„ E U R O B U S I N E S S PARC O R A D E A ” - INDUSTRIAL PARK - O R A D E A E u r o B u s i n e...

12
„ E U R O B U S I N E S S PARC PARC O O R A D E A ” - INDUSTRIAL PARK - O R A D E A E u r o B u s i n e s s P A R C

Transcript of „ E U R O B U S I N E S S PARC O R A D E A ” - INDUSTRIAL PARK - O R A D E A E u r o B u s i n e...

„ „ EE UU RR OO BB UU SS II NN EE SS SS PARC PARC O O RR AA DD EE AA ””

- INDUSTRIAL PARK -

O R A D E A E u r o B u s i n e s s P A R C

Area of the parkArea of the park:: 121 hectares

LocaLocationtion: : Oradea, Borșului Road (E60)

Owner of the landOwner of the land:: Oradea city

Administrator: Administrator: SC EUROBUSINESS PARC ORADEA SRL

Sole shareholderSole shareholder:: Oradea city

The title ofThe title of industrial industrial park park:: Order of MIRA no.685 /15th of December, 2008

O R A D E A E u r o B u s i n e s s P A R C

AcActivitiestivities:: processing industry

services (business, warehousing, logistic, others)

ServicServices and utilities in the parkes and utilities in the park:: interior roads, water and sewage supply, heating energy, electricity, natural gas, telecommunications

FFiscal facilitiesiscal facilities: : no property tax is due for buildings land within Industrial Park is exempted from the land taxation

O R A D E A E u r o B u s i n e s s P A R C

O R A D E A E u r o B u s i n e s s P A R C

O R A D E A E u r o B u s i n e s s P A R C

Location:Location: Borșului Road, km 29 (E60/DN1)

4 km away from the border with Hungary

4 km away from the access point for the future Transilvania Highway

3 km from the entrance in Oradea

6.8 km from Oradea Airport

5.2 km from the city center (city hall)

2 km from the Oradea Railway Station  

Front side of the park to E60Front side of the park to E60: 1,2 km

O R A D E A E u r o B u s i n e s s P A R C

Road access:Road access:

E60 - Hungarian border - Oradea - Cluj-Napoca - Cluj-Napoca - Târgu Mureş - Sighişoara - Braşov - Sinaia - Ploieşti - Bucureşti - Slobozia – Constanţa

E671-(Connection way between E60 and E70) Oradea - Arad – Timişoara

E79 -Oradea - Deva - Simeria - Târgu Jiu - Craiova – Bulgarian border

DN1 -Bucureşti - Ploieşti - Braşov - Făgăraş - Sibiu - Alba Iulia - Turda - Cluj Napoca - Oradea – Hungarian border

DN19-Oradea - Satu Mare - Negreşti Oaş - Sighetu Marmaţiei

DN76-Oradea - Beiuş - Deva (DN7)

DN79-Oradea - Arad  

O R A D E A E u r o B u s i n e s s P A R C

Neighbourhood:Neighbourhood:

-International Transport Companies: Galassini, Centrum, Frigoexpres

-Constructions companies: Selina SA, CIAC, SIMBAC SA

-Company of producing IT components: Celestica, Connectronics

-Heating and electrical power Supplier: Sc Electrocentrale SA

-Custom house for goods

-High Power Transformer Station

-Water cleaning Station  

O R A D E A E u r o B u s i n e s s P A R C

The offer for land in the industrial parkThe offer for land in the industrial park

ConcesConcessionsion

- procedure: public tender

- starting price: 0,32 EUR/sqm/year – for the industry area

0,38 EUR/sqm/year  - for the services area 

- administration tax: 0,50 EUR/sqm/year

The possibility to purchase the landpurchase the land after realizing the investment (100%).

Price of the land: starting from 8 EUR/sqm

O R A D E A E u r o B u s i n e s s P A R C

Exemption:Exemption:The concession of the land can be done through direct negotiation in the case an investor engages to a minimum investment of 5 milions euros (the value of the building). In this case the investor has the possibility to buy the land after 15% of the investment is being realized.

The access of the investors in the Industrial Park The access of the investors in the Industrial Park

Qualification requests – Qualification requests – constitutive documents of the company, certificates

Evaluation of the offers:Evaluation of the offers:

ScoreScore 100 points

Offered price 35 points

The investment engaged 35 points

The number of jobs created 30 points

O R A D E A E u r o B u s i n e s s P A R C

Mandatory clauses in the Mandatory clauses in the terms of referenceterms of reference

Time limits for realizing the investment:

- submit the documents for obtaining the building permit: within 4 months from the date on which the contract came into force

- starting the works: within maximum 1 year from the date on which the contract came into force

The carrying on of the activity for which the concession contract was concluded is necessary to be started within 2 months from finalization of the constructions.

Statutes of Eurobusiness Parc Oradea – Decision of the Local Council of Oradea no.25/2009

O R A D E A E u r o B u s i n e s s P A R C

O R A D E A E u r o B u s i n e s s P A R C

Activities forseen for the year 2009Activities forseen for the year 2009

• Completing the Urbanistic Zonal Plan : August 2009

• Completing Feasibility Study for infrastructure (roads and utilities) : August 2009

• Opening up the public tender for the available lots: August 14th, 2009

Estimated time for completing the works for providing basic utilities in the Industrial Park: Spring 2011