" .. ~ UNITED STATES AGENCY FOR iNTERNAnONAL DEVELOPMENT ~ GoVERNANCE AND LOCAL. DaIOCRACl' PRoJECT/GOLD IWjWI

Page 32: .. PD-lh8uJ ~ gq~

I

:I" Quarter 2000 Performance Report

Objective Site Area

NAG 0604-002

ALB 0604-005

BOH 0604-001

CAP 0604-003

NUV 0604-003

BUL 0604-006

GIS PROGRAM INDIVIDUAL PAR STATUS REPORT

Activity Title Indicators Strengthening of the - Identification/proposal of Naga GIS Unit DBM and Civil Service designations for GIS

practitioners; Development of five additional GIS applications

Using GIS for MBN - Development of a GIS- Based Minimum Basic in the Province of Needs Information system for at least one barangay. Albay Application of GIS - A Provincial TWG comprising of the Policy Group, using MBN Data in Management Group and Production Team has been the Province of organized Bohol - The MBN/GIS Application Description has been

formulated. - The Applications Description Implemented and its

I Desired Situation is realized/installed.

- The Provincial Staff's GIS capability has been enhanced through further training.

i - An MBN Database & Data Entry Program has been

developed and installed. - CRMP & Natural Resources are used with MBN/GIS

data during the workshop. - A Barangay participatory planning and budgeting

workshop has been held, using MBN data in GIS format. Linkages have been established between the·' GIS/MBN program, CRMP and CBRMP.

Expansion of Pilot - All required hardware, software and equipment have GIS application in been procured, installed and utilized; MBN-CBPIMS Data - Participatory planning and budgeting sessions are Generation and held in all barangays of Ivisan and by the municipal Processing government of Ivisan itself;

- Provincial Government of Capiz has established a GIS Center with strategic plans and projects for at least the next three years

Project Tracking and - Policy Group members are actively participating in Information System GIS related discussions and policy formulation

- Production Team can produce and analyze digital maps

- Production Team can Survey data and convert these into digital form

- GIS is being used in the Governor's Office in the allocation of resources

- GIS Resources Center is manned and functioning. Linkage of RPTIS We will know that we are moving in the right direction TD Records to Lot when we actualize the following indicators: Parcel Files - a GPS-based road network map of the Municipality of

Pulilan - rectified lot parcel maps of Pulilan - exception reports from the linkage of Lot Parcei Meps

and digital Tax Declaration records; - standard report formats for resolution of exceptions

Status Issue

97% ongoing

67% ongoing

100% accomplis hed

65% ongoing

38% completed

60% ongoing

I!mI!I ~ UN/TED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT ilYj'JW

ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT IGOLD

32

Page 33: .. PD-lh8uJ ~ gq~

I

3'" Quarter 2000 Performance Report 33

Objective Three PERFORMANCE MEASUREMENT OUTPUT/RESUL TS AGAINST 6'" PLAN DELIVERABLES

sth plan activity Cumulative target for first

3 quarters of sth plan Status of outputs achieved Performance Indicators 1999 Report 1 -3' Quarter targets completed Assessment 2000 Data Collection 10'" Rapid Field Appraisal Overall Framework Finalized l' -3' Quarter targets completed

Fieldwork Designed Fieldwork Completed 10t" RFA Presentation

SWS Indicators Discontinued for 2000 I Contextualization

,

Individual PAR status report

Site PAR # PAR title Current status MAKATI 0902-002 Indicators Effort for 73% Complete

MAKATI 1001-005

i i

I!!!:!l!J ~ UNfTED STATES AGENCY FOR fNTERNATlONAL DEVELOPMENT

Iii'jWi

USAID

10"' Rapid Field Appraisal

Currently awaiting for survey and mailed questionnaire data to be encoded. 79% complete Public Presentation conducted. 10th RFA Synopsis Report to be submitted by Ateneo School of

I Government by 1" week of October.

LR.) GOVERNANCE. AND LOCAL DaIocRAcy PROJEcT/GOLD

,

I

Page 34: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report 34

Obiective Four Development Investment

Plan Activity Cumulative Target fol' Status of Outputs First 3 Quarters of 2000

Establishing the Ateneo de 18 LG Us trained Completed. 14 LGUs trained. PAR has Manila Course in Project been closed. Course has been Development established within the Ateneo School of

Government. Strengthening PDAC for 8 LGUs covered. 28 LG Us covered through various NEDA Region IV activities. Last activities scheduled for

October. Strengthening the NEDA 7 LGUs covered. 6 LGUs covered. Completed. Renion X PDAC Strengthening the NEDA 12 LGUs covered. 21 LGUs covered. Completed. CARAGAPDAC Alfonso Lista Project Project Study Team organized Completed. Team organized and trained. Development Assistance and study completed. Study completed. Sanggunian decided to

adopt ARD/GOLD recommendations on financina.

Support to Sohol alternative Privatization completed. Privatization completed. finance initiative .

Establishment of the Naga NIPS established Completed. NIPS established. City Inv(~stm~nt promotion board. NIPS Direct LG U assistance Albay Province . Last activity October

Alfonso Lista, Ifugao Completed Sohol Province Completed Sulacan Province Last activity October Cam Norte Province Last activity October Davao del Sur Completed Naga City Completed Palawan Province Last activity October Polangui, Albay Completed Sorsogon Last activity October Tiwi, Albav Completed

STATUS OF PROGRAM ACTIVITIES (PAR)

Site PAR Number PAR Title Status Tiwi, Albay ALS 0301-004 Tiwi Investment Completed.

Promotion Albay ALS 0303-002 Albay Eco-tourism On-going. The following have been Province completed: Profiling of eco-tourism potentials,

Community mobilization work and networking with private sector groups. Circuit planning

. and industry development program ror completion in October.

Polangui, ALS 0303-005 Polangui Waterworks Completed. The study has been completed Albay Improvement and and the LGU has been briefed on alternative

Expansion Management financing modes. Plan

Site PAR Number PAR Title Status Sohol SOH 0304-003 Support to the Sohol Completed. Facilities were turned over in Province Privatization Initiative Seotember.

I!!!:!IiJ ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

~ m GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 35: .. PD-lh8uJ ~ gq~

Bulacan BUL 0301-006 Province

Camarines CNT 0301-007 Norte Province

Davao del DVS 0301-008 Sur Province Alfonso IFU 0303-001 Usta, Ifugao

Naga City NAG 0301-003

Metro i PH I 0305-003 Manila i

Metro PHI 0303-006 Manila

,

i Metro PH I 0303-007 Manila

Cebu City PHI 0305-008

, . Southern R040305-001

region Taaaloa Southern R04 0305-002 region Taqalog Northern RIO 0305-005 Mindanao reqion CARAGA R13 0305-006

Sorsogon SOR 0302-003 Province

I

mzmJ

Bulacan Investment Promotion

Camarines Norte Investment Management Plan

Davao del Sur Investment Promotion Proqram Strengthening Alfonso Usta's Project Development Unit

, Operationalization of the i Naga City Investment

Board Establishing the Ateneo de Manila Course in

I Project Development for ! LGUs.

