** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile...

172
** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS_NC_FAY_JUN18 Restoration/Service/Remodel with Service Charges Factored In Legend: CAT = Category SEL = Selector Code ACT = Activity DESCRIPTION = Description UNIT = Unit of Measure REPLACE = Replace Price REMOVE = Remove Price RESET = Reset Price REMOVE & REPLACE = Remove & Replace Price CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE & REPLACE ACC ANCR & Anchor - twist in ground type EA - $ - $ - $ - $ ACC ANCR+ & Anchor - two crossed rods driven into the ground EA - $ - $ - $ - $ ACC BAXL & Axle - electric brake (with springs) EA - $ - $ - $ - $ ACC BIDITM + Accessories - Mobile Home (Bid Item) EA - $ - $ - $ - $ ACC DAXL & Axle - drag (with springs) - no brakes EA - $ - $ - $ - $ ACC DAXL- & Axle hubs - brake type EA - $ - $ - $ - $ ACC EQL & Equalizers EA - $ - $ - $ - $ ACC HTCH & Hitch - "A" frame style with coupler EA - $ - $ - $ - $ ACC HUBS & Axle hubs - drag type EA - $ - $ - $ - $ ACC IBEAM + I beam repair EA - $ - $ - $ - $ ACC LAB + Mobile Home Repair - per hour HR - $ - $ - $ - $ ACC LABL + Mobile Home - General Laborer - per hour HR - $ - $ - $ - $ ACC MN + Mobile Home Accessory - Labor Minimum EA - $ - $ - $ - $ ACC OTRG & Outrigger - up to 30" long EA - $ - $ - $ - $ ACC RIM & Rim - doughnut type with no center EA - $ - $ - $ - $ ACC SPNG & Spring - mono or single leaf only EA - $ - $ - $ - $ ACC TIRE & Tire - 7 x 14.5 or 8 x 14.5 mounted EA - $ - $ - $ - $ ACC TIRE+ & Tire and rim/wheel - 7 x 14.5 or 8 x 14.5 EA - $ - $ - $ - $ ACC TNGJK & Tongue jack EA - $ - $ - $ - $ CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE & REPLACE ACT AV & Acoustic ceiling tile SF ACT AV+ & Acoustic ceiling tile - High grade SF ACT AV++ & Acoustic ceiling tile - Premium grade SF ACT AVARMV - Tear off asbestos acoustic ceiling tile (no haul off) SF ACT AVM & Ceiling panel - w/battens & staples- mobile home SF ACT AVM+ & Ceiling panel -High grade w/battens & staples- mobile SF ACT home ACT AVM++ & Ceiling panel -glued wino battens & staples- mobile home SF - $ - $ - $ - $ ACT BALL++ & Special - ballroom ceiling panels - Premium grade SF - $ - $ - $ - $ ACT BIDITM + Acoustical Treatments (Bid Item) EA - $ - $ - $ - $ ACT BTN & Batten for ceiling panel - mobile home LF - $ - $ - $ - $ ACT DRAPE & Acoustical wall treatment - cloth - theater sound SF - $ - $ - $ - $ ACT FUR & Acoustic ceiling tile furring SF - $ - $ - $ - $ ACT LAB + Acoustical Treatments Installer - per hour HR - $ - $ - $ - $ ACT LABL + Acoustical Treatments - General Laborer - per hour HR - $ - $ - $ - $ ACT LP & Light diffusing panel (i.e., cracked ice) SF - $ - $ - $ - $ ACT LP+ & Light diffusing panel - High grade (i.e., mist white) SF - $ - $ - $ - $ ACT LP++ & Light diffusing panel - Premium grade (i.e., egg crate) SF - $ - $ - $ - $ ACT MN + Acoustic Ceiling - Labor Minimum EA - $ - $ - $ - $ ACT MTRAY & Acoustical ceilings - metal tray type SF - $ - $ - $ - $ ACT SG & Suspended ceiling grid - 2' x 4' SF - $ - $ - $ - $ ACT SG+ & Suspended ceiling grid - High grade - 2' x 4' SF - $ - $ - $ - $ ACT SG++ & Suspended ceiling grid - Premium grade - 2' x 4' SF - $ - $ - $ - $ ACT SG2 & Suspended ceiling grid - 2' x 2' SF - $ - $ - $ - $

Transcript of ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile...

Page 1: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

** CONFIDENTIAL PRICE LIST PRINTOUT **

Price List: IBTS_NC_FAY_JUN18

Restoration/Service/Remodel with Service Charges Factored In

Legend:

CAT = Category

SEL = Selector Code

ACT = Activity

DESCRIPTION = Description

UNIT = Unit of Measure

REPLACE = Replace Price

REMOVE = Remove Price

RESET = Reset Price

REMOVE & REPLACE = Remove & Replace Price

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

ACC ANCR & Anchor - twist in ground type EA -$ -$ -$ -$

ACC ANCR+ & Anchor - two crossed rods driven into the ground EA -$ -$ -$ -$

ACC BAXL & Axle - electric brake (with springs) EA -$ -$ -$ -$

ACC BIDITM + Accessories - Mobile Home (Bid Item) EA -$ -$ -$ -$

ACC DAXL & Axle - drag (with springs) - no brakes EA -$ -$ -$ -$

ACC DAXL- & Axle hubs - brake type EA -$ -$ -$ -$

ACC EQL & Equalizers EA -$ -$ -$ -$

ACC HTCH & Hitch - "A" frame style with coupler EA -$ -$ -$ -$

ACC HUBS & Axle hubs - drag type EA -$ -$ -$ -$

ACC IBEAM + I beam repair EA -$ -$ -$ -$

ACC LAB + Mobile Home Repair - per hour HR -$ -$ -$ -$

ACC LABL + Mobile Home - General Laborer - per hour HR -$ -$ -$ -$

ACC MN + Mobile Home Accessory - Labor Minimum EA -$ -$ -$ -$

ACC OTRG & Outrigger - up to 30" long EA -$ -$ -$ -$

ACC RIM & Rim - doughnut type with no center EA -$ -$ -$ -$

ACC SPNG & Spring - mono or single leaf only EA -$ -$ -$ -$

ACC TIRE & Tire - 7 x 14.5 or 8 x 14.5 mounted EA -$ -$ -$ -$

ACC TIRE+ & Tire and rim/wheel - 7 x 14.5 or 8 x 14.5 EA -$ -$ -$ -$

ACC TNGJK & Tongue jack EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

ACT AV & Acoustic ceiling tile SF

ACT AV+ & Acoustic ceiling tile - High grade SF

ACT AV++ & Acoustic ceiling tile - Premium grade SF

ACT AVARMV - Tear off asbestos acoustic ceiling tile (no haul off) SF

ACT AVM & Ceiling panel - w/battens & staples- mobile home SF

ACT AVM+ & Ceiling panel -High grade w/battens & staples- mobile SF

ACT home

ACT AVM++ & Ceiling panel -glued wino battens & staples- mobile home SF -$ -$ -$ -$

ACT BALL++ & Special - ballroom ceiling panels - Premium grade SF -$ -$ -$ -$

ACT BIDITM + Acoustical Treatments (Bid Item) EA -$ -$ -$ -$

ACT BTN & Batten for ceiling panel - mobile home LF -$ -$ -$ -$

ACT DRAPE & Acoustical wall treatment - cloth - theater sound SF -$ -$ -$ -$

ACT FUR & Acoustic ceiling tile furring SF -$ -$ -$ -$

ACT LAB + Acoustical Treatments Installer - per hour HR -$ -$ -$ -$

ACT LABL + Acoustical Treatments - General Laborer - per hour HR -$ -$ -$ -$

ACT LP & Light diffusing panel (i.e., cracked ice) SF -$ -$ -$ -$

ACT LP+ & Light diffusing panel - High grade (i.e., mist white) SF -$ -$ -$ -$

ACT LP++ & Light diffusing panel - Premium grade (i.e., egg crate) SF -$ -$ -$ -$

ACT MN + Acoustic Ceiling - Labor Minimum EA -$ -$ -$ -$

ACT MTRAY & Acoustical ceilings - metal tray type SF -$ -$ -$ -$

ACT SG & Suspended ceiling grid - 2' x 4' SF -$ -$ -$ -$

ACT SG+ & Suspended ceiling grid - High grade - 2' x 4' SF -$ -$ -$ -$

ACT SG++ & Suspended ceiling grid - Premium grade - 2' x 4' SF -$ -$ -$ -$

ACT SG2 & Suspended ceiling grid - 2' x 2' SF -$ -$ -$ -$

Page 2: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

ACT SG2+ & Suspended ceiling grid - High grade - 2' x 2' SF -$ -$ -$ -$

ACT SG2++ & Suspended ceiling grid - Premium grade - 2' x 2' SF -$ -$ -$ -$

ACT SG2RS + Suspended ceiling grid - Detach & reset SF -$ -$ -$ -$

ACT SGRS + Suspended ceiling grid - Reset/realign SF -$ -$ -$ -$

ACT ST & Suspended ceiling tile - 2' x 4' SF -$ -$ -$ -$

ACT ST- & Suspended ceiling tile - Standard grade - 2' x 4' SF -$ -$ -$ -$

ACT ST+ & Suspended ceiling tile - High grade - 2' x 4' SF -$ -$ -$ -$

ACT ST++ & Suspended ceiling tile - Premium grade - 2' x 4' SF -$ -$ -$ -$

ACT ST2 & Suspended ceiling tile - 2' x 2' SF -$ -$ -$ -$

ACT ST2- & Suspended ceiling tile - Standard grade - 2' x 2' SF -$ -$ -$ -$

ACT ST2+ & Suspended ceiling tile - High grade - 2' x 2' SF -$ -$ -$ -$

ACT ST2++ & Suspended ceiling tile - Premium grade - 2' x 2' SF -$ -$ -$ -$

ACT STCL & Suspended ceiling tile for clean room/kitchen - 2' x 4' SF -$ -$ -$ -$

ACT STCL2 & Suspended ceiling tile for clean room/kitchen - 2' x 2' SF -$ -$ -$ -$

ACT STG & Suspended ceiling system - 2' x 4' SF -$ -$ -$ -$

ACT STG- & Suspended ceiling system - Standard grade - 2' x 4' SF -$ -$ -$ -$

ACT STG+ & Suspended ceiling system - High grade - 2' x 4' SF -$ -$ -$ -$

ACT STG++ & Suspended ceiling system - Premium grade - 2' x 4' SF -$ -$ -$ -$

ACT STG2 & Suspended ceiling system - 2' x 2' SF -$ -$ -$ -$

ACT STG2- & Suspended ceiling system - Standard grade - 2' x 2' SF -$ -$ -$ -$

ACT STG2+ & Suspended ceiling system - High grade - 2' x 2' SF -$ -$ -$ -$

ACT STG2++ & Suspended ceiling system - Premium grade - 2' x 2' SF -$ -$ -$ -$

ACT STGF2 & Suspended ceiling system - 2' x 2' fabric covered SF -$ -$ -$ -$

ACT STGLIN & Suspended ceiling system - Linear metal strip SF -$ -$ -$ -$

ACT STRS + Suspended ceiling tile - Detach & reset SF -$ -$ -$ -$

ACT TINCC & Tin ceiling cornice - embossed - unpainted LF -$ -$ -$ -$

ACT TINCC+ & Tin ceiling cornice - embossed - factory painted LF -$ -$ -$ -$

ACT TINCC++ & Tin ceiling cornice - embossed - chrome/brass/copper LF -$ -$ -$ -$

ACT TINCP & Tin ceiling panel - embossed - unpainted SF -$ -$ -$ -$

ACT TINCP+ & Tin ceiling panel - embossed - factory painted SF -$ -$ -$ -$

ACT TINCP++ & Tin ceiling panel - embossed - chrome/brass/copper SF -$ -$ -$ -$

ACT TINCPRS + Tin ceiling panel - embossed - Detach & reset SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

ANT AGUN + Antique firearm - Enter price EA -$ -$ -$ -$

ANT BOOK + Antique book - Enter price EA -$ -$ -$ -$

ANT FURN + Antique furniture - Enter price EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

APM ACPT + Portable air conditioner EA -$ -$ -$ -$

APM ACPT- + Portable air conditioner - Standard grade EA -$ -$ -$ -$

APM ACPT+ + Portable air conditioner - High grade EA -$ -$ -$ -$

APM ACWA + Window air conditioner/heater EA -$ -$ -$ -$

APM ACWA- + Window air conditioner/heater - Standard grade EA -$ -$ -$ -$

APM ACWA+ + Window air conditioner/heater - High grade EA -$ -$ -$ -$

APM ACWA++ + Window air conditioner/heater - Premium grade EA -$ -$ -$ -$

APM ALLOW + Appearance allowance - APM - Enter price EA -$ -$ -$ -$

APM DRYE + Dryer - Electric EA -$ -$ -$ -$

APM DRYE- + Dryer - Electric - Standard grade EA -$ -$ -$ -$

APM DRYE+ + Dryer - Electric - High grade EA -$ -$ -$ -$

APM DRYE++ + Dryer - Electric - Premium grade EA -$ -$ -$ -$

APM DRYE+++ + Dryer - Electric - Deluxe grade EA -$ -$ -$ -$

APM DRYG + Dryer - Gas EA -$ -$ -$ -$

APM DRYG- + Dryer - Gas - Standard grade EA -$ -$ -$ -$

APM DRYG+ + Dryer - Gas - High grade EA -$ -$ -$ -$

APM DRYG++ + Dryer - Gas - Premium grade EA -$ -$ -$ -$

APM DRYG+++ + Dryer - Gas - Deluxe grade EA -$ -$ -$ -$

APM DWPORT + Dishwasher - Portable EA -$ -$ -$ -$

APM DWPORT- + Dishwasher - Portable - Standard grade EA -$ -$ -$ -$

APM DWPORT+ + Dishwasher - Portable - High grade EA -$ -$ -$ -$

APM FREC + Freezer - Chest EA -$ -$ -$ -$

Page 3: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

APM FREC- + Freezer - Chest - Standard grade EA -$ -$ -$ -$

APM FREC+ + Freezer - Chest - High grade EA -$ -$ -$ -$

APM FREC++ + Freezer - Chest - Premium grade EA -$ -$ -$ -$

APM FREC+++ + Freezer - Chest - Deluxe grade EA -$ -$ -$ -$

APM FREU + Freezer - Upright EA -$ -$ -$ -$

APM FREU- + Freezer - Upright - Standard grade EA -$ -$ -$ -$

APM FREU+ + Freezer - Upright - High grade EA -$ -$ -$ -$

APM FREU++ + Freezer - Upright - Premium grade EA -$ -$ -$ -$

APM FREU+++ + Freezer - Upright - Deluxe grade EA -$ -$ -$ -$

APM RF14 + Refrigerator - top freezer - 14 to 18 cf EA -$ -$ -$ -$

APM RF14- + Refrigerator - top freezer - 14 to 18 cf - Standard grade EA -$ -$ -$ -$

APM RF14+ + Refrigerator - top freezer - 14 to 18 cf - High grade EA -$ -$ -$ -$

APM RF14++ + Refrigerator - top freezer - 14 to 18 cf - Premium grade EA -$ -$ -$ -$

APM RF18 + Refrigerator - top freezer - 18 to 22 cf EA -$ -$ -$ -$

APM RF18- + Refrigerator - top freezer - 18 to 22 cf - Standard grade EA -$ -$ -$ -$

APM RF18+ + Refrigerator - top freezer - 18 to 22 cf - High grade EA -$ -$ -$ -$

APM RF18++ + Refrigerator - top freezer - 18 to 22 cf - Premium grade EA -$ -$ -$ -$

APM RF22 + Refrigerator - top freezer - 22 to 24 cf EA -$ -$ -$ -$

APM RF22- + Refrigerator - top freezer - 22 to 24 cf - Standard grade EA -$ -$ -$ -$

APM RF22+ + Refrigerator - top freezer - 22 to 24 cf - High grd EA -$ -$ -$ -$

APM RF22++ + Refrigerator - top freezer - 22 to 24 cf - Premium grade EA -$ -$ -$ -$

APM RF25 + Refrigerator - top freezer - 24 to 26 cf EA -$ -$ -$ -$

APM RF25- + Refrigerator - top freezer - 24 to 26 cf - Standard grade EA -$ -$ -$ -$

APM RF25+ + Refrigerator - top freezer - 24 to 26 cf - High grade EA -$ -$ -$ -$

APM RF25++ + Refrigerator - top freezer - 24 to 26 cf - Premium grade EA -$ -$ -$ -$

APM RF25+++ + Refrigerator - top freezer - 24 to 26 cf - Deluxe grade EA -$ -$ -$ -$

APM RFB18 + Refrigerator - bottom freezer - 18 to 22 cf EA -$ -$ -$ -$

APM RFB18- + Refrigerator - bottom freezer - 18 to 22 cf - Standard grd EA -$ -$ -$ -$

APM RFB18+ + Refrigerator - bottom freezer - 18 to 22 cf - High grade EA -$ -$ -$ -$

APM RFB18++ + Refrigerator - bottom freezer - 18 to 22 cf - Premium grd EA -$ -$ -$ -$

APM RFB22 + Refrigerator - bottom freezer - 22 to 25 cf EA -$ -$ -$ -$

APM RFB22- + Refrigerator - bottom freezer - 22 to 25 cf - Standard grd EA -$ -$ -$ -$

APM RFB22+ + Refrigerator - bottom freezer - 22 to 25 cf - High grade EA -$ -$ -$ -$

APM RFB22++ + Refrigerator - bottom freezer - 22 to 25 cf - Premium grd EA -$ -$ -$ -$

APM RFB25 + Refrigerator - bottom freezer - 25 to 30 cf EA -$ -$ -$ -$

APM RFB25- + Refrigerator - bottom freezer - 25 to 30 cf - Standard grd EA -$ -$ -$ -$

APM RFB25+ + Refrigerator - bottom freezer - 25 to 30 cf - High grade EA -$ -$ -$ -$

APM RFB25++ + Refrigerator - bottom freezer - 25 to 30 cf - Premium grd EA -$ -$ -$ -$

APM RFMI + Refrigerator - compact (undercounter) EA -$ -$ -$ -$

APM RFMI- + Refrigerator - compact (undercounter) - Standard grade EA -$ -$ -$ -$

APM RFMI+ + Refrigerator - compact (undercounter) - High grade EA -$ -$ -$ -$

APM RFMI++ + Refrigerator - compact (undercounter) - Premium grade EA -$ -$ -$ -$

APM RFS18 + Refrigerator - side by side - 16 to 22 cf EA -$ -$ -$ -$

APM RES18- + Refrigerator - side by side - 16 to 22 cf - Standard grade EA -$ -$ -$ -$

APM RFS18+ + Refrigerator - side by side - 16 to 22 cf - High grade EA -$ -$ -$ -$

APM RFS18++ + Refrigerator - side by side - 16 to 22 cf - Premium grade EA -$ -$ -$ -$

APM RFS22 + Refrigerator - side by side - 22 to 25 cf EA -$ -$ -$ -$

APM RFS22- + Refrigerator - side by side - 22 to 25 cf - Standard grade EA -$ -$ -$ -$

APM RFS22+ + Refrigerator - side by side - 22 to 25 cf - High grade EA -$ -$ -$ -$

APM RFS22++ + Refrigerator - side by side - 22 to 25 cf - Premium grade EA -$ -$ -$ -$

APM RFS24 + Refrigerator - side by side - 25 to 30 cf EA -$ -$ -$ -$

APM RFS24- + Refrigerator - side by side - 25 to 30 cf - Standard grade EA -$ -$ -$ -$

APM RFS24+ + Refrigerator - side by side - 25 to 30 cf - High grade EA -$ -$ -$ -$

APM RFS24++ + Refrigerator - side by side - 25 to 30 cf - Premium grade EA -$ -$ -$ -$

APM RG + Range - freestanding - electric EA -$ -$ -$ -$

APM RG- + Range - freestanding - electric - Standard grade EA -$ -$ -$ -$

APM RG+ + Range - freestanding - electric - High grade EA -$ -$ -$ -$

APM RG++ + Range - freestanding - electric - Premium grade EA -$ -$ -$ -$

APM RG+++ + Range - freestanding - electric - Deluxe grade EA -$ -$ -$ -$

APM RGBI + Range - Built-in/Commercial EA -$ -$ -$ -$

APM RGDL + Range - freestanding - double oven - dual EA -$ -$ -$ -$

APM RGDL- + Range - freestanding - double oven - dual - Standard grade EA -$ -$ -$ -$

APM RGDL+ + Range - freestanding - double oven - dual - High grade EA -$ -$ -$ -$

APM RGDL++ + Range - freestanding - double oven - dual - Premium grade EA -$ -$ -$ -$

APM RGDO + Range - freestanding - double oven - electric EA -$ -$ -$ -$

Page 4: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

APM RGDO- + Range - freestanding - double oven - electric - Std grade EA -$ -$ -$ -$

APM RGDO+ + Range - freestanding - double oven - electric - High grade EA -$ -$ -$ -$

APM RGDO++ + Range - freestanding - double oven - electric - Prem grade EA -$ -$ -$ -$

APM RGDOG + Range - freestanding - double oven - gas EA -$ -$ -$ -$

APM RGDOG- + Range - freestanding - double oven - gas - Standard grade EA -$ -$ -$ -$

APM RGDOG+ + Range - freestanding - double oven - gas - High grade EA -$ -$ -$ -$

APM RGG + Range - freestanding - gas EA -$ -$ -$ -$

APM RGG- + Range - freestanding - gas - Standard grade EA -$ -$ -$ -$

APM RGG+ + Range - freestanding - gas - High grade EA -$ -$ -$ -$

APM RGG++ + Range - freestanding - gas - Premium grade EA -$ -$ -$ -$

APM RGG+++ + Range - freestanding - gas - Deluxe grade EA -$ -$ -$ -$

APM RGL + Range - freestanding - dual EA -$ -$ -$ -$

APM RGL- + Range - freestanding - dual - Standard grade EA -$ -$ -$ -$

APM RGL+ + Range - freestanding - dual - High grade EA -$ -$ -$ -$

APM RGL++ + Range - freestanding - dual - Premium grade EA -$ -$ -$ -$

APM RGL+++ + Range - freestanding - dual - Deluxe grade EA -$ -$ -$ -$

APM RSTR + Restore and repair - APM - Enter price EA -$ -$ -$ -$

APM WASF + Washer / Washing machine - Front-loading EA -$ -$ -$ -$

APM WASF- + Washer / Washing machine - Front-loading - Standard EA -$ -$ -$ -$

grade

APM WASF+ + Washer / Washing machine - Front-loading - High grade EA -$ -$ -$ -$

APM WASF++ Washer / Washing machine - Front-loading - Premium EA -$ -$ -$ -$

+ grade

APM WAST + Washer / Washing machine - Top-loading EA -$ -$ -$ -$

APM WAST- + Washer / Washing machine - Top-loading - Standard grade EA -$ -$ -$ -$

APM WAST+ + Washer / Washing machine - Top-loading - High grade EA -$ -$ -$ -$

APM WAST++ + Washer / Washing machine - Top-loading - Premium grade EA -$ -$ -$ -$

APM WAST+++ + Washer / Washing machine - Top-loading - Deluxe grade EA -$ -$ -$ -$

APM WDCE + Washer / Washing machine & dryer combo - Electric EA -$ -$ -$ -$

APM WDCE- + Washer / Washing machine & dryer combo - Electric - Std EA -$ -$ -$ -$

gr

APM WDCE+ + Washer / Washing machine & dryer combo - Electric - Hi EA -$ -$ -$ -$

grd

APM WDCG + Washer / Washing machine & dryer combo - Gas EA -$ -$ -$ -$

APM WDCG- + Washer / Washing machine & dryer combo - Gas - Std EA -$ -$ -$ -$

grade

APM WDCG+ + Washer / Washing machine & dryer combo - Gas - High EA -$ -$ -$ -$

grade

APM WSDP + Washer & dryer pedestal EA -$ -$ -$ -$

APM WSDP- + Washer & dryer pedestal - Standard grade EA -$ -$ -$ -$

APM WSDP+ + Washer & dryer pedestal - High grade EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

APP BBC & Bottle/can box cooler - Commercial EA -$ -$ -$ -$

APP BIDITM + Appliances (Bid Item) EA -$ -$ -$ -$

APP CKIT & Compact Kitchenette - 48" - Range-Refrigerator-Sink EA -$ -$ -$ -$

APP CKIT+ & Compact Kitchenette - 48" - Range-Frig.-Sink-Wall EA -$ -$ -$ -$

Cabinets -$ -$ -$ -$

APP CKIT< & Compact Kitchenette - 30" - Range-Refrigerator-Sink EA -$ -$ -$ -$

APP CKIT<+ & Compact Kitchenette - 30" - Range-Frig.-Sink-Wall EA -$ -$ -$ -$

Cabinets -$ -$ -$ -$

APP CKIT> & Compact Kitchenette - 60" - Range-Refrigerator-Sink EA -$ -$ -$ -$

APP CKIT>+ & Compact Kitchenette - 60" - Range-Frig.-Sink-Wall EA -$ -$ -$ -$

Cabinets -$ -$ -$ -$

APP CT & Cooktop - electric EA -$ -$ -$ -$

APP CT- & Cooktop - electric - Standard grade EA -$ -$ -$ -$

APP CT+ & Cooktop - electric - High grade EA -$ -$ -$ -$

APP CT++ & Cooktop - electric - Premium grade EA -$ -$ -$ -$

APP CT+++ & Cooktop - electric - Deluxe grade EA -$ -$ -$ -$

APP CTG & Cooktop - gas EA -$ -$ -$ -$

APP CTG- & Cooktop - gas - Standard grade EA -$ -$ -$ -$

APP CTG+ & Cooktop - gas - High grade EA -$ -$ -$ -$

APP CTG++ & Cooktop - gas - Premium grade EA -$ -$ -$ -$

Page 5: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

APP CTG+++ & Cooktop - gas - Deluxe grade EA -$ -$ -$ -$

APP CTM & Cooktop - mobile home EA -$ -$ -$ -$

APP CTRS + Cooktop - Detach & reset EA -$ -$ -$ -$

APP DHC & Dryer - Heavy commercial - 25-35 lb capacity EA -$ -$ -$ -$

APP DHC> & Dryer - Heavy commercial - 40-50 lb capacity EA -$ -$ -$ -$

APP DHC>> & Dryer - Heavy commercial - 60-75 lb capacity EA -$ -$ -$ -$

APP DHC>>> & Dryer - Heavy commercial - 120 lb capacity EA -$ -$ -$ -$

APP DHCCB & Dryer - Commercial - coin box EA -$ -$ -$ -$

APP DHCRS + Dryer - Heavy commercial - Remove & reset - gas/electric EA -$ -$ -$ -$

APP DHCS & Dryer - Heavy commercial - stackable - 30-45 lb capacity EA -$ -$ -$ -$

APP DRYC & Dryer - Light commercial EA -$ -$ -$ -$

APP DRYC> & Dryer - Light commercial - Large EA -$ -$ -$ -$

APP DRYE & Dryer - Electric EA -$ -$ -$ -$

APP DRYE- & Dryer - Electric - Standard grade EA -$ -$ -$ -$

APP DRYE+ & Dryer - Electric - High grade EA -$ -$ -$ -$

APP DRYE++ & Dryer - Electric - Premium grade EA -$ -$ -$ -$

APP DRYE+++ & Dryer - Electric - Deluxe grade EA -$ -$ -$ -$

APP DRYG & Dryer - Gas EA -$ -$ -$ -$

APP DRYG- & Dryer - Gas - Standard grade EA -$ -$ -$ -$

APP DRYG+ & Dryer - Gas - High grade EA -$ -$ -$ -$

APP DRYG++ & Dryer - Gas - Premium grade EA -$ -$ -$ -$

APP DRYG+++ & Dryer - Gas - Deluxe grade EA -$ -$ -$ -$

APP DRYGRS + Dryer - Remove & reset - gas EA -$ -$ -$ -$

APP DRYRS + Dryer - Remove & reset EA -$ -$ -$ -$

APP DRYS & Dryer - Light commercial - stackable EA -$ -$ -$ -$

APP DW & Dishwasher EA -$ -$ -$ -$

APP DW- & Dishwasher - Standard grade EA -$ -$ -$ -$

APP DW+ & Dishwasher - High grade EA -$ -$ -$ -$

APP DW++ & Dishwasher - Premium grade EA -$ -$ -$ -$

APP DW+++ & Dishwasher - Deluxe grade EA -$ -$ -$ -$

APP DWRS + Dishwasher - Detach & reset EA -$ -$ -$ -$

APP DWSUP + Dishwasher supply line - material only EA -$ -$ -$ -$

APP FRBI & Built-in freezer - 36" EA -$ -$ -$ -$

APP FRBI+ & Built-in freezer - 36" - High grade EA -$ -$ -$ -$

APP FRBI++ & Built-in freezer - 36" - Premium grade EA -$ -$ -$ -$

APP FRZRS + Freezer - Remove & reset EA -$ -$ -$ -$

APP GD & Garbage disposer EA -$ -$ -$ -$

APP GD- & Garbage disposer - Standard grade EA -$ -$ -$ -$

APP GD+ & Garbage disposer - High grade EA -$ -$ -$ -$

APP GD++ & Garbage disposer - Premium grade EA -$ -$ -$ -$

APP GDRS + Garbage disposer - Detach & reset EA -$ -$ -$ -$

APP HD & Range hood EA -$ -$ -$ -$

APP HD- & Range hood - Standard grade EA -$ -$ -$ -$

APP HD+ & Range hood - High grade EA -$ -$ -$ -$

APP HD> & Range hood - oversized EA -$ -$ -$ -$

APP HD>- & Range hood - oversized - Standard grade EA -$ -$ -$ -$

APP HD>+ & Range hood - oversized - High grade EA -$ -$ -$ -$

APP HDC & Range hood - copper EA -$ -$ -$ -$

APP HDC+ & Range hood - copper - High grade EA -$ -$ -$ -$

APP HDC> & Range hood - copper - oversized EA -$ -$ -$ -$

APP HDC>+ & Range hood - copper - oversized - High grade EA -$ -$ -$ -$

APP HDI & Range hood - add on cost for ceiling mount/island hood EA -$ -$ -$ -$

APP HDM & Range hood - mobile home EA -$ -$ -$ -$

APP HDRS + Range hood - Detach & reset EA -$ -$ -$ -$

APP HDSS & Range hood - stainless steel EA -$ -$ -$ -$

APP HDSS+ & Range hood - stainless steel - High grade EA -$ -$ -$ -$

APP HDSS> & Range hood - stainless steel - oversized EA -$ -$ -$ -$

APP HDSS>+ & Range hood - stainless steel - oversized - High grade EA -$ -$ -$ -$

APP ICE & Ice machine with storage bin EA -$ -$ -$ -$

APP ICERS + Ice machine with storage bin - Detach & reset EA -$ -$ -$ -$

APP IM & Ice maker appliance, 15" wide - built-in EA -$ -$ -$ -$

APP IM+ & Ice maker appliance, 15" wide - built-in - High grade EA -$ -$ -$ -$

APP IMDP & Ice maker drain pump EA -$ -$ -$ -$

APP IMRS + Ice maker - Detach & reset EA -$ -$ -$ -$

APP KITSF + Kitchen Equipment - Commercial (per SF of kitchen) SF -$ -$ -$ -$

Page 6: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

APP MWS & Microwave oven - over range w/built-in hood EA -$ -$ -$ -$

APP MWS- & Microwave oven - over range w/built-in hood - Standard EA -$ -$ -$ -$

grd

APP MWS+ & Microwave oven - over range w/built-in hood - High grade EA -$ -$ -$ -$

APP MWSRS + Microwave oven - over range type - Detach & reset EA -$ -$ -$ -$

APP OVBI & Built-in oven EA -$ -$ -$ -$

APP OVBI- & Built-in oven - Standard grade EA -$ -$ -$ -$

APP OVBI+ & Built-in oven - High grade EA -$ -$ -$ -$

APP OVBI++ & Built-in oven - Premium grade EA -$ -$ -$ -$

APP OVBID & Built-in double oven EA -$ -$ -$ -$

APP OVBID- & Built-in double oven - Standard grade EA -$ -$ -$ -$

APP OVBID+ & Built-in double oven - High grade EA -$ -$ -$ -$

APP OVBID++ & Built-in double oven - Premium grade EA -$ -$ -$ -$

APP OVBIRS + Built-in oven - Detach & reset EA -$ -$ -$ -$

APP RF14 & Refrigerator - top freezer - 14 to 18 cf EA -$ -$ -$ -$

APP RF14- & Refrigerator - top freezer - 14 to 18 cf - Standard grade EA -$ -$ -$ -$

APP RF14+ & Refrigerator - top freezer - 14 to 18 cf - High grade EA -$ -$ -$ -$

APP RF14++ & Refrigerator - top freezer - 14 to 18 cf - Premium grade EA -$ -$ -$ -$

APP RF18 & Refrigerator - top freezer - 18 to 22 cf EA -$ -$ -$ -$

APP RF18- & Refrigerator - top freezer - 18 to 22 cf - Std grade EA -$ -$ -$ -$

APP RF18+ & Refrigerator - top freezer - 18 to 22 cf - High grade EA -$ -$ -$ -$

APP RF18++ & Refrigerator - top freezer - 18 to 22 cf - Premium grade EA -$ -$ -$ -$

APP RF22 & Refrigerator - top freezer - 22 to 24 cf EA -$ -$ -$ -$

APP RF22- & Refrigerator - top freezer - 22 to 24 cf - Std grade EA -$ -$ -$ -$

APP RF22+ & Refrigerator - top freezer - 22 to 24 cf - High grade EA -$ -$ -$ -$

APP RF22++ & Refrigerator - top freezer - 22 to 24 cf - Premium grade EA -$ -$ -$ -$

APP RF25 & Refrigerator - top freezer - 24 to 26 cf EA -$ -$ -$ -$

APP RF25+ & Refrigerator - top freezer - 24 to 26 cf - High grade EA -$ -$ -$ -$

APP RF25++ & Refrigerator - top freezer - 24 to 26 cf - Premium grade EA -$ -$ -$ -$

APP RF25+++ & Refrigerator - top freezer - 24 to 26 cf - Deluxe grade EA -$ -$ -$ -$

APP RFB18 & Refrigerator - bottom freezer - 18 to 22 cf EA -$ -$ -$ -$

APP RFB18- & Refrigerator - bottom freezer - 18 to 22 cf - Standard grd EA -$ -$ -$ -$

APP RFB18+ & Refrigerator - bottom freezer - 18 to 22 cf - High grade EA -$ -$ -$ -$

APP RFB18++ & Refrigerator - bottom freezer - 18 to 22 cf -Premium grade EA -$ -$ -$ -$

APP RFB22 & Refrigerator - bottom freezer - 22 to 25 cf EA -$ -$ -$ -$

APP RFB22- & Refrigerator - bottom freezer - 22 to 24 cf - Standard grd EA -$ -$ -$ -$

APP RFB22+ & Refrigerator - bottom freezer - 22 to 25 cf - High grade EA -$ -$ -$ -$

APP RFB22++ & Refrigerator - bottom freezer - 22 to 25 cf -Premium grade EA -$ -$ -$ -$

APP RFB25 & Refrigerator - bottom freezer - 25 to 30 cf EA -$ -$ -$ -$

APP RFB25- & Refrigerator - bottom freezer - 25 to 30 cf - Std grade EA -$ -$ -$ -$

APP RFB25+ & Refrigerator - bottom freezer - 25 to 30 cf - High grade EA -$ -$ -$ -$

APP RFB25++ & Refrigerator - bottom freezer - 25 to 30 cf -Premium grade EA -$ -$ -$ -$

APP RFBI & Built-in refrigerator - 36" EA -$ -$ -$ -$

APP RFBI+ & Built-in refrigerator - 36" - High grade EA -$ -$ -$ -$

APP RFBI++ & Built-in refrigerator - 36" - Premium grade EA -$ -$ -$ -$

APP RFBI+++ & Built-in refrigerator - 36" - Deluxe grade EA -$ -$ -$ -$

APP RFBI> & Built-in refrigerator - 42" EA -$ -$ -$ -$

APP RFBI>+ & Built-in refrigerator - 42" - High grade EA -$ -$ -$ -$

APP RFBI>++ & Built-in refrigerator - 42" - Premium grade EA -$ -$ -$ -$

APP RFBI>DX & Built-in refrigerator - 42" - Deluxe grade EA -$ -$ -$ -$

APP RFBIRS + Built-in freezer/refrigerator - Remove & reset EA -$ -$ -$ -$

APP RFBIX & Built-in refrigerator - 48" EA -$ -$ -$ -$

APP RFBIX+ & Built-in refrigerator - 48" - High grade EA -$ -$ -$ -$

APP RFBIX++ & Built-in refrigerator - 48" - Premium grade EA -$ -$ -$ -$

APP RFBIXDX & Built-in refrigerator - 48" - Deluxe grade EA -$ -$ -$ -$

APP RFBIXRS + Built-in freezer/refrigerator - Large - Remove & reset EA -$ -$ -$ -$

APP RFD & Refrigerated drawer appliance - under-counter - built-in EA -$ -$ -$ -$

APP RFDRS + Refrigerated drawers - built-in - Remove & reset EA -$ -$ -$ -$

APP RFM & Refrigerator - mobile home EA -$ -$ -$ -$

APP RFMI & Refrigerator - compact (under counter) EA -$ -$ -$ -$

APP RFMI- & Refrigerator - compact (under counter) - Standard grade EA -$ -$ -$ -$

APP RFMI+ & Refrigerator - compact (under counter) - High grade EA -$ -$ -$ -$

APP RFMI++ & Refrigerator - compact (under counter) - Premium grade EA -$ -$ -$ -$

APP RFP + Refrigerator - paint / refinish EA -$ -$ -$ -$

APP RFPG + Refrigerator - paint / refinish & replace gaskets EA -$ -$ -$ -$

Page 7: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

APP RFR1 & Refrigerator - reach-in - Restaurant Equip. - 1 door EA -$ -$ -$ -$

APP RFR2 & Refrigerator - reach-in - Restaurant Equip. - 2 door EA -$ -$ -$ -$

APP RFR3 & Refrigerator - reach-in - Restaurant Equip. - 3 door EA -$ -$ -$ -$

APP RFRS + Refrigerator - Remove & reset EA -$ -$ -$ -$

APP RFS18 & Refrigerator - side by side - 16 to 22 cf EA -$ -$ -$ -$

APP RFS18- & Refrigerator - side by side - 16 to 22 cf - Standard grade EA -$ -$ -$ -$

APP RFS18+ & Refrigerator - side by side - 16 to 22 cf - High grade EA -$ -$ -$ -$

APP RFS18++ & Refrigerator - side by side - 16 to 22 cf - Premium grade EA -$ -$ -$ -$

APP RFS22 & Refrigerator - side by side - 22 to 25 cf EA -$ -$ -$ -$

APP RFS22- & Refrigerator - side by side - 22 to 25 cf - Standard grade EA -$ -$ -$ -$

APP RFS22+ & Refrigerator - side by side - 22 to 25 cf - High grade EA -$ -$ -$ -$

APP RFS22++ & Refrigerator - side by side - 22 to 25 cf - Premium grade EA -$ -$ -$ -$

APP RFS24 & Refrigerator - side by side - 25 to 30 cf EA -$ -$ -$ -$

APP RFS24- & Refrigerator - side by side - 25 to 30 cf - Standard grade EA -$ -$ -$ -$

APP RFS24+ & Refrigerator - side by side - 25 to 30 cf - High grade EA -$ -$ -$ -$

APP RFS24++ & Refrigerator - side by side - 25 to 30 cf - Premium grade EA -$ -$ -$ -$

APP RFSC & Refrigerator - Commercial - side by side EA -$ -$ -$ -$

APP RFSCRS + Refrigerator - Commercial - side by side - Remove & reset EA -$ -$ -$ -$

APP RFWLRS + Refrig. water line - Disconnect & reconnect - with repairs EA -$ -$ -$ -$

APP RG & Range - freestanding - electric EA -$ -$ -$ -$

APP RG- & Range - freestanding - electric - Standard grade EA -$ -$ -$ -$

APP RG+ & Range - freestanding - electric - High grade EA -$ -$ -$ -$

APP RG++ & Range - freestanding - electric - Premium grade EA -$ -$ -$ -$

APP RG+++ & Range - freestanding - electric - Deluxe grade EA -$ -$ -$ -$

APP RGDI & Range - drop in EA -$ -$ -$ -$

APP RGDI- & Range - drop in - Standard grade EA -$ -$ -$ -$

APP RGDI+ & Range - drop in - High grade EA -$ -$ -$ -$

APP RGDI++ & Range - drop in - Premium grade EA -$ -$ -$ -$

APP RGDIRS + Range - drop in - Detach & reset EA -$ -$ -$ -$

APP RGDO & Range - freestanding - double oven - electric EA -$ -$ -$ -$

APP RGDO+ & Range - freestanding - double oven - electric - High grade EA -$ -$ -$ -$

APP RGDO++ & Range - freestanding - double oven - elec. - Premium grade EA -$ -$ -$ -$

APP RGDOG & Range - freestanding - double oven - gas EA -$ -$ -$ -$

APP RGDOG+ & Range - freestanding - double oven - gas - High grade EA -$ -$ -$ -$

APP RGDOG++ & Range - freestanding - double oven - gas - Premium grade EA -$ -$ -$ -$

APP RGG & Range - freestanding - gas EA -$ -$ -$ -$

APP RGG- & Range - freestanding - gas - Standard grade EA -$ -$ -$ -$

APP RGG+ & Range - freestanding - gas - High grade EA -$ -$ -$ -$

APP RGG++ & Range - freestanding - gas - Premium grade EA -$ -$ -$ -$

APP RGGC & Range - Commercial - 30" - gas EA -$ -$ -$ -$

APP RGGC+ & Range - Commercial - 36" - gas EA -$ -$ -$ -$

APP RGGC++ & Range - Commercial - 48" - gas EA -$ -$ -$ -$

APP RGGCRS + Range - Commercial - gas - Detach & reset EA -$ -$ -$ -$

APP RGGRS + Range - gas - Remove & reset EA -$ -$ -$ -$

APP RGM & Range - mobile home EA -$ -$ -$ -$

APP RGRS + Range - electric - Remove & reset EA -$ -$ -$ -$

APP RGS & Range - slide in - electric EA -$ -$ -$ -$

APP RGS- & Range - slide in - electric - Standard grade EA -$ -$ -$ -$

APP RGS+ & Range - slide in - electric - High grade EA -$ -$ -$ -$

APP RGS++ & Range - slide in - electric - Premium grade EA -$ -$ -$ -$

APP RGS+++ & Range - slide in - electric - Deluxe grade EA -$ -$ -$ -$

APP RGSG & Range - slide in - gas EA -$ -$ -$ -$

APP RGSG- & Range - slide in - gas - Standard grade EA -$ -$ -$ -$

APP RGSG+ & Range - slide in - gas - High grade EA -$ -$ -$ -$

APP RGSG++ & Range - slide in - gas - Premium grade EA -$ -$ -$ -$

APP RGSG+++ & Range - slide in - gas - Deluxe grade EA -$ -$ -$ -$

APP TC & Trash compactor EA -$ -$ -$ -$

APP TC+ & Trash compactor - High grade EA -$ -$ -$ -$

APP TCRS + Trash compactor - Remove & reset EA -$ -$ -$ -$

APP WASF & Washer/Washing Machine - Front-loading EA -$ -$ -$ -$

APP WASF- & Washer/Washing Machine - Front-loading - Standard grade EA -$ -$ -$ -$

APP WASF+ & Washer/Washing Machine - Front-loading - High grade EA -$ -$ -$ -$

APP WASF++ & Washer/Washing Machine - Front-loading - Premium grade EA -$ -$ -$ -$

APP WASHC & Washer - Light commercial EA -$ -$ -$ -$

APP WAST & Washer/Washing Machine - Top-loading EA -$ -$ -$ -$

Page 8: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

APP WAST- & Washer/Washing Machine - Top-loading - Standard grade EA -$ -$ -$ -$

APP WAST+ & Washer/Washing Machine - Top-loading - High grade EA -$ -$ -$ -$

APP WAST++ & Washer/Washing Machine - Top-loading - Premium grade EA -$ -$ -$ -$

APP WAST+++ & Washer/Washing Machine - Top-loading - Deluxe grade EA -$ -$ -$ -$

APP WD & Warming drawer, 30" - built-in EA -$ -$ -$ -$

APP WD+ & Warming drawer, 30" - built-in - High grade EA -$ -$ -$ -$

APP WD++ & Warming drawer, 30" - built-in - Premium grade EA -$ -$ -$ -$

APP WDCE & Washer/Washing machine & dryer combo - Electric EA -$ -$ -$ -$

APP WDCE+ & Washer/Washing machine & dryer combo - Electric - High EA -$ -$ -$ -$

grd

APP WDCG & Washer/Washing machine & dryer combo - Gas EA -$ -$ -$ -$

APP WDCG+ & Washer/Washing machine & dryer combo - Gas - High EA -$ -$ -$ -$

grade

APP WDRS + Built-in warming drawer - Detach & reset EA -$ -$ -$ -$

APP WDSGRS + Stackable washer and dryer - Gas - Remove & reset EA -$ -$ -$ -$

APP WDSRS + Stackable washer and dryer - Remove & reset EA -$ -$ -$ -$

APP WEC & Washer - Extractor - Commercial - 18-20 lb capacity EA -$ -$ -$ -$

APP WEC> & Washer - Extractor - Commercial - 30-40 lb capacity EA -$ -$ -$ -$

APP WEC>> & Washer - Extractor - Commercial - 50-60 lb capacity EA -$ -$ -$ -$

APP WEC>>> & Washer - Extractor - Commercial - 70-80 lb capacity EA -$ -$ -$ -$

APP WEC>>>> & Washer - Extractor - Commercial - 90-125 lb capacity EA -$ -$ -$ -$

APP WECB & Washer - Commercial - coin box EA -$ -$ -$ -$

APP WERS + Washer - Extractor - Remove & reset EA -$ -$ -$ -$

APP WL & Appliance water line - 1/4" EA -$ -$ -$ -$

APP WSHRS + Washing machine - Remove & reset EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

APS AIRP + Air purifier / Air cleaner EA -$ -$ -$ -$

APS AIRP- + Air purifier / Air cleaner - Standard grade EA -$ -$ -$ -$

APS AIRP+ + Air purifier / Air cleaner - High grade EA -$ -$ -$ -$

APS ALLOW + Appearance allowance - APS - Enter price EA -$ -$ -$ -$

APS BRDM + Bread maker EA -$ -$ -$ -$

APS BRDM- + Bread maker - Standard grade EA -$ -$ -$ -$

APS BRDM+ + Bread maker - High grade EA -$ -$ -$ -$

APS BUFT + Buffet tray EA -$ -$ -$ -$

APS BUFT- + Buffet tray - Standard grade EA -$ -$ -$ -$

APS BUFT+ + Buffet tray - High grade EA -$ -$ -$ -$

APS BUFT++ + Buffet tray - Premium grade EA -$ -$ -$ -$

APS CHMK + Hot chocolate / Hot beverage maker EA -$ -$ -$ -$

APS CHMK- + Hot chocolate / Hot beverage maker - Standard grade EA -$ -$ -$ -$

APS CHMK+ + Hot chocolate / Hot beverage maker - High grade EA -$ -$ -$ -$

APS CNOPR + Can / Jar opener - Electric EA -$ -$ -$ -$

APS CNOPR- + Can / Jar opener - Electric - Standard grade EA -$ -$ -$ -$

APS CNOPR+ + Can / Jar opener - Electric - High grade EA -$ -$ -$ -$

APS COFB + Coffee - Brewer / Maker EA -$ -$ -$ -$

APS COFB- + Coffee - Brewer / Maker - Standard grade EA -$ -$ -$ -$

APS COFB+ + Coffee - Brewer / Maker - High grade EA -$ -$ -$ -$

APS COFB++ + Coffee - Brewer / Maker - Premium grade EA -$ -$ -$ -$

APS COFF + Frother EA -$ -$ -$ -$

APS COFF- + Frother - Standard grade EA -$ -$ -$ -$

APS COFF+ + Frother - High grade EA -$ -$ -$ -$

APS COFG + Coffee - Grinder EA -$ -$ -$ -$

APS COFG- + Coffee - Grinder - Standard grade EA -$ -$ -$ -$

APS COFG+ + Coffee - Grinder - High grade EA -$ -$ -$ -$

APS COFG++ + Coffee - Grinder - Premium grade EA -$ -$ -$ -$

APS COFM + Coffee - Cappuccino / Espresso / Multi-function EA -$ -$ -$ -$

APS COFM- + Coffee - Cappuccino / Espresso / Multi-function - Std grd EA -$ -$ -$ -$

APS COFM+ + Coffee - Cappuccino / Espresso / Multi-function - High grd EA -$ -$ -$ -$

APS COFM++ + Coffee - Cappuccino / Espresso / Multi-function - Prem grd EA -$ -$ -$ -$

APS COFM+++ + Coffee - Cappuccino / Espresso / Multi-function - Dlx grd EA -$ -$ -$ -$

APS COFPU + Coffee - Percolator / Urn - Electric EA -$ -$ -$ -$

APS COFPU- + Coffee - Percolator / Urn - Electric - Standard grade EA -$ -$ -$ -$

APS COFPU+ + Coffee - Percolator / Urn - Electric - High grade EA -$ -$ -$ -$

Page 9: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

APS DHMFR + Dehumidifier EA -$ -$ -$ -$

APS DHMFR- + Dehumidifier - Standard grade EA -$ -$ -$ -$

APS DHMFR+ + Dehumidifier - High grade EA -$ -$ -$ -$

APS DRMIX + Smoothie / Specialty / Margarita drink mixer EA -$ -$ -$ -$

APS DRMIX- + Smoothie / Specialty / Margarita drink mixer - Std grd EA -$ -$ -$ -$

APS DRMIX+ + Smoothie / Specialty / Margarita drink mixer - High grade EA -$ -$ -$ -$

APS DRMIX++ + Smoothie / Specialty / Margarita drink mixer - Prem grade EA -$ -$ -$ -$

APS EKNF + Electric knife EA -$ -$ -$ -$

APS EKNF- + Electric knife - Standard grade EA -$ -$ -$ -$

APS EKNF+ + Electric knife - High grade EA -$ -$ -$ -$

APS FANC + Fan - Over-sized / Commercial EA -$ -$ -$ -$

APS FANC- + Fan - Over-sized / Commercial - Standard grade EA -$ -$ -$ -$

APS FANC+ + Fan - Over-sized / Commercial - High grade EA -$ -$ -$ -$

APS FANFL + Fan - Floor / Box EA -$ -$ -$ -$

APS FANFL- + Fan - Floor / Box - Standard grade EA -$ -$ -$ -$

APS FANFL+ + Fan - Floor / Box - High grade EA -$ -$ -$ -$

APS FANP + Fan - Pedestal EA -$ -$ -$ -$

APS FANP- + Fan - Pedestal - Standard grade EA -$ -$ -$ -$

APS FANP+ + Fan - Pedestal - High grade EA -$ -$ -$ -$

APS FANTL + Fan - Table / Desk EA -$ -$ -$ -$

APS FANTL- + Fan - Table / Desk - Standard grade EA -$ -$ -$ -$

APS FANTL+ + Fan - Table / Desk - High grade EA -$ -$ -$ -$

APS FANTW + Fan - Tower EA -$ -$ -$ -$

APS FANTW- + Fan - Tower - Standard grade EA -$ -$ -$ -$

APS FANTW+ + Fan - Tower - High grade EA -$ -$ -$ -$

APS FAQM + Fajita & quesadilla maker EA -$ -$ -$ -$

APS FAQM+ + Fajita & quesadilla maker - High grade EA -$ -$ -$ -$

APS FDCH + Food chopper EA -$ -$ -$ -$

APS FDCH- + Food chopper - Standard grade EA -$ -$ -$ -$

APS FDCH+ + Food chopper - High grade EA -$ -$ -$ -$

APS FDDH + Food dehydrator EA -$ -$ -$ -$

APS FDDH- + Food dehydrator - Standard grade EA -$ -$ -$ -$

APS FDDH+ + Food dehydrator - High grade EA -$ -$ -$ -$

APS FDMG + Food & meat grinder EA -$ -$ -$ -$

APS FDMG- + Food & meat grinder - Standard grade EA -$ -$ -$ -$

APS FDMG+ + Food & meat grinder - High grade EA -$ -$ -$ -$

APS FDMG++ + Food & meat grinder - Premium grade EA -$ -$ -$ -$

APS FDPR + Food processor EA -$ -$ -$ -$

APS FDPR- + Food processor - Standard grade EA -$ -$ -$ -$

APS FDPR+ + Food processor - High grade EA -$ -$ -$ -$

APS FDPR++ + Food processor - Premium grade EA -$ -$ -$ -$

APS FOND + Fondue - Set EA -$ -$ -$ -$

APS FOND- + Fondue - Set - Standard grade EA -$ -$ -$ -$

APS FOND+ + Fondue - Set - High grade EA -$ -$ -$ -$

APS FONF + Fondue - Fountain EA -$ -$ -$ -$

APS FONF- + Fondue - Fountain - Standard grade EA -$ -$ -$ -$

APS FONF+ + Fondue - Fountain - High grade EA -$ -$ -$ -$

APS FONF++ + Fondue - Fountain - Premium grade EA -$ -$ -$ -$

APS FSVAC + Food sealer vacuum EA -$ -$ -$ -$

APS FSVAC- + Food sealer vacuum - Standard grade EA -$ -$ -$ -$

APS FSVAC+ + Food sealer vacuum - High grade EA -$ -$ -$ -$

APS GRDF + Deep fryer EA -$ -$ -$ -$

APS GRDF- + Deep fryer - Standard grade EA -$ -$ -$ -$

APS GRDF+ + Deep fryer - High grade EA -$ -$ -$ -$

APS GRDLE + Grill / Griddle - Electric EA -$ -$ -$ -$

APS GRDLE- + Grill / Griddle - Electric - Standard grade EA -$ -$ -$ -$

APS GRDLE+ + Grill / Griddle - Electric - High grade EA -$ -$ -$ -$

APS HBLD + Hand blender EA -$ -$ -$ -$

APS HBLD- + Hand blender - Standard grade EA -$ -$ -$ -$

APS HBLD+ + Hand blender - High grade EA -$ -$ -$ -$

APS HMIX + Hand mixer EA -$ -$ -$ -$

APS HMIX- + Hand mixer - Standard grade EA -$ -$ -$ -$

APS HMIX+ + Hand mixer - High grade EA -$ -$ -$ -$

APS HTES + Heater - Electric - Small EA -$ -$ -$ -$

APS HTES- + Heater - Electric - Small - Standard grade EA -$ -$ -$ -$

Page 10: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

APS HTES+ + Heater - Electric - Small - High grade EA -$ -$ -$ -$

APS HTGS + Heater - Gas - Small EA -$ -$ -$ -$

APS HTGS- + Heater - Gas - Small - Standard grade EA -$ -$ -$ -$

APS HTGS+ + Heater - Gas - Small - High grade EA -$ -$ -$ -$

APS HUMFR + Humidifier EA -$ -$ -$ -$

APS HUMFR- + Humidifier - Standard grade EA -$ -$ -$ -$

APS HUMFR+ + Humidifier - High grade EA -$ -$ -$ -$

APS ICEM + Ice cream maker / machine EA -$ -$ -$ -$

APS ICEM- + Ice cream maker / machine - Standard grade EA -$ -$ -$ -$

APS ICEM+ + Ice cream maker / machine - High grade EA -$ -$ -$ -$

APS IRON + Iron - Clothing / Clothes EA -$ -$ -$ -$

APS IRON- + Iron - Clothing / Clothes - Standard grade EA -$ -$ -$ -$

APS IRON+ + Iron - Clothing / Clothes - High grade EA -$ -$ -$ -$

APS IRPR + Press - Clothing / Clothes EA -$ -$ -$ -$

APS IRPR- + Press - Clothing / Clothes - Standard grade EA -$ -$ -$ -$

APS IRPR+ + Press - Clothing / Clothes - High grade EA -$ -$ -$ -$

APS JBLND + Jar blender EA -$ -$ -$ -$

APS JBLND- + Jar blender - Standard grade EA -$ -$ -$ -$

APS JBLND+ + Jar blender - High grade EA -$ -$ -$ -$

APS JBLND++ + Jar blender - Premium grade EA -$ -$ -$ -$

APS JUICE + Juicer - Electric EA -$ -$ -$ -$

APS JUICE- + Juicer - Electric - Standard grade EA -$ -$ -$ -$

APS JUICE+ + Juicer - Electric - High grade EA -$ -$ -$ -$

APS JUICE++ + Juicer - Electric - Premium grade EA -$ -$ -$ -$

APS KETE + Kettle - Electric EA -$ -$ -$ -$

APS KETE- + Kettle - Electric - Standard grade EA -$ -$ -$ -$

APS KETE+ + Kettle - Electric - High grade EA -$ -$ -$ -$

APS MWV + Microwave - Countertop EA -$ -$ -$ -$

APS MWV- + Microwave - Countertop - Standard grade EA -$ -$ -$ -$

APS MWV+ + Microwave - Countertop - High grade EA -$ -$ -$ -$

APS MWV++ + Microwave - Countertop - Premium grade EA -$ -$ -$ -$

APS MWV+++ + Microwave - Countertop - Deluxe grade EA -$ -$ -$ -$

APS PANM + Panini maker EA -$ -$ -$ -$

APS PANM- + Panini maker - Standard grade EA -$ -$ -$ -$

APS PANM+ + Panini maker - High grade EA -$ -$ -$ -$

APS PIZO + Pizza oven EA -$ -$ -$ -$

APS PIZO- + Pizza oven - Standard grade EA -$ -$ -$ -$

APS PIZO+ + Pizza oven - High grade EA -$ -$ -$ -$

APS POPM + Popcorn popper / Maker EA -$ -$ -$ -$

APS POPM- + Popcorn popper / Maker - Standard grade EA -$ -$ -$ -$

APS POPM+ + Popcorn popper / Maker - High grade EA -$ -$ -$ -$

APS RCCS + Rice cooker / Steamer EA -$ -$ -$ -$

APS RCCS- + Rice cooker / Steamer - Standard grade EA -$ -$ -$ -$

APS RCCS+ + Rice cooker / Steamer - High grade EA -$ -$ -$ -$

APS RSTR + Restore and repair - APS - Enter price EA -$ -$ -$ -$

APS SANM + Sandwich maker EA -$ -$ -$ -$

APS SANM- + Sandwich maker - Standard grade EA -$ -$ -$ -$

APS SANM+ + Sandwich maker - High grade EA -$ -$ -$ -$

APS SKLTE + Frying pan / Pot / Skillet - Electric EA -$ -$ -$ -$

APS SKLTE- + Frying pan / Pot / Skillet - Electric - Standard grade EA -$ -$ -$ -$

APS SKLTE+ + Frying pan / Pot / Skillet - Electric - High grade EA -$ -$ -$ -$

APS SLCK + Slow cooker / Crock pot EA -$ -$ -$ -$

APS SLCK- + Slow cooker / Crock pot - Standard grade EA -$ -$ -$ -$

APS SLCK+ + Slow cooker / Crock pot - High grade EA -$ -$ -$ -$

APS SLCRE + Slicer - Electric EA -$ -$ -$ -$

APS SLCRE- + Slicer - Electric - Standard grade EA -$ -$ -$ -$

APS SLCRE+ + Slicer - Electric - High grade EA -$ -$ -$ -$

APS SLCRE++ + Slicer - Electric - Premium grade EA -$ -$ -$ -$

APS SMIX + Stand mixer EA -$ -$ -$ -$

APS SMIX- + Stand mixer - Standard grade EA -$ -$ -$ -$

APS SMIX+ + Stand mixer - High grade EA -$ -$ -$ -$

APS SMIX++ + Stand mixer - Premium grade EA -$ -$ -$ -$

APS SNCM + Snow cone / Ice shaver / Slushie maker EA -$ -$ -$ -$

APS SNCM- + Snow cone / Ice shaver / Slushie maker - Standard grade EA -$ -$ -$ -$

APS SNCM+ + Snow cone / Ice shaver / Slushie maker - High grade EA -$ -$ -$ -$

Page 11: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

APS STMR + Steamer - Clothing / Clothes EA -$ -$ -$ -$

APS STMR- + Steamer - Clothing / Clothes - Standard grade EA -$ -$ -$ -$

APS STMR+ + Steamer - Clothing / Clothes - High grade EA -$ -$ -$ -$

APS TBTR + Tabletop range / Cooktop / Hot plate EA -$ -$ -$ -$

APS TBTR- + Tabletop range / Cooktop / Hot plate - Standard grade EA -$ -$ -$ -$

APS TBTR+ + Tabletop range / Cooktop / Hot plate - High grade EA -$ -$ -$ -$

APS TCV + Convection / Turbo oven EA -$ -$ -$ -$

APS TCV- + Convection / Turbo oven - Standard grade EA -$ -$ -$ -$

APS TCV+ + Convection / Turbo oven - High grade EA -$ -$ -$ -$

APS TCVN + Toaster - Conventional EA -$ -$ -$ -$

APS TCVN- + Toaster - Conventional - Standard grade EA -$ -$ -$ -$

APS TCVN+ + Toaster - Conventional - High grade EA -$ -$ -$ -$

APS TCVN++ + Toaster - Conventional - Premium grade EA -$ -$ -$ -$

APS TOVNB + Toaster - Oven / Broiler EA -$ -$ -$ -$

APS TOVNB- + Toaster - Oven / Broiler - Standard grade EA -$ -$ -$ -$

APS TOVNB+ + Toaster - Oven / Broiler - High grade EA -$ -$ -$ -$

APS TRO + Roaster oven EA -$ -$ -$ -$

APS TRO- + Roaster oven - Standard grade EA -$ -$ -$ -$

APS TRO+ + Roaster oven - High grade EA -$ -$ -$ -$

APS TROV + Rotisserie oven EA -$ -$ -$ -$

APS TROV- + Rotisserie oven - Standard grade EA -$ -$ -$ -$

APS TROV+ + Rotisserie oven - High grade EA -$ -$ -$ -$

APS VACB + Vacuum - Broom / Stick EA -$ -$ -$ -$

APS VACB- + Vacuum - Broom / Stick - Standard grade EA -$ -$ -$ -$

APS VACB+ + Vacuum - Broom / Stick - High grade EA -$ -$ -$ -$

APS VACC + Vacuum - Canister EA -$ -$ -$ -$

APS VACC- + Vacuum - Canister - Standard grade EA -$ -$ -$ -$

APS VACC+ + Vacuum - Canister - High grade EA -$ -$ -$ -$

APS VACC++ + Vacuum - Canister - Premium grade EA -$ -$ -$ -$

APS VACD + Vacuum - Carpet / Floor Cleaner / Deep Cleaner EA -$ -$ -$ -$

APS VACD- + Vacuum - Carpet / Floor Cleaner / Deep Cleaner - Std grd EA -$ -$ -$ -$

APS VACD+ + Vacuum - Carpet / Floor Cleaner / Deep Cleaner - High grd EA -$ -$ -$ -$

APS VACH + Vacuum - Handheld / Dustbuster EA -$ -$ -$ -$

APS VACH- + Vacuum - Handheld / Dustbuster - Standard grade EA -$ -$ -$ -$

APS VACH+ + Vacuum - Handheld / Dustbuster - High grade EA -$ -$ -$ -$

APS VACHD + Vacuum - Carpet / Floor cleaner - Handheld EA -$ -$ -$ -$

APS VACHD- + Vacuum - Carpet / Floor cleaner - Handheld - Standard gr. EA -$ -$ -$ -$

APS VACHD+ + Vacuum - Carpet / Floor cleaner - Handheld - High grade EA -$ -$ -$ -$

APS VACRO + Vacuum - Robotic EA -$ -$ -$ -$

APS VACRO- + Vacuum - Robotic - Standard grade EA -$ -$ -$ -$

APS VACRO+ + Vacuum - Robotic - High grade EA -$ -$ -$ -$

APS VACST + Steam cleaner EA -$ -$ -$ -$

APS VACST- + Steam cleaner - Standard grade EA -$ -$ -$ -$

APS VACST+ + Steam cleaner - High grade EA -$ -$ -$ -$

APS VACU + Vacuum - Upright EA -$ -$ -$ -$

APS VACU- + Vacuum - Upright - Standard grade EA -$ -$ -$ -$

APS VACU+ + Vacuum - Upright - High grade EA -$ -$ -$ -$

APS VACU++ + Vacuum - Upright - Premium grade EA -$ -$ -$ -$

APS WAFM + Waffle maker EA -$ -$ -$ -$

APS WAFM- + Waffle maker - Standard grade EA -$ -$ -$ -$

APS WAFM+ + Waffle maker - High grade EA -$ -$ -$ -$

APS WATP + Water purifier EA -$ -$ -$ -$

APS WATP- + Water purifier - Standard grade EA -$ -$ -$ -$

APS WATP+ + Water purifier - High grade EA -$ -$ -$ -$

APS WATP++ + Water purifier - Premium grade EA -$ -$ -$ -$

APS WRMT + Warming tray EA -$ -$ -$ -$

APS WRMT- + Warming tray - Standard grade EA -$ -$ -$ -$

APS WRMT+ + Warming tray - High grade EA -$ -$ -$ -$

APS YOGM + Yogurt machine EA -$ -$ -$ -$

APS YOGM- + Yogurt machine - Standard grade EA -$ -$ -$ -$

APS YOGM+ + Yogurt machine - High grade EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

Page 12: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

AWN BIDITM + Awnings & Patio Covers (Bid Item) EA -$ -$ -$ -$

AWN CARP- & Carport - pre-manufactured freestanding- Std grade, 7'-8' SF -$ -$ -$ -$

AWN CARP>- & Carport - pre-manufactured freestanding- Std grade, 9'40' SF -$ -$ -$ -$

AWN CARP>>- & Carport - pre-manufactured freestanding-Std grade, 11'44' SF -$ -$ -$ -$

AWN CARPP & Carport - pre-manufactured freestanding, 7-8 ft high SF -$ -$ -$ -$

AWN CARPP> & Carport - pre-manufactured freestanding, 9-10 ft high SF -$ -$ -$ -$

AWN CARPP» & Carport - pre-manufactured freestanding, 11-14 ft high SF -$ -$ -$ -$

AWN CARPT & Carport - Freestanding metal - Moderate load SF -$ -$ -$ -$

AWN CARPT- & Carport - Freestanding metal - Light load SF -$ -$ -$ -$

AWN CARPT+ & Carport - Freestanding metal - Heavy load SF -$ -$ -$ -$

AWN LAB + Awning & Patio Cover Installer - per hour HR -$ -$ -$ -$

AWN LABL + Awning & Patio Cover - General Laborer - per hour HR -$ -$ -$ -$

AWN MN + Awning - Labor Minimum EA -$ -$ -$ -$

AWN PC & Patio Cover - Attached - Aluminum - Moderate Load SF -$ -$ -$ -$

AWN PC- & Patio Cover - Attached - Aluminum - Light load SF -$ -$ -$ -$

AWN PC-- & Patio Cover - Attached - Aluminum - No load SF -$ -$ -$ -$

AWN PC+ & Patio Cover - Attached - Aluminum - Heavy Load SF -$ -$ -$ -$

AWN PCC & Patio Cover - Attached - Canvas (fixed) SF -$ -$ -$ -$

AWN PCC+ & Patio Cover - Attached - Canvas (fixed) - High grade SF -$ -$ -$ -$

AWN PCCFAB & Patio Cover - Fabric replacement SF -$ -$ -$ -$

AWN PCCFAB+ & Patio Cover - Fabric replacement - High grade SF -$ -$ -$ -$

AWN PCCM + Add on for retractable awning motor EA -$ -$ -$ -$

AWN PCCR & Patio Cover - Attached - Canvas (retractable) SF -$ -$ -$ -$

AWN PCCR+ & Patio Cover - Attached - Canvas (retractable) - High grade SF -$ -$ -$ -$

AWN PCDK & Patio Cover - Roof panels only - Moderate load SF -$ -$ -$ -$

AWN PCDK- & Patio Cover - Roof panels only - Light load SF -$ -$ -$ -$

AWN PCDK-- & Patio Cover - Roof panels only - No load SF -$ -$ -$ -$

AWN PCDK+ & Patio Cover - Roof panels only - Heavy load SF -$ -$ -$ -$

AWN PCDKINS & Patio Cover - Insulated - Roof panels only SF -$ -$ -$ -$

AWN PCDKRS + Patio Cover - Roof panels - Detach & reset SF -$ -$ -$ -$

AWN PCFACG & Patio Cover - Fascia end - Guttered LF -$ -$ -$ -$

AWN PCFACN & Patio Cover - Fascia end - Non-guttered LF -$ -$ -$ -$

AWN PCFACRS + Patio Cover - Fascia end - Detach & reset LF -$ -$ -$ -$

AWN PCINS & Patio Cover - Insulated - Kit SF -$ -$ -$ -$

AWN PCRS + Patio Cover - Attached - Aluminum - Detach & reset SF -$ -$ -$ -$

AWN PEG & Patio/pool Enclosure - Half Glass SF -$ -$ -$ -$

AWN PEG- & Greenhouse Enclosure - Full Glass SF -$ -$ -$ -$

AWN PEG+ & Patio/pool Enclosure - Full Glass SF -$ -$ -$ -$

AWN PEH & Patio/pool Enclosure - Half Screen SF -$ -$ -$ -$

AWN PES & Patio/pool Enclosure - Full Screen SF -$ -$ -$ -$

AWN PES- & Patio/pool Enclosure - Full Screen - Standard grade SF -$ -$ -$ -$

AWN PES+ & Patio/pool Enclosure - Full Screen - High grade SF -$ -$ -$ -$

AWN PESF & Patio/pool Enclosure - Full Screen - Frame only SF -$ -$ -$ -$

AWN PESF- & Patio/pool Enclosure - Full Screen - Frame only - Standard SF -$ -$ -$ -$

AWN PESF+ & Patio/pool Enclosure - Full Screen - Frame only - High gr. SF -$ -$ -$ -$

AWN PESR & Patio/pool Enclosure - Rescreen SF -$ -$ -$ -$

AWN PESR+ & Patio/pool Enclosure - Rescreen - Heavy duty solar screen SF -$ -$ -$ -$

AWN POSTA & Patio Post - Aluminum tube LF -$ -$ -$ -$

AWN POSTS & Patio Post - Steel Tube LF -$ -$ -$ -$

AWN POSTSC & Patio Post - Scrolled LF -$ -$ -$ -$

AWN SUN & Sunroom / Garden Room kit - over 180 SF SF -$ -$ -$ -$

AWN SUN< & Sunroom / Garden Room kit - under 180 SF SF -$ -$ -$ -$

AWN WINA & Awning - Window/door - Aluminum or steel LF -$ -$ -$ -$

AWN WINA+ & Awning - Window/door - Alum./steel - High grade LF -$ -$ -$ -$

AWN WINA> & Awning - Window/door - Alum./stl. (Oversized) LF -$ -$ -$ -$

AWN WINA>+ & Awning - Window/door - Alum./stl. - High grade LF -$ -$ -$ -$

(Oversized)

AWN WINA>RS + Awning - Aluminum/steel (Oversized) - Detach & reset LF -$ -$ -$ -$

AWN WINACLR + Awning - Aluminum or steel - Add for each color stripe EA -$ -$ -$ -$

AWN WINARS + Awning - Aluminum/steel - Detach & reset LF -$ -$ -$ -$

AWN WINASP & Awning side panels - Alum./steel (PER SET) EA -$ -$ -$ -$

AWN WINASP> & Awning side panels - Alum./steel (Oversized) (PER SET) EA -$ -$ -$ -$

AWN WINC & Awning - Window/door - Canvas (fixed) LF -$ -$ -$ -$

AWN WINC+ & Awning - Window/door - Canvas (retractable) LF -$ -$ -$ -$

AWN WINCM + Awning - Canvas (retractable) - Add to motorize EA -$ -$ -$ -$

Page 13: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

AWN WINCRS + Awning - Canvas - Detach & reset LF -$ -$ -$ -$

AWN WINV & Awning - Window/door - Vinyl (backlit type) LF -$ -$ -$ -$

AWN WINVRS + Awning - Vinyl - Detach & reset LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

CAB AG & Cabinetry - appliance garage EA -$ -$ -$ -$

CAB AG- & Cabinetry - appliance garage - Standard grade EA -$ -$ -$ -$

CAB AG+ & Cabinetry - appliance garage - High grade EA -$ -$ -$ -$

CAB AG++ & Cabinetry - appliance garage - Premium grade EA -$ -$ -$ -$

CAB AG+++ & Cabinetry - appliance garage - Deluxe grade EA -$ -$ -$ -$

CAB AGRS + Cabinetry - appliance garage - Detach & reset EA -$ -$ -$ -$

CAB APNL & Wood appliance panel SF -$ -$ -$ -$

CAB APNL- & Wood appliance panel - Standard grade SF -$ -$ -$ -$

CAB APNL-- & Appliance panel - 1/4" finished veneer SF -$ -$ -$ -$

CAB APNL+ & Wood appliance panel - High grade SF -$ -$ -$ -$

CAB APNL++ & Wood appliance panel - Premium grade SF -$ -$ -$ -$

CAB APNL+++ & Wood appliance panel - Deluxe grade SF -$ -$ -$ -$

CAB APNLRS + Wood appliance panel - Detach & reset SF -$ -$ -$ -$

CAB BARGB & Bar with granite top - Commercial LF -$ -$ -$ -$

CAB BARGF & Bar with granite top and front - Commercial LF -$ -$ -$ -$

CAB BENCH & Decorative wood bench LF -$ -$ -$ -$

CAB BENCH- & Decorative wood bench - Standard grade LF -$ -$ -$ -$

CAB BIDITM + Cabinetry (Bid Item) EA -$ -$ -$ -$

CAB BS & Backsplash - plastic laminate SF -$ -$ -$ -$

CAB BSS & Backsplash - stainless steel SF -$ -$ -$ -$

CAB BSS+ & Backsplash - stainless steel - High grade SF -$ -$ -$ -$

CAB CLASCH & Classroom cabinetry - coat hook cabinet LF -$ -$ -$ -$

CAB CLASS & Classroom cabinetry - storage cabinets - full height LF -$ -$ -$ -$

CAB CLAST & Classroom cabinetry - Teacher cabinet - full height LF -$ -$ -$ -$

CAB COUNTER & Service counter LF -$ -$ -$ -$

CAB CROWN + Add for prefinished crown molding per LF LF -$ -$ -$ -$

CAB CROWN+ + Add for prefinished crown molding - w/detail per LF LF -$ -$ -$ -$

CAB CROWN++ + Add for prefinished 2 piece crown molding LF -$ -$ -$ -$

CAB CROWN3 + Add for prefinished 3 piece crown molding LF -$ -$ -$ -$

CAB CROWN4 + Add for prefinished 4 piece crown molding LF -$ -$ -$ -$

CAB CROWNS + Add for prefinished 5 piece crown molding LF -$ -$ -$ -$

CAB CTBB & Countertop - wood - butcher block (hardrock maple) SF -$ -$ -$ -$

CAB CTCON & Countertop - concrete SF -$ -$ -$ -$

CAB CTCON- & Countertop - concrete - Standard grade SF -$ -$ -$ -$

CAB CTCON+ & Countertop - concrete - High grade SF -$ -$ -$ -$

CAB CTCONE + Add on concrete countertop - edge treatment LF -$ -$ -$ -$

CAB CTCONE+ + Add on concrete countertop - edge treatment - High grade LF -$ -$ -$ -$

CAB CTDK & Countertop subdeck - plywood SF -$ -$ -$ -$

CAB CTDK- & Countertop subdeck - particle board SF -$ -$ -$ -$

CAB C I I-BSR + Backsplash - flat laid plastic laminate - Reset LF -$ -$ -$ -$

CAB C I I-BSRS + Backsplash - flat laid plastic laminate - Detach & reset LF -$ -$ -$ -$

CAB CIFL & Countertop - flat laid plastic laminate LF -$ -$ -$ -$

CAB CTI-L- & Countertop - flat laid plastic laminate - Standard grade LF -$ -$ -$ -$

CAB C I I4L+ & Countertop - flat laid plastic laminate - High grade LF -$ -$ -$ -$

CAB CTFL++ & Countertop - flat laid plastic laminate - Premium grade LF -$ -$ -$ -$

CAB CTFL> & Countertop - flat laid plastic laminate - Oversized LF -$ -$ -$ -$

CAB CTFL>+ & Countertop - flat laid plastic lam. - Oversized - High gr LF -$ -$ -$ -$

CAB C I HT + Countertop - flat laid laminate - laminate only LF -$ -$ -$ -$

CAB CTFLP- + Countertop - flat laid laminate - laminate only - Stnd. gr LF -$ -$ -$ -$

CAB C I I-LP+ + Countertop - flat laid laminate - laminate only - High gr. LF -$ -$ -$ -$

CAB C'I PLP++ + Countertop - flat laid laminate - laminate only - Prem gr. LF -$ -$ -$ -$

CAB CTFLPE + Countertop edge treatment - laminate LF -$ -$ -$ -$

CAB C I FLPEW + Countertop edge treatment - wood LF -$ -$ -$ -$

CAB C I I-LR + Countertop - flat laid plastic laminate - Reset LF -$ -$ -$ -$

CAB C'I I-LRS + Countertop - flat laid plastic laminate - Detach & reset LF -$ -$ -$ -$

CAB CTFSP4H & 4" backsplash for flat laid countertop - Solid hardwood LF -$ -$ -$ -$

CAB CTFSP6H & 6" backsplash for flat laid countertop - Solid hardwood LF -$ -$ -$ -$

CAB CTFSPL4 & 4" backsplash for flat laid countertop LF -$ -$ -$ -$

Page 14: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAB CTFSPL6 & 6" backsplash for flat laid countertop LF -$ -$ -$ -$

CAB CTGE + Add on Granite or Marble - edge treatment LF -$ -$ -$ -$

CAB CTGE+ + Add on Granite or Marble - edge treatment - High grade LF -$ -$ -$ -$

CAB CTGE++ + Add on Granite or Marble - edge treatment - Premium LF -$ -$ -$ -$

grade

CAB CTGE+++ + Add on Granite or Marble - edge treatment - Deluxe grade LF -$ -$ -$ -$

CAB CTGM & Countertop - Granite or Marble SF -$ -$ -$ -$

CAB CTGM- & Countertop - Granite or Marble - Standard grade SF -$ -$ -$ -$

CAB CTGM+ & Countertop - Granite or Marble - High grade SF -$ -$ -$ -$

CAB CTGM++ & Countertop - Granite or Marble - Premium grade SF -$ -$ -$ -$

CAB CTGMP + Countertop - Granite or Marble - buff & polish SF -$ -$ -$ -$

CAB CTGMS + Add on for undermount sink cutout & polish - single basin EA -$ -$ -$ -$

CAB CTGMSD + Add on for undermount sink cutout & polish - double basin EA -$ -$ -$ -$

CAB CTMITER + Add-on for mitered corner (Countertop) EA -$ -$ -$ -$

CAB CTMSB & Countertop - metal support bracket - stainless steel EA -$ -$ -$ -$

CAB CTPF & Countertop - post formed plastic laminate LF -$ -$ -$ -$

CAB CTPF- & Countertop - post formed plastic laminate - Standard grade LF -$ -$ -$ -$

CAB CTPF+ & Countertop - post formed plastic laminate - High grade LF -$ -$ -$ -$

CAB CTPF++ & Countertop - post formed plastic laminate - Premium grade LF -$ -$ -$ -$

CAB CTPF> & Countertop - post formed plastic laminate - Oversized LF -$ -$ -$ -$

CAB CTPFR + Countertop - post formed plastic laminate - Reset LF -$ -$ -$ -$

CAB CTPFRS + Countertop - post formed plastic laminate - Detach & reset LF -$ -$ -$ -$

CAB CTQ & Countertop - quartz/engineered stone SF -$ -$ -$ -$

CAB CTQ+ & Countertop - quartz/engineered stone - High grade SF -$ -$ -$ -$

CAB CTQ++ & Countertop - quartz/engineered stone - Premium grade SF -$ -$ -$ -$

CAB CTRRS + Service counter - Detach & reset LF -$ -$ -$ -$

CAB CTSBSR + Backsplash - solid surface - Unattached - Reset LF -$ -$ -$ -$

CAB CTSBSRS + Backsplash - solid surface - Unattached - Detach & reset LF -$ -$ -$ -$

CAB CTSNKB + Sink - Bar - solid surface material EA -$ -$ -$ -$

CAB CTSNKD + Sink - double - solid surface material EA -$ -$ -$ -$

CAB CTSNKS + Sink - single - solid surface material EA -$ -$ -$ -$

CAB CTSS & Countertop - solid surface SF -$ -$ -$ -$

CAB CTSS- & Countertop - solid surface - Standard grade SF -$ -$ -$ -$

CAB CTSS+ & Countertop - solid surface - High grade SF -$ -$ -$ -$

CAB CTSS++ & Countertop - solid surface - Premium grade SF -$ -$ -$ -$

CAB CTSSBS & Backsplash - solid surface - Unattached LF -$ -$ -$ -$

CAB CTSSBS+ + Backsplash - solid surface - Coved (seamless - permanent) LF -$ -$ -$ -$

CAB CTSSGL + Countertop - solid surface - Add for gloss finish SF -$ -$ -$ -$

CAB CTSSIN + Countertop - solid surface - Add for inlays LF -$ -$ -$ -$

CAB CTSSR + Countertop - solid surface/granite - Reset SF -$ -$ -$ -$

CAB CTSSRS + Countertop - solid surface/granite - Detach & reset SF -$ -$ -$ -$

CAB CTST & Countertop - stainless steel LF -$ -$ -$ -$

CAB CTTZ & Countertop - (terrazzo) SF -$ -$ -$ -$

CAB CUB & Custom cabinets - base units LF -$ -$ -$ -$

CAB CUB+ & Custom cabinets - base units - High grade LF -$ -$ -$ -$

CAB CUB++ & Custom cabinets - base units - Premium grade LF -$ -$ -$ -$

CAB CUFH & Custom cabinets - full height units LF -$ -$ -$ -$

CAB CUFH+ & Custom cabinets - full height units - High grade LF -$ -$ -$ -$

CAB CUFH++ & Custom cabinets - full height units - Premium grade LF -$ -$ -$ -$

CAB CUV & Custom cabinets - vanity units LF -$ -$ -$ -$

CAB CUV+ & Custom cabinets - vanity units - High grade LF -$ -$ -$ -$

CAB CUV++ & Custom cabinets - vanity units - Premium grade LF -$ -$ -$ -$

CAB CUW24 & Custom cabinets - wall units - up to 24" tall LF -$ -$ -$ -$

CAB CUW24+ & Custom cabinets - wall units - up to 24" tall - High grade LF -$ -$ -$ -$

CAB CUW24++ & Custom cabinets - wall units - up to 24" tall - Prem grade LF -$ -$ -$ -$

CAB CUW30 & Custom cabinets - wall units - 30" tall LF -$ -$ -$ -$

CAB CUW30+ & Custom cabinets - wall units - 30" tall - High grade LF -$ -$ -$ -$

CAB CUW30++ & Custom cabinets - wall units - 30" tall - Premium grade LF -$ -$ -$ -$

CAB CUW36 & Custom cabinets - wall units - 36" tall LF -$ -$ -$ -$

CAB CUW36+ & Custom cabinets - wall units - 36" tall - High grade LF -$ -$ -$ -$

CAB CUW36++ & Custom cabinets - wall units - 36" tall - Premium grade LF -$ -$ -$ -$

CAB CUW42 & Custom cabinets - wall units - 42" tall LF -$ -$ -$ -$

CAB CUW42+ & Custom cabinets - wall units - 42" tall - High grade LF -$ -$ -$ -$

CAB CUW42++ & Custom cabinets - wall units - 42" tall - Premium grade LF -$ -$ -$ -$

CAB D & Cabinet door SF -$ -$ -$ -$

Page 15: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAB D- & Cabinet door - Standard grade SF -$ -$ -$ -$

CAB D+ & Cabinet door - High grade SF -$ -$ -$ -$

CAB D++ & Cabinet door - Premium grade SF -$ -$ -$ -$

CAB D+++ & Cabinet door - Deluxe grade SF -$ -$ -$ -$

CAB DF & Cabinet drawer front SF -$ -$ -$ -$

CAB DF- & Cabinet drawer front - Standard grade SF -$ -$ -$ -$

CAB DF+ & Cabinet drawer front - High grade SF -$ -$ -$ -$

CAB DF++ & Cabinet drawer front - Premium grade SF -$ -$ -$ -$

CAB DF+++ & Cabinet drawer front - Deluxe grade SF -$ -$ -$ -$

CAB DSKD & Cabinet - desk drawer unit (knee drawer) EA -$ -$ -$ -$

CAB DSKD- & Cabinet - desk drawer unit (knee drawer) - Standard grade EA -$ -$ -$ -$

CAB DSKD+ & Cabinet - desk drawer unit (knee drawer) - High grade EA -$ -$ -$ -$

CAB DSKD++ & Cabinet - desk drawer unit (knee drawer) - Premium grade EA -$ -$ -$ -$

CAB DSKD+++ & Cabinet - desk drawer unit (knee drawer) - Deluxe grade EA -$ -$ -$ -$

CAB DSL & Cabinet drawer slides - 3/4" extension (per pair) EA -$ -$ -$ -$

CAB DSLF & Cabinet drawer slides - full extension (per pair) EA -$ -$ -$ -$

CAB DSLFS & Cabinet drawer slides - full ext. soft close (per pair) EA -$ -$ -$ -$

CAB FFHC & Laminated plastic cabinets - full height unit - Comm grade LF -$ -$ -$ -$

CAB FH & Cabinetry - full height unit LF -$ -$ -$ -$

CAB FH- & Cabinetry - full height unit - Standard grade LF -$ -$ -$ -$

CAB FH-- & Cabinetry - full height units - utility (unfinished) LF -$ -$ -$ -$

CAB FH+ & Cabinetry - full height unit - High grade LF -$ -$ -$ -$

CAB FH++ & Cabinetry - full height unit - Premium grade LF -$ -$ -$ -$

CAB FH+++ & Cabinetry - full height unit - Deluxe grade LF -$ -$ -$ -$

CAB FHR + Cabinetry - full height unit - Reset LF -$ -$ -$ -$

CAB FHRS + Cabinetry - full height unit - Detach & reset LF -$ -$ -$ -$

CAB FILLSCR & Filler/scribe board - 1" x 4" - hardwood LF -$ -$ -$ -$

CAB FLOW & Cabinetry - laminate lower (base) units LF -$ -$ -$ -$

CAB FLOW- & Cabinetry - laminate lower (base) units - Standard grade LF -$ -$ -$ -$

CAB FLOW+ & Cabinetry - laminate lower (base) units - High grade LF -$ -$ -$ -$

CAB FLOWC & Laminated plastic cabinets - lower unit - Comm grade LF -$ -$ -$ -$

CAB FUP & Cabinetry - laminate upper (wall) units LF -$ -$ -$ -$

CAB FUP- & Cabinetry - laminate upper (wall) units - Standard grade LF -$ -$ -$ -$

CAB FUP+ & Cabinetry - laminate upper (wall) units - High grade LF -$ -$ -$ -$

CAB FUPC & Laminated plastic cabinets - upper unit - Comm grade LF -$ -$ -$ -$

CAB GALLEY + Add for galley rail per LF LF -$ -$ -$ -$

CAB GDBNK+ & Garage cabinetry - drawer bank, 24" - High grade EA -$ -$ -$ -$

CAB GF36+ & Garage cabinetry - full height unit, 36"x24" - High grade EA -$ -$ -$ -$

CAB GF36<+ & Garage cabinetry - full height unit, 36"x18" - High grade EA -$ -$ -$ -$

CAB GFRS + Garage cabinetry - full height unit - Detach & reset EA -$ -$ -$ -$

CAB GL + Add for frosted/etched or beveled glass, per cabinet door EA -$ -$ -$ -$

CAB GL+ + Add for leaded glass (standard design), per cabinet door EA -$ -$ -$ -$

CAB GLASS & Display cabinets - glass LF -$ -$ -$ -$

CAB GLOW+ & Garage cab. - lower unit, 24" - single door - High grade EA -$ -$ -$ -$

CAB GLOWD+ & Garage cab. - lower unit, 24" w/door & drawer - High EA -$ -$ -$ -$

grade

CAB GRS + Garage cabinetry - lower/upper unit - Detach & reset EA -$ -$ -$ -$

CAB GUP+ & Garage cab. - upper (wall) units, 24" - High grade EA -$ -$ -$ -$

CAB HINGC & Cabinet hinge - concealed EA -$ -$ -$ -$

CAB HINGS & Cabinet hinge - surface mount EA -$ -$ -$ -$

CAB IH36 & Island hood, 36" - tapered canopy EA -$ -$ -$ -$

CAB IH36+ & Island hood, 36" - tapered canopy - High grade EA -$ -$ -$ -$

CAB IH36++ & Island hood, 36" - tapered canopy - Premium grade EA -$ -$ -$ -$

CAB IH48 & Island hood, 48" - tapered canopy EA -$ -$ -$ -$

CAB IH48+ & Island hood, 48" - tapered canopy - High grade EA -$ -$ -$ -$

CAB IH48++ & Island hood, 48" - tapered canopy - Premium grade EA -$ -$ -$ -$

CAB IHRS + Wood island hood - Detach & reset EA -$ -$ -$ -$

CAB IRON & Ironing board cabinet - built-in EA -$ -$ -$ -$

CAB IRON- & Ironing board cabinet - built-in - Standard grade EA -$ -$ -$ -$

CAB IRON+ & Ironing board cabinet - built-in - High grade EA -$ -$ -$ -$

CAB IRONRS + Ironing board cabinet - built-in - Detach & reset EA -$ -$ -$ -$

CAB KNPL & Cabinet knob or pull EA -$ -$ -$ -$

CAB KNPL- & Cabinet knob or pull - Standard grade EA -$ -$ -$ -$

CAB KNPL+ & Cabinet knob or pull - High grade EA -$ -$ -$ -$

CAB KNPL++ & Cabinet knob or pull - Premium grade EA -$ -$ -$ -$

Page 16: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAB KNPL+++ & Cabinet knob or pull - Deluxe grade EA -$ -$ -$ -$

CAB KNPLRS + Cabinet knobs or pulls - Detach & reset EA -$ -$ -$ -$

CAB LAB + Carpenter - Finish, Trim / Cabinet - per hour HR -$ -$ -$ -$

CAB LABL + Cabinetry - General Laborer - per hour HR -$ -$ -$ -$

CAB LOW & Cabinetry - lower (base) units LF -$ -$ -$ -$

CAB LOW- & Cabinetry - lower (base) units - Standard grade LF -$ -$ -$ -$

CAB LOW-- & Cabinetry - lower (base) units - utility (unfinished) LF -$ -$ -$ -$

CAB LOW+ & Cabinetry - lower (base) units - High grade LF -$ -$ -$ -$

CAB LOW++ & Cabinetry - lower (base) units - Premium grade LF -$ -$ -$ -$

CAB LOW+++ & Cabinetry - lower (base) units - Deluxe grade LF -$ -$ -$ -$

CAB LOWM & Cabinetry - lower (base) units - mobile home LF -$ -$ -$ -$

CAB LOWR + Cabinetry - lower (base) units - Reset LF -$ -$ -$ -$

CAB LOWRS + Cabinetry - lower (base) units - Detach & reset LF -$ -$ -$ -$

CAB LSHELF & Library book shelves - full height - Commercial LF -$ -$ -$ -$

CAB LZS + Add for lazy susan EA -$ -$ -$ -$

CAB LZS+ + Add for lazy susan - wood shelves EA -$ -$ -$ -$

CAB LZS++ + Add for lazy susan - chrome shelves EA -$ -$ -$ -$

CAB MC & Medicine cabinet EA -$ -$ -$ -$

CAB MC- & Medicine cabinet - Standard grade EA -$ -$ -$ -$

CAB MC+ & Medicine cabinet - High grade EA -$ -$ -$ -$

CAB MC++ & Medicine cabinet - Premium grade EA -$ -$ -$ -$

CAB MCM & Medicine cabinet - mobile home EA -$ -$ -$ -$

CAB MCRS + Medicine cabinet - Detach & reset EA -$ -$ -$ -$

CAB MN + Cabinetry - Labor Minimum EA -$ -$ -$ -$

CAB NCPCTGM & Countertop - Granite or Marble - per ind. material source SF -$ -$ -$ -$

CAB NCPCTQ & Countertop - quartz/eng. stone - per ind. material source SF -$ -$ -$ -$

CAB PBMC & Postal - BMC / GPMC unit LF -$ -$ -$ -$

CAB PCORN & Postal - slatwall corner EA -$ -$ -$ -$

CAB PCUB & Postal - cubbies (per slot) EA -$ -$ -$ -$

CAB PDESK & Postal - writing desk LF -$ -$ -$ -$

CAB PECAP & Postal - end cap units for desk EA -$ -$ -$ -$

CAB PFORM & Postal - forms and waste unit LF -$ -$ -$ -$

CAB PGOND & Postal - merchandise gondola - 4' long EA -$ -$ -$ -$

CAB PHAMP & Postal - pouch / hamper unit LF -$ -$ -$ -$

CAB PLY & Cabinet panels - side, end, or back SF -$ -$ -$ -$

CAB PLY+ & Cabinet panels - side, end, or back - High grade SF -$ -$ -$ -$

CAB PLY++ & Cabinet panels - side, end, or back - Premium grade SF -$ -$ -$ -$

CAB PLYTK & Re-skin toe kick LF -$ -$ -$ -$

CAB PMAIL & Postal - maildrop counter LF -$ -$ -$ -$

CAB PMETR & Postal - shared meter counter LF -$ -$ -$ -$

CAB PNL & Custom cabinet panels - side, end, or back SF -$ -$ -$ -$

CAB PNL+ & Custom cabinet panels - side, end, or back - High grade SF -$ -$ -$ -$

CAB PNL++ & Custom cabinet panels - side, end, or back - Premium grade SF -$ -$ -$ -$

CAB PNL+++ & Custom cabinet panels - side, end, or back - Deluxe grade SF -$ -$ -$ -$

CAB PNOTE & Postal - "left notice" cabinet LF -$ -$ -$ -$

CAB PPARC & Postal - parcel slide storage w/waste LF -$ -$ -$ -$

CAB PSCALE & Postal - scale counter/cabinet LF -$ -$ -$ -$

CAB PSLAT & Postal - slat wall SF -$ -$ -$ -$

CAB PSLATD & Postal - slat wall - drawer unit LF -$ -$ -$ -$

CAB PSLATE & Postal - slat wall - end filler EA -$ -$ -$ -$

CAB PSTAMP & Postal - booklet/stamp machine template EA -$ -$ -$ -$

CAB PTUB & Postal - tub storage unit LF -$ -$ -$ -$

CAB PWAST & Postal - waste unit LF -$ -$ -$ -$

CAB PWCNTR & Postal - work counter EA -$ -$ -$ -$

CAB PWRAP & Postal - cash wrap counter LF -$ -$ -$ -$

CAB QUE & Cabinetry - laminate queue station LF -$ -$ -$ -$

CAB RECEPT & Reception desk - Commercial LF -$ -$ -$ -$

CAB RECEPT+ & Reception desk - laminated plastic cabinets - High grade LF -$ -$ -$ -$

CAB REF & Cabinet refacing SF -$ -$ -$ -$

CAB REF- & Cabinet refacing - Standard grade SF -$ -$ -$ -$

CAB REF+ & Cabinet refacing - High grade SF -$ -$ -$ -$

CAB REF++ & Cabinet refacing - Premium grade SF -$ -$ -$ -$

CAB REF+++ & Cabinet refacing - Deluxe grade SF -$ -$ -$ -$

CAB REST + Cabinetry Restoration / Repair - (Bid Item) EA -$ -$ -$ -$

CAB RESTB + Cabinetry Restoration - Boxes Only - (Bid Item) EA -$ -$ -$ -$

Page 17: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAB RH>RS + Wood range hood, 42" or greater - Detach & reset EA -$ -$ -$ -$

CAB RH30 & Wood range hood, 30" - tapered canopy EA -$ -$ -$ -$

CAB RH30+ & Wood range hood, 30" - tapered canopy - High grade EA -$ -$ -$ -$

CAB RH3O++ & Wood range hood, 30" - tapered canopy - Premium grade EA -$ -$ -$ -$

CAB RH3O+++ & Wood range hood, 30" - tapered canopy - Deluxe grade EA -$ -$ -$ -$

CAB RH36 & Wood range hood, 36" - tapered canopy EA -$ -$ -$ -$

CAB RH36+ & Wood range hood, 36" - tapered canopy - High grade EA -$ -$ -$ -$

CAB RH36++ & Wood range hood, 36" - tapered canopy - Premium grade EA -$ -$ -$ -$

CAB RH36+++ & Wood range hood, 36" - tapered canopy - Deluxe grade EA -$ -$ -$ -$

CAB RH42 & Wood range hood, 42" - tapered canopy EA -$ -$ -$ -$

CAB RH42+ & Wood range hood, 42" - tapered canopy - High grade EA -$ -$ -$ -$

CAB RH42++ & Wood range hood, 42" - tapered canopy - Premium grade EA -$ -$ -$ -$

CAB RH42+++ & Wood range hood, 42" - tapered canopy - Deluxe grade EA -$ -$ -$ -$

CAB RHRS + Wood range hood - Detach & reset EA -$ -$ -$ -$

CAB RLOUT + Add on cost for roll out shelves EA -$ -$ -$ -$

CAB SB & Affixed restaurant table w/2 bench seats (6 person) EA -$ -$ -$ -$

CAB SPR + Add for pull out spice rack EA -$ -$ -$ -$

CAB SS & Suspended bar seat EA -$ -$ -$ -$

CAB SS+ & Suspended bar seat - High grade EA -$ -$ -$ -$

CAB SSIL & Window sill - solid surface LF -$ -$ -$ -$

CAB TELL & Cabinetry - laminate teller casework LF -$ -$ -$ -$

CAB TIPOUT + Add for tip out sink front tray EA -$ -$ -$ -$

CAB TK & Toe kick - pre-finished wood - 1/2" LF -$ -$ -$ -$

CAB TKRS + Toe kick - Detach & reset LF -$ -$ -$ -$

CAB TKU & Toe kick - unfinished wood - 1/2" LF -$ -$ -$ -$

CAB TRASHBN + Add for pull out trash bin EA -$ -$ -$ -$

CAB TROPHY & Trophy case LF -$ -$ -$ -$

CAB UP & Cabinetry - upper (wall) units LF -$ -$ -$ -$

CAB UP- & Cabinetry - upper (wall) units - Standard grade LF -$ -$ -$ -$

CAB UP-- & Cabinetry - upper (wall) units - utility (unfinished) LF -$ -$ -$ -$

CAB UP+ & Cabinetry - upper (wall) units - High grade LF -$ -$ -$ -$

CAB UP++ & Cabinetry - upper (wall) units - Premium grade LF -$ -$ -$ -$

CAB UP+++ & Cabinetry - upper (wall) units - Deluxe grade LF -$ -$ -$ -$

CAB UPM & Cabinetry - upper (wall) units - mobile home LF -$ -$ -$ -$

CAB UPR + Cabinetry - upper (wall) units - Reset LF -$ -$ -$ -$

CAB UPRS + Cabinetry - upper (wall) units - Detach & reset LF -$ -$ -$ -$

CAB VAL & Cabinet valance LF -$ -$ -$ -$

CAB VALRS + Cabinet valance - Detach & reset LF -$ -$ -$ -$

CAB VAN & Vanity LF -$ -$ -$ -$

CAB VAN- & Vanity - Standard grade LF -$ -$ -$ -$

CAB VAN+ & Vanity - High grade LF -$ -$ -$ -$

CAB VAN++ & Vanity - Premium grade LF -$ -$ -$ -$

CAB VAN+++ & Vanity - Deluxe grade LF -$ -$ -$ -$

CAB VANCS & Vanity with cultured marble or solid surface top LF -$ -$ -$ -$

CAB VANGM & Vanity with granite or marble top LF -$ -$ -$ -$

CAB VANM & Vanity - mobile home LF -$ -$ -$ -$

CAB VANPE & Vanity with porcelain or engineered stone top LF -$ -$ -$ -$

CAB VANR + Vanity - Reset LF -$ -$ -$ -$

CAB VANRS + Vanity - Detach & reset LF -$ -$ -$ -$

CAB WC & Bathroom wall cabinet EA -$ -$ -$ -$

CAB WC- & Bathroom wall cabinet - Standard grade EA -$ -$ -$ -$

CAB WC+ & Bathroom wall cabinet - High grade EA -$ -$ -$ -$

CAB WCRS + Bathroom wall cabinet - Detach & reset EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

