▪ Introduction
• NPP program in Indonesia • Education and Training in Nuclear Field• Implementation Fundamental Training
for NPP (Reactor engineering and Safety and IAEA Simulator)
• Training Schema for Reactor Operator and Simulator Training
▪ Conclusion
2
Introduction Indonesia has been considering introducing
NPP option into energy mix supply for 2000 MW to be operated in around 2024 or NP Demontration operated on 2020
Although definite timetable has not been determined, the development of basic infrastructure of NPP preparation which is included HRD has to be initiated.
ETC-BATAN are responsible for the development of HRD program for NPP
3
Nuclear Infrastructure Development Program
Phase 1
Consideration before a decision
to launch a nuclear power programme is
taken
Phase 2
Preparatory work for the
construction of a NPP after a
policy decision has been taken
Phase 3
Activities to implement a first
NPP
Phase 4
Maintenance and continuous
infrastructure improvement
Pre Project Project Decision Making
Construction Operation/ decommissioning
Nulear power option
included within the national energy
strategy
Nulear power option
included within the national energy
strategy
Milestone 1Ready to make a knowledgeable commitment to a nuclear programme
Milestone 2Ready to invite bids for the first NPP
Milestone 3Ready to commission and operate the first NPP
20062006 2019-2024
2019-2024
12 -18 years
Pres.Reg. 5/2006 Act. 17/2007
Feasibility study Bidding process Commissioning
Infr
ast
ruct
ure
D
evelo
pm
ent
Pro
gra
m
4
INPP Roadmap
Timeline for NP Development in Indonesia
5
Training schedule for Key personnel Training schedule for Key personnel of NPPof NPP
Witness during Construction
Mech., IC, E, Water Chem, Reactor. Rad Protec. And
Env, QASafety Analysis
Maintenance
Operation
Nuclear Fuel
Org
. U
tility
-10-12 -8 -5 -3 -1-2 0
Proj
ect I
mpl
emen
tasi
on
Cons
truc
tion
Com
issi
onin
g
Civi
l and
foun
datio
n
Sub.
Sys
tem
tes
t
Com
mer
cial
Ope
ratio
n
1412 16 19 21 2322 24
Training staff and NTC
Plant Specification
Plant operation Management
Operation manager
Civil and Structure6
Timeline for NP Demontration Development
Phase1 :Pre ProjectPhase II:Enginering, procurement and ConstructionPhaseIII: Comissioning and OperationPhaseIV: Research on cogeneration
04/19/23 8
EDUCATION and TRAINING IN NUCLEAR FIELD
NUCLEAR TRAINING CENTER
October 9 Education and Traing center - BATAN 11
Implementation of Fundamental Course for NPP
ETC-BATAN has been implementing TC on Reactor Engineering and Safety I and II (Basic course of an initial training for preparation of NPP HRD program) IAEA simulator are used on RES I
LectureSlide
Curiculla RE 1 Curiculla RE II
G.A. SIWABESSY REACTOR, SERPONGG.A. SIWABESSY REACTOR, SERPONG Oper. since : 1987Power : 30 MWFunction : Research, isotope prod. and testing
Hot Cell
Working Area in NPP
Training Schema for NPP Personnel
14
New Employee
Basic
Competency Assessm
entCertification/Licensing/
Competent personnel
Engineer (Nuclear Island/BOP)
Technician (nuclear Island /BOP)
Training and Certification Training and Certification
15
Introductory Training for New Employee
New
Employee
Month0 3 6 9 12
TC Administratif
TC Industrial safety and Radiation Protection
TC Fundamental of N
PP
OJT Basic Com
ponent Know
ledge and machinary
Arrangement
OJT on Plant Sytem
and Com
ponent
NPP system
and comp
description and location16
Thermal hydraulics
Detail Training Schema for Operator
New
Employee
Introductory, Administrative, Industrial safety,
Radiation Protection, Introduction to NPP and
Familiarization w
ith NPP
Reactor Physics
Preparation for license Op
TC on Plant Sys. and Com
ponent
Month12Reactor safety
0
8 wkPlant and control sys. and
component
Simulator 8 wk
24
OJT on Turbine G
en
OJT on N
SSS Secondary
OJT on N
SSS Primary
OJT Shift in control rooms
Phase 1 Phase 2 Phase 3
License Operator
Non license O
ps
OJT on Auxiliary
8wk
36O
JT on Auxiliary
OJT on TG
OJT on N
SSS secondary.
OJT on N
SSS Prim
ary.
42 wk
OJT on Shift Aux Patroller
50 wk 50 wk
OJT on Shift TG Patroller
Operator TG
Operator Aux
OJT Aux Op.
OJT TG Op
Aux/ equipment O
p.
60
OJT aux/TG/NSSS/ their specialties
50 wk
Simulator
OJT NSSS
Other TC
8 wk
17
Curriculla and Syllabus for Curriculla and Syllabus for Simulator TrainingSimulator Training
Indonesia has been considering introducing NPP option into energy mix supply for 2000 MW to be operated in around 2024 In order to prepare Indonesian Nuclear HRD who has appropriate qualification personnel requirement, the education and training need to be identified, training program and curricula must be developed. The Nuclear Training Center for NPP must be equipped with Simulator (Fullscope or PC Based Simulator)Development and Utilization of Simulator are urgent to supprot NPP HRD program in indonesia
19
20
Bangka