Establishing the De la Salle University Course for LGUs on Project

, Development Focus on i Small Energy Sources i QI I I la I v~u t::' : "~d Urban I~f--st-u-" r

Strengthening DAP's Investment Promotion Course Offering to LGUs Establishing the UP at Cebu course for LGUs Project Development

! Focus on Recycling I Solid Waste , Strengthening PDAC i Teams-Southern ! Taqaloq Reqion Phase 1

Strengthening PDAC Teams-Southern Tagalog Region Phase 2 Strengthening PDAC Teams-Region 10

Strengthening PDAC Teams-Region 13 Community Eco-tourism

. for Sorsogon I I

.~ UNffED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

iiiYW

:;rJ Quarter 2000 Performance Report 35

On-going. The following have been completed: conduct of Investment Networking Workshop, industry studies, stakeholders' workshops, promotions planning. The PAR is to end in October. On-going. The following have been completed: Profiling and evaluation of tourism potentials. Industry profiling (Pineapple and

j jewelry), Drafting of IRR of Investment Code. . Completed.

Completed. The LGU has decided to finance the project through issuance of bonds.

Completed.

Completed. I I

On-going. Module preparation

I

IOn-gOing. Module preparation

On-going. Module preparation

Completed ,

I

On-going. To date, 28 LGUs have been covered by technical assistance through the PDAC Completed

Completed

On going. Profiling has been completed. So has community mobilization work at the sites.

I Private sector groups have been mobiiizeo through various fora. I

..tU) GOVERNANCE AND LOCAl. DEMocRACY PRo.JEcr iGOLD

Page 36: .. PD-lh8uJ ~ gq~

:fd Quarter 2000 Performance Report 36

Obiective Five ENVIRONMENTAL MANAGEMENT

Activities and Deliverables Indicator( s) Status

Watershed Expanding Notebook Accomplished. Watershed Expanding Notebook Network produced produced and disseminated to LGUs Technical Development Capacity building Working Group and other interested individuals. Two

1 $I sharing session national sharing sessions conducted in February Video tape focusing on policy and on IEC. SUb-national sharing Follow-up Assessment sessions were assisted e.g. Misamis Oriental Eastern

Towns (MISORET) and SOCKSARGEN. Video tape cancelled and other materials such as "Practices that Work" were completed instead. Mid-term evaluation of LG U projects conducted with favorable feedback from LGUs.

Watershed Training module produced Accomplished. Seven modules developed and Management 1 specialist training session produced as part of the Watershed Expanding Technical conducted Notebook. One training session conducted in August Training with the Philippine Watershed Management Coalition.

Special TA training package were provided to two additional LGU clusters, Zamboanga del Sur and Abra de IloQ, Mindoro Occidental.

Direct LGU: 40 LGUs started Accomplished. Sixteen inter-LGU clusters consisting of Watershed 40 LGUs complete 50 MLGUs received direct technical assistance. Of Management this number, two clusters (approx. 10 LGUs) have

completed their key tasks while the rest are in the

-- process of com[1leting 1 to 2 more activities. Coastal . Ex'pandingNoiebook Partly Accomplished. A Coastal Resources Resource produced Management Expanding Notebook produced and Network 1 $I sharing session disseminated to LGUs Technical Working Group and Development Follow-up assessment other interested individuals. First sharing session

postponed to last quarter. Mid-term evaluation of LGU projects conducted with favorable feedback.

Coastal Training module produced Accomplished. Seven training modules produced and Resource 1 specialist training session are now in use by participating LG U clusters. A special Technical conducted TA training package was conducted for Zamboanga del Training Sur.

Direct LGU: 40 LG Us started Partly Accomplished. Thirteen inter-LGU clusters Coastal 40 LGUs complete consisting of 89 MLGUs received technical assistance. Resource Four inter-LGU clusters have completed their modules Management while the rest are in the process of completing 1 to 2

more activities. Solid Waste Expanding notebook Partly Accomplished. A Solid Waste Expanding Network produced Notebook produced and disseminated to LGUs Development Conveners capacity building Technical Working Group and other interested

Video tape individuals. SUb-national capacity building events Follow-up assessment conducted in Misamis Oriental Province, Eastern Town 1 specialist training session and SOCKSARGEN. Video tape cancelled instead

several "Practices that Work" were produced. Mid-

" ! ' term evaluation of LGU progress conducted with favorable feedback. Preparation are underway for the National Conference to be conducted in November tOQether with SWAPP and US-AEP.

Solid Waste Training module produced Accomplished. Seven training modules developed and Management 1 specialist training session currently in use by partiCipating LGUs. Two trainings Technical conducted conducted with Solid Waste Management Association Traininq of the Philippines and US-AEP. Direct LGU: 60 LGUs started Partly Accomplished. Twelve inter- LGU clusters Solid Waste 60 complete consisting of 75 MLGUs started their program. 5 inter-Management LGU clusters completed their modules while the rest

are in the process of completing 1-2 more activities.

= ~ UNfTEDSTATES AGENCY FOR INTERNATIONAL DEVELOPMENT ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

I'ft'iW

Page 37: .. PD-lh8uJ ~ gq~

:td Quarter 2000 Performance Report 37

SITE

STATUS OF ENVIRONMENT PROGRAM ACTIVITY RECORD (PAR) JUL V-SEPTEMBER 2000

STATUS OF OUTPUTS PAR # PAR TITLE ACHIEVED

COASTAL RESOURCES MANAGEMENT Aklan AKL-0401-

014

Antique ANT-0401-011

Aparri APA-0401-008

Bato-libon ALB-0401-009

Bohol BOH-0401-017

Capiz CAP-0401-019

Claveria CLA-0401-007

Eastern Samar ESM-0401-010

Lanao del LDN-0401-Norte 013 Neg. Oriental NEG-0401-

. 015

Bohol

ILN-0406-016

I!!l'.lI!J

Technical Assistance for the Design of Comprehensive Coastal Area Development Plan for the Coastal Municipalities of the Province of Aklan Building-up Inter-LGU Capability Towards Integrated and Comprehensive CRM Implementation Integrated Babuyan Channel Resource Management Project