CAP APP + Clean countertop appliance EA -$ -$ -$ -$

CAP APP- + Clean countertop appliance - Light clean EA -$ -$ -$ -$

CAP APP+ + Clean countertop appliance - Heavy clean EA -$ -$ -$ -$

CAP APP< + Clean countertop appliance - small EA -$ -$ -$ -$

CAP APP<- + Clean countertop appliance - small - Light clean EA -$ -$ -$ -$

CAP APP<+ + Clean countertop appliance - small - Heavy clean EA -$ -$ -$ -$

CAP APP> + Clean countertop appliance - large EA -$ -$ -$ -$

CAP APP>- + Clean countertop appliance - large - Light clean EA -$ -$ -$ -$

Page 18: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAP APP>+ + Clean countertop appliance - large - Heavy clean EA -$ -$ -$ -$

CAP APP» + Clean countertop appliance - extra large EA -$ -$ -$ -$

CAP APP>>- + Clean countertop appliance - extra large - Light clean EA -$ -$ -$ -$

CAP APP»+ + Clean countertop appliance - extra large - Heavy clean EA -$ -$ -$ -$

CAP DRY + Clean dryer - interior and exterior EA -$ -$ -$ -$

CAP DRY- + Clean dryer - interior and exterior - Light clean EA -$ -$ -$ -$

CAP DRY+ + Clean dryer - interior and exterior - Heavy clean EA -$ -$ -$ -$

CAP DRYX + Clean dryer - exterior EA -$ -$ -$ -$

CAP DRYX- + Clean dryer - exterior - Light clean EA -$ -$ -$ -$

CAP DRYX+ + Clean dryer - exterior - Heavy clean EA -$ -$ -$ -$

CAP DRYXM + Corrosion mitigation of dryer - exterior EA -$ -$ -$ -$

CAP DWP + Clean dishwasher - portable - interior and exterior EA -$ -$ -$ -$

CAP DWP- + Clean dishwasher - portable - int. & ext. - Light clean EA -$ -$ -$ -$

CAP DWP+ + Clean dishwasher - portable - in & ext. - Heavy clean EA -$ -$ -$ -$

CAP DWPX + Clean dishwasher - portable - exterior EA -$ -$ -$ -$

CAP DWPX- + Clean dishwasher - portable - exterior - Light clean EA -$ -$ -$ -$

CAP DWPX+ + Clean dishwasher - portable - exterior - Heavy clean EA -$ -$ -$ -$

CAP FAN + Clean electric fan - portable EA -$ -$ -$ -$

CAP FAN- + Clean electric fan - portable - Light clean EA -$ -$ -$ -$

CAP FAN+ + Clean electric fan - portable - Heavy clean EA -$ -$ -$ -$

CAP FRZ + Clean freezer - interior and exterior EA -$ -$ -$ -$

CAP FRZ- + Clean freezer - interior and exterior - Light clean EA -$ -$ -$ -$

CAP FRZ+ + Clean freezer - interior and exterior - Heavy clean EA -$ -$ -$ -$

CAP FRZX + Clean freezer - exterior EA -$ -$ -$ -$

CAP FRZX- + Clean freezer - exterior - Light clean EA -$ -$ -$ -$

CAP FRZX+ + Clean freezer - exterior - Heavy clean EA -$ -$ -$ -$

CAP FRZXM + Corrosion mitigation of freezer - exterior EA -$ -$ -$ -$

CAP HHA + Clean household appliance EA -$ -$ -$ -$

CAP HHA- + Clean household appliance - Light clean EA -$ -$ -$ -$

CAP HHA+ + Clean household appliance - Heavy clean EA -$ -$ -$ -$

CAP HHA< + Clean household appliance - small EA -$ -$ -$ -$

CAP HHA<- + Clean household appliance - small - Light clean EA -$ -$ -$ -$

CAP HHA<+ + Clean household appliance - small - Heavy clean EA -$ -$ -$ -$

CAP IRN + Clean iron EA -$ -$ -$ -$

CAP IRN- + Clean iron - Light clean EA -$ -$ -$ -$

CAP IRN+ + Clean iron - Heavy clean EA -$ -$ -$ -$

CAP LAB + Cleaning - Appliances - per hour HR -$ -$ -$ -$

CAP LABM + Cleaning Technician - incl. cleaning agent - per hour HR -$ -$ -$ -$

CAP LABR + Cleaning - Remediation Technician - per hour HR -$ -$ -$ -$

CAP LABS + Cleaning - Supervisory/Administrative - per hour HR -$ -$ -$ -$

CAP MW + Clean microwave - interior and exterior EA -$ -$ -$ -$

CAP MW- + Clean microwave - interior and exterior - Light clean EA -$ -$ -$ -$

CAP MW+ + Clean microwave - interior and exterior - Heavy clean EA -$ -$ -$ -$

CAP MWX + Clean microwave - exterior EA -$ -$ -$ -$

CAP MWX- + Clean microwave - exterior - Light clean EA -$ -$ -$ -$

CAP MWX+ + Clean microwave - exterior - Heavy clean EA -$ -$ -$ -$

CAP REST + Special - Clean/Restore appliance finish - BID ONLY EA -$ -$ -$ -$

CAP RF + Clean refrigerator - interior and exterior EA -$ -$ -$ -$

CAP RF- + Clean refrigerator - interior and exterior - Light clean EA -$ -$ -$ -$

CAP RF+ + Clean refrigerator - interior and exterior - Heavy clean EA -$ -$ -$ -$

CAP RFMI + Clean compact / mini refrigerator - interior and exterior EA -$ -$ -$ -$

CAP RFMIX + Clean compact / mini refrigerator - exterior EA -$ -$ -$ -$

CAP RFX + Clean refrigerator - exterior EA -$ -$ -$ -$

CAP RFX- + Clean refrigerator - exterior - Light clean EA -$ -$ -$ -$

CAP RFX+ + Clean refrigerator - exterior - Heavy clean EA -$ -$ -$ -$

CAP SHMP + Clean carpet shampoo machine EA -$ -$ -$ -$

CAP SHMP- + Clean carpet shampoo machine - Light clean EA -$ -$ -$ -$

CAP SHMP+ + Clean carpet shampoo machine - Heavy clean EA -$ -$ -$ -$

CAP VAC + Clean vacuum cleaner - upright EA -$ -$ -$ -$

CAP VAC- + Clean vacuum cleaner - upright - Light clean EA -$ -$ -$ -$

CAP VAC+ + Clean vacuum cleaner - upright - Heavy clean EA -$ -$ -$ -$

CAP VACC + Clean vacuum cleaner - canister w/ attachments EA -$ -$ -$ -$

CAP VACC- + Clean vacuum cleaner - canister w/ attachments - Light cln EA -$ -$ -$ -$

CAP VACC+ + Clean vacuum cleaner - canister w/ attachments - Heavy EA -$ -$ -$ -$

cln

Page 19: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAP WSH + Clean washer - interior and exterior EA -$ -$ -$ -$

CAP WSH- + Clean washer - interior and exterior - Light clean EA -$ -$ -$ -$

CAP WSH+ + Clean washer - interior and exterior - Heavy clean EA -$ -$ -$ -$

CAP WSHX + Clean washer - exterior EA -$ -$ -$ -$

CAP WSHX- + Clean washer - exterior - Light clean EA -$ -$ -$ -$

CAP WSHX+ + Clean washer - exterior - Heavy clean EA -$ -$ -$ -$

CAP WSHXM + Corrosion mitigation of washer - exterior EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

CLN AC + Clean acoustic ceiling (popcorn) texture SF -$ -$ -$ -$

CLN ACCND + Clean air conditioning condenser unit EA -$ -$ -$ -$

CLN ACT + Clean acoustic ceiling tile SF -$ -$ -$ -$

CLN ACT- + Clean acoustic ceiling tile - Light SF -$ -$ -$ -$

CLN ACT+ + Clean acoustic ceiling tile - Heavy SF -$ -$ -$ -$

CLN ACW + Clean window-mount/through-wall AC unit EA -$ -$ -$ -$

CLN ACW- + Clean window-mount/through-wall AC unit - Light EA -$ -$ -$ -$

CLN ACW+ + Clean window-mount/through-wall AC unit - Heavy EA -$ -$ -$ -$

CLN ACW> + Clean window mount/through-wall AC unit - int. & EA -$ -$ -$ -$

exterior

CLN ACWM + Corrosion mitigation of window-mount/through-wall AC EA -$ -$ -$ -$

unit

CLN AV + Clean {V} SF -$ -$ -$ -$

CLN AV- + Clean {V} - Light SF -$ -$ -$ -$

CLN AV+ + Clean {V} - Heavy SF -$ -$ -$ -$

CLN AVT + Clean hand textured ceiling SF -$ -$ -$ -$

CLN AW + Clean exterior masonry - acid wash SF -$ -$ -$ -$

CLN AWMN + Clean exterior masonry - acid wash - Minimum charge EA -$ -$ -$ -$

CLN AWN + Clean awning - alum./canvas/vinyl EA -$ -$ -$ -$

CLN B + Clean baseboard LF -$ -$ -$ -$

CLN B+ + Clean baseboard - Heavy LF -$ -$ -$ -$

CLN BAC + Clean bath accessory EA -$ -$ -$ -$

CLN BAC- + Clean bath accessory - Light EA -$ -$ -$ -$

CLN BAC+ + Clean bath accessory - Heavy EA -$ -$ -$ -$

CLN BACM + Corrosion mitigation of bath accessory EA -$ -$ -$ -$

CLN BAL + Clean balustrade LF -$ -$ -$ -$

CLN BAL+ + Clean balustrade - Heavy LF -$ -$ -$ -$

CLN BAR + Clean light bar EA -$ -$ -$ -$

CLN BAR- + Clean light bar - Light EA -$ -$ -$ -$

CLN BAR+ + Clean light bar - Heavy EA -$ -$ -$ -$

CLN BAR< + Clean light bar - Small EA -$ -$ -$ -$

CLN BAR<- + Clean light bar - Small - Light EA -$ -$ -$ -$

CLN BAR<+ + Clean light bar - Small - Heavy EA -$ -$ -$ -$

CLN BAR<M + Corrosion mitigation of light bar - Small EA -$ -$ -$ -$

CLN BAR> + Clean light bar - Large EA -$ -$ -$ -$

CLN BAR>- + Clean light bar - Large - Light EA -$ -$ -$ -$

CLN BAR>+ + Clean light bar - Large - Heavy EA -$ -$ -$ -$

CLN BAR>M + Corrosion mitigation of light bar - Large EA -$ -$ -$ -$

CLN BARM + Corrosion mitigation of light bar EA -$ -$ -$ -$

CLN BATH + Clean bathroom fixtures EA -$ -$ -$ -$

CLN BATH- + Clean bathroom fixtures - Light EA -$ -$ -$ -$

CLN BATH+ + Clean bathroom fixtures - Heavy EA -$ -$ -$ -$

CLN BATH> + Clean bathroom fixtures - Large bathroom EA -$ -$ -$ -$

CLN BATH>- + Clean bathroom fixtures - Large bathroom - Light EA -$ -$ -$ -$

CLN BATH>+ + Clean bathroom fixtures - Large bathroom - Heavy EA -$ -$ -$ -$

CLN BATH>M + Corrosion mitigation of bathroom fixtures - Large EA -$ -$ -$ -$

CLN bathroom

CLN BATHM + Corrosion mitigation of bathroom fixtures EA -$ -$ -$ -$

CLN BBH + Clean baseboard heater - exterior LF -$ -$ -$ -$

CLN BBH- + Clean baseboard heater - exterior - Light LF -$ -$ -$ -$

CLN BBH+ + Clean baseboard heater - exterior - Heavy LF -$ -$ -$ -$

CLN BBH> + Clean baseboard heater - interior and exterior LF -$ -$ -$ -$

CLN BBH>- + Clean baseboard heater - interior and exterior - Light LF -$ -$ -$ -$

CLN BBH>+ + Clean baseboard heater - interior and exterior - Heavy LF -$ -$ -$ -$

Page 20: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CLN BF + Clean door - bifold set (per side) EA -$ -$ -$ -$

CLN BF- + Clean door - bifold set (per side) - Light EA -$ -$ -$ -$

CLN BF+ + Clean door - bifold set (per side) - Heavy EA -$ -$ -$ -$

CLN BF< + Clean door - bifold - single (per side) EA -$ -$ -$ -$

CLN BF<- + Clean door - bifold - single (per side) - Light EA -$ -$ -$ -$

CLN BF<+ + Clean door - bifold - single (per side) - Heavy EA -$ -$ -$ -$

CLN BFAN + Clean bathroom fan EA -$ -$ -$ -$

CLN BFAN- + Clean bathroom fan - Light EA -$ -$ -$ -$

CLN BFAN+ + Clean bathroom fan - Heavy EA -$ -$ -$ -$

CLN BFANM + Corrosion mitigation of bathroom fan EA -$ -$ -$ -$

CLN BID + Clean bidet EA -$ -$ -$ -$

CLN BID- + Clean bidet - Light EA -$ -$ -$ -$

CLN BID+ + Clean bidet - Heavy EA -$ -$ -$ -$

CLN BIDITM + Cleaning (Bid Item) EA -$ -$ -$ -$

CLN BIDM + Corrosion mitigation of bidet EA -$ -$ -$ -$

CLN BJ + Clean bar joist LF -$ -$ -$ -$

CLN BJ+ + Clean bar joist - Heavy LF -$ -$ -$ -$

CLN BK + Clean bookcase SF -$ -$ -$ -$

CLN BLND + Clean window blind - horizontal or vertical SF -$ -$ -$ -$

CLN BLND- + Clean window blind - horizontal or vertical - Light SF -$ -$ -$ -$

CLN BLND+ + Clean window blind - horizontal or vertical - Heavy SF -$ -$ -$ -$

CLN BLR + Clean boiler unit EA -$ -$ -$ -$

CLN BM + Clean beams - exposed LF -$ -$ -$ -$

CLN BM+ + Clean beams - exposed - Heavy LF -$ -$ -$ -$

CLN BP + Clean door - bypass set (per side) EA -$ -$ -$ -$

CLN BP- + Clean door - bypass set (per side) - Light EA -$ -$ -$ -$

CLN BP+ + Clean door - bypass set (per side) - Heavy EA -$ -$ -$ -$

CLN BPNL + Clean electrical breaker panel EA -$ -$ -$ -$

CLN BPNL> + Clean electrical breaker panel - Large EA -$ -$ -$ -$

CLN CA + Clean cold air return cover EA -$ -$ -$ -$

CLN CB + Clean cove base molding - rubber or vinyl LF -$ -$ -$ -$

CLN CHAN + Clean chandelier EA -$ -$ -$ -$

CLN CHAN- + Clean chandelier - Light EA -$ -$ -$ -$

CLN CHAN+ + Clean chandelier - above average detail EA -$ -$ -$ -$

CLN CHAN+- + Clean chandelier - above average detail - Light EA -$ -$ -$ -$

CLN CHAN++ + Clean chandelier - with crystal EA -$ -$ -$ -$

CLN CHAN++- + Clean chandelier - with crystal - Light EA -$ -$ -$ -$

CLN CHAN++H + Clean chandelier - with crystal - Heavy EA -$ -$ -$ -$

CLN CHAN++M + Corrosion mitigation of chandelier - with crystal EA -$ -$ -$ -$

CLN CHAN+H + Clean chandelier - above average detail - Heavy EA -$ -$ -$ -$

CLN CHAN+M + Corrosion mitigation of chandelier - above average detail EA -$ -$ -$ -$

CLN CHANH + Clean chandelier - Heavy EA -$ -$ -$ -$

CLN CHANM + Corrosion mitigation of chandelier EA -$ -$ -$ -$

CLN CHIME + Clean door bell/chime EA -$ -$ -$ -$

CLN CHR + Clean chair rail LF -$ -$ -$ -$

CLN CHR+ + Clean chair rail - Heavy LF -$ -$ -$ -$

CLN CHROKL + Clean chimney - creosote removal from chimney liner EA -$ -$ -$ -$

CLN CHSW + Chimney sweep - clean and service fireplace EA -$ -$ -$ -$

CLN CLOS + Clean closet organizer and rod EA -$ -$ -$ -$

CLN CLOS< + Clean closet organizer and rod - Small EA -$ -$ -$ -$

CLN CLOS> + Clean closet organizer and rod - Large EA -$ -$ -$ -$

CLN CLOSLF + Clean closet shelf and rod per lineal foot LF -$ -$ -$ -$

CLN CNC + Clean concrete { V} SF -$ -$ -$ -$

CLN CNCSTP + Clean concrete step EA -$ -$ -$ -$

CLN CNR + Clean corner trim LF -$ -$ -$ -$

CLN CNR+ + Clean corner trim - Heavy LF -$ -$ -$ -$

CLN COVE + Clean carpet cove (wall wrap) LF -$ -$ -$ -$

CLN COVE- + Clean carpet cove (wall wrap) - Light LF -$ -$ -$ -$

CLN COVE+ + Clean carpet cove (wall wrap) - Heavy LF -$ -$ -$ -$

CLN COVEM + Corrosion mitigation of carpet cove (wall wrap) LF -$ -$ -$ -$

CLN CT + Clean cooktop EA -$ -$ -$ -$

CLN CT- + Clean cooktop - Light EA -$ -$ -$ -$

CLN CT+ + Clean cooktop - Heavy EA -$ -$ -$ -$

CLN CTC + Clean cooktop - Commercial EA -$ -$ -$ -$

CLN CTC- + Clean cooktop - Commercial - Light EA -$ -$ -$ -$

Page 21: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CLN CTC+ + Clean cooktop - Commercial - Heavy EA -$ -$ -$ -$

CLN CTF + Clean countertop SF -$ -$ -$ -$

CLN CTF- + Clean countertop - Light SF -$ -$ -$ -$

CLN CTF+ + Clean countertop - Heavy SF -$ -$ -$ -$

CLN CTFM + Corrosion mitigation of countertop SF -$ -$ -$ -$

CLN CTM + Corrosion mitigation of cooktop EA -$ -$ -$ -$

CLN CTTL + Clean countertop - tile SF -$ -$ -$ -$

CLN CTTL- + Clean countertop - tile - Light SF -$ -$ -$ -$

CLN CTTL+ + Clean countertop - tile - Heavy SF -$ -$ -$ -$

CLN CTTLM + Corrosion mitigation of countertop - tile SF -$ -$ -$ -$

CLN CWN + Clean crown molding LF -$ -$ -$ -$

CLN CWN+ + Clean crown molding - Heavy LF -$ -$ -$ -$

CLN DCCARS + Cold air return cover - Detach & reset EA -$ -$ -$ -$

CLN DCREGRS + Heat/AC register - Mechanically attached - Detach & reset EA -$ -$ -$ -$

CLN DCRGFRS + Heat/AC register - Floor register - Detach & reset EA -$ -$ -$ -$

CLN DCTLF + Clean ductwork - Exterior (per LF) LF -$ -$ -$ -$

CLN DCTRM + Clean ductwork - Exterior (per ROOM) EA -$ -$ -$ -$

CLN DCTV + Clean ductwork - Interior (PER REGISTER) EA -$ -$ -$ -$

CLN DCTV+ + Clean ductwork - Interior - Heavy clean (PER REGISTER) EA -$ -$ -$ -$

CLN DODHY + Hydroxyl generator - odor counteractant - 2 optics DA -$ -$ -$ -$

CLN DODHY> + Hydroxyl generator - odor counteractant - 3 optics DA -$ -$ -$ -$

CLN DODNAN + Nano-deodorization - per cubic foot CF -$ -$ -$ -$

CLN DODR + Deodorize building - Hot thermal fog CF -$ -$ -$ -$

CLN DODRCRY + Solid odor counteractant - crystal or solid block DA -$ -$ -$ -$

CLN DODRHZ + Deodorize building - Ozone & hydroxyl treatment CF -$ -$ -$ -$

CLN DODRM + Vapor odor-counteractant membrane - per 24 hrs DA -$ -$ -$ -$

CLN DODRME> + Vapor odor-counteractant system - large - per 24 hrs DA -$ -$ -$ -$

CLN DODRMEM + Vapor odor-counteractant system - small - per 24 hrs DA -$ -$ -$ -$

CLN DODROZ + Deodorize building - Ozone treatment CF -$ -$ -$ -$

CLN DODRSP + Apply odor counteractant - liquid spray SF -$ -$ -$ -$

CLN DOR + Clean door (per side) EA -$ -$ -$ -$

CLN DOR+ + Clean door - with detail (per side) EA -$ -$ -$ -$

CLN DORH + Clean door hardware EA -$ -$ -$ -$

CLN DORH- + Clean door hardware - Light EA -$ -$ -$ -$

CLN DORH+ + Clean door hardware - Heavy EA -$ -$ -$ -$

CLN DORHM + Corrosion mitigation of door hardware EA -$ -$ -$ -$

CLN DORHV + Clean door (per side) - Heavy EA -$ -$ -$ -$

CLN DORHV+ + Clean door - with detail (per side) - Heavy EA -$ -$ -$ -$

CLN DORL + Clean door (per side) - Light EA -$ -$ -$ -$

CLN DORL+ + Clean door - with detail (per side) - Light EA -$ -$ -$ -$

CLN DRAP + Clean drapery - per pleat (3'- 6'length) - unlined PL -$ -$ -$ -$

CLN DRAP+ + Clean drapery - per pleat (3'- 6'length) - lined PL -$ -$ -$ -$

CLN DRAP> + Clean drapery - per pleat (6'- 8'length) - unlined PL -$ -$ -$ -$

CLN DRAP>+ + Clean drapery - per pleat (6'- 8'length) - lined PL -$ -$ -$ -$

CLN DRAP» + Clean drapery - per pleat (8'- 10'length) - unlined PL -$ -$ -$ -$

CLN DRAP»+ + Clean drapery - per pleat (8'- 10'length) - lined PL -$ -$ -$ -$

CLN DRAPHW + Clean drapery hardware EA -$ -$ -$ -$

CLN DRAPHW- + Clean drapery hardware - Light EA -$ -$ -$ -$

CLN DRAPHW+ + Clean drapery hardware - Heavy EA -$ -$ -$ -$

CLN DRAPHWIV1 + Corrosion mitigation of drapery hardware EA -$ -$ -$ -$

CLN DRAPV + Clean drapery valance - not pleated EA -$ -$ -$ -$

CLN DRAPVP + Clean drapery valance - pleated PL -$ -$ -$ -$

CLN DVENT + Clean dryer vent LF -$ -$ -$ -$

CLN DW + Clean dishwasher - interior and exterior EA -$ -$ -$ -$

CLN DW- + Clean dishwasher - interior and exterior - Light EA -$ -$ -$ -$

CLN DW+ + Clean dishwasher - interior and exterior - Heavy EA -$ -$ -$ -$

CLN DWC + Clean dishwasher - interior & ext. - Commercial EA -$ -$ -$ -$

CLN DWC- + Clean dishwasher - interior & ext. - Commercial - Light EA -$ -$ -$ -$

CLN DWC+ + Clean dishwasher - interior & ext. - Commercial - Heavy EA -$ -$ -$ -$

CLN DWM + Corrosion mitigation of dishwasher EA -$ -$ -$ -$

CLN DWX + Clean dishwasher - exterior EA -$ -$ -$ -$

CLN DWX- + Clean dishwasher - exterior - Light EA -$ -$ -$ -$

CLN DWX+ + Clean dishwasher - exterior - Heavy EA -$ -$ -$ -$

CLN DWXC + Clean dishwasher - exterior - Commercial EA -$ -$ -$ -$

CLN DWXC- + Clean dishwasher - exterior - Commercial - Light EA -$ -$ -$ -$

Page 22: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CLN DWXC+ + Clean dishwasher - exterior - Commercial - Heavy EA -$ -$ -$ -$

CLN EC + Clean evaporative cooler EA -$ -$ -$ -$

CLN ECDIF + Clean evaporative cooler diffuser EA -$ -$ -$ -$

CLN ESRV + Fire mitigation emergency svc call - after business hours EA -$ -$ -$ -$

CLN ESRVD + Fire mitigation emergency svc call - during business hours EA -$ -$ -$ -$

CLN F + Clean floor, strip & wax SF -$ -$ -$ -$

CLN F- + Clean floor SF -$ -$ -$ -$

CLN F-- + Clean floor - Light SF -$ -$ -$ -$

CLN F+ + Clean floor, strip & wax - several layers of wax SF -$ -$ -$ -$

CLN F-+ + Clean floor - Heavy SF -$ -$ -$ -$

CLN FAC + Clean fascia LF -$ -$ -$ -$

CLN FAN + Clean exhaust fan EA -$ -$ -$ -$

CLN FAN- + Clean exhaust fan - Light EA -$ -$ -$ -$

CLN FAN+ + Clean exhaust fan - Heavy EA -$ -$ -$ -$

CLN FANA + Clean attic or whole house fan EA -$ -$ -$ -$

CLN FANM + Corrosion mitigation of exhaust fan EA -$ -$ -$ -$

CLN FAU + Clean sink faucet EA -$ -$ -$ -$

CLN FAU- + Clean sink faucet - Light EA -$ -$ -$ -$

CLN FAU+ + Clean sink faucet - Heavy EA -$ -$ -$ -$

CLN FAUM + Corrosion mitigation of sink faucet EA -$ -$ -$ -$

CLN FCC + Clean and deodorize carpet SF -$ -$ -$ -$

CLN FCC- + Clean and deodorize carpet - Light SF -$ -$ -$ -$

CLN FCCM + Corrosion mitigation and deodorize carpet SF -$ -$ -$ -$

CLN FCCMN + Carpet cleaning - Minimum charge EA -$ -$ -$ -$

CLN FCCPC + Re-apply protective coating on carpet SF -$ -$ -$ -$

CLN FCCSTN + Clean and deodorize carpet - heavy staining SF -$ -$ -$ -$

CLN FCCSTP + Clean carpet - cleaning charge per step EA -$ -$ -$ -$

CLN FCCSTP- + Clean carpet - cleaning charge per step - Light EA -$ -$ -$ -$

CLN FCCSTP+ + Clean carpet - cleaning charge per step - Heavy EA -$ -$ -$ -$

CLN FCCSTPM + Corrosion mitigation of carpet - cleaning charge per step EA -$ -$ -$ -$

CLN FCS + Clean floor - stone SF -$ -$ -$ -$

CLN FCS- + Clean floor - stone - Light clean SF -$ -$ -$ -$

CLN FCS+ + Clean floor - stone - Heavy clean SF -$ -$ -$ -$

CLN FCSM + Corrosion mitigation of floor - stone SF -$ -$ -$ -$

CLN FCT + Clean floor - tile SF -$ -$ -$ -$

CLN FCT- + Clean floor - tile - Light clean SF -$ -$ -$ -$

CLN FCT+ + Clean floor - tile - Heavy clean SF -$ -$ -$ -$

CLN FCTM + Corrosion mitigation of floor - tile SF -$ -$ -$ -$

CLN FCW + Clean floor and seal - wood SF -$ -$ -$ -$

CLN FH + Clean cabinetry - full height - inside and out LF -$ -$ -$ -$

CLN FHF + Clean cabinetry - full height - faces only LF -$ -$ -$ -$

CLN FINALC + Final cleaning - construction - Commercial SF -$ -$ -$ -$

CLN FINALR + Final cleaning - construction - Residential SF -$ -$ -$ -$

CLN FL + Clean light fixture - fluorescent EA -$ -$ -$ -$

CLN FL- + Clean light fixture - fluorescent - Light EA -$ -$ -$ -$

CLN FL+ + Clean light fixture - fluorescent - Heavy EA -$ -$ -$ -$

CLN FL< + Clean light fixture - fluorescent - Small EA -$ -$ -$ -$

CLN FL<- + Clean light fixture - fluorescent - Small - Light EA -$ -$ -$ -$

CLN FL<+ + Clean light fixture - fluorescent - Small - Heavy EA -$ -$ -$ -$

CLN FL<M + Corrosion mitigation of light fixture - fluorescent- Small EA -$ -$ -$ -$

CLN FL> + Clean light fixture - fluorescent - Large EA -$ -$ -$ -$

CLN FL>- + Clean light fixture - fluorescent - Large - Light EA -$ -$ -$ -$

CLN FL>+ + Clean light fixture - fluorescent - Large - Heavy EA -$ -$ -$ -$

CLN FL>M + Corrosion mitigation of light fixture - fluorescent- Large EA -$ -$ -$ -$

CLN FLD + Clean folding door (per side) EA -$ -$ -$ -$

CLN FLD- + Clean folding door (per side) - Light EA -$ -$ -$ -$

CLN FLD+ + Clean folding door (per side) - Heavy EA -$ -$ -$ -$

CLN FLM + Corrosion mitigation of light fixture - fluorescent EA -$ -$ -$ -$

CLN F-M + Corrosion mitigation of floor SF -$ -$ -$ -$

CLN FMN + Floor Cleaning - Labor Minimum EA -$ -$ -$ -$

CLN FN + Clean ceiling fan and light EA -$ -$ -$ -$

CLN FN- + Clean ceiling fan and light - Light EA -$ -$ -$ -$

CLN FN+ + Clean ceiling fan and light - Heavy EA -$ -$ -$ -$

CLN FN< + Clean ceiling fan w/out light EA -$ -$ -$ -$

CLN FN<- + Clean ceiling fan w/out light - Light EA -$ -$ -$ -$

Page 23: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CLN FN<+ + Clean ceiling fan w/out light - Heavy EA -$ -$ -$ -$

CLN FN<M + Corrosion mitigation of ceiling fan w/out light EA -$ -$ -$ -$

CLN FNM + Corrosion mitigation of ceiling fan and light EA -$ -$ -$ -$

CLN FNTN + Clean drinking fountain EA -$ -$ -$ -$

CLN FNTN- + Clean drinking fountain - Light EA -$ -$ -$ -$

CLN FNTN+ + Clean drinking fountain - Heavy EA -$ -$ -$ -$

CLN FNTNM + Corrosion mitigation of drinking fountain EA -$ -$ -$ -$

CLN FOIL + Clean wallpaper - foil SF -$ -$ -$ -$

CLN FPL + Clean fireplace face & mantel SF -$ -$ -$ -$

CLN FPS + Clean floor and prep for overlay of subfloor SF -$ -$ -$ -$

CLN FR + Clean door - French (per side) EA -$ -$ -$ -$

CLN FR- + Clean door - French (per side) - Light EA -$ -$ -$ -$

CLN FR+ + Clean door - French (per side) - Heavy EA -$ -$ -$ -$

CLN FR2 + Clean door - French double door set (per side) EA -$ -$ -$ -$

CLN FR2- + Clean door - French double door set (per side) - Light EA -$ -$ -$ -$

CLN FR2+ + Clean door - French double door set (per side) - Heavy EA -$ -$ -$ -$

CLN FRAH + Clean air handler EA -$ -$ -$ -$

CLN FRAH> + Clean air handler - Large EA -$ -$ -$ -$

CLN FRCOIL + Clean evaporator coil EA -$ -$ -$ -$

CLN FRFA + Clean furnace - forced air EA -$ -$ -$ -$

CLN FRFA> + Clean furnace - forced air - Large EA -$ -$ -$ -$

CLN FRW + Clean furnace - wall type EA -$ -$ -$ -$

CLN FW + Clean foundation wall SF -$ -$ -$ -$

CLN GBAR + Clean handicap grab bar EA -$ -$ -$ -$

CLN GBAR- + Clean handicap grab bar - Light EA -$ -$ -$ -$

CLN GBAR+ + Clean handicap grab bar - Heavy EA -$ -$ -$ -$

CLN GD + Clean garbage disposer EA -$ -$ -$ -$

CLN GD- + Clean garbage disposer - Light EA -$ -$ -$ -$

CLN GD+ + Clean garbage disposer - Heavy EA -$ -$ -$ -$

CLN GDM + Corrosion mitigation of garbage disposer EA -$ -$ -$ -$

CLN GDOR + Clean fireplace glass doors EA -$ -$ -$ -$

CLN GDOR- + Clean fireplace glass doors - Light EA -$ -$ -$ -$

CLN GDOR+ + Clean fireplace glass doors - Heavy EA -$ -$ -$ -$

CLN GDORM + Corrosion mitigation of fireplace glass doors EA -$ -$ -$ -$

CLN GLS + Clean glazed store front - glass and aluminum SF -$ -$ -$ -$

CLN GLS- + Clean glazed store front - glass and aluminum - Light SF -$ -$ -$ -$

CLN GLS+ + Clean glazed store front - glass and aluminum - Heavy SF -$ -$ -$ -$

CLN GLSM + Corrosion mitigation of glazed store front - glass & alum SF -$ -$ -$ -$

CLN GN + General clean - up HR -$ -$ -$ -$

CLN GRASS + Clean wallpaper - grass cloth SF -$ -$ -$ -$

CLN GRIL + Clean ornamental iron grill SF -$ -$ -$ -$

CLN GUT + Clean gutter/downspout LF -$ -$ -$ -$

CLN HD + Clean range hood EA -$ -$ -$ -$

CLN HD- + Clean range hood - Light EA -$ -$ -$ -$

CLN HD+ + Clean range hood - Heavy EA -$ -$ -$ -$

CLN HDC + Clean range hood - Commercial EA -$ -$ -$ -$

CLN HDC- + Clean range hood - Commercial - Light EA -$ -$ -$ -$

CLN HDC+ + Clean range hood - Commercial - Heavy EA -$ -$ -$ -$

CLN HDM + Corrosion mitigation of range hood EA -$ -$ -$ -$

CLN HEPAVAC + HEPA Vacuuming - hourly charge HR -$ -$ -$ -$

CLN HEPAVAL + HEPA Vacuuming - Light - (PER SF) SF -$ -$ -$ -$

CLN HEPAVAS + HEPA Vacuuming - Detailed - (PER SF) SF -$ -$ -$ -$

CLN HIGH + Additional cost for high wall or ceiling - Over 14' SF -$ -$ -$ -$

CLN HIGH< + Additional cost for high wall or ceiling - 11' to 14' SF -$ -$ -$ -$

CLN HMF + Clean humidifier unit EA -$ -$ -$ -$

CLN HR + Clean handrail - wall mounted LF -$ -$ -$ -$

CLN HR+ + Clean handrail - wall mounted - Heavy LF -$ -$ -$ -$

CLN HRTH + Clean fireplace hearth SF -$ -$ -$ -$

CLN IC + Clean intercom station EA -$ -$ -$ -$

CLN IC- + Clean intercom station - Light EA -$ -$ -$ -$

CLN IC+ + Clean intercom station - Heavy EA -$ -$ -$ -$

CLN ICM + Corrosion mitigation of intercom station EA -$ -$ -$ -$

CLN JST + Clean floor or roof joist system SF -$ -$ -$ -$

CLN JST+ + Clean floor or roof joist system - Heavy SF -$ -$ -$ -$

CLN LAB + Cleaning Technician - per hour HR -$ -$ -$ -$

Page 24: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CLN LABF + Floor Cleaning Technician - per hour HR -$ -$ -$ -$

CLN LABM + Cleaning Technician - incl. cleaning agent - per hour HR -$ -$ -$ -$

CLN LABR + Cleaning - Remediation Technician - per hour HR -$ -$ -$ -$

CLN LABS + Cleaning - Supervisory/Administrative - per hour HR -$ -$ -$ -$

CLN LIT + Clean light fixture EA -$ -$ -$ -$

CLN LIT- + Clean light fixture - Light EA -$ -$ -$ -$

CLN LIT+ + Clean light fixture - high detail EA -$ -$ -$ -$

CLN LIT+- + Clean light fixture - high detail - Light EA -$ -$ -$ -$

CLN LIT+H + Clean light fixture - high detail - Heavy EA -$ -$ -$ -$

CLN LIT+M + Corrosion mitigation of light fixture - high detail EA -$ -$ -$ -$

CLN LIT< + Clean light fixture - low detail EA -$ -$ -$ -$

CLN LIT<- + Clean light fixture - low detail - Light EA -$ -$ -$ -$

CLN LIT<H + Clean light fixture - low detail - Heavy EA -$ -$ -$ -$

CLN LIT<M + Corrosion mitigation of light fixture - low detail EA -$ -$ -$ -$

CLN LITH + Clean light fixture - Heavy EA -$ -$ -$ -$

CLN LITM + Corrosion mitigation of light fixture EA -$ -$ -$ -$

CLN LOW + Clean cabinetry - lower - inside and out LF -$ -$ -$ -$

CLN LOWF + Clean cabinetry - lower - faces only LF -$ -$ -$ -$

CLN LP + Clean light diffusing panel SF -$ -$ -$ -$

CLN LP- + Clean light diffusing panel - Light SF -$ -$ -$ -$

CLN LP+ + Clean light diffusing panel - Heavy SF -$ -$ -$ -$

CLN LPM + Corrosion mitigation of light diffusing panel SF -$ -$ -$ -$

CLN LTUB + Clean laundry tub EA -$ -$ -$ -$

CLN LTUB- + Clean laundry tub - Light EA -$ -$ -$ -$

CLN LTUB+ + Clean laundry tub - Heavy EA -$ -$ -$ -$

CLN LTUBM + Corrosion mitigation of laundry tub EA -$ -$ -$ -$

CLN LVR + Clean door - full louvered unit (per side) EA -$ -$ -$ -$

CLN LVR- + Clean door - full louvered unit (per side) - Light EA -$ -$ -$ -$

CLN LVR+ + Clean door - full louvered unit (per side) - Heavy EA -$ -$ -$ -$

CLN LVRH + Clean door - half louvered unit (per side) EA -$ -$ -$ -$

CLN LVRH- + Clean door - half louvered unit (per side) - Light EA -$ -$ -$ -$

CLN LVRH+ + Clean door - half louvered unit (per side) - Heavy EA -$ -$ -$ -$

CLN MAR + Clean Marlite (waterproof) paneling SF -$ -$ -$ -$

CLN MAS + Clean masonry SF -$ -$ -$ -$

CLN MC + Clean medicine cabinet EA -$ -$ -$ -$

CLN MC- + Clean medicine cabinet - Light EA -$ -$ -$ -$

CLN MC+ + Clean medicine cabinet - Heavy EA -$ -$ -$ -$

CLN MC> + Clean medicine cabinet - Large EA -$ -$ -$ -$

CLN MC>- + Clean medicine cabinet - Large - Light EA -$ -$ -$ -$

CLN MC>+ + Clean medicine cabinet - Large - Heavy EA -$ -$ -$ -$

CLN MC>M + Corrosion mitigation of medicine cabinet - Large EA -$ -$ -$ -$

CLN MCH + Clean chimney - metal LF -$ -$ -$ -$

CLN MCM + Corrosion mitigation of medicine cabinet EA -$ -$ -$ -$

CLN MlR + Clean mirror SF -$ -$ -$ -$

CLN MIR- + Clean mirror - Light SF -$ -$ -$ -$

CLN MIR+ + Clean mirror - Heavy SF -$ -$ -$ -$

CLN MIRM + Corrosion mitigation of mirror SF -$ -$ -$ -$

CLN MN + Cleaning - Labor Minimum EA -$ -$ -$ -$

CLN MTIL + Clean mirror tile SF -$ -$ -$ -$

CLN MTIL- + Clean mirror tile - Light SF -$ -$ -$ -$

CLN MTIL+ + Clean mirror tile - Heavy SF -$ -$ -$ -$

CLN MTILM + Corrosion mitigation of mirror tile SF -$ -$ -$ -$

CLN MTLR + Clean metal roofing SF -$ -$ -$ -$

CLN MW + Clean microwave - over range - interior and exterior EA -$ -$ -$ -$

CLN MW- + Clean microwave - over range - int. & ext. - Light EA -$ -$ -$ -$

CLN MW+ + Clean microwave - over range - int. & ext. - Heavy EA -$ -$ -$ -$

CLN MWM + Corrosion mitigation of microwave - over range EA -$ -$ -$ -$

CLN MWX + Clean microwave - over range - exterior EA -$ -$ -$ -$

CLN MWX- + Clean microwave - over range - exterior - Light EA -$ -$ -$ -$

CLN MWX+ + Clean microwave - over range - exterior - Heavy EA -$ -$ -$ -$

CLN OH + Clean overhead door & hardware EA -$ -$ -$ -$

CLN OH> + Clean overhead door & hardware - Large EA -$ -$ -$ -$

CLN OHO + Clean overhead (garage) door opener EA -$ -$ -$ -$

CLN OL + Clean phone, TV, or speaker outlet EA -$ -$ -$ -$

CLN OP + Clean door / window opening (per side) EA -$ -$ -$ -$

Page 25: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CLN OPLF + Clean door / window opening (per side) LF -$ -$ -$ -$

CLN ORI + Clean ornamental iron handrail LF -$ -$ -$ -$

CLN ORI- + Clean ornamental iron handrail - Light LF -$ -$ -$ -$

CLN ORI+ + Clean ornamental iron handrail - Heavy LF -$ -$ -$ -$

CLN ORIG + Clean ornamental iron security grill SF -$ -$ -$ -$

CLN ORIG- + Clean ornamental iron security grill - Light SF -$ -$ -$ -$

CLN ORIG+ + Clean ornamental iron security grill - Heavy SF -$ -$ -$ -$

CLN OS + Clean outlet or switch EA -$ -$ -$ -$

CLN OV + Clean oven - interior and exterior EA -$ -$ -$ -$

CLN OV- + Clean oven - interior and exterior - Light EA -$ -$ -$ -$

CLN 0V+ + Clean oven - interior and exterior - Heavy EA -$ -$ -$ -$

CLN OVC + Clean oven - interior & exterior - Commercial EA -$ -$ -$ -$

CLN OVC- + Clean oven - interior & exterior - Commercial - Light EA -$ -$ -$ -$

CLN OVC+ + Clean oven - interior & exterior - Commercial - Heavy EA -$ -$ -$ -$

CLN OVM + Corrosion mitigation of oven EA -$ -$ -$ -$

CLN OVX + Clean oven - exterior EA -$ -$ -$ -$

CLN OVX- + Clean oven - exterior - Light EA -$ -$ -$ -$

CLN OVX+ + Clean oven - exterior - Heavy EA -$ -$ -$ -$

CLN OVXC + Clean oven - exterior - Commercial EA -$ -$ -$ -$

CLN OVXC- + Clean oven - exterior - Commercial - Light EA -$ -$ -$ -$

CLN OVXC+ + Clean oven - exterior - Commercial - Heavy EA -$ -$ -$ -$

CLN PATIO + Clean aluminum patio cover SF -$ -$ -$ -$

CLN PATIO- + Clean aluminum patio cover - Light SF -$ -$ -$ -$

CLN PATIO+ + Clean aluminum patio cover - Heavy SF -$ -$ -$ -$

CLN PDOR + Clean patio door (sliding glass) (per side) EA -$ -$ -$ -$

CLN PDOR- + Clean patio door (sliding glass) (per side) - Light EA -$ -$ -$ -$

CLN PDOR+ + Clean patio door (sliding glass) (per side) - Heavy EA -$ -$ -$ -$

CLN PDOR< + Clean patio door (sliding glass) - Small (per side) EA -$ -$ -$ -$

CLN PDOR<- + Clean patio door (sliding glass) - Small (per side) - Lt EA -$ -$ -$ -$

CLN PDOR<+ + Clean patio door (sliding glass) - Small (per side) - Hvy EA -$ -$ -$ -$

CLN PDOR<M + Corrosion mitigation - patio dr (sliding gls)-Sml (per sd) EA -$ -$ -$ -$

CLN PDOR> + Clean patio door (sliding glass) - Large (per side) EA -$ -$ -$ -$

CLN PDOR>- + Clean patio door (sliding glass) - Large (per side) - Lt EA -$ -$ -$ -$

CLN PDOR>+ + Clean patio door (sliding glass) - Large (per side) - Hvy EA -$ -$ -$ -$

CLN PDOR>M + Corrosion mitigation of patio dr (sliding gls)-Lg (per sd) EA -$ -$ -$ -$

CLN PDORM + Corrosion mitigation of patio dr (sliding gls) (per side) EA -$ -$ -$ -$

CLN PH + Clean panic hardware EA -$ -$ -$ -$

CLN PH- + Clean panic hardware - Light EA -$ -$ -$ -$

CLN PH+ + Clean panic hardware - Heavy EA -$ -$ -$ -$

CLN PHM + Corrosion mitigation of panic hardware EA -$ -$ -$ -$

CLN PNL + Clean paneling SF -$ -$ -$ -$

CLN PNL- + Clean paneling - Light SF -$ -$ -$ -$

CLN PNL+ + Clean paneling - Heavy SF -$ -$ -$ -$

CLN PWASH + Clean with pressure/chemical spray SF -$ -$ -$ -$

CLN PWASH- + Clean with pressure/chemical spray - Light SF -$ -$ -$ -$

CLN PWASH+ + Clean with pressure/chemical spray - Heavy SF -$ -$ -$ -$

CLN PWASH++ + Clean with pressure/chemical spray - Very heavy SF -$ -$ -$ -$

CLN PWASHMN + Pressure/chemical wash - Minimum charge EA -$ -$ -$ -$

CLN RAD + Clean radiator unit EA -$ -$ -$ -$

CLN RADC + Clean radiator cover EA -$ -$ -$ -$

CLN RC + Clean recessed light fixture EA -$ -$ -$ -$

CLN RC- + Clean recessed light fixture - Light EA -$ -$ -$ -$

CLN RC+ + Clean recessed light fixture - Heavy EA -$ -$ -$ -$

CLN RCM + Corrosion mitigation of recessed light fixture EA -$ -$ -$ -$

CLN REG + Clean register - heat / AC EA -$ -$ -$ -$

CLN RF + Clean refrigerator - interior and exterior EA -$ -$ -$ -$

CLN RF- + Clean refrigerator - interior and exterior - Light EA -$ -$ -$ -$

CLN RF+ + Clean refrigerator - interior and exterior - Heavy EA -$ -$ -$ -$

CLN RFC + Clean refrigerator - interior & ext. - Commercial EA -$ -$ -$ -$

CLN RFC- + Clean refrigerator - interior & ext. - Commercial - Light EA -$ -$ -$ -$

CLN RFC+ + Clean refrigerator - interior & ext. - Commercial - Heavy EA -$ -$ -$ -$

CLN RFM + Corrosion mitigation of refrigerator EA -$ -$ -$ -$

CLN RFMI + Clean compact / mini refrigerator - interior and exterior EA -$ -$ -$ -$

CLN RFMIX + Clean compact / mini refrigerator - exterior EA -$ -$ -$ -$

CLN RFX + Clean refrigerator - exterior EA -$ -$ -$ -$

Page 26: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CLN RFX- + Clean refrigerator - exterior - Light EA -$ -$ -$ -$

CLN RFX+ + Clean refrigerator - exterior - Heavy EA -$ -$ -$ -$

CLN RFXC + Clean refrigerator - exterior - Commercial EA -$ -$ -$ -$

CLN RFXC- + Clean refrigerator - exterior - Commercial - Light EA -$ -$ -$ -$

CLN RFXC+ + Clean refrigerator - exterior - Commercial - Heavy EA -$ -$ -$ -$

CLN RG + Clean range - interior and exterior EA -$ -$ -$ -$

CLN RG- + Clean range - interior and exterior Light EA -$ -$ -$ -$

CLN RG+ + Clean range - interior and exterior - Heavy EA -$ -$ -$ -$

CLN RGC + Clean range - interior & ext. - Commercial EA -$ -$ -$ -$

CLN RGC- + Clean range - interior & ext. - Commercial - Light EA -$ -$ -$ -$

CLN RGC+ + Clean range - interior & ext. - Commercial - Heavy EA -$ -$ -$ -$

CLN RGM + Corrosion mitigation of range EA -$ -$ -$ -$

CLN RGX + Clean range - exterior EA -$ -$ -$ -$

CLN RGX- + Clean range - exterior - Light EA -$ -$ -$ -$

CLN RGX+ + Clean range - exterior - Heavy EA -$ -$ -$ -$

CLN RGXC + Clean range - exterior - Commercial EA -$ -$ -$ -$

CLN RGXC- + Clean range - exterior - Commercial - Light EA -$ -$ -$ -$

CLN RGXC+ + Clean range - exterior - Commercial - Heavy EA -$ -$ -$ -$

CLN RISER + Clean stair riser - per side - per LF LF -$ -$ -$ -$

CLN RU + Clean window blind - roll up EA -$ -$ -$ -$

CLN RW + Clean roof window SF -$ -$ -$ -$

CLN RW- + Clean roof window - Light SF -$ -$ -$ -$

CLN RW+ + Clean roof window - Heavy SF -$ -$ -$ -$

CLN RWM + Corrosion mitigation of roof window SF -$ -$ -$ -$

CLN SB + Sandblasting SF -$ -$ -$ -$

CLN SB+ + Sandblasting - Heavy SF -$ -$ -$ -$

CLN SB++ + Sandblasting - Extra heavy SF -$ -$ -$ -$

CLN SBCS + Add on - Confined space blasting SF -$ -$ -$ -$

CLN SBI + Dry ice blasting SF -$ -$ -$ -$

CLN SBI+ + Dry ice blasting - Heavy SF -$ -$ -$ -$

CLN SBI++ + Dry ice blasting - Extra Heavy SF -$ -$ -$ -$

CLN SBMN + Sandblasting - Minimum charge EA -$ -$ -$ -$

CLN SBS + Soda blasting SF -$ -$ -$ -$

CLN SBS+ + Soda blasting - Heavy SF -$ -$ -$ -$

CLN SBS++ + Soda blasting - Extra heavy SF -$ -$ -$ -$

CLN SCR + Clean fireplace screen EA -$ -$ -$ -$

CLN SCRN + Clean window screen EA -$ -$ -$ -$

CLN SCRNW + Clean screen wall SF -$ -$ -$ -$

CLN SDGM + Clean siding - metal or vinyl SF -$ -$ -$ -$

CLN SDGW + Clean siding - wood SF -$ -$ -$ -$

CLN SDOR + Clean shower door EA -$ -$ -$ -$

CLN SDOR- + Clean shower door - Light EA -$ -$ -$ -$

CLN SDOR+ + Clean shower door - Heavy EA -$ -$ -$ -$

CLN SDORM + Corrosion mitigation of shower door EA -$ -$ -$ -$

CLN SFTM + Clean soffit - metal or vinyl SF -$ -$ -$ -$

CLN SFTW + Clean soffit - wood SF -$ -$ -$ -$

CLN SG + Clean suspended ceiling grid SF -$ -$ -$ -$

CLN SH + Clean deck sheathing SF -$ -$ -$ -$

CLN SHOE + Clean base shoe LF -$ -$ -$ -$

CLN SHOE+ + Clean base shoe - Heavy LF -$ -$ -$ -$

CLN SHTR + Clean shutter EA -$ -$ -$ -$

CLN SHW + Clean shelving - wood LF -$ -$ -$ -$

CLN SHWI + Clean shelving - wire (vinyl coated) LF -$ -$ -$ -$

CLN SILM + Clean sill - cultured marble LF -$ -$ -$ -$

CLN SILM- + Clean sill - cultured marble - Light LF -$ -$ -$ -$

CLN SILM+ + Clean sill - cultured marble - Heavy LF -$ -$ -$ -$

CLN SILMM + Corrosion mitigation of sill - cultured marble LF -$ -$ -$ -$

CLN SILT + Clean sill - the LF -$ -$ -$ -$

CLN SILT- + Clean sill - tile - Light LF -$ -$ -$ -$

CLN SILT+ + Clean sill - tile - Heavy LF -$ -$ -$ -$

CLN SILTM + Corrosion mitigation of sill - tile LF -$ -$ -$ -$

CLN SILW + Clean sill - wood LF -$ -$ -$ -$

CLN SKY + Clean roof window or skylight EA -$ -$ -$ -$

CLN SKY- + Clean roof window or skylight - Light EA -$ -$ -$ -$

CLN SKY+ + Clean roof window or skylight - Heavy EA -$ -$ -$ -$

Page 27: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CLN SKY< + Clean roof window or skylight - Small EA -$ -$ -$ -$

CLN SKY<- + Clean roof window or skylight - Small - Light EA -$ -$ -$ -$

CLN SKY<+ + Clean roof window or skylight - Small - Heavy EA -$ -$ -$ -$

CLN SKY<M + Corrosion mitigation of roof window or skylight - Small EA -$ -$ -$ -$

CLN SKY> + Clean roof window or skylight - Large EA -$ -$ -$ -$

CLN SKY>- + Clean roof window or skylight - Large - Light EA -$ -$ -$ -$

CLN SKY>+ + Clean roof window or skylight - Large - Heavy EA -$ -$ -$ -$

CLN SKY>> + Clean roof window or skylight - Extra large EA -$ -$ -$ -$

CLN SKY>>- + Clean roof window or skylight - Extra large - Light EA -$ -$ -$ -$

CLN SKY»+ + Clean roof window or skylight - Extra large - Heavy EA -$ -$ -$ -$

CLN SKY»M + Corrosion mitigation of roof window or skylight - Xlg EA -$ -$ -$ -$

CLN SKY>M + Corrosion mitigation of roof window or skylight - Large EA -$ -$ -$ -$

CLN SKYM + Corrosion mitigation of roof window or skylight EA -$ -$ -$ -$

CLN SMOKE + Clean smoke/carbon monoxide detector EA -$ -$ -$ -$

CLN SNK + Clean sink EA -$ -$ -$ -$

CLN SNK- + Clean sink - Light EA -$ -$ -$ -$

CLN SNK+ + Clean sink - Heavy EA -$ -$ -$ -$

CLN SNKD + Clean sink - double EA -$ -$ -$ -$

CLN SNKD- + Clean sink - double - Light EA -$ -$ -$ -$

CLN SNKD+ + Clean sink - double - Heavy EA -$ -$ -$ -$

CLN SNKDFA + Clean sink - double and faucet EA -$ -$ -$ -$

CLN SNKDFA- + Clean sink - double and faucet - Light EA -$ -$ -$ -$

CLN SNKDFA+ + Clean sink - double and faucet - Heavy EA -$ -$ -$ -$

CLN SNKDFAM + Corrosion mitigation of sink - double and faucet EA -$ -$ -$ -$

CLN SNKDM + Corrosion mitigation of sink - double EA -$ -$ -$ -$

CLN SNKFA + Clean sink and faucet EA -$ -$ -$ -$

CLN SNKFA- + Clean sink and faucet - Light EA -$ -$ -$ -$

CLN SNKFA+ + Clean sink and faucet - Heavy EA -$ -$ -$ -$

CLN SNKFAM + Corrosion mitigation of sink and faucet EA -$ -$ -$ -$

CLN SNKM + Corrosion mitigation of sink EA -$ -$ -$ -$

CLN SNKPE + Clean sink - pedestal EA -$ -$ -$ -$

CLN SNKPE- + Clean sink - pedestal - Light EA -$ -$ -$ -$

CLN SNKPE+ + Clean sink - pedestal - Heavy EA -$ -$ -$ -$

CLN SNKPEM + Corrosion mitigation of sink - pedestal EA -$ -$ -$ -$

CLN SNKPFA + Clean sink and faucet - pedestal EA -$ -$ -$ -$

CLN SNKPFA- + Clean sink and faucet - pedestal - Light EA -$ -$ -$ -$

CLN SNKPFA+ + Clean sink and faucet - pedestal - Heavy EA -$ -$ -$ -$

CLN SNKPFAM + Corrosion mitigation of sink and faucet - pedestal EA -$ -$ -$ -$

CLN SPD + Clean soap dispenser EA -$ -$ -$ -$

CLN SPD- + Clean soap dispenser - Light EA -$ -$ -$ -$

CLN SPD+ + Clean soap dispenser - Heavy EA -$ -$ -$ -$

CLN SPDM + Corrosion mitigation of soap dispenser EA -$ -$ -$ -$

CLN SROD + Clean shower curtain rod EA -$ -$ -$ -$

CLN SROD- + Clean shower curtain rod - Light EA -$ -$ -$ -$

CLN SROD+ + Clean shower curtain rod - Heavy EA -$ -$ -$ -$

CLN SRODM + Corrosion mitigation of shower curtain rod EA -$ -$ -$ -$

CLN SSNK + Clean service sink EA -$ -$ -$ -$

CLN SSNK- + Clean service sink - Light EA -$ -$ -$ -$

CLN SSNK+ + Clean service sink - Heavy EA -$ -$ -$ -$

CLN SSNKM + Corrosion mitigation of service sink EA -$ -$ -$ -$

CLN ST + Clean suspended ceiling tile SF -$ -$ -$ -$

CLN STD + Clean stud wall SF -$ -$ -$ -$

CLN STD+ + Clean stud wall - Heavy SF -$ -$ -$ -$

CLN STM + Clean {V} with pressure steam SF -$ -$ -$ -$

CLN STN + Clean stone veneer SF -$ -$ -$ -$

CLN STOL + Clean window stool & apron LF -$ -$ -$ -$

CLN STR + Clean stair stringer - per side LF -$ -$ -$ -$

CLN STR+ + Clean stair stringer - per side - Heavy LF -$ -$ -$ -$

CLN STRD + Clean disappearing (folding) stairway/attic ladder EA -$ -$ -$ -$

CLN STRD- + Clean disappearing (folding) stairway/attic ladder - Light EA -$ -$ -$ -$

CLN STRD+ + Clean disappearing (folding) stairway/attic ladder - Heavy EA -$ -$ -$ -$

CLN STRMD + Clean storm door (per side) EA -$ -$ -$ -$

CLN STRMD- + Clean storm door (per side) - Light EA -$ -$ -$ -$

CLN STRMD+ + Clean storm door (per side) - Heavy EA -$ -$ -$ -$

CLN STRMDM + Corrosion mitigation of storm door (per side) EA -$ -$ -$ -$

Page 28: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CLN STRMW + Clean storm window (per side) EA -$ -$ -$ -$

CLN STRMW- + Clean storm window (per side) - Light EA -$ -$ -$ -$

CLN STRMW+ + Clean storm window (per side) - Heavy EA -$ -$ -$ -$

CLN STRMWM + Corrosion mitigation of storm window (per side) EA -$ -$ -$ -$

CLN STU + Clean stucco SF -$ -$ -$ -$

CLN SWR + Clean shower EA -$ -$ -$ -$

CLN SWR- + Clean shower - Light EA -$ -$ -$ -$

CLN SWR+ + Clean shower - Heavy EA -$ -$ -$ -$

CLN SWRM + Corrosion mitigation of shower EA -$ -$ -$ -$

CLN T + Clean floor - terrazzo SF -$ -$ -$ -$

CLN T- + Clean floor - terrazzo - Light SF -$ -$ -$ -$

CLN T+ + Clean floor - terrazzo - Heavy SF -$ -$ -$ -$

CLN TBAR + Clean towel bar EA -$ -$ -$ -$

CLN TBAR- + Clean towel bar - Light EA -$ -$ -$ -$

CLN TBAR+ + Clean towel bar - Heavy EA -$ -$ -$ -$

CLN TBARM + Corrosion mitigation of towel bar EA -$ -$ -$ -$

CLN TC + Clean trash compactor - interior and exterior EA -$ -$ -$ -$

CLN TC- + Clean trash compactor - interior and exterior - Light EA -$ -$ -$ -$

CLN TC+ + Clean trash compactor - interior and exterior - Heavy EA -$ -$ -$ -$

CLN TCM + Corrosion mitigation of trash compactor EA -$ -$ -$ -$

CLN TCX + Clean trash compactor - exterior EA -$ -$ -$ -$

CLN TCX- + Clean trash compactor - exterior - Light EA -$ -$ -$ -$

CLN TCX+ + Clean trash compactor - exterior - Heavy EA -$ -$ -$ -$

CLN TIL + Clean ceramic tile SF -$ -$ -$ -$

CLN TIL- + Clean ceramic tile - Light SF -$ -$ -$ -$

CLN TIL+ + Clean ceramic tile - Heavy SF -$ -$ -$ -$

CLN TILM + Corrosion mitigation of ceramic tile SF -$ -$ -$ -$

CLN TILR + Clean tile roofing SF -$ -$ -$ -$

CLN TLT + Clean toilet EA -$ -$ -$ -$

CLN TLT- + Clean toilet - Light EA -$ -$ -$ -$

CLN TLT+ + Clean toilet - Heavy EA -$ -$ -$ -$

CLN TLTM + Corrosion mitigation of toilet EA -$ -$ -$ -$

CLN TLTPS + Clean toilet partition - per stall EA -$ -$ -$ -$

CLN TLTPS- + Clean toilet partition - per stall - Light EA -$ -$ -$ -$

CLN TLTPS+ + Clean toilet partition - per stall - Heavy EA -$ -$ -$ -$

CLN TLTS + Clean toilet seat EA -$ -$ -$ -$

CLN TLTS- + Clean toilet seat - Light EA -$ -$ -$ -$

CLN TLTS+ + Clean toilet seat - Heavy EA -$ -$ -$ -$

CLN TLTSM + Corrosion mitigation of toilet seat EA -$ -$ -$ -$

CLN TM + Corrosion mitigation of floor - terrazzo SF -$ -$ -$ -$

CLN TPD + Clean toilet paper dispenser EA -$ -$ -$ -$

CLN TPD- + Clean toilet paper dispenser - Light EA -$ -$ -$ -$

CLN TPD+ + Clean toilet paper dispenser - Heavy EA -$ -$ -$ -$

CLN TPDM + Corrosion mitigation of toilet paper dispenser EA -$ -$ -$ -$

CLN TR + Clean truss system - up to 5/12 SF -$ -$ -$ -$

CLN TR+ + Clean truss system - up to 5/12 - Heavy SF -$ -$ -$ -$

CLN TR12 + Clean truss system - 9 to 12/12 SF -$ -$ -$ -$

CLN TR12+ + Clean truss system - 9 to 12/12 - Heavy SF -$ -$ -$ -$

CLN TR8 + Clean truss system - 6 to 8/12 SF -$ -$ -$ -$

CLN TR8+ + Clean truss system - 6 to 8/12 - Heavy SF -$ -$ -$ -$

CLN TRD + Clean stair tread - per side - per LF LF -$ -$ -$ -$

CLN TRIM + Clean trim - wood LF -$ -$ -$ -$

CLN TRIM+ + Clean trim - wood - Heavy LF -$ -$ -$ -$

CLN TS + Clean thermostat EA -$ -$ -$ -$

CLN TSFA + Clean tub / shower faucet EA -$ -$ -$ -$

CLN TSFA- + Clean tub / shower faucet - Light EA -$ -$ -$ -$

CLN TSFA+ + Clean tub / shower faucet - Heavy EA -$ -$ -$ -$

CLN TSFAM + Corrosion mitigation of tub / shower faucet EA -$ -$ -$ -$

CLN TUB + Clean tub EA -$ -$ -$ -$

CLN TUB- + Clean tub - Light EA -$ -$ -$ -$

CLN TUB+ + Clean tub - Heavy EA -$ -$ -$ -$

CLN TUBDR + Clean bathtub enclosure - sliding glass doors EA -$ -$ -$ -$

CLN TUBDR- + Clean bathtub enclosure - sliding glass doors - Light EA -$ -$ -$ -$

CLN TUBDR+ + Clean bathtub enclosure - sliding glass doors - Heavy EA -$ -$ -$ -$

CLN TUBDRM + Corrosion mitigation of bathtub enclosure- sliding gls drs EA -$ -$ -$ -$

Page 29: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CLN TUBM + Corrosion mitigation of tub EA -$ -$ -$ -$

CLN TUBSUR + Clean tub and surround EA -$ -$ -$ -$

CLN TUBSUR- + Clean tub and surround - Light EA -$ -$ -$ -$

CLN TUBSUR+ + Clean tub and surround - Heavy EA -$ -$ -$ -$

CLN TUBSURM + Corrosion mitigation of tub and surround EA -$ -$ -$ -$

CLN UL + Clean floor underlayment / wood subfloor SF -$ -$ -$ -$

CLN UP + Clean cabinetry - upper - inside and out LF -$ -$ -$ -$

CLN UPF + Clean cabinetry - upper - faces only LF -$ -$ -$ -$

CLN UR + Clean urinal EA -$ -$ -$ -$

CLN UR- + Clean urinal - Light EA -$ -$ -$ -$

CLN UR+ + Clean urinal - Heavy EA -$ -$ -$ -$

CLN URM + Corrosion mitigation of urinal EA -$ -$ -$ -$

CLN VAC + Vacuuming - (PER SF) SF -$ -$ -$ -$

CLN VAC- + Vacuuming - (PER SF) - Light SF -$ -$ -$ -$

CLN VAC+ + Vacuuming - (PER SF) - Heavy SF -$ -$ -$ -$

CLN VAL + Clean cabinet valance LF -$ -$ -$ -$

CLN VAN + Clean vanity - inside and out LF -$ -$ -$ -$

CLN VANF + Clean vanity - faces only LF -$ -$ -$ -$

CLN VENT + Clean roof vent EA -$ -$ -$ -$

CLN WBS + Clean wood burning stove - freestanding EA -$ -$ -$ -$

CLN WBS- + Clean wood burning stove - freestanding - Light EA -$ -$ -$ -$

CLN WBS+ + Clean wood burning stove - freestanding - Heavy EA -$ -$ -$ -$

CLN WD + Clean window unit (per side) 10 - 20 SF EA -$ -$ -$ -$

CLN WD- + Clean window unit (per side) 10 - 20 SF - Light EA -$ -$ -$ -$

CLN WD+ + Clean window unit (per side) 10 - 20 SF - Heavy EA -$ -$ -$ -$

CLN WD< + Clean window unit (per side) 3 - 9 SF EA -$ -$ -$ -$

CLN WD<- + Clean window unit (per side) 3 - 9 SF - Light EA -$ -$ -$ -$

CLN WD<+ + Clean window unit (per side) 3 - 9 SF - Heavy EA -$ -$ -$ -$

CLN WD<M + Corrosion mitigation of window unit (per side) 3 - 9 SF EA -$ -$ -$ -$

CLN WD> + Clean window unit (per side) 21 - 40 SF EA -$ -$ -$ -$

CLN WD>- + Clean window unit (per side) 21 - 40 SF - Light EA -$ -$ -$ -$

CLN WD>+ + Clean window unit (per side) 21 - 40 SF - Heavy EA -$ -$ -$ -$

CLN WD» + Clean window unit (per side) 41 - 60 SF EA -$ -$ -$ -$

CLN WD»- + Clean window unit (per side) 41 - 60 SF - Light EA -$ -$ -$ -$

CLN WD»+ + Clean window unit (per side) 41 - 60 SF - Heavy EA -$ -$ -$ -$

CLN WD>>M + Corrosion mitigation of window unit (per side) 41 - 60 SF EA -$ -$ -$ -$

CLN WD>M + Corrosion mitigation of window unit (per side) 21 - 40 SF EA -$ -$ -$ -$

CLN WDM + Corrosion mitigation of window unit (per side) 10 - 20 SF EA -$ -$ -$ -$

CLN WH + Clean water heater EA -$ -$ -$ -$

CLN WH- + Clean water heater - Light EA -$ -$ -$ -$

CLN WH+ + Clean water heater - Heavy EA -$ -$ -$ -$

CLN WHP + Clean whirlpool EA -$ -$ -$ -$

CLN WHP- + Clean whirlpool - Light EA -$ -$ -$ -$

CLN WHP+ + Clean whirlpool - Heavy EA -$ -$ -$ -$

CLN WHPM + Corrosion mitigation of whirlpool EA -$ -$ -$ -$

CLN WHT + Clean wall heater - interior and exterior EA -$ -$ -$ -$

CLN WHT- + Clean wall heater - interior and exterior - Light EA -$ -$ -$ -$

CLN WHT+ + Clean wall heater - interior and exterior - Heavy EA -$ -$ -$ -$

CLN WHTX + Clean wall heater - exterior EA -$ -$ -$ -$

CLN WHTX- + Clean wall heater - exterior - Light EA -$ -$ -$ -$

CLN WHTX+ + Clean wall heater - exterior - Heavy EA -$ -$ -$ -$

CLN WPR + Clean wallpaper SF -$ -$ -$ -$

CLN WPR- + Clean wallpaper - Light SF -$ -$ -$ -$

CLN WPR+ + Clean wallpaper - Heavy SF -$ -$ -$ -$

CLN WS + Clean water softener EA -$ -$ -$ -$

CLN WS- + Clean water softener - Light EA -$ -$ -$ -$

CLN WS+ + Clean water softener - Heavy EA -$ -$ -$ -$

CLN X + Clean exterior door (per side) EA -$ -$ -$ -$

CLN X- + Clean exterior door (per side) - Light EA -$ -$ -$ -$

CLN X+ + Clean exterior door (per side) - Heavy EA -$ -$ -$ -$

CLN XLIT + Clean exterior light fixture EA -$ -$ -$ -$

CLN XLIT- + Clean exterior light fixture - Light EA -$ -$ -$ -$

CLN XLIT+ + Clean exterior light fixture - Heavy EA -$ -$ -$ -$

CLN XLITM + Corrosion mitigation of exterior light fixture EA -$ -$ -$ -$

Page 30: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

CNC ABT1/2 + Concrete anchor bolt - 1/2" x 10" EA -$ -$ -$ -$

CNC ABT1/2> + Concrete anchor bolt - 1/2" x 12" EA -$ -$ -$ -$

CNC ABT5/8 + Concrete anchor bolt - 5/8" x 10" EA -$ -$ -$ -$

CNC ABT5/8> + Concrete anchor bolt - 5/8" x 12" EA -$ -$ -$ -$

CNC ASP2 + Asphalt paving - 2" with 6" base - Residential SF -$ -$ -$ -$

CNC ASP3 + Asphalt paving - 2 1/2 - 3" with 6" base - Commercial SF -$ -$ -$ -$

CNC ASPC + Asphalt crack repair LF -$ -$ -$ -$

CNC ASPO + Asphalt overlay - 1 1/2" SF -$ -$ -$ -$

CNC ASPP + Asphalt patch - pothole SF -$ -$ -$ -$

CNC ASPS + Asphalt seal coat SF -$ -$ -$ -$

CNC ASPSC + Asphalt cutting - driveway (per LF per inch of saw depth) LF -$ -$ -$ -$

CNC ASPT + Asphalt tack emulsion - SS1H SF -$ -$ -$ -$

CNC BENCH & Concrete bench LF -$ -$ -$ -$

CNC BIDITM + Concrete & Asphalt (Bid Item) EA -$ -$ -$ -$

CNC BLNKT + Insulated concrete blanket - 6' x 25' DA -$ -$ -$ -$

CNC BM & Concrete Post & Beam construction - Beams CY -$ -$ -$ -$

CNC CCRSD + Concrete caisson - reinforced - slurry drilled CY -$ -$ -$ -$

CNC COL & Concrete Post & Beam construction - Posts CY -$ -$ -$ -$

CNC COLAY + Overlay top coat - stamped polymer-modified concrete SF -$ -$ -$ -$

CNC COLAY- + Overlay top coat - textured - modified concrete SF -$ -$ -$ -$

CNC CORI + Concrete core drilling - 1" diameter x 1" deep EA -$ -$ -$ -$

CNC COR2 + Concrete core drilling - 2" diameter x 1" deep EA -$ -$ -$ -$

CNC COR3 + Concrete core drilling - 3" diameter x 1" deep EA -$ -$ -$ -$

CNC COR4 + Concrete core drilling - 4" diameter x 1" deep EA -$ -$ -$ -$

CNC CORMN + Concrete core drilling - Minimum charge EA -$ -$ -$ -$

CNC CRBGTR & Curb and Gutter - 24" - 30" LF -$ -$ -$ -$

CNC CS + Concrete sealer - brush or spray applied SF -$ -$ -$ -$

CNC CURB & Curb wall - 24" x 8" LF -$ -$ -$ -$

CNC CURB6 & Curb wall - up to 6" x 6" LF -$ -$ -$ -$

CNC CYMN + Concrete CY - Minimum charge EA -$ -$ -$ -$

CNC DKCOLAY & Overlay for exterior decking - stamped polymer concrete SF -$ -$ -$ -$

CNC DYE + Concrete dye - additional charge SF -$ -$ -$ -$

CNC EDGE & Concrete slab - turned down edge CY -$ -$ -$ -$

CNC EJP + Expansion joint - Plastic/PVC LF -$ -$ -$ -$

CNC EJPCA + Expansion joint replacement cap - Plastic/PVC LF -$ -$ -$ -$

CNC EPIT + Concrete - Elevator pit EA -$ -$ -$ -$

CNC EPX + Epoxy injection - concrete repair (per LF of crack) LF -$ -$ -$ -$

CNC EPXC + Epoxy crack and joint filler (per LF of crack) LF -$ -$ -$ -$

CNC EPXF + Epoxy finish - one coat over concrete floor SF -$ -$ -$ -$

CNC EPXF2 + Epoxy finish - two coats over concrete floor SF -$ -$ -$ -$

CNC EPXFN + Epoxy finish - two coats over concrete floor - non-slip SF -$ -$ -$ -$

CNC EPXMN + Epoxy injection - concrete repair - Minimum charge EA -$ -$ -$ -$

CNC FRP & Fiber Reinforced Concrete panels SF -$ -$ -$ -$

CNC FRP+ & Fiber Reinforced Concrete panels - High grade SF -$ -$ -$ -$

CNC FTA + Footings - step charge add on - up to 4' rise EA -$ -$ -$ -$

CNC FTA> + Footings - step charge add on - over 4' rise EA -$ -$ -$ -$

CNC FTG & Footings - labor & materials - Reinforced CY -$ -$ -$ -$

CNC FTG- & Footings - labor and materials CY -$ -$ -$ -$

CNC FTGLF & Footings - 24" x 10" LF -$ -$ -$ -$

CNC FTGPCB & Footings - pre-cast block - 4" x 14" x 14" EA -$ -$ -$ -$

CNC FW & Concrete wall - labor & materials - Reinforced CY -$ -$ -$ -$

CNC FW- & Concrete wall - labor & materials CY -$ -$ -$ -$

CNC FW> & Concrete wall - over 8' high - labor & materials CY -$ -$ -$ -$

CNC FWA + Concrete wall - Additional charge for vertical rise EA -$ -$ -$ -$

CNC FWDIA + Diaphragm concrete wall - labor & materials - Reinforced CY -$ -$ -$ -$

CNC FWlB10 & Composite ICF block - up to 10" wide - concrete core SF -$ -$ -$ -$

CNC FWIB12 & Composite ICF block - 12" wide - concrete core SF -$ -$ -$ -$

CNC FWICF & Insulated concrete form wall - 8" solid concrete core SF -$ -$ -$ -$

CNC FWICF4 & Insulated concrete form wall - 4" solid concrete core SF -$ -$ -$ -$

CNC FWICF6 & Insulated concrete form wall - 6" solid concrete core SF -$ -$ -$ -$

CNC FWLF & Concrete wall - 8" x 8' - labor and material - Reinforced LF -$ -$ -$ -$

CNC FWS + Foundation wall sawing - 8" wall LF -$ -$ -$ -$

Page 31: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CNC FWSMN + Foundation wall sawing - Minimum charge EA -$ -$ -$ -$

CNC GBM & Concrete grade beam CY -$ -$ -$ -$

CNC GUN & Pneumatically spray cone. - per inch thick.- no wire mesh SF -$ -$ -$ -$

CNC GUNM & Wire mesh for pneumatically sprayed concrete - 6"x 6", SF -$ -$ -$ -$

#10

CNC GWDW & Guide walls for diaphragm wall LF -$ -$ -$ -$

CNC HDSTP & Concrete hold down strap EA -$ -$ -$ -$

CNC KNEE & Concrete kneewalls - 8" wall SF -$ -$ -$ -$

CNC LAB + Concrete Finisher - per hour HR -$ -$ -$ -$

CNC LABL + Concrete - General Laborer - per hour HR -$ -$ -$ -$

CNC LWG1 & Light weight, gypsum concrete - 1" thick SF -$ -$ -$ -$

CNC LWG1.5 & Light weight, gypsum concrete - 1 1/2" thick SF -$ -$ -$ -$

CNC LWGYP & Light weight, gypsum concrete - 1/2" thick SF -$ -$ -$ -$

CNC MN + Miscellaneous Concrete - Labor Minimum EA -$ -$ -$ -$

CNC NS + Non-slip aluminum oxide finish SF -$ -$ -$ -$

CNC PATCH + Concrete patch / small repair EA -$ -$ -$ -$

CNC PCAB & Precast concrete - anchor block EA -$ -$ -$ -$

CNC PCB & Precast concrete - barrier wall LF -$ -$ -$ -$

CNC PCPNL & Architectural precast panel SF -$ -$ -$ -$

CNC PCPNL+ & Architectural precast panel - High grade SF -$ -$ -$ -$

CNC PIER & Concrete pier or footing with post anchor EA -$ -$ -$ -$

CNC PIERDCY + Deck pier or footing CY -$ -$ -$ -$

CNC PIL & Concrete pilaster CY -$ -$ -$ -$

CNC PILE + Concrete Piles - 18" diameter LF -$ -$ -$ -$

CNC PILE< + Concrete Piles - 12" diameter LF -$ -$ -$ -$

CNC PILE> + Concrete Piles - 24" diameter LF -$ -$ -$ -$

CNC PILEC & Concrete Pile Caps CY -$ -$ -$ -$

CNC PRECHP + Precast concrete - hollow core - 8" T&G SF -$ -$ -$ -$

CNC PRECTD + Precast concrete - double tee SF -$ -$ -$ -$

CNC PSTA4 + Post anchor - 4" EA -$ -$ -$ -$

CNC PSTA6 + Post anchor - 6" EA -$ -$ -$ -$

CNC PUMP + Concrete pump truck (per hour) HR -$ -$ -$ -$

CNC PUMPCY + Additional concrete pumping fee - per CY of concrete CY -$ -$ -$ -$

CNC RAMP & Concrete ramp slab on grade SF -$ -$ -$ -$

CNC RB10 & Steel rebar - #10 (1-1/4") LF -$ -$ -$ -$

CNC RB3 & Steel rebar - #3 (3/8") LF -$ -$ -$ -$

CNC RB4 & Steel rebar - #4 (1/2") LF -$ -$ -$ -$

CNC RB5 & Steel rebar - #5 (5/8") LF -$ -$ -$ -$

CNC RB6 & Steel rebar - #6 (3/4") LF -$ -$ -$ -$

CNC RB7 & Steel rebar - #7 (7/8") LF -$ -$ -$ -$

CNC RB8 & Steel rebar - #8 (1") LF -$ -$ -$ -$

CNC RB9 & Steel rebar - #9 (1-1/8") LF -$ -$ -$ -$

CNC RBJ42 + Steel rebar - j-bar - #4, 2' 6" EA -$ -$ -$ -$

CNC RBJ43 + Steel rebar - j-bar - #4, 3' 6" EA -$ -$ -$ -$

CNC RBJ44 + Steel rebar - j-bar - #4, 4' 6" EA -$ -$ -$ -$

CNC RBJ47 + Steel rebar - j-bar - #4, 7' 6" EA -$ -$ -$ -$

CNC RBJ52 + Steel rebar - j-bar - #5, 2' 6" EA -$ -$ -$ -$

CNC RBJ53 + Steel rebar - j-bar - #5, 3' 6" EA -$ -$ -$ -$

CNC RBJ54 + Steel rebar - j-bar - #5, 4' 6" EA -$ -$ -$ -$

CNC RBJ57 + Steel rebar - j-bar - #5, 7' 6" EA -$ -$ -$ -$

CNC SAW4 + Concrete floor sawing - 4" slab LF -$ -$ -$ -$

CNC SAW6 + Concrete floor sawing - 6" slab LF -$ -$ -$ -$

CNC SAWMN + Concrete floor sawing - Minimum charge EA -$ -$ -$ -$

CNC SAWSL + Concrete cutting - slab (per LF per inch of saw depth) LF -$ -$ -$ -$

CNC SAWW + Concrete cutting - wall (per LF per inch of saw depth) LF -$ -$ -$ -$

CNC SAWWE + Concrete cutting - basement egress window EA -$ -$ -$ -$

CNC SFBX & Smoke house firebox - precast concrete EA -$ -$ -$ -$

CNC SFCS & Slat flooring - Concrete - suspended SF -$ -$ -$ -$

CNC SHORE + Shoring for suspended concrete SF -$ -$ -$ -$

CNC SHOVEL & Shovel footings CY -$ -$ -$ -$

CNC SL12 & Concrete slab on grade - 12" - finished in place SF -$ -$ -$ -$

CNC SL2 & Concrete slab on grade - 2" - finished in place SF -$ -$ -$ -$

CNC SL4 & Concrete slab on grade - 4" - finished in place SF -$ -$ -$ -$

CNC SL6 & Concrete slab on grade - 6" - finished in place SF -$ -$ -$ -$

CNC SL6S + Concrete slab - suspended - 6" - finished in place SF -$ -$ -$ -$

Page 32: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CNC SL8 & Concrete slab on grade - 8" - finished in place SF -$ -$ -$ -$

CNC SLCY & Concrete slab on grade - finished in place CY -$ -$ -$ -$

CNC SLDEP + Add for depressed slab LF -$ -$ -$ -$

CNC SLFM + Add for fiber mesh - 4" concrete slab SF -$ -$ -$ -$

CNC SLFMAT + Concrete slab - 48" foundation mat - finished in place SF -$ -$ -$ -$

CNC SLFMCY + Add for fiber mesh - per cubic yard CY -$ -$ -$ -$

CNC SLICF10 + ICF flooring system - 10" thick form SF -$ -$ -$ -$

CNC SLICF12 + ICF flooring system - 12" thick form SF -$ -$ -$ -$

CNC SLICF8 + ICF flooring system - 8" thick form SF -$ -$ -$ -$

CNC SLLW & Concrete slab - light weight concrete CY -$ -$ -$ -$

CNC SLMMAT & Concrete slab mud mat 3" float finish SF -$ -$ -$ -$

CNC SLPST & Concrete - post tensioned slab - 7" SF -$ -$ -$ -$

CNC SLPT1 & Concrete post tensioning - 1' grid SF -$ -$ -$ -$

CNC SLPT2 & Concrete post tensioning - 2' grid SF -$ -$ -$ -$

CNC SLPT3 & Concrete post tensioning - 3' grid SF -$ -$ -$ -$

CNC SLPT4 & Concrete post tensioning - 4' grid SF -$ -$ -$ -$

CNC SLPTLF + Concrete post tensioning - per lineal foot LF -$ -$ -$ -$

CNC SLPTN + Add for color & stamped pattern (brick/stone) in slab SF -$ -$ -$ -$

CNC SLRE3 & Concrete slab reinforcement - #3 (3/8") - grid, 24" ea way SF -$ -$ -$ -$

CNC SLRE3< & Concrete slab reinforcement - #3 (3/8") - grid, 12" ea way SF -$ -$ -$ -$

CNC SLRE4 & Concrete slab reinforcement - #4 (1/2") - grid, 24" ea way SF -$ -$ -$ -$

CNC SLRE4< & Concrete slab reinforcement - #4 (1/2") - grid, 12" ea way SF -$ -$ -$ -$

CNC SLRE8 & Concrete slab reinforcement - #8 (1") - grid, 10" ea way SF -$ -$ -$ -$

CNC SLREM & Concrete slab reinforcement - 6" x 6", #10 wire mesh SF -$ -$ -$ -$

CNC SLWA + Concrete - suspended waffle slab - Commercial SF -$ -$ -$ -$

CNC SPLASH & Splash block - precast concrete EA -$ -$ -$ -$

CNC STBC + Stabilization: Drilling/casing - per LF LF -$ -$ -$ -$

CNC STBCGCY + Stabilization: Compaction grout - per CY CY -$ -$ -$ -$

CNC STBCGM + Stabilization: Compaction/Slurry grout - mobilization EA -$ -$ -$ -$

CNC STBCHG + Stabilization: Chemical grout - Polyurethane - per LB LB -$ -$ -$ -$

CNC STBCHGM + Stabilization: Chem. grout up to 500 lbs. & mobilization EA -$ -$ -$ -$

CNC STBCHGP + Stabilization: Chemical grout - Permeation - per GL GL -$ -$ -$ -$

CNC STBPC + Stabilization: Concrete push pier system (Bid Item) EA -$ -$ -$ -$

CNC STBPH + Stabilization: Helical pier system (Bid Item) EA -$ -$ -$ -$

CNC STBSG + Stabilization: Slurry grout - per CF CF -$ -$ -$ -$

CNC STBSSC + Stabilization: Slurry shift charge EA -$ -$ -$ -$

CNC STBUP + Stabilization: Underpinning - per pin EA -$ -$ -$ -$

CNC STP & Concrete step - labor & material CY -$ -$ -$ -$

CNC STPC1 & Precast steps - concrete - 1 to 2 risers - 4' wide EA -$ -$ -$ -$

CNC STPC1> & Precast steps - concrete - 1 to 2 risers - 5' wide EA -$ -$ -$ -$

CNC STPC1>> & Precast steps - concrete - 1 to 2 risers - 6' wide EA -$ -$ -$ -$

CNC STPC3 & Precast steps - concrete - 3 to 4 risers - 4' wide EA -$ -$ -$ -$

CNC STPC3> & Precast steps - concrete - 3 to 4 risers - 5' wide EA -$ -$ -$ -$

CNC STPC3>> & Precast steps - concrete - 3 to 4 risers - 6' wide EA -$ -$ -$ -$

CNC STPC5 & Precast steps - concrete - 5 to 6 risers - 4' wide EA -$ -$ -$ -$

CNC STPC5> & Precast steps - concrete - 5 to 6 risers - 5' wide EA -$ -$ -$ -$

CNC STPC5>> & Precast steps - concrete - 5 to 6 risers - 6' wide EA -$ -$ -$ -$

CNC STPM & Concrete step - monument stair - labor & materials CY -$ -$ -$ -$

CNC STR & Stairway - suspended concrete - straight (per riser) EA -$ -$ -$ -$

CNC STRC & Stairway - suspended concrete - curved (per riser) EA -$ -$ -$ -$

CNC STRL & Stairway landing - suspended concrete SF -$ -$ -$ -$

CNC SWLK & Concrete sidewalk - finished in place SF -$ -$ -$ -$

CNC TILT10 & Tilt-up concrete panel, 10" thick SF -$ -$ -$ -$

CNC TILT6 & Tilt-up concrete panel, 6" thick SF -$ -$ -$ -$

CNC TILT8 & Tilt-up concrete panel, 8" thick SF -$ -$ -$ -$

CNC TILTLW + Add for light weight concrete SF -$ -$ -$ -$

CNC TILTPEB + Add for aggregate (pebble) finish SF -$ -$ -$ -$

CNC TILTRIB + Add for ribbed or ornamental finish SF -$ -$ -$ -$

CNC TILTRUB + Add for rubbed finish SF -$ -$ -$ -$

CNC TILTRUS + Add for rustication - feature/chamfer strips LF -$ -$ -$ -$

CNC TILTSB + Add for sandblasted finish SF -$ -$ -$ -$

CNC TILTSCB + Add for sand casting bed (forming tilt-up on ground) SF -$ -$ -$ -$

CNC TR + Concrete formed underfloor trench LF -$ -$ -$ -$

CNC TUBE10 + Spiral wound fiberboard tube - 10" LF -$ -$ -$ -$

CNC TUBE12 + Spiral wound fiberboard tube - 12" LF -$ -$ -$ -$

Page 33: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CNC TUBE16 + Spiral wound fiberboard tube - 16" LF -$ -$ -$ -$

CNC TUBE24 + Spiral wound fiberboard tube - 24" LF -$ -$ -$ -$

CNC TUBE8 + Spiral wound fiberboard tube - 8" LF -$ -$ -$ -$

CNC VAULT & Poured in place concrete vault SF -$ -$ -$ -$

CNC WP + Concrete waterproof admixture - additional charge CY -$ -$ -$ -$

CNC WWAY & Concrete waterway - 2' wide LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

CON BIDITM + Content Manipulation (Bid Item) EA -$ -$ -$ -$

CON LAB + Content Manipulation charge - per hour HR -$ -$ -$ -$

CON LABA + Content Manipulation charge - per hour - after hours HR -$ -$ -$ -$

CON PROT + Protect contents - Cover with plastic SF -$ -$ -$ -$

CON ROOM + Contents - move out then reset EA -$ -$ -$ -$

CON ROOM< + Contents - move out then reset - Small room EA -$ -$ -$ -$

CON ROOM> + Contents - move out then reset - Large room EA -$ -$ -$ -$

CON ROOM» + Contents - move out then reset - Extra large room EA -$ -$ -$ -$

CON STOPC + Job-site cargo/storage container - 20' long - per month MO -$ -$ -$ -$

CON STOPC< + Job-site cargo/storage container - 16' long - per month MO -$ -$ -$ -$

CON STOPC> + Job-site cargo/storage container - 40' long - per month MO -$ -$ -$ -$

CON STOPCD + Job-site cargo container - pick up/del. (each way) 16'-40' EA -$ -$ -$ -$

CON STOPM + Job-site moving/storage container - 20' long - per month MO -$ -$ -$ -$

CON STOPM< + Job-site moving/storage container - 16' long - per month MO -$ -$ -$ -$

CON STOPM« + Job-site moving/storage container - 12' long - per month MO -$ -$ -$ -$

CON STOPMD + Job-site moving container - pick up/del. (ea. way) 12'-20' EA -$ -$ -$ -$

CON STOPP + Padlock/disc lock EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

DMO BAG - Plastic contractor debris bag EA -$ -$ -$ -$

DMO BARR - Dust control barrier per square foot SF -$ -$ -$ -$

DMO BARRP - Dust control barrier - tension post - per day DA -$ -$ -$ -$

DMO BIDITM - General Demolition (Bid Item) EA -$ -$ -$ -$

DMO CAR - Landfill fees - (per ton) EA -$ -$ -$ -$

DMO DCHUT - Debris chute hopper - per week - 30" x 4' section WK -$ -$ -$ -$

DMO DCHUTH - Debris chute - per week - 30" x 4' section WK -$ -$ -$ -$

DMO DCHUTM - Debris chute mounting hardware - per week WK -$ -$ -$ -$

DMO DD - Debris disposal - (Bid Item) EA -$ -$ -$ -$

DMO DTRLR - Tandem axle dump trailer - per load - including dump fees EA -$ -$ -$ -$

DMO DTRUCK - Single axle dump truck - per load - including dump fees EA -$ -$ -$ -$

DMO DUMP - Dumpster load - Approx. 20 yards, 4 tons of debris EA -$ -$ -$ -$

DMO DUMP< - Dumpster load - Approx. 12 yards, 1-3 tons of debris EA -$ -$ -$ -$

DMO DUMP> - Dumpster load - Approx. 30 yards, 5-7 tons of debris EA -$ -$ -$ -$

DMO DUMP» - Dumpster load - Approx. 40 yards, 7-8 tons of debris EA -$ -$ -$ -$

DMO H - Demolish/remove home (1001 sf - 2000 sf) SF -$ -$ -$ -$

DMO H< - Demolish/remove home (400 sf - 1000 sf) SF -$ -$ -$ -$

DMO H> - Demolish/remove home (2001 sf - 3000 sf) SF -$ -$ -$ -$

DMO H» - Demolish/remove home (3001 sf or greater) SF -$ -$ -$ -$

DMO HM - Demolish/remove home - masonry ext. (1001 sf - 2000 sf) SF -$ -$ -$ -$

DMO HM< - Demolish/remove home - masonry ext. (400 sf - 1000 sf) SF -$ -$ -$ -$

DMO HM> - Demolish/remove home - masonry ext. (2001 sf - 3000 sf) SF -$ -$ -$ -$

DMO HM>> - Demolish/remove home - masonry ext. (3001 sf or greater) SF -$ -$ -$ -$

DMO HRBDR - Demolish/remove - bedroom/room (up to 200 sf) SF -$ -$ -$ -$

DMO HRBDR> - Demolish/remove - bedroom/room (over 200 sf) SF -$ -$ -$ -$

DMO HRBR - Demolish/remove - bathroom (up to 50 sf) SF -$ -$ -$ -$

DMO HRBR> - Demolish/remove - bathroom (over 50 sf) SF -$ -$ -$ -$

DMO HRG - Demolish/remove detached garage SF -$ -$ -$ -$

DMO HRGM - Demolish/remove detached garage - masonry exterior SF -$ -$ -$ -$

DMO HRK - Demolish/remove - kitchen/laundry SF -$ -$ -$ -$

DMO LAB - General Demolition - per hour HR -$ -$ -$ -$

DMO MASKFL - Floor protection - self-adhesive plastic film SF -$ -$ -$ -$

DMO MASKFLP - Floor protection - cloth - skid resistant, leak proof SF -$ -$ -$ -$

DMO MASKFP+ - Floor prot. - cloth - skid resist, leak proof, cleanable SF -$ -$ -$ -$

Page 34: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

DMO MASKFPB - Floor protection - cloth - skid resistant, breathable SF -$ -$ -$ -$

DMO MASKSF - Mask or cover per square foot SF -$ -$ -$ -$

DMO MASKSFC - Floor protection - corrugated cardboard and tape SF -$ -$ -$ -$

DMO MASKSFP - Floor protection - heavy paper and tape SF -$ -$ -$ -$

DMO NDP - Dumpster load - per independent dumpster company EA -$ -$ -$ -$

DMO PU - Haul debris - per pickup truck load - including dump fees EA -$ -$ -$ -$

DMO TREE - Tree - tear out and disposal - 12" to 24" diameter EA -$ -$ -$ -$

DMO TREE< - Tree - tear out and disposal - under 12" diameter EA -$ -$ -$ -$

DMO TREE> - Tree - tear out and disposal - 24" to 36" diameter EA -$ -$ -$ -$

DMO TREEC - Tree - removal - 12" to 24" diameter / large canopy EA -$ -$ -$ -$

DMO TREEC< - Tree - removal - under 12" diameter / large canopy EA -$ -$ -$ -$

DMO TREEC> - Tree - removal - 24" to 36" diameter / large canopy EA -$ -$ -$ -$

DMO TREEHR - Tree - removal and disposal - per hour including equipment HR -$ -$ -$ -$

DMO TREELHR - Tree - removal - per hour (Labor only) HR -$ -$ -$ -$

DMO TSGR - Tree stump grinding - 12" to 24" diameter - per stump EA -$ -$ -$ -$

DMO TSGR< - Tree stump grinding - under 12" diameter - per stump EA -$ -$ -$ -$

DMO TSGR> - Tree stump grinding - 24" to 36" diameter - per stump EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

DOR A + Door astragal LF -$ -$ -$ -$

DOR ALDP & Interior door - solid alder - paneled - pre-hung unit EA -$ -$ -$ -$

DOR ALDP- & Interior door - solid alder - paneled - slab only EA -$ -$ -$ -$

DOR ALDP8 & Interior door, 8' - solid alder - paneled - pre-hung EA -$ -$ -$ -$

DOR ALDP8- & Interior door, 8' - solid alder - paneled - slab only EA -$ -$ -$ -$

DOR ALDPD & Interior double door - solid alder - paneled - pre-hung EA -$ -$ -$ -$

DOR ALDPR & Interior door - solid alder - panel - radius top - prehung EA -$ -$ -$ -$

DOR ALDPX & Exterior door - solid alder - paneled EA -$ -$ -$ -$

DOR ALDPX8 & Exterior door, 8' - solid alder - paneled EA -$ -$ -$ -$

DOR ALDPXR & Exterior door - solid alder - paneled - radius top EA -$ -$ -$ -$

DOR ALDPXS & Exterior door - solid alder - paneled - slab only EA -$ -$ -$ -$

DOR ALDPXS8 & Exterior door, 8' - solid alder - paneled - slab only EA -$ -$ -$ -$

DOR AV & Interior door unit EA -$ -$ -$ -$

DOR AV- & Interior door unit - Standard grade EA -$ -$ -$ -$

DOR AV+ & Interior door unit - High grade EA -$ -$ -$ -$

DOR AV++ & Interior door unit - Premium grade EA -$ -$ -$ -$

DOR AVB & Interior barn door - 24" wide - aluminum coated EA -$ -$ -$ -$

w/hardware

DOR AVM & Interior door unit - mobile home EA -$ -$ -$ -$

DOR AVM- & Interior door unit - mobile home - Standard grade EA -$ -$ -$ -$

DOR AVM+ & Interior door unit - mobile home - High grade EA -$ -$ -$ -$

DOR AVM++ & Interior door unit - mobile home - Premium grade EA -$ -$ -$ -$

DOR BCD & Basement/cellar/bulkhead door - steel - 4' x 4' EA -$ -$ -$ -$

DOR BCD+ & Basement/cellar/bulkhead door - poly - High grade EA -$ -$ -$ -$

DOR BCD> & Basement/cellar/bulkhead door - steel - up to 5' x 7' EA -$ -$ -$ -$

DOR BF & Bifold door set - Colonist - Double EA -$ -$ -$ -$

DOR BF- & Bifold door set - lauan/mahogany - Double EA -$ -$ -$ -$

DOR BF+ & Bifold door set - Birch veneer - Double EA -$ -$ -$ -$

DOR BF++ & Bifold door set - solid core - half louvered - Double EA -$ -$ -$ -$

DOR BF< & Bifold door - Colonist - Single EA -$ -$ -$ -$

DOR BF<- & Bifold door - lauan/mahogany - Single EA -$ -$ -$ -$

DOR BF<+ & Bifold door - Birch veneer - Single EA -$ -$ -$ -$

DOR BF<++ & Bifold door - solid core - half louvered - Single EA -$ -$ -$ -$

DOR BF<RS + Bifold door - (2 slabs only) - Single - Detach & reset EA -$ -$ -$ -$

DOR BFLVR & Bifold door set - full louvered - Double EA -$ -$ -$ -$

DOR BFLVR< & Bifold door - full louvered - Single EA -$ -$ -$ -$

DOR BFMIR & Bifold mirrored door set - Double EA -$ -$ -$ -$

DOR BFMIR+ & Bifold mirrored door set - High grade - Double EA -$ -$ -$ -$

DOR BFMIR< & Bifold mirrored door - Single EA -$ -$ -$ -$

DOR BFMIR<+ & Bifold mirrored door - High grade - Single EA -$ -$ -$ -$

DOR BFPNL & Bifold door set - solid fir 4 or 6 panel - Double EA -$ -$ -$ -$

DOR BFPNL< & Bifold door - solid fir 4 or 6 panel - Single EA -$ -$ -$ -$

DOR BFRS + Bifold door set - (4 slabs only) - Double Detach & reset EA -$ -$ -$ -$

DOR BFXH & Bifold door - exterior horizontal (agricultural use) EA -$ -$ -$ -$

Page 35: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

DOR BFXH90 & Bifold door - exterior horizontal - 90' x 20' - Commercial EA -$ -$ -$ -$

