„ „ EE UU RR OO BB UU SS II NN EE SS SS PARC PARC O O RR AA DD EE AA ””
- INDUSTRIAL PARK -
O R A D E A E u r o B u s i n e s s P A R C
Area of the parkArea of the park:: 121 hectares
LocaLocationtion: : Oradea, Borșului Road (E60)
Owner of the landOwner of the land:: Oradea city
Administrator: Administrator: SC EUROBUSINESS PARC ORADEA SRL
Sole shareholderSole shareholder:: Oradea city
The title ofThe title of industrial industrial park park:: Order of MIRA no.685 /15th of December, 2008
O R A D E A E u r o B u s i n e s s P A R C
AcActivitiestivities:: processing industry
services (business, warehousing, logistic, others)
ServicServices and utilities in the parkes and utilities in the park:: interior roads, water and sewage supply, heating energy, electricity, natural gas, telecommunications
FFiscal facilitiesiscal facilities: : no property tax is due for buildings land within Industrial Park is exempted from the land taxation
O R A D E A E u r o B u s i n e s s P A R C
Location:Location: Borșului Road, km 29 (E60/DN1)
4 km away from the border with Hungary
4 km away from the access point for the future Transilvania Highway
3 km from the entrance in Oradea
6.8 km from Oradea Airport
5.2 km from the city center (city hall)
2 km from the Oradea Railway Station
Front side of the park to E60Front side of the park to E60: 1,2 km
O R A D E A E u r o B u s i n e s s P A R C
Road access:Road access:
E60 - Hungarian border - Oradea - Cluj-Napoca - Cluj-Napoca - Târgu Mureş - Sighişoara - Braşov - Sinaia - Ploieşti - Bucureşti - Slobozia – Constanţa
E671-(Connection way between E60 and E70) Oradea - Arad – Timişoara
E79 -Oradea - Deva - Simeria - Târgu Jiu - Craiova – Bulgarian border
DN1 -Bucureşti - Ploieşti - Braşov - Făgăraş - Sibiu - Alba Iulia - Turda - Cluj Napoca - Oradea – Hungarian border
DN19-Oradea - Satu Mare - Negreşti Oaş - Sighetu Marmaţiei
DN76-Oradea - Beiuş - Deva (DN7)
DN79-Oradea - Arad
O R A D E A E u r o B u s i n e s s P A R C
Neighbourhood:Neighbourhood:
-International Transport Companies: Galassini, Centrum, Frigoexpres
-Constructions companies: Selina SA, CIAC, SIMBAC SA
-Company of producing IT components: Celestica, Connectronics
-Heating and electrical power Supplier: Sc Electrocentrale SA
-Custom house for goods
-High Power Transformer Station
-Water cleaning Station
O R A D E A E u r o B u s i n e s s P A R C
The offer for land in the industrial parkThe offer for land in the industrial park
ConcesConcessionsion
- procedure: public tender
- starting price: 0,32 EUR/sqm/year – for the industry area
0,38 EUR/sqm/year - for the services area
- administration tax: 0,50 EUR/sqm/year
The possibility to purchase the landpurchase the land after realizing the investment (100%).
Price of the land: starting from 8 EUR/sqm
O R A D E A E u r o B u s i n e s s P A R C
Exemption:Exemption:The concession of the land can be done through direct negotiation in the case an investor engages to a minimum investment of 5 milions euros (the value of the building). In this case the investor has the possibility to buy the land after 15% of the investment is being realized.
The access of the investors in the Industrial Park The access of the investors in the Industrial Park
Qualification requests – Qualification requests – constitutive documents of the company, certificates
Evaluation of the offers:Evaluation of the offers:
ScoreScore 100 points
Offered price 35 points
The investment engaged 35 points
The number of jobs created 30 points
O R A D E A E u r o B u s i n e s s P A R C
Mandatory clauses in the Mandatory clauses in the terms of referenceterms of reference
Time limits for realizing the investment:
- submit the documents for obtaining the building permit: within 4 months from the date on which the contract came into force
- starting the works: within maximum 1 year from the date on which the contract came into force
The carrying on of the activity for which the concession contract was concluded is necessary to be started within 2 months from finalization of the constructions.
Statutes of Eurobusiness Parc Oradea – Decision of the Local Council of Oradea no.25/2009
O R A D E A E u r o B u s i n e s s P A R C
O R A D E A E u r o B u s i n e s s P A R C
Activities forseen for the year 2009Activities forseen for the year 2009
• Completing the Urbanistic Zonal Plan : August 2009
• Completing Feasibility Study for infrastructure (roads and utilities) : August 2009
• Opening up the public tender for the available lots: August 14th, 2009
Estimated time for completing the works for providing basic utilities in the Industrial Park: Spring 2011