; Lake Bato Resource Management Program , , , Institutionalizing Integrated Coastal Management

I Capiz Integrated Coastal Resource Management Proiect

! Coastal Resources and Environment Management , ! Inter-IGU Baywide Coastal Resources Management , at Matarinao Bav I lligan Bay Coastal Resources Management Project :

Provincial Assistance to Bayawan-Sta. Catalina Municipal Cluster and Guihulgan-La libertad Municipal Cluster Integrated Coastal Resource

General i Technical Capability Development and

City Environment

80% completed; one activity left

100% completed

80% completed; one activity left 80% completed; one activity left 70% completed; 2-3 activities left 70% completed; 2-3 activities left 80% completed; one activity left

' 100% completed

80% completed; one activity left 70% completed; 2-3 activities left

one

80% completed; one activity left

100% completed

2-3

;.~~ UNiTED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT JR) GoVERNANCE ANt> LOCAl. DEMocRAcY PRoJEcT/GOLD

"Wi'i'

i

, ,

Page 38: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report ~8

SITE PAR# PAR TITLE Status of Project Lanao del LDN-0404- Lanao del Norte Tree Enterprise and Seedling 70% completed; 2-3 Norte 006 Nursery Services Project activities left

Negros NEG-0406- Institutionalization of the Rehabilitation Program of 80% completed; one activitY Oriental 020 Banica River left

Nueva Vizcaya NUV 0406- Operationalizing PRO TREE for Local Community 70% completed; 2-3 019 Watershed Management activities left

Palawan PAL-0406- Palawan Watershed Management Program 100% completed 018

Sarangani SAR-0406- Provincial Support to Municipal Forest Land Use 70% completed; 2-3 022 Planning Implementation activities left

SOLID WASTE MANAGEMENT Agusan del AGN-0404- CARAGA Solid Waste Management 100% completed Norte 017 Antique ANT-0404- L1PASECU Bay Wide Management Council on 100% completed

024 Participatorv Planninq on Solid Waste Manaqement Bohol BOH-0404- Waste Minimization at Source 80% completed; 1 activity

027 left Bulacan BUL-0404- PLGU Bulacan Support for the Development of an 70% completed; 2-3

022 Integrated Solid Waste Manaqement Proqram activities left Bulacan BUK-0404- Upgrading the Marilao Ecological Solid Waste 70% completed; 2-3 (Marilao) 025 Manaqement activities left General GSC-0404- City Support and Enhancement Activities on ISWM 70% completed; 2-3 Santos City 026 Program activities left Lanao del LDN-0404- Lanao del Norte Solid Waste Management 80% completed; one activity Norte 020 Expansion Project left Misamis MOR-0404- Promoting Effective Citizen Participation in Solid 100% completed Oriental 018 Waste Manaaement . Negros NEG-0404- Developing a Provincial Support Program for 70% completed; 2-3 Oriental 021 Municipal Solid Waste Management Initiatives activities' left Northern NSM 0404- Solid Waste Management Program 100% completed Samar 023 Palawan PAL-0404- Strengthening the Provincial Integrated Solid Waste 100% completed

016 Management Program Sarangani SAR-0404- Provincial Support to Municipalities on Integrated 70% completed; 2-3

019 Solid Waste Management Program activities left

GENERAL SITE PAR# PAR TITLE Status of Project

MAKATI MAK-0404- Solid Waste Network On schedule (90%) 013

MAKATI MAK-0406- Watershed Network On schedule (90%) 0113

MAKATI MAK-040l- Coastal Resources Network Delayed schedule (50%) 004

MAKATI MAK-0400- Makati Office Support Activities On schedule (80%) 002

Objective Six COMMUNICATION, REPLICATION, AND FEEDBACK SYSTEM

Activity I Cumulative Target I for first 3 Quarters

Status of outputs achieved

-~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT ID GOVERNANCE AND LOCAl.. DEMOCRACY PROJECT/GOLD IWj'iiJ

Page 39: .. PD-lh8uJ ~ gq~

,

Generating Feedback from Concept designed Constituents and field tested;

workshops conducted

Development of Participatory Concept designed Evaluation and field tested;

conduct of workshops Development of a manual

GOLD Poticy Publications

Development Investment 5 Tech Notes Technical Notes

, ,

, i

Environmental Management 11 Tech Notes Technical Notes

Local Finance Technical 11 Tech Notes Notes

Service Quality Improvement 13 Tech Notes Technical Notes

i ,

Health Technical Notes 12 Tech Notes

Communications Technical 8 Tech Notes Notes I

Local Planning and , Budnetino Technical Notes ! MIS Technical Notes Video Production Documentation of GOLD i 3 Tech Notes Health Technical Assistance

I for Cotabato LOGOnet Web Site i Web site text and

! GOLD CD Project i

ua er e ormance :t" Q rt 2000 P rf, R rt epo

Partially Completed. Discussions and preparations for the CMFM workshop on-going; CMFM guide drafting in process. Completed. Provision of technical assistance for Naga City Citizen's Handbook develooment. Completed. Two workshops for the testing of the design completed - one at the barangay level and one at an inter-municipal level Partially completed. Initial drafting and layout completed. Review and editino in orocess.

! Local Autonomy letterhead designed and printed. 4 issues reviewed by USAID SOs for printing. Layout for one issue for Editorial Board and USAID SOs review completed. Designed and produced the PowerPoint presentation used during the 9th

RFA Presentation of FindinQs. 1 Tech Notes printed. Designed and produced covers for development proposals, feasibility studies, and other outputs generated by the Project Development Workshop for local governments. Revised the design of the Naga City Investment Promotions logo based on LGU recommendations. Designed and produced four flyers about the Development Investment Program. Conducted Social Marketing workshops for consultants and participants in the Project Deveopment Course for LGUs, regional NEDA officers, PDAC officers, and LGU

rO'ect officers in non-GOLD sites. One Tech Notes issue for Editorial Board/SOs review. Technical editing and layout for 2 issues and process. Designed and produced covers for conference materials, workshop outputs, and proceedings for Environmental Management activities on Integrated SQlid Waste Management, Watershed Management, and Coastal ResolJfces- Ma!"!anement. 1 Tech Notes printed. Two issues for Editorial Board/Sos review. Technical writing and layout of two issues in process. Conducted social marketing workshops for Municipal Assessors and Treasurers. 1 Tech Notes printed. Designed a back-te-back Public Service Excellence Program flyer for SQI and the Civil Service Commission. Designed and produced invitations and certificates for various Quality Service Improvement workshops. 1 Tech Notes printed. Technical writing and editing, copy editina, and lavout of 4 Tech Notes in Process. Technical writing, editing, and layout of the Tech Notes issue in orocess PAR not opened.