DOR BIDITM + Doors (Bid Item) EA -$ -$ -$ -$

DOR BIRCH & Interior door - birch - pre-hung unit EA -$ -$ -$ -$

DOR BIRCH- & Interior door - birch - slab only EA -$ -$ -$ -$

DOR BIRCH+ & Interior door - birch - stain grade jamb & casing EA -$ -$ -$ -$

DOR BIRCHDH & Interior double door - birch - pre-hung unit EA -$ -$ -$ -$

DOR BP & Bypass (sliding) door set - Colonist EA -$ -$ -$ -$

DOR BP- & Bypass (sliding) door set - lauan/mahogany EA -$ -$ -$ -$

DOR BP+ & Bypass (sliding) door set - birch EA -$ -$ -$ -$

DOR BP++ & Bypass (sliding) door set - panel EA -$ -$ -$ -$

DOR BPMIR & Bypass mirrored door set EA -$ -$ -$ -$

DOR BPMIR+ & Bypass mirrored door set - High grade EA -$ -$ -$ -$

DOR BPRS + Bypass (sliding) door set - slabs only - Detach & reset EA -$ -$ -$ -$

DOR CAFE & Cafe doors - Louvered pair - up to 36" wide EA -$ -$ -$ -$

DOR CAFERS + Cafe doors set - Detach & reset EA -$ -$ -$ -$

DOR CDA & Curtain Door - 14' x 14' cable winch EA -$ -$ -$ -$

DOR CDA> & Curtain Door - 18' x 18' cable winch EA -$ -$ -$ -$

DOR CDM & Curtain Door - 17' x 18' hand crank EA -$ -$ -$ -$

DOR COL & Interior door - Colonist - pre-hung unit EA -$ -$ -$ -$

DOR COL- & Interior door - Colonist - slab only EA -$ -$ -$ -$

DOR COL+ & Interior door - Colonist - stain grade jamb & casing EA -$ -$ -$ -$

DOR COL8 & Interior door, 8' - Colonist - pre-hung unit EA -$ -$ -$ -$

DOR COL8- & Interior door, 8' - Colonist - slab only EA -$ -$ -$ -$

DOR COL8+ & Interior door, 8' - Colonist - stain grade jamb and casing EA -$ -$ -$ -$

DOR COLD & Interior double door - Colonist - pre-hung unit EA -$ -$ -$ -$

DOR COLD8 & Interior double door, 8' - Colonist - pre-hung unit EA -$ -$ -$ -$

DOR COLS & Interior door - solid core Colonist - pre-hung unit EA -$ -$ -$ -$

DOR COLS- & Interior door - solid core Colonist - slab only EA -$ -$ -$ -$

DOR COLS8 & Interior door, 8' - solid core Colonist - pre-hung unit EA -$ -$ -$ -$

DOR COLS8- & Interior door, 8' - solid core Colonist - slab only EA -$ -$ -$ -$

DOR COLS8+ & Interior door, 8' - solid core - stain grade jamb and case EA -$ -$ -$ -$

DOR COLSD & Interior double door - solid core Colonist - pre-hung unit EA -$ -$ -$ -$

DOR COLSD8 & Interior double door, 8' - solid core Colonist - pre-hung EA -$ -$ -$ -$

DOR DB + On site door prep. for deadbolt - Labor only EA -$ -$ -$ -$

DOR DOR8RS + Interior door, 8' - Detach & reset EA -$ -$ -$ -$

DOR DORD8RS + Interior double door, 8' - Detach & reset EA -$ -$ -$ -$

DOR DORDRS + Interior double door - Detach & reset EA -$ -$ -$ -$

DOR DOR-R + Interior door - Reset - slab only EA -$ -$ -$ -$

DOR DORRS + Interior door - Detach & reset EA -$ -$ -$ -$

DOR DOR-RS + Interior door - Detach & reset - slab only EA -$ -$ -$ -$

DOR DUTCH & Exterior door - Dutch - pre-hung unit EA -$ -$ -$ -$

DOR DUTCH- & Exterior door - Dutch - slabs only EA -$ -$ -$ -$

DOR DUTRS + Dutch door - Detach & reset EA -$ -$ -$ -$

DOR DUT-RS + Dutch door - Detach & reset - slab only EA -$ -$ -$ -$

DOR FLD & Folding door EA -$ -$ -$ -$

DOR FR2RS + French double door set - Detach & reset EA -$ -$ -$ -$

DOR FRI & French door - Interior - single - pre-hung unit EA -$ -$ -$ -$

DOR FRI- & French door - Interior - wood - slab only EA -$ -$ -$ -$

DOR FRI+ & French door - Interior - stain grade jamb & casing EA -$ -$ -$ -$

DOR FRI2 & French double door set - Interior - pre-hung unit EA -$ -$ -$ -$

DOR FRI2+ & French double door set - Interior - pre-hung - stain grade EA -$ -$ -$ -$

DOR FRI8 & French door, 8' - Interior - single - pre-hung unit EA -$ -$ -$ -$

DOR FRI8- & French door, 8' - Interior - wood - slab only EA -$ -$ -$ -$

DOR FRI82 & French double door set, 8' - Interior - pre-hung unit EA -$ -$ -$ -$

DOR FRRS + French door - Detach & reset EA -$ -$ -$ -$

DOR FRX & French door - Exterior - pre-hung unit EA -$ -$ -$ -$

DOR FRX- & French door - Exterior - wood - slab only EA -$ -$ -$ -$

DOR FRX+ & French door - Exterior - stain grade jamb & casing EA -$ -$ -$ -$

DOR FRX2 & French double doors - Exterior - pre-hung unit EA -$ -$ -$ -$

DOR FRX2+ & French double doors - Exterior - stain grade jamb & casing EA -$ -$ -$ -$

DOR FRXM & French door - Exterior - metal - insulated - pre-hung unit EA -$ -$ -$ -$

DOR FRXM- & French door - Exterior - metal - insulated - slab only EA -$ -$ -$ -$

DOR FRXM2 & French double doors - Ext. -metal - insul. - pre-hung unit EA -$ -$ -$ -$

DOR HID & Hidden door SF -$ -$ -$ -$

DOR HD+ & Hidden door - High grade SF -$ -$ -$ -$

Page 36: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

DOR HDB & Hidden door - Bookcase SF -$ -$ -$ -$

DOR LAB + Door Installer/Finish Carpenter - per hour HR -$ -$ -$ -$

DOR LABL + Door - General Laborer - per hour HR -$ -$ -$ -$

DOR LBL & Glass lite with encased blinds - full lite EA -$ -$ -$ -$

DOR LBL1/2 & Glass lite with encased blinds - half lite EA -$ -$ -$ -$

DOR LBLSL & Glass lite with encased blinds - side lite glazing EA -$ -$ -$ -$

DOR LV & Louvered insert, up to 18" x 12" EA -$ -$ -$ -$

DOR LVR & Interior door - full louvered - pre-hung unit EA -$ -$ -$ -$

DOR LVR- & Interior door - half louvered - pre-hung unit EA -$ -$ -$ -$

DOR MAH & Interior door - lauan/mahogany - pre-hung unit EA -$ -$ -$ -$

DOR MAH- & Interior door - lauan/mahogany - slab only EA -$ -$ -$ -$

DOR MAH+ & Interior door - lauan/mahogany - stain grade jamb & case EA -$ -$ -$ -$

DOR MAH++ & Interior door - lauan/mahogany - mahogany jamb & casing EA -$ -$ -$ -$

DOR MAHD & Interior double door - lauan/mahogany - pre-hung unit EA -$ -$ -$ -$

DOR MAHP & Interior door - solid mahogany - paneled - pre-hung unit EA -$ -$ -$ -$

DOR MAHP- & Interior door - solid mahogany - paneled - slab only EA -$ -$ -$ -$

DOR MAHP8 & Interior door, 8' - solid mahogany - paneled - pre-hung EA -$ -$ -$ -$

DOR MAHP8- & Interior door, 8' - solid mahogany - paneled - slab only EA -$ -$ -$ -$

DOR MAHPD & Interior double door - solid mahogany - panel - pre-hung EA -$ -$ -$ -$

DOR MAHPX & Exterior door - solid mahogany - paneled EA -$ -$ -$ -$

DOR MAHPXS & Exterior door - solid mahogany - paneled - slab only EA -$ -$ -$ -$

DOR MN + Door - Labor Minimum EA -$ -$ -$ -$

DOR MORT + On site door prep. for full mortised lockset - Labor only EA -$ -$ -$ -$

DOR OAK & Interior door - oak veneer - pre-hung unit EA -$ -$ -$ -$

DOR OAK- & Interior door - oak veneer - slab only EA -$ -$ -$ -$

DOR OAK+ & Interior door - oak veneer - oak veneer jamb & casing EA -$ -$ -$ -$

DOR OAK++ & Interior door - oak veneer - solid oak jamb & casing EA -$ -$ -$ -$

DOR OAKD & Interior double door - oak veneer - pre-hung unit EA -$ -$ -$ -$

DOR OAKP & Interior door - solid oak - paneled - pre-hung unit EA -$ -$ -$ -$

DOR OAKP- & Interior door - solid oak - paneled - slab only EA -$ -$ -$ -$

DOR OAKP8 & Interior door, 8' - solid oak - paneled - pre-hung EA -$ -$ -$ -$

DOR OAKP8- & Interior door, 8' - solid oak - paneled - slab only EA -$ -$ -$ -$

DOR OAKPD & Interior double door - solid oak - paneled - pre-hung unit EA -$ -$ -$ -$

DOR OHIO & Overhead door & hardware -10' x 7' EA -$ -$ -$ -$

DOR OHIO- & Overhead door & hardware - 10' x 7' - Standard grade EA -$ -$ -$ -$

DOR OHIO+ & Overhead door & hardware - 10' x 7' - High grade EA -$ -$ -$ -$

DOR OHIO++ & Overhead door & hardware - 10' x 7' - Premium grade EA -$ -$ -$ -$

DOR OH1O++> & Overhead door & hardware - 10' x 8' - Premium grade EA -$ -$ -$ -$

DOR OH10+> & Overhead door & hardware - 10' x 8' - High grade EA -$ -$ -$ -$

DOR OHIO> & Overhead door & hardware - 10' x 8' EA -$ -$ -$ -$

DOR OH10-> & Overhead door & hardware - 10' x 8' - Standard grade EA -$ -$ -$ -$

DOR OH12 & Overhead door & hardware - 12' x 7' EA -$ -$ -$ -$

DOR OH12- & Overhead door & hardware - 12' x 7' - Standard grade EA -$ -$ -$ -$

DOR OH12+ & Overhead door & hardware - 12' x 7' - High grade EA -$ -$ -$ -$

DOR OH12++ & Overhead door & hardware - 12' x 7' - Premium grade EA -$ -$ -$ -$

DOR OH12++> & Overhead door & hardware - 12' x 8' - Premium grade EA -$ -$ -$ -$

DOR OH12+> & Overhead door & hardware - 12' x 8' - High grade EA -$ -$ -$ -$

DOR OH12> & Overhead door & hardware - 12' x 8' EA -$ -$ -$ -$

DOR OH12-> & Overhead door & hardware - 12' x 8' - Standard grade EA -$ -$ -$ -$

DOR OH16 & Overhead door & hardware - 16' x 7' EA -$ -$ -$ -$

DOR OH16- & Overhead door & hardware - 16' x 7' - Standard grade EA -$ -$ -$ -$

DOR OH16+ & Overhead door & hardware - 16' x 7' - High grade EA -$ -$ -$ -$

DOR OH16++ & Overhead door & hardware - 16' x 7' - Premium grade EA -$ -$ -$ -$

DOR OH16++> & Overhead door & hardware - 16' x 8' - Premium grade EA -$ -$ -$ -$

DOR OH16+> & Overhead door & hardware - 16' x 8' - High grade EA -$ -$ -$ -$

DOR OH16> & Overhead door & hardware - 16' x 8' EA -$ -$ -$ -$

DOR OH16-> & Overhead door & hardware - 16' x 8' - Standard grade EA -$ -$ -$ -$

DOR OH18 & Overhead door & hardware - 18' x 7' EA -$ -$ -$ -$

DOR OH18- & Overhead door & hardware - 18' x 7' - Standard grade EA -$ -$ -$ -$

DOR OH18+ & Overhead door & hardware - 18' x 7' - High grade EA -$ -$ -$ -$

DOR OH18++ & Overhead door & hardware - 18' x 7' - Premium grade EA -$ -$ -$ -$

DOR OH18++> & Overhead door & hardware - 18' x 8' - Premium grade EA -$ -$ -$ -$

DOR OH18+> & Overhead door & hardware - 18' x 8' - High grade EA -$ -$ -$ -$

DOR OH18> & Overhead door & hardware - 18' x 8' EA -$ -$ -$ -$

DOR OH18-> & Overhead door & hardware - 18' x 8' - Standard grade EA -$ -$ -$ -$

Page 37: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

DOR OH8 & Overhead door & hardware - 8' x 7' EA -$ -$ -$ -$

DOR OH8- & Overhead door & hardware - 8' x 7' - Standard grade EA -$ -$ -$ -$

DOR OH8+ & Overhead door & hardware - 8' x 7' - High grade EA -$ -$ -$ -$

DOR OH8++ & Overhead door & hardware - 8' x 7' - Premium grade EA -$ -$ -$ -$

DOR OH8++> & Overhead door & hardware - 8' x 8' - Premium grade EA -$ -$ -$ -$

DOR OH8+> & Overhead door & hardware - 8' x 8' - High grade EA -$ -$ -$ -$

DOR OH8> & Overhead door & hardware - 8' x 8' EA -$ -$ -$ -$

DOR OH8-> & Overhead door & hardware - 8' x 8' - Standard grade EA -$ -$ -$ -$

DOR OH9 & Overhead door & hardware - 9' x 7' EA -$ -$ -$ -$

DOR OH9- & Overhead door & hardware - 9' x 7' - Standard grade EA -$ -$ -$ -$

DOR OH9+ & Overhead door & hardware - 9' x 7' - High grade EA -$ -$ -$ -$

DOR OH9++ & Overhead door & hardware - 9' x 7' - Premium grade EA -$ -$ -$ -$

DOR OH9++> & Overhead door & hardware - 9' x 8' - Premium grade EA -$ -$ -$ -$

DOR OH9+> & Overhead door & hardware - 9' x 8' - High grade EA -$ -$ -$ -$

DOR OH9> & Overhead door & hardware - 9' x 8' EA -$ -$ -$ -$

DOR OH9-> & Overhead door & hardware - 9' x 8' - Standard grade EA -$ -$ -$ -$

DOR OHBPS + Overhead door bottom panel weather seal w/track LF -$ -$ -$ -$

DOR OHDORMN + Overhead Door - Labor Minimum EA -$ -$ -$ -$

DOR OHDWS + Overhead door weather stop LF -$ -$ -$ -$

DOR OHH10 & Overhead door, 10' x 7' - hardwood overlay EA -$ -$ -$ -$

DOR OHH10> & Overhead door, 10' x 8' - hardwood overlay EA -$ -$ -$ -$

DOR OHH12 & Overhead door, 12' x 7' - hardwood overlay EA -$ -$ -$ -$

DOR OHH12> & Overhead door, 12' x 8' - hardwood overlay EA -$ -$ -$ -$

DOR OHH16 & Overhead door, 16' x 7' - hardwood overlay EA -$ -$ -$ -$

DOR OHH16> & Overhead door, 16' x 8' - hardwood overlay EA -$ -$ -$ -$

DOR OHH18 & Overhead door, 18' x 7' - hardwood overlay EA -$ -$ -$ -$

DOR OHH18> & Overhead door, 18' x 8' - hardwood overlay EA -$ -$ -$ -$

DOR OHINSK + Overhead door insulation kit EA -$ -$ -$ -$

DOR OHLAB + Overhead Door Installer - per hour HR -$ -$ -$ -$

DOR OHO & Overhead (garage) door opener EA -$ -$ -$ -$

DOR OHO- & Overhead (garage) door opener - Standard grade EA -$ -$ -$ -$

DOR OHO+ & Overhead (garage) door opener - High grade EA -$ -$ -$ -$

DOR OHO++ & Overhead (garage) door opener - Premium grade EA -$ -$ -$ -$

DOR OHO+++ & Overhead (garage) door opener-Deluxe grd (smart home EA -$ -$ -$ -$

comp)

DOR OHOCH & Commercial overhead door opener - Hoist/jack-shaft type EA -$ -$ -$ -$

DOR OHOCH+ & Comm overhead door opener - Hoist/jackshaft - Heavy EA -$ -$ -$ -$

duty

DOR OHOCT & Commercial overhead door opener - Trolley type EA -$ -$ -$ -$

DOR OHOCT+ & Comm overhead door opener - Trolley type - Heavy duty EA -$ -$ -$ -$

DOR OHOKP & Keyless entry pad for overhead door opener EA -$ -$ -$ -$

DOR OHORM + Remote unit for overhead door opener EA -$ -$ -$ -$

DOR OHORS + Overhead (garage) door opener - Detach & reset EA -$ -$ -$ -$

DOR OHOS & Overhead (garage) door opener - sensors only (per pair) EA -$ -$ -$ -$

DOR OHRP & Overhead door panel - up to 12' EA -$ -$ -$ -$

DOR OHRP+ & Overhead door panel - up to 12' - High grade EA -$ -$ -$ -$

DOR OHRP++ & Overhead door panel - up to 12' - Premium grade EA -$ -$ -$ -$

DOR OHRP++> & Overhead door panel - 13' to 18' - Premium grade EA -$ -$ -$ -$

DOR OHRP+> & Overhead door panel - 13' to 18' - High grade EA -$ -$ -$ -$

DOR OHRP> & Overhead door panel - 13' to 18' EA -$ -$ -$ -$

DOR OHRRL & Overhead door - rollers only (per pair) EA -$ -$ -$ -$

DOR OHRS + Overhead door - Detach & reset EA -$ -$ -$ -$

DOR OHRS> + Overhead door - Detach & reset - Large EA -$ -$ -$ -$

DOR OHS10 & Overhead door, 10' x 7' - softwood overlay EA -$ -$ -$ -$

DOR OHS10> & Overhead door, 10' x 8' - softwood overlay EA -$ -$ -$ -$

DOR OHS12 & Overhead door, 12' x 7' - softwood overlay EA -$ -$ -$ -$

DOR OHS12> & Overhead door, 12' x 8' - softwood overlay EA -$ -$ -$ -$

DOR OHS16 & Overhead door, 16' x 7' - softwood overlay EA -$ -$ -$ -$

DOR OHS16> & Overhead door, 16' x 8' - softwood overlay EA -$ -$ -$ -$

DOR OHS18 & Overhead door, 18' x 7' - softwood overlay EA -$ -$ -$ -$

DOR OHS18> & Overhead door, 18' x 8' - softwood overlay EA -$ -$ -$ -$

DOR OHTRAK & Overhead door track LF -$ -$ -$ -$

DOR OHWD + Add for square window - overhead door - per window EA -$ -$ -$ -$

DOR OHWD+ + Add for decorative window - overhead door - per window EA -$ -$ -$ -$

DOR PDA & Pet door - thru door - automatic EA -$ -$ -$ -$

Page 38: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

DOR PDA> & Pet door - thru door - automatic - Large EA -$ -$ -$ -$

DOR PDDF & Pet door - thru door - double flap EA -$ -$ -$ -$

DOR PDDF> & Pet door - thru door - double flap - Large EA -$ -$ -$ -$

DOR PDSF & Pet door - thru door - single flap EA -$ -$ -$ -$

DOR PDSF> & Pet door - thru door - single flap - Large EA -$ -$ -$ -$

DOR PDWA & Pet door - thru wall - automatic EA -$ -$ -$ -$

DOR PDWA> & Pet door - thru wall - automatic - Large EA -$ -$ -$ -$

DOR PDWDF & Pet door - thru wall - double flap EA -$ -$ -$ -$

DOR PDWDF> & Pet door - thru wall - double flap - Large EA -$ -$ -$ -$

DOR PDWSF & Pet door - thru wall - single flap EA -$ -$ -$ -$

DOR PDWSF> & Pet door - thru wall - single flap - Large EA -$ -$ -$ -$

DOR PFD3 & Door - Steel clad - pole frame - 3068 EA -$ -$ -$ -$

DOR PFD3L & Door - Steel clad - pole frame - 3068 - w/window EA -$ -$ -$ -$

DOR PFD4 & Door - Steel clad - pole frame - 4068 EA -$ -$ -$ -$

DOR PFDSL8 & Sliding door - agricultural use - 7' high x 8' - metal EA -$ -$ -$ -$

DOR PFDSLE & Sliding door - agricultural use - 12' high x 14' - metal EA -$ -$ -$ -$

DOR PFDSLE< & Sliding door - agricultural use - 12' high x 11' - metal EA -$ -$ -$ -$

DOR PFDSLE> & Sliding door - agricultural use - 12' high x 20' - metal EA -$ -$ -$ -$

DOR PFDSLS & Sliding door - agricultural use - 12' high x 16' - metal EA -$ -$ -$ -$

DOR PFDSLS> & Sliding door - agricultural use - 12' high x 24' - metal EA -$ -$ -$ -$

DOR PFDW11 & Sliding door - agricultural use - 12' high x 11' - wood EA -$ -$ -$ -$

DOR PFDW14 & Sliding door - agricultural use - 12' high x 14' - wood EA -$ -$ -$ -$

DOR PFDW16 & Sliding door - agricultural use - 12' high x 16' - wood EA -$ -$ -$ -$

DOR PFDW20 & Sliding door - agricultural use - 12' high x 20' - wood EA -$ -$ -$ -$

DOR PFDW24 & Sliding door - agricultural use - 12' high x 24' - wood EA -$ -$ -$ -$

DOR PFDW8 & Sliding door - agricultural use - 7' high x 8' - wood EA -$ -$ -$ -$

DOR PKT & Pocket door unit - Colonist EA -$ -$ -$ -$

DOR PKT- & Pocket door unit - lauan/mahogany EA -$ -$ -$ -$

DOR PKT+ & Pocket door unit - birch EA -$ -$ -$ -$

DOR PKT++ & Pocket door unit - panel EA -$ -$ -$ -$

DOR PLN + Plane and refit door EA -$ -$ -$ -$

DOR PNL & Interior door - solid fir door w/paint-grade jamb & case EA -$ -$ -$ -$

DOR PNL- & Interior door - panel - stain grade softwood - slab only EA -$ -$ -$ -$

DOR PNL+ & Interior door - solid fir door w/stain grade jamb & case EA -$ -$ -$ -$

DOR PNLC & Interior door - clear grade pine/cedar EA -$ -$ -$ -$

DOR PNLC- & Interior door - clear grade pine/cedar - slab only EA -$ -$ -$ -$

DOR PNLD & Interior double door - paneled - softwood - pre-hung EA -$ -$ -$ -$

DOR QUCR & Quonset Bldg. - Canister door (14' x 14') EA -$ -$ -$ -$

DOR QUMD & Quonset Bldg. - Entrance door frame kit at end panels EA -$ -$ -$ -$

DOR QUSL & Quonset Bldg. - Sliding (bi-part) door (14' x 24') EA -$ -$ -$ -$

DOR R10-10 & Roll-up door & hardware - 10' x 10' - 26 gauge EA -$ -$ -$ -$

DOR R10-10+ & Roll-up door & hardware - 10' x 10' - 22 gauge EA -$ -$ -$ -$

DOR R10-12 & Roll-up door & hardware - 10' x 12' - 26 gauge EA -$ -$ -$ -$

DOR R10-12+ & Roll-up door & hardware - 10' x 12' - 22 gauge EA -$ -$ -$ -$

DOR R10-14 & Roll-up door & hardware - 10' x 14' - 26 gauge EA -$ -$ -$ -$

DOR R10-14+ & Roll-up door & hardware - 10' x 14' - 22 gauge EA -$ -$ -$ -$

DOR R10-8 & Roll-up door & hardware - 10' x 8' - 26 gauge EA -$ -$ -$ -$

DOR R10-8+ & Roll-up door & hardware - 10' x 8' - 22 gauge EA -$ -$ -$ -$

DOR R12-10 & Roll-up door & hardware - 12' x 10' - 26 gauge EA -$ -$ -$ -$

DOR R12-10+ & Roll-up door & hardware - 12' x 10' - 22 gauge EA -$ -$ -$ -$

DOR R12-12 & Roll-up door & hardware - 12' x 12' - 26 gauge EA -$ -$ -$ -$

DOR R12-12+ & Roll-up door & hardware - 12' x 12' - 22 gauge EA -$ -$ -$ -$

DOR R12-14 & Roll-up door & hardware - 12' x 14' - 26 gauge EA -$ -$ -$ -$

DOR R12-14+ & Roll-up door & hardware - 12' x 14' - 22 gauge EA -$ -$ -$ -$

DOR R12-8 & Roll-up door & hardware - 12' x 8' - 26 gauge EA -$ -$ -$ -$

DOR R12-8+ & Roll-up door & hardware - 12' x 8' - 22 gauge EA -$ -$ -$ -$

DOR R14-10 & Roll-up door & hardware - 14' x 10' - 26 gauge EA -$ -$ -$ -$

DOR R14-10+ & Roll-up door & hardware - 14' x 10' - 22 gauge EA -$ -$ -$ -$

DOR R14-12 & Roll-up door & hardware - 14' x 12' - 26 gauge EA -$ -$ -$ -$

DOR R14-12+ & Roll-up door & hardware - 14' x 12' - 22 gauge EA -$ -$ -$ -$

DOR R14-14 & Roll-up door & hardware - 14' x 14' - 26 gauge EA -$ -$ -$ -$

DOR R14-14+ & Roll-up door & hardware - 14' x 14' - 22 gauge EA -$ -$ -$ -$

DOR R14-8 & Roll-up door & hardware - 14' x 8' - 26 gauge EA -$ -$ -$ -$

DOR R14-8+ & Roll-up door & hardware - 14' x 8' - 22 gauge EA -$ -$ -$ -$

DOR R8-10 & Roll-up door & hardware - 8' x 10' - 26 gauge EA -$ -$ -$ -$

Page 39: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

DOR R8-10+ & Roll-up door & hardware - 8' x 10' - 22 gauge EA -$ -$ -$ -$

DOR R8-12 & Roll-up door & hardware - 8' x 12' - 26 gauge EA -$ -$ -$ -$

DOR R8-12+ & Roll-up door & hardware - 8' x 12' - 22 gauge EA -$ -$ -$ -$

DOR R8-14 & Roll-up door & hardware - 8' x 14' - 26 gauge EA -$ -$ -$ -$

DOR R8-14+ & Roll-up door & hardware - 8' x 14' - 22 gauge EA -$ -$ -$ -$

DOR R8-8 & Roll-up door & hardware - 8' x 8' - 26 gauge EA -$ -$ -$ -$

DOR R8-8+ & Roll-up door & hardware - 8' x 8' - 22 gauge EA -$ -$ -$ -$

DOR REV + Reverse angle track - O.H. door installation on masonry EA -$ -$ -$ -$

DOR S10-10 & Sectional overhead door, 10' x 10' EA -$ -$ -$ -$

DOR S10-10I & Sectional overhead door, 10' x 10' - insulated EA -$ -$ -$ -$

DOR S10-12 & Sectional overhead door, 10' x 12' EA -$ -$ -$ -$

DOR S10-12I & Sectional overhead door, 10' x 12' - insulated EA -$ -$ -$ -$

DOR S12-10 & Sectional overhead door, 12' x 10' EA -$ -$ -$ -$

DOR S12-10I & Sectional overhead door, 12' x 10' - insulated EA -$ -$ -$ -$

DOR S12-12 & Sectional overhead door, 12' x 12' EA -$ -$ -$ -$

DOR S12-121 & Sectional overhead door, 12' x 12' - insulated EA -$ -$ -$ -$

DOR S12-14 & Sectional overhead door, 12' x 14' EA -$ -$ -$ -$

DOR S12-141 & Sectional overhead door, 12' x 14' - insulated EA -$ -$ -$ -$

DOR S14-10 & Sectional overhead door, 14' x 10' EA -$ -$ -$ -$

DOR S14-10I & Sectional overhead door, 14' x 10' - insulated EA -$ -$ -$ -$

DOR S14-12 & Sectional overhead door, 14' x 12' EA -$ -$ -$ -$

DOR S14-121 & Sectional overhead door, 14' x 12' - insulated EA -$ -$ -$ -$

DOR S14-14 & Sectional overhead door, 14' x 14' EA -$ -$ -$ -$

DOR S14-141 & Sectional overhead door, 14' x 14' - insulated EA -$ -$ -$ -$

DOR S16-10 & Sectional overhead door, 16' x 10' EA -$ -$ -$ -$

DOR S16-10I & Sectional overhead door, 16' x 10' - insulated EA -$ -$ -$ -$

DOR S16-12 & Sectional overhead door, 16' x 12' EA -$ -$ -$ -$

DOR S16-12C & Sectional overhead door, 16' x 12' - Glass - Motorized EA -$ -$ -$ -$

DOR S16-121 & Sectional overhead door, 16' x 12' - insulated EA -$ -$ -$ -$

DOR SCRNM & Screen door - metal - 30" - 36" - full screen (no glass) EA -$ -$ -$ -$

DOR SCRNM- & Screen door - metal - 30" - 36" full scrn - Standard grade EA -$ -$ -$ -$

DOR SCRNW & Screen door - wood - 30" - 36" - full screen (no glass) EA -$ -$ -$ -$

DOR SCRNW- & Screen door - wood - 30" - 36" full scrn - Standard grade EA -$ -$ -$ -$

DOR SD3 & Steel door, 3' x 7' EA -$ -$ -$ -$

DOR SD3FL & Steel door, 3' x 7' - full louvered EA -$ -$ -$ -$

DOR SD3FR & Steel door, 3' x 7' - fire rated EA -$ -$ -$ -$

DOR SD3GL & Steel door, 3' x 7' - with glass lite EA -$ -$ -$ -$

DOR SD4 & Steel door, 4' x 7' EA -$ -$ -$ -$

DOR SD4FR & Steel door, 4' x 7' - fire rated EA -$ -$ -$ -$

DOR SDF3 & Steel door frame - 3' opening EA -$ -$ -$ -$

DOR SDF4 & Steel door frame - 4' opening EA -$ -$ -$ -$

DOR SDF6 & Steel door frame - 6' opening EA -$ -$ -$ -$

DOR SDF8 & Steel door frame - 8' opening EA -$ -$ -$ -$

DOR SDFEM + Steel door frame - Add to install in existing masonry EA -$ -$ -$ -$

DOR SDFNM + Steel door frame - Add to install in new masonry EA -$ -$ -$ -$

DOR SPAB & Special Doors - Bale access door - 4' x 8' EA -$ -$ -$ -$

DOR SPABC & Special Doors - Bale chute door EA -$ -$ -$ -$

DOR SPBH & Bulkhead door - 12' x 12' - grain storage EA -$ -$ -$ -$

DOR SPCA & Special Doors - Ceiling access EA -$ -$ -$ -$

DOR SPCA> & Special Doors - Ceiling access - Large EA -$ -$ -$ -$

DOR SPDARK & Special Doors - Revolving dark room door EA -$ -$ -$ -$

DOR SPFP & Special Doors - Folding partition - Non-sound SF -$ -$ -$ -$

DOR SPFP+ & Special Doors - Folding partition - Sound - High grade SF -$ -$ -$ -$

DOR SPGRIL & Roll-up or folding grill door - aluminum/lexan SF -$ -$ -$ -$

DOR SPHD90 & Special Doors - Hydraulic door - 90' x 20' - Commercial EA -$ -$ -$ -$

DOR SPLD & Wood door - oak face, fire rated (lead lined) EA -$ -$ -$ -$

DOR SPRCD & Special Doors - Rolling counter door SF -$ -$ -$ -$

DOR SPRCD+ & Special Doors - Rolling counter door - High grade SF -$ -$ -$ -$

DOR SPRD & Special Doors - Revolving doors EA -$ -$ -$ -$

DOR SPRD+ & Special Doors - Revolving doors - High grade EA -$ -$ -$ -$

DOR SPRH & Special Doors - Roof Hatch EA -$ -$ -$ -$

DOR SPSL & Special Doors - Sliding - pole frame - 8' high x 7'- metal EA -$ -$ -$ -$

DOR SPSLRS + Special Doors - Sliding - pole frame - Detach & reset EA -$ -$ -$ -$

DOR SPTRAF & Special Doors - Traffic impact doors - Automatic EA -$ -$ -$ -$

DOR SPTRAF+ & Special Doors - Traffic impact doors - Automatic - High sp EA -$ -$ -$ -$

Page 40: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

DOR SPV & Special Doors - Vault door - 3080 EA -$ -$ -$ -$

DOR SPV> & Special Doors - Vault door - 4880 EA -$ -$ -$ -$

DOR SPWA & Special Door - Wall access - Ventilator EA -$ -$ -$ -$

DOR STRMD & Storm door assembly EA -$ -$ -$ -$

DOR STRMD- & Storm door assembly - Standard grade EA -$ -$ -$ -$

DOR STRMD+ & Storm door assembly - High grade EA -$ -$ -$ -$

DOR STRMD++ & Storm door assembly - Premium grade EA -$ -$ -$ -$

DOR STRMDRS + Storm door assembly - Detach & reset EA -$ -$ -$ -$

DOR WALUM & Wood door - with aluminum skin - prehung EA -$ -$ -$ -$

DOR WD4 + Wood door - add for 4' door width EA -$ -$ -$ -$

DOR WD4FR + Wood door - add for 4' door width, fire rated EA -$ -$ -$ -$

DOR WD7 + Wood door - add for 7' door height EA -$ -$ -$ -$

DOR WDB & Wood door - birch face, 5 or 7 ply hollow core EA -$ -$ -$ -$

DOR WDBFR & Wood door - birch face, fire rated (mineral fiber core) EA -$ -$ -$ -$

DOR WDBSC & Wood door - birch face, solid core EA -$ -$ -$ -$

DOR WDL & Wood door - lauan face, 5 or 7 ply hollow core EA -$ -$ -$ -$

DOR WDLFR & Wood door - lauan face, fire rated (mineral fiber core) EA -$ -$ -$ -$

DOR WDLSC & Wood door - lauan face, solid core EA -$ -$ -$ -$

DOR WDLV & Wood door slab - solid - full louvered - Commercial EA -$ -$ -$ -$

DOR WDO & Wood door - oak face, 5 or 7 ply hollow core EA -$ -$ -$ -$

DOR WDOFR & Wood door - oak face, fire rated (mineral fiber core) EA -$ -$ -$ -$

DOR WDOSC & Wood door - oak face, solid core EA -$ -$ -$ -$

DOR WDPNL & Wood door - panel - solid pine EA -$ -$ -$ -$

DOR WF & Wood door frame & trim (for a 2" x 4" wall) LF -$ -$ -$ -$

DOR WF6 & Wood door frame & trim (for a 2" x 6" wall) LF -$ -$ -$ -$

DOR WFH & Wood door frame & trim - hardwood (for a 2" x 4" wall) LF -$ -$ -$ -$

DOR WFH6 & Wood door frame & trim - hardwood (for a 2" x 6" wall) LF -$ -$ -$ -$

DOR WFHX & Wood door frame & trim - exterior - hardwood LF -$ -$ -$ -$

DOR WFHX7 & Wood door frame & trim - exterior - hardwood, 7 1/4" wide LF -$ -$ -$ -$

DOR WFX & Wood door frame & trim - exterior - softwood LF -$ -$ -$ -$

DOR WFX7 & Wood door frame & trim - exterior - softwood, 7 1/4" wide LF -$ -$ -$ -$

DOR WN & Glass lite, up to 24" x 24" EA -$ -$ -$ -$

DOR X & Exterior door - metal - insulated - flush or panel style EA -$ -$ -$ -$

DOR X- & Exterior door - solid core lauan / mahogany or birch flush EA -$ -$ -$ -$

DOR X-- & Exterior door - metal - insulated - Standard grade EA -$ -$ -$ -$

DOR X+ & Exterior door - metal - insulated / wood - High grade EA -$ -$ -$ -$

DOR X++ & Exterior door - fiberglass / wood w/detail - Premium grade EA -$ -$ -$ -$

DOR X+++ & Exterior door - Deluxe grade - wood w/detail - pre-hung EA -$ -$ -$ -$

DOR X2 & Exterior door - double - metal - insul. - flush or panel EA -$ -$ -$ -$

DOR X8 & Exterior door, 8' - metal - insulated - flush or panel EA -$ -$ -$ -$

DOR X8+ & Exterior door, 8' - insulated metal / wood - High grade EA -$ -$ -$ -$

DOR X8++ & Exterior door, 8' - fiberglass / wood w/detail - Premium EA -$ -$ -$ -$

DOR X8+++ & Exterior door, 8' - Deluxe - wood w/detail - pre-hung EA -$ -$ -$ -$

DOR X8RS + Exterior door, 8' tall - Detach & reset EA -$ -$ -$ -$

DOR XDRS + Exterior double door - Detach & reset EA -$ -$ -$ -$

DOR XG & Greenhouse door and frame EA -$ -$ -$ -$

DOR XGS & Greenhouse door and frame - sliding EA -$ -$ -$ -$

DOR XPD & Exterior double door - paneled hardwood - no casing EA -$ -$ -$ -$

DOR XPD+ & Ext.double door - paneled hardwood - High grade -no EA -$ -$ -$ -$

casing

DOR XPD++ & Ext. double door - pnl hardwood - Prem grade - no casing EA -$ -$ -$ -$

DOR XPD8 & Exterior double door - paneled hardwood, 8' - no casing EA -$ -$ -$ -$

DOR XPD8+ & Ext. double door - pnl hardwood, 8' - High grade no casing EA -$ -$ -$ -$

DOR XPD8++ & Ext. double door - pnl hardwood - 8' Prem. grade no casing EA -$ -$ -$ -$

DOR XPD8RS + Ext. double door - 8' tall - no casing - Detach & reset EA -$ -$ -$ -$

DOR XPDR & Exterior double door - paneled hardwood - radius top EA -$ -$ -$ -$

DOR XPDR+ & Ext.double door - paneled hardwood - radius top - High gr. EA -$ -$ -$ -$

DOR XPDR++ & Ext. double door - pnl hardwood - Radius top - Prem grade EA -$ -$ -$ -$

DOR XPDRS + Ext. double door - no casing - Detach & reset EA -$ -$ -$ -$

DOR XRETR+ + Additional charge for a retrofit exterior door - difficult EA -$ -$ -$ -$

DOR XRETR>+ + Add. charge for a retrofit ext. door - large - difficult EA -$ -$ -$ -$

DOR XRETRO + Additional charge for a retrofit exterior door EA -$ -$ -$ -$

DOR XRETRO> + Additional charge for a retrofit exterior door - large EA -$ -$ -$ -$

DOR XRETROC + Additional charge to cut down an exterior door EA -$ -$ -$ -$

DOR XRS + Exterior door - Detach & reset EA -$ -$ -$ -$

Page 41: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

DOR XS & Exterior door slab - metal - insulated - flush or panel EA -$ -$ -$ -$

DOR XS- & Exterior door slab - solid core lauan/mah./birch - flush EA -$ -$ -$ -$

DOR XS-- & Exterior door slab - metal - insulated - Standard grade EA -$ -$ -$ -$

DOR XS+ & Exterior door slab - insulated metal or wood - High grade EA -$ -$ -$ -$

DOR XS++ & Exterior door slab - fiberglass/wood w/detail - Premium gr EA -$ -$ -$ -$

DOR XS+++ & Exterior door slab - detailed wood - Deluxe grade EA -$ -$ -$ -$

DOR XS8 & Exterior door slab, 8' - insulated metal - flush or panel EA -$ -$ -$ -$

DOR XS8+ & Exterior door slab, 8' - wood or metal - High grade EA -$ -$ -$ -$

DOR XS8++ & Exterior door slab, 8' - fiberglass/wood - Premium grade EA -$ -$ -$ -$

DOR XS8+++ & Exterior door slab, 8' - detailed wood - Deluxe grade EA -$ -$ -$ -$

DOR XSL & Exterior door sidelite - pre-attached EA -$ -$ -$ -$

DOR XSL+ & Ext. door sidelite - pre-attached - High grade EA -$ -$ -$ -$

DOR XSL+++ & Ext. door sidelite - pre-attached - Deluxe grade EA -$ -$ -$ -$

DOR XSLRS + Exterior door sidelite - Detach & reset EA -$ -$ -$ -$

DOR XSLT & Exterior door sidelite - sidelite only EA -$ -$ -$ -$

DOR XSLT+ & Exterior door sidelite - sidelite only - High grade EA -$ -$ -$ -$

DOR XSLT+++ & Exterior door sidelite - sidelite only - Deluxe grade EA -$ -$ -$ -$

DOR XSM & Exterior door with storm door - mobile home EA -$ -$ -$ -$

DOR XSM+ & Exterior door with storm door - High grade - mobile home EA -$ -$ -$ -$

DOR XSMRS + Exterior door with storm door - m/home - Detach & reset EA -$ -$ -$ -$

DOR XSRS + Exterior door slab - Detach & reset EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

DRY 1/2 & 1/2" drywall - hung, taped, floated, ready for paint SF -$ -$ -$ -$

DRY 1/2- & 1/2" drywall - hung, taped, ready for texture SF -$ -$ -$ -$

DRY 1/2+ & 1/2" drywall - hung, taped, heavy texture, ready for paint SF -$ -$ -$ -$

DRY 1/2++ & 1/2" drywall - hung, taped, with smooth wall finish SF -$ -$ -$ -$

DRY 1/2AC & 1/2" acoustic drywall - hung, taped, ready for texture SF -$ -$ -$ -$

DRY 1/2FT & 1/2" drywall - hung & fire taped only SF -$ -$ -$ -$

DRY 1/2H & 1/2" drywall - hung only (no tape or finish) SF -$ -$ -$ -$

DRY 1/2MR & 1/2" mold/mildew resistant - hung, taped ready for texture SF -$ -$ -$ -$

DRY 1/2MR+ & 1/2" mold resistant - hung, taped, floated ready for paint SF -$ -$ -$ -$

DRY 1/20P & 1/2" drywall over plaster with light texture SF -$ -$ -$ -$

DRY 1/2VN & 1/2" drywall - vinyl coated w/seam battens SF -$ -$ -$ -$

DRY 1/2WR & 1/2" water rock (greenboard) hung, taped ready for texture SF -$ -$ -$ -$

DRY 1/2WR+ & 1/2" water rock - hung, taped, floated, ready for paint SF -$ -$ -$ -$

DRY 1/4C & 1/4" drywall - 2 layer curved - floated, ready for paint SF -$ -$ -$ -$

DRY 1/4C+ & 1/4" drywall - 2 layer curved - hvy.texture, ready for pnt SF -$ -$ -$ -$

DRY 1/4C++ & 1/4" drywall - 2 layer curved - smooth wall finish SF -$ -$ -$ -$

DRY 1/4WM & 1/4" drywall - vinyl coated w/seam battens - mobile home SF -$ -$ -$ -$

DRY 3/8M & 3/8" drywall - hung, taped, floated - mobile home SF -$ -$ -$ -$

DRY 5/8 & 5/8" drywall - hung, taped, floated, ready for paint SF -$ -$ -$ -$

DRY 5/8- & 5/8" drywall - hung, taped, ready for texture SF -$ -$ -$ -$

DRY 5/8+ & 5/8" drywall - hung, taped, heavy texture, ready for paint SF -$ -$ -$ -$

DRY 5/8++ & 5/8" drywall - hung, taped, with smooth wall finish SF -$ -$ -$ -$

DRY 5/8AC & 5/8" acoustic drywall - hung, taped, ready for texture SF -$ -$ -$ -$

DRY 5/8C & 5/8" drywall - type C - hung, taped, light texture SF -$ -$ -$ -$

DRY 5/8FR & 5/8" gypsum panel - fiber reinforced - abuse resistant SF -$ -$ -$ -$

DRY 5/8FT & 5/8" drywall - hung & fire taped only SF -$ -$ -$ -$

DRY 5/8H & 5/8" drywall - hung only (no tape or finish) SF -$ -$ -$ -$

DRY 5/8MR & 5/8" mold/mildew resistant - hung, taped ready for texture SF -$ -$ -$ -$

DRY AC & Acoustic ceiling (popcorn) texture SF -$ -$ -$ -$

DRY AC- & Acoustic ceiling (popcorn) texture - light SF -$ -$ -$ -$

DRY AC+ & Acoustic ceiling (popcorn) texture - heavy SF -$ -$ -$ -$

DRY ACARMV - Scrape off asbestos acoustic (popcorn) texture-no haul off SF -$ -$ -$ -$

DRY ACMN + Acoustic Ceiling (popcorn) Texture - Labor Minimum EA -$ -$ -$ -$

DRY ACR - Tear off painted acoustic ceiling (popcorn) texture SF -$ -$ -$ -$

DRY ADD & Additional cost for high wall or ceiling - 11' to 14' high SF -$ -$ -$ -$

DRY ADD> & Additional cost for high wall or ceiling - over 14' to 20' SF -$ -$ -$ -$

DRY ADDFB + Additional cost for foil backed drywall SF -$ -$ -$ -$

DRY ARCADD + Additional cost to hang and finish drywall archway EA -$ -$ -$ -$

DRY ASBRMV - Tear off asbestos drywall (no haul off) SF -$ -$ -$ -$

DRY BIDITM + Drywall (Bid Item) EA -$ -$ -$ -$

Page 42: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

DRY GLIT + Glitter application to acoustic ceiling SF -$ -$ -$ -$

DRY GLU & Additional cost for gluing drywall SF -$ -$ -$ -$

DRY HC & Hat channel, 16" OC SF -$ -$ -$ -$

DRY HC> & Hat channel, 24" OC SF -$ -$ -$ -$

DRY LAB + Drywall Installer / Finisher - per hour HR -$ -$ -$ -$

DRY LABL + Drywall - General Laborer - per hour HR -$ -$ -$ -$

DRY LEAD & 5/8" drywall - lead lined - 4# SF -$ -$ -$ -$

DRY LF & 1/2" - drywall per LF - up to 2' tall LF -$ -$ -$ -$

DRY LF< & 1/2" - drywall per LF - up to 4 inches tall LF -$ -$ -$ -$

DRY LF<5/8 & 5/8" - drywall per LF - up to 4 inches tall LF -$ -$ -$ -$

DRY LF> & 1/2" - drywall per LF - up to 4' tall LF -$ -$ -$ -$

DRY LF>5/8 & 5/8" - drywall per LF - up to 4' tall LF -$ -$ -$ -$

DRY LF5/8 & 5/8" - drywall per LF - up to 2' tall LF -$ -$ -$ -$

DRY MASKLF + Mask wall - plastic, paper, tape (per LF) LF -$ -$ -$ -$

DRY MASKSF + Mask per square foot for drywall work SF -$ -$ -$ -$

DRY MN + Drywall - Labor Minimum EA -$ -$ -$ -$

DRY MNRP + Drywall Repair - Minimum Charge - Labor and Material EA -$ -$ -$ -$

DRY MST2 & Metal studding, 2 1/2" wide, 16" OC, 25 gauge SF -$ -$ -$ -$

DRY MST2+ & Metal studding, 2 1/2" wide, 16" OC, 20 gauge SF -$ -$ -$ -$

DRY MST4 & Metal studding, 3 5/8" wide, 16" OC, 25 gauge SF -$ -$ -$ -$

DRY MST4+ & Metal studding, 3 5/8" wide, 16" OC, 20 gauge SF -$ -$ -$ -$

DRY MST4< & Metal studding, 3 5/8" wide, 24" OC, 25 gauge SF -$ -$ -$ -$

DRY MST4<+ & Metal studding, 3 5/8" wide, 24" OC, 20 gauge SF -$ -$ -$ -$

DRY MST4> & Metal studding, 3 5/8" wide, 8" OC, 20 gauge SF -$ -$ -$ -$

DRY MST6 & Metal studding, 6" wide, 16" OC, 25 gauge SF -$ -$ -$ -$

DRY MST6+ & Metal studding, 6" wide, 16" OC, 20 gauge SF -$ -$ -$ -$

DRY MST6< & Metal studding, 6" wide, 24" OC, 25 gauge SF -$ -$ -$ -$

DRY MST6<+ & Metal studding, 6" wide, 24" OC, 20 gauge SF -$ -$ -$ -$

DRY MSTHL + Metal studding - Labor to frame header/beam LF -$ -$ -$ -$

DRY MSTL2 & Metal studding - 2 1/2" wide - 16" OC - Labor only SF -$ -$ -$ -$

DRY MSTL2< & Metal studding - 2 1/2" wide - 24" OC - Labor only SF -$ -$ -$ -$

DRY MSTL2> & Metal studding - 2 1/2" wide - 12" OC - Labor only SF -$ -$ -$ -$

DRY MSTL24 & Metal studding - 2 1/2" wide - 4" OC - Labor only SF -$ -$ -$ -$

DRY MSTL28 & Metal studding - 2 1/2" wide - 8" OC - Labor only SF -$ -$ -$ -$

DRY MSTL4 & Metal studding - 3 5/8" wide - 16" OC - Labor only SF -$ -$ -$ -$

DRY MSTL4< & Metal studding - 3 5/8" wide - 24" OC - Labor only SF -$ -$ -$ -$

DRY MSTL4> & Metal studding - 3 5/8" wide - 12" OC - Labor only SF -$ -$ -$ -$

DRY MSTL44 & Metal studding - 3 5/8" wide - 4" OC - Labor only SF -$ -$ -$ -$

DRY MSTL48 & Metal studding - 3 5/8" wide - 8" OC - Labor only SF -$ -$ -$ -$

DRY MSTL6 & Metal studding - 6" wide - 16" OC - Labor only SF -$ -$ -$ -$

DRY MSTL6< & Metal studding - 6" wide - 24" OC - Labor only SF -$ -$ -$ -$

DRY MSTL6> & Metal studding - 6" wide - 12" OC - Labor only SF -$ -$ -$ -$

DRY MSTL64 & Metal studding - 6" wide - 4" OC - Labor only SF -$ -$ -$ -$

DRY MSTL68 & Metal studding - 6" wide - 8" OC - Labor only SF -$ -$ -$ -$

DRY MSTR2 + Metal studding - Track - 2 1/2" wide - 25 ga. - mat. only LF -$ -$ -$ -$

DRY MSTR2+ + Metal studding - Track - 2 1/2" wide - 20 ga. - mat. only LF -$ -$ -$ -$

DRY MSTR4 + Metal studding - Track - 3 5/8" wide - 25 ga. - mat. only LF -$ -$ -$ -$

DRY MSTR4+ + Metal studding - Track - 3 5/8" wide - 20 ga. - mat. only LF -$ -$ -$ -$

DRY MSTR6 + Metal studding - Track - 6" wide - 25 gauge- material only LF -$ -$ -$ -$

DRY MSTR6+ + Metal studding - Track - 6" wide - 20 gauge- material only LF -$ -$ -$ -$

DRY MSTT2 + Metal stud - 2 1/2" wide - 25 gauge - material only LF -$ -$ -$ -$

DRY MSTT2+ + Metal stud - 2 1/2" wide - 20 gauge - material only LF -$ -$ -$ -$

DRY MSTT4 + Metal stud - 3 5/8" wide - 25 gauge - material only LF -$ -$ -$ -$

DRY MSTT4+ + Metal stud - 3 5/8" wide - 20 gauge - material only LF -$ -$ -$ -$

DRY MSTT6 + Metal stud - 6" wide - 25 gauge - material only LF -$ -$ -$ -$

DRY MSTT6+ + Metal stud - 6" wide - 20 gauge - material only LF -$ -$ -$ -$

DRY PATCH + Drywall patch / small repair, ready for paint EA -$ -$ -$ -$

DRY PATCHJ + Tape joint for new to existing drywall - per LF LF -$ -$ -$ -$

DRY PATCHLF + Drywall tape joint/repair - per LF LF -$ -$ -$ -$

DRY RADIANT & Radiant heat - 1/2" double layer drywall (wire not incl.) SF -$ -$ -$ -$

DRY RC & Resilient channel (for sound) - 16" oc SF -$ -$ -$ -$

DRY RC> & Resilient channel (for sound) - 24" oc SF -$ -$ -$ -$

DRY RND + Add for bullnose (rounded) corners SF -$ -$ -$ -$

DRY RNDLF + Add for bullnose (rounded) corners - per LF LF -$ -$ -$ -$

DRY SG & Suspended grid system for drywall SF -$ -$ -$ -$

Page 43: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

DRY SHAFT & Shaft wall - 2 hour fire rated SF -$ -$ -$ -$

DRY TEX + Texture drywall - light hand texture SF -$ -$ -$ -$

DRY TEX- + Texture drywall - machine SF -$ -$ -$ -$

DRY TEX+ + Texture drywall - heavy hand texture SF -$ -$ -$ -$

DRY TEX++ + Texture drywall - smooth / skim coat SF -$ -$ -$ -$

DRY TEXAD + Add on cost to mix PVA sealer with drywall joint SF -$ -$ -$ -$

compound

DRY TEXMK + Texture drywall - machine - knockdown SF -$ -$ -$ -$

DRY WALLF + Fill holes created by wall cavity drying EA -$ -$ -$ -$

DRY WRADD + Add on cost for 5/8" water resistant drywall - Commercial SF -$ -$ -$ -$

DRY ZC & Z channel, 16" OC SF -$ -$ -$ -$

DRY ZC> & Z channel, 24" OC SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

ELE 110 & 110 volt copper wiring run, box and outlet EA -$ -$ -$ -$

ELE 110BOX & 110 volt copper wiring run and box - rough in only EA -$ -$ -$ -$

ELE 110C & 110 volt commercial wiring/conduit, box, outlet, switch EA -$ -$ -$ -$

ELE 110CBOX & 110 volt commercial wiring/conduit and box - rough in EA -$ -$ -$ -$

only

ELE 110CMC & 110 volt metal clad copper wiring, box, outlet, switch EA -$ -$ -$ -$

ELE 110CMCB & 110 volt metal clad copper wiring and box - rough in only EA -$ -$ -$ -$

ELE 110CT & 110 volt comm wiring/conduit, box, tamp resistant outlet EA -$ -$ -$ -$

ELE 110G & 110 volt copper wiring run, box and GFI outlet EA -$ -$ -$ -$

ELE 110S & 110 volt copper wiring run, box and switch EA -$ -$ -$ -$

ELE 110T & 110 volt copper wiring run, box, tamper-resistant outlet EA -$ -$ -$ -$

220 & 220 volt copper wiring run, box and receptacle EA -$ -$ -$ -$

ELE 220BOX & 220 volt copper wiring run and box - rough in only EA -$ -$ -$ -$

ELE 220C & 220 volt commercial wiring/conduit, box, outlet, switch EA -$ -$ -$ -$

ELE 220CBOX & 220 volt commercial wiring/conduit and box - rough in EA -$ -$ -$ -$

only

ELE 220CMC & 220 volt metal clad copper wiring, box, outlet, switch EA -$ -$ -$ -$

ELE 220CMCB & 220 volt metal clad copper wiring and box - rough in only EA -$ -$ -$ -$

ELE AESB + Scoreboard - rough-in EA -$ -$ -$ -$

ELE BBH & Baseboard electric heater - 6' EA -$ -$ -$ -$

ELE BBH< & Baseboard electric heater - 4' EA -$ -$ -$ -$

ELE BBH« & Baseboard electric heater - 3' EA -$ -$ -$ -$

ELE BBH«< & Baseboard electric heater - 2' EA -$ -$ -$ -$

ELE BBH<5 & Baseboard electric heater - 5' EA -$ -$ -$ -$

ELE BBH> & Baseboard electric heater - 8' EA -$ -$ -$ -$

ELE BBH» & Baseboard electric heater - 10' EA -$ -$ -$ -$

ELE BBH>7 & Baseboard electric heater - 7' EA -$ -$ -$ -$

ELE BBH>RS + Baseboard electric heater - 7' to 10' - Detach & reset EA -$ -$ -$ -$

ELE BBHC & Baseboard heater replacement cover LF -$ -$ -$ -$

ELE BBHEC & Baseboard heater end cover EA -$ -$ -$ -$

ELE BBHH2 & Baseboard electric heater - 2' - hydronic EA -$ -$ -$ -$

ELE BBHH3 & Baseboard electric heater - 3' - hydronic EA -$ -$ -$ -$

ELE BBHH4 & Baseboard electric heater - 4' - hydronic EA -$ -$ -$ -$

ELE BBHH5 & Baseboard electric heater - 5' - hydronic EA -$ -$ -$ -$

ELE BBHH6 & Baseboard electric heater - 6' - hydronic EA -$ -$ -$ -$

ELE BBHH7 & Baseboard electric heater - 7' - hydronic EA -$ -$ -$ -$

ELE BBHH8 & Baseboard electric heater - 8' - hydronic EA -$ -$ -$ -$

ELE BBHIRS + Baseboard electric heater - in place - Detach & reset EA -$ -$ -$ -$

ELE BBHRS + Baseboard electric heater - 4' to 6' - Detach & reset EA -$ -$ -$ -$

ELE BBHRS< + Baseboard electric heater - 2' to 3' - Detach & reset EA -$ -$ -$ -$

ELE BFAN & Bathroom ventilation fan, light, and heater EA -$ -$ -$ -$

ELE BFAN< & Bathroom ventilation fan, light, and heater - Small EA -$ -$ -$ -$

ELE BFAN> & Bathroom ventilation fan, light, and heater - Large EA -$ -$ -$ -$

ELE BFANL & Bathroom ventilation fan w/light EA -$ -$ -$ -$

ELE BFANL- & Bathroom ventilation fan w/light - Standard grade EA -$ -$ -$ -$

ELE BFANL+ & Bathroom ventilation fan w/light - High grade EA -$ -$ -$ -$

ELE BFANL++ & Bathroom ventilation fan w/light - Premium grade EA -$ -$ -$ -$

ELE BFANRS + Bathroom ventilation fan light and heater - Detach & reset EA -$ -$ -$ -$

ELE BFANV & Bathroom ventilation fan EA -$ -$ -$ -$

Page 44: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

ELE BFANV- & Bathroom ventilation fan - Standard grade EA -$ -$ -$ -$

ELE BFANV+ & Bathroom ventilation fan - High grade EA -$ -$ -$ -$

ELE BFANV++ & Bathroom ventilation fan - Premium grade EA -$ -$ -$ -$

ELE BFANVRS + Bathroom ventilation fan - Detach & reset EA -$ -$ -$ -$

ELE BHEAT & Bathroom ceiling heater - 1 bulb EA -$ -$ -$ -$

ELE BHEAT> & Bathroom ceiling heater - 2 bulb EA -$ -$ -$ -$

ELE BIDITM + Electrical (Bid Item) EA -$ -$ -$ -$

ELE BONDC + Bonding/Grounding clamp EA -$ -$ -$ -$

ELE BPA100 & Breaker panel - 100 amp w/arc fault breakers EA -$ -$ -$ -$

ELE BPA125 & Breaker panel - 125 amp w/arc fault breakers EA -$ -$ -$ -$

ELE BPA150 & Breaker panel - 150 amp w/arc fault breakers EA -$ -$ -$ -$

ELE BPA200 & Breaker panel - 200 amp w/arc fault breakers EA -$ -$ -$ -$

ELE BPA300 & Breaker panel - 300 amp w/arc fault breakers EA -$ -$ -$ -$

ELE BPA70 & Breaker panel - 70 amp w/arc fault breakers EA -$ -$ -$ -$

ELE BPC & Electrical panel cover EA -$ -$ -$ -$

ELE BPNL<RS + Breaker panel - 70 to 150 amp - Detach & reset EA -$ -$ -$ -$

ELE BPNL100 & Breaker panel - 100 amp EA -$ -$ -$ -$

ELE BPNL125 & Breaker panel - 125 amp EA -$ -$ -$ -$

ELE BPNL150 & Breaker panel - 150 amp EA -$ -$ -$ -$

ELE BPNL200 & Breaker panel - 200 amp EA -$ -$ -$ -$

ELE BPNL300 & Breaker panel - 300 amp EA -$ -$ -$ -$

ELE BPNL70 & Breaker panel - 70 amp EA -$ -$ -$ -$

ELE BPNLRS + Breaker panel - 200 to 300 amp - Detach & reset EA -$ -$ -$ -$

ELE BRK & Circuit breaker - 110 volt - single pole EA -$ -$ -$ -$

ELE BRK220 & Circuit breaker - 220 volt - double pole EA -$ -$ -$ -$

ELE BRKAFCI & Circuit breaker - arc-fault circuit-interrupter (AFCI) EA -$ -$ -$ -$

ELE BRKGFI & Circuit breaker - ground-fault circuit-interrupter (GFI) EA -$ -$ -$ -$

ELE BRKMD & Circuit breaker - main disconnect - 125 amp EA -$ -$ -$ -$

ELE BRKMD< & Circuit breaker - main disconnect - 100 amp EA -$ -$ -$ -$

ELE BRKMD> & Circuit breaker - main disconnect - 150 to 200 amp EA -$ -$ -$ -$

ELE BUSDCT & Bus Duct LF -$ -$ -$ -$

ELE CB< & Circuit breaker - bolt-on - 1 pole, 15 to 60 amp EA -$ -$ -$ -$

ELE CB1200 & Main circuit breaker - 3 pole, 1200 amp EA -$ -$ -$ -$

ELE CB2 & Circuit breaker - bolt-on - 2 pole, 70 to 100 amp EA -$ -$ -$ -$

ELE CB2< & Circuit breaker - bolt-on - 2 pole, 15 to 60 amp EA -$ -$ -$ -$

ELE CB2000 & Main circuit breaker - 3 pole, 2,000 amp EA -$ -$ -$ -$

ELE CB3 & Circuit breaker - bolt-on - 3 pole, 70 to 100 amp EA -$ -$ -$ -$

ELE CB3< & Circuit breaker - bolt-on - 3 pole, 15 to 60 amp EA -$ -$ -$ -$

ELE CB3> & Circuit breaker - bolt-on - 3 pole, 225 amp EA -$ -$ -$ -$

ELE CB3>> & Circuit breaker - bolt-on - 3 pole, 400 amp EA -$ -$ -$ -$

ELE CB3>>> & Circuit breaker - bolt-on - 3 pole, 600 amp EA -$ -$ -$ -$

ELE CB400 & Main circuit breaker - 3 pole, 400 amp EA -$ -$ -$ -$

ELE CB600 & Main circuit breaker - 3 pole, 600 amp EA -$ -$ -$ -$

ELE CB800 & Main circuit breaker - 3 pole, 800 amp EA -$ -$ -$ -$

ELE CBGFI & Circuit breaker - bolt-on - ground-fault interrupter (GFI) EA -$ -$ -$ -$

ELE CBUTTON & Door bell/chime button (button only) EA -$ -$ -$ -$

ELE CBUTTV & Door bell/chime button - Wi-Fi video (button only) EA -$ -$ -$ -$

ELE CBUTTW & Door bell/chime button - wireless (button only) EA -$ -$ -$ -$

ELE CHIME & Door bell/chime EA -$ -$ -$ -$

ELE CHIME- & Door bell/chime - Standard grade EA -$ -$ -$ -$

ELE CHIME+ & Door bell/chime - High grade EA -$ -$ -$ -$

ELE CHIME++ & Door bell/chime - Premium grade EA -$ -$ -$ -$

ELE CHIMERS + Door bell/chime - Detach & reset EA -$ -$ -$ -$

ELE CHIMPRS + Door bell/chime - Programmable - Detach & reset EA -$ -$ -$ -$

ELE CHIMW & Door bell/chime - wireless EA -$ -$ -$ -$

ELE CHIMW- & Door bell/chime - wireless - Standard grade EA -$ -$ -$ -$

ELE CHIMW+ & Door bell/chime - wireless - High grade EA -$ -$ -$ -$

ELE CHIMW++ & Door bell/chime - wireless - Premium grade EA -$ -$ -$ -$

ELE CO & Carbon monoxide detector EA -$ -$ -$ -$

ELE CO- & Carbon monoxide detector - Standard grade EA -$ -$ -$ -$

ELE CO+ & Carbon monoxide detector - High grade EA -$ -$ -$ -$

ELE CORS + Carbon monoxide detector - Detach & reset EA -$ -$ -$ -$

ELE COSM & Combination CO/Smoke detector EA -$ -$ -$ -$

ELE COSM- & Combination CO/Smoke detector - Standard grade EA -$ -$ -$ -$

ELE COSM+ & Combination CO/Smoke detector - High grade EA -$ -$ -$ -$

Page 45: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

ELE COSM++ & Combo CO/Smoke detector - Premium grade (smart home EA -$ -$ -$ -$

comp.)

ELE CSF & Commercial electrical (SF of bldg) - Average load SF -$ -$ -$ -$

ELE CSF+ & Commercial electrical (SF of bldg) - Heavy load SF -$ -$ -$ -$

ELE CSF++ & Commercial electrical (SF of bldg) - Extra heavy load SF -$ -$ -$ -$

ELE DB1200 & Distribution board - 1200 amp, without breakers EA -$ -$ -$ -$

ELE DB2000 & Distribution board - 2000 amp, without breakers EA -$ -$ -$ -$

ELE DB400 & Distribution board - 400 amp, without breakers EA -$ -$ -$ -$

ELE DB600 & Distribution board - 600 amp, without breakers EA -$ -$ -$ -$

ELE DB800 & Distribution board - 800 amp, without breakers EA -$ -$ -$ -$

ELE DISC30 & Disconnect box - 30 amp - non fused EA -$ -$ -$ -$

ELE DISC60 & Disconnect box - 60 amp - non fused EA -$ -$ -$ -$

ELE DROP & Electric power supply cable - secondary EA -$ -$ -$ -$

ELE ECON + Equipment connections EA -$ -$ -$ -$

ELE ECON> + Equipment connections - major EA -$ -$ -$ -$

ELE EMT1 & Electrical metallic tubing, (conduit) 1" LF -$ -$ -$ -$

ELE EMT1.5 & Electrical metallic tubing, (conduit) 1 1/2" LF -$ -$ -$ -$

ELE EMT1/2 & Electrical metallic tubing, (conduit) 1/2" LF -$ -$ -$ -$

ELE EMT2 & Electrical metallic tubing, (conduit) 2" LF -$ -$ -$ -$

ELE EMT3 & Electrical metallic tubing, (conduit) 3" LF -$ -$ -$ -$

ELE EMT3/4 & Electrical metallic tubing, (conduit) 3/4" LF -$ -$ -$ -$

ELE EMT4 & Electrical metallic tubing, (conduit) 4" LF -$ -$ -$ -$

ELE EQW + Equipment wiring - Commercial SF -$ -$ -$ -$

ELE FAN & Exhaust fan EA -$ -$ -$ -$

ELE FAN- & Exhaust fan - Standard grade EA -$ -$ -$ -$

ELE FAN+ & Exhaust fan - High grade EA -$ -$ -$ -$

ELE FAN++ & Exhaust fan - Premium grade EA -$ -$ -$ -$

ELE FANC & Exhaust fan - Commercial EA -$ -$ -$ -$

ELE FANC> & Exhaust fan - Commercial - large EA -$ -$ -$ -$

ELE FANRS + Exhaust fan - Detach & reset EA -$ -$ -$ -$

ELE FLEX & Flexible metal conduit, 1/2" to 1" LF -$ -$ -$ -$

ELE GFI & Ground fault interrupter (GFI) outlet EA -$ -$ -$ -$

ELE GFITR & Ground fault interrupter (GFI) outlet - tamper resistant EA -$ -$ -$ -$

ELE GFITR+ & Ground fault interrupter outlet - tamper resist.- High gr. EA -$ -$ -$ -$

ELE GROD & Grounding rod - copper clad with clamp, 8' EA -$ -$ -$ -$

ELE HNGR & Conduit hanger or support for 1/2"- 1 1/2" conduit EA -$ -$ -$ -$

ELE HNGR> & Conduit hanger or support for 2"- 4" conduit EA -$ -$ -$ -$

ELE HTAPE & Electric heat tape - for exposed water lines - mobile home LF -$ -$ -$ -$

ELE HTAPERS + Electric heat tape - Detach & reset - mobile homes LF -$ -$ -$ -$

ELE HTR5 & Unit heater - 5kw EA -$ -$ -$ -$

ELE HTRU & Under-cabinet / kickspace heater - electric EA -$ -$ -$ -$

ELE HTRU> & Under-cabinet / kickspace heater - electric - Large EA -$ -$ -$ -$

ELE ICM & Intercom - Master station EA -$ -$ -$ -$

ELE ICM- & Intercom - Master station - Standard grade EA -$ -$ -$ -$

ELE ICM+ & Intercom - Master station - High grade EA -$ -$ -$ -$

ELE ICM++ & Intercom - Master station - Premium grade EA -$ -$ -$ -$

ELE ICMRS + Master intercom station - Detach & reset EA -$ -$ -$ -$

ELE ICR & Intercom - Remote station EA -$ -$ -$ -$

ELE ICR+ & Intercom - Remote station - High grade EA -$ -$ -$ -$

ELE ICRS + Intercom station - Detach & reset EA -$ -$ -$ -$

ELE JBOX & Junction box EA -$ -$ -$ -$

ELE LAB + Electrician - per hour HR -$ -$ -$ -$

ELE LABL + Electrician - General Laborer - per hour HR -$ -$ -$ -$

ELE LHN & Lighted house numbers EA -$ -$ -$ -$

ELE LHN+ & Lighted house numbers - High grade EA -$ -$ -$ -$

ELE LHNRS + Lighted house numbers - Detach & reset EA -$ -$ -$ -$

ELE LV & Phone / low voltage copper wiring LF -$ -$ -$ -$

ELE LV> & Phone / low voltage copper wiring - heavy gauge LF -$ -$ -$ -$

ELE MAST & Meter mast for overhead power - 2" conduit EA -$ -$ -$ -$

ELE MAST> & Meter mast for overhead power - 2 1/2" conduit EA -$ -$ -$ -$

ELE MAST» & Meter mast for overhead power - 3" conduit EA -$ -$ -$ -$

ELE MASTRS + Meter mast for overhead power - Detach & reset EA -$ -$ -$ -$

ELE MASTW & Meter mast weatherhead for overhead power - 2" EA -$ -$ -$ -$

ELE MASTW> & Meter mast weatherhead for overhead power - 2 1/2" EA -$ -$ -$ -$

ELE MASTW» & Meter mast weatherhead for overhead power - 3" EA -$ -$ -$ -$

Page 46: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

ELE MCC & Motor control center - 600 amp EA -$ -$ -$ -$

ELE MCC< & Motor control center - 225 amp EA -$ -$ -$ -$

ELE MCC4 & Motor control center - 400 amp EA -$ -$ -$ -$

ELE MCONT + Magnetic contactor - 3 pole - up to 50 hp rating EA -$ -$ -$ -$

ELE MEG + Megohmmeter check electrical circuits - average residence EA -$ -$ -$ -$

ELE MEG< + Megohmmeter check electrical circuits - single circuit EA -$ -$ -$ -$

ELE METB & Meter base - 200 amp EA -$ -$ -$ -$

ELE METB< & Meter base - 100 - 125 amp EA -$ -$ -$ -$

ELE METB> & Meter base - 250 amp EA -$ -$ -$ -$

ELE METB» & Meter base - 400 to 2000 amp EA -$ -$ -$ -$

ELE METR & Meter base and main disconnect - 200 amp EA -$ -$ -$ -$

ELE METR< & Meter base and main disconnect - 100 - 125 amp EA -$ -$ -$ -$

ELE METR> & Meter base and main disconnect - 250 amp EA -$ -$ -$ -$

ELE METR» & Meter base and main disconnect - 400 to 2000 amp EA -$ -$ -$ -$

ELE METRRS + Meter base and main disconnect - Detach & reset EA -$ -$ -$ -$

ELE MN + Electrical- Labor Minimum EA -$ -$ -$ -$

ELE NAILP + Nail plate EA -$ -$ -$ -$

ELE NAILP> + Nail plate - Large EA -$ -$ -$ -$

ELE OCSC & Occupancy sensor - ceiling/wall mounted EA -$ -$ -$ -$

ELE OCSC- & Occupancy sensor - ceiling/wall mounted - Standard grade EA -$ -$ -$ -$

ELE OCSC+ & Occupancy sensor - ceiling/wall mounted - High grade EA -$ -$ -$ -$

ELE OCSCRS + Occupancy sensor - ceiling/wall mounted - Detach & reset EA -$ -$ -$ -$

ELE OCSS & Occupancy sensor - switch EA -$ -$ -$ -$

ELE OCSS- & Occupancy sensor - switch - Standard grade EA -$ -$ -$ -$

ELE OCSS+ & Occupancy sensor - switch - High grade EA -$ -$ -$ -$

ELE OHCC & Overhead crane (power - conductor bar system) LF -$ -$ -$ -$

ELE OL & Phone, TV, or speaker outlet EA -$ -$ -$ -$

ELE OL220 & 220 volt outlet EA -$ -$ -$ -$

ELE OL220+ & 220 volt outlet - Heavy duty EA -$ -$ -$ -$

ELE OL220CV & 220 volt outlet cover EA -$ -$ -$ -$

ELE OL22ORS + 220 volt outlet - Detach & reset EA -$ -$ -$ -$

ELE OLR & Phone/low voltage outlet rough-in EA -$ -$ -$ -$

ELE OLRS + Phone, TV, or speaker outlet - Detach & reset EA -$ -$ -$ -$

ELE OS & Outlet EA -$ -$ -$ -$

ELE OS+ + Outlet - High grade EA -$ -$ -$ -$

ELE OSBOX & Outlet box - includes 4 connectors and plaster ring EA -$ -$ -$ -$

ELE OSC & Outlet or switch - ext. mtd. - Commercial (weatherproof) EA -$ -$ -$ -$

ELE OSCOV & Outlet or switch cover EA -$ -$ -$ -$

ELE OSCOV+ & Outlet or switch cover - High grade EA -$ -$ -$ -$

ELE OSCOVD & Outlet or switch cover - Double EA -$ -$ -$ -$

ELE OSCOVD+ & Outlet or switch cover - Double - High grade EA -$ -$ -$ -$

ELE OSDIM & Dimmer switch EA -$ -$ -$ -$

ELE OSDIM+ & Dimmer switch - High grade EA -$ -$ -$ -$

ELE OSF & Outlet - Floor mounted - brass w/cover - double - 20 amp EA -$ -$ -$ -$

ELE OSFR & Outlet - Floor mounted - round brass w/cover - single EA -$ -$ -$ -$

ELE OSKEY & Switch - key locking EA -$ -$ -$ -$

ELE OSRS + Outlet or switch - Detach & reset EA -$ -$ -$ -$

ELE OSS & Switch EA -$ -$ -$ -$

ELE OSS+ & Switch - High grade EA -$ -$ -$ -$

ELE OSS3 & Switch - 3 way EA -$ -$ -$ -$

ELE OSS3+ & Switch - 3 way - High grade EA -$ -$ -$ -$

ELE OSS4 & Switch - 4 way EA -$ -$ -$ -$

ELE OSS4+ & Switch - 4 way - High grade EA -$ -$ -$ -$

ELE OSSD & Door jamb switch (open-on / close-oft) EA -$ -$ -$ -$

ELE OSTIME & Timer switch EA -$ -$ -$ -$

ELE OSTIME+ & Timer switch - programmable EA -$ -$ -$ -$

ELE OSTR & Outlet - tamper resistant EA -$ -$ -$ -$

ELE OSTR+ & Outlet - tamper resistant - High grade EA -$ -$ -$ -$

ELE OSTRC & Outlet - tamper resistant - Commercial EA -$ -$ -$ -$

ELE OSTRNL & Outlet - tamper resistant w/night light EA -$ -$ -$ -$

ELE PB100 & Panelboard - 120/240, 100 amp, single phase (per circuit) EA -$ -$ -$ -$

ELE PB100+ & Panelboard - 120/208, 100 amp, three phase (per circuit) EA -$ -$ -$ -$

ELE PB100++ & Panelboard - 277/480, 100 amp, three phase (per circuit) EA -$ -$ -$ -$

ELE PB225 & Panelboard - 120/240, 225 amp, single phase (per circuit) EA -$ -$ -$ -$

ELE PB225+ & Panelboard - 120/208, 225 amp, three phase (per circuit) EA -$ -$ -$ -$

Page 47: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

ELE PB225++ & Panelboard - 277/480, 225 amp, three phase (per circuit) EA -$ -$ -$ -$

ELE PB400 & Panelboard - 120/240, 400 amp, single phase (per circuit) EA -$ -$ -$ -$

ELE PB400+ & Panelboard - 120/208, 400 amp, three phase (per circuit) EA -$ -$ -$ -$

ELE PB400++ & Panelboard - 277/480, 400 amp, three phase (per circuit) EA -$ -$ -$ -$

ELE PB600+ & Panelboard - 120/208, 600 amp, three phase (per circuit) EA -$ -$ -$ -$

ELE PB600++ & Panelboard - 277/480, 600 amp, three phase (per circuit) EA -$ -$ -$ -$

ELE PBRS + Panelboard - Detach & reset (per circuit) EA -$ -$ -$ -$

ELE PLBOX & Pull box for 3/4"-2" conduit - with 2 connectors and plate EA -$ -$ -$ -$

ELE PLBOX> & Pull box for 2"- 4" conduit - with 2 connectors and plate EA -$ -$ -$ -$

ELE PVC1 & PVC schedule 40 conduit, 1" LF -$ -$ -$ -$

ELE PVC1.25 & PVC schedule 40 conduit, 1 1/4" LF -$ -$ -$ -$

ELE PVC1.5 & PVC schedule 40 conduit, 1 1/2" LF -$ -$ -$ -$

ELE PVC1/2 & PVC schedule 40 conduit, 1/2" LF -$ -$ -$ -$

ELE PVC2 & PVC schedule 40 conduit, 2" LF -$ -$ -$ -$

ELE PVC2.5 & PVC schedule 40 conduit, 2 1/2" LF -$ -$ -$ -$

ELE PVC3 & PVC schedule 40 conduit, 3" LF -$ -$ -$ -$

ELE PVC3/4 & PVC schedule 40 conduit, 3/4" LF -$ -$ -$ -$

ELE PVC4 & PVC schedule 40 conduit, 4" LF -$ -$ -$ -$

ELE RACE & Raceway - cable tray - basket type LF -$ -$ -$ -$

ELE RACE> & Raceway - cable tray, 32" wide - heavy duty LF -$ -$ -$ -$

ELE RADIANT + Radiant heat - wiring only SF -$ -$ -$ -$

ELE RADMAT + Radiant heat - wire mat SF -$ -$ -$ -$

ELE RC1 & Rigid conduit, 1" LF -$ -$ -$ -$

ELE RC1/2 & Rigid conduit, 1/2" LF -$ -$ -$ -$

ELE RC1-1/2 & Rigid conduit, 1 1/2" LF -$ -$ -$ -$

ELE RC1-1/4 & Rigid conduit, 1 1/4" LF -$ -$ -$ -$

ELE RC2 & Rigid conduit, 2" LF -$ -$ -$ -$

ELE RC2-1/2 & Rigid conduit, 2 1/2" LF -$ -$ -$ -$

ELE RC3 & Rigid conduit, 3" LF -$ -$ -$ -$

ELE RC3/4 & Rigid conduit, 3/4" LF -$ -$ -$ -$

ELE RC3-1/2 & Rigid conduit, 3 1/2" LF -$ -$ -$ -$

ELE RC4 & Rigid conduit, 4" LF -$ -$ -$ -$

ELE REWIRC + Rewire - average residence - copper wiring with conduit SF -$ -$ -$ -$

ELE REWIRE + Rewire - average residence - copper wiring SF -$ -$ -$ -$

ELE ROUGH & Empty conduit runs for future use LF -$ -$ -$ -$

ELE ROUGHAV + Rough-in for audio/visual (per RM) EA -$ -$ -$ -$

ELE SB1200 & Switchboard (main disconnect) - 1200 amp, up to 600 volt EA -$ -$ -$ -$

ELE SB2000 & Switchboard (main disconnect) - 2000 amp, up to 600 volt EA -$ -$ -$ -$

ELE SB400 & Switchboard (main disconnect) - 400 amp, up to 600 volt EA -$ -$ -$ -$

ELE SB4000 & Switchboard (main disconnect) - 4000 amp, up to 600 volt EA -$ -$ -$ -$

ELE SB600 & Switchboard (main disconnect) - 600 amp, up to 600 volt EA -$ -$ -$ -$

ELE SB800 & Switchboard (main disconnect) - 800 amp, up to 600 volt EA -$ -$ -$ -$

ELE SBRS + Switchboard - Detach & reset EA -$ -$ -$ -$

ELE SECC & Security system - contact w/wire (per opening) EA -$ -$ -$ -$

ELE SECC+ & Security system - contact w/wire (per opening)- High grade EA -$ -$ -$ -$

ELE SECK & Security system - key pad EA -$ -$ -$ -$

ELE SECK+ & Security system - key pad - High grade EA -$ -$ -$ -$

ELE SECM & Security system - pressure mat SF -$ -$ -$ -$

ELE SECMD & Security system - motion detector EA -$ -$ -$ -$

ELE SECP & Security system - control panel EA -$ -$ -$ -$

ELE SECP+ & Security system - control panel - High grade EA -$ -$ -$ -$

ELE SECPH & Security system - photo-electric beam EA -$ -$ -$ -$

ELE SFLX1 & Liquid tight flexible conduit, 1" LF -$ -$ -$ -$

ELE SFLX1/2 & Liquid tight flexible conduit, 1/2" LF -$ -$ -$ -$

ELE SFLX2 & Liquid tight flexible conduit, 2" LF -$ -$ -$ -$

ELE SFLX3/4 & Liquid tight flexible conduit, 3/4" LF -$ -$ -$ -$

ELE SMOKE & Smoke detector EA -$ -$ -$ -$

ELE SMOKE- & Smoke detector - Standard grade EA -$ -$ -$ -$

ELE SMOKE+ & Smoke detector - High grade EA -$ -$ -$ -$

ELE SMOKE++ & Smoke detector - Premium grade EA -$ -$ -$ -$

ELE SMOKERS + Smoke detector - Detach & reset EA -$ -$ -$ -$

ELE SPBOX & 12/2 high strand speaker wiring run, box and terminal EA -$ -$ -$ -$

ELE SPBOX+ & 12/2 high strand speaker wiring run - low inductance EA -$ -$ -$ -$

ELE SS100 & Safety switch (disconnect) - 100 amp 240v 3P type 1 EA -$ -$ -$ -$

ELE SS100+ & Safety switch (disconnect) - 100 amp 240v 3P type 3R EA -$ -$ -$ -$

Page 48: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

ELE SS100> & Safety switch (disconnect) - 100 amp 600v 3P type 1 EA -$ -$ -$ -$

ELE SS100>+ & Safety switch (disconnect) - 100 amp 600v 3P type 3R EA -$ -$ -$ -$

ELE SS200 & Safety switch (disconnect) - 200 amp 240v 3P type 1 EA -$ -$ -$ -$

ELE SS200+ & Safety switch (disconnect) - 200 amp 240v 3P type 3R EA -$ -$ -$ -$

ELE SS200> & Safety switch (disconnect) - 200 amp 600v 3P type 1 EA -$ -$ -$ -$

ELE SS200>+ & Safety switch (disconnect) - 200 amp 600v 3P type 3R EA -$ -$ -$ -$

ELE SS30 & Safety switch (disconnect) - 30 amp 240v 3P type 1 EA -$ -$ -$ -$

ELE SS30+ & Safety switch (disconnect) - 30 amp 240v 3P type 3R EA -$ -$ -$ -$

ELE SS30> & Safety switch (disconnect) - 30 amp 600v 3P type 1 EA -$ -$ -$ -$

ELE SS30>+ & Safety switch (disconnect) - 30 amp 600v 3P type 3R EA -$ -$ -$ -$

ELE SS400 & Safety switch (disconnect) - 400 amp 240v 3P type 1 EA -$ -$ -$ -$

ELE SS400+ & Safety switch (disconnect) - 400 amp 240v 3P type 3R EA -$ -$ -$ -$

ELE SS400> & Safety switch (disconnect) - 400 amp 600v 3P type 1 EA -$ -$ -$ -$

ELE SS400>+ & Safety switch (disconnect) - 400 amp 600v 3P type 3R EA -$ -$ -$ -$

ELE SS60 & Safety switch (disconnect) - 60 amp 240v 3P type 1 EA -$ -$ -$ -$

ELE SS60+ & Safety switch (disconnect) - 60 amp 240v 3P type 3R EA -$ -$ -$ -$

ELE SS60> & Safety switch (disconnect) - 60 amp 600v 3P type 1 EA -$ -$ -$ -$

ELE SS60>+ & Safety switch (disconnect) - 60 amp 600v 3P type 3R EA -$ -$ -$ -$

ELE SS600 & Safety switch (disconnect) - 600 amp 240v 3P type 1 EA -$ -$ -$ -$

ELE SS600+ & Safety switch (disconnect) - 600 amp 240v 3P type 3R EA -$ -$ -$ -$

ELE SS600> & Safety switch (disconnect) - 600 amp 600v 3P type 1 EA -$ -$ -$ -$

ELE SS600>+ & Safety switch (disconnect) - 600 amp 600v 3P type 3R EA -$ -$ -$ -$

ELE SS800 & Safety switch (disconnect) - 800 amp 240v 3P type 1 EA -$ -$ -$ -$

ELE SS800+ & Safety switch (disconnect) - 800 amp 240v 3P type 3R EA -$ -$ -$ -$

ELE SS800> & Safety switch (disconnect) - 800 amp 600v 3P type 1 EA -$ -$ -$ -$

ELE SS800>+ & Safety switch (disconnect) - 800 amp 600v 3P type 3R EA -$ -$ -$ -$

ELE SURGE & Surge suppression device EA -$ -$ -$ -$

ELE SWDET & Detection switch for infrared EA -$ -$ -$ -$

ELE TRAN15 & Distribution transformer - 480v. 15kva EA -$ -$ -$ -$

ELE TRAN150 & Distribution transformer - 480v. 150kva EA -$ -$ -$ -$

ELE TRAN30 & Distribution transformer - 480v. 30kva EA -$ -$ -$ -$

ELE TRAN300 & Distribution transformer - 480v. 300kva EA -$ -$ -$ -$

ELE TRAN45 & Distribution transformer - 480v. 45kva EA -$ -$ -$ -$

ELE TRAN75 & Distribution transformer - 480v. 75kva EA -$ -$ -$ -$

ELE TRANSF & Distribution transformer - 480v. 100kva EA -$ -$ -$ -$

ELE TRANSF< & Distribution transformer - 480v. 9kva EA -$ -$ -$ -$

ELE TRUNK & Trunk cable - aluminum - 4 wire 2/0 LF -$ -$ -$ -$

ELE TRUNK- & Trunk cable - aluminum - 4 wire #2 LF -$ -$ -$ -$

ELE TRUNK-- & Trunk cable - aluminum - 4 wire #4 LF -$ -$ -$ -$

ELE TRUNK+ & Trunk cable - aluminum - 4 wire 4/0 LF -$ -$ -$ -$

ELE TRUNK++ & Trunk cable - copper in conduit - 3-350 MCM & 1-1/0 grnd. LF -$ -$ -$ -$

ELE TRUNKC & Trunk cable - copper in conduit - 3-500 MCM & 1-1/0 grnd. LF -$ -$ -$ -$

ELE TS & Thermostat - electric heat EA -$ -$ -$ -$

ELE TS+ & Thermostat - electric heat - High grade EA -$ -$ -$ -$

ELE TS++ & Thermostat - electric heat - Premium grade - programmable EA -$ -$ -$ -$

ELE TS+++ & Thermostat - electric heat - Deluxe grade - programmable EA -$ -$ -$ -$

ELE TSB & Thermostat - electric heat - baseboard mounted EA -$ -$ -$ -$

ELE TV & Television antenna EA -$ -$ -$ -$

ELE TV- & Television antenna - Standard grade EA -$ -$ -$ -$

ELE TV+ & Television antenna - High grade EA -$ -$ -$ -$

ELE TV++ & Television antenna - Premium grade EA -$ -$ -$ -$

ELE TVCAB & Television cable outlet EA -$ -$ -$ -$

ELE TVCOAX & Coaxial TV cable LF -$ -$ -$ -$

ELE TVRS + Television antenna - Detach & reset EA -$ -$ -$ -$

ELE UG & Meter conduit extension - underground power - 2" - per LF LF -$ -$ -$ -$

ELE UG> & Meter conduit extension- underground power- 2 1/2"- per LF -$ -$ -$ -$

LF

ELE UG» & Meter conduit extension - underground power - 3" - per LF LF -$ -$ -$ -$

ELE UPC25 & Utility pole - composite - 25' EA -$ -$ -$ -$

ELE UPC35 & Utility pole - composite - 35' EA -$ -$ -$ -$

ELE UPS35 & Utility pole - steel - 35' EA -$ -$ -$ -$

ELE UPW25 & Utility pole - wood - 25' EA -$ -$ -$ -$

ELE UPW35 & Utility pole - wood - 35' EA -$ -$ -$ -$

ELE W1 & #1 gauge copper wire - stranded or solid LF -$ -$ -$ -$

ELE W1/0 & 1/0 gauge copper cable LF -$ -$ -$ -$

Page 49: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

ELE W10 & #10 gauge copper wire - stranded or solid LF -$ -$ -$ -$

ELE W110 & 110 volt wiring (12/2 copper conductor with ground) LF -$ -$ -$ -$

ELE W110< & 110 volt wiring (14/2 copper conductor with ground) LF -$ -$ -$ -$

ELE W110<3 & 110 volt wiring (14/3 copper conductor with ground) LF -$ -$ -$ -$

ELE W1103 & 110 volt wiring (12/3 copper conductor with ground) LF -$ -$ -$ -$

ELE W110MC & 110 volt wiring (12/2 copper w/ground) metal clad/armored LF -$ -$ -$ -$

ELE W110U & 110 volt wiring (12/2 copper w/ground) - underground LF -$ -$ -$ -$

ELE W12 & #12 gauge copper wire - stranded or solid LF -$ -$ -$ -$

ELE W14 & #14 to #16 gauge copper wire - stranded or solid LF -$ -$ -$ -$

ELE W2 & #2 gauge copper wire - stranded or solid LF -$ -$ -$ -$

ELE W2/0 & 2/0 gauge copper cable LF -$ -$ -$ -$

ELE W220 & 220 volt wiring (8/3 copper conductor with ground) LF -$ -$ -$ -$

ELE W220< & 220 volt copper wiring (10/3 with ground) LF -$ -$ -$ -$

ELE W220> & 220 volt wiring (6/3 copper conductor with ground) LF -$ -$ -$ -$

ELE W220MC & 220 volt wiring (8/3 copper w/ground) metal clad/armored LF -$ -$ -$ -$

ELE W250MCM & 250 MCM copper cable LF -$ -$ -$ -$

ELE W4 & #4 gauge copper wire - stranded or solid LF -$ -$ -$ -$

ELE W4/0 & 4/0 gauge copper cable LF -$ -$ -$ -$

ELE W500MCM & 500 MCM copper cable LF -$ -$ -$ -$

ELE W6 & #6 gauge copper wire - stranded or solid LF -$ -$ -$ -$

ELE W8 & #8 gauge copper wire - stranded or solid LF -$ -$ -$ -$

ELE WALL & Wall heater EA -$ -$ -$ -$

ELE WALL+ & Wall heater - High grade EA -$ -$ -$ -$

ELE WALL++ & Wall heater - Premium grade EA -$ -$ -$ -$

ELE WALLRS + Wall heater - Detach & reset EA -$ -$ -$ -$

ELE WIRE + Wire - average residence - copper wiring SF -$ -$ -$ -$

ELE XOS & Exterior outlet or switch EA -$ -$ -$ -$

ELE XOSC & Exterior outlet or switch cover EA -$ -$ -$ -$

ELE XOSRS + Exterior outlet or switch - Detach & reset EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

EQU BHOE + Backhoe loader and operator HR -$ -$ -$ -$

EQU BIDITM + Heavy Equipment (Bid Item) EA -$ -$ -$ -$

EQU BLIFT + Boom lift - 30'-45' reach DA -$ -$ -$ -$

EQU BLIFT> + Boom lift - 50'-60' reach DA -$ -$ -$ -$

EQU BTRUK + Boom truck and operator - 20 ton HR -$ -$ -$ -$

EQU CHD500 + Construction elevator/material hoist - double cage MO -$ -$ -$ -$

EQU CHDPS & Const. elevator/ mat. hoist - double - additional section EA -$ -$ -$ -$

EQU CHDS & Const. elevator/ material hoist - double cage - set up EA -$ -$ -$ -$

EQU CHS500 + Construction elevator/material hoist - single cage MO -$ -$ -$ -$

EQU CHSD + Construction elevator/material hoist safety door EA -$ -$ -$ -$

EQU CHSPS & Const. elevator/ mat. hoist - single - additional section EA -$ -$ -$ -$

EQU CHSS & Const. elevator/ material hoist - single cage - set up EA -$ -$ -$ -$

EQU CRAN115 + Crane and operator - 115 ton capacity HR -$ -$ -$ -$

EQU CRANE + Crane and operator - 14 ton capacity - 65' extension boom HR -$ -$ -$ -$

EQU CRANE30 + Crane and operator - 30 ton capacity HR -$ -$ -$ -$

EQU CRANE50 + Crane and operator - 50 ton capacity HR -$ -$ -$ -$

EQU CRANETW + Tower crane and operator - 11 ton capacity MO -$ -$ -$ -$

EQU CRNTWS & Tower crane set up EA -$ -$ -$ -$

EQU CRNTWSS & Tower crane set up - additional section EA -$ -$ -$ -$

EQU DLVR + Rental equipment delivery / mobilization (Bid item) EA -$ -$ -$ -$

EQU DTRUK + Dump truck and operator - 10 ton HR -$ -$ -$ -$

EQU DTRUK< + Single axle dump truck and operator HR -$ -$ -$ -$

EQU JIBC + Jib crane - 1 ton (360 degree pivoting) EA -$ -$ -$ -$

EQU JIBC> + Jib crane - 3 ton (360 degree pivoting) EA -$ -$ -$ -$

EQU LAB + Equipment Operator - per hour HR -$ -$ -$ -$

EQU LABL + General Laborer - per hour HR -$ -$ -$ -$

EQU LOADER + Front end wheel loader and operator HR -$ -$ -$ -$

EQU MN + Heavy Equipment - Labor Minimum EA -$ -$ -$ -$

EQU OHC10 + Overhead crane - 10 ton EA -$ -$ -$ -$

EQU OHC2 + Overhead crane - small EA -$ -$ -$ -$

EQU OHC5 + Overhead crane - 5 ton EA -$ -$ -$ -$

EQU PJK + Pallet Jack - up to 6000 lb capacity - manual DA -$ -$ -$ -$

Page 50: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

EQU SKID + Skid steer loader and operator HR -$ -$ -$ -$

EQU SLIFT + Scissor lift - 20' platform height - electric powered DA -$ -$ -$ -$

EQU SLIFT> + Scissor lift - 26' platform height - electric powered DA -$ -$ -$ -$

EQU TELEH + Telehandler/forklift and operator HR -$ -$ -$ -$

EQU TELEHD + Telehandler/forklift (per day) - no operator DA -$ -$ -$ -$

EQU TELEHW + Telehandler/forklift (per week) - no operator WK -$ -$ -$ -$

EQU TRHOE + Trackhoe/excavator and operator HR -$ -$ -$ -$

EQU WCHIP + Chipper/shredder (per day) - no operator DA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

EXC BFH + Backfill by hand - No compaction CY -$ -$ -$ -$

EXC BHOE + Backhoe loader and operator HR -$ -$ -$ -$

EXC BIDITM + Excavation (Bid Item) EA -$ -$ -$ -$

EXC BKFL + Backfill foundations LF -$ -$ -$ -$

EXC CAISSD + Caisson excavation - slurry drilled 48" LF -$ -$ -$ -$

EXC COMP + Walk behind drum compactor and operator HR -$ -$ -$ -$

EXC COMP< + Walk behind plate compactor and operator HR -$ -$ -$ -$

EXC COMP> + Riding drum compactor and operator HR -$ -$ -$ -$

EXC CVRT18 + Culvert - 18" LF -$ -$ -$ -$

EXC CVRT24 + Culvert - 24" LF -$ -$ -$ -$

EXC DIAWALL + Diaphragm wall excavation SF -$ -$ -$ -$

EXC DOZER + Dozer/crawler and operator HR -$ -$ -$ -$

EXC DTRUK + Dump truck and operator - 10 ton HR -$ -$ -$ -$

EXC DW + Dewatering CY -$ -$ -$ -$

EXC ECB + Erosion control - blanket SF -$ -$ -$ -$

EXC ECSB + Erosion control - sand or gravel bag EA -$ -$ -$ -$

EXC ECW + Erosion control - wattle LF -$ -$ -$ -$

EXC EFILL + Engineered fill (per CY) CY -$ -$ -$ -$

EXC EXC + Building foundation excavation CY -$ -$ -$ -$

EXC EXCH + Excavate by hand CY -$ -$ -$ -$

EXC GRAV + Gravel (per CY) CY -$ -$ -$ -$

EXC GRAV+ + Gravel under slab - in place CY -$ -$ -$ -$

EXC GRAVW + Gravel - washed (per CY) CY -$ -$ -$ -$

EXC LAB + Equipment Operator - per hour HR -$ -$ -$ -$

EXC LABL + General Laborer - per hour HR -$ -$ -$ -$

EXC LOADER + Front end wheel loader and operator HR -$ -$ -$ -$

EXC RAB + Recycled asphalt base CY -$ -$ -$ -$

EXC ROADB + Road base (per CY) CY -$ -$ -$ -$

EXC SAND + Bedding sand CY -$ -$ -$ -$

EXC SKID + Skid steer loader and operator HR -$ -$ -$ -$

EXC TRHOE + Trackhoe/excavator and operator HR -$ -$ -$ -$

EXC TSOIL + Topsoil (per CY) CY -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FCC AV & Carpet SF -$ -$ -$ -$

FCC AV- & Carpet - Standard grade SF -$ -$ -$ -$

FCC AV-- & Carpet - Economy grade SF -$ -$ -$ -$

FCC AV+ & Carpet - High grade SF -$ -$ -$ -$

FCC AV++ & Carpet - Premium grade SF -$ -$ -$ -$

FCC AVB + Additional labor cost for Berber or patterned carpets SF -$ -$ -$ -$

FCC AVRS + Carpet - Detach & relay SF -$ -$ -$ -$

FCC BIDITM + Floor Covering - Carpet (Bid Item) EA -$ -$ -$ -$

FCC BIND + Carpet binding LF -$ -$ -$ -$

FCC BW + Add on charge for "baluster wrap" carpet installation EA -$ -$ -$ -$

FCC CALC + Calcium Chloride moisture test - per sample EA -$ -$ -$ -$

FCC CCSA + California Carpet Stewardship Assessment SY -$ -$ -$ -$

FCC COVE & Carpet cove (wall wrap) - 4" LF -$ -$ -$ -$

FCC COVE- & Carpet cove (wall wrap) - 4" - excludes carpet material LF -$ -$ -$ -$

FCC COVE> & Carpet cove (wall wrap) - 6" LF -$ -$ -$ -$

FCC COVE>- & Carpet cove (wall wrap) - 6" - excludes carpet material LF -$ -$ -$ -$

FCC COVE>> & Carpet cove (wall wrap) - 8" LF -$ -$ -$ -$

Page 51: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FCC COVE>>- & Carpet cove (wall wrap) - 8" - excludes carpet material LF -$ -$ -$ -$

