© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate...

16
© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK – Helsinki University of Technology Finland [email protected]

Transcript of © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate...

Page 1: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

DeHiGate (CELTIC No: CP02-008)

WP1 Status

Pekka Parviainen

TKK – Helsinki University of Technology

Finland

[email protected]

Page 2: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

Agenda:01 WP1 Overview

02 WP1 Status

03 WP1 Deliverables this term

04 WP1 Deliverables next term

05 Other…

Page 3: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

Agenda:01 WP1 Overview

02 WP1 Status

03 WP1 Deliverables this term

04 WP1 Deliverables next term

05 Other…

Page 4: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

WP1 Overview 1

WP1 Goals Define the lead applications and their operational scenarios

High-speed data applications Demanding requirements for user interfaces Gateway requirements and wide area networking

Reliability, security and service quality are key attributes Create real added value to the public safety field operations Used for the development of requirements in WP2 and system architectures

Page 5: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

WP1 Overview 2

WP1 Sub packages T1.1 Interaction with user community and user studies

Contribute to network features and operational scenarios Contribute with contacts with user communities User requirements studies: reference scenarios studies, applications, deployment strategy, and feasibility with emergency protocols Initial review and assessment of key applications Report on the viability of the key applications and further guidance Use case description of the selected key applications in practical field operationsStudies on functional applications to make Gateway use easier for Emergency services users

Page 6: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

Expert Discussion Workshop

Date:10th of November 2005

Location: City of Helsinki Rescue Department

All key users in public safety communications (meeting minutes)

• Helsinki Rescue Department

• Finnish Naval Military

• Poliisiosasto / Police of Helsinki

• Helsingin ja Uudenmaan sairaanhoitopiiri (HUS)

• Finnish Red Cross

• Suomen Erillisverkot Oy

Page 7: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

Demands of Different organisations

• For small and large scale scenarions

• IR camera for smoke diving

• data connections to hospitals

• connect the mobile command center to fixed IT servers

• how to have reserved capacity available

• online geographic images for field units

• air to ground video

• remote surveillance of patrolling police officers vital functions

Page 8: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

WP1 Overview 3

WP1 Sub packages T1.1 Interaction with user community and user studies

Description and a work-plan of trial/simulation set-up and required technologies for the use cases Description on the result of the trial/simulation, plan for the improved/modified trial Assessment and evaluation of the results of the simulations and trials Studies on current technological Platforms of Emergency services Users Interfaces Requirements

Page 9: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

WP1 Overview 4

WP1 Deliverables:

D1.1 Initial assessment of key applications, user studies report. Scenarios, operational requirements, and applications

D1.2 Report on the viability of the key applications and user guidance

Page 10: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

WP1 Overview 5

WP1 Leader EADS Finland

WP1 Partners TKK UNIK Telefonica I+D

Page 11: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

Agenda:01 WP1 Overview

02 WP1 Status

03 WP1 Deliverables this term

04 WP1 Deliverables next term

05 Other…

Page 12: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

WP1 Status

WP1 Status Deliverables have been produced in time User workshop was organized in 2005 with Finnish participants from different public safety fields Assessment document for Kuopio Field Trial written

Technical document with minor user assessments Concentration on multicast video

Page 13: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

Agenda:01 WP1 Overview

02 WP1 Status

03 WP1 Deliverables this term

04 WP1 Deliverables next term

05 Other…

Page 14: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

WP1 Deliverables this term

WP1 Deliverables:

D1.1 Initial assessment of key applications, user studies report. Scenarios, operational requirements, and applications

Page 15: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

Agenda:01 WP1 Overview

02 WP1 Status

03 WP1 Deliverables this term

04 WP1 Deliverables next term

05 Other…

Page 16: © DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

© DeHiGate Consortium

DeHiGate – Deployable High Capacity Gateway for Emergency Services

WP1 Deliverables next term

WP1 Deliverables: D1.2 Report on the viability of the key applications and user guidance

T0 + 30