PAR not ooened. PAR not ooened. I Activity ongoing.

, ! i LOGOnet web site designed and uploaded. Text and graphics i uodate, functionalilv develooment. and maintenance onooino. ,

PAR to be opened. Tech Notes files reviewed for corruption, , ! , 0 n ~ ',,,> _Q\I\I ·h 1( •• r , scar oed, educd ann Ira. ,sf .I.d to CD " fe. _ac. ", .. J Adobe Acrobat compression of different file formats tested .

COMMUNICATION, REPLICATION, AND FEEDBACK SYSTEMS PAR STATUS REPORT

PAR Site number PAR Title Current Status

8UL 0201-005 Citizen's Monitoring and Feedback Mechanism for 70% completed Communitv-8ased Proarams and Services (Marilao

I!mI!J --~ UNfTEDSTATE$AGENCY FOR INTERNATIONAL DEVELOPMENT lR) GoVERJWICE AND LOCAL DEMOCiIACY PRoJEcT IGOLD ~

39

Page 40: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report 40 Modej)

COT 0201-006 Citizen's Monitoring and Feedback Mechanism for 70% completed Institution-Based Programs and Services (Cotabato ModeJ)

MAK 0201-007 Monitoring and Feedback System 85% completed. Preparatory CMFM activities completed; Participatory Evaluation activities almost completed.

MAK 0202-001 GOLD Policv Publications 39% comoleted. MAK 0202-006 Development Investment LGTN 67% completed.

Production shifted from Tech Notes to FAQ Primers.

MAK 0202-007 Environmental Management LGTN 86% completed. Targets for the year reduced from 13 to 3 Tech Notes.

MAK 0202-008 Local Finance LGTN 27% completed. Targets for the year reduced from 11 to 4 Tech Notes

MAK 0202-009 Service Quality Improvement LGTN 95% completed. Production of Tech Notes terminated as per decision of SOl Specialist.

MAK 0202-010 Health LGTN 7% completed. Targets reduced from 12 to 6 Tech Notes

MAK 0202-011 Communications LGTN 0% completed. Targets reduced from 10 to 4 Tech Notes

MAK 0202-012 Documentation of GOLD Health Technical Assistance in 23% completed. PAR the Province of Cotabato opened Auqust 2000

MAK 0203-001 LOGOnet Web Site 0% completed. PAR opened Auqust 2000

Ob'ective Seven POLICY SUPPORT Plan versus Actual Performance Matrix

I!li!!I!l ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

liWiiI ID GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 41: .. PD-lh8uJ ~ gq~

3'" Quarter 2000 Performance Report 41

Plan Activity Cumulative Targets for First Three Quarters of 6'" Plan Status of Outputs Achieved

Legislative Tracking and Developed database Done. Database is now with the Analysis League of Vice Govemors of the

Philippines and www.passage.org.ph

3 Quarterly Analysis Partially Done. 2 Quarterly Analysis produced; spot reports and briefs on legislative development.

Legislative Review Partially done. Data gathering and , research have been started by I contractor

Updates on Executive and Compendium completed , Activity was not continued. Supreme Court Support to Local Governance Policy Network Developed Information Sharing Done. Support to LGPF was Development Mechanism sustained including the development

, of its webpage for policy discussions. Dovetailed with LOGOnet Project.

Roundtable Discussion I Two Roundtable Discussions Done. The following fora were held: Series on Local Joint Ventures, Municipal Bonds, Governance ! Watershed Management, Intemal

i Revenue Allotment, Code !

.-"Imendments Process

: i

I Six Reports Produced ! - Two papers on municipal

Bonds (John Petersen); - Joint Ventures (AI Agra): - The LGU Credit Rating System

I -(Orial)

I Five Policy Discussion Papers on Watershed Management

I 3 Quarterl

INDIVIDUAL PAR STATUS REPORT TE PAR # PART TITLE CURRENT STATUS

Makati MAK-1002-001 Roundtable Discussion 100% Series on Decentralized On schedule. For closure. Governance

Makati MAK-1001-004 Legislative Tracking and 69% Analysis Second quarterly report for

submission by 15 October Makati MAK-1002-002 Consensus-Building 100%. PAR Closed

Workshop on the Local Government Code

I Amendments '----_._,--. -_. ---,. , MaKatl MAK -1 000-002 I Policy Management I For closure.

Table 3 List of Publications produced during 3rd Quarter

NAME OF PUBLICATION Document, Video, Poster, Brochure Number ~ PERFORMANCE MEASUREMENT

I!mI!:I ~ UNrreo STATES AGENCY FOR fNTERNAnONAL DEVELOPMENT ~ GOVERNANCE AND LOCAL DaIocRACY PRoJEcT/GOLD

'ft'iii'

Page 42: .. PD-lh8uJ ~ gq~

• Eco-tourism Sites (A revised "Point

• 18,

• 25,

i

• Project (A Project of the LGU of the Province of Sorsogon assisted by 15

• Mainstreaming Child Rights in Local Development Planning Session Guide with NEDA

An Intervention for

~ ENVIRONMENTAL MANAGEMENT

• Preoarinq and Mobilizinq a Resoonsibe Solid Waste Manaqement oroqram: Traininq Manual 150

• Localized Watershed Manaqement: Traininq Manual 80

• Practices That Works (Bulacan Flood Control and Water Resources Proqraml 300

• Practices That Works (Bustos Solid Waste Manaqement Proqram) 300 • Practices That Works (San Fernando City Solid Waste Manaqement Prooram) 300 -~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

IifiiiI ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 43: .. PD-lh8uJ ~ gq~

:t" Quarter 2000 Performance Report 43

• Practices That Works (Sib ulan Solid Waste Manaaement Proaram) 300 'l; COMMUNICATION • Local Health Management and Development Local Governance Technical Notes (LGTN) on Public 3,000

Hospitals (PH) Notes 2 on Measurina Public Hosoital Performance

• Local Governance Network (LOGOnet) web site UDdates

l!mI!J ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT i\{) GoVERNANCEANOLOCAL~PROJECT/GOLD IftYii'

Page 44: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report 44

Table 4 Workshops and Activities conducted during 3'· Quarter 2000

LGU NAME OF PROGRAM/ NUMBER REQUESTER WORKSHOP/ACTIVITIES DATE TYPE OF SUPPORT ACTIVITY OF PAX Antique Consensus Building and July 4-5 Design, Facilitation, Environment 38 ISWM cluster Strategic Action Planning Resource Persons, Supplies