FCC COVH & Carpet cove (wall wrap) - hemmed - 4" LF -$ -$ -$ -$

FCC COVH> & Carpet cove (wall wrap) - hemmed - 6" LF -$ -$ -$ -$

FCC COVH>> & Carpet cove (wall wrap) - hemmed - 8" LF -$ -$ -$ -$

FCC CP & Cut pile carpet - 36 oz. SF -$ -$ -$ -$

FCC CP- & Cut pile carpet - 24 oz. SF -$ -$ -$ -$

FCC CP+ & Cut pile carpet - 46 oz. SF -$ -$ -$ -$

FCC CP++ & Cut pile carpet - 54 oz. SF -$ -$ -$ -$

FCC CT & Carpet tile SF -$ -$ -$ -$

FCC CT- & Carpet tile - Standard grade SF -$ -$ -$ -$

FCC CT+ & Carpet tile - High grade SF -$ -$ -$ -$

FCC EDGE & Carpet - metal transition strip LF -$ -$ -$ -$

FCC FP + Floor prep (scrape rubber back residue) SF -$ -$ -$ -$

FCC GD & Glue down carpet SF -$ -$ -$ -$

FCC GD- & Glue down carpet - Standard grade SF -$ -$ -$ -$

FCC GD+ & Glue down carpet - High grade SF -$ -$ -$ -$

FCC GD++ & Glue down carpet - Premium grade SF -$ -$ -$ -$

FCC GDC & Glue down carpet - heavy traffic SF -$ -$ -$ -$

FCC I/O & Indoor / outdoor carpet SF -$ -$ -$ -$

FCC I/O- & Indoor / outdoor carpet - Standard grade SF -$ -$ -$ -$

FCC I/O+ & Indoor / outdoor carpet - High grade SF -$ -$ -$ -$

FCC I/0++ & Indoor / outdoor carpet - Premium grade SF -$ -$ -$ -$

FCC LAB + Carpet Installer - per hour HR -$ -$ -$ -$

FCC LABL + Carpet - General Laborer - per hour HR -$ -$ -$ -$

FCC LAY + Lay existing carpet - Labor only SF -$ -$ -$ -$

FCC LAYNEW + Lay new carpet - Labor only SF -$ -$ -$ -$

FCC MATCH + Special order - premium matching charge SF -$ -$ -$ -$

FCC MN + Carpet - Labor Minimum EA -$ -$ -$ -$

FCC NFCP & Carpet - per specs from independent carpet analysis SF -$ -$ -$ -$

FCC NFCPCT & Carpet tile - per specs from independent carpet analysis SF -$ -$ -$ -$

FCC NFCPGD & Glue-down carpet - per specs from independent analysis SF -$ -$ -$ -$

FCC NFCPPAD & Carpet pad - per specs from independent pad analysis SF -$ -$ -$ -$

FCC PAD & Carpet pad SF -$ -$ -$ -$

FCC PAD- & Carpet pad - Standard grade SF -$ -$ -$ -$

FCC PAD+ & Carpet pad - High grade SF -$ -$ -$ -$

FCC PAD++ & Carpet pad - Premium grade SF -$ -$ -$ -$

FCC PADVP & Carpet pad - Virgin polyurethane - up to 3/8" SF -$ -$ -$ -$

FCC PADVP> & Carpet pad - Virgin polyurethane - 7/16" SF -$ -$ -$ -$

FCC PFE & Pad - felt SF -$ -$ -$ -$

FCC PRE3/8 & Pad - rebond, 3/8", 7 lb. SF -$ -$ -$ -$

FCC SEAMS + Seam carpet LF -$ -$ -$ -$

FCC SS + Stairway skirt board charge for carpet installation LF -$ -$ -$ -$

FCC STP + Step charge for "waterfall" carpet installation EA -$ -$ -$ -$

FCC STP+ + Step charge for "tucked" carpet installation - High grade EA -$ -$ -$ -$

FCC STPEW + Add on charge for "edge wrap" carpet installation EA -$ -$ -$ -$

FCC STPOR + Step charge for "open riser" carpet installation EA -$ -$ -$ -$

FCC TACK & Tackless strip - per LF LF -$ -$ -$ -$

FCC VRD & Vinyl reducer strip - for carpet LF -$ -$ -$ -$

FCC WOOL & Carpet - wool - looped SF -$ -$ -$ -$

FCC WOOL+ & Carpet - wool - cut SF -$ -$ -$ -$

FCC WOOL++ & Carpet - wool - Premium grade - 80+ ounce w/jute backing SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FCR BIDITM + Floor Covering - Resilient (Bid Item) EA -$ -$ -$ -$

FCR FTI & Tile - foam/soft rubber - interlocking - up to 1/2" SF -$ -$ -$ -$

FCR FTI> & Tile - foam/soft rubber - interlocking - 5/8" to 1" SF -$ -$ -$ -$

FCR LAB + Resilient Floor Covering Installer - per hour HR -$ -$ -$ -$

FCR LABL + Resilient Floor Covering - General Laborer - per hour HR -$ -$ -$ -$

FCR LINO & Linoleum floor covering (sheet goods) SF -$ -$ -$ -$

FCR NFCP & Vinyl comp. tile - per specs from independent analysis SF -$ -$ -$ -$

FCR RSR & Stair riser - resilient - 7" high, 1/8" thick LF -$ -$ -$ -$

FCR RUB & Rubberized floor surface - glued sheets, poured, or rolled SF -$ -$ -$ -$

FCR SAFET1 & Safety/Playground rubber tiles - interlocking - up to 1.5" SF -$ -$ -$ -$

Page 52: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FCR SAFET2 & Safety/Playground rubber tiles- interlocking- 1.75" - 2.5" SF -$ -$ -$ -$

FCR SAFET3 & Safety/Playground rubber tiles - interlocking - over 2.5" SF -$ -$ -$ -$

FCR SAFETR1 & Safety rubber interlocked tile reducer edge trim - 1.5" LF -$ -$ -$ -$

FCR SAFETR2 & Safety rubber interlocked tile reducer edge trim - 2.5" LF -$ -$ -$ -$

FCR SAFETR3 & Safety rubber interlocked tile reducer edge trim over 2.5" LF -$ -$ -$ -$

FCR SNO & Stair nosing safety tread - 1 1/2"x 3" LF -$ -$ -$ -$

FCR STR & Stair tread - 12" wide, 5/16" thick LF -$ -$ -$ -$

FCR TFU & Tile - Futuras (tufted rubber), 12"x 12" SF -$ -$ -$ -$

FCR TFU+ & Tile - Futuras (tufted rubber), 12" x 12" - recessed w/fra SF -$ -$ -$ -$

FCR TRU & Tile - rubber, 1/8" thick SF -$ -$ -$ -$

FCR TVC & Tile - vinyl composition SF -$ -$ -$ -$

FCR TVC+ & Tile - vinyl composition - High grade SF -$ -$ -$ -$

FCR TVC++ & Tile - vinyl composition - Premium grade SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FCS ACID + Acid wash stone floor SF -$ -$ -$ -$

FCS AV & Stone floor covering SF -$ -$ -$ -$

FCS AV+ & Stone floor covering - High grade SF -$ -$ -$ -$

FCS AV++ & Stone floor covering - Premium grade SF -$ -$ -$ -$

FCS AVRS + Stone floor covering - Detach & reset SF -$ -$ -$ -$

FCS BIDITM + Floor Covering - Stone (Bid Item) EA -$ -$ -$ -$

FCS CALC + Calcium Chloride moisture test - per sample EA -$ -$ -$ -$

FCS CNCRM - Additional labor to remove stone from concrete slab SF -$ -$ -$ -$

FCS GROUT + Regrout stone floor SF -$ -$ -$ -$

FCS GROUTC + Recolor/stain grout in stone tile floor SF -$ -$ -$ -$

FCS GROUTST + Regrout stone tile floor SF -$ -$ -$ -$

FCS LAB + Stone Flooring Installer - per hour HR -$ -$ -$ -$

FCS LABL + Stone Flooring - General Laborer - per hour HR -$ -$ -$ -$

FCS MBL & Marble or Granite floor tile SF -$ -$ -$ -$

FCS MBL+ & Marble or Granite floor tile - High grade SF -$ -$ -$ -$

FCS MBLB & Marble or Granite base LF -$ -$ -$ -$

FCS MBLB+ & Marble or Granite base - High grade LF -$ -$ -$ -$

FCS MBLP + Marble or Granite floor - buff & polish SF -$ -$ -$ -$

FCS MBLTR & Marble treads and risers LF -$ -$ -$ -$

FCS MN + Stone Floor Covering - Labor Minimum EA -$ -$ -$ -$

FCS NFCP & Stone floor covering - per specs from ind. stone analysis SF -$ -$ -$ -$

FCS NFCPMBL & Marble or Granite tile - per specs from ind. analysis SF -$ -$ -$ -$

FCS NFCPSL & Slate floor covering - per specs from ind. stone analysis SF -$ -$ -$ -$

FCS SEAL + Tile/stone sealer SF -$ -$ -$ -$

FCS SLATE & Slate floor covering SF -$ -$ -$ -$

FCS SLATE+ & Slate floor covering - High grade SF -$ -$ -$ -$

FCS SLATERS + Slate floor covering - Detach & reset SF -$ -$ -$ -$

FCS TZ2 & Terrazzo - bonded to substrate, 2" thick SF -$ -$ -$ -$

FCS TZ3 & Terrazzo - over sand cushion, 3" thick SF -$ -$ -$ -$

FCS TZB & Terrazzo cove base, 4" to 6" high LF -$ -$ -$ -$

FCS TZBRASS + Terrazzo - Add for brass strips SF -$ -$ -$ -$

FCS TZCLR + Terrazzo - Add for 2 colors of terrazzo SF -$ -$ -$ -$

FCS TZEPX + Terrazzo - Epoxy system, 1/4" thick SF -$ -$ -$ -$

FCS TZR + Terrazzo resurfacing - grind and re-seal SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FCT AV & Tile floor covering SF -$ -$ -$ -$

FCT AV- & Tile floor covering - Standard grade SF -$ -$ -$ -$

FCT AV-- & Tile floor covering - Economy grade SF -$ -$ -$ -$

FCT AV+ & Tile floor covering - High grade SF -$ -$ -$ -$

FCT AV++ & Tile floor covering - Premium grade SF -$ -$ -$ -$

FCT B & Tile base LF -$ -$ -$ -$

FCT B- & Tile base - Standard grade LF -$ -$ -$ -$

FCT B+ & Tile base - High grade LF -$ -$ -$ -$

FCT B++ & Tile base - Premium grade LF -$ -$ -$ -$

FCT BCEM1/2 & 1/2" Cement board SF -$ -$ -$ -$

Page 53: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FCT BCEM1/4 & 1/4" Cement board SF -$ -$ -$ -$

FCT BIDITM + Floor Covering - Tile (Bid Item) EA -$ -$ -$ -$

FCT CALC + Calcium Chloride moisture test - per sample EA -$ -$ -$ -$

FCT CNCRM - Additional labor to remove tile from concrete slab SF -$ -$ -$ -$

FCT DIAGADD + Add-on for diagonal tile installation SF -$ -$ -$ -$

FCT GROUT + Regrout tile floor SF -$ -$ -$ -$

FCT GROUTC + Recolor/stain grout in tile floor SF -$ -$ -$ -$

FCT LAB + Ceramic Tile Flooring Installer - per hour HR -$ -$ -$ -$

FCT LABL + Ceramic Tile Flooring - General Laborer - per hour HR -$ -$ -$ -$

FCT LEVCEM + Floor leveling cement - Average SF -$ -$ -$ -$

FCT LEVCEM< + Floor leveling cement - Light SF -$ -$ -$ -$

FCT LEVCEM> + Floor leveling cement - Heavy SF -$ -$ -$ -$

FCT MAT & Tile mat - uncoupling membrane SF -$ -$ -$ -$

FCT MN + Tile Floor Covering - Labor Minimum EA -$ -$ -$ -$

FCT MORTAR & Mortar bed for tile floors SF -$ -$ -$ -$

FCT NFCP & Tile floor covering - per specs from ind. tile analysis SF -$ -$ -$ -$

FCT NFCPQ & Quarry floor tile - per specs from ind. tile analysis SF -$ -$ -$ -$

FCT NFCPS & Saltillo floor tile - per specs from ind. tile analysis SF -$ -$ -$ -$

FCT QT & Quarry tile floor SF -$ -$ -$ -$

FCT QT+ & Quarry tile floor - High grade SF -$ -$ -$ -$

FCT QT++ & Quarry tile floor - Premium grade SF -$ -$ -$ -$

FCT SAL & Saltillo tile 12" x 12" SF -$ -$ -$ -$

FCT SALP & Saltillo presealed tile 12" x 12" SF -$ -$ -$ -$

FCT SEALG + Grout sealer SF -$ -$ -$ -$

FCT SEALS + Tile/stone sealer SF -$ -$ -$ -$

FCT SLATE & Slate tile SF -$ -$ -$ -$

FCT SLATE- & Slate tile - Standard grade SF -$ -$ -$ -$

FCT SLATE+ & Slate tile - High grade SF -$ -$ -$ -$

FCT SLATE++ & Slate tile - Premium grade SF -$ -$ -$ -$

FCT TRAY & Travertine tile SF -$ -$ -$ -$

FCT TRAY- & Travertine tile - Standard grade SF -$ -$ -$ -$

FCT TRAV+ & Travertine tile - High grade SF -$ -$ -$ -$

FCT TRAV++ & Travertine tile - Premium grade SF -$ -$ -$ -$

FCT UC1/4 & Underlayment - 1/4" cork SF -$ -$ -$ -$

FCT UC1/8 & Underlayment - 1/8" cork SF -$ -$ -$ -$

FCT US & Underlayment - sound/crack membrane - up to 40 mil SF -$ -$ -$ -$

FCT US> & Underlayment - sound/crack membrane - 40+ to 70 mil SF -$ -$ -$ -$

FCT US>> & Underlayment - sound/crack membrane - 70+ to 90 mil SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FCV ASBRMV - Tear out asbestos vinyl floor covering (no haul off) SF -$ -$ -$ -$

FCV AV & Vinyl floor covering (sheet goods) SF -$ -$ -$ -$

FCV AV- & Vinyl floor covering (sheet goods) - Standard grade SF -$ -$ -$ -$

FCV AV-- & Vinyl floor covering (sheet goods) - Economy grade SF -$ -$ -$ -$

FCV AV+ & Vinyl floor covering (sheet goods) - High grade SF -$ -$ -$ -$

FCV AV++ & Vinyl floor covering (sheet goods) - Premium grade SF -$ -$ -$ -$

FCV AVALR - Tear out additional layer of vinyl floor covering SF -$ -$ -$ -$

FCV AVPR - Tear out perimeter-adhered/fastened vinyl floor covering SF -$ -$ -$ -$

FCV BIDITM + Floor Covering - Vinyl (Bid Item) EA -$ -$ -$ -$

FCV CALC + Calcium Chloride moisture test - per sample EA -$ -$ -$ -$

FCV CB2 & Cove base molding - rubber or vinyl, 2 1/2" high LF -$ -$ -$ -$

FCV CB4 & Cove base molding - rubber or vinyl, 4" high LF -$ -$ -$ -$

FCV CB6 & Cove base molding - rubber or vinyl, 6" high LF -$ -$ -$ -$

FCV COVE & Vinyl cove - 4" wrap LF -$ -$ -$ -$

FCV COVE- & Vinyl cove - 4" wrap - excludes vinyl material LF -$ -$ -$ -$

FCV COVE> & Vinyl cove - 6" wrap LF -$ -$ -$ -$

FCV COVE>- & Vinyl cove - 6" wrap - excludes vinyl material LF -$ -$ -$ -$

FCV COVE>> & Vinyl cove - 8" wrap LF -$ -$ -$ -$

FCV COVE>>- & Vinyl cove - 8" wrap - excludes vinyl material LF -$ -$ -$ -$

FCV EDGE & Vinyl - metal transition strip LF -$ -$ -$ -$

FCV LAB + Vinyl Floor Covering Installer - per hour HR -$ -$ -$ -$

FCV LABL + Vinyl Floor Covering - General Laborer - per hour HR -$ -$ -$ -$

FCV MATCH + Special order - premium matching charge SF -$ -$ -$ -$

Page 54: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FCV MN + Vinyl Floor Covering - Labor Minimum EA -$ -$ -$ -$

FCV NFCP & Vinyl floor - per specs from independent vinyl analysis SF -$ -$ -$ -$

FCV NFCPPLK & Vinyl plank flooring - per specs from ind. vinyl analysis SF -$ -$ -$ -$

FCV NFCPUL & Wood underlayment - per specs from independent analysis SF -$ -$ -$ -$

FCV NFCPVT & Vinyl tile - per specs from independent vinyl analysis SF -$ -$ -$ -$

FCV NFCPVTS & Vinyl tile - self adhesive - per specs from ind. analysis SF -$ -$ -$ -$

FCV PLK & Vinyl plank flooring SF -$ -$ -$ -$

FCV PLK- & Vinyl plank flooring - Standard grade SF -$ -$ -$ -$

FCV PLK+ & Vinyl plank flooring - High grade SF -$ -$ -$ -$

FCV PLK++ & Vinyl plank flooring - Premium grade SF -$ -$ -$ -$

FCV PLKGDC & Add for glued down application over concrete substrate SF -$ -$ -$ -$

FCV PLKGDW & Add for glued down application over wood substrate SF -$ -$ -$ -$

FCV PREP + Floor preparation for resilient flooring SF -$ -$ -$ -$

FCV PREP+ + Floor preparation for resilient flooring - Heavy SF -$ -$ -$ -$

FCV PREPE + Embossing leveler for vinyl flooring SF -$ -$ -$ -$

FCV STP + Step charge for vinyl installation EA -$ -$ -$ -$

FCV TRACK & Track/Sports surface - synthetic/rubber SF -$ -$ -$ -$

FCV UL1/2 & Underlayment - 1/2" particle board SF -$ -$ -$ -$

FCV UL1/2P & Underlayment - 1/2" BC plywood SF -$ -$ -$ -$

FCV UL1/2W & Underlayment - 1/2" OSB SF -$ -$ -$ -$

FCV UL1/4 & Underlayment - 1/4" lauan/mahogany plywood SF -$ -$ -$ -$

FCV UL1/4M & Underlayment - 1/4" hardboard SF -$ -$ -$ -$

FCV UL1/4P & Underlayment - 1/4" BC plywood SF -$ -$ -$ -$

FCV UL1/4P+ & Underlayment - 1/4" 5 ply SF -$ -$ -$ -$

FCV UL1/4W & Underlayment - 1/4" waterproof OSB SF -$ -$ -$ -$

FCV UL3/4 & Underlayment - 3/4" particle board SF -$ -$ -$ -$

FCV UL3/4P & Underlayment - 3/4" BC plywood SF -$ -$ -$ -$

FCV UL3/4TG & Underlayment - 3/4" CDX plywood - tongue and groove SF -$ -$ -$ -$

FCV UL3/4W & Underlayment - 3/4" OSB - tongue and groove SF -$ -$ -$ -$

FCV UL3/4WW & Underlayment - 3/4" OSB - High grade eng. water resistant SF -$ -$ -$ -$

FCV UL3/8 & Underlayment - 3/8" particle board SF -$ -$ -$ -$

FCV UL3/8P & Underlayment - 3/8" BC plywood SF -$ -$ -$ -$

FCV UL5/8 & Underlayment - 5/8" particle board SF -$ -$ -$ -$

FCV UL5/8P & Underlayment - 5/8" BC plywood SF -$ -$ -$ -$

FCV UL5/8W & Underlayment - 5/8" OSB SF -$ -$ -$ -$

FCV ULACS + Additional charge for screwing down underlayment SF -$ -$ -$ -$

FCV ULVR - Tear out vinyl & underlayment SF -$ -$ -$ -$

FCV V & Vinyl tile SF -$ -$ -$ -$

FCV V- & Vinyl tile - Standard grade SF -$ -$ -$ -$

FCV V+ & Vinyl tile - High grade SF -$ -$ -$ -$

FCV V++ & Vinyl tile - Premium grade SF -$ -$ -$ -$

FCV VACC + Vinyl tile - accent strip LF -$ -$ -$ -$

FCV VS & Vinyl tile - self adhesive SF -$ -$ -$ -$

FCV VS- & Vinyl tile - self adhesive - Standard grade SF -$ -$ -$ -$

FCV VS+ & Vinyl tile - self adhesive - High grade SF -$ -$ -$ -$

FCV VS++ & Vinyl tile - self adhesive - Premium grade SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FCW AV & Oak flooring - #1 common - no finish SF -$ -$ -$ -$

FCW AV- & Oak flooring - #2 common - no finish SF -$ -$ -$ -$

FCW AV+ & Oak flooring - select grade - no finish SF -$ -$ -$ -$

FCW AV++ & Oak flooring - clear grade - no finish SF -$ -$ -$ -$

FCW AVPF & Pre-finished solid wood flooring SF -$ -$ -$ -$

FCW AVPF+ & Pre-finished solid wood flooring - High grade SF -$ -$ -$ -$

FCW AVPF++ & Pre-finished solid wood flooring - Premium grade SF -$ -$ -$ -$

FCW AVPFD & Pre-finished - pre-distressed / hand scraped SF -$ -$ -$ -$

FCW BAM & Bamboo flooring - no finish SF -$ -$ -$ -$

FCW BAME & Bamboo flooring - engineered - pre-finished SF -$ -$ -$ -$

FCW BAMP & Bamboo flooring - pre-finished SF -$ -$ -$ -$

FCW BAMP+ & Bamboo flooring - stained - pre-finished SF -$ -$ -$ -$

FCW BAMP++ & Bamboo flooring - scraped - pre-finished SF -$ -$ -$ -$

FCW BARR + Vapor barrier - 15# felt SF -$ -$ -$ -$

FCW BARRV & Vapor barrier - visqueen - 6mil SF -$ -$ -$ -$

Page 55: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FCW BIDITM + Floor Covering - Wood (Bid Item) EA -$ -$ -$ -$

FCW BIR & Birch flooring - #1 common - no finish SF -$ -$ -$ -$

FCW BIR- & Birch flooring - #2 common - no finish SF -$ -$ -$ -$

FCW BIR+ & Birch flooring - select grade - no finish SF -$ -$ -$ -$

FCW BIR++ & Birch flooring - clear grade - no finish SF -$ -$ -$ -$

FCW CALC + Calcium Chloride moisture test - per sample EA -$ -$ -$ -$

FCW CHE & Cherry floor - #3 grade - no finish SF -$ -$ -$ -$

FCW CHE+ & Cherry floor - #2 or better - no finish SF -$ -$ -$ -$

FCW CHE++ & Cherry floor - #1 or better - select grade - no finish SF -$ -$ -$ -$

FCW CK & Cork flooring - snaplock floating SF -$ -$ -$ -$

FCW CK- & Cork flooring - snaplock floating - Standard grade SF -$ -$ -$ -$

FCW CK+ & Cork flooring - snaplock floating - High grade SF -$ -$ -$ -$

FCW CK++ & Cork flooring - snaplock floating - Premium grade SF -$ -$ -$ -$

FCW CKT & Cork flooring - solid tile SF -$ -$ -$ -$

FCW CKT- & Cork flooring - solid tile - Standard grade SF -$ -$ -$ -$

FCW CKT+ & Cork flooring - solid tile - High grade SF -$ -$ -$ -$

FCW CKT++ & Cork flooring - solid tile - Premium grade SF -$ -$ -$ -$

FCW DIAGADD + Add for diagonal installation SF -$ -$ -$ -$

FCW EPXF + Epoxy finish - one coat over concrete floor SF -$ -$ -$ -$

FCW EXPF & Pre-finished solid wood flooring - exotic species SF -$ -$ -$ -$

FCW FIN + Sand & finish wood floor (natural finish) SF -$ -$ -$ -$

FCW FIN- + Sand and seal wood floor SF -$ -$ -$ -$

FCW FIN+ + Sand, stain, and finish wood floor SF -$ -$ -$ -$

FCW FINADD + Additional coats of finish (per coat) SF -$ -$ -$ -$

FCW FINDS + Add for dustless floor sanding SF -$ -$ -$ -$

FCW FINMN + Finish wood floor - Minimum charge EA -$ -$ -$ -$

FCW FINP + Additional cost to pre-stain wood flooring SF -$ -$ -$ -$

FCW FINREG + Sand & finish wood heat register EA -$ -$ -$ -$

FCW FINSC + Screen and coat wood floor SF -$ -$ -$ -$

FCW FINSTP + Sand & finish steps and/or risers (natural finish) LF -$ -$ -$ -$

FCW FINSTP+ + Sand, stain, and finish steps and/or risers LF -$ -$ -$ -$

FCW FINSTPP + Additional cost to pre-stain wood step and/or risers LF -$ -$ -$ -$

FCW FINSTW + Sand & finish steps/risers (nat. finish) water-based/latex LF -$ -$ -$ -$

FCW FINSTW+ + Sand, stain, and finish steps/risers - water-based/latex LF -$ -$ -$ -$

FCW FINW + Sand & finish wood floor (nat. finish) - water-based/latex SF -$ -$ -$ -$

FCW FINW+ + Sand, stain, & finish wood flr - water-based/latex finish SF -$ -$ -$ -$

FCW FIR & Fir floor - straight grain - no finish SF -$ -$ -$ -$

FCW FIR- & Fir subfloor - no finish SF -$ -$ -$ -$

FCW FS & Felt and sleepers/underlay - wood floor over concrete SF -$ -$ -$ -$

FCW FSP & Plastic sht./sleepers/underlay - wood floor over concrete SF -$ -$ -$ -$

FCW GADDC & Add for glued down application over concrete substrate SF -$ -$ -$ -$

FCW GADDW & Add for glued down application over wood substrate SF -$ -$ -$ -$

FCW HIK & Hickory floor - #3 grade - no finish SF -$ -$ -$ -$

FCW HIK+ & Hickory floor - #2 or better - no finish SF -$ -$ -$ -$

FCW HIK++ & Hickory floor - #1 or better - select grade - no finish SF -$ -$ -$ -$

FCW HIKDIS & Hickory floor - pre-distressed / hand scraped SF -$ -$ -$ -$

FCW ILB + Wood floor border inlay LF -$ -$ -$ -$

FCW LAB + Wood Floor Covering Installer - per hour HR -$ -$ -$ -$

FCW LABL + Wood Floor Covering - General Laborer - per hour HR -$ -$ -$ -$

FCW LAM & Laminate - simulated wood flooring SF -$ -$ -$ -$

FCW LAM- & Laminate - simulated wood flooring - Standard grade SF -$ -$ -$ -$

FCW LAM+ & Laminate - simulated wood flooring - High grade SF -$ -$ -$ -$

FCW LAMB & Baseboard - for wood flooring LF -$ -$ -$ -$

FCW LAME & End molding - for wood flooring LF -$ -$ -$ -$

FCW LAMQ & Quarter round - for wood flooring LF -$ -$ -$ -$

FCW LAMR & Reducer strip - for wood flooring LF -$ -$ -$ -$

FCW LAMS & Stair nosing - for wood flooring LF -$ -$ -$ -$

FCW LAMSL & Snaplock Laminate - simulated wood flooring SF -$ -$ -$ -$

FCW LAMSL- & Snaplock Laminate - simulated wood floor - Standard SF -$ -$ -$ -$

grade

FCW LAMSL+ & Snaplock Laminate - simulated wood flooring - High grade SF -$ -$ -$ -$

FCW LAMST & Laminate fir simulated wood- step charge (tread and riser) LF -$ -$ -$ -$

FCW LAMSTD & Laminate fir simulated wood - step charge (tread only) LF -$ -$ -$ -$

FCW LAMT & T- molding - for wood flooring LF -$ -$ -$ -$

FCW LAMTD & Engineered wood flooring SF -$ -$ -$ -$

Page 56: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FCW LAMTD- & Engineered wood flooring - Standard grade SF -$ -$ -$ -$

FCW LAMTD+ & Engineered wood flooring - High grade SF -$ -$ -$ -$

FCW LAMTD++ & Engineered wood flooring - Premium grade SF -$ -$ -$ -$

FCW LAMTDT & Engineered wood flooring - step charge (tread and riser) LF -$ -$ -$ -$

FCW LAMTDTD & Engineered wood flooring - step charge (tread only) LF -$ -$ -$ -$

FCW LAMTF & Engineered wood flooring - floating SF -$ -$ -$ -$

FCW LAMTF- & Engineered wood flooring - floating - Standard grade SF -$ -$ -$ -$

FCW LAMTF+ & Engineered wood flooring - floating - High grade SF -$ -$ -$ -$

FCW LAMTF++ & Engineered wood flooring - floating - Premium grade SF -$ -$ -$ -$

FCW LEVCEM + Floor leveling cement - Average SF -$ -$ -$ -$

FCW LEVCEM< + Floor leveling cement - Light SF -$ -$ -$ -$

FCW LEVCEM> + Floor leveling cement - Heavy SF -$ -$ -$ -$

FCW M & Maple floor - #3 grade - no finish SF -$ -$ -$ -$

FCW M+ & Maple floor - #2 or better - no finish SF -$ -$ -$ -$

FCW M++ & Maple floor - #1 or better - select grade - no finish SF -$ -$ -$ -$

FCW MASKLF + Mask or cover per linear foot LF -$ -$ -$ -$

FCW MASKSF + Mask or cover per square foot SF -$ -$ -$ -$

FCW MN + Wood Floor Covering - Labor Minimum EA -$ -$ -$ -$

FCW NFCP & Wood floor - per specs from independent wood analysis SF -$ -$ -$ -$

FCW NFCPCK & Cork flooring - snaplock - specs from ind. analysis SF -$ -$ -$ -$

FCW NFCPCKT & Cork flooring - solid tile - specs from ind. analysis SF -$ -$ -$ -$

FCW NFCPENF & Engineered wood floor - floating - specs from ind analysis SF -$ -$ -$ -$

FCW NFCPENG & Engineered wood floor - specs from independent analysis SF -$ -$ -$ -$

FCW NFCPLAM & Laminate floor - per specs from independent analysis SF -$ -$ -$ -$

FCW NFCPPQ & Parquet wood floor - per specs from independent analysis SF -$ -$ -$ -$

FCW NFCPSN & Snaplock Laminate - per specs from independent analysis SF -$ -$ -$ -$

FCW NFCPSNF & Snaplock Lam. w/attached foam- per specs from ind SF -$ -$ -$ -$

analysis

FCW NFCPUC & Underlayment - cork - per specs from independent analysis SF -$ -$ -$ -$

FCW NFCPUDG & Underlayment - rubber gluedown per specs from ind SF -$ -$ -$ -$

analysis

FCW NFCPUDR & Underlayment - rubber - per specs from ind. analysis SF -$ -$ -$ -$

FCW NFCPUS & Underlayment - snd/crk mbrn - per specs from ind. analysis SF -$ -$ -$ -$

FCW OPL & Oak floor planked w/plugs SF -$ -$ -$ -$

FCW PQ & Parquet flooring SF -$ -$ -$ -$

FCW PQ- & Parquet flooring - Standard grade SF -$ -$ -$ -$

FCW PQ+ & Parquet flooring - High grade SF -$ -$ -$ -$

FCW PQ++ & Parquet flooring - Premium grade SF -$ -$ -$ -$

FCW PQU & Parquet flooring - unfinished SF -$ -$ -$ -$

FCW PQU+ & Parquet flooring - unfinished - High grade SF -$ -$ -$ -$

FCW SOFT & Softwood flooring - no finish SF -$ -$ -$ -$

FCW SOFT- & Softwood flooring - Standard grade - no finish SF -$ -$ -$ -$

FCW SOFT+ & Softwood flooring - High grade - no finish SF -$ -$ -$ -$

FCW SOFT++ & Softwood flooring - Premium grade - no finish SF -$ -$ -$ -$

FCW SUBFLR - Tear out wood flooring and subfloor SF -$ -$ -$ -$

FCW TRIMRS + Wood flooring trim - Detach & reset LF -$ -$ -$ -$

FCW UC1/4 & Underlayment - 1/4" cork SF -$ -$ -$ -$

FCW UC1/8 & Underlayment - 1/8" cork SF -$ -$ -$ -$

FCW UDR & Underlayment - rubber - 1/4" - 3/8" - Floating SF -$ -$ -$ -$

FCW UDR< & Underlayment - rubber - 1/8" - Floating SF -$ -$ -$ -$

FCW UDR> & Underlayment - rubber - 3/8" - 1/2" - Floating SF -$ -$ -$ -$

FCW UDRG & Underlayment - rubber - 1/4" - 3/8" - Glue down SF -$ -$ -$ -$

FCW US & Underlayment - sound/crack membrane - up to 40 mil SF -$ -$ -$ -$

FCW US> & Underlayment - sound/crack membrane - 40+ to 70 mil SF -$ -$ -$ -$

FCW US» & Underlayment - sound/crack membrane - 70+ to 90 mil SF -$ -$ -$ -$

FCW WPQ & Walnut parquet flooring SF -$ -$ -$ -$

FCW WPQ+ & Walnut parquet flooring - High grade SF -$ -$ -$ -$

FCW WPQ++ & Walnut parquet flooring - Premium grade SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FEC BTLA + Batteries - Lead acid fee EA -$ -$ -$ -$

FEC CAEW + California electronic waste recycling fee >= 15" & < 35" EA -$ -$ -$ -$

FEC CAEW< + California electronic waste recycling fee > 4" & < 15" EA -$ -$ -$ -$

Page 57: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FEC CAEW> + California electronic waste recycling fee >= 35" EA -$ -$ -$ -$

FEC CAMRF + California mattress recycling fee EA -$ -$ -$ -$

FEC CTMRF + Connecticut mattress recycling fee EA -$ -$ -$ -$

FEC MJC + Marijuana / Cannabis fee EA -$ -$ -$ -$

FEC NCWG + North Carolina white goods recycling fee EA -$ -$ -$ -$

FEC PPDW + Prepaid wireless fee EA -$ -$ -$ -$

FEC RIMRF + Rhode Island mattress recycling fee EA -$ -$ -$ -$

FEC SH + Shipping & handling fee - Price includes applicable tax EA -$ -$ -$ -$

FEC TIRE + Tire fee EA -$ -$ -$ -$

FEC URF + Universal Regulatory Fee / Environmental Handling Fee EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FEE ASBT + Asbestos test fee - full service survey - base fee EA -$ -$ -$ -$

FEE ASBTPS + Asbestos test fee - full service survey - per sample EA -$ -$ -$ -$

FEE ASBTS + Asbestos test fee - self test (per sample) EA -$ -$ -$ -$

FEE DEL + Delivery charge (Bid Item) EA -$ -$ -$ -$

FEE DRV + Additional driving charge - per mile EA -$ -$ -$ -$

FEE DV + Georgia State Diminution of Value (Bid Item) EA -$ -$ -$ -$

FEE ENG + Engineering fees (Bid Item) EA -$ -$ -$ -$

FEE FLSRCHG + Fuel surcharge EA -$ -$ -$ -$

FEE FRY + Ferry charge for work truck - per mile / km EA -$ -$ -$ -$

FEE FRYT + Ferry charge for work truck - per round trip (Bid Item) EA -$ -$ -$ -$

FEE HDACC + High Density Large Inner City - Access (Bid Item) EA -$ -$ -$ -$

FEE HDMST + High Density Large Inner City- Material staging (Bid Item) EA -$ -$ -$ -$

FEE HDPARK + High Density Large Inner City- Parking- fees etc- Bid Item EA -$ -$ -$ -$

FEE HDSEC + High Density Large Inner City - Security (Bid Item) EA -$ -$ -$ -$

FEE LDCNCCR + LEED for new construction - construction review fee EA -$ -$ -$ -$

FEE LDCNCDR + LEED for new const/existing building - design review fee EA -$ -$ -$ -$

FEE LDCS + LEED for core and shell - precertification fee EA -$ -$ -$ -$

FEE LDEXRC + LEED for existing building - recertification review fee EA -$ -$ -$ -$

FEE LDHMFC + LEED for homes - multi-family home certification fee SF -$ -$ -$ -$

FEE LDHMFR + LEED for homes - multi family registration fee EA -$ -$ -$ -$

FEE LDHSFC + LEED for homes - single family certification fee EA -$ -$ -$ -$

FEE LDHSFR + LEED for homes - single family registration fee EA -$ -$ -$ -$

FEE LEAD + Lead test fee - full service lead survey EA -$ -$ -$ -$

FEE LEADS + Lead test fee - self test (per sample) EA -$ -$ -$ -$

FEE LEADSS + Lead test - chemical solution - self test (per sample) EA -$ -$ -$ -$

FEE LEADSW + Lead swab test - self test (per sample) EA -$ -$ -$ -$

FEE PLAN + Architectural/Drafting fees (Bid Item) EA -$ -$ -$ -$

FEE PROP + Propane fuel (per gallon) GL -$ -$ -$ -$

FEE RADON + Radon test fee - full service radon survey EA -$ -$ -$ -$

FEE RADONS + Radon test fee (per sample) EA -$ -$ -$ -$

FEE SSEPP + Subsidence stabilization engineered pin plan (Bid Item) EA -$ -$ -$ -$

FEE SSP + Subsidence stabilization permit (Bid Item) EA -$ -$ -$ -$

FEE STEST + Soil test (Bid Item) EA -$ -$ -$ -$

FEE TIPF + Taxes, insurance, permits & fees (Bid Item) EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FEN ALGT4 & Aluminum fence gate, 3'- 4' wide - up to 4' high EA -$ -$ -$ -$

FEN ALGT4T & Aluminum fence gate, 3'- 4' wide - 5' to 6' high EA -$ -$ -$ -$

FEN ALGT6 & Aluminum fence gate, 5'- 6' wide - up to 4' high EA -$ -$ -$ -$

FEN ALGT6T & Aluminum fence gate, 5'- 6' wide - 5' to 6' high EA -$ -$ -$ -$

FEN ALU & Aluminum fence, 3' - 4' high LF -$ -$ -$ -$

FEN ALU> & Aluminum fence, 5' - 6' high LF -$ -$ -$ -$

FEN BARB & Barbed wire - 3 strands mounted on wire arm LF -$ -$ -$ -$

FEN BIDITM + Fencing (Bid Item) EA -$ -$ -$ -$

FEN BW & Basket weave fence - 2' to 4' high LF -$ -$ -$ -$

FEN BW> & Basket weave fence - 4' to 6' high LF -$ -$ -$ -$

FEN BWGT & Basket weave fence gate - 2' to 4' high LF -$ -$ -$ -$

FEN BWGT> & Basket weave fence gate - 4' to 6' high LF -$ -$ -$ -$

FEN BWIRE & Barbed wire fence - 4' high - 4 strand LF -$ -$ -$ -$

Page 58: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FEN BWIRE> & Barbed wire fence - 5' high - 5 strand LF -$ -$ -$ -$

FEN CL10 & Chain link fence w/posts & top rail - 10' high - 9 gauge LF -$ -$ -$ -$

FEN CL12 & Chain link fence w/posts & top rail - 12' high - 9 gauge LF -$ -$ -$ -$

FEN CL3 & Chain link fence w/posts & top rail - 3' high LF -$ -$ -$ -$

FEN CL3+ & Chain link fence w/posts & top rail - 3' high - 9 gauge LF -$ -$ -$ -$

FEN CL4 & Chain link fence w/posts & top rail - 4' high LF -$ -$ -$ -$

FEN CL4+ & Chain link fence w/posts & top rail - 4' high - 9 gauge LF -$ -$ -$ -$

FEN CL5 & Chain link fence w/posts & top rail - 5' high LF -$ -$ -$ -$

FEN CL5+ & Chain link fence w/posts & top rail - 5' high - 9 gauge LF -$ -$ -$ -$

FEN CL6 & Chain link fence w/posts & top rail - 6' high LF -$ -$ -$ -$

FEN CL6+ & Chain link fence w/posts & top rail - 6' high - 9 gauge LF -$ -$ -$ -$

FEN CL7 & Chain link fence w/posts & top rail - 7' high LF -$ -$ -$ -$

FEN CL7+ & Chain link fence w/posts & top rail - 7' high - 9 gauge LF -$ -$ -$ -$

FEN CLF10 & Chain link fence - fabric only - 10' high - galv.- 9 gauge LF -$ -$ -$ -$

FEN CLF12 & Chain link fence - fabric only - 12' high - galv.- 9 gauge LF -$ -$ -$ -$

FEN CLF3 & Chain link fence - fabric only - 3' high - galvanized LF -$ -$ -$ -$

FEN CLF3+ & Chain link fence - fabric only - 3' high - galv. - 9 gauge LF -$ -$ -$ -$

FEN CLF4 & Chain link fence - fabric only - 4' high - galvanized LF -$ -$ -$ -$

FEN CLF4+ & Chain link fence - fabric only - 4' high - galv. - 9 gauge LF -$ -$ -$ -$

FEN CLF5 & Chain link fence - fabric only - 5' high - galvanized LF -$ -$ -$ -$

FEN CLF5+ & Chain link fence - fabric only - 5' high - galv. - 9 gauge LF -$ -$ -$ -$

FEN CLF6 & Chain link fence - fabric only - 6' high - galvanized LF -$ -$ -$ -$

FEN CLF6+ & Chain link fence - fabric only - 6' high - galv. - 9 gauge LF -$ -$ -$ -$

FEN CLF7 & Chain link fence - fabric only - 7' high - galvanized LF -$ -$ -$ -$

FEN CLF7+ & Chain link fence - fabric only - 7' high - galv. - 9 gauge LF -$ -$ -$ -$

FEN CLFRS + Chain link fence fabric - Detach & reset SF -$ -$ -$ -$

FEN CLGT3 & Chain link fence gate - 3' high - rolling LF -$ -$ -$ -$

FEN CLGT4 & Chain link fence gate - 4' high - rolling LF -$ -$ -$ -$

FEN CLGT5 & Chain link fence gate - 5' high - rolling LF -$ -$ -$ -$

FEN CLGT6 & Chain link fence gate - 6' high - rolling LF -$ -$ -$ -$

FEN CLGTRS + Chain link fence gate - rolling - Detach & reset LF -$ -$ -$ -$

FEN CLGTS3 & Chain link fence gate - 3' high - swinging LF -$ -$ -$ -$

FEN CLGTS4 & Chain link fence gate - 4' high - swinging LF -$ -$ -$ -$

FEN CLGTS5 & Chain link fence gate - 5' high - swinging LF -$ -$ -$ -$

FEN CLGTS6 & Chain link fence gate - 6' high - swinging LF -$ -$ -$ -$

FEN CLGTSRS + Chain link fence gate - swinging - Detach & reset LF -$ -$ -$ -$

FEN CLGTV3 & Chain link fence gate - vinyl coated - 3' high - rolling LF -$ -$ -$ -$

FEN CLGTV4 & Chain link fence gate - vinyl coated - 4' high - rolling LF -$ -$ -$ -$

FEN CLGTV5 & Chain link fence gate - vinyl coated - 5' high - rolling LF -$ -$ -$ -$

FEN CLGTV6 & Chain link fence gate - vinyl coated - 6' high - rolling LF -$ -$ -$ -$

FEN CLGTVS3 & Chain link fence gate - vinyl coated - 3' high - swinging LF -$ -$ -$ -$

FEN CLGTVS4 & Chain link fence gate - vinyl coated - 4' high - swinging LF -$ -$ -$ -$

FEN CLGTVS5 & Chain link fence gate - vinyl coated - 5' high - swinging LF -$ -$ -$ -$

FEN CLGTVS6 & Chain link fence gate - vinyl coated - 6' high - swinging LF -$ -$ -$ -$

FEN CLPS + Chain link fence - vinyl privacy slats SF -$ -$ -$ -$

FEN CLTOPR & Chain-link fence - top rail LF -$ -$ -$ -$

FEN CLV10 & Chain link fence w/posts & top rail - vinyl coat 10' high LF -$ -$ -$ -$

FEN CLV12 & Chain link fence w/posts & top rail - vinyl coat 12' high LF -$ -$ -$ -$

FEN CLV3 & Chain link fence w/posts & top rail - vinyl coat - 3' high LF -$ -$ -$ -$

FEN CLV4 & Chain link fence w/posts & top rail - vinyl coat - 4' high LF -$ -$ -$ -$

FEN CLV5 & Chain link fence w/posts & top rail - vinyl coat - 5' high LF -$ -$ -$ -$

FEN CLV6 & Chain link fence w/posts & top rail - vinyl coat - 6' high LF -$ -$ -$ -$

FEN CLV7 & Chain link fence w/posts & top rail - vinyl coat - 7' high LF -$ -$ -$ -$

FEN CLVF10 & Chain link fence - fabric only - 10' high - vinyl coated LF -$ -$ -$ -$

FEN CLVF12 & Chain link fence - fabric only - 12' high - vinyl coated LF -$ -$ -$ -$

FEN CLVF3 & Chain link fence - fabric only - 3' high - vinyl coated LF -$ -$ -$ -$

FEN CLVF4 & Chain link fence - fabric only - 4' high - vinyl coated LF -$ -$ -$ -$

FEN CLVF5 & Chain link fence - fabric only - 5' high - vinyl coated LF -$ -$ -$ -$

FEN CLVF6 & Chain link fence - fabric only - 6' high - vinyl coated LF -$ -$ -$ -$

FEN CLVF7 & Chain link fence - fabric only - 7' high - vinyl coated LF -$ -$ -$ -$

FEN CPP6 + Concrete post and panel fence - precast - up to 6' high LF -$ -$ -$ -$

FEN CPP8 + Concrete post and panel fence - precast - 8' high LF -$ -$ -$ -$

FEN LAB + Fencing Installer - per hour HR -$ -$ -$ -$

FEN LABL + Fencing - General Laborer - per hour HR -$ -$ -$ -$

FEN MESH & Welded-wire mesh fence - 4' high - 12 gauge LF -$ -$ -$ -$

Page 59: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FEN MESHF & Welded-wire mesh fence - fabric only - 4' high - 12 gauge LF -$ -$ -$ -$

FEN MESHP & Poultry-wire mesh fence - 4' high - 20 gauge LF -$ -$ -$ -$

FEN MESHPF & Poultry-wire mesh fence - fabric only - 4' high - 20 gauge LF -$ -$ -$ -$

FEN MN + Fencing - Labor Minimum EA -$ -$ -$ -$

FEN NFP + Fencing bid - from program provider EA -$ -$ -$ -$

FEN OPEN & Electric gate opener EA -$ -$ -$ -$

FEN OPEN- & Electric gate opener - Standard grade EA -$ -$ -$ -$

FEN OPEN+ & Electric gate opener - High grade EA -$ -$ -$ -$

FEN P & Picket fence, 3' to 4' high LF -$ -$ -$ -$

FEN P> & Picket fence, 5' to 6' high LF -$ -$ -$ -$

FEN PGT & Picket fence gate - 3' to 4' high LF -$ -$ -$ -$

FEN PGT> & Picket fence gate - 5' to 6' high LF -$ -$ -$ -$

FEN POST4 & Post - 2 3/8" diameter metal - 4' high fence EA -$ -$ -$ -$

FEN POSTS & Post - 2 3/8" diameter metal - 5' high fence EA -$ -$ -$ -$

FEN POST6 & Post - 2 3/8" diameter metal - 6' high fence EA -$ -$ -$ -$

FEN POSTC4 & Fence/deck post cap - 4" x 4" - copper EA -$ -$ -$ -$

FEN POSTC6 & Fence/deck post cap - 6" x 6" - copper EA -$ -$ -$ -$

FEN POSTCD2 & Cedar post - Dowelled - corner/end/line - 2 hole EA -$ -$ -$ -$

FEN POSTCD3 & Cedar post - Dowelled - corner/end/line - 3 hole EA -$ -$ -$ -$

FEN POSTCS2 & Cedar post - Split rail - corner/end/line - 2 hole EA -$ -$ -$ -$

FEN POSTCS3 & Cedar post - Split rail - corner/end/line - 3 hole EA -$ -$ -$ -$

FEN PR2 & Post & rail fence - 2 rail - cedar or equal LF -$ -$ -$ -$

FEN PR3 & Post & rail fence - 3 rail - cedar or equal LF -$ -$ -$ -$

FEN PR4 & Post & rail fence - 4 rail - cedar or equal LF -$ -$ -$ -$

FEN PRD2 & Post & rail fence - Dowelled cedar - 2 rail LF -$ -$ -$ -$

FEN PRD3 & Post & rail fence - Dowelled cedar - 3 rail LF -$ -$ -$ -$

FEN PRS2 & Post & rail fence - Split cedar - 2 rail LF -$ -$ -$ -$

FEN PRS3 & Post & rail fence - Split cedar - 3 rail LF -$ -$ -$ -$

FEN RAIL & Wood fence rail - 2" x 4" x 8' EA -$ -$ -$ -$

FEN RAILD & Wood fence rail - Dowelled cedar EA -$ -$ -$ -$

FEN RAILSP & Wood fence rail - Split cedar EA -$ -$ -$ -$

FEN RAILT & Wood fence rail - 2" x 4" x 8' - treated EA -$ -$ -$ -$

FEN RAZOR & Razor wire installed on top of a chain link fence LF -$ -$ -$ -$

FEN SCTN4RS + Wood fence 3' - 4' high - Detach & reset - per 8' section EA -$ -$ -$ -$

FEN SCTN6RS + Wood fence 5' - 6' high - Detach & reset - per 8' section EA -$ -$ -$ -$

FEN SCTN8RS + Wood fence 7' - 8' high - Detach & reset - per 8' section EA -$ -$ -$ -$

FEN SLAT4 & Wood fence slat 3' - 4' high - cedar or equal EA -$ -$ -$ -$

FEN SLAT4T & Wood fence slat 3' - 4' high - treated EA -$ -$ -$ -$

FEN SLAT6 & Wood fence slat 5' - 6' high - cedar or equal EA -$ -$ -$ -$

FEN SLAT6T & Wood fence slat 5' - 6' high - treated EA -$ -$ -$ -$

FEN SLAT8 & Wood fence slat 7' - 8' high - cedar or equal EA -$ -$ -$ -$

FEN SLAT8T & Wood fence slat 7' - 8' high - treated EA -$ -$ -$ -$

FEN SLATRS + Wood fence slat - Detach & reset EA -$ -$ -$ -$

FEN SP3R & Steel pipe fence - 3 rail - 4' high LF -$ -$ -$ -$

FEN SP3R- & Steel pipe fence - 3 rail - 4' high - used/salvaged pipe LF -$ -$ -$ -$

FEN SP4R & Steel pipe fence - 4 rail - 5' high LF -$ -$ -$ -$

FEN SP4R- & Steel pipe fence - 4 rail - 5' high - used/salvaged pipe LF -$ -$ -$ -$

FEN SPGT & Steel pipe painted gate - up to 50" tall LF -$ -$ -$ -$

FEN TRMTL & Post - 2 1/2" diameter metal - terminal EA -$ -$ -$ -$

FEN TRWD & Post - wood - 4" x 4" fence grade cedar or equal EA -$ -$ -$ -$

FEN TRWDT & Post - wood - 4" x 4" treated lumber EA -$ -$ -$ -$

FEN VNL4 & Vinyl (PVC) fence, 3'- 4' high - w/lattice LF -$ -$ -$ -$

FEN VNL6 & Vinyl (PVC) fence, 5'- 6' high - w/lattice LF -$ -$ -$ -$

FEN VNLGT4 & Vinyl (PVC) fence gate, 3'- 4' high - w/lattice LF -$ -$ -$ -$

FEN VNLGT6 & Vinyl (PVC) fence gate, 5'- 6' high - w/lattice LF -$ -$ -$ -$

FEN VNLP4 & Vinyl (PVC) fence, 3'- 4' high - w/lattice panel only LF -$ -$ -$ -$

FEN VNLP6 & Vinyl (PVC) fence, 5'- 6' high - w/lattice panel only LF -$ -$ -$ -$

FEN VNLPC & Vinyl (PVC) fence post cap only - 5" x 5" EA -$ -$ -$ -$

FEN VNLPF4 & Vinyl (PVC) fence, 3'- 4' high - picket LF -$ -$ -$ -$

FEN VNLPF6 & Vinyl (PVC) fence, 5'- 6' high - picket LF -$ -$ -$ -$

FEN VNLPFG4 & Vinyl (PVC) fence gate, 3'- 4' high - picket LF -$ -$ -$ -$

FEN VNLPFG6 & Vinyl (PVC) fence gate, 5'- 6' high - picket LF -$ -$ -$ -$

FEN VNLPFP4 & Vinyl (PVC) fence, 3'- 4' high - picket panel only LF -$ -$ -$ -$

FEN VNLPFP6 & Vinyl (PVC) fence, 5'- 6' high - picket panel only LF -$ -$ -$ -$

FEN VNLPST5 & Vinyl (PVC) fence post with cap - 5" x 5" EA -$ -$ -$ -$

Page 60: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FEN VNLRS + Vinyl fence panel - Detach & reset - per 6' section EA -$ -$ -$ -$

FEN VNLS4 & Vinyl (PVC) fence, 3'- 4' high - full slat LF -$ -$ -$ -$

FEN VNLS6 & Vinyl (PVC) fence, 5'- 6' high - full slat LF -$ -$ -$ -$

FEN VNLSGT4 & Vinyl (PVC) fence gate, 3'- 4' high - full slat LF -$ -$ -$ -$

FEN VNLSGT6 & Vinyl (PVC) fence gate, 5'- 6' high - full slat LF -$ -$ -$ -$

FEN VNLSP4 & Vinyl (PVC) fence, 3'- 4' high - full slat panel only LF -$ -$ -$ -$

FEN VNLSP6 & Vinyl (PVC) fence, 5'- 6' high - full slat panel only LF -$ -$ -$ -$

FEN VNLSR2 & Vinyl (PVC) fence - split rail - 2 rail LF -$ -$ -$ -$

FEN VNLSR2+ & Vinyl (PVC) fence - split rail - 2 rail - heavy duty LF -$ -$ -$ -$

FEN VNLSR3 & Vinyl (PVC) fence - split rail - 3 rail LF -$ -$ -$ -$

FEN VNLSR3+ & Vinyl (PVC) fence - split rail - 3 rail - heavy duty LF -$ -$ -$ -$

FEN VNLSR4 & Vinyl (PVC) fence - split rail - 4 rail LF -$ -$ -$ -$

FEN VNLSR4+ & Vinyl (PVC) fence - split rail - 4 rail - heavy duty LF -$ -$ -$ -$

FEN VNLSRG2 & Vinyl (PVC) fence gate - split rail - 2 rail LF -$ -$ -$ -$

FEN VNLSRG3 & Vinyl (PVC) fence gate - split rail - 3 rail LF -$ -$ -$ -$

FEN VNLSRG4 & Vinyl (PVC) fence gate - split rail - 4 rail LF -$ -$ -$ -$

FEN WDF4 & Wood fence 3.- 4' high - cedar or equal LF -$ -$ -$ -$

FEN WDF4T & Wood fence 3'- 4' high - treated LF -$ -$ -$ -$

FEN WDF6 & Wood fence 5.- 6' high - cedar or equal LF -$ -$ -$ -$

FEN WDF6T & Wood fence 5'- 6' high - treated LF -$ -$ -$ -$

FEN WDF8 & Wood fence 7'- 8' high - cedar or equal LF -$ -$ -$ -$

FEN WDF8T & Wood fence 7'- 8' high - treated LF -$ -$ -$ -$

FEN WDFB4+ & Wood fence- B on B- 3'-4' high- cedar or equal- High grade LF -$ -$ -$ -$

FEN WDFB4T+ & Wood fence - B on B - 3'- 4' high - treated - High grade LF -$ -$ -$ -$

FEN WDFB6+ & Wood fence- B on B- 5.-6' high- cedar or equal- High grade LF -$ -$ -$ -$

FEN WDFB6T+ & Wood fence - B on B - 5'- 6' high - treated - High grade LF -$ -$ -$ -$

FEN WDFBB4 & Wood fence - board on board - 3'- 4' high - cedar or equal LF -$ -$ -$ -$

FEN WDFBB4T & Wood fence - board on board - 3'- 4' high - treated LF -$ -$ -$ -$

FEN WDFBB6 & Wood fence - board on board - 5.- 6' high - cedar or equal LF -$ -$ -$ -$

FEN WDFBB6T & Wood fence - board on board - 5'- 6' high - treated LF -$ -$ -$ -$

FEN WDFBB8 & Wood fence - board on board - 7'- 8' high - cedar or equal LF -$ -$ -$ -$

FEN WDFBB8T & Wood fence - board on board - 7'- 8' high - treated LF -$ -$ -$ -$

FEN WDFBP4 & Wood fence- B on B- 3.-4. high- cedar or equal- panel only LF -$ -$ -$ -$

FEN WDFBP4T & Wood fence - B on B - 3'- 4' high - treated - panel only LF -$ -$ -$ -$

FEN WDFBP6 & Wood fence- B on B- 5'-6' high- cedar or equal- panel only LF -$ -$ -$ -$

FEN WDFBP6T & Wood fence - B on B - 5'- 6' high - treated - panel only LF -$ -$ -$ -$

FEN WDFBP8 & Wood fence- B on B- 7'-8' high- cedar or equal- panel only LF -$ -$ -$ -$

FEN WDFBP8T & Wood fence - B on B - 7'- 8' high - treated - panel only LF -$ -$ -$ -$

FEN WDFL4 & Wood fence 3'- 4' high - cedar or equal - w/lattice top LF -$ -$ -$ -$

FEN WDFL6 & Wood fence 5'- 6' high - cedar or equal - w/lattice top LF -$ -$ -$ -$

FEN WDFP4 & Wood fence 3'- 4' high - cedar or equal - panel only LF -$ -$ -$ -$

FEN WDFP4T & Wood fence 3'- 4' high - treated - panel only LF -$ -$ -$ -$

FEN WDFP6 & Wood fence 5'- 6' high - cedar or equal - panel only LF -$ -$ -$ -$

FEN WDFP6T & Wood fence 5'- 6' high - treated - panel only LF -$ -$ -$ -$

FEN WDFP8 & Wood fence 7'- 8' high - cedar or equal - panel only LF -$ -$ -$ -$

FEN WDFP8T & Wood fence 7'- 8' high - treated - panel only LF -$ -$ -$ -$

FEN WDGT4 & Wood gate 3'- 4' high - cedar or equal LF -$ -$ -$ -$

FEN WDGT4T & Wood gate 3'- 4' high - treated LF -$ -$ -$ -$

FEN WDGT6 & Wood gate 5'- 6' high - cedar or equal LF -$ -$ -$ -$

FEN WDGT6T & Wood gate 5'- 6' high - treated LF -$ -$ -$ -$

FEN WDGT8 & Wood gate 7'- 8' high - cedar or equal LF -$ -$ -$ -$

FEN WDGT8T & Wood gate 7'- 8' high - treated LF -$ -$ -$ -$

FEN WDGTRS + Wood or vinyl gate - Detach & reset LF -$ -$ -$ -$

FEN WPF4 & Wood polymer/composite fence 3'-4' high LF -$ -$ -$ -$

FEN WPF6 & Wood polymer/composite fence 5'-6' high LF -$ -$ -$ -$

FEN WPF8 & Wood polymer/composite fence 7.-8' high LF -$ -$ -$ -$

FEN WPGT4 & Wood polymer/composite fence gate 3'-4' high LF -$ -$ -$ -$

FEN WPGT6 & Wood polymer/composite fence gate 5'-6' high LF -$ -$ -$ -$

FEN WPPC & Wood polymer/composite fence post cap only EA -$ -$ -$ -$

FEN WPPOST & Wood polymer/composite fence post with cap EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FNC 1/2X4 & Trim board - 1/2" x 4" - installed (pine) LF -$ -$ -$ -$

Page 61: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FNC 1/2X6 & Trim board - 1/2" x 6" - installed (pine) LF -$ -$ -$ -$

FNC 1X10 & Trim board - 1" x 10" - installed (pine) LF -$ -$ -$ -$

FNC 1X10C & Trim board - 1" x 10" - installed (cedar) LF -$ -$ -$ -$

FNC 1X1OH & Trim board - 1" x 10" - installed (hardwood - oak or =) LF -$ -$ -$ -$

FNC 1X1OR & Trim board - 1" x 10" - installed (redwood) LF -$ -$ -$ -$

FNC 1X12 & Trim board - 1" x 12" - installed (pine) LF -$ -$ -$ -$

FNC 1X1216H + Trim board - 1" x 12" x 16' Hardwood - material only EA -$ -$ -$ -$

FNC 1X1216M + Trim board - 1" x 12" x 16' MDF - material only EA -$ -$ -$ -$

FNC 1X1216S + Trim board - 1" x 12" x 16' Softwood - material only EA -$ -$ -$ -$

FNC 1X12C & Trim board - 1" x 12" - installed (cedar) LF -$ -$ -$ -$

FNC 1X12H & Trim board - 1" x 12" - installed (hardwood - oak or =) LF -$ -$ -$ -$

FNC 1X12R & Trim board - 1" x 12" - installed (redwood) LF -$ -$ -$ -$

FNC 1X2 & Trim board - 1" x 2" - installed (pine) LF -$ -$ -$ -$

FNC 1X2C & Trim board - 1" x 2" - installed (cedar) LF -$ -$ -$ -$

FNC 1X2H & Trim board - 1" x 2" - installed (hardwood - oak or =) LF -$ -$ -$ -$

FNC 1X2R & Trim board - 1" x 2" - installed (redwood) LF -$ -$ -$ -$

FNC 1X4 & Trim board - 1" x 4" - installed (pine) LF -$ -$ -$ -$

FNC 1X4C & Trim board - 1" x 4" - installed (cedar) LF -$ -$ -$ -$

FNC 1X4H & Trim board - 1" x 4" - installed (hardwood - oak or =) LF -$ -$ -$ -$

FNC 1X4R & Trim board - 1" x 4" - installed (redwood) LF -$ -$ -$ -$

FNC 1X6 & Trim board - 1" x 6" - installed (pine) LF -$ -$ -$ -$

FNC 1X6C & Trim board - 1" x 6" - installed (cedar) LF -$ -$ -$ -$

FNC 1X6H & Trim board - 1" x 6" - installed (hardwood - oak or =) LF -$ -$ -$ -$

FNC 1X6R & Trim board - 1" x 6" - installed (redwood) LF -$ -$ -$ -$

FNC 1X8 & Trim board - 1" x 8" - installed (pine) LF -$ -$ -$ -$

FNC 1X812H + 1" x 8" x 12' S4S hardwood - material only EA -$ -$ -$ -$

FNC 1X812H+ + 1" x 8" x 12' S4S hardwood - High grade - material only EA -$ -$ -$ -$

FNC 1X812S + 1" x 8" x 12' S4S softwood - material only EA -$ -$ -$ -$

FNC 1X8C & Trim board - 1" x 8" - installed (cedar) LF -$ -$ -$ -$

FNC 1X8H & Trim board - 1" x 8" - installed (hardwood - oak or =) LF -$ -$ -$ -$

FNC 1X8R & Trim board - 1" x 8" - installed (redwood) LF -$ -$ -$ -$

FNC 1X8X16M + Trim board - 1" x 8" x 16' MDF - material only EA -$ -$ -$ -$

FNC 1X8X16P + Trim board - 1" x 8" x 16' pine - material only EA -$ -$ -$ -$

FNC 1XRS + Trim board - 1"x 2" to 1"x 6" - Detach & reset LF -$ -$ -$ -$

FNC 1XRS> + Trim board - 1"x 8" to 1"x 12" - Detach & reset LF -$ -$ -$ -$

FNC ACC & Access - face frame & doors SF -$ -$ -$ -$

FNC ACC+ & Access - face frame & doors - High grade SF -$ -$ -$ -$

FNC ATTIC & Attic entrance cover and trim EA -$ -$ -$ -$

FNC B & Baseboard - 2 1/4" LF -$ -$ -$ -$

FNC B+ & Baseboard - 2 1/4" stain grade LF -$ -$ -$ -$

FNC B10 & Baseboard - 10" paint grade - 2 piece LF -$ -$ -$ -$

FNC B1OH & Baseboard - 10" hardwood - 2 piece LF -$ -$ -$ -$

FNC B2M & Baseboard - 2 1/4" MDF - flat profile LF -$ -$ -$ -$

FNC B2M+ & Baseboard - 2 1/4" MDF w/profile LF -$ -$ -$ -$

FNC B3 & Baseboard - 3 1/4" LF -$ -$ -$ -$

FNC B3+ & Baseboard - 3 1/4" stain grade LF -$ -$ -$ -$

FNC B3H & Baseboard - 3 1/4" hardwood LF -$ -$ -$ -$

FNC B3H+ & Baseboard - 3 1/4" hardwood - molded w/detail LF -$ -$ -$ -$

FNC B3H++ & Baseboard - 3 1/4" hardwood - molded w/intricate detail LF -$ -$ -$ -$

FNC B3M & Baseboard - 3 1/4" MDF - flat profile LF -$ -$ -$ -$

FNC B3M+ & Baseboard - 3 1/4" MDF w/profile LF -$ -$ -$ -$

FNC B4 & Baseboard - 4 1/4" LF -$ -$ -$ -$

FNC B4+ & Baseboard - 4 1/4" stain grade LF -$ -$ -$ -$

FNC B4H & Baseboard - 4 1/4" hardwood LF -$ -$ -$ -$

FNC B4M & Baseboard - 4 1/4" MDF - flat profile LF -$ -$ -$ -$

FNC B4M+ & Baseboard - 4 1/4" MDF - w/profile LF -$ -$ -$ -$

FNC B4S & Baseboard - 4 1/4" w/shoe LF -$ -$ -$ -$

FNC B4S+ & Baseboard - 4 1/4" w/shoe - stain grade LF -$ -$ -$ -$

FNC B5 & Baseboard - 5 1/4" LF -$ -$ -$ -$

FNC B5+ & Baseboard - 5 1/4" stain grade LF -$ -$ -$ -$

FNC B5H & Baseboard - 5 1/4" hardwood LF -$ -$ -$ -$

FNC B5M & Baseboard - 5 1/4" MDF - flat profile LF -$ -$ -$ -$

FNC B5M+ & Baseboard - 5 1/4" MDF - w/profile LF -$ -$ -$ -$

FNC B5S & Baseboard - 5 1/4" w/shoe LF -$ -$ -$ -$

FNC B5S+ & Baseboard - 5 1/4" w/shoe - stain grade LF -$ -$ -$ -$

Page 62: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FNC B6 & Baseboard - 6" stain grade LF -$ -$ -$ -$

FNC B6FJ & Baseboard - 6" LF -$ -$ -$ -$

FNC B6H & Baseboard - 6" hardwood LF -$ -$ -$ -$

FNC B6H+ & Baseboard - 6" hardwood - molded w/detail LF -$ -$ -$ -$

FNC B6H++ & Baseboard - 6" hardwood - molded w/intricate detail LF -$ -$ -$ -$

FNC B6M & Baseboard - 6" MDF - flat profile LF -$ -$ -$ -$

FNC B6M+ & Baseboard - 6" MDF w/profile LF -$ -$ -$ -$

FNC B6S & Baseboard - 6" w/shoe - stain grade LF -$ -$ -$ -$

FNC B6SFJ & Baseboard - 6" w/shoe LF -$ -$ -$ -$

FNC B8 & Baseboard - 8" paint grade - 2 piece LF -$ -$ -$ -$

FNC B8H & Baseboard - 8" hardwood - 2 piece LF -$ -$ -$ -$

FNC BAFE + Balustrade fitting - easing EA -$ -$ -$ -$

FNC BAFE+ + Balustrade fitting - easing - High grade EA -$ -$ -$ -$

FNC BAFGN + Balustrade gooseneck EA -$ -$ -$ -$

FNC BAFGN+ + Balustrade gooseneck - High grade EA -$ -$ -$ -$

FNC BAFTO + Balustrade turnout EA -$ -$ -$ -$

FNC BAFTO+ + Balustrade turnout - High grade EA -$ -$ -$ -$

FNC BAFV + Balustrade volute EA -$ -$ -$ -$

FNC BAFV+ + Balustrade volute - High grade EA -$ -$ -$ -$

FNC BAL & Balustrade LF -$ -$ -$ -$

FNC BAL- & Balustrade - Standard grade LF -$ -$ -$ -$

FNC BAL+ & Balustrade - High grade LF -$ -$ -$ -$

FNC BAL++ & Balustrade - Premium grade LF -$ -$ -$ -$

FNC BAL+++ & Balustrade - Deluxe grade LF -$ -$ -$ -$

FNC BALB + Baluster - material only EA -$ -$ -$ -$

FNC BALB- + Baluster - Standard grade - material only EA -$ -$ -$ -$

FNC BALB+ + Baluster - High grade - material only EA -$ -$ -$ -$

FNC BALB++ + Baluster - Premium grade - material only EA -$ -$ -$ -$

FNC BALBM + Metal baluster - straight/single twist - material only EA -$ -$ -$ -$

FNC BALBMB + Metal baluster - 1 basket - material only EA -$ -$ -$ -$

FNC BALBMB2 + Metal baluster - 2 baskets - material only EA -$ -$ -$ -$

FNC BALBMK + Metal baluster - 1 knuckle - material only EA -$ -$ -$ -$

FNC BALBMK2 + Metal baluster - 2 knuckles - material only EA -$ -$ -$ -$

FNC BALBMS + Metal baluster - fancy scroll - material only EA -$ -$ -$ -$

FNC BALBMSH + Metal baluster - shoe/knuckle - material only EA -$ -$ -$ -$

FNC BALBMT2 + Metal baluster - double twist - material only EA -$ -$ -$ -$

FNC BALC & Balustrade - curved LF -$ -$ -$ -$

FNC BALC+ & Balustrade - curved - High grade LF -$ -$ -$ -$

FNC BALC++ & Balustrade - curved - Premium grade LF -$ -$ -$ -$

FNC BALC+++ & Balustrade - curved - Deluxe grade LF -$ -$ -$ -$

FNC BALD & Baluster - Dowel top EA -$ -$ -$ -$

FNC BALD- & Baluster - Dowel top - Standard grade EA -$ -$ -$ -$

FNC BALD+ & Baluster - Dowel top - High grade EA -$ -$ -$ -$

FNC BALD++ & Baluster - Dowel top - Premium grade EA -$ -$ -$ -$

FNC BALFE + Balustrade fitting - easing - material only EA -$ -$ -$ -$

FNC BALFE+ + Balustrade fitting - easing - High grade - material only EA -$ -$ -$ -$

FNC BALGN + Balustrade gooseneck - material only EA -$ -$ -$ -$

FNC BALGN+ + Balustrade gooseneck - High grade - material only EA -$ -$ -$ -$

FNC BALHR + Balustrade top rail - material only LF -$ -$ -$ -$

FNC BALHR- + Balustrade top rail - Standard grade - material only LF -$ -$ -$ -$

FNC BALHR+ + Balustrade top rail - High grade - material only LF -$ -$ -$ -$

FNC BALL & Baluster install - w/infill top & bottom - Labor only EA -$ -$ -$ -$

FNC BALLAB & Balustrade - Labor only LF -$ -$ -$ -$

FNC BALLD1 & Baluster install - dowel 1 side, infill 1 side - Lab. only EA -$ -$ -$ -$

FNC BALLD2 & Baluster install - dowel both sides - Labor only EA -$ -$ -$ -$

FNC BALM & Metal baluster - straight/single twist EA -$ -$ -$ -$

FNC BALMB & Metal baluster - 1 basket EA -$ -$ -$ -$

FNC BALMB2 & Metal baluster - 2 baskets EA -$ -$ -$ -$

FNC BALMK & Metal baluster - 1 knuckle EA -$ -$ -$ -$

FNC BALMK2 & Metal baluster - 2 knuckles EA -$ -$ -$ -$

FNC BALMS & Metal baluster - fancy scroll EA -$ -$ -$ -$

FNC BALMSH & Metal baluster - shoe/knuckle EA -$ -$ -$ -$

FNC BALMT2 & Metal baluster - double twist EA -$ -$ -$ -$

FNC BALN + Balustrade newel - material only EA -$ -$ -$ -$

FNC BALN- + Balustrade newel - Standard grade - material only EA -$ -$ -$ -$

Page 63: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FNC BALN+ + Balustrade newel - High grade - material only EA -$ -$ -$ -$

FNC BALRS + Balustrade - Detach & reset LF -$ -$ -$ -$

FNC BALS & Baluster - Square top EA -$ -$ -$ -$

FNC BALS- & Baluster - Square top - Standard grade EA -$ -$ -$ -$

FNC BALS+ & Baluster - Square top - High grade EA -$ -$ -$ -$

FNC BALS++ & Baluster - Square top - Premium grade EA -$ -$ -$ -$

FNC BALSH + Balustrade shoe & fillet - material only LF -$ -$ -$ -$

FNC BALSH- + Balustrade shoe & fillet - Standard grade - material only LF -$ -$ -$ -$

FNC BALSH+ + Balustrade shoe & fillet - High grade - material only LF -$ -$ -$ -$

FNC BALSHF & Balustrade shoe & fillet LF -$ -$ -$ -$

FNC BALSHF- & Balustrade shoe & fillet - Standard grade LF -$ -$ -$ -$

FNC BALSHF+ & Balustrade shoe & fillet - High grade LF -$ -$ -$ -$

FNC BALWI & Balustrade - wood handrail with iron balusters LF -$ -$ -$ -$

FNC BALWI+ & Balustrade - wood handrail w/iron balusters - High grade LF -$ -$ -$ -$

FNC BALWI++ & Balustrade - wood handrail w/iron baluster - Premium LF -$ -$ -$ -$

grade

FNC BC & Base cap LF -$ -$ -$ -$

FNC BC+ & Base cap - stain grade LF -$ -$ -$ -$

FNC BCS & Baseboard - 4" w/ cap and shoe LF -$ -$ -$ -$

FNC BCS+ & Baseboard - 4" w/ cap and shoe - stain grade LF -$ -$ -$ -$

FNC BH & Baseboard - 2 1/4" hardwood LF -$ -$ -$ -$

FNC BH+ & Baseboard - 2 1/4" hardwood - molded w/detail LF -$ -$ -$ -$

FNC BH++ & Baseboard - 2 1/4" hardwood - molded w/intricate detail LF -$ -$ -$ -$

FNC BIDITM + Finish Carpentry / Trim (Bid Item) EA -$ -$ -$ -$

FNC BK10 & Bookcase - built in - 10" - (SF of face area) SF -$ -$ -$ -$

FNC BK12 & Bookcase - built in - 12" - (SF of face area) SF -$ -$ -$ -$

FNC BLKP & Plinth block - 3/4" x 3 1/2" x 6 1/2" -MDF EA -$ -$ -$ -$

FNC BLKP+ & Plinth block - 3/4" x 3 1/2" x 6 1/2" - Pine EA -$ -$ -$ -$

FNC BLKP++ & Plinth block - 3/4" x 3 1/2" x 6 1/2" - Hardwood EA -$ -$ -$ -$

FNC BLKR & Rosette - corner block - 3/4" x 3 1/2" - MDF EA -$ -$ -$ -$

FNC BLKR+ & Rosette - corner block - 3/4" x 3 1/2" - Pine EA -$ -$ -$ -$

FNC BLKR++ & Rosette - corner block - 3/4" x 3 1/2" - Hardwood EA -$ -$ -$ -$

FNC BM & Brick mold - paint grade softwood - finger jointed LF -$ -$ -$ -$

FNC BMC & Brick mold - composite trim LF -$ -$ -$ -$

FNC BMH & Brick mold - stain grade hardwood LF -$ -$ -$ -$

FNC BMP & Wall bumpers - (2) 2x6 LF -$ -$ -$ -$

FNC BMRS + Brick mold - Detach & reset LF -$ -$ -$ -$

FNC BPL & Baseboard - plastic (simulated wood) LF -$ -$ -$ -$

FNC BPL+ & Baseboard - plastic (simulated wood) - High grade LF -$ -$ -$ -$

FNC BR + Baseboard - Reset LF -$ -$ -$ -$

FNC BR> + Baseboard - Reset - multi-member LF -$ -$ -$ -$

FNC BRS + Baseboard - Detach & reset LF -$ -$ -$ -$

FNC BRS> + Baseboard - Detach & reset - multi-member LF -$ -$ -$ -$

FNC BTILE - Add-on for tearing out trim/base from tile/grout LF -$ -$ -$ -$

FNC C & Casing - 2 1/4" LF -$ -$ -$ -$

FNC C+ & Casing - 2 1/4" stain grade LF -$ -$ -$ -$

FNC C> & Casing - oversized - 3 1/4" LF -$ -$ -$ -$

FNC C>+ & Casing - oversized - 3 1/4" stain grade LF -$ -$ -$ -$

FNC C4H & Casing - 4" - hardwood LF -$ -$ -$ -$

FNC C4M & Casing - 4" - MDF LF -$ -$ -$ -$

FNC C5H & Casing - 5" - hardwood LF -$ -$ -$ -$

FNC C5M & Casing - 5" - MDF LF -$ -$ -$ -$

FNC C6H & Casing - 6" - hardwood - 2 piece LF -$ -$ -$ -$

FNC C8H & Casing - 8" - hardwood - 2 piece LF -$ -$ -$ -$

FNC CAM & Casing - 2 1/4" MDF LF -$ -$ -$ -$

FNC CAM+ & Casing - 2 1/4" MDF w/detail LF -$ -$ -$ -$

FNC CAM> & Casing - oversized - 3 1/4" MDF LF -$ -$ -$ -$

FNC CAM>+ & Casing - oversized - 3 1/4" MDF w/detail LF -$ -$ -$ -$

FNC CBL & Corbel - wood - 2" to 4" wide EA -$ -$ -$ -$

FNC CBL+ & Corbel - wood - 2" to 4" wide w/ intricate detail EA -$ -$ -$ -$

FNC CBL< & Corbel - wood - up to 2" wide EA -$ -$ -$ -$

FNC CBL> & Corbel - wood - over 4" wide EA -$ -$ -$ -$

FNC CBL>+ & Corbel - wood - over 4" wide w/ intricate detail EA -$ -$ -$ -$

FNC CBLRS + Corbel - wood - Detach & reset EA -$ -$ -$ -$

FNC CH & Casing - 2 1/4" hardwood LF -$ -$ -$ -$

Page 64: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FNC CH+ & Casing - 2 1/2" hardwood - molded w/detail LF -$ -$ -$ -$

FNC CH++ & Casing - 2 1/4" hardwood - molded w/intricate detail LF -$ -$ -$ -$

FNC CH> & Casing - oversized - 3 1/4" hardwood LF -$ -$ -$ -$

FNC CH>+ & Casing - oversized - 3 1/4" hardwood - molded w/detail LF -$ -$ -$ -$

FNC CHR & Chair rail - 2 1/2" LF -$ -$ -$ -$

FNC CHR+ & Chair rail - 2 1/2" stain grade LF -$ -$ -$ -$

FNC CHR> & Chair rail - oversized - 3 1/4" LF -$ -$ -$ -$

FNC CHR>+ & Chair rail - oversized - 3 1/4" stain grade LF -$ -$ -$ -$

FNC CHR>++ & Chair rail - oversized - 3 1/4" stain grade - w/detail LF -$ -$ -$ -$

FNC CHR2 & Chair rail - 2 piece LF -$ -$ -$ -$

FNC CHR2+ & Chair rail - 2 piece - hardwood LF -$ -$ -$ -$

FNC CHR2> & Chair rail - 2 piece - oversized LF -$ -$ -$ -$

FNC CHR2>+ & Chair rail - 2 piece - oversized - hardwood LF -$ -$ -$ -$

FNC CHR3 & Chair rail - 3 piece LF -$ -$ -$ -$

FNC CHR3+ & Chair rail - 3 piece - hardwood LF -$ -$ -$ -$

FNC CHR3> & Chair rail - 3 piece - oversized LF -$ -$ -$ -$

FNC CHR3>+ & Chair rail - 3 piece - oversized - hardwood LF -$ -$ -$ -$

FNC CHRH & Chair rail - 2 1/2" hardwood LF -$ -$ -$ -$

FNC CHRH+ & Chair rail - 2 1/2" hardwood - molded w/detail LF -$ -$ -$ -$

FNC CHRH++ & Chair rail - 2 1/2" hardwood - molded w/intricate detail LF -$ -$ -$ -$

FNC CHRH>+ & Chair rail - oversized - 3 1/4" hardwood molded w/detail LF -$ -$ -$ -$

FNC CHRH>++ & Chair rail - oversized - 3 1/4" hardwood w/int. detail LF -$ -$ -$ -$

FNC CHRM & Chair rail - 2 1/2" MDF LF -$ -$ -$ -$

FNC CHRM+ & Chair rail - 2 1/2" MDF w/detail LF -$ -$ -$ -$

FNC CHRM> & Chair rail - oversized - 3 1/4" MDF LF -$ -$ -$ -$

FNC CHRM>+ & Chair rail - oversized - 3 1/4" MDF - w/detail LF -$ -$ -$ -$

FNC CHRMRS + Chair rail - multi-member - Detach & reset LF -$ -$ -$ -$

FNC CHRMTL & Chair rail - vinyl over metal - prefinished LF -$ -$ -$ -$

FNC CHRRS + Chair rail - Detach & reset LF -$ -$ -$ -$

FNC CLHDB++ & Closet organizer drawer bank - hardwood - Prem. grade EA -$ -$ -$ -$

FNC CLHSH++ & Closet org. shelf unit- hardwood - up to 5' - Prem. gr. EA -$ -$ -$ -$

FNC CLOS & Closet shelf and rod package LF -$ -$ -$ -$

FNC CLOS+ + Organized closet shelving SF -$ -$ -$ -$

FNC CLOSL & Closet package - hall/linen (4 shelves 3' wide) EA -$ -$ -$ -$

FNC CLOSL> & Closet package - hall/linen (4 shelves 5'- 6' wide) EA -$ -$ -$ -$

FNC CLOSM & Closet Organizer - Melamine LF -$ -$ -$ -$

FNC CLOSM+ & Closet Organizer - Melamine - High grade LF -$ -$ -$ -$

FNC CLOSM++ & Closet Organizer - Melamine - Premium grade LF -$ -$ -$ -$

FNC CLOSMRS + Closet Organizer - Melamine or Wire - Detach & reset LF -$ -$ -$ -$

FNC CLOSRS + Closet shelf and rod package - Detach & reset LF -$ -$ -$ -$

FNC CLOSW & Closet Organizer - Wire shelves LF -$ -$ -$ -$

FNC CLOSW- & Shelving - wire (vinyl coated) LF -$ -$ -$ -$

FNC CLOSW+ & Closet Organizer - Wire shelves - High grade LF -$ -$ -$ -$

FNC CLOSW++ & Closet Organizer - Wire shelves - Premium grade LF -$ -$ -$ -$

FNC CLOSWRS + Shelving - wire (vinyl coated) - Detach & reset LF -$ -$ -$ -$

FNC CLROD & Closet rod LF -$ -$ -$ -$

FNC CLROD+ & Closet rod - High grade LF -$ -$ -$ -$

FNC CLROD++ & Closet rod - Premium grade - stainless steel LF -$ -$ -$ -$

FNC CLRODRS + Closet rod - Detach & reset LF -$ -$ -$ -$

FNC CM & Cove molding - 3/4" LF -$ -$ -$ -$

FNC CM+ & Cove molding - 3/4" - stain grade LF -$ -$ -$ -$

FNC CMH & Cove molding - 3/4" - hardwood LF -$ -$ -$ -$

FNC CMRS + Cove mold - Detach & reset LF -$ -$ -$ -$

FNC CNR & Corner trim LF -$ -$ -$ -$

FNC CNR+ & Corner trim - stain grade LF -$ -$ -$ -$

FNC CNRH & Corner trim - hardwood LF -$ -$ -$ -$

FNC CNRPL & Corner trim - plastic LF -$ -$ -$ -$

FNC CNRRS + Corner trim - Detach & reset LF -$ -$ -$ -$

FNC COF & Coffered ceiling grid system SF -$ -$ -$ -$

FNC COF+ & Coffered ceiling grid system - High grade SF -$ -$ -$ -$

FNC COLW & Wood column - 12" diameter LF -$ -$ -$ -$

FNC COLW< & Wood column - 10" diameter LF -$ -$ -$ -$

FNC COLW<< & Wood column - 8" diameter LF -$ -$ -$ -$

FNC CPL & Casing - plastic (simulated wood) LF -$ -$ -$ -$

FNC CR10 & Column - round cast fiberglass - 10" diameter LF -$ -$ -$ -$

Page 65: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FNC CR12 & Column - round cast fiberglass - 12" diameter LF -$ -$ -$ -$

FNC CR8 & Column - round cast fiberglass - 8" diameter LF -$ -$ -$ -$

FNC CRF10 & Column - round cast fiberglass, fluted - 10" diameter LF -$ -$ -$ -$

FNC CRF12 & Column - round cast fiberglass, fluted - 12" diameter LF -$ -$ -$ -$

FNC CRF8 & Column - round cast fiberglass, fluted - 8" diameter LF -$ -$ -$ -$

FNC CRS + Casing - Detach & reset LF -$ -$ -$ -$

FNC CWN & Crown molding - 3 1/4" LF -$ -$ -$ -$

FNC CWN+ & Crown molding - 3 1/4" stain grade LF -$ -$ -$ -$

FNC CWN< & Crown molding - 2 1/4" LF -$ -$ -$ -$

FNC CWN<+ & Crown molding - 2 1/4" stain grade LF -$ -$ -$ -$

FNC CWN> & Crown molding - 4 1/4" LF -$ -$ -$ -$

FNC CWN>+ & Crown molding - 4 1/4" stain grade LF -$ -$ -$ -$

FNC CWN5 & Crown molding - 5 1/4" LF -$ -$ -$ -$

FNC CWN5+ & Crown molding - 5 1/4" stain grade LF -$ -$ -$ -$

FNC CWN6 & Crown molding - 5 3/8" to 6" LF -$ -$ -$ -$

FNC CWN6+ & Crown molding - 5 3/8" to 6" stain grade LF -$ -$ -$ -$

FNC CWN7 & Crown molding - 6 1/8" to 7" LF -$ -$ -$ -$

FNC CWN7+ & Crown molding - 6 1/8" to 7" stain grade LF -$ -$ -$ -$

FNC CWNH & Crown molding - 3 1/4" hardwood LF -$ -$ -$ -$

FNC CWNH< & Crown molding - 2 1/4" hardwood LF -$ -$ -$ -$

FNC CWNH> & Crown molding - 4 1/4" hardwood LF -$ -$ -$ -$

FNC CWNH5 & Crown molding - 5 1/4" hardwood LF -$ -$ -$ -$

FNC CWNH6 & Crown molding - 5 3/8" to 6" hardwood LF -$ -$ -$ -$

FNC CWNH7 & Crown molding - 6 1/8" to 7" hardwood LF -$ -$ -$ -$

FNC CWNM & Crown molding - 3 1/4" MDF LF -$ -$ -$ -$

FNC CWNM+ & Crown molding - 3 1/4" MDF - w/detail LF -$ -$ -$ -$

FNC CWNM> & Crown molding - 4 1/4" MDF LF -$ -$ -$ -$

FNC CWNM>+ & Crown molding - 4 1/4" MDF - w/detail LF -$ -$ -$ -$

FNC CWNM>5 & Crown molding - 5 1/4" MDF LF -$ -$ -$ -$

FNC CWNM>6 & Crown molding - 5 3/8" to 6" MDF LF -$ -$ -$ -$

FNC CWNM>7 & Crown molding - 6 1/8" to 7" MDF LF -$ -$ -$ -$

FNC CWNM3 & Crown molding - 3-piece LF -$ -$ -$ -$

FNC CWNM3- & Crown molding - 3-piece - MDF LF -$ -$ -$ -$

FNC CWNM3+ & Crown molding - 3-piece - stain grade LF -$ -$ -$ -$

FNC CWNM3++ & Crown molding - 3-piece - hardwood LF -$ -$ -$ -$

FNC CWNM4 & Crown molding - 4-piece LF -$ -$ -$ -$

FNC CWNM4- & Crown molding - 4-piece - MDF LF -$ -$ -$ -$

FNC CWNM4+ & Crown molding - 4-piece - stain grade LF -$ -$ -$ -$

FNC CWNM4++ & Crown molding - 4-piece - hardwood LF -$ -$ -$ -$

FNC CWNM5 & Crown molding - 5-piece LF -$ -$ -$ -$

FNC CWNM5- & Crown molding - 5-piece - MDF LF -$ -$ -$ -$

FNC CWNM5+ & Crown molding - 5-piece - stain grade LF -$ -$ -$ -$

FNC CWNM5++ & Crown molding - 5-piece - hardwood LF -$ -$ -$ -$

FNC CWNM6 & Crown molding - 6-piece LF -$ -$ -$ -$

FNC CWNM6- & Crown molding - 6-piece - MDF LF -$ -$ -$ -$

FNC CWNM6+ & Crown molding - 6-piece - stain grade LF -$ -$ -$ -$

FNC CWNM6++ & Crown molding - 6-piece - hardwood LF -$ -$ -$ -$

FNC CWNM7 & Crown molding - 7-piece LF -$ -$ -$ -$

FNC CWNM7- & Crown molding - 7-piece - MDF LF -$ -$ -$ -$

FNC CWNM7+ & Crown molding - 7-piece - stain grade LF -$ -$ -$ -$

FNC CWNM7++ & Crown molding - 7-piece - hardwood LF -$ -$ -$ -$

FNC CWNMM & Crown molding - 2-piece LF -$ -$ -$ -$

FNC CWNMM- & Crown molding - 2-piece - MDF LF -$ -$ -$ -$

FNC CWNMM+ & Crown molding - 2-piece - stain grade LF -$ -$ -$ -$

FNC CWNMM++ & Crown molding - 2-piece - hardwood LF -$ -$ -$ -$

FNC CWNRS + Crown molding - Detach & reset LF -$ -$ -$ -$

FNC DJ4 & Door jamb per LF - interior - paint grade - 4 9/16" LF -$ -$ -$ -$

FNC DJ4+ & Door jamb per LF - interior - softwood - 4 9/16" LF -$ -$ -$ -$

FNC DJ4H & Door jamb per LF - interior - hardwood - 4 9/16" LF -$ -$ -$ -$

FNC DJ6 & Door jamb per LF - interior - paint grade - 6 9/16" LF -$ -$ -$ -$

FNC DJ6+ & Door jamb per LF - interior - softwood - 6 9/16" LF -$ -$ -$ -$

FNC DJ6H & Door jamb per LF - interior - hardwood - 6 9/16" LF -$ -$ -$ -$

FNC DOP & Door opening (jamb & casing) - 32"to36"wide - paint grade EA -$ -$ -$ -$

FNC DOP+ & Door opening (jamb & casing) - 32"to36"wide - stain grade EA -$ -$ -$ -$

FNC DOP< & Door opening (jamb & casing) - up to 32"wide - paint EA -$ -$ -$ -$

Page 66: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

grade

FNC DOP<+ & Door opening (jamb & casing) - up to 32"wide - stain grade EA -$ -$ -$ -$

FNC DOP> & Door opening (jamb & casing) - 36"to60"wide - paint grade EA -$ -$ -$ -$

FNC DOP>+ & Door opening (jamb & casing) - 36"to60"wide - stain grade EA -$ -$ -$ -$

FNC DOP» & Door opening (jamb & casing) - 60" or wider - paint grade EA -$ -$ -$ -$

FNC DOP>>+ & Door opening (jamb & casing) - 60" or wider - stain grade EA -$ -$ -$ -$

FNC DOPH & Door opening (jamb & casing) - 32" to 36" wide - EA -$ -$ -$ -$

hardwood

FNC DOPH< & Door opening (jamb & casing) - up to 32"wide - hardwood EA -$ -$ -$ -$

FNC DOPH> & Door opening (jamb & casing) - 36"to60"wide - hardwood EA -$ -$ -$ -$

FNC DOPH» & Door opening (jamb & casing) - 60" or wider - hardwood EA -$ -$ -$ -$

FNC DOPRS + Door opening trim - Detach & reset EA -$ -$ -$ -$

FNC FLM & Flexible molding - up to 3" - flat radius LF -$ -$ -$ -$

FNC FLM> & Flexible molding - 3" to 5" - flat radius LF -$ -$ -$ -$

FNC FLM» & Flexible molding - 5" to 7" - flat radius LF -$ -$ -$ -$

FNC HR & Handrail - round / oval - softwood - wall mounted LF -$ -$ -$ -$

FNC HR+ & Handrail - detailed profile - softwood - wall mounted LF -$ -$ -$ -$

FNC HRH & Handrail - round / oval - hardwood - wall mounted LF -$ -$ -$ -$

FNC HRH+ & Handrail - detailed profile - hardwood - wall mounted LF -$ -$ -$ -$

FNC HRH++ & Handrail - prem. grade ornamental - hardwood - wall LF -$ -$ -$ -$

mount.

