Located in Sopot, Poland „Krzywy Domek“ Construction started in January 2003 and in December...

6
The Crooked house

Transcript of Located in Sopot, Poland „Krzywy Domek“ Construction started in January 2003 and in December...

Page 1: Located in Sopot, Poland  „Krzywy Domek“  Construction started in January 2003 and in December 2003 it was finished.  Architects - Szotyńscy & Zaleski.

The Crooked house

Page 2: Located in Sopot, Poland  „Krzywy Domek“  Construction started in January 2003 and in December 2003 it was finished.  Architects - Szotyńscy & Zaleski.

Located in Sopot, Poland „Krzywy Domek“ Construction started in January 2003 and in

December 2003 it was finished. Architects - Szotyńscy & Zaleski Jan Marcin Szancer (famous Polish artist and

child books illustrator) Per Dahlberg (Swedish painter) pictures and

paintings

When? Who?

Page 3: Located in Sopot, Poland  „Krzywy Domek“  Construction started in January 2003 and in December 2003 it was finished.  Architects - Szotyńscy & Zaleski.

In the city enter from Monte Cassino and Morska

Streets Part of Rezydent shopping center in

downtown Sopot the most photographed building in the

whole country It is approximately 4,000 square meters.

Page 4: Located in Sopot, Poland  „Krzywy Domek“  Construction started in January 2003 and in December 2003 it was finished.  Architects - Szotyńscy & Zaleski.

On the list of 50 strangest buildings of the world Polish version of the American Hollywood Walk of Fame – The wall

of fame Inside – shops, restaurants, drinking

establishments, beauty salons, doctors’ offices and radio RMF FM a RMF MAXXX  

there are two Per Dahlberg wall pictures inside

Interior

Page 5: Located in Sopot, Poland  „Krzywy Domek“  Construction started in January 2003 and in December 2003 it was finished.  Architects - Szotyńscy & Zaleski.

the symbol of the modern world that harmoniously combines business with culture and art

Krzywy Domek never sleeps 5 floors

Page 6: Located in Sopot, Poland  „Krzywy Domek“  Construction started in January 2003 and in December 2003 it was finished.  Architects - Szotyńscy & Zaleski.

Thanks for your attention!

Júlia Krišová 2.B