Workshop and Materials Antique CRM Crossvisit July 4-6 Facilitation, resource Person Environment 32 cluster Negros Consensus Building and Aug. 8-9 Design, Facilitation, Environment 41 Occiendtal Strategic Action Planning Resource Persons, Supplies CRM cluster Workshop and Materials Sarangani Documentation of Good July 13 Design, FaCilitation, Envi ronment 25 ISWM cluster Practices Workshop Resource Persons, Supplies

and Materials Eastern Resource Management July Design, FaCilitation, Environment 26 SamarCRM Options Workshop 13-14 Resource Persons, Supplies cluster and Materials Antique Policy Review and July Design, FaCilitation, Environment 39 ISWM cluster Generation Workshop 24-25 Resource Persons, Supplies

and Materials Eastern Consensus Building Aug. 1-2 Design, Facilitation, Environment 75 SamarCRM Workshop Resource Persons, Supplies cluster and Materials Romblon Consensus Bldg. And Aug. 1-2 Design, I-acilitation, Environment 20 CRM cluster Strategic Action Planning Resource Persons, Supplies (Corcuera, Workshop and Materials cluster) Romblon Consensus Bldg. And Aug. 7-8 Design, FaCilitation, Environment 46 CRM cluster Strategic Action Planning Resource Persons, Supplies (Romblon Workshop and Materials cluster) Maitum Consensus Building Aug. 7-9 Design, Facilitation, Environment 118 Watershed Workshop Resource Persons, Supplies

and Materials Sarangani Consensus Building Aug. 8-9 Design, Facilitation, Environment 77 ISWM cluster Workshop Resource Persons, Supplies

and Materials Romblon Consensus Bldg. And Aug. Design, FaCilitation, Environment 46 CRM cluster Strategic Action Planning 10-11 Resource Persons, Supplies (Tablas Workshop and Materials cluster) SOCKSAR- Consensus Building and Aug. Design, Facilitation, Environment 61 GEN ISWM Strategic Action Planning 10-11 Resource Persons, Supplies

Workshop and Materials Bukidnon First Conference of the Aug. 14 Resource Person Environment 45 Watershed Bukidnon Watershed

Protection and Development Council

Lanao del ISWM SMS Training Aug. Design, Facilitation, Environment 25 Norte 15-18 Resource Persons, Supplies ISWM Cluster and Materials Zamboanga Watershed Management Aug. Design, Facilitation, Environment 55 del SurCRM Orientation and Planning 15-17 Resource Persons, Supplies cluster Workshop and Materials Arakan Orientation on Process of Aug. 16 Facilitation and Resource Environment 35 E-code Participatory E-Code Person

Preparation Romblon Crossvisit Aug. Design, Facilitation Environment 65 CRM cluster 21-26 Agusan Policy Formulation and Aug. Design, Facilitation, Environment 32 ISWM cluster Enforcement Workshop 22-23 Resource Persons, Supplies

and Materials

I!I.:I!I!J ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

'ifii'iI ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 45: .. PD-lh8uJ ~ gq~

3" Quarter 2000 Performance Report 45

REQ~GU NAME OF DATE ~PEOF OFPAJ( A\.."VII r

~~~4 i ~, i,v, 30 Watershed I.and" Persons, Supplies

'0'

Cluster i ~