FNC HRPH & Handrail - round / oval - post to post - hardwood LF -$ -$ -$ -$

FNC HRPH+ & Handrail - detailed profile - post to post - hardwood LF -$ -$ -$ -$

FNC HRPS & Handrail - round / oval - post to post - softwood LF -$ -$ -$ -$

FNC HRPS+ & Handrail - detailed profile - post to post - softwood LF -$ -$ -$ -$

FNC HRRS + Handrail - wall mounted - Detach & reset LF -$ -$ -$ -$

FNC JPF & Judges paneling - flat panel w/ molding - paint grade SF -$ -$ -$ -$

FNC JPF+ & Judges paneling - flat panel w/ molding - hardwood SF -$ -$ -$ -$

FNC JPR & Judges paneling - raised panel - paint grade SF -$ -$ -$ -$

FNC JPR+ & Judges paneling - raised panel - hardwood SF -$ -$ -$ -$

FNC JPS & Judges paneling - shaker style - paint grade SF -$ -$ -$ -$

FNC JPS+ & Judges paneling - shaker style - hardwood SF -$ -$ -$ -$

FNC LAB + Finish Carpenter - per hour HR -$ -$ -$ -$

FNC LABL + Finish Carpentry - General Laborer - per hour HR -$ -$ -$ -$

FNC LATTICE & Lattice work SF -$ -$ -$ -$

FNC LOCK & Open locker - built-in - 5' tall - paint grade EA -$ -$ -$ -$

FNC LOCK+ & Open locker - built-in - 5' tall - stain grade hardwood EA -$ -$ -$ -$

FNC MN + Finish Carpentry - Labor Minimum EA -$ -$ -$ -$

FNC MSU + Mill set up charge for unique molding - each profile EA -$ -$ -$ -$

FNC NICHE< & Wall niche - Surface mtd. - small EA -$ -$ -$ -$

FNC NICHEP & Wall niche - polymer EA -$ -$ -$ -$

FNC NICHES & Wall niche - cast stone EA -$ -$ -$ -$

FNC NICHEX> & Wall niche - Surface mtd. - large EA -$ -$ -$ -$

FNC NPB & Box newel post - plain EA -$ -$ -$ -$

FNC NPB+ & Box newel post - fluted EA -$ -$ -$ -$

FNC NPB++ & Box newel post - paneled EA -$ -$ -$ -$

FNC NPBH & Box newel post - hardwood - plain EA -$ -$ -$ -$

FNC NPBH+ & Box newel post - hardwood - fluted EA -$ -$ -$ -$

FNC NPBH++ & Box newel post - hardwood - paneled EA -$ -$ -$ -$

FNC NPBHM + Box newel post - plain hardwood - material only EA -$ -$ -$ -$

FNC NPBHM+ + Box newel post - fluted hardwood - material only EA -$ -$ -$ -$

FNC NPBHM++ + Box newel post - paneled hardwood - material only EA -$ -$ -$ -$

FNC NPBM + Box newel post - plain - material only EA -$ -$ -$ -$

FNC NPBM+ + Box newel post - fluted - material only EA -$ -$ -$ -$

FNC NPBM++ + Box newel post - paneled - material only EA -$ -$ -$ -$

FNC NPT & Newel post - turned EA -$ -$ -$ -$

FNC NPT+ & Newel post - turned w/detail EA -$ -$ -$ -$

FNC NPTH & Newel post - turned - premium hardwood EA -$ -$ -$ -$

FNC NPTH+ & Newel post - turned w/detail - premium hardwood EA -$ -$ -$ -$

FNC NPTO & Newel post - turned - w/over post fitting EA -$ -$ -$ -$

FNC NPTO+ & Newel post - turned w/detail - w/over post fitting EA -$ -$ -$ -$

FNC NPTOH & Newel post - turned - prem. hardwood - w/over post fitting EA -$ -$ -$ -$

FNC NPTOH+ & Newel post - detailed - prem. hardwood - w/over post ftg. EA -$ -$ -$ -$

FNC OHJ & Jamb and trim for overhead door unit LF -$ -$ -$ -$

FNC OHJC & Jamb and trim for overhead door unit - Composite LF -$ -$ -$ -$

Page 67: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FNC OHJR & Jamb and trim for overhead door unit - Redwood LF -$ -$ -$ -$

FNC PCAP & Panel cap - stain grade LF -$ -$ -$ -$

FNC PCAP+ & Panel cap - hardwood LF -$ -$ -$ -$

FNC PCMED & Medallion - up to 12" diameter EA -$ -$ -$ -$

FNC PCMEDB> & Brass medallion - Large EA -$ -$ -$ -$

FNC PDAC & Pediment - acorn style LF -$ -$ -$ -$

FNC PDPC & Pediment - peaked cap style LF -$ -$ -$ -$

FNC PDRH & Pediment - rams head style LF -$ -$ -$ -$

FNC PDSB & Pediment - sunburst style LF -$ -$ -$ -$

FNC PILF & Pilaster - urethane - fluted face LF -$ -$ -$ -$

FNC PILP & Pilaster - urethane - paneled face LF -$ -$ -$ -$

FNC PILS & Pilaster - urethane - smooth face LF -$ -$ -$ -$

FNC PL10 & Pilaster - cast fiberglass - 10" width LF -$ -$ -$ -$

FNC PL12 & Pilaster - cast fiberglass - 12" width LF -$ -$ -$ -$

FNC PL8 & Pilaster - cast fiberglass - 8" width LF -$ -$ -$ -$

FNC PLF10 & Pilaster - cast fiberglass, fluted - 10" width LF -$ -$ -$ -$

FNC PLF12 & Pilaster - cast fiberglass, fluted - 12" width LF -$ -$ -$ -$

FNC PLF8 & Pilaster - cast fiberglass, fluted - 8" width LF -$ -$ -$ -$

FNC QR & Quarter round - 3/4" LF -$ -$ -$ -$

FNC QR+ & Quarter round - 3/4" - stain grade LF -$ -$ -$ -$

FNC QRBSRS + Base cap or shoe / Quarter round - Detach & reset LF -$ -$ -$ -$

FNC QRH & Quarter round - 3/4" - hardwood LF -$ -$ -$ -$

FNC SH12 & Shelving - 12" - in place LF -$ -$ -$ -$

FNC SH12+ & Shelving - 12" - in place - stain grade LF -$ -$ -$ -$

FNC SH16 & Shelving - 16" - in place LF -$ -$ -$ -$

FNC SH16+ & Shelving - 16" - in place - stain grade LF -$ -$ -$ -$

FNC SH24 & Shelving - 24" - in place LF -$ -$ -$ -$

FNC SH24+ & Shelving - 24" - in place - stain grade LF -$ -$ -$ -$

FNC SHOE & Base shoe LF -$ -$ -$ -$

FNC SHOE+ & Base shoe - stain grade LF -$ -$ -$ -$

FNC SHOEH & Base shoe - hardwood LF -$ -$ -$ -$

FNC SHRS + Shelving - Detach & reset LF -$ -$ -$ -$

FNC SILL & Window sill LF -$ -$ -$ -$

FNC SILL+ & Window sill - stain grade LF -$ -$ -$ -$

FNC SILLH & Window sill - hardwood LF -$ -$ -$ -$

FNC SKB & Stair skirt bracket EA -$ -$ -$ -$

FNC SKB+ & Stair skirt bracket - High grade EA -$ -$ -$ -$

FNC SKRT & Stair Skirt/Apron - wall side - paint grade LF -$ -$ -$ -$

FNC SKRTH & Stair Skirt/Apron - wall side - hardwood LF -$ -$ -$ -$

FNC SKRTL & Stair Skirt/Apron - wall side - Labor only LF -$ -$ -$ -$

FNC SKRTLO & Stair Skirt/Apron - open side - Labor only LF -$ -$ -$ -$

FNC SKRTO & Stair Skirt/Apron - open side - paint grade LF -$ -$ -$ -$

FNC SKRTOH & Stair Skirt/Apron - open side - hardwood LF -$ -$ -$ -$

FNC STOL & Window stool & apron LF -$ -$ -$ -$

FNC STOLRS + Window stool & apron - Detach & reset LF -$ -$ -$ -$

FNC STUD & Student cubicle - study carrel LF -$ -$ -$ -$

FNC WDBKT + Wood bracket - decorative EA -$ -$ -$ -$

FNC WOP & Window trim set (casing & stop) LF -$ -$ -$ -$

FNC WOP+ & Window trim set (casing & stop) - stain grade LF -$ -$ -$ -$

FNC WOPH & Window trim set (casing & stop) - hardwood LF -$ -$ -$ -$

FNC WS & Window seat - paint grade LF -$ -$ -$ -$

FNC WS+ & Window seat - hardwood LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FNH BAC & Bath accessory EA -$ -$ -$ -$

FNH BAC- & Bath accessory - Standard grade EA -$ -$ -$ -$

FNH BAC+ & Bath accessory - High grade EA -$ -$ -$ -$

FNH BAC++ & Bath accessory - Premium grade EA -$ -$ -$ -$

FNH BCL & Door ball catch latch EA -$ -$ -$ -$

FNH BCL- & Door ball catch latch - Standard grade EA -$ -$ -$ -$

FNH BENCH & Locker room bench LF -$ -$ -$ -$

FNH BFT & Bifold door track & hardware EA -$ -$ -$ -$

FNH BFTPRS + Bifold pivot door hardware - Detach & reset EA -$ -$ -$ -$

Page 68: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FNH BFTRS + Bifold door track & hardware - Detach & reset EA -$ -$ -$ -$

FNH BIDITM + Finish Hardware (Bid Item) EA -$ -$ -$ -$

FNH BMP & Bumper for loading dock EA -$ -$ -$ -$

FNH BRUSH & Brush and cup holder EA -$ -$ -$ -$

FNH BRUSHRS + Brush and cup holder - Detach & reset EA -$ -$ -$ -$

FNH CDB & Deadbolt - Commercial grade EA -$ -$ -$ -$

FNH CDB+ & Deadbolt - Heavy duty - Commercial grade EA -$ -$ -$ -$

FNH CDBRS + Deadbolt - Commercial grade - Detach & reset EA -$ -$ -$ -$

FNH CDC & Door closer - Commercial grade EA -$ -$ -$ -$

FNH CDC+ & Door closer - Heavy duty - Commercial grade EA -$ -$ -$ -$

FNH CDCRS + Door closer - Commercial grade - Detach & reset EA -$ -$ -$ -$

FNH CG2 & Corner Guard - vinyl - 2" wings LF -$ -$ -$ -$

FNH CG2- & Corner Guard - vinyl - 2" wings - Standard grade LF -$ -$ -$ -$

FNH CG3 & Corner Guard - vinyl - 3" wings LF -$ -$ -$ -$

FNH CHK & Ceiling hook EA -$ -$ -$ -$

FNH CHKRS + Ceiling hook - Detach & reset EA -$ -$ -$ -$

FNH CKEY & Entrance hardware - card key EA -$ -$ -$ -$

FNH CUBIC & Cubicle curtains, tracks, & hardware LF -$ -$ -$ -$

FNH DB & Deadbolt EA -$ -$ -$ -$

FNH DB- & Deadbolt - Standard grade EA -$ -$ -$ -$

FNH DB+ & Deadbolt - High grade EA -$ -$ -$ -$

FNH DB++ & Deadbolt - Premium grade EA -$ -$ -$ -$

FNH DB+++ & Deadbolt - Deluxe grade EA -$ -$ -$ -$

FNH DBRS + Deadbolt - Detach & reset EA -$ -$ -$ -$

FNH DBX & Door lockset & deadbolt - exterior EA -$ -$ -$ -$

FNH DBX- & Door lockset & deadbolt - exterior - Standard grade EA -$ -$ -$ -$

FNH DBX+ & Door lockset & deadbolt - exterior - High grade EA -$ -$ -$ -$

FNH DBX++ & Door lockset & deadbolt - exterior - Premium grade EA -$ -$ -$ -$

FNH DBX+++ & Door lockset & deadbolt - exterior - Deluxe grade EA -$ -$ -$ -$

FNH DBXRS + Door lockset & deadbolt - exterior - Detach & reset EA -$ -$ -$ -$

FNH DC & Door closer - spring loaded hinges (per pair) EA -$ -$ -$ -$

FNH DC+ & Door closer - hydraulic - High grade EA -$ -$ -$ -$

FNH DC++ & Door closer - hydraulic - Premium grade EA -$ -$ -$ -$

FNH DCASER & Display case - Recessed SF -$ -$ -$ -$

FNH DCASES & Display case - Surface mounted SF -$ -$ -$ -$

FNH DCH & Door security chain set EA -$ -$ -$ -$

FNH DCHRS + Door security chain set - Detach & reset EA -$ -$ -$ -$

FNH DCP & Door closer - pneumatic EA -$ -$ -$ -$

FNH DCRS + Door closer - Detach & reset EA -$ -$ -$ -$

FNH DIR & Building Directory - aluminum and glass EA -$ -$ -$ -$

FNH DIR+ & Building Directory - aluminum and glass - High grade EA -$ -$ -$ -$

FNH DIR++ & Building Directory - stain. steel & glass - Premium grade EA -$ -$ -$ -$

FNH DJR + Door jamb reinforcement hardware EA -$ -$ -$ -$

FNH DJRD + Door jamb reinforcement hardware - double door EA -$ -$ -$ -$

FNH DJRSD + Sliding patio door reinforcement/security lock hardware EA -$ -$ -$ -$

FNH DORDH & Door dummy knob - interior EA -$ -$ -$ -$

FNH DORDH- & Door dummy knob - interior - Standard grade EA -$ -$ -$ -$

FNH DORDH+ & Door dummy knob - interior - High grade EA -$ -$ -$ -$

FNH DORDH++ & Door dummy knob - interior - Premium grade EA -$ -$ -$ -$

FNH DORDHD+ & Door dummy knob - interior - Deluxe grade EA -$ -$ -$ -$

FNH DORDHRS + Door dummy knob - Detach & reset EA -$ -$ -$ -$

FNH DORH & Door knob - interior EA -$ -$ -$ -$

FNH DORH- & Door knob - interior - Standard grade EA -$ -$ -$ -$

FNH DORH+ & Door knob - interior - High grade EA -$ -$ -$ -$

FNH DORH++ & Door knob - interior - Premium grade EA -$ -$ -$ -$

FNH DORH+++ & Door knob - interior - Deluxe grade EA -$ -$ -$ -$

FNH DORHRS + Door lockset - Detach & reset EA -$ -$ -$ -$

FNH DORHX & Door lockset - exterior EA -$ -$ -$ -$

FNH DORHX- & Door lockset - exterior - Standard grade EA -$ -$ -$ -$

FNH DORHX+ & Door lockset - exterior - High grade EA -$ -$ -$ -$

FNH DORHX++ & Door lockset - exterior - Premium grade EA -$ -$ -$ -$

FNH DORO & Residential automatic door latch release system EA -$ -$ -$ -$

FNH DORO+ & Residential automatic door operator system EA -$ -$ -$ -$

FNH DOROK & Wireless/Keyless entry pad for auto door operator system EA -$ -$ -$ -$

FNH DOROP & Push-pad for residential handicap access EA -$ -$ -$ -$

Page 69: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FNH DOROP> & Large push-pad for residential handicap access EA -$ -$ -$ -$

FNH DSTP & Door stop - wall or floor mounted EA -$ -$ -$ -$

FNH DSTP- & Door stop - spring stop - mounted on baseboard EA -$ -$ -$ -$

FNH DSTPH & Door stop - hinge pin mounted EA -$ -$ -$ -$

FNH DSTPRS + Door stop - wall or floor mounted - Detach & reset EA -$ -$ -$ -$

FNH FB & Flush bolts (set of 2) EA -$ -$ -$ -$

FNH HANG & Clothes hanger - door mounted EA -$ -$ -$ -$

FNH HANGRS + Clothes hanger - door mounted - Detach & reset EA -$ -$ -$ -$

FNH HING>RS + Door hinges (set of 3) and slab - Detach & reset EA -$ -$ -$ -$

FNH HING4 & Door hinge, 4" ball bearing (set of 3) EA -$ -$ -$ -$

FNH HING4+ & Door hinge, 4" ball bearing w/non-removable pin (set of 3) EA -$ -$ -$ -$

FNH HINGC & Door hinges - continuous gear EA -$ -$ -$ -$

FNH HINGE & Door hinges (set of 2) EA -$ -$ -$ -$

FNH HINGE- & Door hinges - Standard grade (set of 2) EA -$ -$ -$ -$

FNH HINGE+ & Door hinges - High grade (set of 2) EA -$ -$ -$ -$

FNH HINGE> & Door hinges (set of 3) EA -$ -$ -$ -$

FNH HINGE>- & Door hinges - Standard grade (set of 3) EA -$ -$ -$ -$

FNH HINGE>+ & Door hinges - High grade (set of 3) EA -$ -$ -$ -$

FNH HINGERS + Door hinges (set of 2) and slab - Detach & reset EA -$ -$ -$ -$

FNH HOLD & Door hold open EA -$ -$ -$ -$

FNH HOLDM & Door hold open device - magnetic EA -$ -$ -$ -$

FNH HOLDRS + Door hold open - Detach & reset EA -$ -$ -$ -$

FNH KICK & Door kick plate - 16 gauge, 8" x 34" EA -$ -$ -$ -$

FNH KICKRS + Door kick plate - Detach & reset EA -$ -$ -$ -$

FNH KNOCK & Door knocker EA -$ -$ -$ -$

FNH KNOCKRS + Door knocker - Detach & reset EA -$ -$ -$ -$

FNH LAB + Finish Hardware Installer - per hour HR -$ -$ -$ -$

FNH LABL + Finish Hardware - General Laborer - per hour HR -$ -$ -$ -$

FNH LKR & Locker - 12" wide x 60" high x 15" deep EA -$ -$ -$ -$

FNH LKRD & Double locker - 12" wide x 60" high x 15" deep EA -$ -$ -$ -$

FNH LKRD+ & Double locker - 12" wide x 72" high x 15" deep - High grd EA -$ -$ -$ -$

FNH LKRP & Postal parcel lockers EA -$ -$ -$ -$

FNH LOKK & Lockset - keyed - Medium duty - Commercial grade EA -$ -$ -$ -$

FNH LOKK+ & Lockset - keyed - Heavy duty - Commercial grade EA -$ -$ -$ -$

FNH LOICKM & Lockset - full mortised - keyed EA -$ -$ -$ -$

FNH LOICKM+ & Lockset - full mortised - keyed - High grade EA -$ -$ -$ -$

FNH LOKKM++ & Lockset - full mortised - keyed - Premium grade EA -$ -$ -$ -$

FNH LOKP & Lockset - passage - Medium duty - Commercial grade EA -$ -$ -$ -$

FNH LOKRS + Lockset - Commercial grade - Detach & reset EA -$ -$ -$ -$

FNH MAIL & Mailboxes - commercial/group - keyed EA -$ -$ -$ -$

FNH MARKB & Chalkboards, Tackboards, & Markerboards SF -$ -$ -$ -$

FNH MARKB+ & Chalkboards, Tackboards, & Markerboards - High grade SF -$ -$ -$ -$

FNH MARKB++ & Chalkboards, Tackboards, & Markerboards - 3-part sliding SF -$ -$ -$ -$

FNH MARKMR & Map & display rail for chalkboard or markerboard LF -$ -$ -$ -$

FNH MARKTR & Aluminum tray for chalkboard or markerboard LF -$ -$ -$ -$

FNH MN + Finish Hardware - Labor Minimum EA -$ -$ -$ -$

FNH NUMB & House numbers/letters - plastic or metal - up to 4" EA -$ -$ -$ -$

FNH PEEP & Door peep hole EA -$ -$ -$ -$

FNH PEEPRS + Door peep hole - Detach & reset EA -$ -$ -$ -$

FNH PH & Panic hardware - rim series (bar and latch, no rods) EA -$ -$ -$ -$

FNH PHCR & Panic hardware with concealed vertical rods EA -$ -$ -$ -$

FNH PHRS + Panic hardware - Detach & reset EA -$ -$ -$ -$

FNH PHXR & Panic hardware with external vertical rods EA -$ -$ -$ -$

FNH PKT & Pocket door hardware EA -$ -$ -$ -$

FNH PKTL & Pocket door latch EA -$ -$ -$ -$

FNH PKTL+ & Pocket door latch - High grade EA -$ -$ -$ -$

FNH PKTL++ & Pocket door latch - Premium grade EA -$ -$ -$ -$

FNH PKTLRS + Pocket door latch - Detach & reset EA -$ -$ -$ -$

FNH PULL & Door pull plate, 4" x 16" EA -$ -$ -$ -$

FNH PUSH & Door push plate, 4" x 16" EA -$ -$ -$ -$

FNH PUSHRS + Door push or pull plate - Detach & reset EA -$ -$ -$ -$

FNH ROBE & Robe hook EA -$ -$ -$ -$

FNH ROBERS + Robe hook - Detach & reset EA -$ -$ -$ -$

FNH SDH & Sliding patio door handle EA -$ -$ -$ -$

FNH SDHRS + Sliding patio door handle - Detach & reset EA -$ -$ -$ -$

Page 70: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FNH SDISH & Soap dish - Wall mounted EA -$ -$ -$ -$

FNH SDISH- & Soap dish - Wall mounted - Standard grade EA -$ -$ -$ -$

FNH SDISH+ & Soap dish - Wall mounted - High grade EA -$ -$ -$ -$

FNH SDISHRS + Soap dish - Detach & reset EA -$ -$ -$ -$

FNH SDISP & Soap dispenser - wall mounted EA -$ -$ -$ -$

FNH SDISP- & Soap dispenser - wall mounted - Standard grade EA -$ -$ -$ -$

FNH SDISP+ & Soap dispenser - wall mounted - High grade EA -$ -$ -$ -$

FNH SDISPRS + Soap dispenser - Detach & reset EA -$ -$ -$ -$

FNH SHLDR & Soap holder - recessed EA -$ -$ -$ -$

FNH SHLDRRS + Soap holder - recessed - Detach & reset EA -$ -$ -$ -$

FNH SROD & Shower curtain rod EA -$ -$ -$ -$

FNH SRODRS + Shower curtain rod - Detach & reset EA -$ -$ -$ -$

FNH SS + Smoke seal LF -$ -$ -$ -$

FNH SW & Door sweep EA -$ -$ -$ -$

FNH TBAR & Towel bar EA -$ -$ -$ -$

FNH TBAR- & Towel bar - Standard grade EA -$ -$ -$ -$

FNH TBAR+ & Towel bar - High grade EA -$ -$ -$ -$

FNH TBAR++ & Towel bar - Premium grade EA -$ -$ -$ -$

FNH TBARRS + Towel bar - Detach & reset EA -$ -$ -$ -$

FNH THR & Door threshold EA -$ -$ -$ -$

FNH THRA & Door threshold, aluminum LF -$ -$ -$ -$

FNH THRR & Door threshold, rubber LF -$ -$ -$ -$

FNH THRRS + Door threshold - Detach & reset LF -$ -$ -$ -$

FNH THRW & Door threshold, wood LF -$ -$ -$ -$

FNH TP & Toilet paper holder EA -$ -$ -$ -$

FNH TP- & Toilet paper holder - Standard grade EA -$ -$ -$ -$

FNH TP+ & Toilet paper holder - High grade EA -$ -$ -$ -$

FNH TP++ & Toilet paper holder - Premium grade EA -$ -$ -$ -$

FNH TPRS + Toilet paper holder - Detach & reset EA -$ -$ -$ -$

FNH TR & Towel ring EA -$ -$ -$ -$

FNH TR- & Towel ring - Standard grade EA -$ -$ -$ -$

FNH TR+ & Towel ring - High grade EA -$ -$ -$ -$

FNH TR++ & Towel ring - Premium grade EA -$ -$ -$ -$

FNH TRRS + Towel ring - Detach & reset EA -$ -$ -$ -$

FNH TVC & TV Brackets - Ceiling mounted EA -$ -$ -$ -$

FNH TVRS + TV Brackets - Wall or ceiling mounted - Detach & reset EA -$ -$ -$ -$

FNH TVW & TV Brackets - Wall mounted EA -$ -$ -$ -$

FNH TW & Towel warmer - Free standing portable electric EA -$ -$ -$ -$

FNH TW+ & Towel warmer - Electric floor/wall mounted EA -$ -$ -$ -$

FNH WCH & Wash cloth holder EA -$ -$ -$ -$

FNH WCH- & Wash cloth holder - Standard grade EA -$ -$ -$ -$

FNH WCH+ & Wash cloth holder - High grade EA -$ -$ -$ -$

FNH WCH++ & Wash cloth holder - Premium grade EA -$ -$ -$ -$

FNH WCHRS + Wash cloth holder - Detach & reset EA -$ -$ -$ -$

FNH WLOCK & Window locks EA -$ -$ -$ -$

FNH WS & Door weather stripping EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FPL AV & Masonry fireplace & chimney - single story home EA -$ -$ -$ -$

FPL AV+ & Masonry fireplace & chimney - single story home - High EA -$ -$ -$ -$

grd

FPL AV> & Masonry fireplace & chimney - two story home EA -$ -$ -$ -$

FPL AV>+ & Masonry fireplace & chimney - two story home - High EA -$ -$ -$ -$

grade

FPL AVC + Masonry fireplace & chimney - Commercial - single story EA -$ -$ -$ -$

FPL AVC> + Masonry fireplace & chimney - Commercial - 2 story EA -$ -$ -$ -$

FPL AVCHLF & Add for tall masonry chimney over 15' (per vertical LF) LF -$ -$ -$ -$

FPL AVTRIM + Upgraded trim kit for zero clnce fireplace EA -$ -$ -$ -$

FPL AVTRIM+ + Upgraded trim kit for zero clnce fireplace - High grade EA -$ -$ -$ -$

FPL AVZCHLF & Zero clearance chimney framing per vertical LF LF -$ -$ -$ -$

FPL AVZDV & Fireplace, zero clnce, direct vent, w/ venting EA -$ -$ -$ -$

FPL AVZDV+ & Fireplace, zero clnce, direct vent w/ venting - High grade EA -$ -$ -$ -$

FPL AVZG & Fireplace, zero clnce, gas burning, w/ venting EA -$ -$ -$ -$

Page 71: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FPL AVZG+ & Fireplace, zero clnce, gas burning, w/venting - High grade EA -$ -$ -$ -$

FPL AVZGRS + Fireplace, zero clearance, gas burning - Detach & reset EA -$ -$ -$ -$

FPL AVZLAB + Fireplace Installer - per hour HR -$ -$ -$ -$

FPL AVZW & Fireplace, zero clnce, wood burning, w/ venting EA -$ -$ -$ -$

FPL AVZW+ & Fireplace, zero clnce, wood burning w/venting - High grade EA -$ -$ -$ -$

FPL BEE & Beehive Fireplace EA -$ -$ -$ -$

FPL BIDITM + Fireplaces (Bid Item) EA -$ -$ -$ -$

FPL BLWR & Direct vent fireplace blower - add on EA -$ -$ -$ -$

FPL BVENT & Fireplace B-vent per LF LF -$ -$ -$ -$

FPL CCAPC & Fireplace - chimney cap - concrete EA -$ -$ -$ -$

FPL CCAPCC & Fireplace - chimney chase cover - copper EA -$ -$ -$ -$

FPL CCAPM & Fireplace - chimney chase cover - sheet metal EA -$ -$ -$ -$

FPL CCAPSS & Fireplace - chimney chase cover - stainless steel EA -$ -$ -$ -$

FPL CHLF & Masonry chimney and flue LF -$ -$ -$ -$

FPL DCSC & Fireplace - decorative chimney shroud - copper EA -$ -$ -$ -$

FPL DCSM & Fireplace - decorative chimney shroud - metal EA -$ -$ -$ -$

FPL DMP & Fireplace damper EA -$ -$ -$ -$

FPL ELBOX & Electric fireplace insert, built-in, w/ heater- 33" to 39" EA -$ -$ -$ -$

FPL ELBOX> & Electric fireplace insert, built-in, w/ heater- 42" to 52" EA -$ -$ -$ -$

FPL FACB & Fireplace face, brick SF -$ -$ -$ -$

FPL FACST & Fireplace face, cultured stone SF -$ -$ -$ -$

FPL FACST+ & Fireplace face, natural stone SF -$ -$ -$ -$

FPL FLCP & Flue cap EA -$ -$ -$ -$

FPL FLCP+ & Flue cap - copper EA -$ -$ -$ -$

FPL FLCP> & Flue cap - oversized EA -$ -$ -$ -$

FPL FLCP>+ & Flue cap - oversized - copper EA -$ -$ -$ -$

FPL FLUE & Flue tile liner - 8" x 8" LF -$ -$ -$ -$

FPL FLUE> & Flue tile liner - 8" x 12" LF -$ -$ -$ -$

FPL FLUE» & Flue tile liner - 12" x 12" LF -$ -$ -$ -$

FPL FLUEPC + Flue liner - Poured concrete LF -$ -$ -$ -$

FPL GDOR & Glass fireplace door EA -$ -$ -$ -$

FPL GDOR- & Glass fireplace door - Standard grade EA -$ -$ -$ -$

FPL GDOR+ & Glass fireplace door - High grade EA -$ -$ -$ -$

FPL GDOR++ & Glass fireplace door - Premium grade EA -$ -$ -$ -$

FPL GDORRS + Glass fireplace door - Detach & reset EA -$ -$ -$ -$

FPL GLOG & Fireplace gas log set - 18" to 24" EA -$ -$ -$ -$

FPL GLOG> & Fireplace gas log set - 30" EA -$ -$ -$ -$

FPL GLOGRS + Fireplace gas log set - Detach & reset EA -$ -$ -$ -$

FPL GRATE & Fireplace grate EA -$ -$ -$ -$

FPL HRTH & Fireplace hearth - brick SF -$ -$ -$ -$

FPL HRTH- & Fireplace hearth - tile SF -$ -$ -$ -$

FPL HRTH+ & Fireplace hearth - marble SF -$ -$ -$ -$

FPL HRTHRS + Fireplace hearth - Detach & reset SF -$ -$ -$ -$

FPL LAB + Mason - Brick / Stone - per hour HR -$ -$ -$ -$

FPL LABL + Fireplace - General Laborer - per hour HR -$ -$ -$ -$

FPL MBOX36 & Fireplace box zero clnce - 36" wood burning EA -$ -$ -$ -$

FPL MBOX42 & Fireplace box zero clnce - 42" wood burning EA -$ -$ -$ -$

FPL MN + Fireplace - Labor Minimum EA -$ -$ -$ -$

FPL MNTL & Fireplace mantel - paint grade - prefab. EA -$ -$ -$ -$

FPL MNTL- & Fireplace mantel - wood beam or shelf only (per LF) LF -$ -$ -$ -$

FPL MNTL+ & Fireplace mantel - stain grade or hardwood - prefab. EA -$ -$ -$ -$

FPL MNTL++ & Fireplace mantel - paint grade - custom EA -$ -$ -$ -$

FPL MNTL+++ & Fireplace mantel - stain grade or hardwood - custom EA -$ -$ -$ -$

FPL MNTLC> + Fireplace mantel - Commercial - extra large EA -$ -$ -$ -$

FPL RF + Refurbish wood stove - no trim EA -$ -$ -$ -$

FPL RF+ + Refurbish wood stove - with trim EA -$ -$ -$ -$

FPL RF++ + Refurbish wood stove - with highly decorative trim EA -$ -$ -$ -$

FPL SCR & Fireplace screen EA -$ -$ -$ -$

FPL SCR- & Fireplace screen - Standard grade EA -$ -$ -$ -$

FPL SCR+ & Fireplace screen - High grade EA -$ -$ -$ -$

FPL SCR++ & Fireplace screen - Premium grade EA -$ -$ -$ -$

FPL SCRRS + Fireplace screen - Detach & reset EA -$ -$ -$ -$

FPL SPDMP & Stove pipe damper section EA -$ -$ -$ -$

FPL SSFL & Stainless steel flue liner LF -$ -$ -$ -$

FPL SSFLI + Stainless steel flue liner insulation LF -$ -$ -$ -$

Page 72: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FPL STOVE & Wood stove - Small size EA -$ -$ -$ -$

FPL STOVE> & Wood stove - Medium size EA -$ -$ -$ -$

FPL STOVE» & Wood stove - Large size EA -$ -$ -$ -$

FPL STOVEB + Blower - upgrade charge for a wood stove EA -$ -$ -$ -$

FPL STOVEBD + Brass door - upgrade charge for a wood stove EA -$ -$ -$ -$

FPL STOVEBL + Brass legs - upgrade charge for a wood stove EA -$ -$ -$ -$

FPL STOVECL + Black cast legs - upgrade charge for a wood stove EA -$ -$ -$ -$

FPL STOVEEG + Etched glass - upgrade charge for a wood stove EA -$ -$ -$ -$

FPL STOVEP + Pedestal base - upgrade charge for a wood stove EA -$ -$ -$ -$

FPL STOVERS + Wood stove - Detach & reset EA -$ -$ -$ -$

FPL SW6 & Single wall flue - black, 6" LF -$ -$ -$ -$

FPL SW8 & Single wall flue - black, 8" LF -$ -$ -$ -$

FPL TH6 & Wall thimble - 6" EA -$ -$ -$ -$

FPL TH8 & Wall thimble - 8" EA -$ -$ -$ -$

FPL TRI & Triple wall or insulated high temperature flue LF -$ -$ -$ -$

FPL TRIRF & Triple wall flue roof installation kit EA -$ -$ -$ -$

FPL WSFBDF + Washington Solid Fuel Burning Device Fee EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FPS ANSUL & Ansul fire extinguisher system above cooking area EA -$ -$ -$ -$

FPS AVR4 & Alarm and valve riser, 4" EA -$ -$ -$ -$

FPS AVR6 & Alarm and valve riser, 6" EA -$ -$ -$ -$

FPS BF & Backflow preventer - check valve - 8" EA -$ -$ -$ -$

FPS BFP10 & Backflow preventer, 10" EA -$ -$ -$ -$

FPS BFP2 & Backflow preventer, 2 1/2" EA -$ -$ -$ -$

FPS BFP4 & Backflow preventer, 4" EA -$ -$ -$ -$

FPS BFP6 & Backflow preventer, 6" EA -$ -$ -$ -$

FPS BFP8 & Backflow preventer, 8" EA -$ -$ -$ -$

FPS BIDITM + Fire Protection Systems (Bid Item) EA -$ -$ -$ -$

FPS DS + Drain and re-charge wet fire suppression system EA -$ -$ -$ -$

FPS FRP + Freeze-proof system - additional charge SF -$ -$ -$ -$

FPS FRX & 5 lb. ABC fire extinguisher EA -$ -$ -$ -$

FPS FRX10 & 10 lb. ABC fire extinguisher EA -$ -$ -$ -$

FPS FRX20 & 20 lb. ABC fire extinguisher EA -$ -$ -$ -$

FPS FXCAB & Fire extinguisher and cabinet, 14" x 27" x 8" EA -$ -$ -$ -$

FPS GASC & Gas fire suppression system - Commercial SF -$ -$ -$ -$

FPS GASH & Gas fire suppression system - whole house SF -$ -$ -$ -$

FPS HSCAB & 1 1/2" fire hose and cabinet - 50' long EA -$ -$ -$ -$

FPS HSCAB+ & 2 1/2" fire hose and cabinet - 50' long EA -$ -$ -$ -$

FPS LAB + Plumber - per hour HR -$ -$ -$ -$

FPS LABL + Fire Protection System - General Laborer - per hour HR -$ -$ -$ -$

FPS PREA & Preaction system EA -$ -$ -$ -$

FPS PUMP & Fire pump and reservoir - Commercial EA -$ -$ -$ -$

FPS PVC1.5 & Water supply line - CPVC with fitting and hanger, 1-1/2" LF -$ -$ -$ -$

FPS SF & Exposed fire sprinkler system (SF of bldg) SF -$ -$ -$ -$

FPS SF- & Exposed fire sprinkler system (SF of bldg) open/warehouse SF -$ -$ -$ -$

FPS SF+ & Concealed fire sprinkler system (SF of bldg) SF -$ -$ -$ -$

FPS SFADD + Add on cost for corrosion resistant pipe SF -$ -$ -$ -$

FPS SFD & Dry head fire protection system (SF of bldg) SF -$ -$ -$ -$

FPS SFR & Concealed fire sprinkler system (SF of bldg) - Residential SF -$ -$ -$ -$

FPS SH & Sprinkler head only EA -$ -$ -$ -$

FPS SH- & Sprinkler head only - Standard grade EA -$ -$ -$ -$

FPS SHE & Sprinkler head with escutcheon EA -$ -$ -$ -$

FPS SHE- & Sprinkler head with escutcheon - Standard grade EA -$ -$ -$ -$

FPS SHE+ & Sprinkler head with escutcheon - High grade EA -$ -$ -$ -$

FPS SHEO & Escutcheon only EA -$ -$ -$ -$

FPS SHEO- & Escutcheon only - Standard grade EA -$ -$ -$ -$

FPS SHEO+ & Escutcheon only - High grade EA -$ -$ -$ -$

FPS SHIERS + Sprinkler head/escutcheon - Detach & reset EA -$ -$ -$ -$

FPS SIAM & Siamese fire department connection EA -$ -$ -$ -$

FPS STPIPE & Stand pipe - 12" LF -$ -$ -$ -$

FPS STPIPE< & Stand pipe - 8" LF -$ -$ -$ -$

FPS VALV & Flow control valve EA -$ -$ -$ -$

Page 73: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

FRM 1X10 & 1" x 10" lumber (.83 BF per LF) LF -$ -$ -$ -$

FRM 1X12 & 1" x 12" lumber (1 BF per LF) LF -$ -$ -$ -$

FRM 1X12WP & 1/2" x 12" wood polymer lumber LF -$ -$ -$ -$

FRM 1X2 & 1" x 2" lumber (.167 BF per LF) LF -$ -$ -$ -$

FRM 1X2P & 1" x 2" lumber, Select pine (.167 BF per LF) LF -$ -$ -$ -$

FRM 1X3 & 1" x 3" lumber (.25 BF per LF) LF -$ -$ -$ -$

FRM 1X4 & 1" x 4" lumber (.333 BF per LF) LF -$ -$ -$ -$

FRM 1X4P & 1" x 4" lumber, Select pine (.333 BF per LF) LF -$ -$ -$ -$

FRM 1X6 & 1" x 6" lumber (.5 BF per LF) LF -$ -$ -$ -$

FRM 1X6P & 1" x 6" lumber, Select pine (.5 BF per LF) LF -$ -$ -$ -$

FRM 1X6WP & 1" x 6" lumber - wood polymer (.5 BF per LF) LF -$ -$ -$ -$

FRM 1X8 & 1" x 8" lumber (.667 BF per LF) LF -$ -$ -$ -$

FRM 1X8P & 1" x 8" lumber, Select pine (.667 BF per LF) LF -$ -$ -$ -$

FRM 1X8WP & 1/2" x 8" wood polymer lumber LF -$ -$ -$ -$

FRM 2X10 & 2" x 10" lumber (1.67 BF per LF) LF -$ -$ -$ -$

FRM 2X1010T + 2" x 10" x 10' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1012T + 2" x 10" x 12' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1014T + 2" x 10" x 14' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1016T + 2" x 10" x 16' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1018T + 2" x 10" x 18' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1020T + 2" x 10" x 20' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X108T + 2" x 10" x 8' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1OT & 2" x 10" lumber - treated (1.67 BF per LF) LF -$ -$ -$ -$

FRM 2X1OWP & 2" x 10" lumber - wood polymer (1.67 BF per LF) LF -$ -$ -$ -$

FRM 2X10X10 + 2" x 10" x 10' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X10X12 + 2" x 10" x 12' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X10X14 + 2" x 10" x 14' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X10X16 + 2" x 10" x 16' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X10X18 + 2" x 10" x 18' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X10X20 + 2" x 10" x 20' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X10X8 + T x 10" x 8' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X12 & 2" x 12" lumber (2 BF per LF) LF -$ -$ -$ -$

FRM 2X1210T + 2" x 12" x 10' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1212T + 2" x 12" x 12' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1214T + 2" x 12" x 14' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1216T + 2" x 12" x 16' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1218T + 2" x 12" x 18' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X1220T + 2" x 12" x 20' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X128T + 2" x 12" x 8' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X12T & 2" x 12" lumber - treated (2 BF per LF) LF -$ -$ -$ -$

FRM 2X12X10 + 2" x 12" x 10' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X12X12 + 2" x 12" x 12' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X12X14 + 2" x 12" x 14' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X12X16 + 2" x 12" x 16' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X12X18 + 2" x 12" x 18' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X12X20 + 2" x 12" x 20' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X12X8 + 2" x 12" x 8' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X212WP + Baluster - 2"x2"x12' wood polymer lumber - material only EA -$ -$ -$ -$

FRM 2X2M & 2" x 2" interior wall framing - mobile home SF -$ -$ -$ -$

FRM 2X2R & 2" x 2" lumber - redwood (.33 BF per LF) LF -$ -$ -$ -$

FRM 2X2T & 2" x 2" lumber - treated (.33 BF per LF) LF -$ -$ -$ -$

FRM 2X2X8 + 2" x 2" x 8' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X2X8C + 2" x 2" x 8' Cedar (material only) EA -$ -$ -$ -$

FRM 2X2X8R + 2" x 2" x 8' Redwood (material only) EA -$ -$ -$ -$

FRM 2X2X8T + 2" x 2" x 8' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X3 & 2" x 3" lumber (.5 BF per LF) LF -$ -$ -$ -$

FRM 2X4 & 2" x 4" lumber (.667 BF per LF) LF -$ -$ -$ -$

FRM 2X4C & 2" x 4" cedar - deck grade (.667 BF per LF) LF -$ -$ -$ -$

FRM 2X4R & 2" x 4" lumber - redwood (.667 BF per LF) LF -$ -$ -$ -$

FRM 2X4R- & 2" x 4" lumber - redwood - Standard grade (.667 BF per LF) LF -$ -$ -$ -$

FRM 2X4R+ & 2" x 4" lumber - redwood - High grade (.667 BF per LF) LF -$ -$ -$ -$

Page 74: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM 2X4T & 2" x 4" lumber - treated (.667 BF per LF) LF -$ -$ -$ -$

FRM 2X4WP & 2" x 4" lumber - wood polymer (.667 BF per LF) LF -$ -$ -$ -$

FRM 2X4X10 + 2" x 4" x 10' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X4X10C + 2" x 4" x 10' Cedar (material only) EA -$ -$ -$ -$

FRM 2X4X1OP + 2" x 4" x 116 5/8" pre-cut stud (for 10' wall, mat only) EA -$ -$ -$ -$

FRM 2X4X1OR + 2" x 4" x 10' Redwood (material only) EA -$ -$ -$ -$

FRM 2X4X1OT + 2" x 4" x 10' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X4X12 + 2" x 4" x 12' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X4X12C + 2" x 4" x 12' Cedar (material only) EA -$ -$ -$ -$

FRM 2X4X12R + 2" x 4" x 12' Redwood (material only) EA -$ -$ -$ -$

FRM 2X4X12T + 2" x 4" x 12' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X4X14 + 2" x 4" x 14' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X4X14C + 2" x 4" x 14' Cedar (material only) EA -$ -$ -$ -$

FRM 2X4X14R + 2" x 4" x 14' Redwood (material only) EA -$ -$ -$ -$

FRM 2X4X14T + 2" x 4" x 14' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X4X16 + 2" x 4" x 16' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X4X16C + 2" x 4" x 16' Cedar (material only) EA -$ -$ -$ -$

FRM 2X4X16R + 2" x 4" x 16' Redwood (material only) EA -$ -$ -$ -$

FRM 2X4X16T + 2" x 4" x 16' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X4X18 + 2" x 4" x 18' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X4X18C + 2" x 4" x 18' Cedar (material only) EA -$ -$ -$ -$

FRM 2X4X18R + 2" x 4" x 18' Redwood (material only) EA -$ -$ -$ -$

FRM 2X4X18T + 2" x 4" x 18' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X4X20 + 2" x 4" x 20' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X4X20C + 2" x 4" x 20' Cedar (material only) EA -$ -$ -$ -$

FRM 2X4X20R + 2" x 4" x 20' Redwood (material only) EA -$ -$ -$ -$

FRM 2X4X20T + 2" x 4" x 20' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X4X8 + 2" x 4" x 8' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X4X8C + 2" x 4" x 8' Cedar (material only) EA -$ -$ -$ -$

FRM 2X4X8P + 2" x 4" x 92 5/8" pre-cut stud (for 8' wall, mat only) EA -$ -$ -$ -$

FRM 2X4X8R + 2" x 4" x 8' Redwood (material only) EA -$ -$ -$ -$

FRM 2X4X8T + 2" x 4" x 8' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X4X9P + 2" x 4" x 104 5/8" pre-cut stud (for 9' wall, mat only) EA -$ -$ -$ -$

FRM 2X6 & 2" x 6" lumber (1 BF per LF) LF -$ -$ -$ -$

FRM 2X6C & 2" x 6" cedar - deck grade (1 BF per LF) LF -$ -$ -$ -$

FRM 2X6R & 2" x 6" lumber - redwood (1 BF per LF) LF -$ -$ -$ -$

FRM 2X6R- & 2" x 6" lumber - redwood - Standard grade (1 BF per LF) LF -$ -$ -$ -$

FRM 2X6R+ & 2" x 6" lumber - redwood - High grade (1 BF per LF) LF -$ -$ -$ -$

FRM 2X6T & 2" x 6" lumber - treated (1 BF per LF) LF -$ -$ -$ -$

FRM 2X6WP & 2" x 6" lumber - wood polymer (1 BF per LF) LF -$ -$ -$ -$

FRM 2X6X10 + 2" x 6" x 10' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X6X10C + 2" x 6" x 10' Cedar (material only) EA -$ -$ -$ -$

FRM 2X6X1OP + 2" x 6" x 116 5/8" pre-cut stud (for 10' wall, mat only) EA -$ -$ -$ -$

FRM 2X6X1OR + 2" x 6" x 10' Redwood (material only) EA -$ -$ -$ -$

FRM 2X6X1OT + 2" x 6" x 10' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X6X12 + 2" x 6" x 12' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X6X12C + 2" x 6" x 12' Cedar (material only) EA -$ -$ -$ -$

FRM 2X6X12R + 2" x 6" x 12' Redwood (material only) EA -$ -$ -$ -$

FRM 2X6X12T + 2" x 6" x 12' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X6X14 + 2" x 6" x 14' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X6X14C + 2" x 6" x 14' Cedar (material only) EA -$ -$ -$ -$

FRM 2X6X14R + 2" x 6" x 14' Redwood (material only) EA -$ -$ -$ -$

FRM 2X6X14T + 2" x 6" x 14' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X6X16 + 2" x 6" x 16' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X6X16C + 2" x 6" x 16' Cedar (material only) EA -$ -$ -$ -$

FRM 2X6X16R + 2" x 6" x 16' Redwood (material only) EA -$ -$ -$ -$

FRM 2X6X16T + 2" x 6" x 16' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X6X18 + 2" x 6" x 18' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X6X18C + 2" x 6" x 18' Cedar (material only) EA -$ -$ -$ -$

FRM 2X6X18R + 2" x 6" x 18' Redwood (material only) EA -$ -$ -$ -$

FRM 2X6X18T + 2" x 6" x 18' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X6X20 + 2" x 6" x 20' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X6X20C + 2" x 6" x 20' Cedar (material only) EA -$ -$ -$ -$

FRM 2X6X20R + 2" x 6" x 20' Redwood (material only) EA -$ -$ -$ -$

FRM 2X6X20T + 2" x 6" x 20' #2 treated pine (material only) EA -$ -$ -$ -$

Page 75: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM 2X6X8 + 2" x 6" x 8' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X6X8C + 2" x 6" x 8' Cedar (material only) EA -$ -$ -$ -$

FRM 2X6X8P + 2" x 6" x 92 5/8" pre-cut stud (for 8' wall, mat only) EA -$ -$ -$ -$

FRM 2X6X8R + 2" x 6" x 8' Redwood (material only) EA -$ -$ -$ -$

FRM 2X6X8T + 2" x 6" x 8' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X6X9P + 2" x 6" x 104 5/8" pre-cut stud (for 9' wall, mat only) EA -$ -$ -$ -$

FRM 2X8 & 2" x 8" lumber (1.33 BF per LF) LF -$ -$ -$ -$

FRM 2X8T & 2" x 8" lumber - treated (1.33 BF per LF) LF -$ -$ -$ -$

FRM 2X8WP & 2" x 8" lumber - wood polymer (1.33 BF per LF) LF -$ -$ -$ -$

FRM 2X8X10 + 2" x 8" x 10' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X8X1OT + 2" x 8" x 10' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X8X12 + 2" x 8" x 12' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X8X12T + 2" x 8" x 12' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X8X14 + 2" x 8" x 14' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X8X14T + 2" x 8" x 14' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X8X16 + 2" x 8" x 16' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X8X16T + 2" x 8" x 16' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X8X18 + 2" x 8" x 18' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X8X18T + 2" x 8" x 18' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X8X20 + 2" x 8" x 20' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X8X20T + 2" x 8" x 20' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 2X8X8 + 2" x 8" x 8' #2 & better Fir / Larch (material only) EA -$ -$ -$ -$

FRM 2X8X8T + 2" x 8" x 8' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 3LF & Stud wall - 2" x 3" x 8' - 16" oc LF -$ -$ -$ -$

FRM 4LF & Stud wall - 2" x 4" x 8' - 16" oc LF -$ -$ -$ -$

FRM 4LF< & Stud wall - 2" x 4" x 8' - 12" oc LF -$ -$ -$ -$

FRM 4LF> & Stud wall - 2" x 4" x 8' - 24" oc LF -$ -$ -$ -$

FRM 4LF1L & Labor to frame 2" x 4" x 10' non-bearing wall - 16" oc LF -$ -$ -$ -$

FRM 4LF1L> & Labor to frame 2" x 4" x 10' non-bearing wall - 24" oc LF -$ -$ -$ -$

FRM 4LF9L & Labor to frame 2" x 4" x 9' non-bearing wall - 16" oc LF -$ -$ -$ -$

FRM 4LF9L> & Labor to frame 2" x 4" x 9' non-bearing wall - 24" oc LF -$ -$ -$ -$

FRM 4LFB & Stud wall - 2" x 4" x 8' load bearing - 16" oc LF -$ -$ -$ -$

FRM 4LFB1L & Labor to frame 2" x 4" x 10' load bearing wall - 16" oc LF -$ -$ -$ -$

FRM 4LFB1L< & Labor to frame 2" x 4" x 10' load bearing wall - 12" oc LF -$ -$ -$ -$

FRM 4LFB9L & Labor to frame 2" x 4" x 9' load bearing wall - 16" oc LF -$ -$ -$ -$

FRM 4LFB9L< & Labor to frame 2" x 4" x 9' load bearing wall - 12" oc LF -$ -$ -$ -$

FRM 4LFBL & Labor to frame 2" x 4" x 8' load bearing wall - 16" oc LF -$ -$ -$ -$

FRM 4LFBL< & Labor to frame 2" x 4" x 8' load bearing wall - 12" oc LF -$ -$ -$ -$

FRM 4LFL & Labor to frame 2" x 4" x 8' non-bearing wall - 16" oc LF -$ -$ -$ -$

FRM 4LFL> & Labor to frame 2" x 4" x 8' non-bearing wall - 24" oc LF -$ -$ -$ -$

FRM 4LFNB & Stud wall - 2" x 4" x 8' non-bearing - 16" oc LF -$ -$ -$ -$

FRM 4LFNB> & Stud wall - 2" x 4" x 8' non-bearing - 24" oc LF -$ -$ -$ -$

FRM 4SF & Stud wall - 2" x 4" - 16" oc SF -$ -$ -$ -$

FRM 4SF< & Stud wall - 2" x 4" - 12" oc SF -$ -$ -$ -$

FRM 4SF« & Stud wall - 2" x 4" - 8" oc SF -$ -$ -$ -$

FRM 4SF> & Stud wall - 2" x 4" - 24" oc SF -$ -$ -$ -$

FRM 4SFB & Stud wall - 2" x 4" load bearing - 16" oc SF -$ -$ -$ -$

FRM 4SFBL & Labor to frame 2" x 4" load bearing wall - 16" oc SF -$ -$ -$ -$

FRM 4SFBL< & Labor to frame 2" x 4" load bearing wall - 12" oc SF -$ -$ -$ -$

FRM 4SFBL4 & Labor to frame 2" x 4" wall - 4" oc SF -$ -$ -$ -$

FRM 4SFBL8 & Labor to frame 2" x 4" wall - 8" oc SF -$ -$ -$ -$

FRM 4SFH + Additional labor for framing high wall - 2" x 4" SF -$ -$ -$ -$

FRM 4SFL & Labor to frame 2" x 4" non-bearing wall - 16" oc SF -$ -$ -$ -$

FRM 4SFL> & Labor to frame 2" x 4" non-bearing wall - 24" oc SF -$ -$ -$ -$

FRM 4SFNB & Stud wall - 2" x 4" non-bearing - 16" oc SF -$ -$ -$ -$

FRM 4SFNB> & Stud wall - 2" x 4" non-bearing - 24" oc SF -$ -$ -$ -$

FRM 4SKTM & 2x4 skirting framework - mobile home SF -$ -$ -$ -$

FRM 4X4 & 4" x 4" square wood post (1.33 BF per LF) LF -$ -$ -$ -$

FRM 4X4LAB & 4" x 4" square wood post - Labor only LF -$ -$ -$ -$

FRM 4X4R & 4" x 4" wood post - redwood (1.33 BF per LF) LF -$ -$ -$ -$

FRM 4X4T & 4" x 4" wood post - treated (1.33 BF per LF) LF -$ -$ -$ -$

FRM 4X4TU10 & 4" x 4" x 10' wood post - turned EA -$ -$ -$ -$

FRM 4X4TU36 & 4" x 4" x 36" exterior newel post - turned EA -$ -$ -$ -$

FRM 4X4TU42 & 4" x 4" x 42" exterior newel post - turned EA -$ -$ -$ -$

FRM 4X4TU60 & 4" x 4" x 60" exterior newel post - turned EA -$ -$ -$ -$

Page 76: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM 4X4TU8 & 4" x 4" x 8' wood post - turned EA -$ -$ -$ -$

FRM 4X4WP & 4" x 4" post - wood polymer lumber (1.33 BF per LF) LF -$ -$ -$ -$

FRM 4X4X10 + 4" x 4" x 10' - fir/larch post - material only EA -$ -$ -$ -$

FRM 4X4X10E + 4" x 4" x 10' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 4X4X1OT + 4" x 4" x 10' - treated lumber post - material only EA -$ -$ -$ -$

FRM 4X4X12 + 4" x 4" x 12' - fir/larch post - material only EA -$ -$ -$ -$

FRM 4X4X12E + 4" x 4" x 12' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 4X4X12T + 4" x 4" x 12' - treated lumber post - material only EA -$ -$ -$ -$

FRM 4X4X14 + 4" x 4" x 14' - fir/larch post - material only EA -$ -$ -$ -$

FRM 4X4X14E + 4" x 4" x 14' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 4X4X14T + 4" x 4" x 14' - treated lumber post - material only EA -$ -$ -$ -$

FRM 4X4X16 + 4" x 4" x 16 - fir/larch post - material only EA -$ -$ -$ -$

FRM 4X4X16E + 4" x 4" x 16' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 4X4X16T + 4" x 4" x 16 - treated lumber post - material only EA -$ -$ -$ -$

FRM 4X4X8 + 4" x 4" x 8' - fir/larch post - material only EA -$ -$ -$ -$

FRM 4X4X8C + 4" x 4" x 8' - cedar post - material only EA -$ -$ -$ -$

FRM 4X4X8E + 4" x 4" x 8' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 4X4X8R + 4" x 4" x 8' - redwood post - material only EA -$ -$ -$ -$

FRM 4X4X8T + 4" x 4" x 8' - treated lumber post - material only EA -$ -$ -$ -$

FRM 4X6LAB & 4" x 6" square wood post - Labor only LF -$ -$ -$ -$

FRM 4X6X10 + 4" x 6" x 10' - fir/larch post - material only EA -$ -$ -$ -$

FRM 4X6X10E + 4" x 6" x 10' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 4X6X12 + 4" x 6" x 12' - fir/larch post - material only EA -$ -$ -$ -$

FRM 4X6X12E + 4" x 6" x 12' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 4X6X14 + 4" x 6" x 14' - fir/larch post - material only EA -$ -$ -$ -$

FRM 4X6X14E + 4" x 6" x 14' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 4X6X16 + 4" x 6" x 16 - fir/larch post - material only EA -$ -$ -$ -$

FRM 4X6X16E + 4" x 6" x 16' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 4X6X16T + 4" x 6" x 16' - treated lumber post - material only EA -$ -$ -$ -$

FRM 4X6X20T + 4" x 6" x 20' - treated lumber post - material only EA -$ -$ -$ -$

FRM 4X6X8 + 4" x 6" x 8' - fir/larch post - material only EA -$ -$ -$ -$

FRM 4X6X8E + 4" x 6" x 8' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 5/4T10 + 5/4" x 6" x 10' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 5/4T10+ + 5/4" x 6" x 10' #1 treated pine (material only) EA -$ -$ -$ -$

FRM 5/4T12 + 5/4" x 6" x 12' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 5/4T12+ + 5/4" x 6" x 12' #1 treated pine (material only) EA -$ -$ -$ -$

FRM 5/4T14 + 5/4" x 6" x 14' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 5/4T14+ + 5/4" x 6" x 14' #1 treated pine (material only) EA -$ -$ -$ -$

FRM 5/4T16 + 5/4" x 6" x 16' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 5/4T16+ + 5/4" x 6" x 16' #1 treated pine (material only) EA -$ -$ -$ -$

FRM 5/4T8 + 5/4" x 6" x 8' #2 treated pine (material only) EA -$ -$ -$ -$

FRM 5/4T8+ + 5/4" x 6" x 8' #1 treated pine (material only) EA -$ -$ -$ -$

FRM 5X5TU10 & 5" x 5" x 10' wood post - turned EA -$ -$ -$ -$

FRM 5X5TU8 & 5" x 5" x 8' wood post - turned EA -$ -$ -$ -$

FRM 6LF & Stud wall - 2" x 6" x 8' - 16" oc LF -$ -$ -$ -$

FRM 6LF< & Stud wall - 2" x 6" x 8' - 12" oc LF -$ -$ -$ -$

FRM 6LF> & Stud wall - 2" x 6" x 8' - 24" oc LF -$ -$ -$ -$

FRM 6LF1L & Labor to frame 2" x 6" x 10' non-bearing wall - 16" oc LF -$ -$ -$ -$

FRM 6LF1L> & Labor to frame 2" x 6" x 10' non-bearing wall - 24" oc LF -$ -$ -$ -$

FRM 6LF9L & Labor to frame 2" x 6" x 9' non-bearing wall - 16" oc LF -$ -$ -$ -$

FRM 6LF9L> & Labor to frame 2" x 6" x 9' non-bearing wall - 24" oc LF -$ -$ -$ -$

FRM 6LFB1L & Labor to frame 2" x 6" x 10' load bearing wall - 16" oc LF -$ -$ -$ -$

FRM 6LFB1L< & Labor to frame 2" x 6" x 10' load bearing wall - 12" oc LF -$ -$ -$ -$

FRM 6LFB9L & Labor to frame 2" x 6" x 9' load bearing wall - 16" oc LF -$ -$ -$ -$

FRM 6LFB9L< & Labor to frame 2" x 6" x 9' load bearing wall - 12" oc LF -$ -$ -$ -$

FRM 6LFBL & Labor to frame 2" x 6" x 8' load bearing wall - 16" oc LF -$ -$ -$ -$

FRM 6LFBL< & Labor to frame 2" x 6" x 8' load bearing wall - 12" oc LF -$ -$ -$ -$

FRM 6LFL & Labor to frame 2" x 6" x 8' non-bearing wall - 16" oc LF -$ -$ -$ -$

FRM 6LFL> & Labor to frame 2" x 6" x 8' non-bearing wall - 24" oc LF -$ -$ -$ -$

FRM 6SF & Stud wall - 2" x 6" - 16" oc SF -$ -$ -$ -$

FRM 6SF< & Stud wall - 2" x 6" - 12" oc SF -$ -$ -$ -$

FRM 6SF> & Stud wall - 2" x 6" - 24" oc SF -$ -$ -$ -$

FRM 6SFBL & Labor to frame 2" x 6" load bearing wall - 16" oc SF -$ -$ -$ -$

FRM 6SFBL< & Labor to frame 2" x 6" load bearing wall - 12" oc SF -$ -$ -$ -$

FRM 6SFBL4 & Labor to frame 2" x 6" wall - 4" oc SF -$ -$ -$ -$

Page 77: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM 6SFBL8 & Labor to frame 2" x 6" wall - 8" oc SF -$ -$ -$ -$

FRM 6SFH + Additional labor for framing high wall - 2" x 6" SF -$ -$ -$ -$

FRM 6SFL & Labor to frame 2" x 6" non-bearing wall - 16" oc SF -$ -$ -$ -$

FRM 6SFL> & Labor to frame 2" x 6" non-bearing wall - 24" oc SF -$ -$ -$ -$

FRM 6X6 & 6" x 6" square wood post (3 BF per LF) LF -$ -$ -$ -$

FRM 6X6L & 6" x 6" square treated wood post - laminated LF -$ -$ -$ -$

FRM 6X6LAB & 6" x 6" square wood post - Labor only LF -$ -$ -$ -$

FRM 6X6T & 6" x 6" square wood post - treated (3 BF per LF) LF -$ -$ -$ -$

FRM 6X6TU10 & 6" x 6" x 10' wood posts - turned EA -$ -$ -$ -$

FRM 6X6TU8 & 6" x 6" x 8' wood post - turned EA -$ -$ -$ -$

FRM 6X6X10 + 6" x 6" x 10' - fir/larch post - material only EA -$ -$ -$ -$

FRM 6X6X10E + 6" x 6" x 10' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 6X6X1OT + 6" x 6" x 10' - treated lumber post - material only EA -$ -$ -$ -$

FRM 6X6X12 + 6" x 6" x 12' - fir/larch post - material only EA -$ -$ -$ -$

FRM 6X6X12E + 6" x 6" x 12' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 6X6X12T + 6" x 6" x 12' - treated lumber post - material only EA -$ -$ -$ -$

FRM 6X6X14 + 6" x 6" x 14' - fir/larch post - material only EA -$ -$ -$ -$

FRM 6X6X14E + 6" x 6" x 14' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 6X6X14T + 6" x 6" x 14' - treated lumber post - material only EA -$ -$ -$ -$

FRM 6X6X16 + 6" x 6" x 16' - fir/larch post - material only EA -$ -$ -$ -$

FRM 6X6X16E + 6" x 6" x 16' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 6X6X16T + 6" x 6" x 16' - treated lumber post - material only EA -$ -$ -$ -$

FRM 6X6X8 + 6" x 6" x 8' - fir/larch post - material only EA -$ -$ -$ -$

FRM 6X6X8C+ + 6" x 6" x 8' - S4S cedar - material only EA -$ -$ -$ -$

FRM 6X6X8E + 6" x 6" x 8' - engineered strand lumber - material only EA -$ -$ -$ -$

FRM 6X6X8T + 6" x 6" x 8' - treated lumber post - material only EA -$ -$ -$ -$

FRM 6X8L & 6" x 8" square treated wood post - laminated LF -$ -$ -$ -$

FRM 8SF & Stud wall - 2" x 8" - 16" oc SF -$ -$ -$ -$

FRM 8SF> & Stud wall - 2" x 8" - 24" oc SF -$ -$ -$ -$

FRM 8X8 & 8" x 8" square wood post (5.33 BF per LF) LF -$ -$ -$ -$

FRM AB1/2 & Wedge anchor bolt - 1/2" x 5 1/2" EA -$ -$ -$ -$

FRM AB1/2> & Wedge anchor bolt - 1/2" x 8 1/2" EA -$ -$ -$ -$

FRM AB3/8 & Wedge anchor bolt - 3/8" x 4" EA -$ -$ -$ -$

FRM AB5/8 & Wedge anchor bolt - 5/8" x 6" EA -$ -$ -$ -$

FRM AB5/8> & Wedge anchor bolt - 5/8" x 8 1/2" EA -$ -$ -$ -$

FRM AC1/2 & AC plywood - 1/2" SF -$ -$ -$ -$

FRM AC1/4 & AC plywood - 1/4" SF -$ -$ -$ -$

FRM ADHV + Construction adhesive LF -$ -$ -$ -$

FRM ARCADD + Additional labor charge for arched openings EA -$ -$ -$ -$

FRM BB & Builder board - 1/2" (composition or fiberboard sheathing) SF -$ -$ -$ -$

FRM BB1 & Builder board - 1" (composition or fiberboard sheathing) SF -$ -$ -$ -$

FRM BBN & Builder board - 1/2" natural - fiberboard sheathing SF -$ -$ -$ -$

FRM BIDITM + Framing & Rough Carpentry (Bid Item) EA -$ -$ -$ -$

FRM BJ10 & Bar joist - 2" x 9 1/2" (measure LF) LF -$ -$ -$ -$

FRM BJ12 & Bar joist - 2" x 11 7/8" (measure LF) LF -$ -$ -$ -$

FRM BJ14 & Bar joist - 2" x 14" (measure LF) LF -$ -$ -$ -$

FRM BJ16 & Bar joist - 2" x 16" (measure LF) LF -$ -$ -$ -$

FRM BME4X10 & Beam - engineered strand lumber - 3 1/2" x 9 1/2" LF -$ -$ -$ -$

FRM BME4X12 & Beam - engineered strand lumber - 3 1/2" x 11 7/8" LF -$ -$ -$ -$

FRM BME4X8 & Beam - engineered strand lumber - 3 1/2" x 7 1/4" LF -$ -$ -$ -$

FRM BME6X10 & Beam - engineered strand lumber - 5 1/4" x 9 1/2" LF -$ -$ -$ -$

FRM BME6X12 & Beam - engineered strand lumber - 5 1/4" x 11 7/8" LF -$ -$ -$ -$

FRM BME6X8 & Beam - engineered strand lumber - 5 1/4" x 7" LF -$ -$ -$ -$

FRM BMGBA & Beam - glulam - Arched (per BF) BF -$ -$ -$ -$

FRM BMGBF & Beam - glulam (per BF) BF -$ -$ -$ -$

FRM BMM2X10 & Beam - microlam - 1 3/4" x 9 1/2" LF -$ -$ -$ -$

FRM BMM2X12 & Beam - microlam - 1 3/4" x 11 7/8" LF -$ -$ -$ -$

FRM BMM2X14 & Beam - microlam - 1 3/4" x 14" LF -$ -$ -$ -$

FRM BMM2X16 & Beam - microlam - 1 3/4" x 16" LF -$ -$ -$ -$

FRM BMM2X6 & Beam - microlam - 1 3/4" x 5 1/2" LF -$ -$ -$ -$

FRM BMM2X8 & Beam - microlam - 1 3/4" x 7 1/4" LF -$ -$ -$ -$

FRM BMM4X10 & Beam - microlam - 3 1/2" x 9 1/2" LF -$ -$ -$ -$

FRM BMM4X12 & Beam - microlam - 3 1/2" x 11 1/4" LF -$ -$ -$ -$

FRM BMM4X8 & Beam - microlam - 3 1/2" x 7 1/4" LF -$ -$ -$ -$

FRM BMR & Beam - 6" x 6" rough sawn BF -$ -$ -$ -$

Page 78: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM BMR+ & Beam - 8" x 8" rough sawn BF -$ -$ -$ -$

FRM BP3 & Bottom plate - 2" x 3" LF -$ -$ -$ -$

FRM BP4 & Bottom plate - 2" x 4" LF -$ -$ -$ -$

FRM BP4T & Bottom plate - 2" x 4" - treated LF -$ -$ -$ -$

FRM BP6 & Bottom plate - 2" x 6" LF -$ -$ -$ -$

FRM BP6T & Bottom plate - 2" x 6" - treated LF -$ -$ -$ -$

FRM CLPA + California Lumber Products Assessment EA -$ -$ -$ -$

FRM DBP4 & Drilled bottom plate - 2" x 4" treated lumber LF -$ -$ -$ -$

FRM DBP6 & Drilled bottom plate - 2" x 6" treated lumber LF -$ -$ -$ -$

FRM DBPAD4 & Add. charge - drilled treated plate in framed wall, 2"x4" LF -$ -$ -$ -$

FRM DBPAD6 & Add. charge - drilled treated plate in framed wall, 2"x6" LF -$ -$ -$ -$

FRM DBPAT4N + Add. charge - treated plate in framed wall, 2"x4" No drill LF -$ -$ -$ -$

FRM DBPAT6N + Add. charge - treated plate in framed wall, 2"x6" No drill LF -$ -$ -$ -$

FRM DCKL4 & Laminated roof decking - cedar - 4" thick SF -$ -$ -$ -$

FRM DKC & Deck planking - cedar (per BF) BF -$ -$ -$ -$

FRM DKC- & Deck planking - cedar - Standard grade (per BF) BF -$ -$ -$ -$

FRM DKC+ & Deck planking - cedar - High grade (per BF) BF -$ -$ -$ -$

FRM DKCSF & Deck planking - cedar (per SF) SF -$ -$ -$ -$

FRM DKCSF- & Deck planking - cedar - Standard grade (per SF) SF -$ -$ -$ -$

FRM DKCSF+ & Deck planking - cedar - High grade (per SF) SF -$ -$ -$ -$

FRM DKFLSHG & Deck flashing - galvanized - 6" wide - L shape LF -$ -$ -$ -$

FRM DKFLSHM & Deck flashing - membrane - 6" wide LF -$ -$ -$ -$

FRM DKH & Deck planking - hardwood (Ipe) - 1"x 6" SF -$ -$ -$ -$

FRM DICH410 + Deck planking - 1" x 4" x 10' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DICH410> + Deck planking - 5/4" x 4" x 10' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH412 + Deck planking - 1" x 4" x 12' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH412> + Deck planking - 5/4" x 4" x 12' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH414 + Deck planking - 1" x 4" x 14' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH414> + Deck planking - 5/4" x 4" x 14' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DICH416 + Deck planking - 1" x 4" x 16' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH416> + Deck planking - 5/4" x 4" x 16' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH418 + Deck planking - 1" x 4" x 18' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH418> + Deck planking - 5/4" x 4" x 18' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DICH420 + Deck planking - 1" x 4" x 20' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DICH420> + Deck planking - 5/4" x 4" x 20' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH48 + Deck planking - 1" x 4" x 8' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH48> + Deck planking - 5/4" x 4" x 8' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH610 + Deck planking - 1" x 6" x 10' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH610> + Deck planking - 5/4" x 6" x 10' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH612 + Deck planking - 1" x 6" x 12' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH612> + Deck planking - 5/4" x 6" x 12' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH614 + Deck planking - 1" x 6" x 14' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH614> + Deck planking - 5/4" x 6" x 14' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH616 + Deck planking - 1" x 6" x 16' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH616> + Deck planking - 5/4" x 6" x 16' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH618 + Deck planking - 1" x 6" x 18' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH618> + Deck planking - 5/4" x 6" x 18' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DICH620 + Deck planking - 1" x 6" x 20' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH620> + Deck planking - 5/4" x 6" x 20' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKH68 + Deck planking - 1" x 6" x 8' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKI-168> + Deck planking - 5/4" x 6" x 8' - Ipe Hardwood - mat. only EA -$ -$ -$ -$

FRM DKL4 & 4" softwood deck planking - Labor only (per SF) SF -$ -$ -$ -$

FRM DKL6 & 6" softwood deck planking - Labor only (per SF) SF -$ -$ -$ -$

FRM DKLH4 & 4" hardwood (Ipe) decking - Labor only (per SF) SF -$ -$ -$ -$

FRM DKLH6 & 6" hardwood (Ipe) decking - Labor only (per SF) SF -$ -$ -$ -$

FRM DKLP4 & 4" wood polymer decking - Labor only (per SF) SF -$ -$ -$ -$

FRM DKLP6 & 6" wood polymer decking - Labor only (per SF) SF -$ -$ -$ -$

FRM DKLV & Vinyl decking - Labor only (per SF) SF -$ -$ -$ -$

FRM DKNPL & Deck / Exterior guard rail - Newel post - Labor only EA -$ -$ -$ -$

FRM DKP412 + Deck planking - 2" x 4" x 12' - Polymer - mat. only EA -$ -$ -$ -$

FRM DKP416 + Deck planking - 2" x 4" x 16' - Polymer - mat. only EA -$ -$ -$ -$

FRM DKP420 + Deck planking - 2" x 4" x 20' - Polymer - mat. only EA -$ -$ -$ -$

FRM DKP612 + Deck planking - 2" x 6" x 12' - Polymer - mat. only EA -$ -$ -$ -$

FRM DKP612< + Deck planking - 5/4" x 6" x 12' - Polymer - mat. only EA -$ -$ -$ -$

FRM DKP616 + Deck planking - 2" x 6" x 16' - Polymer - mat. only EA -$ -$ -$ -$

Page 79: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM DKP616< + Deck planking - 5/4" x 6" x 16' - Polymer - mat. only EA -$ -$ -$ -$

FRM DKP620 + Deck planking - 2" x 6" x 20' - Polymer - mat. only EA -$ -$ -$ -$

FRM DKP620< + Deck planking - 5/4" x 6" x 20' - Polymer - mat. only EA -$ -$ -$ -$

FRM DKR & Deck planking - redwood (per BF) BF -$ -$ -$ -$

FRM DKR- & Deck planking - redwood - Standard grade (per BF) BF -$ -$ -$ -$

FRM DKR+ & Deck planking - redwood - High grade (per BF) BF -$ -$ -$ -$

FRM DKRHRL & Deck handrail - w/out balusters - Hardware & Labor only LF -$ -$ -$ -$

FRM DKRLBM + Baluster - round - 32" - aluminum - material only EA -$ -$ -$ -$

FRM DKRLBMB + Baluster - belly style - aluminum - material only EA -$ -$ -$ -$

FRM DKRLC & Deck guard rail - cedar LF -$ -$ -$ -$

FRM DKRLC- & Deck guard rail - cedar - Standard grade LF -$ -$ -$ -$

FRM DKRLC+ & Deck guard rail - cedar - High grade LF -$ -$ -$ -$

FRM DKRLL & Deck hand rail/guard rail - Labor only LF -$ -$ -$ -$

FRM DKRLNWP + Newel post - 4" x 4" x 52" - wood polymer - material only EA -$ -$ -$ -$

FRM DKRLR & Deck guard rail - redwood LF -$ -$ -$ -$

FRM DKRLR- & Deck guard rail - redwood - Standard grade LF -$ -$ -$ -$

FRM DKRLR+ & Deck guard rail - redwood - High grade LF -$ -$ -$ -$

FRM DKRLT & Deck guard rail - treated lumber LF -$ -$ -$ -$

FRM DKRLV & Deck guard rail - Vinyl LF -$ -$ -$ -$

FRM DKRLV+ & Deck guard rail - Vinyl - High grade LF -$ -$ -$ -$

FRM DKRLVH & Handrail - round - vinyl LF -$ -$ -$ -$

FRM DKRLVM + Vinyl balustrade - material only (posts excluded) LF -$ -$ -$ -$

FRM DKRLVM+ + Vinyl balustrade - High gr.- mat. only (posts excluded) LF -$ -$ -$ -$

FRM DKRLVPM + Vinyl newel post - material only EA -$ -$ -$ -$

FRM DKRLWP & Deck guard rail - wood polymer lumber LF -$ -$ -$ -$

FRM DKRLWP+ & Deck guard rail - wood polymer lumber - High grade LF -$ -$ -$ -$

FRM DKRLWPB + Deck bottom rail - wood polymer - 6' length - mat. only EA -$ -$ -$ -$

FRM DKRLWPT + Deck top rail - wood polymer - 6' length - material only EA -$ -$ -$ -$

FRM DKRSF & Deck planking - redwood (per SF) SF -$ -$ -$ -$

FRM DKRSF- & Deck planking - redwood - Standard grade (per SF) SF -$ -$ -$ -$

FRM DKRSF+ & Deck planking - redwood - High grade (per SF) SF -$ -$ -$ -$

FRM DKSCREW + Additional charge to attach decking w/screws SF -$ -$ -$ -$

FRM DKSCRH + Additional charge to attach decking w/hidden fasteners SF -$ -$ -$ -$

FRM DKT & Deck planking - treated lumber (per BF) BF -$ -$ -$ -$

FRM DKTSF & Deck planking - treated lumber (per SF) SF -$ -$ -$ -$

FRM DKTSF< & Deck planking - 5/4" treated lumber, #2 (per SF) SF -$ -$ -$ -$

FRM DKTSF<+ & Deck planking - 5/4" treated lumber, #1 (per SF) SF -$ -$ -$ -$

FRM DKV & Deck planking - Vinyl (per SF) SF -$ -$ -$ -$

FRM DKV+ & Deck planking - Vinyl - High grade (per SF) SF -$ -$ -$ -$

FRM DKV612 + Deck planking - 2" x 6" x 12' - Vinyl - mat. only EA -$ -$ -$ -$

FRM DKV612+ + Deck planking - 2" x 6" x 12' - Vinyl T&G - mat. only EA -$ -$ -$ -$

FRM DKV616 + Deck planking - 2" x 6" x 16' - Vinyl - mat. only EA -$ -$ -$ -$

FRM DKV616+ + Deck planking - 2" x 6" x 16' - Vinyl T&G - mat. only EA -$ -$ -$ -$

FRM DKVF & Deck fascia - Vinyl (per LF) LF -$ -$ -$ -$

FRM DKVL & Deck lattice work - Vinyl (per SF) SF -$ -$ -$ -$

FRM DKWP & Deck planking - 5/4"x6" wood polymer lumber (per BF) BF -$ -$ -$ -$

FRM DKWP+ & Deck planking - 2x6 wood polymer lumber (per BF) BF -$ -$ -$ -$

FRM DKWPP & Deck planking - 5/4"x6" polymer lumber - Prem. colors SF -$ -$ -$ -$

(SF)

FRM DKWPP+ & Deck planking - 2"x6" polymer lumber - Prem. colors (SF) SF -$ -$ -$ -$

FRM DKWPSF & Deck planking - 5/4"x6" wood polymer lumber (per SF) SF -$ -$ -$ -$

FRM DKWPSF+ & Deck planking - 2x6 wood polymer lumber (per SF) SF -$ -$ -$ -$

FRM FLTR & Floor trusses - up to 22" deep LF -$ -$ -$ -$

FRM FLTR< & Floor trusses - up to 16" deep LF -$ -$ -$ -$

FRM FRBT & Joist bridging tie EA -$ -$ -$ -$

FRM FRHNG & Framing hanger EA -$ -$ -$ -$

FRM FRHNG> & Framing hanger - large EA -$ -$ -$ -$

FRM FRHS & Framing/truss hurricane strap EA -$ -$ -$ -$

FRM FRHT & Framing hurricane tie EA -$ -$ -$ -$

FRM FRMHD & Framing hold down - 16" EA -$ -$ -$ -$

FRM FRPB4 & Framing post base connector - 4" EA -$ -$ -$ -$

FRM FRPB6 & Framing post base connector - 6" EA -$ -$ -$ -$

FRM FRPB8 & Framing post base connector - 8" EA -$ -$ -$ -$

FRM FRPC4 & Framing post cap connector - 4" EA -$ -$ -$ -$

FRM FRPC6 & Framing post cap connector - 6" EA -$ -$ -$ -$

Page 80: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM FRPC8 & Framing post cap connector - 8" EA -$ -$ -$ -$

FRM FRSTP & Framing strap - 24" long EA -$ -$ -$ -$

FRM FRSTP66 & Framing strap - 66" long EA -$ -$ -$ -$

FRM FRSWAY & Metal sway brace EA -$ -$ -$ -$

FRM FSP & Floating subfloor SF -$ -$ -$ -$

FRM FURL & Furring strip - 1" x 2" SF -$ -$ -$ -$

FRM FUR1X3 & Furring strip - 1" x 3" SF -$ -$ -$ -$

FRM FUR2 & Furring strip - 2" x 2" SF -$ -$ -$ -$

FRM FURC1 & Furring strip - 1" x 2" - applied to concrete SF -$ -$ -$ -$

FRM FURC1X3 & Furring strip - 1" x 3" - applied to concrete SF -$ -$ -$ -$

FRM FURC2 & Furring strip - 2" x 2" - applied to concrete SF -$ -$ -$ -$

FRM H10 & Hip or roof intersection 10/12 slope (hip/valley length) LF -$ -$ -$ -$

FRM H1010 & Hip or roof intersection 10/12 slope (hip/val length) 2x10 LF -$ -$ -$ -$

FRM H12 & Hip or roof intersection 12/12 slope (hip/valley length) LF -$ -$ -$ -$

FRM H1210 & Hip or roof intersection 12/12 slope (hip/val length) 2x10 LF -$ -$ -$ -$

FRM H4 & Hip or roof intersection 4/12 slope (hip/valley length) LF -$ -$ -$ -$

FRM H410 & Hip or roof intersection 4/12 slope (hip/val length) 2x10 LF -$ -$ -$ -$

FRM H6 & Hip or roof intersection 6/12 slope (hip/valley length) LF -$ -$ -$ -$

FRM H610 & Hip or roof intersection 6/12 slope (hip/val length) 2x10 LF -$ -$ -$ -$

FRM H8 & Hip or roof intersection 8/12 slope (hip/valley length) LF -$ -$ -$ -$

FRM H810 & Hip or roof intersection 8/12 slope (hip/val length) 2x10 LF -$ -$ -$ -$

FRM HDE4X10 & Header - engineered strand lumber - 3 1/2" x 9 1/2" LF -$ -$ -$ -$

FRM HDE4X12 & Header - engineered strand lumber - 3 1/2" x 11 7/8" LF -$ -$ -$ -$

FRM HDE4X8 & Header - engineered strand lumber - 3 1/2" x 7" LF -$ -$ -$ -$

FRM HDE6X10 & Header - engineered strand lumber - 5 1/4" x 9 1/2" LF -$ -$ -$ -$

FRM HDE6X12 & Header - engineered strand lumber - 5 1/4" x 11 7/8" LF -$ -$ -$ -$

FRM HDE6X8 & Header - engineered strand lumber - 5 1/4" x 7" LF -$ -$ -$ -$

FRM HDR10 & Header - double 2" x 10" LF -$ -$ -$ -$

FRM HDR103 & Header - triple 2" x 10" LF -$ -$ -$ -$

FRM HDR103T & Header - triple 2" x 10" - treated LF -$ -$ -$ -$

FRM HDR104 & Header - quadruple 2" x 10" LF -$ -$ -$ -$

FRM HDR104T & Header - quadruple 2" x 10" - treated LF -$ -$ -$ -$

FRM HDR1OT & Header - double 2" x 10" - treated LF -$ -$ -$ -$

FRM HDR12 & Header - double 2" x 12" LF -$ -$ -$ -$

FRM HDR123 & Header - triple 2" x 12" LF -$ -$ -$ -$

FRM HDR123T & Header - triple 2" x 12" - treated LF -$ -$ -$ -$

FRM HDR124 & Header - quadruple 2" x 12" LF -$ -$ -$ -$

FRM HDR124T & Header - quadruple 2" x 12" - treated LF -$ -$ -$ -$

FRM HDR12T & Header - double 2" x 12" - treated LF -$ -$ -$ -$

FRM HDR6 & Header - double 2" x 6" LF -$ -$ -$ -$

FRM HDR63 & Header - triple 2" x 6" LF -$ -$ -$ -$

FRM HDR63T & Header - triple 2" x 6" - treated LF -$ -$ -$ -$

FRM HDR64 & Header - quadruple 2" x 6" LF -$ -$ -$ -$

FRM HDR64T & Header - quadruple 2" x 6" - treated LF -$ -$ -$ -$

FRM HDR6T & Header - double 2" x 6" - treated LF -$ -$ -$ -$

FRM HDR8 & Header - double 2" x 8" LF -$ -$ -$ -$

FRM HDR83 & Header - triple 2" x 8" LF -$ -$ -$ -$

FRM HDR83T & Header - triple 2" x 8" - treated LF -$ -$ -$ -$

FRM HDR84 & Header - quadruple 2" x 8" LF -$ -$ -$ -$

FRM HDR84T & Header - quadruple 2" x 8" - treated LF -$ -$ -$ -$

FRM HDR8T & Header - double 2" x 8" - treated LF -$ -$ -$ -$

FRM IJ12 & I-joist - 12" deep - 1 3/4" flange LF -$ -$ -$ -$

FRM IJ12< & I-joist - 12" deep - 1 1/2" flange LF -$ -$ -$ -$

FRM U12> & I-joist - 12" deep - 2 5/16" flange LF -$ -$ -$ -$

FRM U12» & I-joist - 12" deep - 3 1/2" flange LF -$ -$ -$ -$

FRM IJ14 & I-joist - 14" deep - 1 3/4" flange LF -$ -$ -$ -$

FRM IJ14< & I-joist - 14" deep - 1 1/2" flange LF -$ -$ -$ -$

FRM IJ14> & I-joist - 14" deep - 2 5/16" flange LF -$ -$ -$ -$

FRM U14» & I-joist - 14" deep - 3 1/2" flange LF -$ -$ -$ -$

FRM IJ16 & I-joist - 16" deep - 1 3/4" flange LF -$ -$ -$ -$

FRM IJ16> & I-joist - 16" deep - 2 5/16" flange LF -$ -$ -$ -$

FRM U16>> & I-joist - 16" deep - 3 1/2" flange LF -$ -$ -$ -$

FRM 1J9 & I-joist - 9 1/2" deep - 1 3/4" flange LF -$ -$ -$ -$

FRM IJ9< & I-joist - 9 1/2" deep - 1 1/2" flange LF -$ -$ -$ -$

FRM J1OL & Labor to install joist - floor or ceiling - 2x10 LF -$ -$ -$ -$

Page 81: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM J1OLF & Joist - floor or ceiling - 2x10 - w/blocking LF -$ -$ -$ -$

FRM J10SF & Joist - floor or ceiling - 2x10 - w/blocking - 16" oc SF -$ -$ -$ -$

FRM J10SF< & Joist - floor or ceiling - 2x10 - w/blocking - 12" oc SF -$ -$ -$ -$

FRM J10SF> & Joist - floor or ceiling - 2x10 - w/blocking - 24" oc SF -$ -$ -$ -$

FRM J12L & Labor to install joist - floor or ceiling - 2x12 LF -$ -$ -$ -$

FRM J12LF & Joist - floor or ceiling - 2x12 - w/blocking LF -$ -$ -$ -$

FRM J12SF & Joist - floor or ceiling - 2x12 - w/blocking - 16" oc SF -$ -$ -$ -$

FRM J12SF< & Joist - floor or ceiling - 2x12 - w/blocking - 12" oc SF -$ -$ -$ -$

FRM J12SF> & Joist - floor or ceiling - 2x12 - w/blocking - 24" oc SF -$ -$ -$ -$

FRM J4L & Labor to install joist - floor or ceiling - 2x4 LF -$ -$ -$ -$

FRM J4LF & Joist - floor or ceiling - 2x4 - w/blocking LF -$ -$ -$ -$

FRM J4SF & Joist - floor or ceiling - 2x4 - w/blocking - 16" oc SF -$ -$ -$ -$

FRM J4SF< & Joist - floor or ceiling - 2x4 - w/blocking - 12" oc SF -$ -$ -$ -$

FRM J4SF> & Joist - floor or ceiling - 2x4 - w/blocking - 24" oc SF -$ -$ -$ -$

FRM J6L & Labor to install joist - floor or ceiling - 2x6 LF -$ -$ -$ -$

FRM J6LF & Joist - floor or ceiling - 2x6 - w/blocking LF -$ -$ -$ -$

FRM J6SF & Joist - floor or ceiling - 2x6 - w/blocking - 16" oc SF -$ -$ -$ -$

FRM J6SF< & Joist - floor or ceiling - 2x6 - w/blocking - 12" oc SF -$ -$ -$ -$

FRM J6SF> & Joist - floor or ceiling - 2x6 - w/blocking - 24" oc SF -$ -$ -$ -$

FRM J8L & Labor to install joist - floor or ceiling - 2x8 LF -$ -$ -$ -$

FRM J8LF & Joist - floor or ceiling - 2x8 - w/blocking LF -$ -$ -$ -$

FRM J8SF & Joist - floor or ceiling - 2x8 - w/blocking - 16" oc SF -$ -$ -$ -$

FRM J8SF< & Joist - floor or ceiling - 2x8 - w/blocking - 12" oc SF -$ -$ -$ -$

FRM J8SF> & Joist - floor or ceiling - 2x8 - w/blocking - 24" oc SF -$ -$ -$ -$

FRM JST10 & Joist - 2x10 floor or ceiling system BF -$ -$ -$ -$

FRM JST12 & Joist - 2x12 floor or ceiling system BF -$ -$ -$ -$

FRM JST6 & Joist - 2x6 floor or ceiling system BF -$ -$ -$ -$

FRM JST8 & Joist - 2x8 floor or ceiling system BF -$ -$ -$ -$

FRM JSTR & Rim joist - engineered - 1-1/8" x 9-1/2" LF -$ -$ -$ -$

FRM JSTR> & Rim joist - engineered - 1-1/8" x 11-7/8" LF -$ -$ -$ -$

FRM JSTR>> & Rim joist - engineered - 1-1/8" x 14" LF -$ -$ -$ -$

FRM JSTR>>> & Rim joist - engineered - 1-1/8" x 16" LF -$ -$ -$ -$

FRM JSTRL10 & Rim joist - engineered LVL - 1-5/16" x 9-1/2" LF -$ -$ -$ -$

FRM JSTRL12 & Rim joist - engineered LVL - 1-5/16" x 11-7/8" LF -$ -$ -$ -$

FRM JSTRL14 & Rim joist - engineered LVL - 1-5/16" x 14" LF -$ -$ -$ -$

FRM JSTRL16 & Rim joist - engineered LVL - 1-5/16" x 16" LF -$ -$ -$ -$

FRM JSTT10 & Joist - 2x10 floor or ceiling system - treated BF -$ -$ -$ -$

FRM JSTT12 & Joist - 2x12 floor or ceiling system - treated BF -$ -$ -$ -$

FRM JSTT6 & Joist - 2x6 floor or ceiling system - treated BF -$ -$ -$ -$

FRM JSTT8 & Joist - 2x8 floor or ceiling system - treated BF -$ -$ -$ -$

FRM LAB + Carpenter - General Framer - per hour HR -$ -$ -$ -$

FRM LABL + Carpentry - General Laborer - per hour HR -$ -$ -$ -$

FRM LGBLT5 & Lag bolt - 1/2" x 5" - hex lag screw - zinc plated EA -$ -$ -$ -$

FRM LVL12M + 1-3/4" x 11-7/8" LVL lumber - material only LF -$ -$ -$ -$

FRM LVL12M< + 1-5/16" x 11-7/8" LVL lumber - material only LF -$ -$ -$ -$

FRM LVL14M + 1-3/4" x 14" LVL lumber - material only LF -$ -$ -$ -$

FRM LVL14M< + 1-5/16" x 14" LVL lumber - material only LF -$ -$ -$ -$

FRM LVL9M + 1-3/4" x 9-1/2" LVL lumber - material only LF -$ -$ -$ -$

FRM LVL9M< + 1-1/4" x 9-1/2" LVL lumber - material only LF -$ -$ -$ -$

FRM MHO & Metal floor or ceiling joist - 10" - 18 gauge LF -$ -$ -$ -$

FRM MHO+ & Metal floor or ceiling joist - 10" - 16 gauge LF -$ -$ -$ -$

FRM MJ10++ & Metal floor or ceiling joist - 10" - 14 gauge LF -$ -$ -$ -$

FRM MJ12 & Metal floor or ceiling joist - 12" - 18 gauge LF -$ -$ -$ -$

FRM MJ12+ & Metal floor or ceiling joist - 12" - 16 gauge LF -$ -$ -$ -$

FRM MJ12++ & Metal floor or ceiling joist - 12" - 14 gauge LF -$ -$ -$ -$

FRM MJ8 & Metal floor or ceiling joist - 8" - 18 gauge LF -$ -$ -$ -$

FRM MJ8+ & Metal floor or ceiling joist - 8" - 16 gauge LF -$ -$ -$ -$

FRM MJ8++ & Metal floor or ceiling joist - 8" - 14 gauge LF -$ -$ -$ -$

FRM MN + Framing - Labor Minimum EA -$ -$ -$ -$

FRM MRJ10 & Rim joist - metal - 10" - 18 gauge LF -$ -$ -$ -$

FRM MRJ10+ & Rim joist - metal - 10" - 16 gauge LF -$ -$ -$ -$

FRM MRJ10++ & Rim joist - metal - 10" - 14 gauge LF -$ -$ -$ -$

FRM MRJ12 & Rim joist - metal - 12" - 18 gauge LF -$ -$ -$ -$

FRM MRJ12+ & Rim joist - metal - 12" - 16 gauge LF -$ -$ -$ -$

FRM MRJ12++ & Rim joist - metal - 12" - 14 gauge LF -$ -$ -$ -$

Page 82: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM MRJ8 & Rim joist - metal - 8" - 18 gauge LF -$ -$ -$ -$

FRM MRJ8+ & Rim joist - metal - 8" - 16 gauge LF -$ -$ -$ -$

FRM MRJ8++ & Rim joist - metal - 8" - 14 gauge LF -$ -$ -$ -$

FRM MS414 & Metal studding, 3 5/8" wide, 16" OC, 14 gauge SF -$ -$ -$ -$

FRM MS414< & Metal studding, 3 5/8" wide, 24" OC, 14 gauge SF -$ -$ -$ -$

FRM MS414> & Metal studding, 3 5/8" wide, 12" OC, 14 gauge SF -$ -$ -$ -$

FRM MS416 & Metal studding, 3 5/8" wide, 16" OC, 16 gauge SF -$ -$ -$ -$

FRM MS416< & Metal studding, 3 5/8" wide, 24" OC, 16 gauge SF -$ -$ -$ -$

FRM MS416> & Metal studding, 3 5/8" wide, 12" OC, 16 gauge SF -$ -$ -$ -$

FRM MS418 & Metal studding, 3 5/8" wide, 16" OC, 18 gauge SF -$ -$ -$ -$

FRM MS418< & Metal studding, 3 5/8" wide, 24" OC, 18 gauge SF -$ -$ -$ -$

FRM MS418> & Metal studding, 3 5/8" wide, 12" OC, 18 gauge SF -$ -$ -$ -$

FRM MS614 & Metal studding, 6" wide, 16" OC, 14 gauge SF -$ -$ -$ -$

FRM MS614< & Metal studding, 6" wide, 24" OC, 14 gauge SF -$ -$ -$ -$

FRM MS614> & Metal studding, 6" wide, 12" OC, 14 gauge SF -$ -$ -$ -$

FRM MS616 & Metal studding, 6" wide, 16" OC, 16 gauge SF -$ -$ -$ -$

FRM MS616< & Metal studding, 6" wide, 24" OC, 16 gauge SF -$ -$ -$ -$

FRM MS616> & Metal studding, 6" wide, 12" OC, 16 gauge SF -$ -$ -$ -$

FRM MS618 & Metal studding, 6" wide, 16" OC, 18 gauge SF -$ -$ -$ -$

FRM MS618< & Metal studding, 6" wide, 24" OC, 18 gauge SF -$ -$ -$ -$

FRM MS618> & Metal studding, 6" wide, 12" OC, 18 gauge SF -$ -$ -$ -$

FRM MST2 & Metal studding, 2 1/2" wide, 16" OC, 25 gauge SF -$ -$ -$ -$

FRM MST2+ & Metal studding, 2 1/2" wide, 16" OC, 20 gauge SF -$ -$ -$ -$

FRM MST4 & Metal studding, 3 5/8" wide, 16" OC, 25 gauge SF -$ -$ -$ -$

FRM MST4+ & Metal studding, 3 5/8" wide, 16" OC, 20 gauge SF -$ -$ -$ -$

FRM MST4< & Metal studding, 3 5/8" wide, 24" OC, 25 gauge SF -$ -$ -$ -$

FRM MST4<+ & Metal studding, 3 5/8" wide, 24" OC, 20 gauge SF -$ -$ -$ -$

FRM MST6 & Metal studding, 6" wide, 16" OC, 25 gauge SF -$ -$ -$ -$

FRM MST6+ & Metal studding, 6" wide, 16" OC, 20 gauge SF -$ -$ -$ -$

FRM MST6< & Metal studding, 6" wide, 24" OC, 25 gauge SF -$ -$ -$ -$

FRM MST6<+ & Metal studding, 6" wide, 24" OC, 20 gauge SF -$ -$ -$ -$

FRM MST6>+ & Metal studding, 6" wide, 12" OC, 20 gauge SF -$ -$ -$ -$

FRM MTR10 & Light gauge metal truss - 10/12 - 20 gauge LF -$ -$ -$ -$

FRM MTR10+ & Light gauge metal truss - 10/12 - 14 gauge LF -$ -$ -$ -$

FRM MTR12 & Light gauge metal truss - 12/12 - 20 gauge LF -$ -$ -$ -$

FRM MTR12+ & Light gauge metal truss - 12/12 - 14 gauge LF -$ -$ -$ -$

FRM MTR3 & Light gauge metal truss - 3/12 - 20 gauge LF -$ -$ -$ -$

FRM MTR3+ & Light gauge metal truss - 3/12 - 14 gauge LF -$ -$ -$ -$

FRM MTR4 & Light gauge metal truss - 4/12 - 20 gauge LF -$ -$ -$ -$

FRM MTR4+ & Light gauge metal truss - 4/12 - 14 gauge LF -$ -$ -$ -$

FRM MTR6 & Light gauge metal truss - 6/12 - 20 gauge LF -$ -$ -$ -$

FRM MTR6+ & Light gauge metal truss - 6/12 - 14 gauge LF -$ -$ -$ -$

FRM MTR8 & Light gauge metal truss - 8/12 - 20 gauge LF -$ -$ -$ -$

FRM MTR8+ & Light gauge metal truss - 8/12 - 14 gauge LF -$ -$ -$ -$

FRM MTRA10 & Light gauge metal truss - attic - 10/12 - 20 gauge LF -$ -$ -$ -$

FRM MTRA10+ & Light gauge metal truss - attic - 10/12 - 14 gauge LF -$ -$ -$ -$

FRM MTRA12 & Light gauge metal truss - attic - 12/12 - 20 gauge LF -$ -$ -$ -$

FRM MTRA12+ & Light gauge metal truss - attic - 12/12 - 14 gauge LF -$ -$ -$ -$

FRM MTRA8 & Light gauge metal truss - attic - 8/12 - 20 gauge LF -$ -$ -$ -$

FRM MTRA8+ & Light gauge metal truss - attic - 8/12 - 14 gauge LF -$ -$ -$ -$

FRM MTRGMB & Light gauge metal truss - gambrel/bowstring - 20 gauge LF -$ -$ -$ -$

FRM MTRGMB+ & Light gauge metal truss - gambrel/bowstring - 14 gauge LF -$ -$ -$ -$

FRM MTRV10 & Light ga. metal truss - vaulted/scissor - 10/12 - 20 gauge LF -$ -$ -$ -$

FRM MTRV10+ & Light ga. metal truss - vaulted/scissor - 10/12 - 14 gauge LF -$ -$ -$ -$

FRM MTRV12 & Light ga. metal truss - vaulted/scissor - 12/12 - 20 gauge LF -$ -$ -$ -$

FRM MTRV12+ & Light ga. metal truss - vaulted/scissor - 12/12 - 14 gauge LF -$ -$ -$ -$

FRM MTRV3 & Light ga. metal truss - vaulted/scissor - 3/12 - 20 gauge LF -$ -$ -$ -$

FRM MTRV3+ & Light ga. metal truss - vaulted/scissor - 3/12 - 14 gauge LF -$ -$ -$ -$

FRM MTRV4 & Light ga. metal truss - vaulted/scissor - 4/12 - 20 gauge LF -$ -$ -$ -$

FRM MTRV4+ & Light ga. metal truss - vaulted/scissor - 4/12 - 14 gauge LF -$ -$ -$ -$

FRM MTRV6 & Light ga. metal truss - vaulted/scissor - 6/12 - 20 gauge LF -$ -$ -$ -$

FRM MTRV6+ & Light ga. metal truss - vaulted/scissor - 6/12 - 14 gauge LF -$ -$ -$ -$

FRM MTRV8 & Light ga. metal truss - vaulted/scissor - 8/12 - 20 gauge LF -$ -$ -$ -$

FRM MTRV8+ & Light ga. metal truss - vaulted/scissor - 8/12 - 14 gauge LF -$ -$ -$ -$

FRM PAP + Powder actuated drive pin - up to 2 1/2" nail EA -$ -$ -$ -$

Page 83: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM PAPF + Powder actuated drive pin - 1 1/2" plastic-flange nail EA -$ -$ -$ -$

FRM PIER & Precast concrete or block pier EA -$ -$ -$ -$

FRM RAD + Additional labor to frame a radius (curved) wall SF -$ -$ -$ -$

FRM RAILTU & Porch or deck handrail w/turned balusters LF -$ -$ -$ -$

FRM RF1OLF & Rafters - 2x10 - stick frame roof (using rafter length) LF -$ -$ -$ -$

FRM RF1OLFL & Rafters - 2x10 - Labor only - (using rafter length) LF -$ -$ -$ -$

FRM RF1OSF & Rafters - 2x10 - 16" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF1OSF< & Rafters - 2x10 - 12" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF1OSF> & Rafters - 2x10 - 24" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF12LF & Rafters - 2x12 - stick frame roof (using rafter length) LF -$ -$ -$ -$

FRM RF12LFL & Rafters - 2x12 - Labor only - (using rafter length) LF -$ -$ -$ -$

FRM RF12SF & Rafters - 2x12 - 16" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF12SF< & Rafters - 2x12 - 12" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF12SF> & Rafters - 2x12 - 24" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF4LF & Rafters - 2x4 - stick frame roof (using rafter length) LF -$ -$ -$ -$

FRM RF4LFL & Rafters - 2x4 - Labor only - (using rafter length) LF -$ -$ -$ -$

FRM RF4SF & Rafters - 2x4 - 16" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF4SF< & Rafters - 2x4 - 12" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF4SF> & Rafters - 2x4 - 24" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF6LF & Rafters - 2x6 - stick frame roof (using rafter length) LF -$ -$ -$ -$

FRM RF6LFL & Rafters - 2x6 - Labor only - (using rafter length) LF -$ -$ -$ -$

FRM RF6SF & Rafters - 2x6 - 16" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF6SF< & Rafters - 2x6 - 12" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF6SF> & Rafters - 2x6 - 24" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF8LF & Rafters - 2x8 - stick frame roof (using rafter length) LF -$ -$ -$ -$

FRM RF8LFA & Rafters - lx8 laminated - arched (per LF of rafter) LF -$ -$ -$ -$

FRM RF8LFL & Rafters - 2x8 - Labor only - (using rafter length) LF -$ -$ -$ -$

FRM RF8SF & Rafters - 2x8 - 16" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF8SF< & Rafters - 2x8 - 12" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RF8SF> & Rafters - 2x8 - 24" OC (3-5/12 Gable, per SF of floor) SF -$ -$ -$ -$

FRM RFAlS & Add-on lab & mat - 2x10 - 5/12 to 9/12 slope - 16" OC SF -$ -$ -$ -$

FRM RFA1S< & Add-on lab & mat - 2x10 - 5/12 to 9/12 slope - 12" OC SF -$ -$ -$ -$

FRM RFA1S> & Add-on lab & mat - 2x10 - 5/12 to 9/12 slope - 24" OC SF -$ -$ -$ -$

FRM RFA1SS & Add-on lab & mat - 2x10 - 9/12 to 12/12 slope - 16" OC SF -$ -$ -$ -$

FRM RFA1SS< & Add-on lab & mat - 2x10 - 9/12 to 12/12 slope - 12" OC SF -$ -$ -$ -$

FRM RFA1SS> & Add-on lab & mat - 2x10 - 9/12 to 12/12 slope - 24" OC SF -$ -$ -$ -$

FRM RFA2S & Add-on lab & mat - 2x12 - 5/12 to 9/12 slope - 16" OC SF -$ -$ -$ -$

FRM RFA2S< & Add-on lab & mat - 2x12 - 5/12 to 9/12 slope - 12" OC SF -$ -$ -$ -$

FRM RFA2S> & Add-on lab & mat - 2x12 - 5/12 to 9/12 slope - 24" OC SF -$ -$ -$ -$

FRM RFA2SS & Add-on lab & mat - 2x12 - 9/12 to 12/12 slope - 16" OC SF -$ -$ -$ -$

FRM RFA2SS< & Add-on lab & mat - 2x12 - 9/12 to 12/12 slope - 12" OC SF -$ -$ -$ -$

FRM RFA2SS> & Add-on lab & mat - 2x12 - 9/12 to 12/12 slope - 24" OC SF -$ -$ -$ -$

FRM RFA4L & Additional labor - 2x4-2x6 - 5/12 to 9/12 slope LF -$ -$ -$ -$

FRM RFA4L> & Additional labor - 2x4-2x6 - 9/12 to 12/12 slope LF -$ -$ -$ -$

FRM RFA4S & Add-on lab & mat - 2x4 - 5/12 to 9/12 slope - 16" OC SF -$ -$ -$ -$

FRM RFA4S< & Add-on lab & mat - 2x4 - 5/12 to 9/12 slope - 12" OC SF -$ -$ -$ -$

FRM RFA4S> & Add-on lab & mat - 2x4 - 5/12 to 9/12 slope - 24" OC SF -$ -$ -$ -$

FRM RFA4SS & Add-on lab & mat - 2x4 - 9/12 to 12/12 slope - 16" OC SF -$ -$ -$ -$

FRM RFA4SS< & Add-on lab & mat - 2x4 - 9/12 to 12/12 slope - 12" OC SF -$ -$ -$ -$

FRM RFA4SS> & Add-on lab & mat - 2x4 - 9/12 to 12/12 slope - 24" OC SF -$ -$ -$ -$

FRM RFA6S & Add-on lab & mat - 2x6 - 5/12 to 9/12 slope - 16" OC SF -$ -$ -$ -$

FRM RFA6S< & Add-on lab & mat - 2x6 - 5/12 to 9/12 slope - 12" OC SF -$ -$ -$ -$

FRM RFA6S> & Add-on lab & mat - 2x6 - 5/12 to 9/12 slope - 24" OC SF -$ -$ -$ -$

FRM RFA6SS & Add-on lab & mat - 2x6 - 9/12 to 12/12 slope - 16" OC SF -$ -$ -$ -$

FRM RFA6SS< & Add-on lab & mat - 2x6 - 9/12 to 12/12 slope - 12" OC SF -$ -$ -$ -$

FRM RFA6SS> & Add-on lab & mat - 2x6 - 9/12 to 12/12 slope - 24" OC SF -$ -$ -$ -$

