:: Milestone 8 2-D Discrete Cosine Transform
description
Transcript of :: Milestone 8 2-D Discrete Cosine Transform
M2: Team Paradigm
:: Milestone 8 2-D Discrete Cosine Transform
Group M2:Tommy Taylor Brandon HsiungChangshi XiaoBongkwan Kim
Project Manager: Yaping Zhan
M2: Team Paradigm
Team Paradigm
M2: Team Paradigm
Project Status
18-525, Integrated Circuits Design Project
Design Proposal (Done)Architecture Proposal (Done)Gate level Design(Done)Component Layout (DRC & LVS): (Done)Component Simulation: (Done)Component Layout (Done)Component Simulation (Done)Chip Layout (90%)TBD
Chip Layout (Finished)Spice Simulation of Entire Chip
Still Speed but alsoReduction of size
Design Goals
M2: Team Paradigm
Masks for 1-D
M2: Team Paradigm
Poly Top
M2: Team Paradigm
Poly Bottom
M2: Team Paradigm
M1 Top
M2: Team Paradigm
M1 Bottom
M2: Team Paradigm
M2 Top
M2: Team Paradigm
M2 Bottom
M2: Team Paradigm
M3 Top
M2: Team Paradigm
M3 Bottom
M2: Team Paradigm
M4 Top
M2: Team Paradigm
M4 Bottom
M2: Team Paradigm
1ddct
M2: Team Paradigm
2DDCT
: 450 by 450: Sorry yesterdays transistor count was only for
the DCTs: Revised Transistor Count: 31484 Transistors: Density/Porosity: 0.155
M2: Team Paradigm
::conclusion & questions