~~~;~ I I Env't I

~~~4 . I '" '~. ,0 ~ ..... v .... 'o' .. 35 Action Program ~~: ,~, Supplies and

Antiique CRM Action Plaln~~~g ~~~3 ~oo,~ .. , I ~ 32

cluster Supplies and ., . I

r:!egros Local,P~olicy '0 10.J and ~~~5 : ~esign, Fi 50

CRM cluster Development , a;;'d~~'"o.' o,ov .. o, Supplies

Mt. Apo ~v " .. ~ Aug. 24 . ,:,d~ .. , i 30 Cluster Workshop , Persons, Supplies

, and , Lanao del i Aug. 29 i

", Supplies ~ ..... v." "0,", 19

Norte ISWM Options I

' "" cluster . and

:v .... o, CRM Str~~;~i~Actio~ Plaln~~~g i Sept. 4-5 I i", ~" 35 ! i , "" . o,ov .. o, Supplies

cluster ; and 'v .... "'a' na.o,o"ou Sept. :=: I

I 33

~iu';;;~;"ou I Action Program 5-6 Supplies and

, Northern vv, 'O0' 'ovo Building and Sept. 6-7 ::.'" 38 , Samar ISWM Strategic Action Planning ", Supplies

cluster and , ,

. Misamis ISW~ Policy Formulation Sept. 6 ,i~ .. , i , , i 30

I ' Oriental and Enforcement Training ro'ov!'~, Supplies and , : ISWM cluster

Palawan Tree Enterprise '" Sept. 7-8 , i 23 Watershed Planning cluster

()r;pnt~1

ISWM lEG I raining ~~~t2 I "', 36 ",P.;;;·,,~p Supplies

ISWM cluster .ancl ,~ I 6~~~II:;~~t rand ~~~t3 66

CRM cluster c, Supplies

and ~

Strat~g;c :c~:~n ~~~~ing ~~~t4 45 ISWM cluster ::.'." "' Supplies

and Abra d~ lIog,

Plan';i'~g Workshop ~;?,t5 "~'" I 55 Supplies

i and I Davao del Watershed Management ~i~t5 ' np.inn i ~""'V"'''o,", 50

Sur Consensus Building Resource Persons, Supplies

• ~u~;:;~hed Workshop and Materials i

Zamboanga CRM ,and RMA ~;~t5 Resource p~rson~:' Supplies ~"Y"V'"''O''' 51

del SurCRM Workshop cluster and Materials '~',:'''.v~v, I,!=C cum ~:~t5 i "', ~, 68 CRM Cluster Social ,"' "~ Resource Persons. Supplies

and Materials

IS"w;" ISWM IEC '''''"'"9 ~:~t5 ':'""o,~" I ~, 35 cluster Resource Persons, Supplies

and Materials

~ao.o, CRM )on . ~~~i3 ':'""o'~'" . 9

cluster ~~~on PI;m .. v.v .... vv a;;;';~' ,0 Persons, Supplies

Negros ~ocial "'a'"o ... '~,,~v , ~~~i8 ,:,ool~ .. ,. I ~""'V""'O'" 38 . I Development .o'ov: ,~, Supplies and

CRM c1~~~r , •

I!ll!Jl!J ;.~~ UNfTED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT JR) GoVERNANCE AND LOCAl OOrocRACY PRo.JEcr /GOLD IffiW'

Page 46: .. PD-lh8uJ ~ gq~

3 d Quarter 2000 Performance Report 46 LGU NAME OF PROGRAM/ NUMBER

REQUESTER WORKSHOP/ACTIVITIES DATE TYPE OF SUPPORT ACTIVITY OF PAX Davao City DAP-sa-Mindanao (DSM) July 3-4 Design, Facilitation, Resource Investment 8

Faculty Meeting for the Persons, Supplies and Investment Promotion Materials Course for LGUs .

Camarines Validation of potential July 3-5 Design, Facilitation, Resource Investment 25 Norte tourism sites Persons, Supplies and

Materials Butuan City Project Development July 4-7 Design, Facilitation, Resource Investment 23

Writeshop for CARAGA Persons, Supplies and Projects/LGUs Materials

T agaytay City Project Development July 4-7 Design, Facilitation, Resource Investment 16 Writeshop for Sta. Teresita Persons, Supplies and and Agoncillo, Batanoas Materials

Davao City Technology of Participation July 5-6 Design, Facilitation, Resource Investment 13 Level I (TOP 1) Training Persons, Supplies and for Faculty members of Materials DSM

Camarines Design of Implementing July 6-7 Design, Facilitation, Resource Investment 9 Norte Rules and Regulations Persons, Supplies and

Document for the Materials Provincial Investment Promotions Code

Metro Manila TOP 1 Training for Faculty July 6-7 Design, Facilitation, Resource Investment 23 Members of Development Persons, Supplies and Academy of the Philippines Materials - Pasig, plus ouests

Butuan City GIS for CARAGA July Design, Facilitation, Resource Investment 20 12-13 Persons

Mendez, Pilot Testing of Child July Design, Facilitation, Resource Investment 25 Cavile Rights Planning Workshop, 12-14 Persons

with Quezon Province LGU as model

Sorsogon, Ecotourism Site July Design, Facilitation, Resource Investment 17 Sorsogon Management Guidelines 18-19 Persons, Supplies and

Preparation Materials Meycauayan, Bulacan Inter-Agency July Design, Facilitation, Resource Investment 10 Bulacan Meeting in Preparation for 18-19 Persons, Supplies and

Meycauayan Strategic Materials Planning

Daet, TOP 1 Training for July Design, Facilitation, Resource Investment 28 Camarines Investment Promotion and 19-20 Persons, Supplies and Norte Tourism Planning TWG Materials

Members Albay On-Site Assessment of 2"" July 20 Design, Facilitation, Resource Investment 10

Ecotourism Pilot Area Persons San Ecotourism Site July 20 Design, Facilitation, Resource Investment 26 Fernando, AssessmenVDevelopment Persons, Supplies and Romblon Workshop Materials Cajidiocan, Ecotourism Site July 20 Design, Facilitation, Resource Investment 28 Romblon AssessmenVDevelopment Persons, Supplies and

Workshop Materials Magdiwang, Ecotourism Site July 21 Design, Facilitation, Resource Investment 24 Remblon AssessmenVDevelopment Persons, Supplies and

Workshop Materials Romblon, Briefing of Romblon July 21 Design, Facilitation, Resource Investment 17 Romblon Provincial Sanggunian on Persons, Supplies and

Province's Ecotourism Materials Potentials

Camiguin Social Marketing Workshop July Design, Facilitation, Resource Investment 35 for the Camiguin Integrated 24-28 Persons, Supplies and Solid Waste Management Materials Project

I!!I!!iI ~ UNrrEDSTATES AGENCY FOR INTERNATIONAL DEVELOPMENT

IftYii1 ill GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 47: .. PD-lh8uJ ~ gq~

.'

lGU REQUESTER Baler, Aurora

Camarines Norte

Butuan City

Pasig City

Prieto Diaz, Sor5090n

Meycauayan, Bulacan

Daet, Cam Norte

Baguio City

! SorsogonT

i .

I

I I

!

Sorsogon

Baguio City

Dinagat, Surigao del Norte Lanuza, Surigao del Sur

Daet, Camarines Norte Cebu City

Gibong, Agsn del Surf Butuan City

GUigUinto, Bulacan

Sta. Teresita, Batangas

Camiguin

mm:!J

NAME OF WORKSHOP/ACTIVITIES Resource Management Options and Pre­Consensus Building Worksho Focus Group Discussions on the Jewelry Industry

Orientation on GIS systems

TOP 2 in support to DAP i Investment Promotion I Module Wrilin

Municipal Workshop to Prepare for Ecotourism Community Mobilization Activities Meycauayan Jewelry

1 Industry Strategic Planning

i W riteshop to formulate the i Incentives Code's

Implementing Rules and Regulations TOP 1 Training for LGU Facilitators of Workshop Mainstreaming Child Rights

. in Local Planning (covering 4 provinces and 4 cities) Seminar Workshop on Marketing Services

Facilitators Training for Workshop Mainstreaming Child Rights in Local

• Planning (covering 4 provinces and 4 cities) Dinagat Water Supply

! Project Development i WriteshopfFinalization

Lanuza Water Supply System Project Development W riteshop/ Finalization I Focus Group Discussion for Industry Profiling,

I Pineapple Industrv I Surigao City Land Fill

