Mechanical Components have been ordered and should arrive by Week 1 of winter quarter ...

13
Week 11 Review

description

*Minimum Life Until Failure: As part of the design and testing process teams should consider ways to prove an expected life as listed. Previous tests on the device or tests conducted on components in a similar application will be acceptable. Methods of superposition or extrapolation of high wear components may also be considered.

Transcript of Mechanical Components have been ordered and should arrive by Week 1 of winter quarter ...

Page 1: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Week 11 Review

Page 2: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Mechanical Components have been ordered and should arrive by Week 1 of winter quarter

Outstanding electrical components dependent on varying mechanical parts

Working on methods to attach and store electrical components (due Week 1 winter)

Test plans have been created for each component, will be ready to complete upon arrival

Current State

Page 3: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Updated Specifications*Minimum Life Until Failure: As part of the design and testing process teams

should consider ways to prove an expected life as listed. Previous tests on

the device or tests conducted on components in a similar application will be acceptable. Methods of superposition

or extrapolation of high wear components may also be considered.

Page 4: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Project Plan: Week 3

Page 5: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Project Plan: Current

Page 6: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Project Plan: Current

Page 7: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Project Plan: Current

Page 8: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Electrical component selection will be finalized when verify mechanical component testing

Outstanding purchased parts◦ electrical components for PCB and battery◦ Steel for attachment◦ Need to verify electronic attachment

Testing plan- need to verify power terrain, how to determine speed, full system testing

Project Plan: Unfinished Tasks

Page 9: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Project Plan: MSD II

Page 10: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Risk Assessment: Week 3

Page 12: Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding…

Added individual owners to all risk items Risk items more specialized, before was a

generalization Added specific tasks once finalized the

system architecture with the locking mechanism

Customer needs have been identified, should be met based on current design

Risk Assessment: Improvements