FRM RFA8L & Additional labor - 2x8-2x12 - 5/12 to 9/12 slope LF -$ -$ -$ -$

FRM RFA8L> & Additional labor - 2x8-2x12 - 9/12 to 12/12 slope LF -$ -$ -$ -$

FRM RFA8S & Add-on lab & mat - 2x8 - 5/12 to 9/12 slope - 16" OC SF -$ -$ -$ -$

FRM RFA8S< & Add-on lab & mat - 2x8 - 5/12 to 9/12 slope - 12" OC SF -$ -$ -$ -$

FRM RFA8S> & Add-on lab & mat - 2x8 - 5/12 to 9/12 slope - 24" OC SF -$ -$ -$ -$

FRM RFA8SS & Add-on lab & mat - 2x8 - 9/12 to 12/12 slope - 16" OC SF -$ -$ -$ -$

FRM RFA8SS< & Add-on lab & mat - 2x8 - 9/12 to 12/12 slope - 12" OC SF -$ -$ -$ -$

FRM RFA8SS> & Add-on lab & mat - 2x8 - 9/12 to 12/12 slope - 24" OC SF -$ -$ -$ -$

FRM RFC & Rafters - curved LF -$ -$ -$ -$

Page 84: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM RFTR10 & Rafters - 2x10 stick frame roof BF -$ -$ -$ -$

FRM RFTR12 & Rafters - 2x12 stick frame roof BF -$ -$ -$ -$

FRM RFTR6 & Rafters - 2x6 stick frame roof BF -$ -$ -$ -$

FRM RFTR8 & Rafters - 2x8 stick frame roof BF -$ -$ -$ -$

FRM RFTRA & Additional labor for stick frame roof, 5/12 to 9/12 slope BF -$ -$ -$ -$

FRM RFTRA> & Additional labor for stick frame roof, 9/12 to 12/12 slope BF -$ -$ -$ -$

FRM RFTRT10 & Rafters - 2x10 stick frame roof - treated BF -$ -$ -$ -$

FRM RFTRT12 & Rafters - 2x12 stick frame roof - treated BF -$ -$ -$ -$

FRM RFTRT6 & Rafters - 2x6 stick frame roof - treated BF -$ -$ -$ -$

FRM RFTRT8 & Rafters - 2x8 stick frame roof - treated BF -$ -$ -$ -$

FRM RH1OLFL & Rafters - hip - 10" - Labor only (use hip length) LF -$ -$ -$ -$

FRM RH12LFL & Rafters - hip - 12" - Labor only (use hip length) LF -$ -$ -$ -$

FRM RH4LFL & Rafters - hip - 4" - Labor only (use hip length) LF -$ -$ -$ -$

FRM RH6LFL & Rafters - hip - 6" - Labor only (use hip length) LF -$ -$ -$ -$

FRM RH8LFL & Rafters - hip - 8" - Labor only (use hip length) LF -$ -$ -$ -$

FRM RR & Railroad ties LF -$ -$ -$ -$

FRM SC & Saddle or cricket - up to 25 SF EA -$ -$ -$ -$

FRM SC> & Saddle or cricket - 26 to 50 SF EA -$ -$ -$ -$

FRM SCDSF + Screw down existing subfloor - eliminate floor squeaks SF -$ -$ -$ -$

FRM SFT & Add for interior/cabinet soffit framing LF -$ -$ -$ -$

FRM SH1/2 & Sheathing - plywood - 1/2" CDX SF -$ -$ -$ -$

FRM SH1/2F & Sheathing - plywood - 1/2" CDX - fire-treated SF -$ -$ -$ -$

FRM SH1/2T & Sheathing - plywood - 1/2" - treated SF -$ -$ -$ -$

FRM SH1TG & Sheathing - 1 1/8" - tongue and groove SF -$ -$ -$ -$

FRM SH1X6 & Sheathing - spaced 1" x 6" SF -$ -$ -$ -$

FRM SH1X6TG & Sheathing - 1" x 6" - tongue and groove SF -$ -$ -$ -$

FRM SH2X6TG & Sheathing - 2" x 6" - tongue and groove SF -$ -$ -$ -$

FRM SH3/4 & Sheathing - plywood - 3/4" CDX SF -$ -$ -$ -$

FRM SH3/4T & Sheathing - plywood - 3/4" - treated SF -$ -$ -$ -$

FRM SH3/4TG & Sheathing - plywood - 3/4" - tongue and groove SF -$ -$ -$ -$

FRM SH3/4TM & Sheathing - plywood - 3/4" - T & G - mobile home SF -$ -$ -$ -$

FRM SH3/8 & Sheathing - plywood - 3/8" SF -$ -$ -$ -$

FRM SH3/8RS & Sheathing - plywood - 3/8" - rough sawn fir SF -$ -$ -$ -$

FRM SH5/8 & Sheathing - plywood - 5/8" CDX SF -$ -$ -$ -$

FRM SH5/8T & Sheathing - plywood - 5/8" - treated SF -$ -$ -$ -$

FRM SH5/8TG & Sheathing - plywood - 5/8" - tongue and groove SF -$ -$ -$ -$

FRM SH5/8TM & Sheathing - plywood - 5/8" - T & G - mobile home SF -$ -$ -$ -$

FRM SHB1/2 & Sheathing system w/ built-in barrier & taped seams - 1/2" SF -$ -$ -$ -$

FRM SHB5/8 & Sheathing system w/ built-in barrier & taped seams - 5/8" SF -$ -$ -$ -$

FRM SHCLIP + Sheathing - additional cost for H-clips SF -$ -$ -$ -$

FRM SHF1 & Sheathing - foil faced foam - 1" SF -$ -$ -$ -$

FRM SHF1/2 & Sheathing - foil faced foam - 1/2" SF -$ -$ -$ -$

FRM SHF3/4 & Sheathing - foil faced foam - 3/4" SF -$ -$ -$ -$

FRM SHFG1/2 & Sheathing - fiberglass gypsum panel - 1/2" SF -$ -$ -$ -$

FRM SHFG5/8 & Sheathing - fiberglass gypsum panel - 5/8" SF -$ -$ -$ -$

FRM SHINS3 & Sheathing - insulated panel (nail base) - 4" SF -$ -$ -$ -$

FRM SHINS6 & Sheathing - insulated panel (nail base) - 6" SF -$ -$ -$ -$

FRM SHPANG & Pre-manufactured shear panel - garage portal SF -$ -$ -$ -$

FRM SHPANR & Pre-manufactured shear panel - raised floor SF -$ -$ -$ -$

FRM SHPANRL & Pre-manufactured shear panel - raised floor - Large SF -$ -$ -$ -$

FRM SHPANS & Pre-manufactured shear panel - standard slab SF -$ -$ -$ -$

FRM SHPANSL & Pre-manufactured shear panel - standard slab - Large SF -$ -$ -$ -$

FRM SHR1/2 & Sheathing - radiant barrier - 1/2" - OSB SF -$ -$ -$ -$

FRM SHR1/2P & Sheathing - radiant barrier - 1/2" - plywood SF -$ -$ -$ -$

FRM SHR5/8 & Sheathing - radiant barrier - 5/8" - OSB SF -$ -$ -$ -$

FRM SHR5/8P & Sheathing - radiant barrier - 5/8" - plywood SF -$ -$ -$ -$

FRM SHSG & Sheathing - structural grade - 1/8" - foil or poly face SF -$ -$ -$ -$

FRM SHSTP & Add charge for sheathing steep roof - 7/12 - 9/12 slope SF -$ -$ -$ -$

FRM SHSTP> & Add charge for sheathing steep roof - 10/12 - 12/12 slope SF -$ -$ -$ -$

FRM SHSTP>> & Add charge for sheathing steep roof - over 12/12 slope SF -$ -$ -$ -$

FRM SHW1/2 & Sheathing - OSB - 1/2" SF -$ -$ -$ -$

FRM SHW3/4T & Sheathing - OSB - 3/4" - tongue and groove SF -$ -$ -$ -$

FRM SHW3/4W & Sheathing - OSB - 3/4"- T&G - High grade eng. wtr resist. SF -$ -$ -$ -$

FRM SHW5/8 & Sheathing - OSB - 5/8" SF -$ -$ -$ -$

FRM SILLS4 + Sill seal foam - 4" LF -$ -$ -$ -$

Page 85: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM SILLS6 + Sill seal foam - 6" LF -$ -$ -$ -$

FRM SIPF10 & Structural insulated panel (SIP) - Floor - 10 1/8" SF -$ -$ -$ -$

FRM SIPF8 & Structural insulated panel (SIP) - Floor - 8 1/4" SF -$ -$ -$ -$

FRM SIPR10 & Structural insulated panel (SIP) - Roof - 10 1/8" SF -$ -$ -$ -$

FRM SIPR8 & Structural insulated panel (SIP) - Roof - 8 1/4" SF -$ -$ -$ -$

FRM SIPW4 & Structural insulated panel (SIP) - Walls - 4 3/8" SF -$ -$ -$ -$

FRM SIPW6 & Structural insulated panel (SIP) - Walls - 6 3/8" SF -$ -$ -$ -$

FRM SJACK + Temporary shoring post - Screw jack (per day) DA -$ -$ -$ -$

FRM SL1X3 & Sleepers/underlay over concrete 1" x 3" sleepers SF -$ -$ -$ -$

FRM SL1X4 & Sleepers/underlay over concrete 1" x 4" sleepers SF -$ -$ -$ -$

FRM SL2X3 & Sleepers/underlay over concrete 2" x 3" sleepers SF -$ -$ -$ -$

FRM SL2X4 & Sleepers/underlay over concrete 2" x 4" sleepers SF -$ -$ -$ -$

FRM SLSHIM + Level sleeper floor over concrete - heavy slope SF -$ -$ -$ -$

FRM SLSHIM- + Level sleeper floor over concrete - moderate slope SF -$ -$ -$ -$

FRM ST4 & Stud wall - 2x4 (per BF) BF -$ -$ -$ -$

FRM ST6 & Stud wall - 2x6 (per BF) BF -$ -$ -$ -$

FRM ST8 & Stud wall - 2x8 (per BF) BF -$ -$ -$ -$

FRM STT10 & Stud wall - 2x10 - treated (per BF) BF -$ -$ -$ -$

FRM STT12 & Stud wall - 2x12 - treated (per BF) BF -$ -$ -$ -$

FRM STT4 & Stud wall - 2x4 - treated (per BF) BF -$ -$ -$ -$

FRM STT6 & Stud wall - 2x6 - treated (per BF) BF -$ -$ -$ -$

FRM STT8 & Stud wall - 2x8 - treated (per BF) BF -$ -$ -$ -$

FRM SWR & Single wall construction - Redwood LF -$ -$ -$ -$

FRM TBVND & Vent door at base of tobacco barn LF -$ -$ -$ -$

FRM TIER2 & Tier, 2 racks high, tobacco drying barn SF -$ -$ -$ -$

FRM TIER3 & Tier, 3 racks high, tobacco drying barn SF -$ -$ -$ -$

FRM TPL4 & Top plate - 2" x 4" LF -$ -$ -$ -$

FRM TPL6 & Top plate - 2" x 6" LF -$ -$ -$ -$

FRM TRIO & Truss - 10/12 slope LF -$ -$ -$ -$

FRM TRIO+ & Truss - 10/12 slope - heavy loading LF -$ -$ -$ -$

FRM TR1OT & Truss - 10/12 slope - treated LF -$ -$ -$ -$

FRM TR12 & Truss - 12/12 slope LF -$ -$ -$ -$

FRM TR12+ & Truss - 12/12 slope - heavy loading LF -$ -$ -$ -$

FRM TR12T & Truss - 12/12 slope - treated LF -$ -$ -$ -$

FRM TR3 & Truss - 3/12 slope LF -$ -$ -$ -$

FRM TR3T & Truss - 3/12 slope - treated LF -$ -$ -$ -$

FRM TR4 & Truss - 4/12 slope LF -$ -$ -$ -$

FRM TR4+ & Truss - 4/12 slope - heavy loading LF -$ -$ -$ -$

FRM TR4T & Truss - 4/12 slope - treated LF -$ -$ -$ -$

FRM TR6 & Truss - 6/12 slope LF -$ -$ -$ -$

FRM TR6+ & Truss - 6/12 slope - heavy loading LF -$ -$ -$ -$

FRM TR6T & Truss - 6/12 slope - treated LF -$ -$ -$ -$

FRM TR6T++ & Truss - 6/12 slope - extra-heavy loading - treated - 2-ply LF -$ -$ -$ -$

FRM TR8 & Truss - 8/12 slope LF -$ -$ -$ -$

FRM TR8+ & Truss - 8/12 slope - heavy loading LF -$ -$ -$ -$

FRM TR8T & Truss - 8/12 slope - treated LF -$ -$ -$ -$

FRM TRA10 & Attic truss - 10/12 slope LF -$ -$ -$ -$

FRM TRA12 & Attic truss - 12/12 slope LF -$ -$ -$ -$

FRM TRA8 & Attic truss - 8/12 slope LF -$ -$ -$ -$

FRM TRAY & Add on for trayed, dropped or coffered ceiling SF -$ -$ -$ -$

FRM TRFL & Truss - flat roof system LF -$ -$ -$ -$

FRM TRFL+ & Truss - flat roof system - heavy loading LF -$ -$ -$ -$

FRM TRG + Truss - gambrel roof - add for extra framing LF -$ -$ -$ -$

FRM TRGIO & Girder truss - 10/12 slope LF -$ -$ -$ -$

FRM TRG12 & Girder truss - 12/12 slope LF -$ -$ -$ -$

FRM TRG3 & Girder truss - 3/12 slope LF -$ -$ -$ -$

FRM TRG4 & Girder truss - 4/12 slope LF -$ -$ -$ -$

FRM TRG6 & Girder truss - 6/12 slope LF -$ -$ -$ -$

FRM TRG8 & Girder truss - 8/12 slope LF -$ -$ -$ -$

FRM TRGB & Gambrel truss - barn style LF -$ -$ -$ -$

FRM TRMIO & Mono truss - 10/12 slope LF -$ -$ -$ -$

FRM TRM12 & Mono truss - 12/12 slope LF -$ -$ -$ -$

FRM TRM3 & Mono truss - 3/12 slope LF -$ -$ -$ -$

FRM TRM4 & Mono truss - 4/12 slope LF -$ -$ -$ -$

FRM TRM6 & Mono truss - 6/12 slope LF -$ -$ -$ -$

Page 86: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

FRM TRM8 & Mono truss - 8/12 slope LF -$ -$ -$ -$

FRM TR010 & Overbuild/Valley Truss - 10/12 slope LF -$ -$ -$ -$

FRM TRO12 & Overbuild/Valley Truss - 12/12 slope LF -$ -$ -$ -$

FRM TRG3 & Overbuild/Valley Truss - 3/12 slope LF -$ -$ -$ -$

FRM TRG4 & Overbuild/Valley Truss - 4/12 slope LF -$ -$ -$ -$

FRM TRG6 & Overbuild/Valley Truss - 6/12 slope LF -$ -$ -$ -$

FRM TRG8 & Overbuild/Valley Truss - 8/12 slope LF -$ -$ -$ -$

FRM TRRS + Truss - Detach & reset LF -$ -$ -$ -$

FRM TRSC10 & Scissor truss - 10/12 slope LF -$ -$ -$ -$

FRM TRSC12 & Scissor truss - 12/12 slope LF -$ -$ -$ -$

FRM TRSC3 & Scissor truss - 3/12 slope LF -$ -$ -$ -$

FRM TRSC4 & Scissor truss - 4/12 slope LF -$ -$ -$ -$

FRM TRSC6 & Scissor truss - 6/12 slope LF -$ -$ -$ -$

FRM TRSC8 & Scissor truss - 8/12 slope LF -$ -$ -$ -$

FRM TRST10 & Stepdown truss - 10/12 slope LF -$ -$ -$ -$

FRM TRST12 & Stepdown truss - 12/12 slope LF -$ -$ -$ -$

FRM TRST3 & Stepdown truss - 3/12 slope LF -$ -$ -$ -$

FRM TRST4 & Stepdown truss - 4/12 slope LF -$ -$ -$ -$

FRM TRST6 & Stepdown truss - 6/12 slope LF -$ -$ -$ -$

FRM TRST8 & Stepdown truss - 8/12 slope LF -$ -$ -$ -$

FRM UL1/2 & Underlayment - 1/2" particle board SF -$ -$ -$ -$

FRM UL1/2P & Underlayment - 1/2" BC plywood SF -$ -$ -$ -$

FRM UL1/2W & Underlayment - 1/2" OSB SF -$ -$ -$ -$

FRM UL1/4 & Underlayment - 1/4" lauan/mahogany plywood SF -$ -$ -$ -$

FRM UL1/4M & Underlayment - 1/4" hardboard SF -$ -$ -$ -$

FRM UL1/4P & Underlayment - 1/4" BC plywood SF -$ -$ -$ -$

FRM UL1/4P+ & Underlayment - 1/4" 5 ply SF -$ -$ -$ -$

FRM UL1/4W & Underlayment - 1/4" waterproof OSB SF -$ -$ -$ -$

FRM UL3/4 & Underlayment - 3/4" particle board SF -$ -$ -$ -$

FRM UL3/4P & Underlayment - 3/4" BC plywood SF -$ -$ -$ -$

FRM UL3/4W & Underlayment - 3/4" OSB - tongue and groove SF -$ -$ -$ -$

FRM UL3/4WW & Underlayment - 3/4" OSB - High grade eng. water resistant SF -$ -$ -$ -$

FRM UL3/8 & Underlayment - 3/8" particle board SF -$ -$ -$ -$

FRM UL3/8P & Underlayment - 3/8" BC plywood SF -$ -$ -$ -$

FRM UL5/8 & Underlayment - 5/8" particle board SF -$ -$ -$ -$

FRM UL5/8P & Underlayment - 5/8" BC plywood SF -$ -$ -$ -$

FRM UL5/8W & Underlayment - 5/8" OSB SF

FRM ULAC & Additional charge for underlayment in confined spaces SF

FRM ULACS + Additional charge for screwing down SF

underlayment/subfloor

FRM WHPF & Water heater platform - wood frame EA -$ -$ -$ -$

FRM X4 & Stud wall 2x4x8 ext. w/shear panels & 1/2" bldr bd LF -$ -$ -$ -$

FRM X6 & Stud wall 2x6x8 ext. w/shear panels & 1/2" bldr bd LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

GLS 1.25LT & Safety glass - 1 1/4" laminated glass - double pane SF -$ -$ -$ -$

GLS 1/2 + Reglaze 1/2" to 5/8" annealed/float glass - single pane SF -$ -$ -$ -$

GLS 1/2T + Reglaze 1/2" to 5/8" tempered glass - single pane SF -$ -$ -$ -$

GLS 1/4 + Reglaze 1/4" annealed/float glass - single pane SF -$ -$ -$ -$

GLS 1/4+ + Reglaze 1/4" glass - double pane SF -$ -$ -$ -$

GLS 1/4T + Reglaze 1/4" tempered glass - single pane SF -$ -$ -$ -$

GLS 1/4T+ + Reglaze 1/4" tempered glass - double pane SF -$ -$ -$ -$

GLS 1/4W + Reglaze 1/4" wire glass - single pane SF -$ -$ -$ -$

GLS 1/8T + Reglaze 1/8" tempered glass - single pane SF -$ -$ -$ -$

GLS 1L + Reglaze 1" laminated glass - single pane SF -$ -$ -$ -$

GLS 1WAY + Add on for one-way glass SF -$ -$ -$ -$

GLS 3/16 + Reglaze 3/16" annealed/float glass - single pane SF -$ -$ -$ -$

GLS 3/16+ + Reglaze 3/16" glass - double pane SF -$ -$ -$ -$

GLS 3/16T + Reglaze 3/16" tempered glass - single pane SF -$ -$ -$ -$

GLS 3/16T+ + Reglaze 3/16" tempered glass - double pane SF -$ -$ -$ -$

GLS 3/4 + Reglaze 3/4" annealed/float glass - single pane SF -$ -$ -$ -$

GLS 3/4T + Reglaze 3/4" tempered glass - single pane SF -$ -$ -$ -$

GLS 3/8 + Reglaze 3/8" annealed/float glass - single pane SF -$ -$ -$ -$

Page 87: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

GLS 3/8T + Reglaze 3/8" tempered glass - single pane SF -$ -$ -$ -$

GLS BIDITM + Glass, Glazing, & Storefronts (Bid Item) EA -$ -$ -$ -$

GLS CW & Curtain wall - single pane SF -$ -$ -$ -$

GLS CW2 & Curtain wall - double pane SF -$ -$ -$ -$

GLS GGRAIL & Glass guardrail 36" - 42" height - metal handrail LF -$ -$ -$ -$

GLS GRID + Add on for grid (double or triple glazed windows) SF -$ -$ -$ -$

GLS GSKT + Glazing gasket - per LF LF -$ -$ -$ -$

GLS HMSF & Steel frame glazed openings SF -$ -$ -$ -$

GLS HRGRID + Add on for grid in half round window - per window unit EA -$ -$ -$ -$

GLS LAB + Window Glazing/Repair - per hour HR -$ -$ -$ -$

GLS LABL + Window Glazing - General Laborer - per hour HR -$ -$ -$ -$

GLS LAMIR + Add on for impact resistant laminated glass SF -$ -$ -$ -$

GLS LEAD + Add on for leaded stained glass in windows SF -$ -$ -$ -$

GLS LEADC & Leaded stained glass - Commercial SF -$ -$ -$ -$

GLS LEADC++ & Leaded stained glass - Commercial - Premium grade SF -$ -$ -$ -$

GLS LOGO & Sandblasted glass Logo SF -$ -$ -$ -$

GLS LOWE + Add on for "Low E" glass SF -$ -$ -$ -$

GLS MN + Glass, Glazing, & Storefronts - Labor Minimum EA -$ -$ -$ -$

GLS OBS + Add on for obscure glass SF -$ -$ -$ -$

GLS PC1 + Reglaze 1" polycarbonate - single pane SF -$ -$ -$ -$

GLS PC1/2 + Reglaze 1/2" polycarbonate - single pane SF -$ -$ -$ -$

GLS PC1/4 + Reglaze 1/4" polycarbonate - single pane SF -$ -$ -$ -$

GLS PTHRU & Pass-Thru window SF -$ -$ -$ -$

GLS PTHRU+ & Pass-Thru window - Bulletproof SF -$ -$ -$ -$

GLS PX1 + Reglaze 1" plexiglass - single pane SF -$ -$ -$ -$

GLS PX1/2 + Reglaze 1/2" plexiglass - single pane SF -$ -$ -$ -$

GLS PX1/4 + Reglaze 1/4" plexiglass - single pane SF -$ -$ -$ -$

GLS PX1/8 + Reglaze 1/8" plexiglass - single pane SF -$ -$ -$ -$

GLS PX3/8 + Reglaze 3/8" plexiglass - single pane SF -$ -$ -$ -$

GLS REC + Sliding glass window, receptionist 4' x 3' EA -$ -$ -$ -$

GLS SFA & Storefront - aluminum anodized frame - Single pane SF -$ -$ -$ -$

GLS SFA+ & Storefront - aluminum anodized frame - Double pane SF -$ -$ -$ -$

GLS SFAC & Storefront - alum. frame - segmented (curved) -Single pane SF -$ -$ -$ -$

GLS SFAC+ & Storefront - alum. frame - segmented (curved) -Double SF -$ -$ -$ -$

pane

GLS SFAD & Storefront - auto. single sliding door - Single pane EA -$ -$ -$ -$

GLS SFAD2 & Storefront - auto. double sliding door - Single pane EA -$ -$ -$ -$

GLS SFAF + Storefront - aluminum frame only LF -$ -$ -$ -$

GLS SFB & Storefront - bronze anodized frame - Single pane SF -$ -$ -$ -$

GLS SFB+ & Storefront - bronze anodized frame - Double pane SF -$ -$ -$ -$

GLS SFBC & Storefront - bronze frame - segmented (curved)-Single pane SF -$ -$ -$ -$

GLS SFBC+ & Storefront - bronze frame - segmented (curved)-Double SF -$ -$ -$ -$

pane

GLS SFDA & Storefront door - alum. anodized frame, 3'x7' -Single pane EA -$ -$ -$ -$

GLS SFDA+ & Storefront door - alum. anodized frame, 3'x7' -Double pane EA -$ -$ -$ -$

GLS SFDB & Storefront door - bronze anod. frame, 3'x7' - Single pane EA -$ -$ -$ -$

GLS SFDB+ & Storefront door - bronze anod. frame, 3'x7' - Double pane EA -$ -$ -$ -$

GLS SFDB> & Storefront door -bronze anod. frame, oversized-Single pane EA -$ -$ -$ -$

GLS SFDB>+ & Storefront door -bronze anod. frame, oversized-Double EA -$ -$ -$ -$

pane

GLS SFW & Storefront - hardwood veneer frame SF -$ -$ -$ -$

GLS SGLDR & Solid glass herculite door, 4' x 7' - 1/2" glass EA -$ -$ -$ -$

GLS SMOKE + Add on for tinted glass in windows SF -$ -$ -$ -$

GLS SOUND + Add on for sound rated glass panels SF -$ -$ -$ -$

GLS SPAN + Add on for spandrel glass SF -$ -$ -$ -$

GLS TEMP + Add on for tempered glass - per pane SF -$ -$ -$ -$

GLS TINT + Add on for tinted glass in windows SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

HMR ACARMV - Scrape off asbestos acoustic (popcorn) texture-no haul off SF -$ -$ -$ -$

HMR ASBEN + Apply asbestos fiber encapsulating compound SF -$ -$ -$ -$

HMR ASBRMD - Tear off asbestos drywall (no haul off) SF -$ -$ -$ -$

HMR ASBRMM - Remove asbestos floor mastic (no haul off) SF -$ -$ -$ -$

Page 88: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

HMR ASBRMS - Tear off asbestos siding (no haul off) SF -$ -$ -$ -$

HMR ASBRMV - Tear out asbestos vinyl floor covering (no haul off) SF -$ -$ -$ -$

HMR ASBRMVN - Tear off rigid asbestos shingles (no haul off) SQ -$ -$ -$ -$

HMR ASBT + Asbestos test fee - full service survey - base fee EA -$ -$ -$ -$

HMR ASBTPS + Asbestos test fee - full service survey - per sample EA -$ -$ -$ -$

HMR ASBTS + Asbestos test fee - self test (per sample) EA -$ -$ -$ -$

HMR AVARMV - Tear off asbestos acoustic ceiling tile (no haul off) SF -$ -$ -$ -$

HMR BAG + Plastic bag - used for disposal of contaminated items EA -$ -$ -$ -$

HMR BARR + Containment Barrier/Airlock/Decon. Chamber SF -$ -$ -$ -$

HMR BARRP + Containment Barrier - tension post - per day DA -$ -$ -$ -$

HMR BARRZ + Peel & seal zipper EA -$ -$ -$ -$

HMR BARRZ+ + Peel & seal zipper - heavy duty EA -$ -$ -$ -$

HMR BASEB - Tear out baseboard and bag for disposal LF -$ -$ -$ -$

HMR BIDITM + Hazardous Material Remediation (Bid Item) EA -$ -$ -$ -$

HMR CLNAV + Clean (V} SF -$ -$ -$ -$

HMR CLNAV- + Clean (VI - Light SF -$ -$ -$ -$

HMR CLNAV+ + Clean {VI - Heavy SF -$ -$ -$ -$

HMR CLNAVH + Additional cost for high wall or ceiling - Over 14' SF -$ -$ -$ -$

HMR CLNAVH< + Additional cost for high wall or ceiling - 11' to 14' SF -$ -$ -$ -$

HMR CLNJST + Clean floor or roof joist system SF -$ -$ -$ -$

HMR CLNJST+ + Clean floor or roof joist system - Heavy SF -$ -$ -$ -$

HMR CLNSTD + Clean stud wall SF -$ -$ -$ -$

HMR CLNSTD+ + Clean stud wall - Heavy SF -$ -$ -$ -$

HMR DRYW4S - Tear out wet drywall, cleanup, bag, per LF - to 4' - Cat 3 LF -$ -$ -$ -$

HMR DRYWG - Add-on cost for tearing out glued-on drywall SF -$ -$ -$ -$

HMR DRYWLS - Tear out wet drywall, cleanup, bag, per LF - to 2' - Cat 3 LF -$ -$ -$ -$

HMR DRYWS - Tear out wet drywall, cleanup, bag - Cat 3 SF -$ -$ -$ -$

HMR DUCT6 + Ducting - flexible - 6" round LF -$ -$ -$ -$

HMR EQD + Equipment decontamination charge - per piece of EA -$ -$ -$ -$

equipment

HMR EQDH + Equipment decontamination charge - HVY, per piece of EA -$ -$ -$ -$

equip

HMR EVAL + Hazardous Material/Mold Evaluation (Bid Item) EA -$ -$ -$ -$

HMR FCCGDS - Tear out wet non-salv. gluedn. cpt, cut/bag - Cat 3 water SF -$ -$ -$ -$

HMR FCCS - Tear out wet non-salvageable carpet, cut/bag - Cat 3 water SF -$ -$ -$ -$

HMR FCWLS - Tear out non-salv floating floor & bag - Category 3 water SF -$ -$ -$ -$

HMR FCWS - Tear out non-salv wood floor & bag - Category 3 water SF -$ -$ -$ -$

HMR FHEPA + Add for HEPA filter (for negative air exhaust fan) EA -$ -$ -$ -$

HMR FHEPA< + Add for HEPA filter (for canister/backpack vacuums) EA -$ -$ -$ -$

HMR FHEPA« + Add for HEPA filter (for upright vacuums) EA -$ -$ -$ -$

HMR FHEPA> + Add for HEPA filter (for neg. air machine/vacuum - Large) EA -$ -$ -$ -$

HMR FLCHM + Chemical gas and odor neutralization cartridge - 16" x 16" EA -$ -$ -$ -$

HMR FLCHM> + Chemical gas and odor neutralization cartridge - 24" x 24" EA -$ -$ -$ -$

HMR FLVAP + Carbon vapor filter (for air scrubber) - 16" x 16" EA -$ -$ -$ -$

HMR FLVAP> + Carbon vapor filter (for air scrubber) - 24" x 24" EA -$ -$ -$ -$

HMR GRM + Apply anti-microbial agent to {V} SF -$ -$ -$ -$

HMR GRMB + Apply plant-based anti-microbial agent to {V} SF -$ -$ -$ -$

HMR GRMBIO + Apply biological cleaning agent (spore-based) to {V} SF -$ -$ -$ -$

HMR GRMS + Apply mold/mildew stain remover to {V} SF -$ -$ -$ -$

HMR HBAG + Plastic bag - used for hazardous waste cleanup - Medium EA -$ -$ -$ -$

HMR HBAG< + Plastic bag - used for hazardous waste cleanup - Small EA -$ -$ -$ -$

HMR HBAG> + Plastic bag - used for hazardous waste cleanup - Large EA -$ -$ -$ -$

HMR HBOX + Box and liner - used for hazardous waste cleanup - Medium EA -$ -$ -$ -$

HMR HBOX< + Box and liner - used for hazardous waste cleanup - Small EA -$ -$ -$ -$

HMR HBOX> + Box and liner - used for hazardous waste cleanup - Large EA -$ -$ -$ -$

HMR HC14 + Plastic container - hazardous waste cleanup - 14 gl EA -$ -$ -$ -$

HMR HC30 + Plastic container - hazardous waste cleanup - 30 gl EA -$ -$ -$ -$

HMR HC60 + Plastic container - hazardous waste cleanup - 60 gl EA -$ -$ -$ -$

HMR HCON + Plastic container - hazardous waste cleanup - Medium EA -$ -$ -$ -$

HMR HCON< + Plastic container - hazardous waste cleanup - Small EA -$ -$ -$ -$

HMR HCON> + Plastic container - hazardous waste cleanup - Large EA -$ -$ -$ -$

HMR HEPAVAC + HEPA Vacuuming - hourly charge HR -$ -$ -$ -$

HMR HEPAVAL + HEPA Vacuuming - Light - (PER SF) SF -$ -$ -$ -$

HMR HEPAVAS + HEPA Vacuuming - Detailed - (PER SF) SF -$ -$ -$ -$

HMR HWD + Hazardous waste hauling & disposal - (Bid Item) EA -$ -$ -$ -$

Page 89: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

HMR INSCS - Tear out and bag wet insulation in confined space - Cat 3 SF -$ -$ -$ -$

HMR INSS - Tear out and bag wet insulation - Category 3 water SF -$ -$ -$ -$

HMR LABH + Hazardous Waste/Mold Cleaning Technician - per hour HR -$ -$ -$ -$

HMR LABHA + Hazardous Waste/Mold Cleaning Technician - after hours HR -$ -$ -$ -$

HMR LABHS + Hazardous Waste/Mold Cleaning- Supervisory/Admin- per HR -$ -$ -$ -$

hour

HMR LABHSA + Hazardous Waste/Mold Cleaning- Supervisory/Admin- HR -$ -$ -$ -$

after hr

HMR LEAD + Lead test fee - full service lead survey EA -$ -$ -$ -$

HMR LEADS + Lead test fee - self test (per sample) EA -$ -$ -$ -$

HMR LEADSS + Lead test - chemical solution - self test (per sample) EA -$ -$ -$ -$

HMR LEADSW + Lead swab test - self test (per sample) EA -$ -$ -$ -$

HMR LPS + Lead Paint Safety (Bid Item) EA -$ -$ -$ -$

HMR MN + Hazardous Waste/Mold Remediation - Labor Minimum EA -$ -$ -$ -$

HMR NAFAN + Negative air fan/Air scrubber (24 hr period) - No monit. DA -$ -$ -$ -$

HMR NAFAN> + Neg. air fan/Air scrub.-Large (per 24 hr period)-No monit. DA -$ -$ -$ -$

HMR NAFAN» + Neg. air fan/Air scrub.-XLrg (per 24 hr period)-No monit. DA -$ -$ -$ -$

HMR PADS - Tear out wet carpet pad, cut/bag - Category 3 water SF -$ -$ -$ -$

HMR PPE + Add for personal protective equipment (hazardous cleanup) EA -$ -$ -$ -$

HMR PPE+ + Add for personal protective equipment - Heavy duty EA -$ -$ -$ -$

HMR PPEB + Boots - waterproof latex - Disposable (per pair) EA -$ -$ -$ -$

HMR PPEE + Eye protection - plastic goggles - Disposable EA -$ -$ -$ -$

HMR PPEG6 + Personal protective gloves - Disposable (per pair) EA -$ -$ -$ -$

HMR PPEGHD + Personal protective gloves - Heavy duty (per pair) EA -$ -$ -$ -$

HMR PPERC + Respirator cartridge - HEPA only (per pair) EA -$ -$ -$ -$

HMR PPERCM + Respirator cartridge - HEPA & vapor & gas (per pair) EA -$ -$ -$ -$

HMR PPERCP + PAPR cartridge - HEPA only (single cartridge) EA -$ -$ -$ -$

HMR PPERCPM + PAPR cartridge - HEPA & vapor & gas (single cartridge) EA -$ -$ -$ -$

HMR PPERCPV + PAPR cartridge - vapor only (single cartridge) EA -$ -$ -$ -$

HMR PPERCV + Respirator cartridge - organic vapor & acid gas (per pair) EA -$ -$ -$ -$

HMR PPERF + Respirator - Full face - multi-purpose resp. (per day) DA -$ -$ -$ -$

HMR PPERH + Respirator - Half face - multi-purpose resp. (per day) DA -$ -$ -$ -$

HMR PPPAPR + Powered Air-Purifying Respirator (PAPR) - per day DA -$ -$ -$ -$

HMR PPSAR + Supply Air Respirator (SAR) - per day DA -$ -$ -$ -$

HMR PROT + Protect - Cover with plastic SF -$ -$ -$ -$

HMR PROTX + Protect - Cover with plastic - whole house SF -$ -$ -$ -$

HMR SANDF + Sand exposed framing - Floor SF -$ -$ -$ -$

HMR SANDW + Sand exposed framing - Walls SF -$ -$ -$ -$

HMR SSWR + Temporary safety shower EA -$ -$ -$ -$

HMR TACKS - Tear out tackless strip and bag for disposal - Category 3 LF -$ -$ -$ -$

HMR TRIM - Tear out trim and bag for disposal LF -$ -$ -$ -$

HMR TRIMT - Add-on for tearing out trim/base from tile/grout LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

HVC AC & Central air conditioning system - 3 ton - up to 13 SEER EA -$ -$ -$ -$

HVC AC+ & Central air conditioning system - 3 ton - 14-15 SEER EA -$ -$ -$ -$

HVC AC++ & Central air conditioning system - 3 ton - 16-21 SEER EA -$ -$ -$ -$

HVC AC< & Central air conditioning system - 2 ton - up to 13 SEER EA -$ -$ -$ -$

HVC AC<+ & Central air conditioning system - 2 ton - 14-15 SEER EA -$ -$ -$ -$

HVC AC<++ & Central air conditioning system - 2 ton - 16-21 SEER EA -$ -$ -$ -$

HVC AC<25 & Central air conditioning system - 2.5 ton - up to 13 SEER EA -$ -$ -$ -$

HVC AC<25+ & Central air conditioning system - 2.5 ton - 14-15 SEER EA -$ -$ -$ -$

HVC AC> & Central air conditioning system - 4 ton - up to 13 SEER EA -$ -$ -$ -$

HVC AC>+ & Central air conditioning system - 4 ton - 14-15 SEER EA -$ -$ -$ -$

HVC AC>++ & Central air conditioning system - 4 ton - 16-21 SEER EA -$ -$ -$ -$

HVC AC» & Central air conditioning system - 5 ton - up to 13 SEER EA -$ -$ -$ -$

HVC AC»+ & Central air conditioning system - 5 ton - 14-15 SEER EA -$ -$ -$ -$

HVC AC»++ & Central air conditioning system - 5 ton - 16-21 SEER EA -$ -$ -$ -$

HVC AC10 & Air conditioning unit, 10 ton - Commercial grade EA -$ -$ -$ -$

HVC AC15 & Air conditioning unit, 15 ton - Commercial grade EA -$ -$ -$ -$

HVC AC2 & Air conditioning unit, 2 ton - Commercial grade EA -$ -$ -$ -$

HVC AC20 & Air conditioning unit, 20 ton - Commercial grade EA -$ -$ -$ -$

HVC AC35 & Central air conditioning system - 3.5 ton - up to 13 SEER EA -$ -$ -$ -$

Page 90: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

HVC AC35+ & Central air conditioning system - 3.5 ton - 14-15 SEER EA -$ -$ -$ -$

HVC AC5 & Air conditioning unit, 5 ton - Commercial grade EA -$ -$ -$ -$

HVC AC8 & Air conditioning unit, 8 ton - Commercial grade EA -$ -$ -$ -$

HVC ACCN2+ & Central air - condenser unit - 2 ton - 14-15 SEER EA -$ -$ -$ -$

HVC ACCN2++ & Central air - condenser unit - 2 ton - 16-21 SEER EA -$ -$ -$ -$

HVC ACCN25 & Central air - condenser unit - 2.5 ton - up to 13 SEER EA -$ -$ -$ -$

HVC ACCN25+ & Central air - condenser unit - 2.5 ton - 14-15 SEER EA -$ -$ -$ -$

HVC ACCN3+ & Central air - condenser unit - 3 ton - 14-15 SEER EA -$ -$ -$ -$

HVC ACCN3++ & Central air - condenser unit - 3 ton - 16-21 SEER EA -$ -$ -$ -$

HVC ACCN35 & Central air - condenser unit - 3.5 ton - up to 13 SEER EA -$ -$ -$ -$

HVC ACCN35+ & Central air - condenser unit - 3.5 ton - 14-15 SEER EA -$ -$ -$ -$

HVC ACCN4+ & Central air - condenser unit - 4 ton - 14-15 SEER EA -$ -$ -$ -$

HVC ACCN4++ & Central air - condenser unit - 4 ton - 16-21 SEER EA -$ -$ -$ -$

HVC ACCN5+ & Central air - condenser unit - 5 ton - 14-15 SEER EA -$ -$ -$ -$

HVC ACCN5++ & Central air - condenser unit - 5 ton - 16-21 SEER EA -$ -$ -$ -$

HVC ACCND & Central air - condenser unit - 3 ton - up to 13 SEER EA -$ -$ -$ -$

HVC ACCND< & Central air - condenser unit - 2 ton - up to 13 SEER EA -$ -$ -$ -$

HVC ACCND> & Central air - condenser unit - 4 ton - up to 13 SEER EA -$ -$ -$ -$

HVC ACCND>> & Central air - condenser unit - 5 ton - up to 13 SEER EA -$ -$ -$ -$

HVC ACCNDRS + Central air - condenser unit - Detach & reset EA -$ -$ -$ -$

HVC ACCVR & Air conditioning cover EA -$ -$ -$ -$

HVC ACDXP & Central air - DX package system - 3 ton EA -$ -$ -$ -$

HVC ACFINC + A/C fin condenser cage (Bid Item) EA -$ -$ -$ -$

HVC ACFINN> + Comb/straighten a/c cond. fins - w/out trip charge - Large EA -$ -$ -$ -$

HVC ACFINS + Comb and straighten a/c condenser fins - with trip charge EA -$ -$ -$ -$

HVC ACFINS> + Comb/straighten a/c cond. fins - w/trip charge - Large EA -$ -$ -$ -$

HVC ACFINSN + Comb and straighten a/c condenser fins - w/out trip charge EA -$ -$ -$ -$

HVC ACM & Air conditioning unit - mobile home EA -$ -$ -$ -$

HVC ACP & Condenser pad - 24" x 24" EA -$ -$ -$ -$

HVC ACP> & Condenser pad - 36" x 36" EA -$ -$ -$ -$

HVC ACR + Central air cond. system - refrigerant only LB -$ -$ -$ -$

HVC ACRC + Central air cond. system - recharge - 101b refrigerant EA -$ -$ -$ -$

HVC ACRC< + Central air cond. system - recharge - 51b refrigerant EA -$ -$ -$ -$

HVC ACRC> + Central air cond. system - recharge - 131b refrigerant EA -$ -$ -$ -$

HVC ACRC» + Central air cond. system - recharge - 171b refrigerant EA -$ -$ -$ -$

HVC ACREV + Central air cond. system - refrigerant evacuation EA -$ -$ -$ -$

HVC ACRFD + Central air - filter drier repair - up to 16 cu. in. EA -$ -$ -$ -$

HVC ACRFD> + Central air - filter drier repair - 16.1 to 30 cu. in. EA -$ -$ -$ -$

HVC ACRPC + Central air - condenser repair - contactor - 30 amp EA -$ -$ -$ -$

HVC ACRPC> + Central air - condenser repair - contactor - 40 amp EA -$ -$ -$ -$

HVC ACRPCAP + Central air - condenser repair - capacitor EA -$ -$ -$ -$

HVC ACRPCC + Central air- condenser repair- capacitor & contactor 30amp EA -$ -$ -$ -$

HVC ACRPCC> + Central air- condenser repair- capacitor & contactor 40amp EA -$ -$ -$ -$

HVC ACRPCM + Central air - condenser repair - compressor EA -$ -$ -$ -$

HVC ACRPFAN + Central air - condenser repair - fan blade and guard EA -$ -$ -$ -$

HVC ACRPFG + Central air - condenser repair - fan guard EA -$ -$ -$ -$

HVC ACRPM + Central air - condenser repair - fan motor EA -$ -$ -$ -$

HVC ACSC & Air conditioning security cage EA -$ -$ -$ -$

HVC ACSC+ & Air conditioning security cage - High grade EA -$ -$ -$ -$

HVC ACTW & AC unit w/sleeve - through-wall/window - 8,000 BTU EA -$ -$ -$ -$

HVC ACTW< & AC unit w/sleeve - through-wall/window - 5,000 BTU EA -$ -$ -$ -$

HVC ACTW> & AC unit w/sleeve - through-wall/window - 12,000 BTU EA -$ -$ -$ -$

HVC ACTW» & AC unit w/sleeve - through-wall/window - 18,000 BTU EA -$ -$ -$ -$

HVC ACTWRS + AC unit w/sleeve - through wall - Detach & reset EA -$ -$ -$ -$

HVC AEXC & Air exchange system - Commercial EA -$ -$ -$ -$

HVC AEXR & Air exchange system - Residential EA -$ -$ -$ -$

HVC AFAN & Attic fan - whole house - installed EA -$ -$ -$ -$

HVC AFAN> & Attic fan - 36" diameter, 6,500 CFM EA -$ -$ -$ -$

HVC AFAN» & Attic fan - 48" diameter, 12,000 CFM EA -$ -$ -$ -$

HVC AH2 & Air handler - with heat element - 2 ton EA -$ -$ -$ -$

HVC AH3 & Air handler - with heat element - 3 ton EA -$ -$ -$ -$

HVC AH4 & Air handler - with heat element - 4 ton EA -$ -$ -$ -$

HVC AH5 & Air handler - with heat element - 5 ton EA -$ -$ -$ -$

HVC AHAC2 & Air handler - with A-coil - 2 ton EA -$ -$ -$ -$

HVC AHAC3 & Air handler - with A-coil - 3 ton EA -$ -$ -$ -$

Page 91: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

HVC AHAC4 & Air handler - with A-coil - 4 ton EA -$ -$ -$ -$

HVC AHAC5 & Air handler - with A-coil - 5 ton EA -$ -$ -$ -$

HVC AHH2 & Air handler - with heat element and A/C coil - 2 ton EA -$ -$ -$ -$

HVC AHH3 & Air handler - with heat element and A/C coil - 3 ton EA -$ -$ -$ -$

HVC AHH4 & Air handler - with heat element and A/C coil - 4 ton EA -$ -$ -$ -$

HVC AHH5 & Air handler - with heat element and A/C coil - 5 ton EA -$ -$ -$ -$

HVC AHHACRS + Air handler - with A-coil - Detach & reset EA -$ -$ -$ -$

HVC AHHE + Electric heat element - 10 kilowatt EA -$ -$ -$ -$

HVC AHHK & Air handler hanging kit with drip pan EA -$ -$ -$ -$

HVC AHRS + Air handler - with heat element - Detach & reset EA -$ -$ -$ -$

HVC AIRE & Electronic air cleaner - in-duct EA -$ -$ -$ -$

HVC ATB + Test & Balance - HVAC system SF -$ -$ -$ -$

HVC ATBHW + Test & Balance - HVAC system - (hot water) SF -$ -$ -$ -$

HVC ATBLS + Test & Balance - HVAC system (under 20,000 sf) SF -$ -$ -$ -$

HVC BBHC3 & Baseboard heat cover - steam/hot water - 12"- 36" long EA -$ -$ -$ -$

HVC BBHC5 & Baseboard heat cover - steam/hot water - 37"- 60" long EA -$ -$ -$ -$

HVC BBHC7 & Baseboard heat cover - steam/hot water - 61"- 84" long EA -$ -$ -$ -$

HVC BBHC8 & Baseboard heat cover - steam/hot water - over 85" long EA -$ -$ -$ -$

HVC BBHSCRS + Baseboard heat - steam/hot wtr cover only - Detach & reset EA -$ -$ -$ -$

HVC BBHST & Baseboard heat - steam or hot water LF -$ -$ -$ -$

HVC BBHSTRS + Baseboard heat - steam or hot water - Detach & reset LF -$ -$ -$ -$

HVC BFAN & Box fan - wall ventilator - 50" (w/louvers) EA -$ -$ -$ -$

HVC BIDITM + Heat, Vent, & Air Conditioning (Bid Item) EA -$ -$ -$ -$

HVC BLR & Boiler - natural gas - 130,000 BTU EA -$ -$ -$ -$

HVC BLR< & Boiler - natural gas - 62,000 BTU EA -$ -$ -$ -$

HVC BLR> & Boiler - natural gas - 165,000 BTU EA -$ -$ -$ -$

HVC BLR>> & Boiler - natural gas - 200,000 BTU EA -$ -$ -$ -$

HVC BLR90 & Boiler - natural gas - 90,000 to 95,000 BTU EA -$ -$ -$ -$

HVC BLRE & Boiler - 109 MBH - electric - steam or hot water EA -$ -$ -$ -$

HVC BLRE< & Boiler - 55 MBH - electric, steam or hot water EA -$ -$ -$ -$

HVC BLRE> & Boiler - 218 MBH - electric, steam or hot water EA -$ -$ -$ -$

HVC BLRE» & Boiler - 328 MBH - electric, steam or hot water EA -$ -$ -$ -$

HVC BLRG & Boiler - 554 MBH - natural gas EA -$ -$ -$ -$

HVC BLRG< & Boiler - 320 MBH - natural gas EA -$ -$ -$ -$

HVC BLRG> & Boiler - 801 MBH - natural gas EA -$ -$ -$ -$

HVC BLRG» & Boiler - 1047 MBH - natural gas EA -$ -$ -$ -$

HVC BLRO & Boiler - oil fired - 130,000 BTU EA -$ -$ -$ -$

HVC BLRO< & Boiler - oil fired - 62,000 BTU EA -$ -$ -$ -$

HVC BLRO> & Boiler - oil fired - 165,000 BTU EA -$ -$ -$ -$

HVC BLRO» & Boiler - oil fired - 200,000 BTU EA -$ -$ -$ -$

HVC BLR090 & Boiler - oil fired - 90,000 to 97,000 BTU EA -$ -$ -$ -$

HVC BLRRS + Boiler unit - Detach & reset EA -$ -$ -$ -$

HVC BVENT & Bathroom ventilation fan EA -$ -$ -$ -$

HVC BVENT- & Bathroom ventilation fan - Standard grade EA -$ -$ -$ -$

HVC BVENT+ & Bathroom ventilation fan - High grade EA -$ -$ -$ -$

HVC BVENT++ & Bathroom ventilation fan - Premium grade EA -$ -$ -$ -$

HVC BVENTRS + Bathroom ventilation fan - Detach & reset EA -$ -$ -$ -$

HVC BVHTRS + Bathroom ventilation fan light and heater - Detach & reset EA -$ -$ -$ -$

HVC BVLHT & Bathroom ventilation fan, light, and heater EA -$ -$ -$ -$

HVC BVLHT< & Bathroom ventilation fan, light, and heater - Small EA -$ -$ -$ -$

HVC BVLHT> & Bathroom ventilation fan, light, and heater - Large EA -$ -$ -$ -$

HVC BVLIT & Bathroom ventilation fan w/light EA -$ -$ -$ -$

HVC BVLIT- & Bathroom ventilation fan w/light - Standard grade EA -$ -$ -$ -$

HVC BVLIT+ & Bathroom ventilation fan w/light - High grade EA -$ -$ -$ -$

HVC BVLIT++ & Bathroom ventilation fan w/light - Premium grade EA -$ -$ -$ -$

HVC CA & Cold air return cover EA -$ -$ -$ -$

HVC CA< & Cold air return cover - Small EA -$ -$ -$ -$

HVC CA> & Cold air return cover - Large EA -$ -$ -$ -$

HVC CA>> & Cold air return cover - Extra large EA -$ -$ -$ -$

HVC CARS + Cold air return cover - Detach & reset EA -$ -$ -$ -$

HVC CCWA & Cooling system - chilled water (Air cooled) - Commercial SF -$ -$ -$ -$

HVC CCWW & Cooling system - chilled water (Water cooled) - SF -$ -$ -$ -$

Commercial

HVC CDXP & Cooling system - DX coil (Packaged) - Commercial SF -$ -$ -$ -$

HVC CDXS & Cooling system - DX coil (Split system) - Commercial SF -$ -$ -$ -$

Page 92: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

HVC CED & Cooling system - evaporative cooling (Non-ducted) - SF -$ -$ -$ -$

Comm.

HVC CEI & Cooling system - evaporative cooling (Ducted) - SF -$ -$ -$ -$

Commercial

HVC CHPP & Cooling system - heat pump cooling (Packaged) - SF -$ -$ -$ -$

Commercial

HVC COIL2 & Coil - 2 ton - cased EA -$ -$ -$ -$

HVC COIL3 & Coil - 3 ton - cased EA -$ -$ -$ -$

HVC COIL4 & Coil - 4 ton - cased EA -$ -$ -$ -$

HVC COILS & Coil - 5 ton - cased EA -$ -$ -$ -$

HVC COILRS + Coil - Detach & reset EA -$ -$ -$ -$

HVC CPUMP & Condensate drain pump EA -$ -$ -$ -$

HVC CURB + Retrofit curb EA -$ -$ -$ -$

HVC CURB> + Retrofit curb - large EA -$ -$ -$ -$

HVC CURB» + Retrofit curb - extra large EA -$ -$ -$ -$

HVC DCR & Ductwork - hot or cold air LF -$ -$ -$ -$

HVC DCR> & Ductwork - hot or cold air - Large size LF -$ -$ -$ -$

HVC DCR» & Ductwork - hot or cold air - Extra large size LF -$ -$ -$ -$

HVC DCT & Ductwork system - hot or cold air - 1200 to 1599 SF home EA -$ -$ -$ -$

HVC DCT< & Ductwork system - hot or cold air - 901 to 1199 SF home EA -$ -$ -$ -$

HVC DCT« & Ductwork system - hot or cold air - up to 900 SF home EA -$ -$ -$ -$

HVC DCT> & Ductwork system - hot or cold air - 1600 to 2199 SF home EA -$ -$ -$ -$

HVC DCT» & Ductwork system - hot or cold air - 2200 to 2500 SF home EA -$ -$ -$ -$

HVC DCTA + Ductwork - aluminum (per pound) LB -$ -$ -$ -$

HVC DCTF10 & Ductwork - flexible - insulated - 10" round LF -$ -$ -$ -$

HVC DCTF12 & Ductwork - flexible - insulated - 12" round LF -$ -$ -$ -$

HVC DCTF4 & Ductwork - flexible - insulated - 4" round LF -$ -$ -$ -$

HVC DCTF6 & Ductwork - flexible - insulated - 6" round LF -$ -$ -$ -$

HVC DCTF7 & Ductwork - flexible - insulated - 7" round LF -$ -$ -$ -$

HVC DCTF8 & Ductwork - flexible - insulated - 8" round LF -$ -$ -$ -$

HVC DCTFN3 & Ductwork - flexible - non-insulated - 3" round LF -$ -$ -$ -$

HVC DCTFN4 & Ductwork - flexible - non-insulated - 4" round LF -$ -$ -$ -$

HVC DCTFN6 & Ductwork - flexible - non-insulated - 6" round LF -$ -$ -$ -$

HVC DCTG & Ductwork - galvanized (per pound) LB -$ -$ -$ -$

HVC DCTLF & Ductwork - hot or cold air - 6" round LF -$ -$ -$ -$

HVC DCTLF< & Ductwork - hot or cold air - 4" round LF -$ -$ -$ -$

HVC DCTLF> & Ductwork - hot or cold air - Large size LF -$ -$ -$ -$

HVC DCTLF>> & Ductwork - hot or cold air - Extra large size LF -$ -$ -$ -$

HVC DCTLF10 & Ductwork - hot or cold air - 10" round LF -$ -$ -$ -$

HVC DCTLF12 & Ductwork - hot or cold air - 12" round LF -$ -$ -$ -$

HVC DCTLF7 & Ductwork - hot or cold air - 7" round LF -$ -$ -$ -$

HVC DCTLF8 & Ductwork - hot or cold air - 8" round LF -$ -$ -$ -$

HVC DCTLN + Duct liner - mineral fiber insulation - 1" SF -$ -$ -$ -$

HVC DCTLN< + Duct liner - mineral fiber insulation - 1/2" SF -$ -$ -$ -$

HVC DCTLRS + Ductwork - small - hot or cold air - Detach & reset LF -$ -$ -$ -$

HVC DCTLRS> + Ductwork - large - hot or cold air - Detach & reset LF -$ -$ -$ -$

HVC DCTM & Ductwork - complete under floor system - mobile home EA -$ -$ -$ -$

HVC DCTPL & Ductwork - Mechanical room - Plenum & Return air EA -$ -$ -$ -$

HVC DCTPLI & Ductwork - Mech. room - Plenum & Return air - Insulated EA -$ -$ -$ -$

HVC DCTR & Ductwork system - hot and cold air (per run) EA -$ -$ -$ -$

HVC DCTRI & Ductwork system - hot and cold air (per run) - Insulated EA -$ -$ -$ -$

HVC DCTRM & Ductwork - hot or cold air (per room) EA -$ -$ -$ -$

HVC DCTRM+ & Ductwork in crawl space - hot or cold air (per room) EA -$ -$ -$ -$

HVC DCTRMI & Ductwork - hot or cold air (per room) - Insulated EA -$ -$ -$ -$

HVC DCTS10 & Ductwork - spiral - 10" diameter - 26 gauge LF -$ -$ -$ -$

HVC DCTS12 & Ductwork - spiral - 12" diameter - 26 gauge LF -$ -$ -$ -$

HVC DCTS14 & Ductwork - spiral - 14" diameter - 26 gauge LF -$ -$ -$ -$

HVC DCTS16 & Ductwork - spiral - 16" diameter - 24 gauge LF -$ -$ -$ -$

HVC DCTS18 & Ductwork - spiral - 18" diameter - 24 gauge LF -$ -$ -$ -$

HVC DCTS20 & Ductwork - spiral - 20" diameter - 24 gauge LF -$ -$ -$ -$

HVC DCTS22 & Ductwork - spiral - 22" diameter - 24 gauge LF -$ -$ -$ -$

HVC DCTS24 & Ductwork - spiral - 24" diameter - 24 gauge LF -$ -$ -$ -$

HVC DCTS6 & Ductwork - spiral - 6" diameter - 26 gauge LF -$ -$ -$ -$

HVC DCTS8 & Ductwork - spiral - 8" diameter - 26 gauge LF -$ -$ -$ -$

HVC DCTSF12 + Ductwork - spiral - fitting - up to 12" diameter EA -$ -$ -$ -$

Page 93: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

HVC DCTSF18 + Ductwork - spiral - fitting - 13" to 18" diameter EA -$ -$ -$ -$

HVC DCTSF24 + Ductwork - spiral - fitting - 19" to 24" diameter EA -$ -$ -$ -$

HVC DCTSRS + Ductwork - spiral - 13" to 18" diameter - Detach & reset LF -$ -$ -$ -$

HVC DCTSRS< + Ductwork - spiral - up to 12" diameter - Detach & reset LF -$ -$ -$ -$

HVC DCTSRS> + Ductwork - spiral - 19" to 24" diameter - Detach & reset LF -$ -$ -$ -$

HVC DCTST12 + Ductwork - spiral - tee/branch - up to 12" diameter EA -$ -$ -$ -$

HVC DCTST18 + Ductwork - spiral - tee/branch - 13" to 18" diameter EA -$ -$ -$ -$

HVC DCTST24 + Ductwork - spiral - tee/branch - 19" to 24" diameter EA -$ -$ -$ -$

HVC DIFC & Ceiling diffusers/grills - circular - 8"-10" diameter EA -$ -$ -$ -$

HVC DIFC‹ & Ceiling diffusers/grills - circular - 6" diameter EA -$ -$ -$ -$

HVC DIFC> & Ceiling diffusers/grills - circular - 12"-15" diameter EA -$ -$ -$ -$

HVC DIFC» & Ceiling diffusers/grills - circular - 18" diameter EA -$ -$ -$ -$

HVC DIFSL & Ceiling diffuser - square, lay-in - 24" EA -$ -$ -$ -$

HVC DMPC & Damper - motorized - up to 8" diameter EA -$ -$ -$ -$

HVC DMPC> & Damper - motorized - 9"-14" diameter EA -$ -$ -$ -$

HVC DMPC» & Damper - motorized - 15'"-18" diameter EA -$ -$ -$ -$

HVC DMPR & Damper - motorized - up to 100 square inches EA -$ -$ -$ -$

HVC DMPR> & Damper - motorized - 101-252 square inches EA -$ -$ -$ -$

HVC DMPR» & Damper - motorized - 253-360 square inches EA -$ -$ -$ -$

HVC DRNL & Condensate drain line EA -$ -$ -$ -$

HVC DVENT & Clothes dryer vent - installed EA -$ -$ -$ -$

HVC DVENTC & Clothes dryer vent - Commercial - installed EA -$ -$ -$ -$

HVC DVENTHD & Clothes dryer vent cover EA -$ -$ -$ -$

HVC DVNTCRS + Clothes dryer vent cover - Detach & reset EA -$ -$ -$ -$

HVC DVTCC & Direct vent termination cap - copper EA -$ -$ -$ -$

HVC DVTCG & Direct vent termination cap - galvanized EA -$ -$ -$ -$

HVC DVTCSS & Direct vent termination cap - stainless steel EA -$ -$ -$ -$

HVC EC & Evaporative cooler - 5200 cfm EA -$ -$ -$ -$

HVC EC< & Evaporative cooler - 4500 cfm EA -$ -$ -$ -$

HVC EC> & Evaporative cooler - 6600 cfm EA -$ -$ -$ -$

HVC EC>> & Evaporative cooler - 7200 cfm EA -$ -$ -$ -$

HVC EC340 & Evaporative condenser - 340 ton EA -$ -$ -$ -$

HVC ECCON & Evaporative cooler controls EA -$ -$ -$ -$

HVC ECDCT & Evaporative cooler ductwork LF -$ -$ -$ -$

HVC ECDIF & Evaporative cooler diffuser EA -$ -$ -$ -$

HVC ECRS + Evaporative cooler - Detach & reset EA -$ -$ -$ -$

HVC ECSL & Evaporative cooler supply line LF -$ -$ -$ -$

HVC EFAN & Exhaust fan - large room EA -$ -$ -$ -$

HVC ETNK & Expansion tank - for boiler system up to 80 gallon EA -$ -$ -$ -$

HVC EXCFN & Exhaust fan - cone style 36" 6 blade, galvanized EA -$ -$ -$ -$

HVC EXCFN> & Exhaust fan - cone style 42" 6 blade, galvanized EA -$ -$ -$ -$

HVC EXCFN>> & Exhaust fan - cone style 48" 6 blade, galvanized EA -$ -$ -$ -$

HVC EXFAN & Attic fan - 36" diameter, 12,100 CFM EA -$ -$ -$ -$

HVC EXFAN> & Attic fan - 42" diameter, 15,900 CFM EA -$ -$ -$ -$

HVC EXFAN>> & Attic fan - 48" diameter, 21,100 CFM EA -$ -$ -$ -$

HVC EXFD & Exhaust fan vent doors EA -$ -$ -$ -$

HVC EXSFN & Exhaust fan - slant wall - 36" - 3 blade EA -$ -$ -$ -$

HVC EXSFN> & Exhaust fan - slant wall - 46" - 3 blade EA -$ -$ -$ -$

HVC EXSFN>> & Exhaust fan - slant wall - 48" - 3 blade EA -$ -$ -$ -$

HVC FDVENT & Foundation vent - installed in wood framing EA -$ -$ -$ -$

HVC FDVENT+ & Foundation vent - installed in masonry block/brick EA -$ -$ -$ -$

HVC FIRED + Fire damper in wall - 2' x 2' - spring actuated EA -$ -$ -$ -$

HVC FIRED+ + Fire damper in wall - 2' x 2' - motorized EA -$ -$ -$ -$

HVC FLUSH + Boiler unit - flush and recharge EA -$ -$ -$ -$

HVC FRCLN + Furnace - check, clean, replace filters and service EA -$ -$ -$ -$

HVC FRCLN+ + Furnace - check, heavy clean, replace filters and service EA -$ -$ -$ -$

HVC FRCLNAC + Furnace - heavy clean, replace filters and service - w/ AC EA -$ -$ -$ -$

HVC FRF & Furnace - floor - up to 50,000 BTU EA -$ -$ -$ -$

HVC FRF< & Furnace - floor - up to 35,000 BTU EA -$ -$ -$ -$

HVC FRF> & Furnace - floor - up to 65,000 BTU EA -$ -$ -$ -$

HVC FRFA & Furnace - forced air - 100,000 BTU EA -$ -$ -$ -$

HVC FRFA< & Furnace - forced air - 60 - 75,000 BTU EA -$ -$ -$ -$

HVC FRFA> & Furnace - forced air - 125,000 BTU EA -$ -$ -$ -$

HVC FRFA>> & Furnace - forced air - 140,000 BTU EA -$ -$ -$ -$

HVC FRFAH & Furnace - forced air - high efficiency - 75,000 BTU EA -$ -$ -$ -$

Page 94: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

HVC FRFAH< & Furnace - forced air - high efficiency - 65,000 BTU EA -$ -$ -$ -$

HVC FRFAH> & Furnace - forced air - high efficiency - 100,000 BTU EA -$ -$ -$ -$

HVC FRFAH>> & Furnace - forced air - high efficiency - 120,000 BTU EA -$ -$ -$ -$

HVC FRFAH35 & Furnace - forced air - high efficiency - 135,000 BTU EA -$ -$ -$ -$

HVC FRFARS + Furnace - forced air - Detach & reset EA -$ -$ -$ -$

HVC FRFRS + Furnace - floor - Detach & reset EA -$ -$ -$ -$

HVC FRHZ & Furnace - horizontal - forced air - 48 - 75,000 BTU EA -$ -$ -$ -$

HVC FRHZ> & Furnace - horizontal - forced air - 80,000 BTU EA -$ -$ -$ -$

HVC FRHZ>> & Furnace - horizontal - forced air - 100,000 BTU EA -$ -$ -$ -$

HVC FRHZ135 & Furnace - horizontal - forced air - 135,000 BTU EA -$ -$ -$ -$

HVC FRHZ150 & Furnace - horizontal - forced air - 150,000 BTU EA -$ -$ -$ -$

HVC FRHZH & Furnace - horizontal - forced air - high effic. 60,000 BTU EA -$ -$ -$ -$

HVC FRHZH> & Furnace - horizontal - forced air - high effic. 80,000 BTU EA -$ -$ -$ -$

HVC FRHZH>> & Furnace - horizontal - forced air - high effic. 95,000 BTU EA -$ -$ -$ -$

HVC FRHZH20 & Furnace - horizontal - forced air - high effic.120,000 BTU EA -$ -$ -$ -$

HVC FRHZH35 & Furnace - horizontal - forced air - high effic.135,000 BTU EA -$ -$ -$ -$

HVC FRHZRS + Furnace - horizontal - forced air - Detach & reset EA -$ -$ -$ -$

HVC FRM & Furnace - 47,000 BTU - mobile home EA -$ -$ -$ -$

HVC FRM+ & Furnace - 47,000 BTU - AC ready - mobile home EA -$ -$ -$ -$

HVC FRM> & Furnace - 56,000 BTU - mobile home EA -$ -$ -$ -$

HVC FRM>+ & Furnace - 56,000 BTU - AC ready - mobile home EA -$ -$ -$ -$

HVC FRM>>+ & Furnace - 72,000 BTU - AC ready - mobile home EA -$ -$ -$ -$

HVC FRMH & Furnace - 56,000 BTU - mobile home - AC ready, high EA -$ -$ -$ -$

effic.

HVC FRMH> & Furnace - 72,000 BTU - mobile home - AC ready, high EA -$ -$ -$ -$

effic.

HVC FRMH» & Furnace - 95,000 BTU - mobile home - AC ready, high EA -$ -$ -$ -$

effic.

HVC FRMH>» & Furnace - 114,000 BTU - mobile home - AC ready, high eff. EA -$ -$ -$ -$

HVC FRW & Furnace - wall - single, 35,000 BTU EA -$ -$ -$ -$

HVC FT & Air exchange system - residential EA -$ -$ -$ -$

HVC GHPH2 + Geothermal heating and cooling system - horizontal - 2 ton EA -$ -$ -$ -$

HVC GHPH3 + Geothermal heating and cooling system - horizontal - 3 ton EA -$ -$ -$ -$

HVC GHPH4 + Geothermal heating and cooling system - horizontal - 4 ton EA -$ -$ -$ -$

HVC GHPH5 + Geothermal heating and cooling system - horizontal - 5 ton EA -$ -$ -$ -$

HVC GHPH6 + Geothermal heating and cooling system - horizontal - 6 ton EA -$ -$ -$ -$

HVC GHPV2 + Geothermal heating and cooling system - vertical - 2 ton EA -$ -$ -$ -$

HVC GHPV3 + Geothermal heating and cooling system - vertical - 3 ton EA -$ -$ -$ -$

HVC GHPV4 + Geothermal heating and cooling system - vertical - 4 ton EA -$ -$ -$ -$

HVC GHPV5 + Geothermal heating and cooling system - vertical - 5 ton EA -$ -$ -$ -$

HVC GHPV6 + Geothermal heating and cooling system - vertical - 6 ton EA -$ -$ -$ -$

HVC GRNHEC & Greenhouse - cooling panel system LF -$ -$ -$ -$

HVC HBHC & Heating syst. - gas boiler - hydronic coil (Ducted) - Comm SF -$ -$ -$ -$

HVC HBRPS & Heating system - boiler - radiant piping (Steam) - Comm SF -$ -$ -$ -$

HVC HBRPW & Heating syst. - boiler - radiant piping (Hot water) - Comm SF -$ -$ -$ -$

HVC HC10 & Heating and cooling unit - 10 ton, 260 MBH EA -$ -$ -$ -$

HVC HC2 & Heating and cooling unit - 2 ton, 80 MBH EA -$ -$ -$ -$

HVC HC20 & Heating and cooling unit - 20 ton, 400 MBH EA -$ -$ -$ -$

HVC HC5 & Heating and cooling unit - 5 ton, 140 MBH EA -$ -$ -$ -$

HVC HCCRU & Heating and cooling system - computer room cooling unit SF -$ -$ -$ -$

HVC HCDD & Heat/Cool syst. - constant volume - dual duct - Commercial SF -$ -$ -$ -$

HVC HCFC & Heating and cooling system - fan coils - Commercial SF -$ -$ -$ -$

HVC HCFS & Heating and cooling system - furnaces - Commercial SF -$ -$ -$ -$

HVC HCHP & Heating and cooling system - heat pump - Commercial SF -$ -$ -$ -$

HVC HCMAU & Heating/Cooling syst. - modular make-up air unit - Comm. SF -$ -$ -$ -$

HVC HCMZ & Heating/Cooling syst. - constant vol. - multi zone - Comm SF -$ -$ -$ -$

HVC HCPTAC & Heating and cooling system - wall mounted unit - Comm SF -$ -$ -$ -$

HVC HCRTU & Heating/Cooling syst. - packaged roof mounted unit - SF -$ -$ -$ -$

Comm

HVC HC SP1 & Duct-free split system - 1 zone EA -$ -$ -$ -$

HVC HCSP1+ & Duct-free split system - 1 zone - High efficiency EA -$ -$ -$ -$

HVC HCSP2 & Duct-free split system - 2 zone EA -$ -$ -$ -$

HVC HCSP2+ & Duct-free split system - 2 zone - High efficiency EA -$ -$ -$ -$

HVC HCSP3 & Duct-free split system - 3 zone EA -$ -$ -$ -$

HVC HCSP3+ & Duct-free split system - 3 zone - High efficiency EA -$ -$ -$ -$

Page 95: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

HVC HCSP4 & Duct-free split system - 4 zone EA -$ -$ -$ -$

HVC HCSP4+ & Duct-free split system - 4 zone - High efficiency EA -$ -$ -$ -$

HVC HCSZ & Heating/Cooling syst. - constant vol. - single zone - Comm SF -$ -$ -$ -$

HVC HCVAV & Heating and cooling system - variable volume - SF -$ -$ -$ -$

Commercial

HVC HEC & Heating system - electric coil (Ducted) - Commercial SF -$ -$ -$ -$

HVC HGFD & Heating system - gas/oil fired (Non-ducted) - Commercial SF -$ -$ -$ -$

HVC HGFI & Heating system - gas/oil fired (Ducted) - Commercial SF -$ -$ -$ -$

HVC HHPE & Heating system - heat pump - elec. (Non-ducted) - Comm. SF -$ -$ -$ -$

HVC HMF & Humidifier unit EA -$ -$ -$ -$

HVC HMF< & Humidifier unit - Small EA -$ -$ -$ -$

HVC HMF> & Humidifier unit - Large EA -$ -$ -$ -$

HVC HMF>> & Humidifier unit - Extra large EA -$ -$ -$ -$

HVC HMFRS + Humidifier unit - Detach & reset EA -$ -$ -$ -$

HVC HPC2 & Heat pump - exterior coil unit - 2 ton - 13 SEER EA -$ -$ -$ -$

HVC HPC2+ & Heat pump - exterior coil unit - 2 ton - 14 SEER EA -$ -$ -$ -$

HVC HPC2++ & Heat pump - exterior coil unit - 2 ton - 15-16 SEER EA -$ -$ -$ -$

HVC HPC3 & Heat pump - exterior coil unit - 3 ton - 13 SEER EA -$ -$ -$ -$

HVC HPC3+ & Heat pump - exterior coil unit - 3 ton - 14 SEER EA -$ -$ -$ -$

HVC HPC3++ & Heat pump - exterior coil unit - 3 ton - 15-16 SEER EA -$ -$ -$ -$

HVC HPC4 & Heat pump - exterior coil unit - 4 ton - 13 SEER EA -$ -$ -$ -$

HVC HPC4+ & Heat pump - exterior coil unit - 4 ton - 14 SEER EA -$ -$ -$ -$

HVC HPC4++ & Heat pump - exterior coil unit - 4 ton - 15-16 SEER EA -$ -$ -$ -$

HVC HPC5 & Heat pump - exterior coil unit - 5 ton - 13 SEER EA -$ -$ -$ -$

HVC HPC5+ & Heat pump - exterior coil unit - 5 ton - 14 SEER EA -$ -$ -$ -$

HVC HPC5++ & Heat pump - exterior coil unit - 5 ton - 15-16 SEER EA -$ -$ -$ -$

HVC HPCRS + Heat pump - exterior coil unit - Detach & reset EA -$ -$ -$ -$

HVC HPR10 & Heat pump, roof mounted - 10 ton, 120 MBH EA -$ -$ -$ -$

HVC HPR15 & Heat pump, roof mounted - 15 ton, 180 MBH EA -$ -$ -$ -$

HVC HPR20 & Heat pump, roof mounted - 20 ton, 240 MBH EA -$ -$ -$ -$

HVC HPR8 & Heat pump, roof mounted - 8 ton, 90 MBH EA -$ -$ -$ -$

HVC HPRU2 & Reversible cycle heat pump - packaged unit - 2 ton 14 EA -$ -$ -$ -$

SEER

HVC HPRU3 & Reversible cycle heat pump - packaged unit - 3 ton 14 EA -$ -$ -$ -$

SEER

HVC HPRU3+ & Reversible cycle heat pump - packaged unit - 3 ton 16 EA -$ -$ -$ -$

SEER

HVC HPRU4 & Reversible cycle heat pump - packaged unit - 4 ton 14 EA -$ -$ -$ -$

SEER

HVC HPRU4+ & Reversible cycle heat pump - packaged unit - 4 ton 16 EA -$ -$ -$ -$

SEER

HVC HPRU5 & Reversible cycle heat pump - packaged unit - 5 ton 14 EA -$ -$ -$ -$

SEER

HVC HPRU5+ & Reversible cycle heat pump - packaged unit - 5 ton 16 EA -$ -$ -$ -$

SEER

HVC HPRURS + Reversible cycle heat pump -packaged unit - Detach & EA -$ -$ -$ -$

reset

HVC HPW2 & Heat pump, through wall unit - 2 ton, 26 MBH EA -$ -$ -$ -$

HVC HPW3 & Heat pump, through wall unit - 3 ton, 37 MBH EA -$ -$ -$ -$

HVC HPW4 & Heat pump, through wall unit - 4 ton, 52 MBH EA -$ -$ -$ -$

HVC HPW5 & Heat pump, through wall unit - 5 ton, 61 MBH EA -$ -$ -$ -$

HVC HTRU & Under-cabinet / kickspace heater - hydronic EA -$ -$ -$ -$

HVC HTRU> & Under-cabinet / kickspace heater - hydronic - Large EA -$ -$ -$ -$

HVC IDCT & Insulated duct - 1" wall SF -$ -$ -$ -$

HVC IDCT- & Insulated duct - 1/2" wall SF -$ -$ -$ -$

HVC IDCT12 & Insulated duct - 12" diameter, 24 gauge LF -$ -$ -$ -$

HVC IDCT20 & Insulated duct - 20" diameter, 24 gauge LF -$ -$ -$ -$

HVC IDCT30 & Insulated duct - 30" diameter, 22 gauge LF -$ -$ -$ -$

HVC IDCT4 & Insulated duct - 4" diameter, 26 gauge LF -$ -$ -$ -$

HVC IDCT42 & Insulated duct - 42" diameter, 20 gauge LF -$ -$ -$ -$

HVC IDCT8 & Insulated duct - 8" diameter, 26 gauge LF -$ -$ -$ -$

HVC IDCTL & Insulated ductwork - 1" wall - large size LF -$ -$ -$ -$

HVC IDCTL- & Insulated ductwork - 1/2" wall - large size LF -$ -$ -$ -$

HVC IDCTL> & Insulated ductwork - 1" wall - extra large size LF -$ -$ -$ -$

HVC IDCTL>- & Insulated ductwork - 1/2" wall - extra large size LF -$ -$ -$ -$

Page 96: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

HVC IRDHU & Ice rink - Dehumidifier EA -$ -$ -$ -$

HVC LAB + HVAC Technician - per hour HR -$ -$ -$ -$

HVC LABL + HVAC - General Laborer - per hour HR -$ -$ -$ -$

HVC LIN30 & Refrigerant lineset - 3/8" x 3/4" tubing - up to 30' EA -$ -$ -$ -$

HVC LIN30> & Refrigerant lineset - 3/8" x 1" tubing - up to 30' EA -$ -$ -$ -$

HVC LINES> & Refrigerant lineset - 3/8" x 1" tubing - 31' to 50' EA -$ -$ -$ -$

HVC LINESET & Refrigerant lineset - 3/8" x 3/4" tubing - 31' to 50' EA -$ -$ -$ -$

HVC LVR & Gable end louver - 30" x 30" EA -$ -$ -$ -$

HVC MN + Heat, Vent, & Air Conditioning - Labor Minimum EA -$ -$ -$ -$

HVC NAILP + Nail plate EA -$ -$ -$ -$

HVC NAILP> + Nail plate - Large EA -$ -$ -$ -$

HVC PAC2 & Packaged air conditioning unit - 2 ton 13 SEER EA -$ -$ -$ -$

HVC PAC2+ & Packaged air conditioning unit - 2 ton 14-16 SEER EA -$ -$ -$ -$

HVC PAC25 & Packaged air conditioning unit - 2.5 ton 13 SEER EA -$ -$ -$ -$

HVC PAC25+ & Packaged air conditioning unit - 2.5 ton 14-16 SEER EA -$ -$ -$ -$

HVC PAC3 & Packaged air conditioning unit - 3 ton 13 SEER EA -$ -$ -$ -$

HVC PAC3+ & Packaged air conditioning unit - 3 ton 14-16 SEER EA -$ -$ -$ -$

HVC PAC35 & Packaged air conditioning unit - 3.5 ton 13 SEER EA -$ -$ -$ -$

HVC PAC35+ & Packaged air conditioning unit - 3.5 ton 14-16 SEER EA -$ -$ -$ -$

HVC PAC4 & Packaged air conditioning unit - 4 ton 13 SEER EA -$ -$ -$ -$

HVC PAC4+ & Packaged air conditioning unit - 4 ton 14-16 SEER EA -$ -$ -$ -$

HVC PACS & Packaged air conditioning unit - 5 ton 13 SEER EA -$ -$ -$ -$

HVC PACS+ & Packaged air conditioning unit - 5 ton 14-16 SEER EA -$ -$ -$ -$

HVC PACG2 & Packaged gas furnace & A/C unit - 2 ton 13 SEER EA -$ -$ -$ -$

HVC PACG2+ & Packaged gas furnace & A/C unit - 2 ton 14-16 SEER EA -$ -$ -$ -$

HVC PACG25 & Packaged gas furnace & A/C unit - 2.5 ton 13 SEER EA -$ -$ -$ -$

HVC PACG25+ & Packaged gas furnace & A/C unit - 2.5 ton 14-16 SEER EA -$ -$ -$ -$

HVC PACG3 & Packaged gas furnace & A/C unit - 3 ton 13 SEER EA -$ -$ -$ -$

HVC PACG3+ & Packaged gas furnace & A/C unit - 3 ton 14-16 SEER EA -$ -$ -$ -$

HVC PACG35 & Packaged gas furnace & A/C unit - 3.5 ton 13 SEER EA -$ -$ -$ -$

HVC PACG35+ & Packaged gas furnace & A/C unit - 3.5 ton 14-16 SEER EA -$ -$ -$ -$

HVC PACG4 & Packaged gas furnace & A/C unit - 4 ton 13 SEER EA -$ -$ -$ -$

HVC PACG4+ & Packaged gas furnace & A/C unit - 4 ton 14-16 SEER EA -$ -$ -$ -$

HVC PACG5 & Packaged gas furnace & A/C unit - 5 ton 13 SEER EA -$ -$ -$ -$

HVC PACG5+ & Packaged gas furnace & A/C unit - 5 ton 14-16 SEER EA -$ -$ -$ -$

HVC PACGRS + Packaged gas furnace & AC unit - Detach & reset EA -$ -$ -$ -$

HVC PACRS + Packaged air conditioning unit - Detach & reset EA -$ -$ -$ -$

HVC PAN & Emergency drip pan EA -$ -$ -$ -$

HVC PAV & Roof mount power attic vent EA -$ -$ -$ -$

HVC PAV> & Roof mount power attic vent - Large EA -$ -$ -$ -$

HVC PAVC & Power attic vent cover only - metal EA -$ -$ -$ -$

HVC PAVC- & Power attic vent cover only - plastic EA -$ -$ -$ -$

HVC PAVG & Gable mount power attic vent EA -$ -$ -$ -$

HVC PAVG> & Gable mount power attic vent - Large EA -$ -$ -$ -$

HVC PAVGL & Automatic gable louver EA -$ -$ -$ -$

HVC PAVH & Humidistat for power attic vent EA -$ -$ -$ -$

HVC PDR + Paintless dent repair to A/C unit (Bid Item) EA -$ -$ -$ -$

HVC RAD>RS + Radiator unit - Large - Detach & reset EA -$ -$ -$ -$

HVC RAD2 & Radiator - 2 column/tube - 20" - 30" high - per section EA -$ -$ -$ -$

HVC RAD2+ & Radiator - 2 column/tube - 31" - 45" high - per section EA -$ -$ -$ -$

HVC RAD3 & Radiator - 3 column/tube - 16" - 30" high - per section EA -$ -$ -$ -$

HVC RAD4 & Radiator - 4 column/tube - 16" - 30" high - per section EA -$ -$ -$ -$

HVC RAD4+ & Radiator - 4 column/tube - 31" - 45" high - per section EA -$ -$ -$ -$

HVC RAD5 & Radiator - 5 column/tube - 26" - 38" high - per section EA -$ -$ -$ -$

HVC RAD6 & Radiator - 6 column/tube - 11" - 20" high - per section EA -$ -$ -$ -$

HVC RADC & Radiator cover - 13" to 22" tall LF -$ -$ -$ -$

HVC RADC< & Radiator cover - up to 12" tall LF -$ -$ -$ -$

HVC RADC> & Radiator cover - 23" to 32" tall LF -$ -$ -$ -$

HVC RADC» & Radiator cover - 33" to 44" tall LF -$ -$ -$ -$

HVC RADC>RS + Radiator cover - Large - Detach & reset LF -$ -$ -$ -$

HVC RADCRS + Radiator cover - Detach & reset LF -$ -$ -$ -$

HVC RADF + Radiant floor heating system SF -$ -$ -$ -$

HVC RADRS + Radiator unit - Detach & reset EA -$ -$ -$ -$

HVC RADT & Radiant tube heater - Suspended - Gas (60,000 BTU) EA -$ -$ -$ -$

HVC REG & Heat/AC register - Mechanically attached EA -$ -$ -$ -$

Page 97: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

HVC REGF & Heat/AC register - Floor register EA -$ -$ -$ -$

HVC REGFRS + Heat/AC register - Floor register - Detach & reset EA -$ -$ -$ -$

HVC REGRS + Heat/AC register - Mechanically attached - Detach & reset EA -$ -$ -$ -$

HVC REGW & Heat/AC register - wood EA -$ -$ -$ -$

HVC REGW+ & Heat/AC register - wood - flush mount EA -$ -$ -$ -$

HVC SPACE & Space Heater - Ceiling hung gas unit 320,000 BTU EA -$ -$ -$ -$

warehouse

HVC SPACE< & Space Heater - Ceiling hung gas unit - 225,000 BTU EA -$ -$ -$ -$

HVC SPACE<< & Space Heater - Ceiling hung gas unit - 100,000 BTU EA -$ -$ -$ -$

HVC SPACE30 & Space Heater - Ceiling hung gas unit - 30,000 BTU EA -$ -$ -$ -$

HVC TS & Thermostat EA -$ -$ -$ -$

HVC TS- & Thermostat - Standard grade EA -$ -$ -$ -$

HVC TS+ & Thermostat - High grade EA -$ -$ -$ -$

HVC TS++ & Thermostat - Premium grade EA -$ -$ -$ -$

HVC TS+++ & Thermostat - Deluxe grade (smart home compatible) EA -$ -$ -$ -$

HVC TSRS + Thermostat - Detach & reset EA -$ -$ -$ -$

HVC TSZ & Thermostat - zone control EA -$ -$ -$ -$

HVC VENT3 & Furnace vent - aluminum, 3" LF -$ -$ -$ -$

HVC VENT4 & Furnace vent - aluminum, 4" LF -$ -$ -$ -$

HVC VENTS+ & Furnace vent - double wall, 5" LF -$ -$ -$ -$

HVC VENT6+ & Furnace vent - double wall, 6" LF -$ -$ -$ -$

HVC VENT8+ & Furnace vent - double wall, 8" LF -$ -$ -$ -$

HVC VENTCAP & Exterior cover for ventilation duct, 5" or 6" EA -$ -$ -$ -$

HVC VENTCP5 & Furnace vent - rain cap and storm collar, 5" EA -$ -$ -$ -$

HVC VENTCP6 & Furnace vent - rain cap and storm collar, 6" EA -$ -$ -$ -$

HVC VENTCP8 & Furnace vent - rain cap and storm collar, 8" EA -$ -$ -$ -$

HVC VENTCR5 & Furnace vent - rain cap only, 5" EA -$ -$ -$ -$

HVC VENTCR6 & Furnace vent - rain cap only, 6" EA -$ -$ -$ -$

HVC VENTCR8 & Furnace vent - rain cap only, 8" EA -$ -$ -$ -$

HVC VENTPVC & Furnace vent - PVC (90% efficient furnaces) LF -$ -$ -$ -$

HVC WACM & Window AC unit - mobile home EA -$ -$ -$ -$

HVC WBFR & Wood burning furnace EA -$ -$ -$ -$

HVC WFADDWH & Add-on water heating system for wood burning furnace EA -$ -$ -$ -$

HVC WH & Wall heater - blue flame vent-free - up to 30,000 BTU EA -$ -$ -$ -$

HVC WHI & Wall heater - infrared vent-free - up to 30,000 BTU EA -$ -$ -$ -$

HVC WINE & Cooling unit for wine room - Small EA -$ -$ -$ -$

HVC WINE> & Cooling unit for wine room - Large EA -$ -$ -$ -$

HVC WINERS + Cooling unit for wine room - Detach & reset EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

INS BELLYM + Belly paper repair (underbelly material) - mobile home SF -$ -$ -$ -$

INS BELLYMP & Belly paper (underbelly material) - mobile home SF -$ -$ -$ -$

INS BI10 & Blown-in insulation - 10" depth - R26 SF -$ -$ -$ -$

INS BI12 & Blown-in insulation - 12" depth - R30 SF -$ -$ -$ -$

INS BI14 & Blown-in insulation - 14" depth - R38 SF -$ -$ -$ -$

INS BI16 & Blown-in insulation - 16" depth - R44 SF -$ -$ -$ -$

INS BI20 & Blown-in insulation - 20" depth - R50 SF -$ -$ -$ -$

INS BI24 & Blown-in insulation - 24" depth - R66 SF -$ -$ -$ -$

INS BI6 & Blown-in insulation - 6" depth - R13 SF -$ -$ -$ -$

INS BI8 & Blown-in insulation - 8" depth - R19 SF -$ -$ -$ -$

INS BIC10 & Blown-in cellulose insulation - 10" depth - R38 SF -$ -$ -$ -$

INS BIC12 & Blown-in cellulose insulation - 12" depth - R44 SF -$ -$ -$ -$

INS BIC14 & Blown-in cellulose insulation - 14" depth - R50 SF -$ -$ -$ -$

INS BIC6 & Blown-in cellulose insulation - 6" depth - R22 SF -$ -$ -$ -$

INS BIC8 & Blown-in cellulose insulation - 8" depth - R30 SF -$ -$ -$ -$

INS BIDITM + Insulation (Bid Item) EA -$ -$ -$ -$

INS BIM - Blown-in insulation - Machine removal SF -$ -$ -$ -$

INS BT10 & Batt insulation - 10" - R30 - unfaced batt SF -$ -$ -$ -$

INS BT12 & Batt insulation - 12" - R38 - unfaced batt SF -$ -$ -$ -$

INS BT2 & Batt insulation - 2" - R6 (split R11 batt) SF -$ -$ -$ -$

INS BT4 & Batt insulation - 4" - R11- unfaced batt SF -$ -$ -$ -$

INS BT4+ & Batt insulation - 4" - R13 - unfaced batt SF -$ -$ -$ -$

INS BT4R12 & Batt insulation - 4" - R12 - unfaced batt SF -$ -$ -$ -$

Page 98: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

INS BT6 & Batt insulation - 6" - R19 - unfaced batt SF -$ -$ -$ -$

INS BT6+ & Batt insulation - 6" - R21 - unfaced batt SF -$ -$ -$ -$

INS BT6R20 & Batt insulation - 6" - R20 - unfaced batt SF -$ -$ -$ -$

INS BT8 & Batt insulation - 8" - R25 - unfaced batt SF -$ -$ -$ -$

INS BTCS & Batt insulation - Add-on for confined spaces SF -$ -$ -$ -$

INS BTF10 & Batt insulation - 10" - R30 - paper faced SF -$ -$ -$ -$

INS BTF12 & Batt insulation - 12" - R38 - paper faced SF -$ -$ -$ -$

INS BTF4 & Batt insulation - 4" - R11 - paper faced SF -$ -$ -$ -$

INS BTF4+ & Batt insulation - 4" - R13 - paper faced SF -$ -$ -$ -$

INS BTF4++ & Batt insulation - 4" - R15 - paper faced SF -$ -$ -$ -$

INS BTF6 & Batt insulation - 6" - R19 - paper faced SF -$ -$ -$ -$

INS BTF6+ & Batt insulation - 6" - R21 - paper faced SF -$ -$ -$ -$

INS BTLF4 & Batt insulation replacement per LF - 4" - up to 2' tall LF -$ -$ -$ -$

INS BTLF6 & Batt insulation replacement per LF - 6" - up to 2' tall LF -$ -$ -$ -$

INS BVNT & Baffle vent - cardboard LF -$ -$ -$ -$

INS BVNTF & Baffle vent - foam LF -$ -$ -$ -$

INS CW10 & Wet spray cellulose insulation - 10" - R34 SF -$ -$ -$ -$

INS CW12 & Wet spray cellulose insulation - 12" - R44 SF -$ -$ -$ -$

INS CW4 & Wet spray cellulose insulation - 4" - R13 SF -$ -$ -$ -$

INS CW6 & Wet spray cellulose insulation - 6" - R20 SF -$ -$ -$ -$

INS CW8 & Wet spray cellulose insulation - 8" - R28 SF -$ -$ -$ -$

INS DR11 & Drape roll insulation - unfaced - R11 SF -$ -$ -$ -$

INS DR11VF & Drape roll insulation - vinyl faced - R11 SF -$ -$ -$ -$

INS FIRE & Fire retardant insulation - Spray-on mineral fiber SF -$ -$ -$ -$

INS FOAM + Urethane foam sealant LF -$ -$ -$ -$

INS FOIL & Reflective multi-layer foil insulation - R-7+ SF -$ -$ -$ -$

INS FOIL- & Reflective multi-layer foil insulation - R-4 SF -$ -$ -$ -$

INS FOILA & Foil vapor barrier - aluminum - single sided SF -$ -$ -$ -$

INS FOILA+ & Foil vapor barrier - aluminum - double sided SF -$ -$ -$ -$

INS FSAFE + Firesafing - draft stop LF -$ -$ -$ -$

INS HWRAP & House wrap (air/moisture barrier) SF -$ -$ -$ -$

INS LAB + Insulation Installer - per hour HR -$ -$ -$ -$

INS LABL + Insulation - General Laborer - per hour HR -$ -$ -$ -$

INS LAM & Vinyl-faced/laminated insulation - 2" SF -$ -$ -$ -$

INS LAM3 & Vinyl-faced/laminated insulation - 3" SF -$ -$ -$ -$

INS LAM4 & Vinyl-faced/laminated insulation - 4" SF -$ -$ -$ -$

INS LAM6 & Vinyl-faced/laminated insulation - 6" SF -$ -$ -$ -$

INS MN + Insulation - Labor Minimum EA -$ -$ -$ -$

INS MWC & Acoustical/fire-safing insulation - 2" mineral wool SF -$ -$ -$ -$

INS MWC4 & Acoustical/fire-safing insulation - 4" mineral wool SF -$ -$ -$ -$

INS MWC6 & Acoustical/fire-safing insulation - 6" mineral wool SF -$ -$ -$ -$

INS RBCS & Rigid foam insulation - Add-on for confined spaces SF -$ -$ -$ -$

INS RBD1 & Rigid foam insulation board - 1" SF -$ -$ -$ -$

INS RBD1.5 & Rigid foam insulation board - 1 1/2" SF -$ -$ -$ -$

INS RBD1/2 & Rigid foam insulation board - 1/2" SF -$ -$ -$ -$

INS RBD2 & Rigid foam insulation board - 2" SF -$ -$ -$ -$

INS RBD3/4 & Rigid foam insulation board - 3/4" SF -$ -$ -$ -$

INS RBDL1 & Rigid foam insulation board - 1" - low density SF -$ -$ -$ -$

INS RBDL2 & Rigid foam insulation board - 2" - low density SF -$ -$ -$ -$

INS REPS1 & Rigid foam EPS Insulation blocks - 1 LB/CF density CF -$ -$ -$ -$

INS SB10 & Net & blow insulation - 10" - R39 SF -$ -$ -$ -$

INS SB12 & Net & blow insulation - 12" - R47 SF -$ -$ -$ -$

INS SB4 & Net & blow insulation - 4" - R15 SF -$ -$ -$ -$

INS SB6 & Net & blow insulation - 6" - R23 SF -$ -$ -$ -$

INS SB8 & Net & blow insulation - 8" - R30 SF -$ -$ -$ -$

INS SPF & Sprayed polyurethane foam - 21b mix - per inch thick SF -$ -$ -$ -$

INS SPFCS & Sprayed polyurethane foam - confined spaces SF -$ -$ -$ -$

INS SPFOC4 & Sprayed polyurethane foam - open cell - 4" SF -$ -$ -$ -$

INS SPFOC6 & Sprayed polyurethane foam - open cell - 6" SF -$ -$ -$ -$

INS VIS & Polyethylene vapor barrier SF -$ -$ -$ -$

INS VISTC & Polyethylene vapor barrier, seam taping & joint caulking SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

Page 99: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

LAB ADMIN + Administrative/supervisor labor charge (Bid Item) HR -$ -$ -$ -$

LAB CARPFNC + Carpenter - Finish, Trim / Cabinet - per hour H R -$ -$ -$ -$

LAB CARPFRM + Carpenter - General Framer - per hour HR -$ -$ -$ -$

LAB CARPMEC + Carpenter - Mechanic - per hour HR -$ -$ -$ -$

LAB CLN + Cleaning Technician - per hour HR -$ -$ -$ -$

LAB CLN-F + Floor Cleaning Technician - per hour HR -$ -$ -$ -$

LAB CLN-R + Cleaning Remediation Technician HR -$ -$ -$ -$

LAB CLN-S + Cleaning - Supervisory/Administrative - per hour HR -$ -$ -$ -$

LAB CNC + Concrete Finisher - per hour HR -$ -$ -$ -$

LAB DMO + Demolition Laborer - per hour HR -$ -$ -$ -$

LAB DRY + Drywall Installer / Finisher - per hour HR -$ -$ -$ -$

LAB ELE + Electrician - per hour HR -$ -$ -$ -$

LAB EQU + Equipment Operator - per hour HR -$ -$ -$ -$

LAB FEN + Fencing Installer - per hour HR -$ -$ -$ -$

LAB FLR + Flooring Installer - per hour HR -$ -$ -$ -$

LAB FLR-W + Wood Flooring Installer - per hour HR -$ -$ -$ -$

LAB HDW + Hardware Installer - per hour HR -$ -$ -$ -$

LAB HMRT + Hazardous Waste/Mold Cleaning Technician - per hour HR -$ -$ -$ -$

LAB HMRT-S + Hazardous Waste/Mold Cleaning -Supervisory/Admin- per HR -$ -$ -$ -$

hour

LAB HVC + Heating / A.C. Mechanic - per hour HR -$ -$ -$ -$

LAB INS + Insulation Installer - per hour HR -$ -$ -$ -$

LAB LBR + General Laborer - per hour HR -$ -$ -$ -$

LAB LBRMN + General Labor - Labor Minimum EA -$ -$ -$ -$

LAB MAS + Mason - Brick / Stone - per hour HR -$ -$ -$ -$

LAB OHD + Overhead Door Installer - per hour HR -$ -$ -$ -$

LAB ORI + Ornamental Iron Installer - per hour HR -$ -$ -$ -$

LAB PLA + Plasterer - per hour HR -$ -$ -$ -$

LAB PLM + Plumber - per hour HR -$ -$ -$ -$

LAB PNT + Painter - per hour HR -$ -$ -$ -$

LAB RFG + Roofer - per hour HR -$ -$ -$ -$

LAB RFG-M + Membrane Roofing Installer - per hour HR -$ -$ -$ -$

LAB SDG + Siding Installer - per hour HR -$ -$ -$ -$

LAB STL + Steel Worker - per hour HR -$ -$ -$ -$

LAB STU + Stucco Installer - per hour HR -$ -$ -$ -$

LAB SUPERC + Commercial Supervision / Project Management - per hour HR -$ -$ -$ -$

LAB SUPERR + Residential Supervision / Project Management - per hour HR -$ -$ -$ -$

LAB TIL + Tile / Cultured Marble Installer - per hour HR -$ -$ -$ -$

LAB TRT + Trauma/Crime Scene Cleaning Technician - per hour HR -$ -$ -$ -$

LAB TRT-S + Trauma/Crime Scene Cleaning - Supervisory/Admin.- per HR -$ -$ -$ -$

hour

LAB WPR + Wallpaper Hanger - per hour HR -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

LIT ARCH & Architectural effect lights - exterior EA -$ -$ -$ -$

LIT ARCH+ & Architectural effect lights - HID (soffit) 150 watt - Ext EA -$ -$ -$ -$