Project Development WriteshopfFinalization Gibong Watershed Management Project Development Writeshop/Finalization

...

I FGDs for Profiling the Garden Industry

Camiguin Integrated Waste Management System Project Development Writesho f Finalization

, , !

DATE July 25

July 25-28

July 26-27 July 26-28

July 28

Aug. 1-2

Aug 1-4

Aug. 1-2

Aug. 3-4.

Aug. 3-4

Aug. 8-10

I Aug. 8-10

I I , Aug. I 8-11 I

Aug. 8-11

Aug. 8-10

I Aug. 9-10

: Aug. 11

Aug. 14-18

-~ UNrrEDSTATESAGENCYFORINTERNATTONALDEVELOPMENT

~

:1" Quarter 2000 Performance Report 47

I

I

, , i i

TYPE OF SUPPORT Design, Facilitation, Resource Persons, Supplies and Materials

Desig", Facilitation, Resource Persons, Supplies and Materials Design, Facilitation, Resource Persons

! Design, Facilitation, Resource Persons, Supplies and Materials Design, Facilitation, Resource Persons

Design, Facilitation, Resource Persons, Supplies and Materials Design, FaCilitation, Resource Persons Supplies and , Materials

Design, Facilitation, Resource Persons, Supplies and Materials

Design, Facilitation, Resource Persons, Supplies and Materials Design, Facilitation, Resource Persons

Design, FaCilitation, Resource Persons, Supplies and Materials Design, FaCilitation, Resource Persons, Supplies and Materials

Design, Facilitation, Resource Persons, Supplies and Materials

I Design, FaCilitation, Resource i Persons, Supplies and ! Materials I

I I ,

Design, Facilitation, Resource Persons, Supplies and Materials

.. DeSign, FaCIlitation, Resource Persons, Supplies and Materials Design, Facilitation, Resource Persons, Supplies and Materials Design, FaCilitation, Resource Persons, Supplies and Materials

i

PROGRAM! ACTIVITY

Investment

Investment

Investment

Investment

Investment

Investment

f Investment

Investment

Investment

Investment

: Investment

Investment

Investment

Investment

Investment

Investment

Investment

Investment

,

.

NUMBER OF PAX

25

48

20

12

15

35

16

30

14

30

10

10

75

4

8

30

14

10

i\{) GOVERNANCE. AND LOCAL DaIocRA.CY PRo.sEcT IGOLD

,

I

Page 48: .. PD-lh8uJ ~ gq~

:r Quarter 2000 Performance Report 48 LGU NAME OF PROGRAMI NUMBER

REQUESTER WORKSHOP/ACTIVITIES DATE TYPE OF SUPPORT ACTIVITY OF PAX Sugbongco- Kaulayanan Agri-Tourism Aug. Design, Facilitation, Resource Investment 10 gon, Mis. Village Project 14-18 Persons, Supplies and Oriental Development W riteshopl Materials

Finalization Tangub City Finalization of Tangub City Aug. Design, Facilitation, Resource Investment 12

Drainage Masterplan 14-18 Persons, Supplies and Materials

Ozamis City Finalization of Ozamis City Aug. Design, Facilitation, Resource Investment 6 Drainage Masterplan 14-18 Persons, Supplies and

Materials Makati City Alfonso Usta Presentation Aug. 15 Resource Persons Investment 10

of Water Supply Project to Multinational Investment Bancorporation for Bond Financinq

Alfonso Usta, Alfonso Usta Presentation Aug. 16 Resource Persons Investment 8 Ifugao of Water Supply Project to

LGUGC for Guarantee of Bond Float

Davao City Davao del Sur Aug. Design, Facilitation, Resource Investment 23 Organizational 15-17 Persons, Supplies and Strengthening of Materials Investment Promotions Unit

Cagayan de Misamis Oriental Property Aug. Design, Facilitation, Resource Investment 7 Oro Development Project 15-19 Persons, Supplies and

Development Writeshopi Materials Finalization

Prieto Diaz, First Community Aug. 18 Design, Facilitation, Resource Investment 70 Sorsogon Mobilization for the Persons

Ecotourism Project of Prieto Diaz

Polangui, Presentation of Alternative Aug. 22 Design, Facilitation, Resource Investment 15 Albay Financinq Modes Persons Naga City Assessment of Technical Aug. 23 Design, Facilitation, Resource Investment 12

Assistance Persons Bulusan First Community Aug. 25 Design, Facilitation, Resource Investment 50

Mobilization for the Persons Ecotourism Project of Bulusan

Daet, Tourism Circuit Planning Aug. Design, Facilitation, Resource Investment 25 Camarines Workshop 28-29 Persons, Supplies and Norte Materials

Daet, Designing the Industry Aug. Design, Facilitation, Resource Investment 20 Camarines Profile Writeshop and 29-30 Persons, Supplies and Norte Document Materials Polangui, Polangui Water Supply Sept. 5-8 Design, Facilitation, Resource Investment 9 Albay Project Finalizationl Persons, Supplies and

Writeshop Materials Pasig City Consolidation of Draft Sept. 7-8 Design, Facilitation, Resource Investment 6

Investment Promotion Persons, Supplies and Planninq Module for DAP Materials

Manila NEDA-PDAC Orientation , Sept Design, Facilitation" Resource Investment 27

on Alternative Financing 12-15 Persons, Supplies and

for LGUs Materials

Puerto Palawan Provincial Sept. Design, Facilitation, Resource Investment 320 Princesa City Development Council 20-21 Persons, Supplies and

conference Materials

Butuan City Investors Forum (for Sept. 22 Design, Facilitation, Resource Investment 43 selected projects of Persons, Materials

Reoions 13 and 10)

I:!li!.$J ~ UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT

ifi1'iiI ID GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 49: .. PD-lh8uJ ~ gq~

-,---

3'" Quarter 2000 Performance Report 49

LGU NAME OF PROGRAM! I NUMBER REQUESTER WORKSHOP/ACTIVITIES DATE TYPE OF SUPPORT ACTIVITY OF PAX LGA Workshop on Developing June Design, Resource Persons, Institutional 15 Collaboration Typologies for CBRMP 19-23 Supplies and Materials Support

Projects LGA Customizing Project July Design, Resource Persons, Institutional 25 Collaboration Development Workshop 10-12 Supplies and Materials Support

Desiqn of CBRMP ORID Book Consultative Workshop Aug_ 15 Design, Resource Persons, 10 for LCEs Suppjies and Materials Manila RFA Consultant's Briefing July Funding Performance 15

13-14 Measure-, ment

Manila 10'" RFA Synthesis Sept. Funding Performance 18 Seminar 18-21 Measure-

ment Manila 10 RFA Public Sept. 22 Funding Performance 60

Presentation Measure-ment

Negros Writeshop for Curriculum July 5-7 Design, Facilitation, Resource RPTS 50 Oriental Development for Negros Persons, Supplies and

i Oriental RPTS Proaram Materials BLGF ToPI Training BLGF Staff Aug. Design, Facilitation, Resource RPTS 50

2-4 Persons, Supplies and Materials

Cotabato Social Marketing Planning Aug. Design, Facilitation, Resource RPTS 50 and Design Workshop for 9-10 Persons, Supplies and Cotabato RPTS Proqram Materials

Capiz Writeshop for Curriculum Aug. Design, Facilitation, Resource RPTS ! 50 Development for Capiz 17-18 Persons, Supplies and , RPTS Program i Materials

Manila ToP 1 I July 6-7 Trainers/Materials ' Participation DAP/ARD Aug. CSC 17-18 Aug. 31- Trainers, Venue, Food, LCEs Sept. 1 Materials

,

Manila . ToP 2 July Trainers/Materials i Participation DAP 26-28 Aug. Trainers, Venue, Food, AdeNU 9-11 Materials , AdeDU , SOPREX