LIT AV & Light fixture EA -$ -$ -$ -$

LIT AV- & Light fixture - Standard grade EA -$ -$ -$ -$

LIT AV+ & Light fixture - High grade EA -$ -$ -$ -$

LIT AV++ & Light fixture - Premium grade EA -$ -$ -$ -$

LIT AVC & Light fixture (cover only) - medium size EA -$ -$ -$ -$

LIT AVC+ & Light fixture (cover only) - medium size - High grade EA -$ -$ -$ -$

LIT AVC< & Light fixture (cover only) - small size EA -$ -$ -$ -$

LIT AVC<+ & Light fixture (cover only) - small size - High grade EA -$ -$ -$ -$

LIT AVC> & Light fixture (cover only) - large size EA -$ -$ -$ -$

LIT AVC>+ & Light fixture (cover only) - large size - High grade EA -$ -$ -$ -$

LIT BAR2 & Light bar - 2 lights EA -$ -$ -$ -$

LIT BAR2+ & Light bar - 2 lights - High grade EA -$ -$ -$ -$

LIT BAR3 & Light bar - 3 lights EA -$ -$ -$ -$

LIT BAR3+ & Light bar - 3 lights - High grade EA -$ -$ -$ -$

LIT BAR4 & Light bar - 4 lights EA -$ -$ -$ -$

LIT BAR4+ & Light bar - 4 lights - High grade EA -$ -$ -$ -$

LIT BARS & Light bar - 5 lights EA -$ -$ -$ -$

Page 100: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

LIT BARS+ & Light bar - 5 lights - High grade EA -$ -$ -$ -$

LIT BAR6 & Light bar - 6 lights EA -$ -$ -$ -$

LIT BAR6+ & Light bar - 6 lights - High grade EA -$ -$ -$ -$

LIT BAR8 & Light bar - 8 lights EA -$ -$ -$ -$

LIT BAR8+ & Light bar - 8 lights - High grade EA -$ -$ -$ -$

LIT BIDITM + Light Fixtures (Bid Item) EA -$ -$ -$ -$

LIT BLCFA + Light bulb - Compact Fluorescent stand. type - mat. only EA -$ -$ -$ -$

LIT BLCFSP + Light bulb - Compact Flrscnt spot/flood (R30) - mat. only EA -$ -$ -$ -$

LIT BLCFT + Light bulb - Compact Fluorescent twist - mat. only EA -$ -$ -$ -$

LIT BLFLC + Light bulb - Fluorescent circline - material only EA -$ -$ -$ -$

LIT BLFLT2 + Light bulb - Fluorescent tube - 2' soft white - mat. only EA -$ -$ -$ -$

LIT BLFLT3 + Light bulb - Fluorescent tube - 3' soft white - mat. only EA -$ -$ -$ -$

LIT BLFLT4 + Light bulb - Fluorescent tube - 4' soft white - mat. only EA -$ -$ -$ -$

LIT BLFLT6- + Light bulb - Fluorescent tube - 6' cool white - mat. only EA -$ -$ -$ -$

LIT BLFLT8- + Light bulb - Fluorescent tube - 8' cool white - mat. only EA -$ -$ -$ -$

LIT BLHDE + Light bulb - Halogen double-ended tube - mat. only EA -$ -$ -$ -$

LIT BLHSP + Light bulb - Halogen spot/flood (PAR30) - mat. only EA -$ -$ -$ -$

LIT BLI + Light bulb - Incand. standard bulb - 1000 hr - mat. only EA -$ -$ -$ -$

LIT BLI+ + Light bulb - Incand. standard bulb - 2000 hr - mat. only EA -$ -$ -$ -$

LIT BLIGL + Light bulb - Incand. small or medium globe - mat. only EA -$ -$ -$ -$

LIT BLIGL> + Light bulb - Incandescent large globe - material only EA -$ -$ -$ -$

LIT BLISP + Light bulb - Incandescent spot/flood (R30) - material only EA -$ -$ -$ -$

LIT BLL + Light bulb - LED A19 - up to 500 lm - material only EA -$ -$ -$ -$

LIT BLL+ + Light bulb - LED A19 - over 500 to 800 lm - material only EA -$ -$ -$ -$

LIT BLLC + Light bulb - LED candle - up to 200 lm - material only EA -$ -$ -$ -$

LIT BLLC+ + Light bulb - LED candle - over 200 to 350 lm - mat. only EA -$ -$ -$ -$

LIT BLLCSB + Light bulb - LED candle - smart bulb - material only EA -$ -$ -$ -$

LIT BLLF + Light bulb - LED BR30 - 600 to 800 lm - material only EA -$ -$ -$ -$

LIT BLLFSB + Light bulb - LED BR30 - smart bulb - material only EA -$ -$ -$ -$

LIT BLLFSB+ + Light bulb - LED BR30 - smart bulb - multi-color- mat EA -$ -$ -$ -$

only

LIT BLLG + Light bulb - LED globe - up to 250 lm - material only EA -$ -$ -$ -$

LIT BLLG+ + Light bulb - LED globe - over 250 to 500 lm- material only EA -$ -$ -$ -$

LIT BLLSB + Light bulb - LED A19 - smart bulb - material only EA -$ -$ -$ -$

LIT BLLSB+ + Light bulb - LED A19 - smart bulb - multi-color - mat only EA -$ -$ -$ -$

LIT BLLT2 + Light bulb - LED tube - 2' - material only EA -$ -$ -$ -$

LIT BLLT4 + Light bulb - LED tube - 4' - material only EA -$ -$ -$ -$

LIT BP & Emergency lighting - battery - Commercial EA -$ -$ -$ -$

LIT CANN & Chandelier - Natural deer antler - 18"-30" diameter EA -$ -$ -$ -$

LIT CANN+ & Chandelier - Natural elk or moose antler - 18-30" diameter EA -$ -$ -$ -$

LIT CANN> & Chandelier - Natural deer antler - 30"-48" diameter EA -$ -$ -$ -$

LIT CANN>+ & Chandelier - Natural elk or moose antler - 30-48" diameter EA -$ -$ -$ -$

LIT CANN>> & Chandelier - Natural deer antler - 48"-60" diameter EA -$ -$ -$ -$

LIT CANN>>+ & Chandelier - Natural elk or moose antler - 48-60" diameter EA -$ -$ -$ -$

LIT CANOPY & Canopy light - explosion proof EA -$ -$ -$ -$

LIT CANR & Chandelier - Reproduction deer antler - 18"-30" diameter EA -$ -$ -$ -$

LIT CANR+ & Chandelier - Reproduction elk or moose - 18"-30" diameter EA -$ -$ -$ -$

LIT CANR> & Chandelier - Reproduction deer antler - 30"-48" diameter EA -$ -$ -$ -$

LIT CANR>+ & Chandelier - Reproduction elk or moose - 30"-48" diameter EA -$ -$ -$ -$

LIT CANR» & Chandelier - Reproduction deer antler - 48"-60" diameter EA -$ -$ -$ -$

LIT CANR»+ & Chandelier - Reproduction elk or moose - 48"-60" diameter EA -$ -$ -$ -$

LIT CHAN & Chandelier EA -$ -$ -$ -$

LIT CHAN- & Chandelier - Standard grade EA -$ -$ -$ -$

LIT CHAN+ & Chandelier - High grade EA -$ -$ -$ -$

LIT CHAN++ & Chandelier - Premium grade EA -$ -$ -$ -$

LIT CHAN>++ & Chandelier - oversized - Premium grade EA -$ -$ -$ -$

LIT CHANC+ & Chandelier - Crystal - High grade EA -$ -$ -$ -$

LIT CHANC++ & Chandelier - Crystal - Premium grade EA -$ -$ -$ -$

LIT CHANCRS + Chandelier - crystal or oversized - Detach & reset EA -$ -$ -$ -$

LIT CHANRS + Chandelier - Detach & reset EA -$ -$ -$ -$

LIT COLDC & Cold cathode light LF -$ -$ -$ -$

LIT CWRT & Chandelier - Wrought iron - 48"-60" diameter EA -$ -$ -$ -$

LIT CWRT+ & Chandelier - Wrought iron - 60"-80" diameter EA -$ -$ -$ -$

LIT CWRT++ & Chandelier - Wrought iron - 80" plus diameter EA -$ -$ -$ -$

LIT DIM & Stage lighting dimmer control board EA -$ -$ -$ -$

Page 101: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

LIT EXIT & Exit sign - wired in EA -$ -$ -$ -$

LIT EXIT+ & Exit sign - internal power EA -$ -$ -$ -$

LIT EXITRS + Exit sign - Detach & reset EA -$ -$ -$ -$

LIT FL & Fluorescent light fixture EA -$ -$ -$ -$

LIT FL- & Fluorescent light fixture - Standard grade EA -$ -$ -$ -$

LIT FL+ & Fluorescent light fixture - High grade EA -$ -$ -$ -$

LIT FL++ & Fluorescent light fixture - Premium grade EA -$ -$ -$ -$

LIT FL1-2 & Fluorescent - one tube - 2' - strip light EA -$ -$ -$ -$

LIT FL1-2+ & Fluorescent - one tube - 2' - fixture w/lens EA -$ -$ -$ -$

LIT FL1-4 & Fluorescent - one tube - 4' - strip light EA -$ -$ -$ -$

LIT FL1-4+ & Fluorescent - one tube - 4' - fixture w/lens EA -$ -$ -$ -$

LIT FL1-4RS + Fluorescent light fixture - 2' & 4' - Detach & reset EA -$ -$ -$ -$

LIT FL1-6 & Fluorescent - one tube - 6' - strip light EA -$ -$ -$ -$

LIT FL1-6+ & Fluorescent - one tube - 6' - fixture w/lens EA -$ -$ -$ -$

LIT FL1-8 & Fluorescent - one tube - 8' - strip light EA -$ -$ -$ -$

LIT FL1-8+ & Fluorescent - one tube - 8' - fixture w/lens EA -$ -$ -$ -$

LIT FL2-4 & Fluorescent - two tube - 4' - strip light EA -$ -$ -$ -$

LIT FL2-4+ & Fluorescent - two tube - 4' - fixture w/lens EA -$ -$ -$ -$

LIT FL2-6 & Fluorescent - two tube - 6' - strip light EA -$ -$ -$ -$

LIT FL2-6+ & Fluorescent - two tube - 6' - fixture w/lens EA -$ -$ -$ -$

LIT FL2-8 & Fluorescent - two tube - 8' - strip light EA -$ -$ -$ -$

LIT FL2-8+ & Fluorescent - two tube - 8' - fixture w/lens EA -$ -$ -$ -$

LIT FL4-4 & Fluorescent - four tube - 4' - strip light EA -$ -$ -$ -$

LIT FL4-4+ & Fluorescent - four tube - 4' - fixture w/lens EA -$ -$ -$ -$

LIT FL4-6 & Fluorescent - four tube - 6' - strip light EA -$ -$ -$ -$

LIT FL4-6+ & Fluorescent - four tube - 6' - fixture w/lens EA -$ -$ -$ -$

LIT FL4-8 & Fluorescent - four tube - 8' - strip light EA -$ -$ -$ -$

LIT FL4-8+ & Fluorescent - four tube - 8' - fixture w/lens EA -$ -$ -$ -$

LIT FLACT & Fluorescent - acoustic grid fixture, 2' x 2' EA -$ -$ -$ -$

LIT FLACT2 & Fluorescent - acoustic grid fixture - two tube, 2'x 4' EA -$ -$ -$ -$

LIT FLACT2+ & Fluorescent - acoustic grid fixture - 2 tube - 2' High grd EA -$ -$ -$ -$

LIT FLACT4 & Fluorescent - acoustic grid fixture - four tube, 2'x 4' EA -$ -$ -$ -$

LIT FLACT4+ & Fluorescent - acoustic grid fixture - 4 tube - High grd EA -$ -$ -$ -$

LIT FLC & Fluorescent - circular fixture EA -$ -$ -$ -$

LIT FLLN & Fluorescent light fixture lens - wraparound (lens only) EA -$ -$ -$ -$

LIT FLRS + Fluorescent light fixture - 6' & 8' - Detach & reset EA -$ -$ -$ -$

LIT FN & Ceiling fan without light EA -$ -$ -$ -$

LIT FN- & Ceiling fan without light - Standard grade EA -$ -$ -$ -$

LIT FN+ & Ceiling fan without light - High grade EA -$ -$ -$ -$

LIT FN++ & Ceiling fan without light - Premium grade EA -$ -$ -$ -$

LIT FNDR18 + Add on - Ceiling fan down rod - 18" EA -$ -$ -$ -$

LIT FNDR18- + Add on - Ceiling fan down rod - 18" - Standard grade EA -$ -$ -$ -$

LIT FNDR18+ + Add on - Ceiling fan down rod - 18" - High/Prem grade EA -$ -$ -$ -$

LIT FNDR36 + Add on - Ceiling fan down rod - 19"-36" EA -$ -$ -$ -$

LIT FNDR36- + Add on - Ceiling fan down rod - 19"-36" - Standard grade EA -$ -$ -$ -$

LIT FNDR36+ + Add on - Ceiling fan down rod - 19"-36" - High/Prem EA -$ -$ -$ -$

grade

LIT FNDR72 + Add on - Ceiling fan down rod - 37"-72" EA -$ -$ -$ -$

LIT FNDR72- + Add on - Ceiling fan down rod - 37"-72" - Standard grade EA -$ -$ -$ -$

LIT FNDR72+ + Add on - Ceiling fan down rod - 37"-72" - High/Prem EA -$ -$ -$ -$

grade

LIT FNL & Ceiling fan & light EA -$ -$ -$ -$

LIT FNL- & Ceiling fan & light - Standard grade EA -$ -$ -$ -$

LIT FNL+ & Ceiling fan & light - High grade EA -$ -$ -$ -$

LIT FNL++ & Ceiling fan & light - Premium grade EA -$ -$ -$ -$

LIT FNRS + Ceiling fan - Detach & reset EA -$ -$ -$ -$

LIT GHGL4 + Greenhouse - Grow lights - HPS - 400 watt EA -$ -$ -$ -$

LIT HG & Hanging light fixture EA -$ -$ -$ -$

LIT HG+ & Hanging light fixture - High grade EA -$ -$ -$ -$

LIT HG++ & Hanging light fixture - Premium grade EA -$ -$ -$ -$

LIT HG2 & Hanging double light fixture EA -$ -$ -$ -$

LIT HG2+ & Hanging double light fixture - High grade EA -$ -$ -$ -$

LIT HG2++ & Hanging double light fixture - Premium grade EA -$ -$ -$ -$

LIT LAB + Lighting Installer - Electrician - per hour HR -$ -$ -$ -$

LIT LABL + Lighting - General Laborer - per hour HR -$ -$ -$ -$

Page 102: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

LIT LAM & LAM - Indirect metal halide EA -$ -$ -$ -$

LIT LAM++ & LAM - Indirect metal halide - Premium grade EA -$ -$ -$ -$

LIT MARQ + Theater Marquee - neon lights EA -$ -$ -$ -$

LIT MARQ< + Theater Marquee - neon lights - Small EA -$ -$ -$ -$

LIT MARQ> + Theater Marquee - neon lights - Large EA -$ -$ -$ -$

LIT MBALL + Dance lighting - Mirror ball - 20" EA -$ -$ -$ -$

LIT MER & Mercury vapor security light EA -$ -$ -$ -$

LIT MN + Light Fixture - Labor Minimum EA -$ -$ -$ -$

LIT NEON & Neon sign EA -$ -$ -$ -$

LIT NEON< & Neon sign - small EA -$ -$ -$ -$

LIT NEON> & Neon sign - large EA -$ -$ -$ -$

LIT NEON>+ & Neon sign - large - High grade EA -$ -$ -$ -$

LIT OCCUP & Lighting panel - Occupancy EA -$ -$ -$ -$

LIT PARK + Parking lights - metal halide, 250 watt (pole mount) EA -$ -$ -$ -$

LIT PHOTO & Photo-electric timer for lights EA -$ -$ -$ -$

LIT POL4 & Light pole only - up to 20' high - steel - 4" EA -$ -$ -$ -$

LIT POLS & Light pole only - up to 20' high - steel - 5" EA -$ -$ -$ -$

LIT POLS> & Light pole only - 25' to 30' high - steel - 5" EA -$ -$ -$ -$

LIT POL6 & Light pole only - 25' to 30' high - steel - 6" EA -$ -$ -$ -$

LIT POLE & Light pole w/concrete base - up to 20' high - steel - 4" EA -$ -$ -$ -$

LIT POLE+ & Light pole w/concrete base - up to 20' high - steel - 5" EA -$ -$ -$ -$

LIT POLE> & Light pole w/concrete base - 25' to 30' high - steel - 5" EA -$ -$ -$ -$

LIT POLE>+ & Light pole w/concrete base - 25' to 30' high - steel - 6" EA -$ -$ -$ -$

LIT POR & Porcelain light fixture EA -$ -$ -$ -$

LIT PORRS + Porcelain light fixture - Detach & reset EA -$ -$ -$ -$

LIT PUCK & Puck light - shallow EA -$ -$ -$ -$

LIT PUCK- & Puck light - shallow - Standard grade EA -$ -$ -$ -$

LIT PUCK+ & Puck light - shallow - High grade EA -$ -$ -$ -$

LIT RC & Recessed light fixture EA -$ -$ -$ -$

LIT RC- & Recessed light fixture - Standard grade EA -$ -$ -$ -$

LIT RC+ & Recessed light fixture - High grade EA -$ -$ -$ -$

LIT RC++ & Recessed light fixture - Premium grade EA -$ -$ -$ -$

LIT RCBFC & Recessed light - insulation baffle/draft stop EA -$ -$ -$ -$

LIT RCRS + Recessed light fixture - Detach & reset entire unit EA -$ -$ -$ -$

LIT RCT & Recessed light fixture - trim only EA -$ -$ -$ -$

LIT RCT- & Recessed light fixture - trim only - Standard grade EA -$ -$ -$ -$

LIT RCT+ & Recessed light fixture - trim only - High grade EA -$ -$ -$ -$

LIT RCT++ & Recessed light fixture - trim only - Premium grade EA -$ -$ -$ -$

LIT RCTRS + Recessed light fixture - Detach & reset trim only EA -$ -$ -$ -$

LIT RECORD & Panel light - "Recording In Progress" EA -$ -$ -$ -$

LIT RS + Light fixture - Detach & reset EA -$ -$ -$ -$

LIT RS> + Light fixture - Detach & reset - Large EA -$ -$ -$ -$

LIT RS» + Light fixture - Detach & reset - Extra large EA -$ -$ -$ -$

LIT RUN & LED light runner - channel-mounted rope light LF -$ -$ -$ -$

LIT SCON & Light fixture - wall sconce EA -$ -$ -$ -$

LIT SCON- & Light fixture - wall sconce - Standard grade EA -$ -$ -$ -$

LIT SCON+ & Light fixture - wall sconce - High grade EA -$ -$ -$ -$

LIT SCON++ & Light fixture - wall sconce - Premium grade EA -$ -$ -$ -$

LIT SCON>+ & Light fixture - wall sconce - large - High grade EA -$ -$ -$ -$

LIT SHL & Heat lamp fixture - adjustable w/shield EA -$ -$ -$ -$

LIT SIGND & Digital electric sign (programmable) EA -$ -$ -$ -$

LIT SPOT1 & Spot light fixture - single EA -$ -$ -$ -$

LIT SPOT2 & Spot light fixture - double EA -$ -$ -$ -$

LIT SPOT2M & Spot light fixture - double - w/motion sensor EA -$ -$ -$ -$

LIT SPOT3 & Spot light fixture - triple EA -$ -$ -$ -$

LIT STAGE & Stage lighting system EA -$ -$ -$ -$

LIT STRIPI & Light strip - incandescent LF -$ -$ -$ -$

LIT SWRW & Shower light - waterproof fixture EA -$ -$ -$ -$

LIT TASK & Task light - directional EA -$ -$ -$ -$

LIT TASKC & Task light - directional - Commercial EA -$ -$ -$ -$

LIT TRK & Track lighting - track only LF -$ -$ -$ -$

LIT TRKC+ & Track lighting - track only - Commercial LF -$ -$ -$ -$

LIT TRKCN & Fixture (can) for track lighting EA -$ -$ -$ -$

LIT TRKCN+ & Fixture (can) for track lighting - High grade EA -$ -$ -$ -$

LIT TRKCNC+ & Fixture (can) for track lighting - Commercial - High grade EA -$ -$ -$ -$

Page 103: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

LIT TRKCNRS + Fixture (can) for track lighting - Detach & reset EA -$ -$ -$ -$

LIT TRKRS + Track for track lighting - Detach & reset LF -$ -$ -$ -$

LIT UNIST & Unistrut lighting support system - double hanger LF -$ -$ -$ -$

LIT UNIST- & Unistrut lighting support system - single hanger LF -$ -$ -$ -$

LIT WP & Exterior wall pack - Sodium - 250 watt EA -$ -$ -$ -$

LIT WP< & Exterior wall pack - Sodium - 100 watt - Mini EA -$ -$ -$ -$

LIT X & Exterior light fixture EA -$ -$ -$ -$

LIT X- & Exterior light fixture - Standard grade EA -$ -$ -$ -$

LIT X+ & Exterior light fixture - High grade EA -$ -$ -$ -$

LIT X++ & Exterior light fixture - Premium grade EA -$ -$ -$ -$

LIT XMOT & Motion sensor for exterior light fixture EA -$ -$ -$ -$

LIT XPOST & Exterior post light fixture EA -$ -$ -$ -$

LIT XPOST+ & Exterior post light fixture - High grade EA -$ -$ -$ -$

LIT XPOST++ & Exterior post light fixture - Premium grade EA -$ -$ -$ -$

LIT XRS + Exterior light fixture - Detach & reset EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

LND BHOE Backhoe loader and operator HR -$ -$ -$ -$

LND BIDITM + Landscaping (Bid Item) EA -$ -$ -$ -$

LND BWDR + Block wall - decorative - retaining (Bid Item) EA -$ -$ -$ -$

LND DFERT + Fertilizing SF -$ -$ -$ -$

LND DMUL + Mulching SF -$ -$ -$ -$

LND DMULCY + Mulching (per CY) CY -$ -$ -$ -$

LND DPC + Drain pipe - corrugated - 3" to 4" (material only) LF -$ -$ -$ -$

LND LABL + General Laborer - per hour HR -$ -$ -$ -$

LND LCADYE + Landscape - curbing dye - additional charge LF -$ -$ -$ -$

LND LCAS + Landscape - curbing - stamped - additional charge LF -$ -$ -$ -$

LND LCF & Landscape - curbing - flat - 4" x 6" LF -$ -$ -$ -$

LND LCMS & Landscape - curbing - mower or slanted 4" x 6" LF -$ -$ -$ -$

LND LFB + Landscape fabric SF -$ -$ -$ -$

LND LHS + Lawn - hand seeding SF -$ -$ -$ -$

LND LHYD + Lawn - hydroseeding SF -$ -$ -$ -$

LND LSOD + Lawn - sod SF -$ -$ -$ -$

LND MN + Landscaping - Labor Minimum EA -$ -$ -$ -$

LND PFV1 + Plants - ferns - vines - 1 gallon EA -$ -$ -$ -$

LND PFV5 + Plants - ferns - vines - 5 gallon EA -$ -$ -$ -$

LND PPGG + Plants - perennials - grasses - groundcover EA -$ -$ -$ -$

LND PPGG1G + Plants - perennials - grasses - groundcover - 1 gallon EA -$ -$ -$ -$

LND PPGG4 + Plants - perennials - grasses - groundcover - 4" EA -$ -$ -$ -$

LND PPGG5P + Plants - perennials - grasses - groundcover - 5pt EA -$ -$ -$ -$

LND PSD1 + Plants - shrubs - deciduous - 1 gallon EA -$ -$ -$ -$

LND PSD5 + Plants - shrubs - deciduous - 5 gallon EA -$ -$ -$ -$

LND PSE1 + Plants - shrubs - evergreen - 1 gallon EA -$ -$ -$ -$

LND PSE5 + Plants - shrubs - evergreen - 5 gallon EA -$ -$ -$ -$

LND ROCK + Decorative rock (per CY) CY -$ -$ -$ -$

LND RW + Rock wall / landscaping boulders - (Bid Item) EA -$ -$ -$ -$

LND SC4 & Sprinkler - controller - up to 4 valves EA -$ -$ -$ -$

LND SC4+ & Sprinkler - controller - up to 4 valves - High grade EA -$ -$ -$ -$

LND SC6 & Sprinkler - controller - up to 6 valves EA -$ -$ -$ -$

LND SC6+ & Sprinkler - controller - up to 6 valves - High grade EA -$ -$ -$ -$

LND SC8 & Sprinkler - controller - up to 8 valves EA -$ -$ -$ -$

LND SC8+ & Sprinkler - controller - up to 8 valves - High grade EA -$ -$ -$ -$

LND SDRIP & Sprinkler - drip system SF -$ -$ -$ -$

LND SHF12 & Sprinkler head - fixed spray - 12" plastic pop-up EA -$ -$ -$ -$

LND SHF2 & Sprinkler head - fixed spray - 2" plastic pop-up EA -$ -$ -$ -$

LND SHF4 & Sprinkler head - fixed spray - 4" plastic pop-up EA -$ -$ -$ -$

LND SHF6 & Sprinkler head - fixed spray - 6" plastic pop-up EA -$ -$ -$ -$

LND SHI4 & Sprinkler head - impact - 4" plastic pop-up EA -$ -$ -$ -$

LND SHR12 & Sprinkler head - rotor - 12" plastic pop-up EA -$ -$ -$ -$

LND SHR4 & Sprinkler head - rotor - 4" plastic pop-up EA -$ -$ -$ -$

LND SHR6 & Sprinkler head - rotor - 6" plastic pop-up EA -$ -$ -$ -$

LND SHS12 & Sprinkler - shrub stick - 12" EA -$ -$ -$ -$

LND SHS24 & Sprinkler - shrub stick - 24" EA -$ -$ -$ -$

Page 104: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

LND SKID + Skid steer loader and operator HR -$ -$ -$ -$

LND SMSW4 & Sprinkler - direct burial multi-strand wire - 4 conductor LF -$ -$ -$ -$

LND SMSW6 & Sprinkler - direct burial multi-strand wire - 6 conductor LF -$ -$ -$ -$

LND SMSW8 & Sprinkler - direct burial multi-strand wire - 8 conductor LF -$ -$ -$ -$

LND SP1 + Sprinkler - pipe - 1" LF -$ -$ -$ -$

LND SP3/4 + Sprinkler - pipe - 3/4" LF -$ -$ -$ -$

LND SRPBV & Sprinkler - reduced pressure backflow valve 1" EA -$ -$ -$ -$

LND SV1 & Sprinkler - valve - plastic - 1" EA -$ -$ -$ -$

LND SV1- & Sprinkler - valve - plastic - 1" - Standard grade EA -$ -$ -$ -$

LND SVB1 & Sprinkler - valve box - 1 valve EA -$ -$ -$ -$

LND SVB2 & Sprinkler - valve box - 2 valves EA -$ -$ -$ -$

LND SVB3 & Sprinkler - valve box - 3 valves EA -$ -$ -$ -$

LND SVB4 & Sprinkler - valve box - 4 valves EA -$ -$ -$ -$

LND TEV2 + Tree - evergreen - up to 2' in height EA -$ -$ -$ -$

LND TEV3 + Tree - evergreen - 2' to 3' in height EA -$ -$ -$ -$

LND TEV4 + Tree - evergreen - 3' to 4' in height EA -$ -$ -$ -$

LND TEV5 + Tree - evergreen - 4' to 5' in height EA -$ -$ -$ -$

LND TEV6 + Tree - evergreen - 5' to 6' in height EA -$ -$ -$ -$

LND TEV7 + Tree - evergreen - 6' to 7' in height EA -$ -$ -$ -$

LND TFN1 + Tree - fruit or nut - up to 1" caliper EA -$ -$ -$ -$

LND TFN3 + Tree - fruit or nut - 1" to 2" caliper EA -$ -$ -$ -$

LND TFND1 + Tree - dwarf fruit or nut - up to 1" caliper EA -$ -$ -$ -$

LND TFND2 + Tree - dwarf fruit or nut - 1" to 2" caliper EA -$ -$ -$ -$

LND TFS11/2 + Tree - shade or flowering - 1 1/2" caliper EA -$ -$ -$ -$

LND TFS2 + Tree - shade or flowering - 2" caliper EA -$ -$ -$ -$

LND TFS21/2 + Tree - shade or flowering - 2 1/2" caliper EA -$ -$ -$ -$

LND TFS3 + Tree - shade or flowering - 3" caliper EA -$ -$ -$ -$

LND TFS31/2 + Tree - shade or flowering - 3 1/2" caliper EA -$ -$ -$ -$

LND TFS4 + Tree - shade or flowering - 4" caliper EA -$ -$ -$ -$

LND TILL + Tiller and operator HR -$ -$ -$ -$

LND TRBID + Tree replacement - (Bid Item) EA -$ -$ -$ -$

LND TRENCH + Walk behind trencher and operator HR -$ -$ -$ -$

LND TRENCH> + Riding trencher and operator HR -$ -$ -$ -$

LND TSOIL + Topsoil (per CY) CY -$ -$ -$ -$

LND WF + Water features - bid per job EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

MAS AB10 & Adobe block 10" x 4" x 16" - in place SF -$ -$ -$ -$

MAS AB12 & Adobe block 12" x 4" x 16" - in place SF -$ -$ -$ -$

MAS AB14 & Adobe block 14" x 4" x 16" - in place SF -$ -$ -$ -$

MAS AB16 & Adobe block 16" x 4" x 16" - in place SF -$ -$ -$ -$

MAS AB8 & Adobe block 8" x 4" x 16" - in place SF -$ -$ -$ -$

MAS ABBB3 + Adobe bond beam 3" x 4" x 16" - block faced LF -$ -$ -$ -$

MAS ABBB4 + Adobe bond beam 4" x 4" x 16" - block faced LF -$ -$ -$ -$

MAS ABBC12 + Adobe bond beam 6" deep up to 12" wide - concrete LF -$ -$ -$ -$

MAS ABBC16 + Adobe bond beam 6" deep up to 16" wide - concrete LF -$ -$ -$ -$

MAS ABRB + Adobe block repair - cut out and replace - single block EA -$ -$ -$ -$

MAS ABRS + Adobe block repair surface - cut off and repair block face EA -$ -$ -$ -$

MAS AW + Masonry acid wash SF -$ -$ -$ -$

MAS BIDITM + Masonry (Bid Item) EA -$ -$ -$ -$

MAS BL10 & Block - 10" x 8" x 16" - in place SF -$ -$ -$ -$

MAS BL10+ & Block - 10" x 8" x 16" - in place - reinforced SF -$ -$ -$ -$

MAS BL12 & Block - 12" x 8" x 16" - in place SF -$ -$ -$ -$

MAS BL12+ & Block - 12" x 8" x 16" - in place - reinforced SF -$ -$ -$ -$

MAS BL4 & Block - 4" x 8" x 16" - in place SF -$ -$ -$ -$

MAS BL6 & Block - 6" x 8" x 16" - in place SF -$ -$ -$ -$

MAS BL6+ & Block - 6" x 8" x 16" - in place - reinforced SF -$ -$ -$ -$

MAS BL8 & Block - 8" x 8" x 16" - in place SF -$ -$ -$ -$

MAS BL8+ & Block - 8" x 8" x 16" - in place - reinforced SF -$ -$ -$ -$

MAS BLCH & Block chimney w/8" x 8" flue liner - per vertical LF LF -$ -$ -$ -$

MAS BLCH> & Block chimney w/8" x 12" flue liner - per vertical LF LF -$ -$ -$ -$

MAS BLCH» & Block chimney w/12" x 12" flue liner - per vertical LF LF -$ -$ -$ -$

MAS BLGBN + Add-on for bullnose end block - glass LF -$ -$ -$ -$

Page 105: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

MAS BLGL & Block - glass - 4"x 8"x 8" SF -$ -$ -$ -$

MAS BLGL< & Block - glass - 3"x 8"x 8" SF -$ -$ -$ -$

MAS BLGLR + Block - glass - Add for reinforcements SF -$ -$ -$ -$

MAS BLGRLF + Block - grout cell per lineal foot LF -$ -$ -$ -$

MAS BLP + Block - Add for pilaster SF -$ -$ -$ -$

MAS BLPF + Block - Beam/Joist pocket fill - per pocket EA -$ -$ -$ -$

MAS BLS + Block - Add for scored or split faced block SF -$ -$ -$ -$

MAS BLSC4 & Block - 4" x 8" x 16" - sculpture/decorative screen SF -$ -$ -$ -$

MAS BLSC8 & Block - 8" x 8" x 16" - sculpture/decorative screen SF -$ -$ -$ -$

MAS BLVRE24 + Block - Add if vertical reinforcement is 24" OC SF -$ -$ -$ -$

MAS BM10 & Block - bond beam - 10" x 8" x 16" - U Block LF -$ -$ -$ -$

MAS BM12 & Block - bond beam - 12" x 8" x 16" - U Block LF -$ -$ -$ -$

MAS BM6 & Block - bond beam - 6" x 8" x 16" - U block LF -$ -$ -$ -$

MAS BM8 & Block - bond beam - 8" x 8" x 16" - U Block LF -$ -$ -$ -$

MAS BMS12 + Structural brick - bond beam - 12" x 4" x 16" LF -$ -$ -$ -$

MAS BMS6 + Structural brick - bond beam - 6" x 4" x 16" - U block LF -$ -$ -$ -$

MAS BMS8 + Structural brick - bond beam - 8" x 4" x 16" - U block LF -$ -$ -$ -$

MAS BRK & Brick veneer SF -$ -$ -$ -$

MAS BRK- & Brick veneer - Standard grade (i.e., concrete) SF -$ -$ -$ -$

MAS BRK+ & Brick veneer - High grade SF -$ -$ -$ -$

MAS BRK++ & Brick veneer - Premium grade SF -$ -$ -$ -$

MAS BRKARCH + Brick - Add for arch LF -$ -$ -$ -$

MAS BRKBW + Brick - Add for basket weave pattern SF -$ -$ -$ -$

MAS BRKCOL + Brick - Add for column SF -$ -$ -$ -$

MAS BRKHB + Brick - Add for herringbone pattern SF -$ -$ -$ -$

MAS BRKL & Brick lintel - steel LF -$ -$ -$ -$

MAS BRKPF + Brick - Beam/Joist pocket fill - per pocket EA -$ -$ -$ -$

MAS BRKPIL + Add for block/brick pilaster LF -$ -$ -$ -$

MAS BRKROW + Brick - Add for rowlock course LF -$ -$ -$ -$

MAS BRKRS + Brick veneer - Detach & reset SF -$ -$ -$ -$

MAS BRKS10 & Brick - structural (Giant brick), 10" SF -$ -$ -$ -$

MAS BRKS4 & Brick - structural (Giant brick), 4" SF -$ -$ -$ -$

MAS BRKS6 & Brick - structural (Giant brick), 6" SF -$ -$ -$ -$

MAS BRKS8 & Brick - structural (Giant brick), 8" SF -$ -$ -$ -$

MAS BRKSB + Brick - Add for stacked bond SF -$ -$ -$ -$

MAS BRKSO + Brick - Add for soldier or sailor course LF -$ -$ -$ -$

MAS BRKT & Thin brick veneer SF -$ -$ -$ -$

MAS BRKT+ & Thin brick veneer - High grade SF -$ -$ -$ -$

MAS CPM + Concrete panel mounted on metal studs SF -$ -$ -$ -$

MAS CPM+ + Concrete panel mounted on metal studs - Articulated SF -$ -$ -$ -$

MAS FRM & Framing/truss anchor - wood to concrete/masonry EA -$ -$ -$ -$

MAS FRME & Framing/truss anchor - wood to concrete/masonry - EA -$ -$ -$ -$

embedded

MAS GMF & Granite or marble facade SF -$ -$ -$ -$

MAS GMF+ & Granite or marble facade - High grade SF -$ -$ -$ -$

MAS GMF++ & Granite or marble facade - Premium grade SF -$ -$ -$ -$

MAS INS + Masonry insulation - Vermiculite or Perlite SF -$ -$ -$ -$

MAS INSF + Masonry insulation - spray-in insulating foam SF -$ -$ -$ -$

MAS LAB + Mason - Brick / Stone - per hour HR -$ -$ -$ -$

MAS LABL + Masonry - General Laborer - per hour HR -$ -$ -$ -$

MAS LIM & Limestone veneer SF -$ -$ -$ -$

MAS LIM+ & Limestone veneer - High grade SF -$ -$ -$ -$

MAS MN + Masonry - Labor Minimum EA -$ -$ -$ -$

MAS PAV & Paver brick SF -$ -$ -$ -$

MAS PAV- & Paver brick - Standard grade SF -$ -$ -$ -$

MAS PAV+ & Paver brick - High grade SF -$ -$ -$ -$

MAS PCARCH & Precast arches and sills EA -$ -$ -$ -$

MAS PCBAL & Precast balustrade - cast stone LF -$ -$ -$ -$

MAS PCBELT + Precast trim - belt LF -$ -$ -$ -$

MAS PCBELT> + Precast trim - belt - large LF -$ -$ -$ -$

MAS PCBKT + Precast bracket/corbel EA -$ -$ -$ -$

MAS PCBKT++ + Precast bracket/corbel - Premium grade EA -$ -$ -$ -$

MAS PCBKT> + Precast bracket/corbel - large EA -$ -$ -$ -$

MAS PCCAP + Precast column cap EA -$ -$ -$ -$

MAS PCCAP24 + Precast concrete/fiberglass capital - up to 24" diameter EA -$ -$ -$ -$

Page 106: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

MAS PCCAP36 + Precast concrete/fiberglass capital - up to 36" diameter EA -$ -$ -$ -$

MAS PCCOL & Precast column - 18" diameter LF -$ -$ -$ -$

MAS PCCOL< & Precast column - 12" diameter LF -$ -$ -$ -$

MAS PCCOL> & Precast column - 24" diameter LF -$ -$ -$ -$

MAS PCCOL» & Precast column - 36" diameter LF -$ -$ -$ -$

MAS PCCORN + Precast cornice - band LF -$ -$ -$ -$

MAS PCCORNR + Precast cornice - at roof LF -$ -$ -$ -$

MAS PCCWN + Precast crown molding with dentils LF -$ -$ -$ -$

MAS PCENT36 + Precast concrete entablature - 36" EA -$ -$ -$ -$

MAS PCRAIL + Precast railing LF -$ -$ -$ -$

MAS PCRAIL+ + Precast railing - radius curve LF -$ -$ -$ -$

MAS PCSILL & Precast sill LF -$ -$ -$ -$

MAS PCSILL< & Precast sill - small LF -$ -$ -$ -$

MAS PCTRIM + Precast trim LF -$ -$ -$ -$

MAS PCWCOPE & Precast wall coping LF -$ -$ -$ -$

MAS PL10 + Precast lintel - structural - 10" x 10" LF -$ -$ -$ -$

MAS PL12 + Precast lintel - structural - 12" x 12" LF -$ -$ -$ -$

MAS PL6 + Precast lintel - structural - 6" x 6" LF -$ -$ -$ -$

MAS PL6+ + Precast lintel - structural - 6" x 6" - decorative LF -$ -$ -$ -$

MAS PL8 + Precast lintel - structural - 8" x 8" LF -$ -$ -$ -$

MAS POINT + Re-point masonry SF -$ -$ -$ -$

MAS POINTB + Re-point masonry - block SF -$ -$ -$ -$

MAS QUOIN & Quoin - 8" x 8" x 12" EA -$ -$ -$ -$

MAS SLUM10 & Slump stone block - 10" width SF -$ -$ -$ -$

MAS SLUM12 & Slump stone block - 12" width SF -$ -$ -$ -$

MAS SLUM4 & Slump stone block - 4" width SF -$ -$ -$ -$

MAS SLUM6 & Slump stone block - 6" width SF -$ -$ -$ -$

MAS SLUM8 & Slump stone block - 8" width SF -$ -$ -$ -$

MAS STN & Stone veneer - natural stone SF -$ -$ -$ -$

MAS STN+ & Stone veneer - natural stone - High grade SF -$ -$ -$ -$

MAS STN< & Stone veneer - natural thin veneer (NTV) SF -$ -$ -$ -$

MAS STN<+ & Stone veneer - natural thin veneer (NTV) - High grade SF -$ -$ -$ -$

MAS STNBAND & Stone trim - band LF -$ -$ -$ -$

MAS STNC & Stone veneer - manufactured stone SF -$ -$ -$ -$

MAS STNC+ & Stone veneer - manufactured stone - High grade SF -$ -$ -$ -$

MAS STNCOL + Stone column - 36" diameter LF -$ -$ -$ -$

MAS STNCOL< + Stone column - 24" diameter LF -$ -$ -$ -$

MAS STNCOLB + Stone column base - Large EA -$ -$ -$ -$

MAS STNCOLC + Stone column capital - Large EA -$ -$ -$ -$

MAS STNGP + Stone veneer - Granite panel SF -$ -$ -$ -$

MAS STNRS + Stone veneer - Detach & reset SF -$ -$ -$ -$

MAS STRL12 & Stair - tread - limestone - 12" LF -$ -$ -$ -$

MAS STRL18 & Stair - tread - limestone - 18" LF -$ -$ -$ -$

MAS STRL6 & Stair - tread or riser - limestone - 6" LF -$ -$ -$ -$

MAS STWIN & Stone trim - windows LF -$ -$ -$ -$

MAS TRIMB & Limestone trim - Belt LF -$ -$ -$ -$

MAS TRIMBL & Limestone trim - Block EA -$ -$ -$ -$

MAS TRIMC & Limestone trim - Chamfer cap & trim (window header) EA -$ -$ -$ -$

MAS TRIMK & Limestone trim - Keystone EA -$ -$ -$ -$

MAS TRIMS & Limestone trim - Sill LF -$ -$ -$ -$

MAS TRIMWT & Limestone trim - Water table LF -$ -$ -$ -$

MAS WCC13 & Wall coping - clay - 13" LF -$ -$ -$ -$

MAS WCC18 & Wall coping - clay - 18" LF -$ -$ -$ -$

MAS WCC9 & Wall coping - clay - 9" LF -$ -$ -$ -$

MAS WCCF13 + Wall coping fitting - clay - 13" EA -$ -$ -$ -$

MAS WCCF18 + Wall coping fitting - clay - 18" EA -$ -$ -$ -$

MAS WCCF9 + Wall coping fitting - clay - 9" EA -$ -$ -$ -$

MAS WR10 + Add for pre-fabricated wire reinforcing, 10" LF -$ -$ -$ -$

MAS WR12 + Add for pre-fabricated wire reinforcing, 12" LF -$ -$ -$ -$

MAS WR6 + Add for pre-fabricated wire reinforcing, 6" LF -$ -$ -$ -$

MAS WR8 + Add for pre-fabricated wire reinforcing, 8" LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

Page 107: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

MBL B & Baseboard - cultured (simulated) marble LF -$ -$ -$ -$

MBL BIDITM + Marble - Cultured / Natural (Bid Item) EA -$ -$ -$ -$

MBL BN & Baseboard - natural marble/granite - prefabricated LF -$ -$ -$ -$

MBL BRS + Baseboard - natural or cultured marble - Detach & reset LF -$ -$ -$ -$

MBL CT & Countertop - cultured (simulated) marble SF -$ -$ -$ -$

MBL CTONX & Countertop - onyx SF -$ -$ -$ -$

MBL CTRS + Countertop - cultured marble - Detach & reset SF -$ -$ -$ -$

MBL LAB + Tile / Cultured Marble Installer - per hour HR -$ -$ -$ -$

MBL LABL + Tile / Cultured Marble - General Laborer - per hour HR -$ -$ -$ -$

MBL SILM4 & Sill - cultured marble on 2" x 4" wall LF -$ -$ -$ -$

MBL SILM6 & Sill - cultured marble on 2" x 6" wall LF -$ -$ -$ -$

MBL SILNM4 & Sill - natural marble on 2" x 4" wall LF -$ -$ -$ -$

MBL SILNM6 & Sill - natural marble on 2" x 6" wall LF -$ -$ -$ -$

MBL SNKN + Add for sink opening in natural marble (self-rimming sink) EA -$ -$ -$ -$

MBL SNKN+ + Add for sink opening in natural marble (bottom-mount sink) EA -$ -$ -$ -$

MBL SWRCC & Concrete shower curb - cultured marble - per LF LF -$ -$ -$ -$

MBL SWRCF & Framed shower curb - cultured marble - per LF LF -$ -$ -$ -$

MBL THR & Threshold - natural marble LF -$ -$ -$ -$

MBL THRC & Threshold - cultured marble LF -$ -$ -$ -$

MBL VTSNK & Vanity top - one sink - cultured marble LF -$ -$ -$ -$

MBL VTSNK+ & Vanity top - one sink - cultured marble - High grade LF -$ -$ -$ -$

MBL VTSNK> & Vanity top - two sinks - cultured marble LF -$ -$ -$ -$

MBL VTSNK>+ & Vanity top - two sinks - cultured marble - High grade LF -$ -$ -$ -$

MBL VTSNKO & Vanity top - one sink - cultured onyx LF -$ -$ -$ -$

MBL VTSNKO+ & Vanity top - one sink - cultured onyx - High grade LF -$ -$ -$ -$

MBL VTSNKO> & Vanity top - two sinks - cultured onyx LF -$ -$ -$ -$

MBL VTSNKRS + Vanity top - Detach & reset LF -$ -$ -$ -$

MBL VTSNO>+ & Vanity top - two sinks - cultured onyx - High grade LF -$ -$ -$ -$

MBL W & Wall veneer panels - cultured marble SF -$ -$ -$ -$

MBL WN & Wall veneer panels - natural marble SF -$ -$ -$ -$

MBL WSD & Wall - soap dish - cultured marble EA -$ -$ -$ -$

MBL WSHC & Wall - corner shelf - cultured marble EA -$ -$ -$ -$

MBL WSSDC & Wall - shampoo soap dish shelf - cultured marble EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

MPR BIDITM + Moisture Protection (Bid Item) EA -$ -$ -$ -$

MPR BR + Open cell backing rod, 1/2" LF -$ -$ -$ -$

MPR CLKA + Caulking - acrylic LF -$ -$ -$ -$

MPR CLKB + Caulking - butyl rubber LF -$ -$ -$ -$

MPR CLKF + Caulking - latex fire sealant LF -$ -$ -$ -$

MPR CLKF> + Caulking - latex fire sealant - 5/16" to 3/4" LF -$ -$ -$ -$

MPR CLKF» + Caulking - latex fire sealant - 9/16" to 1 1/4" LF -$ -$ -$ -$

MPR CLKFEA + Caulking - latex fire sealant - per opening EA -$ -$ -$ -$

MPR CLKFEA< + Caulking - latex fire sealant - per opening - small EA -$ -$ -$ -$

MPR CLKS + Caulking - silicone LF -$ -$ -$ -$

MPR CSGRAV + Moisture protection for crawl space - washed gravel SF -$ -$ -$ -$

MPR CSLIME + Moisture protection for crawl space - hydrated lime SF -$ -$ -$ -$

MPR CSR & Radon barrier for crawl space or under slab SF -$ -$ -$ -$

MPR CSV & Moisture protection for crawl space - visqueen - 6 mil SF -$ -$ -$ -$

MPR CSV> & Moisture protection for crawl space - visqueen - 10 mil SF -$ -$ -$ -$

MPR CSVT + Moisture protection - vapor barrier seam tape SF -$ -$ -$ -$

MPR DMAT + Waterproofing - Drainage mat SF -$ -$ -$ -$

MPR DMEM + Waterproofing - sheet membrane SF -$ -$ -$ -$

MPR DMPR + Dampproofing SF -$ -$ -$ -$

MPR DMPR+ + Dampproofing - asphalt emulsion SF -$ -$ -$ -$

MPR FLPANP + Flashing - Sill pan flashing - plastic - up to 4.5' sill EA -$ -$ -$ -$

MPR FLPANP> + Flashing - Sill pan flashing - plastic - greater than 4.5' EA -$ -$ -$ -$

MPR FLPANT + Flashing - Sill flashing - moldable tape LF -$ -$ -$ -$

MPR LAB + Moisture Protection Installer - per hour HR -$ -$ -$ -$

MPR LABL + Moisture Protection - General Laborer - per hour HR -$ -$ -$ -$

MPR WPRF + Waterproofing - two coats of emulsion over a glass fabric SF -$ -$ -$ -$

Page 108: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

MSD AV & Mirror - 1/4" plate glass SF -$ -$ -$ -$

MSD AV- & Mirror - 1/8" plate glass SF -$ -$ -$ -$

MSD AV+ & Mirror - 1/4" plate glass - gold veined or smoked SF -$ -$ -$ -$

MSD AVB1 + Additional cost to bevel a mirror up to 1" LF -$ -$ -$ -$

MSD AVB1> + Additional cost to bevel a mirror over 1" up to 1 1/2" LF -$ -$ -$ -$

MSD AVF & Mirror - framed SF -$ -$ -$ -$

MSD AVF+ & Mirror - framed - High grade SF -$ -$ -$ -$

MSD AVJ + Add metal J channel to a mirror LF -$ -$ -$ -$

MSD AVJ- + Add metal J channel to a mirror - Standard grade LF -$ -$ -$ -$

MSD AVRS + Mirror - plate glass - Detach & reset SF -$ -$ -$ -$

MSD BIDITM + Mirrors & Shower Doors (Bid Item) EA -$ -$ -$ -$

MSD LAB + Mirror & Shower Door Installer - per hour HR -$ -$ -$ -$

MSD LABL + Mirror & Shower Door - General Laborer - per hour HR -$ -$ -$ -$

MSD MN + Mirror/Shower Door - Labor Minimum EA -$ -$ -$ -$

MSD OHC + Outlet hole - cut into mirror EA -$ -$ -$ -$

MSD SDC & Custom shower door & partition - 1/4" glass w/frame SF -$ -$ -$ -$

MSD SDC+ & Custom shower door & partition - 1/2" glass - frameless SF -$ -$ -$ -$

MSD SDOR & Shower door EA -$ -$ -$ -$

MSD SDOR- & Shower door - Standard grade EA -$ -$ -$ -$

MSD SDOR+ & Shower door - High grade EA -$ -$ -$ -$

MSD SDOR++ & Shower door - Premium grade EA -$ -$ -$ -$

MSD SDOR> & Shower door - corner unit - oversized EA -$ -$ -$ -$

MSD SDOR>+ & Shower door - corner unit - oversized - High grade EA -$ -$ -$ -$

MSD SDOR>++ & Shower door - corner unit - oversized - Premium grade EA -$ -$ -$ -$

MSD SDORC & Shower door - comer unit EA -$ -$ -$ -$

MSD SDORC+ & Shower door - corner unit - High grade EA -$ -$ -$ -$

MSD SDORC++ & Shower door - corner unit - Premium grade EA -$ -$ -$ -$

MSD SDORCRS + Shower door system - corner unit - Detach & reset EA -$ -$ -$ -$

MSD SDORRS + Shower door system - Detach & reset EA -$ -$ -$ -$

MSD SDOR-RS + Shower door - slab only - Detach & reset EA -$ -$ -$ -$

MSD TIL & Mirror tile SF -$ -$ -$ -$

MSD TIL+ & Mirror tile - High grade SF -$ -$ -$ -$

MSD TIL++ & Mirror tile - Premium grade SF -$ -$ -$ -$

MSD TUBDR & Bathtub enclosure - sliding glass doors EA -$ -$ -$ -$

MSD TUBDR- & Bathtub enclosure - sliding glass doors - Standard grade EA -$ -$ -$ -$

MSD TUBDR+ & Bathtub enclosure - sliding glass doors - High grade EA -$ -$ -$ -$

MSD TUBDR++ & Bathtub enclosure - sliding glass doors - Premium grade EA -$ -$ -$ -$

MSD TUBDRRS + Bathtub end. - sliding glass door system - Detach & reset EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

MSK BIDITM + Mobile Homes, Skirting, & Setup (Bid Item) EA -$ -$ -$ -$

MSK BLK & Mobile home leveling - per 4" x 8" x 16" hollow block EA -$ -$ -$ -$

MSK BLK+ & Mobile home leveling - per 4" x 8" x 16" solid block EA -$ -$ -$ -$

MSK BRKDW + Break down prior to move EA -$ -$ -$ -$

MSK BRKSET + Break down prior to and set up after move EA -$ -$ -$ -$

MSK LAB + Mobile Home Skirting Installer - per hour HR -$ -$ -$ -$

MSK LABL + Mobile Home Skirting - General Laborer - per hour HR -$ -$ -$ -$

MSK LEV + Block and level - single wide EA -$ -$ -$ -$

MSK LEV> + Block and level - double wide EA -$ -$ -$ -$

MSK LEV>> + Block and level - triple wide EA -$ -$ -$ -$

MSK LV + Loss of value EA -$ -$ -$ -$

MSK MHD + Manufactured home double wide 1501-2000 SF SF -$ -$ -$ -$

MSK MHD- + Manufactured home double wide 1501-2000 SF - Std. SF -$ -$ -$ -$

grade

MSK MHD+ + Manufactured home double wide 1501-2000 SF - High SF -$ -$ -$ -$

grade

MSK MHD< + Manufactured home double wide 1000-1500 SF SF -$ -$ -$ -$

MSK MHD<- + Manufactured home double wide 1000-1500 SF - Std. SF -$ -$ -$ -$

grade

MSK MHD<+ + Manufactured home double wide 1000-1500 SF - High SF -$ -$ -$ -$

grade

Page 109: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

MSK MHD> + Manufactured home double wide 2001-3000 SF SF -$ -$ -$ -$

MSK MHD>- + Manufactured home double wide 2001-3000 SF - Std. SF -$ -$ -$ -$

grade

MSK MHD>+ + Manufactured home double wide 2001-3000 SF - High SF -$ -$ -$ -$

grade

MSK MHS + Manufactured home single wide 1001-1500 SF SF -$ -$ -$ -$

MSK MHS- + Manufactured home single wide 1001-1500 SF - Std. grade SF -$ -$ -$ -$

MSK MHS+ + Manufactured home single wide 1001-1500 SF - High SF -$ -$ -$ -$

grade

MSK MHS< + Manufactured home single wide 1000 SF or less SF -$ -$ -$ -$

MSK MHS<- + Manufactured home single wide 1000 SF or less - Std. SF -$ -$ -$ -$

grade

MSK MHS<+ + Manufactured home single wide 1000 SF or less - High SF -$ -$ -$ -$

grade

MSK MHT + Manufactured home triple wide 2000-3000 SF SF -$ -$ -$ -$

MSK MHT- + Manufactured home triple wide 2000-3000 SF - Std. grade SF -$ -$ -$ -$

MSK MHT+ + Manufactured home triple wide 2000-3000 SF - High grade SF -$ -$ -$ -$

MSK MHT> + Manufactured home triple wide 3001 SF or greater SF -$ -$ -$ -$

MSK MHT>- + Manufactured home triple wide 3001 SF or grt. - Std. grade SF -$ -$ -$ -$

MSK MHT>+ + Manufactured home triple wide 3001 SF or grt. - High SF -$ -$ -$ -$

grade

MSK MN + Mobile Home Setup/Skirting - Labor Minimum EA -$ -$ -$ -$

MSK MOVE + Moving - (Bid Item) EA -$ -$ -$ -$

MSK RELEV + Relevel - single wide EA -$ -$ -$ -$

MSK RELEV> + Relevel - double wide EA -$ -$ -$ -$

MSK RELEV» + Relevel - triple wide EA -$ -$ -$ -$

MSK SKRTDOR & Access door - in mobile home skirting EA -$ -$ -$ -$

MSK SKRTF & Skirting - T1-11 hardboard - 24" to 36" LF -$ -$ -$ -$

MSK SKRTF> & Skirting - T1-11 hardboard - 37" to 48" LF -$ -$ -$ -$

MSK SKRTM & Skirting - metal - 24" to 36" LF -$ -$ -$ -$

MSK SKRTM> & Skirting - metal - 37" to 48" LF -$ -$ -$ -$

MSK SKRTMP & Skirting - metal panels - 24" to 36" LF -$ -$ -$ -$

MSK SKRTMP> & Skirting - metal panels - 37" to 48" LF -$ -$ -$ -$

MSK SKRTRS + Skirting - 24" to 36" - Detach & reset LF -$ -$ -$ -$

MSK SKRTRS> + Skirting - 37" to 48" - Detach & reset LF -$ -$ -$ -$

MSK SKRTV & Skirting - vinyl or plastic - 24" to 36" LF -$ -$ -$ -$

MSK SKRTV> & Skirting - vinyl or plastic - 37" to 48" LF -$ -$ -$ -$

MSK SKRTVP & Skirting - vinyl or plastic panels - 24" to 36" LF -$ -$ -$ -$

MSK SKRTVP> & Skirting - vinyl or plastic panels - 37" to 48" LF -$ -$ -$ -$

MSK SKTBA & Mobile home metal skirt track/trim - bottom LF -$ -$ -$ -$

MSK SKTBTV & Mobile home vinyl skirt track/trim - bottom LF -$ -$ -$ -$

MSK SKTBV & Mobile home vinyl skirt track/trim - top/back LF -$ -$ -$ -$

MSK SKTFV & Mobile home vinyl skirt trim - top/front LF -$ -$ -$ -$

MSK SKTTA & Mobile home metal skirt track/trim - top LF -$ -$ -$ -$

MSK STAND & Park stand or pier with screw adjuster EA -$ -$ -$ -$

MSK WHDOR & Access door - water heater in mobile home EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

MTL ASHD & Ash dump door (fireplace clean-out) EA -$ -$ -$ -$

MTL BENCH & Security bench - steel LF -$ -$ -$ -$

MTL BIDITM + Metal Structures & Components (Bid Item) EA -$ -$ -$ -$

MTL HRAF + Handrail - Aluminum (no glass) - Floor mounted LF -$ -$ -$ -$

MTL HRAF+ + Handrail - Alum/without glass - Floor mtd. - High grade LF -$ -$ -$ -$

MTL HRAG + Handrail - Aluminum & glass - Floor mounted LF -$ -$ -$ -$

MTL HRAG+ + Handrail - Alum. & glass - Floor mtd. - High grade LF -$ -$ -$ -$

MTL HRAW + Handrail - Aluminum (no glass) - Wall mounted LF -$ -$ -$ -$

MTL HRSCH & Handrail - Steel - Floor mounted - Chain railing LF -$ -$ -$ -$

MTL HRSP1 & Handrail - Steel pipe - Floor mounted - 1 rail LF -$ -$ -$ -$

MTL HRSP2 & Handrail - Steel pipe - Floor mounted - 2 rail LF -$ -$ -$ -$

MTL HRSP3 & Handrail - Steel pipe - Floor mounted - 3 rail LF -$ -$ -$ -$

MTL HRSP4 & Handrail - Steel pipe - Floor mounted - 4 rail LF -$ -$ -$ -$

MTL HRSP5 & Handrail - Steel pipe - Floor mounted - 5 rail LF -$ -$ -$ -$

MTL HRSPP & Handrail - Steel pipe - Floor mounted - w/pickets LF -$ -$ -$ -$

Page 110: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

MTL HRSPW & Handrail - Steel pipe - Wall mounted LF -$ -$ -$ -$

MTL HRSRS + Handrail - Steel pipe - Detach & reset LF -$ -$ -$ -$

MTL HRSSC & Handrail - Stainless steel - Floor mounted - w/wire cables LF -$ -$ -$ -$

MTL LAB + Metal Structure Installer - per hour HR -$ -$ -$ -$

MTL LABL + Metal Structure - General Laborer - per hour HR -$ -$ -$ -$

MTL LADDER & Ladder - steel fabricated - wall mounted LF -$ -$ -$ -$

MTL MN + Metal Structure - Labor Minimum EA -$ -$ -$ -$

MTL MNRP + Metal Structure Repair - Min. Charge - Labor and Material EA -$ -$ -$ -$

MTL MSC + Miscellaneous metal framing/accessories SF -$ -$ -$ -$

MTL NOSE + Stair nosing - cast metal LF -$ -$ -$ -$

MTL PMBA & Pre-eng. Metal Building w/o sheeting (3000-3999 sf) SF -$ -$ -$ -$

MTL PMBA< & Pre-eng. Metal Building w/o sheeting (2000-2999 sf) SF -$ -$ -$ -$

MTL PMBA<< & Pre-eng. Metal Building w/o sheeting (1000-1999 sf) SF -$ -$ -$ -$

MTL PMBA> & Pre-eng. Metal Building w/o sheeting (4000-4999 sf) SF -$ -$ -$ -$

MTL PMBA>> & Pre-eng. Metal Building w/o sheeting (5000-5999 sf) SF -$ -$ -$ -$

MTL PMBA>>> & Pre-eng. Metal Building w/o sheeting (6000 sf or greater) SF -$ -$ -$ -$

MTL PNLC & Wall/roof panel - corrugated - 26 gauge SF -$ -$ -$ -$

MTL PNLC- & Wall/roof panel - corrugated - 29 gauge SF -$ -$ -$ -$

MTL PNLC-- & Wall/roof panel - corrugated - 29 gauge - galv. SF -$ -$ -$ -$

MTL PNLC+ & Wall/roof panel - corrugated - 24 gauge SF -$ -$ -$ -$

MTL PNLCA & Wall/roof panel - corrugated - 29 gauge - Agricultural SF -$ -$ -$ -$

MTL PNLCR & Outside/Inside corner - 26 gauge LF -$ -$ -$ -$

MTL PNLCR- & Outside/Inside corner - 29 gauge LF -$ -$ -$ -$

MTL PNLCS & Closure strips for metal panels LF -$ -$ -$ -$

MTL PNLI & Insulated metal panel - 2" - embossed/textured SF -$ -$ -$ -$

MTL PNLI- & Insulated metal panel - 1/2" - smooth/painted SF -$ -$ -$ -$

MTL PNLJ & Metal J trim - metal building LF -$ -$ -$ -$

MTL PNLR & Wall/roof panel - ribbed - 26 gauge - up to 1" SF -$ -$ -$ -$

MTL PNLR- & Wall/roof panel - ribbed - 29 gauge - up to 1" SF -$ -$ -$ -$

MTL PNLR+ & Wall/roof panel - ribbed - 24 gauge - up to 1" SF -$ -$ -$ -$

MTL PNLR> & Wall/roof panel - ribbed - 26 gauge - 1 1/8" to 1 1/2" SF -$ -$ -$ -$

MTL PNLR>+ & Wall/roof panel - ribbed - 24 gauge - 1 1/8" to 1 1/2" SF -$ -$ -$ -$

MTL PNLRC & Wall/roof panel - ribbed - up to 1" - 26 gauge SF -$ -$ -$ -$

MTL PNLRC- & Wall/roof panel - ribbed - to 1" - 29 gauge - Agricultural SF -$ -$ -$ -$

MTL PNLRCP & Wall/roof panel - ribbed - to 1" - 29 gauge - Agr. (pert) SF -$ -$ -$ -$

MTL PP & Post and pole framed steel building SF -$ -$ -$ -$

MTL RFGCA & Roof panel - aluminum - mill finish - Agricultural SF -$ -$ -$ -$

MTL RFGPR & Metal roofing - corrugated - 29 gauge - Agricultural SF -$ -$ -$ -$

MTL SSRFG & Standing seam metal roofing SF -$ -$ -$ -$

MTL STRACC + Commercial stairwell - accessory components SF -$ -$ -$ -$

MTL TR6 + Metal truss - 6/12 slope LF -$ -$ -$ -$

MTL XBRAC & X-bracing - 5/16" galvanized cable LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

ORI BALB & Ornamental iron baluster - single basket EA -$ -$ -$ -$

ORI BALB+ & Ornamental iron baluster - double basket EA -$ -$ -$ -$

ORI BALT & Ornamental iron baluster - single twist EA -$ -$ -$ -$

ORI BALT+ & Ornamental iron baluster - double twist EA -$ -$ -$ -$

ORI BIDITM + Ornamental Iron (Bid Item) EA -$ -$ -$ -$

ORI COR & Ornamental iron corbel - 8" EA -$ -$ -$ -$

ORI CRES & Ornamental iron cresting LF -$ -$ -$ -$

ORI CRES+ & Ornamental iron cresting - High grade LF -$ -$ -$ -$

ORI DORS & Ornamental iron - Security door EA -$ -$ -$ -$

ORI DORS+ & Ornamental iron - Security door - High grade EA -$ -$ -$ -$

ORI DORS++ & Ornamental iron - Security door - Premium grade EA -$ -$ -$ -$

ORI DORSRS + Ornamental iron - Security door - Detach & reset EA -$ -$ -$ -$

ORI FEN4 & Ornamental iron fencing - 4' high LF -$ -$ -$ -$

ORI FEN4+ & Ornamental iron fencing - 4' high - High grade LF -$ -$ -$ -$

ORI FEN6 & Ornamental iron fencing - 6' high LF -$ -$ -$ -$

ORI FEN6+ & Ornamental iron fencing - 6' high - High grade LF -$ -$ -$ -$

ORI GRIL & Ornamental iron - security grill - window SF -$ -$ -$ -$

ORI GRIL- & Ornamental iron - security grill - window - Standard grade SF -$ -$ -$ -$

ORI GRILQR & Ornamental iron - security grill - quick release lock EA -$ -$ -$ -$

Page 111: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

ORI GRILRS + Ornamental iron - security grill - Detach & reset SF -$ -$ -$ -$

ORI LAB + Ornamental Iron Worker - per hour HR -$ -$ -$ -$

ORI LABL + Ornamental Iron - General Laborer - per hour HR -$ -$ -$ -$

ORI MN + Ornamental Iron - Labor Minimum EA -$ -$ -$ -$

ORI ORGT & Ornamental iron fence gate, 3' - 4' wide - 3' - 4' high EA -$ -$ -$ -$

ORI ORGT> & Ornamental iron fence gate, 3' - 4' wide - 5' - 6' high EA -$ -$ -$ -$

ORI ORGT6 & Ornamental iron fence gate, 5' - 6' wide - 3' - 4' high EA -$ -$ -$ -$

ORI ORGT6> & Ornamental iron fence gate, 5' - 6' wide - 5' - 6' high EA -$ -$ -$ -$

ORI ORGTRS + Ornamental iron fence gate - Detach & reset EA -$ -$ -$ -$

ORI ORP & Ornamental iron post - 4' high fence EA -$ -$ -$ -$

ORI ORP> & Ornamental iron post - 6' high fence EA -$ -$ -$ -$

ORI ORRS + Ornamental iron handrail - Detach & reset LF -$ -$ -$ -$

ORI ORSP & Ornamental iron handrail w/ straight pickets, 3' high LF -$ -$ -$ -$

ORI ORTP & Ornamental iron handrail w/ twisted pickets, 3' high LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

PLA 2 & Two coat plaster (no lath) SF -$ -$ -$ -$

PLA APG & Acoustic plaster over 1/2" gypsum core blueboard SF -$ -$ -$ -$

PLA APG5/8 & Acoustic plaster over 5/8" gypsum core blueboard SF -$ -$ -$ -$

PLA APM & Acoustic plaster over metal lath SF -$ -$ -$ -$

PLA BIDITM + Interior Lath & Plaster (Bid Item) EA -$ -$ -$ -$

PLA BL>H & 5/8" blueboard - hung only (no tape or finish) SF -$ -$ -$ -$

PLA BLH & 1/2" blueboard - hung only (no tape or finish) SF -$ -$ -$ -$

PLA COFFER + Plaster - add for coffers/domes SF -$ -$ -$ -$

PLA DETAILC + Plaster - add for ceiling detailing/trim LF -$ -$ -$ -$

PLA G2 & Two coat plaster over 1/2" gypsum core blueboard SF -$ -$ -$ -$

PLA G2> & Two coat plaster over 5/8" gypsum core blueboard SF -$ -$ -$ -$

PLA LAB + Plasterer - per hour HR -$ -$ -$ -$

PLA LABL + Plaster - General Laborer - per hour HR -$ -$ -$ -$

PLA M2 & Two coat plaster over metal lath SF -$ -$ -$ -$

PLA M3 & Three coat plaster over metal lath SF -$ -$ -$ -$

PLA MASKLF + Mask wall - plastic, paper, tape (per LF) LF -$ -$ -$ -$

PLA MASKSF + Mask per square foot for plaster work SF -$ -$ -$ -$

PLA MED & Ceiling medallion - molded polymer EA -$ -$ -$ -$

PLA MN + Plaster - Labor Minimum EA -$ -$ -$ -$

PLA MNRP + Interior Plaster Repair - Min. Charge - Labor and Material EA -$ -$ -$ -$

PLA PATCH + Plaster patch / small repair - ready for paint EA -$ -$ -$ -$

PLA THIN + Thin coat plaster (no lath) SF -$ -$ -$ -$

PLA THING & Thin coat plaster over 1/2" gypsum core blueboard SF -$ -$ -$ -$

PLA THING> & Thin coat plaster over 5/8" gypsum core blueboard SF -$ -$ -$ -$

PLA VEN2 + Venetian plaster - two coats SF -$ -$ -$ -$

PLA VEN3 + Venetian plaster - three coats SF -$ -$ -$ -$

PLA VEN4 + Venetian plaster - four coats SF -$ -$ -$ -$

PLA WLATH - Tear off plaster on wood lath SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

PLM AAV & Air admittance valve (AAV) - 1.5" to 2" EA -$ -$ -$ -$

PLM AAV> & Air admittance valve (AAV) - 3" to 4" EA -$ -$ -$ -$

PLM ACID + Acid waste piping LF -$ -$ -$ -$

PLM ACIDF + Acid waste piping - Fire resistant - PVDF LF -$ -$ -$ -$

PLM ACIDPT & P-trap assembly - Acid waste piping (PVDF) EA -$ -$ -$ -$

PLM ACIDTNK + Acid waste neutralization tank EA -$ -$ -$ -$

PLM AIR1 & Compressed air piping LF -$ -$ -$ -$

PLM AIRD + Dental air compressor EA -$ -$ -$ -$

PLM BFAU & Bidet - faucet w/fittings EA -$ -$ -$ -$

PLM BFAU+ & Bidet - faucet w/fittings - High grade EA -$ -$ -$ -$

PLM BFAU++ & Bidet - faucet w/fittings - Premium grade EA -$ -$ -$ -$

PLM BFLOW> & Backflow preventer - 10" - single check valve EA -$ -$ -$ -$

PLM BFP4 & Backflow preventer - 4" EA -$ -$ -$ -$

PLM BFP8 & Backflow preventer - 8" EA -$ -$ -$ -$

PLM BFPD1 & Backflow preventer - 1" - Dual check valve EA -$ -$ -$ -$

Page 112: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PLM BFPD1< & Backflow preventer - 3/4" - Dual check valve EA -$ -$ -$ -$

PLM BFV3 & Butterfly valve - 3" EA -$ -$ -$ -$

PLM BFV4 & Butterfly valve - 4" EA -$ -$ -$ -$

PLM BFV6 & Butterfly valve - 6" EA -$ -$ -$ -$

PLM BFV8 & Butterfly valve - 8" EA -$ -$ -$ -$

PLM BID & Bidet EA -$ -$ -$ -$

PLM BID+ & Bidet - High grade EA -$ -$ -$ -$

PLM BIDITM + Plumbing (Bid Item) EA -$ -$ -$ -$

PLM BIDRS + Bidet - Detach & reset EA -$ -$ -$ -$

PLM BP1 & Black pipe with fitting and hanger, 1" LF -$ -$ -$ -$

PLM BP1/2 & Black pipe with fitting and hanger, 1/2" LF -$ -$ -$ -$

PLM BP2 & Black pipe with fitting and hanger, 2" LF -$ -$ -$ -$

PLM BP3 & Black pipe with fitting and hanger, 3" LF -$ -$ -$ -$

PLM BP3/4 & Black pipe with fitting and hanger, 3/4" LF -$ -$ -$ -$

PLM BP4 & Black pipe with fitting and hanger, 4" LF -$ -$ -$ -$

PLM BP6 & Black steel pipe 6" x .188" wall thickness - no fittings LF -$ -$ -$ -$

PLM BPRS + Black or Galvanized pipe - Detach & reset LF -$ -$ -$ -$

PLM BV1 & Ball valve - brass - 1" EA -$ -$ -$ -$

PLM BV1/2 & Ball valve - brass - up to 1/2" EA -$ -$ -$ -$

PLM BV2 & Ball valve - brass - 2" EA -$ -$ -$ -$

PLM BV3 & Ball valve - brass - 3" EA -$ -$ -$ -$

PLM BV3/4 & Ball valve - brass - 3/4" EA -$ -$ -$ -$

PLM BV3/4E & Ball valve - 3/4" - electronic (smart home compatible) EA -$ -$ -$ -$

PLM BV4 & Ball valve - brass - 4" EA -$ -$ -$ -$

PLM BV5/8 & Ball valve - brass - 5/8" EA -$ -$ -$ -$

PLM BWV4 + Backwater valve - 4" EA -$ -$ -$ -$

PLM BWV6 + Backwater valve - 6" EA -$ -$ -$ -$

PLM CF & Claw-foot tub EA -$ -$ -$ -$

PLM CF- & Claw-foot tub - Standard grade EA -$ -$ -$ -$

PLM CF+ & Claw-foot tub - High grade EA -$ -$ -$ -$

PLM CFCR & Claw-foot shower curtain surround EA -$ -$ -$ -$

PLM CFCR- & Claw-foot shower curtain surround - Standard grade EA -$ -$ -$ -$

PLM CFCR+ & Claw-foot shower curtain surround - High grade EA -$ -$ -$ -$

PLM CFFAU & Claw-foot tub faucet EA -$ -$ -$ -$

PLM CFFAU- & Claw-foot tub faucet - Standard grade EA -$ -$ -$ -$

PLM CFFAU+ & Claw-foot tub faucet - High grade EA -$ -$ -$ -$

PLM CFFAUH & Claw-foot tub faucet w/hand-held shower EA -$ -$ -$ -$

PLM CFFAUH- & Claw-foot tub faucet w/hand held shower - Standard grade EA -$ -$ -$ -$

PLM CFFAUH+ & Claw-foot tub faucet w/hand held shower - High grade EA -$ -$ -$ -$

PLM CFFAUS & Claw-foot tub faucet with shower EA -$ -$ -$ -$

PLM CFFAUS- & Claw-foot tub faucet with shower - Standard grade EA -$ -$ -$ -$

PLM CFFAUS+ & Claw-foot tub faucet with shower - High grade EA -$ -$ -$ -$

PLM CFFSTRS + Clawfoot tub/shower faucet (finish trim) - Detach & reset EA -$ -$ -$ -$

PLM CI-F1 TRS + Clawfoot tub faucet (finish trim) - Detach & reset EA -$ -$ -$ -$

PLM CFRS + Claw-foot tub - Detach & reset EA -$ -$ -$ -$

PLM CFSL & Claw-foot tub supply lines EA -$ -$ -$ -$

PLM CFSL- & Claw-foot tub supply lines - Standard grade EA -$ -$ -$ -$

PLM CFSL+ & Claw-foot tub supply lines - High grade EA -$ -$ -$ -$

PLM CFWO & Claw-foot tub - waste & overflow drain EA -$ -$ -$ -$

PLM CFWO- & Claw-foot tub - waste & overflow drain - Standard grade EA -$ -$ -$ -$

PLM CFWO+ & Claw-foot tub - waste & overflow drain - High grade EA -$ -$ -$ -$

PLM CHV1 & Swing check valve - brass - 7/8" to 1 1/4" EA -$ -$ -$ -$

PLM CHV3/4 & Swing check valve - brass - up to 3/4" EA -$ -$ -$ -$

PLM CI1-1/2 & Cast iron pipe (no-hub) with fitting and hanger, 1-1/2" LF -$ -$ -$ -$

PLM CI12 & Cast iron pipe (no hub) with fitting and hanger, 12" LF -$ -$ -$ -$

PLM Cl2 & Cast iron pipe (no-hub) with fitting and hanger, 2" LF -$ -$ -$ -$

PLM CI3 & Cast iron pipe (no-hub) with fitting and hanger, 3" LF -$ -$ -$ -$

PLM CI4 & Cast iron pipe (no-hub) with fitting and hanger, 4" LF -$ -$ -$ -$

PLM CI6 & Cast iron pipe (no-hub) with fitting and hanger, 6" LF -$ -$ -$ -$

PLM CI8 & Cast iron pipe (no-hub) with fitting and hanger, 8" LF -$ -$ -$ -$

PLM CIRS + Cast iron pipe (no hub) - Detach & reset LF -$ -$ -$ -$

PLM C06 + Sewer clean-out - 6" diameter EA -$ -$ -$ -$

PLM CPUMP< & Circulator pump - cast iron - 1 1/2" - 1/8 to 1/6 HP EA -$ -$ -$ -$

PLM CPUMP<+ & Circulator pump - bronze - 1 1/2" - 1/8 to 1/6 HP EA -$ -$ -$ -$

PLM CPUMP<< & Circulator pump - cast iron - 3/4" - 1/40 to 1/20 HP EA -$ -$ -$ -$

Page 113: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PLM CPUMP> & Circulator pump - cast iron - 20 HP EA -$ -$ -$ -$

PLM DRN1 & Drain/Vent line-ABS pipe with fitting and hanger, 1-1/2" LF -$ -$ -$ -$

PLM DRN2 & Drain/Vent line - ABS pipe with fitting and hanger, 2" LF -$ -$ -$ -$

PLM DRN3 & Drain/Vent line - ABS pipe with fitting and hanger, 3" LF -$ -$ -$ -$

PLM DRN4 & Drain/Vent line - ABS pipe with fitting and hanger, 4" LF -$ -$ -$ -$

PLM DRN6 & Drain/Vent line - ABS pipe with fitting and hanger, 6" LF -$ -$ -$ -$

PLM DRNF + Foundation drainage system - French drain & drainage mat LF -$ -$ -$ -$

PLM DRNFR + Foundation drainage system - French drain LF -$ -$ -$ -$

PLM DRNP1 & Drain/Vent line - PVC pipe with fitting and hanger, 1-1/2" LF -$ -$ -$ -$

PLM DRNP2 & DrainNent line - PVC pipe with fitting and hanger, 2" LF -$ -$ -$ -$

PLM DRNP3 & Drain/Vent line - PVC pipe with fitting and hanger, 3" LF -$ -$ -$ -$

PLM DRNP4 & Drain/Vent line - PVC pipe with fitting and hanger, 4" LF -$ -$ -$ -$

PLM DRNP6 & DrainNent line - PVC pipe with fitting and hanger, 6" LF -$ -$ -$ -$

PLM DRNRS + DrainNent line - ABS or PVC pipe - Detach & reset LF -$ -$ -$ -$

PLM DW + Dishwasher connection EA -$ -$ -$ -$

PLM EQCK + Plumbing equipment connections - Commercial kitchen EA -$ -$ -$ -$

PLM FAU & Sink faucet - Kitchen EA -$ -$ -$ -$

PLM FAU- & Sink faucet - Kitchen - Standard grade EA -$ -$ -$ -$

PLM FAU-- & Sink faucet - Kitchen - Economy grade EA -$ -$ -$ -$

PLM FAU+ & Sink faucet - Kitchen - High grade EA -$ -$ -$ -$

PLM FAU++ & Sink faucet - Kitchen - Premium grade EA -$ -$ -$ -$

PLM FAU+++ & Sink faucet - Kitchen - Deluxe grade EA -$ -$ -$ -$

PLM FAUB & Sink faucet - Brass EA -$ -$ -$ -$

PLM FAUBA & Sink faucet - Bathroom EA -$ -$ -$ -$

PLM FAUBA- & Sink faucet - Bathroom - Standard grade EA -$ -$ -$ -$

PLM FAUBA-- & Sink faucet - Bathroom - Economy grade EA -$ -$ -$ -$

PLM FAUBA+ & Sink faucet - Bathroom - High grade EA -$ -$ -$ -$

PLM FAUBA++ & Sink faucet - Bathroom - Premium grade EA -$ -$ -$ -$

PLM FAUBAD & Sink faucet - Bathroom - Deluxe grade EA -$ -$ -$ -$

PLM FAUGOLD & Sink faucet - Gold plated EA -$ -$ -$ -$

PLM FAUKDM & Faucet for kitchen sink - mobile home EA -$ -$ -$ -$

PLM FAUPF & Pot filler faucet EA -$ -$ -$ -$

PLM FAUPF- & Pot filler faucet - Standard grade EA -$ -$ -$ -$

PLM FAUPF+ & Pot filler faucet - High grade EA -$ -$ -$ -$

PLM FAUPF++ & Pot filler faucet - Premium grade EA -$ -$ -$ -$

PLM FAURS + Sink faucet - Detach & reset EA -$ -$ -$ -$

PLM FAUS & Sink sprayer attachment - side pull EA -$ -$ -$ -$

PLM FAUS+ & Sink sprayer attachment - center pull EA -$ -$ -$ -$

PLM FAUS++ & Sink sprayer attachment - center pull - High grade EA -$ -$ -$ -$

PLM FAUSP+ & Sink sprayer attachment - side pull - High grade EA -$ -$ -$ -$

PLM FLD & Floor drain - tub/shower - metal/plastic EA -$ -$ -$ -$

PLM FLDCI + Floor drain - cast iron (no-hub) - 2" to 4" EA -$ -$ -$ -$

PLM FLDCI> + Floor drain - cast iron (no-hub) - 6" EA -$ -$ -$ -$

PLM FLDPVC + Floor drain - PVC - 2" to 4" EA -$ -$ -$ -$

PLM FLDPVC> + Floor drain - PVC - 6" EA -$ -$ -$ -$

PLM FLDR + Floor drain system SF -$ -$ -$ -$

PLM FM6 & Flow meter - water - 6" EA -$ -$ -$ -$

PLM FNTN & Drinking fountain EA -$ -$ -$ -$

PLM FNTN+ & Drinking fountain with cooler EA -$ -$ -$ -$

PLM FNTNE & Eye wash fountain EA -$ -$ -$ -$

PLM FSNK10 & Floor sink with grate - 10" sump depth EA -$ -$ -$ -$

PLM FSNK6 & Floor sink with grate - 6" sump depth EA -$ -$ -$ -$

PLM FSNK8 & Floor sink with grate - 8" sump depth EA -$ -$ -$ -$

PLM FT1/2C2 & Flexible gas supply line connector - 1/2" - up to 24" EA -$ -$ -$ -$

PLM FT1/2C4 & Flexible gas supply line connector - 1/2" - 25" to 48" EA -$ -$ -$ -$

PLM FT1/2C6 & Flexible gas supply line connector - 1/2" - 49" to 72" EA -$ -$ -$ -$

PLM FT3/8C2 & Flexible gas supply line connector - 3/8" - up to 24" EA -$ -$ -$ -$

PLM FT3/8C4 & Flexible gas supply line connector - 3/8" - 25" to 48" EA -$ -$ -$ -$

PLM FT3/8C6 & Flexible gas supply line connector - 3/8" - 49" to 72" EA -$ -$ -$ -$

PLM FT5/8C2 & Flexible gas supply line connector - 5/8" - up to 24" EA -$ -$ -$ -$

PLM FT5/8C4 & Flexible gas supply line connector - 5/8" - 25" to 48" EA -$ -$ -$ -$

PLM FT5/8C6 & Flexible gas supply line connector - 5/8" - 49" to 72" EA -$ -$ -$ -$

PLM FTLF1 & Flexible gas tubing - CSST, 1" per LF LF -$ -$ -$ -$

PLM FTLF3/4 & Flexible gas tubing - CSST, 3/4" - per LF LF -$ -$ -$ -$

PLM FTMAN & Manifold for flexible gas tubing - CSST EA -$ -$ -$ -$

Page 114: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PLM FTREG & Pressure regulator for flexible gas tubing - CSST EA -$ -$ -$ -$

PLM FTSTUB & Flexible gas tubing - CSST - per stub out - up to 1/2" EA -$ -$ -$ -$

PLM FV2 & Float valve - 2" EA -$ -$ -$ -$

PLM GAS1 + Natural gas service line LF -$ -$ -$ -$

PLM GES & Emergency stop push button EA -$ -$ -$ -$

PLM GHIS & Greenhouse - Irrigation system (automatic) LF -$ -$ -$ -$

PLM GP1 & Galvanized pipe with fitting and hanger, 1" LF -$ -$ -$ -$

PLM GP1/2 & Galvanized pipe with fitting and hanger, 1/2" LF -$ -$ -$ -$

PLM GP1-1/2 & Galvanized pipe with fitting and hanger, 1-1/2" LF -$ -$ -$ -$

PLM GP2 & Galvanized pipe with fitting and hanger, 2" LF -$ -$ -$ -$

PLM GP3/4 & Galvanized pipe with fitting and hanger, 3/4" LF -$ -$ -$ -$

PLM GRI + Grease interceptor - 1300 gallon EA -$ -$ -$ -$

PLM GRI< + Grease separator - small EA -$ -$ -$ -$

PLM GSV & Gas solenoid valve EA -$ -$ -$ -$

PLM GV1 & Gate valve - 1" EA -$ -$ -$ -$

PLM GV1/2 & Gate valve - 1/2" EA -$ -$ -$ -$

PLM GV3 & Gate valve - 3" EA -$ -$ -$ -$

PLM GV3/4 & Gate valve - 3/4" EA -$ -$ -$ -$

PLM GVF3 & Globe valve- flanged - 2 way - 3" EA -$ -$ -$ -$

PLM GVF4 & Globe valve- flanged - 2 way - 4" EA -$ -$ -$ -$

PLM GVF6 & Globe valve- flanged - 2 way - 6" EA -$ -$ -$ -$

PLM GVF8 & Globe valve- flanged - 2 way - 8" EA -$ -$ -$ -$

PLM GVFM6 & Globe mixing valve - flanged - 3 way - 6" EA -$ -$ -$ -$

PLM HAI & Hammer arrester - 1" EA -$ -$ -$ -$

PLM HA1/2 & Hammer arrester - 1/2" EA -$ -$ -$ -$

PLM HD & Instant hot water dispenser EA -$ -$ -$ -$

PLM HD- & Instant hot water dispenser - Standard grade EA -$ -$ -$ -$

PLM HD+ & Instant hot water dispenser - High grade EA -$ -$ -$ -$

PLM HD++ & Instant hot water dispenser - Premium grade EA -$ -$ -$ -$

PLM JT & Jetted tub - Acrylic EA -$ -$ -$ -$

PLM JT- & Jetted tub - Acrylic - Standard grade EA -$ -$ -$ -$

PLM JT+ & Jetted tub - Acrylic - High grade EA -$ -$ -$ -$

PLM JT++ & Jetted tub - Acrylic - Premium grade EA -$ -$ -$ -$

PLM JTCNR & Jetted tub - Acrylic - corner unit EA -$ -$ -$ -$

PLM JTCNR- & Jetted tub - Acrylic - corner unit - Standard grade EA -$ -$ -$ -$

PLM JTCNR+ & Jetted tub - Acrylic - corner unit - High grade EA -$ -$ -$ -$

PLM JTCNR++ & Jetted tub - Acrylic - corner unit - Premium grade EA -$ -$ -$ -$

PLM JTFAU & Jetted tub faucet EA -$ -$ -$ -$

PLM JTFAU+ & Jetted tub faucet - High grade EA -$ -$ -$ -$

PLM JTRS + Jetted tub - Acrylic - Detach & reset EA -$ -$ -$ -$

PLM LAB + Plumber - per hour HR -$ -$ -$ -$

PLM LABL + Plumber - General Laborer - per hour HR -$ -$ -$ -$

PLM LDP & Laundry drip pan - single appliance pan - Plastic EA -$ -$ -$ -$

PLM LDP+ & Laundry drip pan - single appliance pan - Acrylic EA -$ -$ -$ -$

PLM LDP2+ & Laundry drip pan - double appliance pan - Acrylic EA -$ -$ -$ -$

PLM LEAK + Fee to detect underslab leak EA -$ -$ -$ -$

PLM LINTC + Lint interceptor - Commercial EA -$ -$ -$ -$

PLM LTUB & Laundry tub EA -$ -$ -$ -$

PLM LTUB- & Laundry tub - Standard grade EA -$ -$ -$ -$

PLM LTUB+ & Laundry tub - High grade EA -$ -$ -$ -$

PLM LTUB++ & Laundry tub - Premium grade EA -$ -$ -$ -$

PLM LTUBRS + Laundry tub - Detach & reset EA -$ -$ -$ -$

PLM MN + Plumbing - Labor Minimum EA -$ -$ -$ -$

PLM NAILP + Nail plate EA -$ -$ -$ -$

PLM NAILP> + Nail plate - Large EA -$ -$ -$ -$

PLM PEXMAN & Distribution manifold for PEX tubing EA -$ -$ -$ -$

PLM PEXMAN> & Distribution manifold for PEX tubing - Large EA -$ -$ -$ -$

PLM PF1 & Foam pipe insulation - 1" wall for 1" to 1 1/2" pipe LF -$ -$ -$ -$

PLM PF1/2 & Foam pipe insulation - 1/2" wall for 1" to 1 1/2" pipe LF -$ -$ -$ -$

PLM PF1/2< & Foam pipe insulation - 1/2" wall for 1/8" to 3/4" pipe LF -$ -$ -$ -$

PLM PF1/2> & Foam pipe insulation - 1/2" wall for 2" to 3" pipe LF -$ -$ -$ -$

PLM PF1< & Foam pipe insulation - 1" wall for 1/8" to 3/4" pipe LF -$ -$ -$ -$

PLM PF1> & Foam pipe insulation - 1" wall for 2" to 3" pipe LF -$ -$ -$ -$

PLM PF3/4 & Foam pipe insulation - 3/4" wall for 1" to 1 1/2" pipe LF -$ -$ -$ -$

PLM PF3/4< & Foam pipe insulation - 3/4" wall for 1/8" to 3/4" pipe LF -$ -$ -$ -$

Page 115: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PLM PF3/4> & Foam pipe insulation - 3/4" wall for 2" to 3" pipe LF -$ -$ -$ -$

PLM PLUG + Toilet/sink/drain plug - disposable - up to 4" EA -$ -$ -$ -$

PLM PSNK & Pedestal sink EA -$ -$ -$ -$

PLM PSNK- & Pedestal sink - Standard grade EA -$ -$ -$ -$

PLM PSNK+ & Pedestal sink - High grade EA -$ -$ -$ -$

PLM PSNK++ & Pedestal sink - Premium grade EA -$ -$ -$ -$

PLM PSNKR + Pedestal sink - Reset EA -$ -$ -$ -$

PLM PSNKRS + Pedestal sink - Detach & reset EA -$ -$ -$ -$

PLM PTRAP & P-trap assembly - ABS (plastic) EA -$ -$ -$ -$

PLM PTRAPRS + P-trap assembly - Detach & reset EA -$ -$ -$ -$

PLM PUMP & Well pump - 5 HP - 150' deep EA -$ -$ -$ -$

PLM PUMP> & Well pump - 50 HP - 500' deep EA -$ -$ -$ -$

PLM PUMPB & Booster pump - 10 hp EA -$ -$ -$ -$

PLM PUMPM & Vertical pump - manure EA -$ -$ -$ -$

PLM PUMPR & Circulation pump - 10 gpm EA -$ -$ -$ -$

PLM PUMPV + Pump - dental - vacuum EA -$ -$ -$ -$

PLM PVC1 & Water supply line - PVC with fitting and hanger, 1" LF -$ -$ -$ -$

PLM PVC1.25 & Water supply line - PVC with fitting and hanger, 1-1/4" LF -$ -$ -$ -$

PLM PVC1.5 & Water supply line - PVC with fitting and hanger, 1-1/2" LF -$ -$ -$ -$

PLM PVC1/2 & Water supply line - PVC with fitting and hanger, 1/2" LF -$ -$ -$ -$

PLM PVC2 & Water supply line - PVC with fitting and hanger, 2" LF -$ -$ -$ -$

PLM PVC3/4 & Water supply line - PVC with fitting and hanger, 3/4" LF -$ -$ -$ -$

PLM RAD1/2 + Radiant heat tubing - in-slab - 1/2" - 9" spacing SF -$ -$ -$ -$

PLM RAD1/2> + Radiant heat tubing - in-slab - 1/2" - 12" spacing SF -$ -$ -$ -$

PLM RAD1/2J & Radiant heat tubing - between joists - 1/2" - 8" spacing SF -$ -$ -$ -$

PLM RADM2 & Radiant heat manifold - 2 loop EA -$ -$ -$ -$

PLM RADM4 & Radiant heat manifold - 4 loop EA -$ -$ -$ -$

PLM RADM6 & Radiant heat manifold - 6 loop EA -$ -$ -$ -$

PLM RADM8 & Radiant heat manifold - 8 loop EA -$ -$ -$ -$

PLM RADTR & Radiant heat tubing - wood track - 5/16" tubing SF -$ -$ -$ -$

PLM RALF1 & Radiant heat tubing - 1" - Per LF LF -$ -$ -$ -$

PLM RALF3/4 & Radiant heat tubing - 3/4" - Per LF LF -$ -$ -$ -$

PLM RAZC3 & Hydronic zone controller - up to 3 zones EA -$ -$ -$ -$

PLM RAZC5 & Hydronic zone controller - 4 to 5 zones EA -$ -$ -$ -$

PLM RAZC6 & Hydronic zone controller - 6 zones EA -$ -$ -$ -$

PLM RAZV3/4 & Hydronic zone control valve - up to 3/4" EA -$ -$ -$ -$

PLM RFD & Roof drain - cast iron - 2" to 6" outlet EA -$ -$ -$ -$

PLM RFD- & Roof drain - PVC/ABS - 2" to 6" outlet EA -$ -$ -$ -$

PLM RFDR + Roof drain system - (per SF roof) SF -$ -$ -$ -$

PLM RFIXP + Rough in plumbing - per fixture - w/PEX EA -$ -$ -$ -$

PLM RFIXP- + Rough in plumbing - per fixture - w/PEX - Branch system EA -$ -$ -$ -$

PLM RGHFD + Rough in plumbing - floor/laundry pan drain EA -$ -$ -$ -$

PLM RGHFIX + Rough in plumbing - per fixture EA -$ -$ -$ -$

PLM RO & Reverse osmosis water treatment system - 30 gpd EA -$ -$ -$ -$

PLM RO< & Reverse osmosis water treatment system - 15 gpd EA -$ -$ -$ -$

PLM RO> & Reverse osmosis water treatment system - 40 gpd EA -$ -$ -$ -$

PLM RO» & Reverse osmosis water treatment system - 50 gpd 10 gal EA -$ -$ -$ -$

tnk

PLM RORS + Reverse osmosis water treatment system - Detach & reset EA -$ -$ -$ -$

PLM ROUGH + Rough in plumbing - includes supply and waste lines SF -$ -$ -$ -$

PLM ROUGHC + Rough-in plumbing - Commercial - 1-3 level SF -$ -$ -$ -$

PLM ROUGHC> + Rough-in plumbing - Commercial - high rise SF -$ -$ -$ -$

PLM ROUGHP + Rough in plumbing - supply & waste lines, w/PEX - SF -$ -$ -$ -$

Branched

PLM SEWF & Sewage filtration/septic tank - 1500 gl. EA -$ -$ -$ -$

PLM SEWF< & Sewage filtration/septic tank - 1250 gl. EA -$ -$ -$ -$

PLM SEWF<< & Sewage filtration/septic tank - 1000 gl. EA -$ -$ -$ -$

PLM SEWF> & Sewage filtration/septic tank - 2000 gl. EA -$ -$ -$ -$

PLM SEWFAP + Sewage filtration/septic tank - aerator pump EA -$ -$ -$ -$

PLM SEWFPUM + Sewage filtration/septic tank - effluent pump EA -$ -$ -$ -$

PLM SFAU & Service sink faucet EA -$ -$ -$ -$

PLM SL1 & Water supply line - copper with fitting and hanger, 1" LF -$ -$ -$ -$

PLM SL1/2 & Water supply line - copper with fitting and hanger, 1/2" LF -$ -$ -$ -$

PLM SL1-1/2 & Water supply line - copper with fitting and hanger, 1-1/2" LF -$ -$ -$ -$

PLM SL2 & Water supply line - copper with fitting and hanger, 2" LF -$ -$ -$ -$

Page 116: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PLM SL3 & Water supply line - copper with fitting and hanger, 3" LF -$ -$ -$ -$

PLM SL3/4 & Water supply line - copper with fitting and hanger, 3/4" LF -$ -$ -$ -$

PLM SL3/8 & Water supply line - copper with fitting and hanger, 3/8" LF -$ -$ -$ -$

PLM SLABOC + Open and close slab for plumbing work EA -$ -$ -$ -$

PLM SLBP & Water supply line - booster pump EA -$ -$ -$ -$

PLM SLCAM + Sewer/drain line camera w/ operator EA -$ -$ -$ -$

PLM SLPEX & Water supply line - PEX with fitting and hanger, 1/2" LF -$ -$ -$ -$

PLM SLPEX< & Water supply line - PEX with fitting and hanger, 3/8" LF -$ -$ -$ -$

PLM SLPEX> & Water supply line - PEX with fitting and hanger, 3/4" LF -$ -$ -$ -$

PLM SLPEX>> & Water supply line - PEX with fitting and hanger, 1" LF -$ -$ -$ -$

PLM SLPV1 & Water pressure regulator valve - 1" EA -$ -$ -$ -$

PLM SLPV1> & Water pressure regulator valve - 1-1/4" EA -$ -$ -$ -$

PLM SLPV1>> & Water pressure regulator valve - 1-1/2" EA -$ -$ -$ -$

PLM SLPV2 & Water pressure regulator valve - 2" EA -$ -$ -$ -$

PLM SLPV3/4 & Water pressure regulator valve - 3/4" EA -$ -$ -$ -$

PLM SM1-1/4 & Water supply line type M - copper fitting & hanger, 1-1/4" LF -$ -$ -$ -$

PLM SM2-1/2 & Water supply line type M - copper fitting & hanger, 2-1/2" LF -$ -$ -$ -$

PLM SM3 & Water supply line type M - copper fitting & hanger, 3" LF -$ -$ -$ -$

PLM SM4 & Water supply line type M - copper fitting & hanger, 4" LF -$ -$ -$ -$

PLM SNK & Sink - single EA -$ -$ -$ -$

PLM SNK- & Sink - single - Standard grade EA -$ -$ -$ -$

PLM SNK+ & Sink - single - High grade EA -$ -$ -$ -$

PLM SNK++ & Sink - single - Premium grade EA -$ -$ -$ -$

PLM SNKD & Sink - double EA -$ -$ -$ -$

PLM SNKD- & Sink - double - Standard grade EA -$ -$ -$ -$

PLM SNKD+ & Sink - double - High grade EA -$ -$ -$ -$

PLM SNKD++ & Sink - double - Premium grade EA -$ -$ -$ -$

PLM SNKDBR + Sink - double - Reset EA -$ -$ -$ -$

PLM SNKDR + Sink drain assembly with stop EA -$ -$ -$ -$

PLM SNKDR+ + Sink drain assembly with stop - High grade EA -$ -$ -$ -$

PLM SNKDRS + Sink - double - Detach & reset EA -$ -$ -$ -$

PLM SNKKS & Kitchen Sink - single basin EA -$ -$ -$ -$

PLM SNKKS- & Kitchen Sink - single basin - Standard grade EA -$ -$ -$ -$

PLM SNKKS+ & Kitchen Sink - single basin - High grade EA -$ -$ -$ -$

PLM SNKKS++ & Kitchen Sink - single basin - Premium grade EA -$ -$ -$ -$

PLM SNKM & Single basin sink - mobile home EA -$ -$ -$ -$

PLM SNKR + Sink - single - Reset EA -$ -$ -$ -$

PLM SNKRS + Sink - single - Detach & reset EA -$ -$ -$ -$

PLM SNKST + Sink strainer and drain assembly EA -$ -$ -$ -$

PLM SNKST+ + Sink strainer and drain assembly - High grade EA -$ -$ -$ -$

PLM SNKST< + Sink strainer and drain assembly - 2" EA -$ -$ -$ -$

PLM SNKTR & Sink - trough style - Commercial EA -$ -$ -$ -$

PLM SNKURS + Sink - undermount - Detach & reset EA -$ -$ -$ -$

PLM SNKWF & Sink - circular wash fountain - Commercial EA -$ -$ -$ -$

PLM SNKWM & Sink - wall mounted EA -$ -$ -$ -$

PLM SNKWM+ & Sink - wall mounted - High grade EA -$ -$ -$ -$

PLM SNKWM++ & Sink - wall mounted - Premium grade EA -$ -$ -$ -$

PLM SNKWMRS + Sink - wall mounted - Detach & reset EA -$ -$ -$ -$

PLM SSNK & Service sink - 24" x 20" - wall hung EA -$ -$ -$ -$

PLM SSNK+ & Service sink - corner - floor mounted EA -$ -$ -$ -$

PLM STOP & Angle stop valve EA -$ -$ -$ -$

PLM SUMP & Sump pump - 1/3 hp - up to 1 1/2" discharge EA -$ -$ -$ -$

PLM SUMP> & Sump pump - 1/2 hp - up to 1 1/2" discharge EA -$ -$ -$ -$

PLM SUMP>> & Sump pump - 3/4 hp - up to 1 1/2" discharge EA -$ -$ -$ -$

PLM SUMPB & Sump pump basin EA -$ -$ -$ -$

PLM SUMPRS + Sump pump - Detach & reset EA -$ -$ -$ -$

PLM SUP & Plumbing fixture supply line EA -$ -$ -$ -$

PLM SWFAU & Shower faucet EA -$ -$ -$ -$

PLM SWFAU- & Shower faucet - Standard grade EA -$ -$ -$ -$

PLM SWFAU+ & Shower faucet - High grade EA -$ -$ -$ -$

PLM SWFAU++ & Shower faucet - Premium grade EA -$ -$ -$ -$

PLM SWFSH & Shower head only EA -$ -$ -$ -$

PLM SWFSH- & Shower head only - Standard grade EA -$ -$ -$ -$

PLM SWFSH+ & Shower head only - High grade EA -$ -$ -$ -$

PLM SWFSH++ & Shower head only - Premium grade EA -$ -$ -$ -$

Page 117: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PLM SWR & Fiberglass shower unit EA -$ -$ -$ -$