Bohol RPT for Barangay/School Aug. Trainers, Venue, Food, i Participation !

BLGF Officials 21-25 Materials

Baguio Regional Consultation on Aug. 5 Design{ Facilitation Participation LGUslPOsl Proposed NGOslPS

Manila GOLD Assessment Sept. 4 Design{ Facilitation Participation ARDIUSAID/ Workshop Consultant

Manila Bonds Workshop July Design! Facilitation Participation DOF,LGUs, 11-12 PS,NGOs,

USAID,Aoile Manila ToT-RPT for Brgy. officials Sept. Trainer Participation Uga ng mga

27-29 Baranoav

TableS Significant Upco:ning Event .. expected in the 4'" QualiE:r

~ PARTICIPATION • Center for Local Governance Assessment cum Planning on October 10-12, 2000 • Barangay Officials Participatory Workshop for Real Property Tax on October 16-18, 2000 • School Officials Participatory Workshop for Read Property Tax pm October 18-20, 2000 • Training on Municipal Environment Planning Workshop

~ INVESTMENT

I!mI!J -~ UNfTED STATES AGENCY FOR tNTERNATIONAL DEVELOPMENT i\{) GoVERNANCE AND LOCAL DEIIOcRAcY PfJoJEcr /GOLD

IftYii'

Page 50: .. PD-lh8uJ ~ gq~

~ Quarter 2000 Performance Report 50 • Project Development Course on Micro-Hydro Power Development for LGUs, by De La Salle University,

Center for Engineering Research, Training and Consultancy (CERTC), Manila, last week of November, 2000.

• Basic Course on Investment Promotion, Development Academy of the Philippines (DAP), Tagbilaran City November 7-9, 2000.

• Jazzing Up Investment Promotion, Development Academy of the Philippines (DAP), Mandaluyong City, November 22-24, 2000.

~ POLICY • Launching of Municipal Bonds Manual • Editing and Distribution of Local Autonomy Papers • Drafting of the Final Report on Consensus-Based Policy Change: the Case of the 1991 Local Government

Code

~ ENVIRONMENT • Special Training for Centers of Local Governance on the Municipal Environment Planning Workshop,

sponsored by ARD/GOLD at Cebu City • SWAPPCon 2000 sponsored by the Solid Waste Management Association of the Philippines (SWAPP), US­

AEP, GOLD and other partners, November 22-24, 2000 at Traders Hotel, Malate, Manila • Tree Farming Congress, sponsored by the Philippine Watershed Coalition and GOLD, Iloilo City, November

6-7,2000 • Training Course on Coastal Resources Management proposed to be co-sponsored by Bureau of Fisheries

and Aquatic Resources, Gerry Roxas Foundation, ARD-GOLD, and Coastal Resources Management Program, Roxas City in 2nd week of November

~ COMMUNICATION • LOGOnet we site launching • GOLD CD Project • Formation of Management Committee and finding sponsors for LOGOnet • Production and distribution of the manual on Participatory Evaluation • Production and distribution of the Guide on CMFM • Community workshop on CMFM Installation • Workshop on Effective Hospital Care (components: BCSS and Feedback Mechanism Installation)

RESOURCE MOBILIZATION • Launching of FTMS Program

~ MIS/GIS • Completion of T A and hand-over in all the remaining sites • Assessment, analysis,and presentation of data gathered in the projects • Documentation/Manualization of Application Development process • Presentation of proposed Position Titles to DBM • Support for Organization of Association of G IS Practitioners

I!ImlI ~ UNITED STATES AGENCY FOR fNTERNATfONAl DEVELOPMENT

'WiJiI ID GOVERNANCE AND LOCAL DEMOCRACY PROJECT/GOLD

Page 51: .. PD-lh8uJ ~ gq~

:i" Quarter 2000 Performance Report 51 ••

Table 6 Synergy with other development programs

~ POLICY • Facilitaion of the Palawan Provincial Development Council Annual Planning Conference (with

Investment Promotions Group) • Pilot-testing of design and manual drafting of the Participatory Monitoring and Evaluation Workshop

(with Communication and Performance Measurement)

~ ENVIRONMENT • Coordinated with US-AEP and the Solid Waste Management Association of the Philippines (SWAPP) in

design, conduct and facilitation of two training courses on municipal solid waste management and one National Conference.

• Coordinated with the Ford Foundation assisted Philippine Watershed Coalition in the conduct, design and facilitation of a training course on watershed management.

• Provided assistance to the Local Government Academy in the design of project development modules for the World Bank assisted CBRM (conducted together with the Investment Promotions Team of GOLD).

~ DEVELOPMENT INVESTMENT • Promote private sector participation in project implementation (Asian Development Bank/Capacity

Building in LGU Financing). Orientation in Alternative Financing Modes for LGUs. CARAGA Region Investment Forum

• Promote project development work among LGUs and generate interest of financing institutions in projects developed by LGUs with GOLD assistance. (World Bank LOFOFIND Municipal Development Fund Office)

CARAGA Region Investment Forum • Promote private sector participation in project implementation. (Coordinating Council for Private Sector

Participation BOT III USAID) Orientation in Alternative Financing Modes for LGUs CARAGA Region Investment Forum

• Promote the use of renewable energy resources for power generation and other uses. (USAID Renewable Energy Program)

De La Salle University Course on Power Generation from Micro-Hydro and Solar Energy sources • Manualization of planning approaches for use of LGUs. (UNICEF Countryside Program for Children V)

PDAC strengthening events • Promote the use of alternative financing (Bonds-LGU Guarantee Corporation).

Orientation in Alternative Financing Modes for LGUs Preparation of Bohol Manuals

• Promote linkages between LGUs and National Government agencies to support LGU initiatives in cultural heritage tourism (National Council for Culture and the Arts -NCAA)

Romblon Ecotourism initiative Camarines Norte Ecotourism initiative

~ COMMUNICATION • Participatory Evaluation Workshop with the Libon-Bato Resource Management Project • Participatory Evaluationh of the BPPB Workshop with the Barangay Development Council of Barangay,

Anggub, Solano, Nueva Vizcaya

I!mI!J "~ UNffED STATES AGENCY FOR INTERNAnONAL DEVELOPMENT lR.) GOVERNANCEANOLOCALDaIOCRACYPRo.IEcT/GOLD

IftWii

Page 52: .. PD-lh8uJ ~ gq~

3 d QUarter 2000 Performance Report t.

~ PARTICIPATION • Linked up with the Liga ng mga Barangay for Barangay Officials Participatory Workshop on Real Property

Tax Training.

~ GEOGRAPHIC INFORMATION SYSTEM • Bohol - have met with implementors of S02 for USAID • Nueva Vizcaya worked closely with CASCADE • Capiz Provincial Government has shown our work to UNFI~A and other development organizations

~ LOCAL PARTICIPATORY PLANNING AND BUDGETING • Liga ng mga Barangay with Department of Health - DOH-L.NB regional workshops to be conducted in

November 2000 to January 2001. • LGAIRIASC/DILG - Participatory CLUP process walk-through for Regions 5, 6 and 8.