PLM SWR- & Fiberglass shower unit - Standard grade EA -$ -$ -$ -$

PLM SWR+ & Fiberglass shower unit - High grade EA -$ -$ -$ -$

PLM SWR++ & Fiberglass shower unit - Premium grade EA -$ -$ -$ -$

PLM SWRB & Shower Base (fiberglass) EA -$ -$ -$ -$

PLM SWRB+ & Shower Base (cultured marble) EA -$ -$ -$ -$

PLM SWRPAN + Shower pan EA -$ -$ -$ -$

PLM SWRPAN> + Shower pan - Large EA -$ -$ -$ -$

PLM SWRPH + Shower pan - hot mop - 17 to 30 SF EA -$ -$ -$ -$

PLM SWRPH< + Shower pan - hot mop - up to 16 SF EA -$ -$ -$ -$

PLM SWRPH> + Shower pan - hot mop - 31 to 40 SF EA -$ -$ -$ -$

PLM SWRPHS + Shower seat add on - hot mop - built in EA -$ -$ -$ -$

PLM SWRRS + Fiberglass shower unit - Detach & reset EA -$ -$ -$ -$

PLM SWRST & Steam shower EA -$ -$ -$ -$

PLM SWRSTB & Steam shower/bath EA -$ -$ -$ -$

PLM TET158 & Thermal expansion tank - 158 gallon EA -$ -$ -$ -$

PLM TET2 & Thermal expansion tank - 2 gallon EA -$ -$ -$ -$

PLM TET5 & Thermal expansion tank - 4 to 5 gallon EA -$ -$ -$ -$

PLM TLT & Toilet EA -$ -$ -$ -$

PLM TLT- & Toilet - Standard grade EA -$ -$ -$ -$

PLM TLT+ & Toilet - High grade EA -$ -$ -$ -$

PLM TLT++ & Toilet - Premium grade EA -$ -$ -$ -$

PLM TLTD & Toilet - stainless steel - detention area EA -$ -$ -$ -$

PLM TLTFL & Toilet flange EA -$ -$ -$ -$

PLM TLTP + Add-on for pressure assisted toilet EA -$ -$ -$ -$

PLM TLTR + Toilet - Reset EA -$ -$ -$ -$

PLM TLTRK + Toilet tank repair kit - interior components EA -$ -$ -$ -$

PLM TLTRS + Toilet - Detach & reset EA -$ -$ -$ -$

PLM TLTS & Toilet seat EA -$ -$ -$ -$

PLM TLTS- & Toilet seat - Standard grade EA -$ -$ -$ -$

PLM TLTS+ & Toilet seat - High grade EA -$ -$ -$ -$

PLM TLTS++ & Toilet seat - Premium grade EA -$ -$ -$ -$

PLM TLTSRS + Toilet seat - Detach & reset EA -$ -$ -$ -$

PLM TLTTRS + Toilet tank - Detach & reset EA -$ -$ -$ -$

PLM TPV & Trap primer valve EA -$ -$ -$ -$

PLM TSFAU & Tub/shower faucet EA -$ -$ -$ -$

PLM TSFAU- & Tub/shower faucet - Standard grade EA -$ -$ -$ -$

PLM TSFAU+ & Tub/shower faucet - High grade EA -$ -$ -$ -$

PLM TSFAU++ & Tub/shower faucet - Premium grade EA -$ -$ -$ -$

PLM TSFAURS + Tub/shower faucet - Detach & reset EA -$ -$ -$ -$

PLM TSFFIRS + Tub/shower faucet (finish trim) - Detach & reset EA -$ -$ -$ -$

PLM TUB & Bathtub EA -$ -$ -$ -$

PLM TUB- & Bathtub - Standard grade EA -$ -$ -$ -$

PLM TUB/S & Fiberglass tub & shower combination EA -$ -$ -$ -$

PLM TUB/S- & Fiberglass tub & shower combination - Standard grade EA -$ -$ -$ -$

PLM TUB/S+ & Fiberglass tub & shower combination - High grade EA -$ -$ -$ -$

PLM TUB/S++ & Fiberglass tub & shower combination - Premium grade EA -$ -$ -$ -$

PLM TUB/SRS + Fiberglass tub & shower combination - Detach & reset EA -$ -$ -$ -$

PLM TUB+ & Bathtub - High grade EA -$ -$ -$ -$

PLM TUB++ & Bathtub - Premium grade EA -$ -$ -$ -$

PLM TUBFAU & Bathtub faucet (no shower) EA -$ -$ -$ -$

PLM TUBFAU+ & Bathtub faucet (no shower) - High grade EA -$ -$ -$ -$

PLM TUBFTRS + Bathtub or shower faucet (finish trim) - Detach & reset EA -$ -$ -$ -$

PLM TUBGM & Garden bathtub - 4.5 ft. long - mobile home EA -$ -$ -$ -$

PLM TUBM & Bathtub, 4.5 ft long - mobile home EA -$ -$ -$ -$

PLM TUBRS + Bathtub - Detach & reset EA -$ -$ -$ -$

PLM TUBS & Fiberglass tub surround only EA -$ -$ -$ -$

PLM TUBS- & Fiberglass tub surround only - Standard grade EA -$ -$ -$ -$

PLM TUBS+ & Fiberglass tub surround only - High grade EA -$ -$ -$ -$

PLM UR & Urinal - wall hung EA -$ -$ -$ -$

PLM UR+ & Urinal - stall type EA -$ -$ -$ -$

PLM URRS + Urinal - Detach & reset EA -$ -$ -$ -$

PLM USPP & Under sink plumbing protectors EA -$ -$ -$ -$

PLM WBOX & Washing machine outlet box with valves EA -$ -$ -$ -$

PLM WC & Water closet (Commercial grade) EA -$ -$ -$ -$

Page 118: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PLM WCC & Wall cleanout cover - 5" - 6" EA -$ -$ -$ -$

PLM WCC< & Wall cleanout cover - 3" - 4" EA -$ -$ -$ -$

PLM WCC> & Wall cleanout cover - 7" - 8" EA -$ -$ -$ -$

PLM WCC» & Wall cleanout cover - 9" - 10" EA -$ -$ -$ -$

PLM WCE & Water closet (Commercial grade) - elongated EA -$ -$ -$ -$

PLM WCHA & Water closet (Commercial grade) - handicap accessible EA -$ -$ -$ -$

PLM WCRS + Water closet (Commercial grade) - Detach & reset EA -$ -$ -$ -$

PLM WCS & Water closet seat (Commercial grade) EA -$ -$ -$ -$

PLM WCS+ & Water closet seat (Commercial grade) - High grade EA -$ -$ -$ -$

PLM WCSE & Water closet seat (Commercial grade) - elongated EA -$ -$ -$ -$

PLM WCSRS + Water closet seat (Commercial grade) - Detach & reset EA -$ -$ -$ -$

PLM WCWH & Water closet (Commercial grade) - wall hung EA -$ -$ -$ -$

PLM WH100 & Water heater - 100 gal - Residential grade - Gas EA -$ -$ -$ -$

PLM WH100+ & Water heater - 100 gal - CA approved EA -$ -$ -$ -$

PLM WH120E & Water heater - 120 gallon - Electric EA -$ -$ -$ -$

PLM WH140 & Water heater - 140 gal - Gas EA -$ -$ -$ -$

PLM WH2O & Water heater - 20 gallon - Electric EA -$ -$ -$ -$

PLM WH200 & Water heater - 200 gal - Gas EA -$ -$ -$ -$

PLM WH30 & Water heater - 30 gallon - Gas - 6 yr EA -$ -$ -$ -$

PLM WH30+ & Water heater - 30 gallon - Gas - 9 yr EA -$ -$ -$ -$

PLM WH3O++ & Water heater - 30 gallon - Gas - 12 yr EA -$ -$ -$ -$

PLM WH3OE & Water heater - 30 gallon - Electric - 6 yr EA -$ -$ -$ -$

PLM WH30E+ & Water heater - 30 gallon - Electric - 9 yr EA -$ -$ -$ -$

PLM WH30E++ & Water heater - 30 gallon - Electric - 12 yr EA -$ -$ -$ -$

PLM WH3OM & Water heater - 30 gal. (direct vented) - Gas - mobile home EA -$ -$ -$ -$

PLM WH40 & Water heater - 40 gallon - Gas - 6 yr EA -$ -$ -$ -$

PLM WH40+ & Water heater - 40 gallon - Gas - 9 yr EA -$ -$ -$ -$

PLM WH4O++ & Water heater - 40 gallon - Gas - 12 yr EA -$ -$ -$ -$

PLM WH4OE & Water heater - 40 gallon - Electric - 6 yr EA -$ -$ -$ -$

PLM WH40E+ & Water heater - 40 gallon - Electric - 9 yr EA -$ -$ -$ -$

PLM WH40E++ & Water heater - 40 gallon - Electric - 12 yr EA -$ -$ -$ -$

PLM WH4OM & Water heater - 40 gal. (direct vented) - Gas - mobile home EA -$ -$ -$ -$

PLM WH50 & Water heater - 50 gallon - Gas - 6 yr EA -$ -$ -$ -$

PLM WH50+ & Water heater - 50 gallon - Gas - 9 yr EA -$ -$ -$ -$

PLM WH5O++ & Water heater - 50 gallon - Gas - 12 yr EA -$ -$ -$ -$

PLM WH5OE & Water heater - 50 gallon - Electric - 6 yr EA -$ -$ -$ -$

PLM WH50E+ & Water heater - 50 gallon - Electric - 9 yr EA -$ -$ -$ -$

PLM WH50E++ & Water heater - 50 gallon - Electric - 12 yr EA -$ -$ -$ -$

PLM WH6 & Water heater - 6 gallon - Electric EA -$ -$ -$ -$

PLM WH60 & Water heater - 60 gallon - Gas EA -$ -$ -$ -$

PLM WH6OE & Water heater - 60 gallon - Electric EA -$ -$ -$ -$

PLM WH60E- & Water heater - 60 gallon - Electric - Standard grade EA -$ -$ -$ -$

PLM WH7.5M & Water heater - 7.5 gallon - Electric - mobile home EA -$ -$ -$ -$

PLM WH75 & Water heater - 75 gallon - Gas EA -$ -$ -$ -$

PLM WH8OE & Water heater - 80 gallon - Electric EA -$ -$ -$ -$

PLM WH80E- & Water heater - 80 gallon - Electric - Standard grade EA -$ -$ -$ -$

PLM WHB & Water heater blanket EA -$ -$ -$ -$

PLM WHC119 & Water heater - Commercial, HD - 119 gallon - Gas EA -$ -$ -$ -$

PLM WHC120E & Water heater - Commercial - 120 gallon - Electric EA -$ -$ -$ -$

PLM WHC50 & Water heater - Commercial - 50 gallon - Gas EA -$ -$ -$ -$

PLM WHC75 & Water heater - Commercial - 75 gallon - Gas EA -$ -$ -$ -$

PLM WHC80E & Water heater - Commercial - 80 gallon - Electric EA -$ -$ -$ -$

PLM WHC900E & Water heater - Commercial - 900 gallon - Electric EA -$ -$ -$ -$

PLM WHE24 & Water heater - enclosure - 24" x 24" EA -$ -$ -$ -$

PLM WHE30 & Water heater - enclosure - 30" x 30" EA -$ -$ -$ -$

PLM WHFS & Water heater - flood sensor/shutoff - 3/4" EA -$ -$ -$ -$

PLM WHP40 & Water heater - 40 gallon - Gas - Power vent EA -$ -$ -$ -$

PLM WHP50 & Water heater - 50 gallon - Gas - Power vent EA -$ -$ -$ -$

PLM WHPAN & Water heater overflow drain pan EA -$ -$ -$ -$

PLM WHPFM & Water heater platform - metal EA -$ -$ -$ -$

PLM WHPFMRS + Water heater platform - metal - Detach & reset EA -$ -$ -$ -$

PLM WHRJM & Water heater roof jack assembly - mobile home EA -$ -$ -$ -$

PLM WHRS + Water heater - Detach & reset EA -$ -$ -$ -$

PLM WHSO & Solar water heater system EA -$ -$ -$ -$

PLM WHSOP & Solar water heater panel - 25-32 SF EA -$ -$ -$ -$

Page 119: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PLM WHSOP< & Solar water heater panel - up to 24 SF EA -$ -$ -$ -$

PLM WHSOP> & Solar water heater panel - over 33 SF EA -$ -$ -$ -$

PLM WHSORS + Solar water heater panel - Detach & reset EA -$ -$ -$ -$

PLM WHSS & Water heater seismic strap kit - up to 55 gallon EA -$ -$ -$ -$

PLM WHSS> & Water heater seismic strap kit - up to 80 gallon EA -$ -$ -$ -$

PLM WHSS>> & Water heater seismic strap kit - up to 120 gallon EA -$ -$ -$ -$

PLM WHST & Water heater storage tank - 500 gallon EA -$ -$ -$ -$

PLM WHSUP & Water heater connector line - 3/4" flexible tubing EA -$ -$ -$ -$

PLM WHT & Holding tank - plastic - 260 gallon EA -$ -$ -$ -$

PLM WHT3 & Water heater - tankless - 3-3.9 gallon - Gas EA -$ -$ -$ -$

PLM WHT3+ & Water heater - tankless - 3-3.9 gallon - Gas - Power vent EA -$ -$ -$ -$

PLM WHT4 & Water heater - tankless - 4-4.9 gallon - Gas EA -$ -$ -$ -$

PLM WHT4+ & Water heater - tankless - 4-4.9 gallon - Gas - Power vent EA -$ -$ -$ -$

PLM WHT5 & Water heater - tankless - 5-5.9 gallon - Gas EA -$ -$ -$ -$

PLM WHT5+ & Water heater - tankless - 5-5.9 gallon - Gas - Power vent EA -$ -$ -$ -$

PLM WHTE12 & Water heater - tankless - Up to 14.9 kw - Electric EA -$ -$ -$ -$

PLM WHTE20 & Water heater - tankless - 15 to 20 kw - Electric EA -$ -$ -$ -$

PLM WHTE36 & Water heater - tanldess - 20.1 to 36 kw - Electric EA -$ -$ -$ -$

PLM WHTRS + Water heater - tankless - Detach & reset EA -$ -$ -$ -$

PLM WMHR & Washing machine hose line - rubber (per pair) EA -$ -$ -$ -$

PLM WMHS & Washing machine hose line - stainless steel (per pair) EA -$ -$ -$ -$

PLM WP1/2J & Jet well pump - 1/2 hp - pump & motor EA -$ -$ -$ -$

PLM WP1/2JM & Jet well pump - 1/2 hp - motor only EA -$ -$ -$ -$

PLM WP1/2S & Well pump - submersible - 1/2 hp - pump w/motor EA -$ -$ -$ -$

PLM WP1J & Jet well pump - 1 hp - pump & motor EA -$ -$ -$ -$

PLM WP1JM & Jet well pump - 1 hp - motor only EA -$ -$ -$ -$

PLM WPMPJ15 & Well pump - single jet - less than 25' deep - 15 gpm EA -$ -$ -$ -$

PLM WPMPJ50 & Well pump - single jet - less than 25' deep - 50 gpm EA -$ -$ -$ -$

PLM WPS & Water filtration system - under sink EA -$ -$ -$ -$

PLM WPSM & Well pump motor - submersible - 1 1/2 - 2 hp EA -$ -$ -$ -$

PLM WPSM< & Well pump motor - submersible - 3/4 - 1 hp EA -$ -$ -$ -$

PLM WPSM<< & Well pump motor - submersible - 1/3 - 1/2 hp EA -$ -$ -$ -$

PLM WPSM> & Well pump motor - submersible - 3 hp EA -$ -$ -$ -$

PLM WPSM» & Well pump motor - submersible - 5 hp EA -$ -$ -$ -$

PLM WPUMP & Well pump - submersible - 150' + deep - residential LF -$ -$ -$ -$

PLM WPUMP< & Well pump - submersible - up to 150' deep - residential EA -$ -$ -$ -$

PLM WPUMPJ & Well pump - single jet - less than 25' deep - 7 gpm EA -$ -$ -$ -$

PLM WPUMPJ+ & Well pump - single jet - less than 25' deep - 12 gpm EA -$ -$ -$ -$

PLM WS & Water softener - electronically metered EA -$ -$ -$ -$

PLM WS< & Water softener - electronically metered - Small EA -$ -$ -$ -$

PLM WS> & Water softener - electronically metered - Large EA -$ -$ -$ -$

PLM WS» & Water softener - electronically metered - Extra large EA -$ -$ -$ -$

PLM WSBOX & Refrigerator/icemaker water supply box with valve EA -$ -$ -$ -$

PLM WSRS + Water softener - Detach & reset EA -$ -$ -$ -$

PLM WST & Water softener - manual timer EA -$ -$ -$ -$

PLM WST< & Water softener - manual timer - Small EA -$ -$ -$ -$

PLM WST> & Water softener - manual timer - Large EA -$ -$ -$ -$

PLM WST» & Water softener - manual timer - Extra large EA -$ -$ -$ -$

PLM WTANK & Pressurized water tank - 40 gallons EA -$ -$ -$ -$

PLM WTANK< & Pressurized water tank - 20 gallons EA -$ -$ -$ -$

PLM WTANK> & Pressurized water tank - 60 gallons EA -$ -$ -$ -$

PLM WTANK>> & Pressurized water tank - 80-90 gallons EA -$ -$ -$ -$

PLM WTANKRS + Pressurized water tank - Detach & reset EA -$ -$ -$ -$

PLM XFAU & Exterior faucet / hose bibb EA -$ -$ -$ -$

PLM XFAUF & Exterior faucet / hose bibb - frost free EA -$ -$ -$ -$

PLM XFAURS + Exterior faucet / hose bibb - Detach & reset EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

PNL AV & Paneling SF -$ -$ -$ -$

PNL AV- & Paneling - Standard grade SF -$ -$ -$ -$

PNL AV+ & Paneling - High grade SF -$ -$ -$ -$

PNL AV++ & Paneling - Premium grade SF -$ -$ -$ -$

PNL AVM & Paneling - mobile home SF -$ -$ -$ -$

Page 120: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PNL AVM- & Paneling - Standard grade - mobile home SF -$ -$ -$ -$

PNL AVRS + Paneling - Detach & reset SF -$ -$ -$ -$

PNL BAB & Board & batten style wall covering SF -$ -$ -$ -$

PNL BBH & Bead board - 1/4" to 3/8" hardwood SF -$ -$ -$ -$

PNL BBM 1/2 & Bead board - 1/2" MDF SF -$ -$ -$ -$

PNL BBM1/4 & Bead board - 1/4" MDF SF -$ -$ -$ -$

PNL BBS & Bead board - 3/8" softwood veneer SF -$ -$ -$ -$

PNL BIDITM + Paneling & Wood Wall Finishes (Bid Item) EA -$ -$ -$ -$

PNL BOB & Board on board style wall covering SF -$ -$ -$ -$

PNL CHEV + Add for chevron style install (langle joint in wall cntr) SF -$ -$ -$ -$

PNL CLOS & Cedar closet lining SF -$ -$ -$ -$

PNL CLOSP & Cedar closet lining - flake board panel SF -$ -$ -$ -$

PNL CORK & Cork wall tile SF -$ -$ -$ -$

PNL CORK+ & Cork wall tile - High grade SF -$ -$ -$ -$

PNL DIAG + Add for diagonal installation SF -$ -$ -$ -$

PNL DIF & Acoustical wall panels - diffusing SF -$ -$ -$ -$

PNL FORM & Plastic laminate wall finish SF -$ -$ -$ -$

PNL FORMT & Plastic laminate wall finish w/trim SF -$ -$ -$ -$

PNL FORMTC & Plastic laminate wall finish w/trim - Commercial SF -$ -$ -$ -$

PNL FRP & Fiberglass reinforced plastic (FRP) paneling SF -$ -$ -$ -$

PNL FRPT & Fiberglass reinforced plastic (FRP) paneling w/trim SF -$ -$ -$ -$

PNL GREAS & Grease board panel - wall system SF -$ -$ -$ -$

PNL HBONE + Add for herringbone install-diagonal joints 4'-6' apart SF -$ -$ -$ -$

PNL LAB + Paneling Installer - Finish Carpenter - per hour HR -$ -$ -$ -$

PNL LABL + Paneling - General Laborer - per hour HR -$ -$ -$ -$

PNL MN + Paneling - Labor Minimum EA -$ -$ -$ -$

PNL PEG & Pegboard SF -$ -$ -$ -$

PNL SPPNL & Special paneling - ornate hardwood feature wall SF -$ -$ -$ -$

PNL SPPNL- & Special paneling - hardwood feature wall SF -$ -$ -$ -$

PNL SS & Wall sheathing - stainless steel SF -$ -$ -$ -$

PNL STOR & Paneling - plywood w/2x4 base & chair rail SF -$ -$ -$ -$

PNL SWR & Waterproof panel shower surround w/trim - up to 98 SF EA -$ -$ -$ -$

PNL TECTUM & Acoustical wall panels - decorative - pressed wood fiber SF -$ -$ -$ -$

PNL TECTUMP & Acoustical wall panels - decorative (panel only) SF -$ -$ -$ -$

PNL TGB & T & G paneling - butterfly (beaded vee with 1" cove) SF -$ -$ -$ -$

PNL TGBN & T & G paneling - bullnose (rounded joints) - (unfinished) SF -$ -$ -$ -$

PNL TGBV & T & G paneling - double beaded vee (unfinished) SF -$ -$ -$ -$

PNL TGCD & T & G paneling - cedar paneling (unfinished) SF -$ -$ -$ -$

PNL TGKP & T & G paneling - knotty pine paneling (unfinished) SF -$ -$ -$ -$

PNL TGRW & T & G paneling - redwood paneling (unfinished) SF -$ -$ -$ -$

PNL TGV & T & G paneling - v-joint paneling (unfinished) SF -$ -$ -$ -$

PNL TUB & Waterproof panel tub surround w/trim - up to 65 SF EA -$ -$ -$ -$

PNL WCAPSS & Wall cap - stainless steel LF -$ -$ -$ -$

PNL WP & Waterproof paneling w/trim SF -$ -$ -$ -$

PNL WP+ & Waterproof paneling w/trim - High grade SF -$ -$ -$ -$

PNL WP++ & Waterproof paneling w/trim - Premium grade SF -$ -$ -$ -$

PNL WPA & Wall paneling w/trim - Agricultural bldgs. - PVC SF -$ -$ -$ -$

PNL WPC & Waterproof paneling w/trim - Commercial (FRP) SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

PNT AC + Seal & paint acoustic ceiling (popcorn) texture SF -$ -$ -$ -$

PNT ACP + Paint acoustic ceiling (popcorn) texture - 1 coat SF -$ -$ -$ -$

PNT ACS + Seal/prime acoustic ceiling (popcorn) texture SF -$ -$ -$ -$

PNT ACT + Seal & paint acoustic ceiling tile SF -$ -$ -$ -$

PNT AGRIL + Prime & paint air ventilation grill (per side) SF -$ -$ -$ -$

PNT ATT12 + Seal attic framing for odor control - 9 to 12/12 SF -$ -$ -$ -$

PNT ATT12+ + Seal attic framing (shellac) - 9 to 12/12 SF -$ -$ -$ -$

PNT ATT8 + Seal attic framing for odor control - 6 to 8/12 SF -$ -$ -$ -$

PNT ATT8+ + Seal attic framing (shellac) - 6 to 8/12 SF -$ -$ -$ -$

PNT ATTIC + Seal attic framing for odor control - up to 5/12 SF -$ -$ -$ -$

PNT ATTIC+ + Seal attic framing (shellac) - up to 5/12 SF -$ -$ -$ -$

PNT AWN + Paint aluminum awning SF -$ -$ -$ -$

PNT B + Paint baseboard - one coat LF -$ -$ -$ -$

Page 121: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PNT B> + Paint baseboard, oversized - one coat LF -$ -$ -$ -$

PNT B>1SP + Seal & paint baseboard, oversized - two coats LF -$ -$ -$ -$

PNT B>2 + Paint baseboard, oversized - two coats LF -$ -$ -$ -$

PNT B>2SP + Seal & paint baseboard, oversized - three coats LF -$ -$ -$ -$

PNT B1SP + Seal & paint baseboard - two coats LF -$ -$ -$ -$

PNT B2 + Paint baseboard - two coats LF -$ -$ -$ -$

PNT B2SP + Seal & paint baseboard - three coats LF -$ -$ -$ -$

PNT BAL + Paint balustrade - one coat LF -$ -$ -$ -$

PNT BAL1SP + Seal & paint balustrade - two coats LF -$ -$ -$ -$

PNT BAL2 + Paint balustrade - two coats LF -$ -$ -$ -$

PNT BAL2SP + Seal & paint balustrade - three coats LF -$ -$ -$ -$

PNT BALP + Additional cost to pre-stain balustrade LF -$ -$ -$ -$

PNT BALS + Stain & finish balustrade LF -$ -$ -$ -$

PNT BALS1 + Finish balustrade - 1 coat urethane LF -$ -$ -$ -$

PNT BBH + Paint baseboard heater LF -$ -$ -$ -$

PNT BCS + Paint baseboard w/cap &/or shoe - one coat LF -$ -$ -$ -$

PNT BCS> + Paint baseboard w/cap &/or shoe, oversized - one coat LF -$ -$ -$ -$

PNT BCS>1SP + Seal & paint baseboard w/cap &/or shoe, oversized- 2 coats LF -$ -$ -$ -$

PNT BCS>2 + Paint baseboard w/cap &/or shoe, oversized - 2 coats LF -$ -$ -$ -$

PNT BCS>2SP + Seal & paint baseboard w/cap &/or shoe, oversized- 3 coats LF -$ -$ -$ -$

PNT BCS>S + Stain & finish baseboard w/cap &/or shoe, oversized LF -$ -$ -$ -$

PNT BCS>S1 + Finish baseboard w/cap &/or shoe-oversized-1 coat LF -$ -$ -$ -$

urethane

PNT BCS1SP + Seal & paint baseboard w/cap &/or shoe - two coats LF -$ -$ -$ -$

PNT BCS2 + Paint baseboard w/cap &/or shoe - two coats LF -$ -$ -$ -$

PNT BCS2SP + Seal & paint baseboard w/cap &/or shoe - three coats LF -$ -$ -$ -$

PNT BCSS + Stain & finish baseboard w/cap 8c/or shoe LF -$ -$ -$ -$

PNT BCSS1 + Finish baseboard w/cap &/or shoe - 1 coat urethane LF -$ -$ -$ -$

PNT BF + Paint bifold door set - slab only - 2 coats (per side) EA -$ -$ -$ -$

PNT BF< + Paint single bifold door - slab only - 2 coats (per side) EA -$ -$ -$ -$

PNT BF<1 + Paint single bifold door - slab only - 1 coat (per side) EA -$ -$ -$ -$

PNT BF1 + Paint bifold door set - slab only - 1 coat (per side) EA -$ -$ -$ -$

PNT BFL + Paint full lvrd bifold door set - slab - 2 coats -per side EA -$ -$ -$ -$

PNT BFL- + Paint half lvrd bifold door set - slab - 2 coats -per side EA -$ -$ -$ -$

PNT BFL< + Paint full lvrd single bifold door - slab -2 coats -1 side EA -$ -$ -$ -$

PNT BFL<- + Paint half lvrd single bifold door - slab -2 coats -1 side EA -$ -$ -$ -$

PNT BFL<1 + Paint full lvrd single bifold door - slab - 1 coat -1 side EA -$ -$ -$ -$

PNT BFL<-1 + Paint half lvrd single bifold door - slab - 1 coat -1 side EA -$ -$ -$ -$

PNT BFL1 + Paint full lvrd bifold door set - slab - 1 coat -per side EA -$ -$ -$ -$

PNT BFL-1 + Paint half lvrd bifold door set - slab - 1 coat -per side EA -$ -$ -$ -$

PNT BFLS + Stain & finish full lvrd bifold door set - slab - per side EA -$ -$ -$ -$

PNT BFLS- + Stain & finish half lvrd bifold door set - slab - per side EA -$ -$ -$ -$

PNT BFLS< + Stain & finish full lvrd single bifold door- slab - 1 side EA -$ -$ -$ -$

PNT BFLS<- + Stain & finish half lvrd single bifold door- slab - 1 side EA -$ -$ -$ -$

PNT BFLS<1 + Finish full lvrd single bifold door-1 coat urethane-1 side EA -$ -$ -$ -$

PNT BFLS<-1 + Finish half lvrd single bifold door-1 coat urethane-1 side EA -$ -$ -$ -$

PNT BFLS1 + Finish full lvrd bifold set - 1 coat urethane - per side EA -$ -$ -$ -$

PNT BFLS-1 + Finish half lvrd bifold set - 1 coat urethane - per side EA -$ -$ -$ -$

PNT BFLSP + Seal & paint full lvrd bifold door set - slab - per side EA -$ -$ -$ -$

PNT BFLSP- + Seal & paint half lvrd bifold door set - slab - per side EA -$ -$ -$ -$

PNT BFLSP< + Seal & paint full lvrd single bifold door - slab -per side EA -$ -$ -$ -$

PNT BFLSP<- + Seal & paint half lvrd single bifold door - slab -per side EA -$ -$ -$ -$

PNT BFS + Stain & finish bifold door set - slab only - (per side) EA -$ -$ -$ -$

PNT BFS< + Stain & finish single bifold door - slab only - (per side) EA -$ -$ -$ -$

PNT BFS<1 + Finish single bifold door - 1 coat urethane (per side) EA -$ -$ -$ -$

PNT BFS1 + Finish bifold set - 1 coat urethane (per side) EA -$ -$ -$ -$

PNT BFSP + Seal & paint bifold door set - slab only (per side) EA -$ -$ -$ -$

PNT BFSP< + Seal & paint single bifold door - slab only (per side) EA -$ -$ -$ -$

PNT BIDITM + Painting (Bid Item) EA -$ -$ -$ -$

PNT BK + Seal & paint bookcase SF -$ -$ -$ -$

PNT BK1 + Paint bookcase - one coat SF -$ -$ -$ -$

PNT BKS + Stain & finish bookcase SF -$ -$ -$ -$

PNT BKS1 + Finish bookcase - 1 coat urethane SF -$ -$ -$ -$

PNT BLR + Paint boiler unit EA -$ -$ -$ -$

PNT BM + Seal & paint wood beam SF -$ -$ -$ -$

Page 122: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PNT BMF12 + Finish post/wood beam 12" x 12" - 1 coat urethane LF -$ -$ -$ -$

PNT BMF6 + Finish post/wood beam 6" x 6" - 1 coat urethane LF -$ -$ -$ -$

PNT BMS + Stain & finish wood beam SF -$ -$ -$ -$

PNT BMS12 + Stain & finish post/wood beam 12" x 12" LF -$ -$ -$ -$

PNT BMS6 + Stain & finish post/wood beam 6" x 6" LF -$ -$ -$ -$

PNT BP + Paint bypass door set - slab only - 2 coats (per side) EA -$ -$ -$ -$

PNT B P1 + Paint bypass door set - slab only - 1 coat (per side) EA -$ -$ -$ -$

PNT BP1SP + Seal/Paint bypass door set - slab only- 2 coats (per side) EA -$ -$ -$ -$

PNT BP2SP + Seal/Paint bypass door set - slab only- 3 coats (per side) EA -$ -$ -$ -$

PNT BPNL + Prime & paint breaker panel cover EA -$ -$ -$ -$

PNT BPS + Stain & finish bypass door set - slab only (per side) EA -$ -$ -$ -$

PNT BPS1 + Finish bypass door set - 1 coat urethane (per side) EA -$ -$ -$ -$

PNT BRK + Seal brick with masonry sealer SF -$ -$ -$ -$

PNT BRKP + Paint brick SF -$ -$ -$ -$

PNT BS + Stain & finish baseboard LF -$ -$ -$ -$

PNT BS> + Stain & finish baseboard - oversized LF -$ -$ -$ -$

PNT BS>1 + Finish baseboard - oversized - 1 coat urethane LF -$ -$ -$ -$

PNT B S1 + Finish baseboard - 1 coat urethane LF -$ -$ -$ -$

PNT C + Paint casing - one coat LF -$ -$ -$ -$

PNT C> + Paint casing - oversized - one coat LF -$ -$ -$ -$

PNT C>1SP + Seal & paint casing - oversized - two coats LF -$ -$ -$ -$

PNT C>2 + Paint casing - oversized - two coats LF -$ -$ -$ -$

PNT C>2SP + Seal & paint casing - oversized - three coats LF -$ -$ -$ -$

PNT C1SP + Seal & paint casing - two coats LF -$ -$ -$ -$

PNT C2 + Paint casing - two coats LF -$ -$ -$ -$

PNT C2SP + Seal & paint casing - three coats LF -$ -$ -$ -$

PNT CA + Prime & paint cold air return (cover) EA -$ -$ -$ -$

PNT CAFE + Paint cafe doors - pair - 2 coats (per side) EA -$ -$ -$ -$

PNT CAFES + Stain & finish cafe doors - pair - (per side) EA -$ -$ -$ -$

PNT CAFESP + Seal & paint cafe doors - pair - 2 coats (per side) EA -$ -$ -$ -$

PNT CBL + Paint corbel - one coat EA -$ -$ -$ -$

PNT CBL1SP + Seal & paint corbel - two coats EA -$ -$ -$ -$

PNT CBL2 + Paint corbel - two coats EA -$ -$ -$ -$

PNT CBL2SP + Seal & paint corbel - three coats EA -$ -$ -$ -$

PNT CBLS + Stain & finish corbel EA -$ -$ -$ -$

PNT CBLS1 + Finish corbel - 1 coat urethane EA -$ -$ -$ -$

PNT CHR + Paint chair rail - one coat LF -$ -$ -$ -$

PNT CHR1SP + Seal & paint chair rail - two coats LF -$ -$ -$ -$

PNT CHR2 + Paint chair rail - two coats LF -$ -$ -$ -$

PNT CHR2SP + Seal & paint chair rail - three coats LF -$ -$ -$ -$

PNT CHRS + Stain & finish chair rail LF -$ -$ -$ -$

PNT CHRS1 + Finish chair rail - 1 coat urethane LF -$ -$ -$ -$

PNT CLOS + Seal & paint closet shelving - single shelf EA -$ -$ -$ -$

PNT CLOS< + Seal & paint closet shelving - single shelf - Small closet EA -$ -$ -$ -$

PNT CLOS> + Seal & paint closet shelving - single shelf - Large closet EA -$ -$ -$ -$

PNT CLOSL + Seal & paint closet shelving - linen closet EA -$ -$ -$ -$

PNT CLOSLF + Seal & paint closet shelving LF -$ -$ -$ -$

PNT CM + Paint cove molding - one coat LF -$ -$ -$ -$

PNT CM2 + Paint cove molding - two coats LF -$ -$ -$ -$

PNT CM2SP + Seal & Paint cove molding - three coats LF -$ -$ -$ -$

PNT CMS + Stain & finish cove molding LF -$ -$ -$ -$

PNT CMS1 + Finish cove molding - 1 coat urethane LF -$ -$ -$ -$

PNT CNC + Paint concrete {V} SF -$ -$ -$ -$

PNT CNCS + Stained concrete SF -$ -$ -$ -$

PNT CNR + Paint corner trim - one coat LF -$ -$ -$ -$

PNT CNRS + Stain & finish corner trim LF -$ -$ -$ -$

PNT CNRSP + Seal & paint corner trim - two coats LF -$ -$ -$ -$

PNT COL + Paint column - one coat LF -$ -$ -$ -$

PNT COL1SP + Seal & paint column - two coats LF -$ -$ -$ -$

PNT COL2 + Paint column - two coats LF -$ -$ -$ -$

PNT COL2SP + Seal & paint column - three coats LF -$ -$ -$ -$

PNT COLS + Stain & finish column LF -$ -$ -$ -$

PNT CS + Stain & finish casing LF -$ -$ -$ -$

PNT CS1 + Finish casing - 1 coat urethane LF -$ -$ -$ -$

PNT CWN + Paint crown molding - one coat LF -$ -$ -$ -$

Page 123: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PNT CWN> + Paint crown molding, oversized - one coat LF -$ -$ -$ -$

PNT CWN>1SP + Seal & paint crown molding, oversized - two coats LF -$ -$ -$ -$

PNT CWN>2 + Paint crown molding, oversized - two coats LF -$ -$ -$ -$

PNT CWN>2SP + Seal & paint crown molding, oversized - three coats LF -$ -$ -$ -$

PNT CWN1SP + Seal & paint crown molding - two coats LF -$ -$ -$ -$

PNT CWN2 + Paint crown molding - two coats LF -$ -$ -$ -$

PNT CWN2SP + Seal & paint crown molding - three coats LF -$ -$ -$ -$

PNT CWNS + Stain & finish crown molding LF -$ -$ -$ -$

PNT CWNS1 + Finish crown molding - 1 coat urethane LF -$ -$ -$ -$

PNT DCT + Prime & paint ductwork system - hot or cold air EA -$ -$ -$ -$

PNT DCTLF + Prime & paint ductwork - hot or cold air LF -$ -$ -$ -$

PNT DCTRM + Prime & paint ductwork - hot or cold air (per room) EA -$ -$ -$ -$

PNT DGL + Apply paint deglosser SF -$ -$ -$ -$

PNT DGLTR + Apply paint deglosser to trim LF -$ -$ -$ -$

PNT DK + Stain/finish deck SF -$ -$ -$ -$

PNT DKAP + Deck coating - acrylic polymer SF -$ -$ -$ -$

PNT DKP1 + Paint deck - 1 coat paint SF -$ -$ -$ -$

PNT DKP2 + Paint deck - 2 coats paint SF -$ -$ -$ -$

PNT DKPP + Prime & paint deck - 2 coats primer, 2 coats paint SF -$ -$ -$ -$

PNT DKPP1 + Prime & paint deck - 1 coat primer, 1 coat paint SF -$ -$ -$ -$

PNT DKRL + Stain/finish deck handrail LF -$ -$ -$ -$

PNT DKRLP1 + Paint deck handrail - 1 coat paint LF -$ -$ -$ -$

PNT DKRLP2 + Paint deck handrail - 2 coats paint LF -$ -$ -$ -$

PNT DKRLPP + Prime & paint ext. railing - 2 coats primer, 2 coats paint LF -$ -$ -$ -$

PNT DKRLPP1 + Prime & paint ext. railing - 1 coat primer, 1 coat paint LF -$ -$ -$ -$

PNT DOR + Paint door slab only - 2 coats (per side) EA -$ -$ -$ -$

PNT DORI + Paint door slab only - 1 coat (per side) EA -$ -$ -$ -$

PNT DORP + Additional cost to pre-stain door slab only (per side) EA -$ -$ -$ -$

PNT DORS + Stain & finish door slab only (per side) EA -$ -$ -$ -$

PNT DORS1 + Finish door slab only - 1 coat urethane (per side) EA -$ -$ -$ -$

PNT DORSP + Seal & paint door slab only (per side) EA -$ -$ -$ -$

PNT DORST + Strip paint/finish from door, 3-0 or smaller (per side) EA -$ -$ -$ -$

PNT DORT + Paint door/window trim & jamb - 2 coats (per side) EA -$ -$ -$ -$

PNT DORT> + Paint door/window trim & jamb - Large - 2 coats (per side) EA -$ -$ -$ -$

PNT DORT>1 + Paint door/window trim & jamb - Large - 1 coat (per side) EA -$ -$ -$ -$

PNT DORT1 + Paint door/window trim & jamb - 1 coat (per side) EA -$ -$ -$ -$

PNT DORTP + Add. cost to pre-stain door/window trim & jamb (per side) EA -$ -$ -$ -$

PNT DORTP> + Add. cost pre-stain door/window trim & jamb-Lrg (per side) EA -$ -$ -$ -$

PNT DORTS + Stain & finish door/window trim & jamb (per side) EA -$ -$ -$ -$

PNT DORTS> + Stain & finish door/window trim & jamb - Large (per side) EA -$ -$ -$ -$

PNT DORTS>1 + Finish door/win trim & jamb - Lrg - 1 coat urethane EA -$ -$ -$ -$

PNT DORTS1 + Finish door/win trim & jamb -1 coat urethane (per side) EA -$ -$ -$ -$

PNT DORTSP + Seal & paint door/window trim & jamb - (per side) EA -$ -$ -$ -$

PNT DORTSP> + Seal & paint door/window trim & jamb - Large (per side) EA -$ -$ -$ -$

PNT EC + Prime & paint evaporative cooler EA -$ -$ -$ -$

PNT ECDIF + Prime & paint evaporative cooler diffuser EA -$ -$ -$ -$

PNT ELAST + Paint surfaces with elastomeric wall covering paint SF -$ -$ -$ -$

PNT EPX + Epoxy finish - one coat over concrete floor SF -$ -$ -$ -$

PNT EPX2 + Epoxy finish - two coats over concrete floor SF -$ -$ -$ -$

PNT EPX2N + Epoxy finish - two coats over concrete floor - non-slip SF -$ -$ -$ -$

PNT EPXW + Paint wall with epoxy coating SF -$ -$ -$ -$

PNT EPXW2 + Paint wall with epoxy coating - 2 coats SF -$ -$ -$ -$

PNT FACM + Prime & paint exterior fascia - metal, 4"- 6" wide LF -$ -$ -$ -$

PNT FACM> + Prime & paint exterior fascia - metal, 6"- 8" wide LF -$ -$ -$ -$

PNT FACM1 + Paint exterior fascia - 1 coat - metal, 4"- 6" wide LF -$ -$ -$ -$

PNT FACM1> + Paint exterior fascia - 1 coat - metal, 6"- 8" wide LF -$ -$ -$ -$

PNT FACW + Prime & paint exterior fascia - wood, 4"- 6" wide LF -$ -$ -$ -$

PNT FACW> + Prime & paint exterior fascia - wood, 6"- 8" wide LF -$ -$ -$ -$

PNT FACW1 + Paint exterior fascia - 1 coat - wood, 4"- 6" wide LF -$ -$ -$ -$

PNT FACW1> + Paint exterior fascia - 1 coat - wood, 6"- 8" wide LF -$ -$ -$ -$

PNT FAUX + Painting - Faux (special effects) - 2 part SF -$ -$ -$ -$

PNT FAUX+ + Painting - Faux (special effects) - 3 part SF -$ -$ -$ -$

PNT FAUX++ + Painting - Faux (special effects) - Marbling SF -$ -$ -$ -$

PNT FCS + Seal stone flooring with masonry sealer SF -$ -$ -$ -$

PNT FEN + Seal & paint - wood fence/gate SF -$ -$ -$ -$

Page 124: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PNT FENST + Stain - wood fence/gate SF -$ -$ -$ -$

PNT FH + Seal & paint full height cabinetry - inside and out LF -$ -$ -$ -$

PNT FH< + Paint cabinetry - full height - inside and out LF -$ -$ -$ -$

PNT FHF + Seal & paint full height cabinetry - faces only LF -$ -$ -$ -$

PNT FHF< + Paint cabinetry - full height - faces only LF -$ -$ -$ -$

PNT FHFS + Stain & finish full height cabinetry - faces only LF -$ -$ -$ -$

PNT FIIFS1 + Finish full height cabinetry - faces only- 1 coat urethane LF -$ -$ -$ -$

PNT FHFST + Strip and refinish cabinetry - full height - faces only LF -$ -$ -$ -$

PNT FHS + Stain & finish full height cabinetry - inside and out LF -$ -$ -$ -$

PNT FHS1 + Finish full height cabinetry- inside & out-1 coat urethane LF -$ -$ -$ -$

PNT FHST + Strip and refinish cabinetry - full ht - inside and out LF -$ -$ -$ -$

PNT FR + Paint French door slab only - 2 coats (per side) EA -$ -$ -$ -$

PNT FR1 + Paint French door slab only - 1 coat (per side) EA -$ -$ -$ -$

PNT FR2 + Paint double French door slabs only - 2 coats (per side) EA -$ -$ -$ -$

PNT FR21 + Paint double French door slabs only - 1 coat (per side) EA -$ -$ -$ -$

PNT FRS + Stain & finish French door slab only - (per side) EA -$ -$ -$ -$

PNT FRS1 + Finish French door slab only - 1 coat urethane (per side) EA -$ -$ -$ -$

PNT FRSP + Seal & paint French door slab only - 2 coats (per side) EA -$ -$ -$ -$

PNT FRX + Prime & paint French door slab only - exterior (per side) EA -$ -$ -$ -$

PNT FRX1 + Paint French door slab only - exterior - 1 coat (per side) EA -$ -$ -$ -$

PNT FRXS + Stain & finish French door slab only - exterior (per side) EA -$ -$ -$ -$

PNT FRXS1 + Finish French door slab only - ext. - 1 coat (per side) EA -$ -$ -$ -$

PNT FW + Seal foundation wall SF -$ -$ -$ -$

PNT GAME + Add for painted game lines/stripes for a hardwood court EA -$ -$ -$ -$

PNT GRIL + Prime & paint ornamental iron grill SF -$ -$ -$ -$

PNT GUTG + Prime & paint gutter / downspout LF -$ -$ -$ -$

PNT GUTG> + Prime & paint gutter / downspout - Oversized LF -$ -$ -$ -$

PNT HR + Paint handrail - wall mounted LF -$ -$ -$ -$

PNT HRS + Stain & finish handrail - wall mounted LF -$ -$ -$ -$

PNT HRSP + Seal & paint handrail - wall mounted LF -$ -$ -$ -$

PNT HRTH + Paint fireplace hearth SF -$ -$ -$ -$

PNT JP + Paint - judges paneling - one coat SF -$ -$ -$ -$

PNT JP2 + Paint - judges paneling - two coats SF -$ -$ -$ -$

PNT JPP + Additional cost to pre-stain wood judges paneling SF -$ -$ -$ -$

PNT JPS + Stain and finish wood judges paneling SF -$ -$ -$ -$

PNT JPSP + Seal & paint - judges paneling - two coats SF -$ -$ -$ -$

PNT JST + Seal floor or ceiling joist system SF -$ -$ -$ -$

PNT JST+ + Seal floor or ceiling joist system (shellac) SF -$ -$ -$ -$

PNT JST++ + Seal floor/ceiling joist system (anti-microbial coating) SF -$ -$ -$ -$

PNT LAB + Painter - per hour HR -$ -$ -$ -$

PNT LAT + Seal & paint lattice work SF -$ -$ -$ -$

PNT LATS + Stain & finish lattice work SF -$ -$ -$ -$

PNT LOW + Seal & paint cabinetry - lower - inside and out LF -$ -$ -$ -$

PNT LOW< + Paint cabinetry - lower - inside and out LF -$ -$ -$ -$

PNT LOWF + Seal & paint cabinetry - lower - faces only LF -$ -$ -$ -$

PNT LOWF< + Paint cabinetry - lower - faces only LF -$ -$ -$ -$

PNT LOWFS + Stain & finish cabinetry - lower - faces only LF -$ -$ -$ -$

PNT LOWFS1 + Finish cabinetry - lower - faces only - 1 coat urethane LF -$ -$ -$ -$

PNT LOWFST + Strip & refinish cabinetry - lower - faces only LF -$ -$ -$ -$

PNT LOWS + Stain & finish cabinetry - lower - inside and out LF -$ -$ -$ -$

PNT LOWS1 + Finish cabinetry - lower - inside and out- 1 coat urethane LF -$ -$ -$ -$

PNT LOWST + Strip & refinish cabinetry - lower - inside and out LF -$ -$ -$ -$

PNT LVR + Paint full louvered door slab only - 2 coats (per side) EA -$ -$ -$ -$

PNT LVR- + Paint half louvered door slab only - 2 coats (per side) EA -$ -$ -$ -$

PNT LVR1 + Paint full louvered door slab only - 1 coat (per side) EA -$ -$ -$ -$

PNT LVR-1 + Paint half louvered door slab only - 1 coat (per side) EA -$ -$ -$ -$

PNT LVRS + Stain & finish full louvered door slab only - (per side) EA -$ -$ -$ -$

PNT LVRS- + Stain & finish half louvered door slab only - (per side) EA -$ -$ -$ -$

PNT LVRS1 + Finish full louvered door slab, 1 coat urethane (per side) EA -$ -$ -$ -$

PNT LVRS-1 + Finish half louvered door slab, 1 coat urethane (per side) EA -$ -$ -$ -$

PNT LVRSP + Seal & paint full louvered door slab only (per side) EA -$ -$ -$ -$

PNT MAS + Seal block with masonry sealer SF -$ -$ -$ -$

PNT MAS+ + Seal masonry - elastomeric sealer SF -$ -$ -$ -$

PNT MASKF + Mask French door lites (per side of slab) EA -$ -$ -$ -$

PNT MASKFL + Floor protection - self-adhesive plastic film SF -$ -$ -$ -$

Page 125: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PNT MASKL + Mask and cover large light fixture EA -$ -$ -$ -$

PNT MASKL- + Mask and cover light fixture EA -$ -$ -$ -$

PNT MASKL+ + Mask and cover large ornate light fixture EA -$ -$ -$ -$

PNT MASKLF + Mask and prep for paint - plastic, paper, tape (per LF) LF -$ -$ -$ -$

PNT MASKLFP + Mask and prep for paint - paper and tape (per LF) LF -$ -$ -$ -$

PNT MASKLFT + Mask and prep for paint - tape only (per LF) LF -$ -$ -$ -$

PNT MASKSF + Mask {V} per square foot - plastic and tape - 4 mil SF -$ -$ -$ -$

PNT MASKSF> + Floor protection - plastic and tape - 10 mil SF -$ -$ -$ -$

PNT MASKSFC + Floor protection - corrugated cardboard and tape SF -$ -$ -$ -$

PNT MASKSFP + Floor protection - heavy paper and tape SF -$ -$ -$ -$

PNT MASKTD + Labor to tape drop cloths SF -$ -$ -$ -$

PNT MASP + Paint masonry SF -$ -$ -$ -$

PNT MATCH + Paint - special order - premium matching charge SF -$ -$ -$ -$

PNT MC + Paint medicine cabinet EA -$ -$ -$ -$

PNT MCS + Stain & finish medicine cabinet EA -$ -$ -$ -$

PNT MCST + Strip and refinish medicine cabinet EA -$ -$ -$ -$

PNT MED + Paint ceiling medallion EA -$ -$ -$ -$

PNT MLDG + Paint - molding - ornate or multi-member - one coat LF -$ -$ -$ -$

PNT MLDG2 + Paint - molding - ornate or multi-member - two coats LF -$ -$ -$ -$

PNT MLDGS + Stain & finish ornate or multi-member molding LF -$ -$ -$ -$

PNT MLDGS1 + Finish ornate or multi-member molding - 1 coat urethane LF -$ -$ -$ -$

PNT MN + Painting - Labor Minimum EA -$ -$ -$ -$

PNT MNRP + Painting - Minimum Charge - Labor and Material EA -$ -$ -$ -$

PNT MNTL + Seal & paint fireplace mantel LF -$ -$ -$ -$

PNT MNTLP + Additional cost to pre-stain wood fireplace mantel LF -$ -$ -$ -$

PNT MNTLS + Stain & finish wood fireplace mantel LF -$ -$ -$ -$

PNT MTL + Prime & paint metal siding SF -$ -$ -$ -$

PNT MTL1 + Paint metal siding - 1 coat SF -$ -$ -$ -$

PNT MTLR + Prime & paint metal roofmg SF -$ -$ -$ -$

PNT MTLR1 + Paint metal roofing - 1 coat SF -$ -$ -$ -$

PNT MURAL + Hand painted mural SF -$ -$ -$ -$

PNT NICHE + Paint wall niche EA -$ -$ -$ -$

PNT OH + Paint overhead door - 2 coats (per side) EA -$ -$ -$ -$

PNT OH> + Paint overhead door - Large - 2 coats (per side) EA -$ -$ -$ -$

PNT OH>1 + Paint overhead door - Large - 1 coat (per side) EA -$ -$ -$ -$

PNT OH1 + Paint overhead door - 1 coat (per side) EA -$ -$ -$ -$

PNT OHDORT + Seal & paint single garage door opening & trim EA -$ -$ -$ -$

PNT OHDORT> + Seal & paint double garage door opening & trim EA -$ -$ -$ -$

PNT OHDOT>1 + Paint double garage door opening & trim - 1 coat EA -$ -$ -$ -$

PNT OHDOT1 + Paint single garage door opening & trim - 1 coat EA -$ -$ -$ -$

PNT OHS + Stain and finish overhead door (per side) EA -$ -$ -$ -$

PNT OHS> + Stain and finish overhead door - Large (per side) EA -$ -$ -$ -$

PNT OHS>1 + Finish overhead door - Large - 1 coat urethane (per side) EA -$ -$ -$ -$

PNT OHS>2 + Finish overhead door - Large - 2 coats urethane (per side) EA -$ -$ -$ -$

PNT OHS1 + Finish overhead door - 1 coat urethane (per side) EA -$ -$ -$ -$

PNT OHS2 + Finish overhead door - 2 coats urethane (per side) EA -$ -$ -$ -$

PNT OIL + Additional SF cost for oil based or water-oil hybrid paint SF -$ -$ -$ -$

PNT OILLF + Additional LF cost for oil based or water-oil hybrid paint LF -$ -$ -$ -$

PNT OP + Paint door or window opening - 2 coats (per side) EA -$ -$ -$ -$

PNT OP> + Paint door or window opening - Large - 2 coats (per side) EA -$ -$ -$ -$

PNT OP>1 + Paint door or window opening - Large - 1 coat (per side) EA -$ -$ -$ -$

PNT OP1 + Paint door or window opening - 1 coat (per side) EA -$ -$ -$ -$

PNT OPSP + Seal & paint door or window opening (per side) EA -$ -$ -$ -$

PNT OPSP> + Seal & paint door or window opening - Large (per side) EA -$ -$ -$ -$

PNT ORI + Prime & paint ornamental iron handrail, 36" to 42" high LF -$ -$ -$ -$

PNT ORIF + Prime & paint ornamental fence - per SF SF -$ -$ -$ -$

PNT P + Paint {V} - one coat SF -$ -$ -$ -$

PNT P+ + Paint {V} - one coat - 2 colors SF -$ -$ -$ -$

PNT P2 + Paint {V} - two coats SF -$ -$ -$ -$

PNT P2+ + Paint {V} - two coats - 2 colors SF -$ -$ -$ -$

PNT PATCH + Drywall patch / small hole repair, ready for paint EA -$ -$ -$ -$

PNT PATIO + Prime & paint aluminum patio cover SF -$ -$ -$ -$

PNT PHIGH + Additional cost for high wall or ceiling - Over 14' SF -$ -$ -$ -$

PNT PHIGH< + Additional cost for high wall or ceiling - 11' to 14' SF -$ -$ -$ -$

PNT PIPE + Prime & paint pipe, 4" to 6" diameter LF -$ -$ -$ -$

Page 126: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PNT PIPE< + Prime & paint pipe, 1" to 3" diameter LF -$ -$ -$ -$

PNT PNL + Seal & paint paneling SF -$ -$ -$ -$

PNT PNL1 + Paint paneling - one coat SF -$ -$ -$ -$

PNT PNLP + Additional cost to pre-stain paneling SF -$ -$ -$ -$

PNT PNLS + Stain & finish paneling SF -$ -$ -$ -$

PNT PNLS+ + Strip & refinish paneling SF -$ -$ -$ -$

PNT POST + Paint/finish - fence post - wood EA -$ -$ -$ -$

PNT RAD + Prime & paint radiator unit EA -$ -$ -$ -$

PNT RADC + Prime & paint radiator cover EA -$ -$ -$ -$

PNT RGSTR + Prime & paint heat register EA -$ -$ -$ -$

PNT RGSTRSP + Strip, prime & paint heat register EA -$ -$ -$ -$

PNT RISER + Seal & paint stair riser - per side - per LF LF -$ -$ -$ -$

PNT RISERS + Stain & finish stair riser - per side - per LF LF -$ -$ -$ -$

PNT RISERS1 + Finish stair riser - 1 coat urethane - per side - per LF LF -$ -$ -$ -$

PNT RJACK + Prime & paint roof jack EA -$ -$ -$ -$

PNT S + Seal {V} w/latex based stain blocker - one coat SF -$ -$ -$ -$

PNT S- + Seal {V} w/PVA primer - one coat SF -$ -$ -$ -$

PNT S+ + Seal {V} w/oil based/hybrid stain blocker - one coat SF -$ -$ -$ -$

PNT S++ + Seal {V} shellac - one coat SF -$ -$ -$ -$

PNT S+++ + Seal {V} w/anti-microbial coating - one coat SF -$ -$ -$ -$

PNT S< + Spot seal w/oil based/hybrid stain blocker EA -$ -$ -$ -$

PNT S2 + Seal {V} w/latex based stain blocker - two coats SF -$ -$ -$ -$

PNT S3 + Seal {V} w/latex based stain blocker - three coats SF -$ -$ -$ -$

PNT SAND + Sand wood - interior SF -$ -$ -$ -$

PNT SANDE + Sand wood - exterior SF -$ -$ -$ -$

PNT SCRP + Scrape {V} & prep for paint SF -$ -$ -$ -$

PNT SDG + Seal & paint wood siding SF -$ -$ -$ -$

PNT SDG1 + Paint wood siding - 1 coat SF -$ -$ -$ -$

PNT SDGS + Stain & finish wood siding SF -$ -$ -$ -$

PNT SDGS1 + Finish wood siding - 1 coat urethane SF -$ -$ -$ -$

PNT SFTM + Prime & paint exterior soffit - metal SF -$ -$ -$ -$

PNT SFTM1 + Paint exterior soffit - metal - 1 coat SF -$ -$ -$ -$

PNT SFTR + Prime & paint exterior soffit - exposed rafters SF -$ -$ -$ -$

PNT SFTR1 + Paint exterior soffit - exposed rafters - 1 coat SF -$ -$ -$ -$

PNT SFTW + Prime & paint exterior soffit - wood SF -$ -$ -$ -$

PNT SFTW1 + Paint exterior soffit - wood - 1 coat SF -$ -$ -$ -$

PNT SG + Paint suspended ceiling grid SF -$ -$ -$ -$

PNT SH + Paint plywood sheathing SF -$ -$ -$ -$

PNT SHOE + Seal & paint base shoe or quarter round LF -$ -$ -$ -$

PNT SHOE1 + Paint base shoe or quarter round - 1 coat LF -$ -$ -$ -$

PNT SHOES + Stain & finish base shoe or quarter round LF -$ -$ -$ -$

PNT SHOES1 + Finish base shoe or quarter round - 1 coat urethane LF -$ -$ -$ -$

PNT SHSP + Seal & paint plywood sheathing SF -$ -$ -$ -$

PNT SHTR + Seal & paint window shutters - per side (set) EA -$ -$ -$ -$

PNT SHTR1 + Paint window shutters - per side (set) - 1 coat EA -$ -$ -$ -$

PNT SHTRS + Stain & finish window shutters - per side (set) EA -$ -$ -$ -$

PNT SHTRS1 + Finish window shutters - per side (set) - 1 coat urethane EA -$ -$ -$ -$

PNT SHW + Seal & paint wood shelving, 12"- 24" width LF -$ -$ -$ -$

PNT SHVV1 + Paint wood shelving, 12"- 24" width - 1 coat LF -$ -$ -$ -$

PNT SHWS + Stain & finish wood shelving, 12"- 24" width LF -$ -$ -$ -$

PNT SHWS1 + Finish wood shelving, 12"- 24" width - 1 coat urethane LF -$ -$ -$ -$

PNT SILL + Seal & paint window sill LF -$ -$ -$ -$

PNT SILL1 + Paint window sill - 1 coat LF -$ -$ -$ -$

PNT SILLS + Stain & finish wood window sill LF -$ -$ -$ -$

PNT SILLS1 + Finish wood window sill - 1 coat urethane LF -$ -$ -$ -$

PNT SM2 + Paint sheet metal - two coats SF -$ -$ -$ -$

PNT SP + Seal/prime then paint {V} (2 coats) SF -$ -$ -$ -$

PNT SP+ + Seal/prime then paint {V} (2 coats) - 2 colors SF -$ -$ -$ -$

PNT SP2 + Seal/prime then paint {V} twice (3 coats) SF -$ -$ -$ -$

PNT SP2+ + Seal/prime then paint {V} twice (3 coats) - 2 colors SF -$ -$ -$ -$

PNT SPMP + Special paint - multi-pigmented - Commercial SF -$ -$ -$ -$

PNT SPN + Seal/paint interior - per SF of floor - 1 tone- New Const. SF -$ -$ -$ -$

PNT SPN2 + Seal/paint interior - per SF of floor - 2 tone- New Const. SF -$ -$ -$ -$

PNT SPN3 + Seal/paint interior - per SF of floor - 3 tone- New Const. SF -$ -$ -$ -$

PNT SPSB + Seal w/stain blocker then paint {V} (2 coats) SF -$ -$ -$ -$

Page 127: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PNT SPSB2 + Seal w/stain blocker then paint {V} twice (3 coats) SF -$ -$ -$ -$

PNT STJ2 + Paint steel truss / bar joist - 8" to 24" LF -$ -$ -$ -$

PNT STJ4 + Paint steel truss / bar joist - 25" to 48" LF -$ -$ -$ -$

PNT STJ6 + Paint steel truss / bar joist - 49" to 72" LF -$ -$ -$ -$

PNT STOL + Seal & paint window stool and apron LF -$ -$ -$ -$

PNT STOL1 + Paint window stool and apron - 1 coat LF -$ -$ -$ -$

PNT STOLS + Stain & finish window stool and apron LF -$ -$ -$ -$

PNT STOLS1 + Finish window stool and apron - 1 coat urethane LF -$ -$ -$ -$

PNT STR + Paint stair stringer - one side LF -$ -$ -$ -$

PNT STRDIS + Paint disappearing (folding) stairway/attic access ladder EA -$ -$ -$ -$

PNT STRMD + Prime & paint/finish storm door assembly EA -$ -$ -$ -$

PNT STRMD1 + Paint/finish storm door assembly - 1 coat EA -$ -$ -$ -$

PNT STRMW + Prime & paint/finish storm window EA -$ -$ -$ -$

PNT STRMW1 + Paint/finish storm window - 1 coat EA -$ -$ -$ -$

PNT STRS + Stain & finish stair stringer LF -$ -$ -$ -$

PNT STRS1 + Finish stair stringer - 1 coat urethane LF -$ -$ -$ -$

PNT STRSP + Seal & paint stair stringer - one side LF -$ -$ -$ -$

PNT STSK + Paint stair skirt/apron LF -$ -$ -$ -$

PNT STSKS + Stain & finish stair skirt/apron LF -$ -$ -$ -$

PNT STSKS1 + Finish stair skirt/apron - 1 coat urethane LF -$ -$ -$ -$

PNT STSKSP + Seal & paint stair skirt/apron (2 coats) LF -$ -$ -$ -$

PNT STU + Seal & paint stucco SF -$ -$ -$ -$

PNT STUP + Paint stucco SF -$ -$ -$ -$

PNT STUS+ + Seal stucco - elastomeric sealer SF -$ -$ -$ -$

PNT SWALL + Seal stud wall for odor control SF -$ -$ -$ -$

PNT SWALL+ + Seal stud wall for odor control (shellac) SF -$ -$ -$ -$

PNT SWALL++ + Seal stud wall for odor control (anti-microbial coating) SF -$ -$ -$ -$

PNT TBAR + Prime & paint towel bar EA -$ -$ -$ -$

PNT TEX + Seal & texture paint {V} SF -$ -$ -$ -$

PNT TKS + Stain & finish toe-kick LF -$ -$ -$ -$

PNT TR + Seal truss system - up to 5/12 SF -$ -$ -$ -$

PNT TR+ + Seal truss system (shellac) - up to 5/12 SF -$ -$ -$ -$

PNT TR12 + Seal truss system - 9 to 12/12 SF -$ -$ -$ -$

PNT TR12+ + Seal truss system (shellac) - 9 to 12/12 SF -$ -$ -$ -$

PNT TR8 + Seal truss system - 6 to 8/12 SF -$ -$ -$ -$

PNT TR8+ + Seal truss system (shellac) - 6 to 8/12 SF -$ -$ -$ -$

PNT TRD + Seal & paint stair tread - per side - per LF LF -$ -$ -$ -$

PNT TRDS + Stain & finish stair tread - per side - per LF LF -$ -$ -$ -$

PNT TRIM + Seal & paint trim - two coats LF -$ -$ -$ -$

PNT TRIM1 + Paint trim - one coat LF -$ -$ -$ -$

PNT TRIMP + Additional cost to pre-stain trim LF -$ -$ -$ -$

PNT TRIMS + Stain & finish trim LF -$ -$ -$ -$

PNT TRIMS1 + Finish trim - 1 coat urethane LF -$ -$ -$ -$

PNT TRIMST + Strip paint/finish from trim, 1" - 4" wide LF -$ -$ -$ -$

PNT TRIMST> + Strip paint/finish from trim, 4" - 8" wide LF -$ -$ -$ -$

PNT TRS + Paint steel truss system SF -$ -$ -$ -$

PNT TUB + Refinish bathtub EA -$ -$ -$ -$

PNT TUBCA + Refinish bathtub - nonstandard color - additional charge EA -$ -$ -$ -$

PNT TUBCR + Bathtub chip repair EA -$ -$ -$ -$

PNT UL + Seal underlayment for odor control SF -$ -$ -$ -$

PNT UP + Seal & paint cabinetry - upper - inside and out LF -$ -$ -$ -$

PNT UP< + Paint cabinetry - upper - inside and out LF -$ -$ -$ -$

PNT UPF + Seal & paint cabinetry - upper - faces only LF -$ -$ -$ -$

PNT UPF< + Paint cabinetry - upper - faces only LF -$ -$ -$ -$

PNT UPFS + Stain & finish cabinetry - upper - faces only LF -$ -$ -$ -$

PNT UPFS1 + Finish cabinetry - upper - faces only - 1 coat urethane LF -$ -$ -$ -$

PNT UPFST + Strip & refinish cabinetry - upper - faces only LF -$ -$ -$ -$

PNT UPS + Stain & finish cabinetry - upper - inside and out LF -$ -$ -$ -$

PNT UPS1 + Finish cabinetry - upper - inside and out- 1 coat urethane LF -$ -$ -$ -$

PNT UPST + Strip & refinish cabinetry - upper - inside and out LF -$ -$ -$ -$

PNT VAN + Seal & paint vanity - inside and out LF -$ -$ -$ -$

PNT VAN< + Paint vanity - inside and out LF -$ -$ -$ -$

PNT VANF + Seal & paint vanity - faces only LF -$ -$ -$ -$

PNT VANF< + Paint vanity - faces only LF -$ -$ -$ -$

PNT VANFS + Stain & finish vanity - faces only LF -$ -$ -$ -$

Page 128: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

PNT VANFS1 + Finish vanity - faces only - 1 coat urethane LF -$ -$ -$ -$

PNT VANFST + Strip & refinish vanity - faces only LF -$ -$ -$ -$

PNT VANS + Stain & finish vanity - inside and out LF -$ -$ -$ -$

PNT VANS1 + Finish vanity - inside and out - 1 coat urethane LF -$ -$ -$ -$

PNT VANST + Strip & refinish vanity - inside and out LF -$ -$ -$ -$

PNT VENT + Prime & paint roof vent EA -$ -$ -$ -$

PNT VENTG + Seal & paint wood gable vent EA -$ -$ -$ -$

PNT WDP + Paint wood patio door - 2 coats (per side) EA -$ -$ -$ -$

PNT WDP1 + Paint wood patio door - 1 coat (per side) EA -$ -$ -$ -$

PNT WDPS + Stain & finish wood patio door (per side) EA -$ -$ -$ -$

PNT WDPS1 + Finish wood patio door - 1 coat urethane (per side) EA -$ -$ -$ -$

PNT WDW + Seal & paint wood window (per side) EA -$ -$ -$ -$

PNT WDW< + Seal & paint wood window (per side) - Small EA -$ -$ -$ -$

PNT WDW<1 + Paint wood window - 1 coat (per side) - Small EA -$ -$ -$ -$

PNT WDW> + Seal & paint wood window (per side) - Large EA -$ -$ -$ -$

PNT WDW>> + Seal & paint wood window (per side) - Extra large EA -$ -$ -$ -$

PNT WDW»1 + Paint wood window - 1 coat (per side) - Extra large EA -$ -$ -$ -$

PNT WDW>1 + Paint wood window - 1 coat (per side) - Large EA -$ -$ -$ -$

PNT WDW1 + Paint wood window - 1 coat (per side) EA -$ -$ -$ -$

PNT WDWS + Stain & finish wood window (per side) EA -$ -$ -$ -$

PNT WDWS< + Stain & finish wood window (per side) - Small EA -$ -$ -$ -$

PNT WDWS<1 + Finish wood window - 1 coat urethane (per side) - Small EA -$ -$ -$ -$

PNT WDWS> + Stain & finish wood window (per side) - Large EA -$ -$ -$ -$

PNT WDWS>> + Stain & finish wood window (per side) - Extra large EA -$ -$ -$ -$

PNT WDWS»1 + Finish wood window - 1 coat urethane (per side) - Extr lrg EA -$ -$ -$ -$

PNT WDWS>1 + Finish wood window - 1 coat urethane (per side) - Large EA -$ -$ -$ -$

PNT WDWS1 + Finish wood window - 1 coat urethane (per side) EA -$ -$ -$ -$

PNT WDWST + Strip & refinish wood window (per side) EA -$ -$ -$ -$

PNT WDWST< + Strip & refinish wood window (per side) - Small EA -$ -$ -$ -$

PNT WDWST> + Strip & refinish wood window (per side) - Large EA -$ -$ -$ -$

PNT WDWST» + Strip & refinish wood window (per side) - Extra large EA -$ -$ -$ -$

PNT WGRID + Paint wood window grid LF -$ -$ -$ -$

PNT WGRIDS + Stain & finish wood window grid LF -$ -$ -$ -$

PNT WP + Waterproof concrete & masonry paint SF -$ -$ -$ -$

PNT WPR + Seal & paint wallpaper SF -$ -$ -$ -$

PNT WSH + Paint (stain) wood shingles SF -$ -$ -$ -$

PNT X1 + Exterior - paint one coat SF -$ -$ -$ -$

PNT X2 + Exterior - paint two coats SF -$ -$ -$ -$

PNT XDOR + Prime & paint door slab only - exterior (per side) EA -$ -$ -$ -$

PNT XDOR1 + Paint door slab only - 1 coat - exterior (per side) EA -$ -$ -$ -$

PNT XDORS + Stain and finish door slab only - exterior (per side) EA -$ -$ -$ -$

PNT XDORS1 + Finish door slab only - 1 coat urethane - ext (per side) EA -$ -$ -$ -$

PNT XS + Exterior - seal or prime and prep for paint SF -$ -$ -$ -$

PNT XSP + Exterior - seal or prime then paint with one finish coat SF -$ -$ -$ -$

PNT XSP2 + Exterior - seal or prime then paint with two finish coats SF -$ -$ -$ -$

PNT XSTN + Exterior - stain one coat SF -$ -$ -$ -$

PNT XSTN2 + Exterior - stain two coats SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

RFG 220 & 3 tab - 20 yr. - composition shingle roofing - incl. felt SQ -$ -$ -$ -$

RFG 220E & 3 tab - 20 yr. - composition shingle roofing (per SHINGLE) EA -$ -$ -$ -$

RFG 220S & 3 tab - 20 yr. - comp. shingle roofing - w/out felt SQ -$ -$ -$ -$

RFG 240 & 3 tab - 25 yr. - composition shingle roofing - incl. felt SQ -$ -$ -$ -$

RFG 240E & 3 tab - 25 yr. - composition shingle roofing (per SHINGLE) EA -$ -$ -$ -$

RFG 240S & 3 tab - 25 yr. - comp. shingle roofing - w/out felt SQ -$ -$ -$ -$

RFG 300 & Laminated - comp. shingle rfg. - w/ felt SQ -$ -$ -$ -$

RFG 300E & Laminated - comp. shingle rfg (per SHINGLE) EA -$ -$ -$ -$

RFG 300S & Laminated - comp. shingle rfg. - w/out felt SQ -$ -$ -$ -$

RFG 400 & Laminated - High grade - comp. shingle rfg. - w/ felt SQ -$ -$ -$ -$

RFG 400E & Laminated - High grade - comp. shingle rfg. (per EA -$ -$ -$ -$

SHINGLE)

RFG 4001 & Laminated - High grd - impact resist shingle - w/ felt SQ -$ -$ -$ -$

RFG 4001E & Laminated - High grd - impact resist shingle (per EA -$ -$ -$ -$

Page 129: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

SHINGLE)

RFG 4001S & Laminated - High grd - impact resist shingle - w/out felt SQ -$ -$ -$ -$

RFG 400S & Laminated - High grd - comp. shingle rfg. - w/out felt SQ -$ -$ -$ -$

RFG 500 & Laminated - Deluxe grd - comp. shingle rfg. - w/ felt SQ -$ -$ -$ -$

RFG 500- & Laminated - Premium grd - comp. shingle rfg. - w/ felt SQ -$ -$ -$ -$

RFG 500E & Laminated - Deluxe grd - comp. shingle rfg. (per EA -$ -$ -$ -$

SHINGLE)

RFG 500E- & Laminated - Premium grd - comp. shingle rfg. (per EA -$ -$ -$ -$

SHINGLE)

RFG 5001 & Laminated - Premium grd - impact resist shingle - w/ felt SQ -$ -$ -$ -$

RFG 500lE & Laminated - Prem grd - impact resist shingle (per EA -$ -$ -$ -$

SHINGLE)

RFG 50015 & Laminated - Premium grd - impact resist shingle - w/o felt SQ -$ -$ -$ -$

RFG 500S & Laminated - Deluxe grd - comp. shingle rfg. - w/out felt SQ -$ -$ -$ -$

RFG 500S- & Laminated - Premium grd - comp. shingle rfg. - w/out felt SQ -$ -$ -$ -$

RFG 500SH & Laminated - Shake look comp. shingle - w/felt SQ -$ -$ -$ -$

RFG 500SH+ & Laminated - Shake look Premium grd comp. shingle - SQ -$ -$ -$ -$

w/felt

RFG 500SHE & Laminated - Shake look comp. shingle (per SHINGLE) EA -$ -$ -$ -$

RFG 500SHE+ & Laminated - Shake look Premium comp. shingle (per EA -$ -$ -$ -$

SHINGLE)

RFG 500SHS & Laminated - Shake look comp. shingle - w/out felt SQ -$ -$ -$ -$

RFG 500SHS+ & Laminated - Shake look Premium grd comp.shingle-w/out SQ -$ -$ -$ -$

felt

RFG 500SL & Laminated - Slate look comp. shingle - w/felt SQ -$ -$ -$ -$

RFG 500SL- & Laminated - Slate look Standard comp. shingle - w/felt SQ -$ -$ -$ -$

RFG 500SL+ & Laminated - Slate look Premium grd comp. shingle - w/felt SQ -$ -$ -$ -$

RFG 500SLE & Laminated - Slate look comp. shingle (per SHINGLE) EA -$ -$ -$ -$

RFG 500SLE- & Laminated - Slate look Standard comp shingle (per EA -$ -$ -$ -$

SHINGLE)

RFG 500SLE+ & Laminated - Slate look Premium comp. shingle (per EA -$ -$ -$ -$

SHINGLE)

RFG 500SLS & Laminated - Slate look comp. shingle - w/out felt SQ -$ -$ -$ -$

RFG 500SLS- & Laminated - Slate look Standard comp. shingle - w/out felt SQ -$ -$ -$ -$

RFG 500SLS+ & Laminated - Slate look Premium comp. shingle - w/out felt SQ -$ -$ -$ -$

RFG ADDCOLD + Add for adhesive application - comp shingle - cold weather SQ -$ -$ -$ -$

RFG ADDRM> - Add. layer of comp. shingles, remove & disp. - Laminated SQ -$ -$ -$ -$

RFG ADDRM» - Add. layer of comp. shingles, remove & disp. - High pro. SQ -$ -$ -$ -$

RFG ADDRMV - Add. layer of comp. shingles, remove & disp. - 3 tab SQ -$ -$ -$ -$

RFG ADDRMVN - Additional layer of comp. shingles, remove (no haul oft) SQ -$ -$ -$ -$

RFG ALPNT & Aluminum coating - without fiber SF -$ -$ -$ -$

RFG ALPNT+ & Aluminum coating - with fiber SF -$ -$ -$ -$

RFG ALU & Aluminum shingle - including felt - mill finish SQ -$ -$ -$ -$

RFG ALU+ & Aluminum shingle - including felt - color finish SQ -$ -$ -$ -$

RFG ALUA & Aluminum shingle - w/out felt - mill finish SQ -$ -$ -$ -$

RFG ALUA+ & Aluminum shingle - w/out felt - color finish SQ -$ -$ -$ -$

RFG ALUE & Aluminum shingle - mill finish (per SHINGLE/PANEL) EA -$ -$ -$ -$

RFG ALUE+ & Aluminum shingle - color finish (per SHINGLE/PANEL) EA -$ -$ -$ -$

RFG ALUEC + Aluminum end caps - mill finish LF -$ -$ -$ -$

RFG ALUEC+ + Aluminum end caps - color finish LF -$ -$ -$ -$

RFG ALUET & Aluminum rake/gable edge trim - mill finish LF -$ -$ -$ -$

RFG ALUET+ & Aluminum rake/gable edge trim - color finish LF -$ -$ -$ -$

RFG ALUF + Foam insert for metal shingle/shake/slate roofing SQ -$ -$ -$ -$

RFG ALUM & Aluminum corrugated sheet roofing - .019 SF -$ -$ -$ -$

RFG ALUM> & Aluminum corrugated sheet roofing - .034 SF -$ -$ -$ -$

RFG ALUMA & Aluminum corrugated sheet roofing - .019 - Agricultural SF -$ -$ -$ -$

RFG ALUMA> & Aluminum corrugated sheet roofing - .034 - Agricultural SF -$ -$ -$ -$

RFG ALUR & Aluminum shingle - ridge or hip LF -$ -$ -$ -$

RFG ALUR+ & Aluminum shingle - ridge or hip - color finish LF -$ -$ -$ -$

RFG ALUS & Aluminum shake/slate - including felt - mill finish SQ -$ -$ -$ -$

RFG ALUS+ & Aluminum shake/slate - including felt - color finish SQ -$ -$ -$ -$

RFG ALUSA & Aluminum shake/slate - w/out felt - mill finish SQ -$ -$ -$ -$

RFG ALUSA+ & Aluminum shake/slate - w/out felt - color finish SQ -$ -$ -$ -$

RFG ALUSR & Aluminum shake/slate - ridge or hip - mill finish LF -$ -$ -$ -$

RFG ALUSR+ & Aluminum shake/slate - ridge or hip - color finish LF -$ -$ -$ -$

Page 130: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

RFG ALUSS + Aluminum shingle/shake - starter strip LF -$ -$ -$ -$

RFG ALUSW & Aluminum sidewall/endwall flashing - mill finish LF -$ -$ -$ -$

RFG ALUSW+ & Aluminum sidewall/endwall flashing - color finish LF -$ -$ -$ -$

RFG ALUV & Aluminum shingle/shake valley flashing LF -$ -$ -$ -$

RFG ALUV+ & Aluminum shingle/shake valley flashing - color finish LF -$ -$ -$ -$

RFG ARMV - Tear off, haul and dispose of comp. shingles - 3 tab SQ -$ -$ -$ -$

RFG ARMV> - Tear off, haul and dispose of comp. shingles - Laminated SQ -$ -$ -$ -$

RFG ARMV» - Tear off, haul and dispose of comp. shingles - High pro. SQ -$ -$ -$ -$

RFG ARMVN - Tear off composition shingles (no haul off) SQ -$ -$ -$ -$

RFG ASBRMVN - Tear off rigid asbestos shingles (no haul off) SQ -$ -$ -$ -$

RFG ASTR + Asphalt starter - peel and stick LF -$ -$ -$ -$

RFG ASTR- + Asphalt starter - universal starter course LF -$ -$ -$ -$

RFG ASTR+ + Asphalt starter - laminated double layer starter LF -$ -$ -$ -$

RFG BI & Modified bitumen roof SQ -$ -$ -$ -$

RFG BIC & Modified bitumen roof - cold adhesive application SQ -$ -$ -$ -$

RFG BIDITM + Roofing (Bid Item) EA -$ -$ -$ -$

RFG BIGFLC & Bitumen roof - Add. glass felt layer - cold adhesive appl. SQ -$ -$ -$ -$

RFG BIGFLM & Bitumen roof - Add. glass felt layer - hot mopped appl. SQ -$ -$ -$ -$

RFG BIGM + Glass mat gypsum - 1/4" - primed SQ -$ -$ -$ -$

RFG BIGM> + Glass mat gypsum - 1/2" - primed SQ -$ -$ -$ -$

RFG BIM & Modified bitumen roof - hot mopped SQ -$ -$ -$ -$

RFG BIRMV - Tear off, haul and dispose of modified bitumen roofing SQ -$ -$ -$ -$

RFG BIRMVN - Tear off modified bitumen roofing (no haul off) SQ -$ -$ -$ -$

RFG BISA & Modified bitumen roof - self-adhering SQ -$ -$ -$ -$

RFG BISABS & Bitumen roof - Add. base sheet - self-adhering SQ -$ -$ -$ -$

RFG BU3 & Built-up 3 ply roofing - in place SQ -$ -$ -$ -$

RFG BU3RMV - Tear off, haul and dispose of 3 ply built-up roofing SQ -$ -$ -$ -$

RFG BU3RMVN - Tear off 3 ply built-up roofing (no haul off) SQ -$ -$ -$ -$

RFG BU4 & Built-up 4 ply roofing - in place SQ -$ -$ -$ -$

RFG BU4RMV - Tear off, haul and dispose of 4 ply built-up roofing SQ -$ -$ -$ -$

RFG BU4RMVN - Tear off 4 ply built-up roofing (no haul off) SQ -$ -$ -$ -$

RFG BU5 & Built-up 5 ply roofing - in place SQ -$ -$ -$ -$

RFG BU5RMV - Tear off, haul and dispose of 5 ply built-up roofing SQ -$ -$ -$ -$

RFG BU5RMVN - Tear off 5 ply built-up roofing (no haul off) SQ -$ -$ -$ -$

RFG BUCG & Built-up roof with granulated cap sheet - in place SQ -$ -$ -$ -$

RFG BUFL & Built-up roof - Additional glass felt layer SQ -$ -$ -$ -$

RFG BUG & Built-up roofing - gravel ballast SQ -$ -$ -$ -$

RFG BUGRMV - Tear off, haul and dispose of gravel ballast SQ -$ -$ -$ -$

RFG BUGRMVN - Tear off gravel ballast (no haul off) SQ -$ -$ -$ -$

RFG BUSF + Built-up roofing - scratch and flood (no gravel) SQ -$ -$ -$ -$

RFG BUSFG + Built-up roofing - scratch, flood and re-gravel SQ -$ -$ -$ -$

RFG CFG & Corrugated fiberglass roofing (greenhouse type) SF -$ -$ -$ -$

RFG CFGRMV - Tear off, haul and dispose corrugated fiberglass roofing SF -$ -$ -$ -$

RFG CFGRMVN - Tear off corrugated fiberglass roofing (no haul off) SF -$ -$ -$ -$

RFG COP & Copper shingle - including felt SQ -$ -$ -$ -$

RFG COP+ & Copper shingle - including felt - High grade SQ -$ -$ -$ -$

RFG COPC & Copper shingle - w/out felt SQ -$ -$ -$ -$

RFG COPC+ & Copper shingle - w/out felt - High grade SQ -$ -$ -$ -$

RFG COPE & Copper shingle (per SHINGLE/PANEL) EA -$ -$ -$ -$

RFG COPE+ & Copper shingle - High grade (per SHINGLE/PANEL) EA -$ -$ -$ -$

RFG COPF & Copper panel - flat seam - 16 oz SF -$ -$ -$ -$

RFG COPF+ & Copper panel - flat seam - 20 oz SF -$ -$ -$ -$

RFG COPR & Copper ridge or hip LF -$ -$ -$ -$

RFG COPR+ & Copper ridge or hip - High grade LF -$ -$ -$ -$

RFG COPS & Copper panel - standing seam 1" - 16 oz SF -$ -$ -$ -$

RFG COPS+ & Copper panel - standing seam 1" - 20 oz SF -$ -$ -$ -$

RFG COPY & Copper valley - v-channel LF -$ -$ -$ -$

RFG COPV+ & Copper valley - v-channel - High grade LF -$ -$ -$ -$

RFG CSFC & Fiber cement composite roofing - Corrugated style SQ -$ -$ -$ -$

RFG CSFCE & Fiber cement composite roofing - Corrugated (per PANEL) EA -$ -$ -$ -$

RFG CSFRMV - Tear off, haul and dispose of fiber cement roofing SQ -$ -$ -$ -$

RFG CSFRMVN - Tear off fiber cement composite roofing (no haul off) SQ -$ -$ -$ -$

RFG CSFSH & Fiber cement composite roofing - Shake style SQ -$ -$ -$ -$

RFG CSFSHE & Fiber cement comp. roofing - Shake style (per SHINGLE) EA -$ -$ -$ -$

RFG CSFSL & Fiber cement composite roofing - Slate style SQ -$ -$ -$ -$

Page 131: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

RFG CSFSLE & Fiber cement comp. roofing - Slate style (per SHINGLE) EA -$ -$ -$ -$

RFG CSH & Synthetic composite rfg - Shake style - 50 yr.- incl. felt SQ -$ -$ -$ -$

RFG CSHE & Synthetic composite roofing - Shake style (per SHINGLE) EA -$ -$ -$ -$

RFG CSHS & Synthetic composite rfg - Shake style - 50 yr.- w/out felt SQ -$ -$ -$ -$

RFG CSL & Synthetic composite rfg - Slate style - 50 yr. - incl felt SQ -$ -$ -$ -$

RFG CSLE & Synthetic composite roofing - Slate style (per SHINGLE) EA -$ -$ -$ -$

RFG CSLS & Synthetic composite rfg - Slate style - 50 yr - w/out felt SQ -$ -$ -$ -$

RFG CSRMV - Tear off, haul and dispose of synthetic composite roofing SQ -$ -$ -$ -$

RFG CSRMVN - Tear off synthetic composite roofing (no haul off) SQ -$ -$ -$ -$

RFG CUP & Cupola - Wood EA -$ -$ -$ -$

RFG CUP+ & Cupola-Vinyl EA -$ -$ -$ -$

RFG CUP++ & Cupola - Copper EA -$ -$ -$ -$

RFG CUP< & Cupola - Wood - Small EA -$ -$ -$ -$

RFG CUP<+ & Cupola - Vinyl - Small EA -$ -$ -$ -$

RFG CUP<++ & Cupola - Copper - Small EA -$ -$ -$ -$

RFG CUP> & Cupola - Wood - Large EA -$ -$ -$ -$

RFG CUP>+ & Cupola - Vinyl - Large EA -$ -$ -$ -$

RFG CUP>++ & Cupola - Copper - Large EA -$ -$ -$ -$

RFG CUPV & Cupola for exhaust ventilation EA -$ -$ -$ -$

RFG DISHRS + Digital satellite system - Detach & reset EA -$ -$ -$ -$

RFG DRIP & Drip edge LF -$ -$ -$ -$

RFG DRIP> & Drip edge/gutter apron LF -$ -$ -$ -$

RFG DRIPC & Drip edge - copper LF -$ -$ -$ -$

RFG DRIPP & Drip edge - PVC/TPO clad metal LF -$ -$ -$ -$

RFG DRIPP> & Drip edge - PVC/TPO clad metal with cleat LF -$ -$ -$ -$

RFG EJR + Expansion joint - Roof - neoprene w/alum. cover, 1"-1 1/2" LF -$ -$ -$ -$

RFG EJR2 + Expansion joint - Roof - neoprene w/alum. cover, 2"-3" LF -$ -$ -$ -$

RFG EJR3 + Expansion joint - Roof - neoprene w/alum. cover, 4"-10" LF -$ -$ -$ -$

RFG ELASTO + Elastomeric roof coating (rubberized) for mobile home SF -$ -$ -$ -$

RFG ELASTO< + Elastomeric roof coating (rubberized) small patch EA -$ -$ -$ -$

RFG ELASTO1 + Elastomeric roof coating (rubberized) - mobile home 1 coat SF -$ -$ -$ -$

RFG ERC + Elastomeric roof coating - Rib roof SF -$ -$ -$ -$

RFG ERCF + Elastomeric roof coating - Flat roof SF -$ -$ -$ -$

RFG ERCP + Elastomeric roof primer SF -$ -$ -$ -$

RFG FB1 & Fiberboard - 1" SF -$ -$ -$ -$

RFG FB1/2 & Fiberboard - 1/2" SF -$ -$ -$ -$

RFG FB2 & Fiberboard - 2" SF -$ -$ -$ -$

RFG FB3 & Fiberboard - 3" SF -$ -$ -$ -$

RFG FELT15 + Roofing felt - 15 lb. SQ -$ -$ -$ -$

RFG FELT30 + Roofing felt - 30 lb. SQ -$ -$ -$ -$

RFG FELTL15 + Roofing felt - 15 lb. - double coverage/low slope SQ -$ -$ -$ -$

RFG FELTSU + Roofing felt - synthetic underlayment SQ -$ -$ -$ -$

RFG FELTSU- + Roofing felt - synthetic underlayment - Standard grade SQ -$ -$ -$ -$

RFG FIN & Roof finial EA -$ -$ -$ -$

RFG FIN+ & Roof finial - High grade EA -$ -$ -$ -$

RFG FL14 & Flashing, 14" wide LF -$ -$ -$ -$

RFG FL14C & Flashing, 14" wide - copper LF -$ -$ -$ -$

RFG FL20 & Flashing, 20" wide LF -$ -$ -$ -$

RFG FLCAP & Cap flashing LF -$ -$ -$ -$

RFG FLCAP> & Cap flashing - large LF -$ -$ -$ -$

RFG FLCAPC & Cap flashing - copper LF -$ -$ -$ -$

RFG FLCAPS & Cap flashing - steel LF -$ -$ -$ -$

RFG FLCAPS> & Cap flashing - steel - large LF -$ -$ -$ -$

RFG FLCH & Chimney flashing - average (32" x 36") EA -$ -$ -$ -$

RFG FLCH< & Chimney flashing - small (24" x 24") EA -$ -$ -$ -$

RFG FLCH> & Chimney flashing - large (32" x 60") EA -$ -$ -$ -$

RFG FLCHC & Chimney flashing - average (32" x 36") - copper EA -$ -$ -$ -$

RFG FLCHC< & Chimney flashing - small (24" x 24") - copper EA -$ -$ -$ -$

RFG FLCHC> & Chimney flashing - large (32" x 60") - copper EA -$ -$ -$ -$

RFG FLCRB & Curb flashing - PVC/TPO LF -$ -$ -$ -$

RFG FLCTR & Counterflashing - Apron flashing LF -$ -$ -$ -$

RFG FLCTRC & Counterflashing - Apron flashing - copper LF -$ -$ -$ -$

RFG FLKICK & Flashing - kick-out diverter EA -$ -$ -$ -$

RFG FLL & Flashing - L flashing - galvanized LF -$ -$ -$ -$

RFG FLL+ & Flashing - L flashing - color finish LF -$ -$ -$ -$

Page 132: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

RFG FLP & Flash parapet wall only LF -$ -$ -$ -$

RFG FLP6OP & Flash parapet wall only - PVC/TPO LF -$ -$ -$ -$

RFG FLPB & Flash parapet wall only - bitumen LF -$ -$ -$ -$

RFG FLPIPE & Flashing - pipe jack EA -$ -$ -$ -$

RFG FLPIPEC & Flashing - pipe jack - copper EA -$ -$ -$ -$

RFG FLPIPEL & Flashing - pipe jack - lead EA -$ -$ -$ -$

RFG FLPJ6 & Flashing - pipe jack - 6" EA -$ -$ -$ -$

RFG FLPJ8 & Flashing - pipe jack - 8" EA -$ -$ -$ -$

RFG FLPJSB & Flashing - pipe jack - split boot EA -$ -$ -$ -$

RFG FLRD & Flashing - rain diverter EA -$ -$ -$ -$

RFG FLRIG & Ridge flashing LF -$ -$ -$ -$

RFG FLRIGC & Ridge flashing - copper LF -$ -$ -$ -$

RFG FLTB & Aluminum termination bar / flashing for membrane roofs LF -$ -$ -$ -$

RFG GCR240 & Gable cornice return - 3 tab EA -$ -$ -$ -$

RFG GCR240H & Gable cornice return - 3 tab - 2 stories or greater EA -$ -$ -$ -$

RFG GCR300 & Gable cornice return - laminated EA -$ -$ -$ -$

RFG GCR300H & Gable cornice return - laminated - 2 stories or greater EA -$ -$ -$ -$

RFG GCS240 & Gable cornice strip - 3 tab LF -$ -$ -$ -$

RFG GCS240H & Gable cornice strip - 3 tab - 2 stories of greater LF -$ -$ -$ -$

RFG GCS300 & Gable cornice strip - laminated LF -$ -$ -$ -$

RFG GCS300H & Gable cornice strip - laminated - 2 stories or greater LF -$ -$ -$ -$

RFG GLVM & Galvanized roofing or similar - mobile home SF -$ -$ -$ -$

RFG GSTOP & Gravel stop LF -$ -$ -$ -$

RFG GSTOPC & Gravel stop - copper LF -$ -$ -$ -$

RFG HIGH & Additional charge for high roof (2 stories or greater) SQ -$ -$ -$ -$

RFG HTMN + Roofing repair - hot material required - Minimum charge EA -$ -$ -$ -$

RFG IF1 & Insulation - fiberglass board, 1" SQ -$ -$ -$ -$

RFG IF2 & Insulation - fiberglass board, 2" SQ -$ -$ -$ -$

RFG IF3/4 & Insulation - fiberglass board, 3/4" SQ -$ -$ -$ -$

RFG IP1 & Insulation - perlite board, 1" SQ -$ -$ -$ -$

RFG IP1-1/2 & Insulation - perlite board, 1-1/2" SQ -$ -$ -$ -$

RFG IP2 & Insulation - perlite board, 2" SQ -$ -$ -$ -$

RFG IP3 & Insulation - perlite board, 3" SQ -$ -$ -$ -$

RFG IPO1 & Insulation - polystyrene board, 1" SQ -$ -$ -$ -$

RFG IPO1> & Insulation - polystyrene board, 1-1/2" SQ -$ -$ -$ -$

RFG IP02 & Insulation - polystyrene board, 2" SQ -$ -$ -$ -$

RFG IP03 & Insulation - polystyrene board, 3" SQ -$ -$ -$ -$

RFG ISO1 & Insulation - ISO board, 1 1/2" SQ -$ -$ -$ -$

RFG ISO1< & Insulation - ISO board, 1" SQ -$ -$ -$ -$

RFG IS02 & Insulation - ISO board, 2" SQ -$ -$ -$ -$

RFG IS03 & Insulation - ISO board, 3" SQ -$ -$ -$ -$

RFG IS03> & Insulation - ISO board, 3 1/2" SQ -$ -$ -$ -$

RFG IS04 & Insulation - ISO board, 4" SQ -$ -$ -$ -$

RFG IU1 & Insulation - urethane board, 1" SQ -$ -$ -$ -$

RFG IU1-1/2 & Insulation - urethane board, 1-1/2" SQ -$ -$ -$ -$

RFG IU2 & Insulation - urethane board, 2" SQ -$ -$ -$ -$

RFG IU3 & Insulation - urethane board, 3" SQ -$ -$ -$ -$

RFG IWS + Ice & water barrier SF -$ -$ -$ -$

RFG IWS- + Ice & water barrier - no material waste included SF -$ -$ -$ -$

RFG IWSHT + Ice & water barrier - High temp SF -$ -$ -$ -$

RFG IWSHT- + Ice & water barrier - High temp - no material waste incl. SF -$ -$ -$ -$

RFG LAB + Roofer - per hour HR -$ -$ -$ -$

RFG LABL + Roofing - General Laborer - per hour HR -$ -$ -$ -$

RFG LABM + Membrane Roofing Installer - per hour HR -$ -$ -$ -$

RFG MBAL & Membrane roofing - Add for stone ballast SQ -$ -$ -$ -$

RFG MCANT & Membrane roofing - cant strips - wood LF -$ -$ -$ -$

RFG MCANTP & Membrane roofing - cant strips - perlite LF -$ -$ -$ -$

RFG MMN + Flat Roof / Membrane Roofing - Labor Minimum EA -$ -$ -$ -$

RFG MN + Roofing - Labor Minimum EA -$ -$ -$ -$

RFG MNRP + Roofing Repair - Minimum Charge - Labor and Material EA -$ -$ -$ -$

RFG MTL & Metal roofing SF -$ -$ -$ -$

RFG MTL- & Metal roofing - Standard grade SF -$ -$ -$ -$

RFG MTL+ & Metal roofing - High grade SF -$ -$ -$ -$

RFG MTL++ & Metal roofing - Premium grade SF -$ -$ -$ -$

RFG MTLC & Metal roofing - corrugated - 26 gauge SF -$ -$ -$ -$

Page 133: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

RFG MTLC- & Metal roofing - corrugated - 29 gauge. SF -$ -$ -$ -$

RFG MTLC-- & Metal roofing - corrugated - 29 gauge - galv. SF -$ -$ -$ -$

RFG MTLC+ & Metal roofing - corrugated - 24 gauge SF -$ -$ -$ -$

RFG MTLCA & Metal roofing - corrugated - 29 gauge - Agricultural SF -$ -$ -$ -$

RFG MTLCS & Closure strips for metal roofing - inside and/or outside LF -$ -$ -$ -$

RFG MTLET & Eave trim for metal roofing - 29 gauge LF -$ -$ -$ -$

RFG MTLET+ & Eave trim for metal roofing - 26 gauge LF -$ -$ -$ -$

RFG MTLEW & Endwall flashing for metal roofing - 29 gauge LF -$ -$ -$ -$

RFG MTLEW+ & Endwall flashing for metal roofing - 26 gauge LF -$ -$ -$ -$

RFG MTLGT & Gable trim for metal roofing - 29 gauge LF -$ -$ -$ -$

RFG MTLGT+ & Gable trim for metal roofing - 26 gauge LF -$ -$ -$ -$

RFG MTLPT & Pitch transition flashing for metal roofing - 29 gauge LF -$ -$ -$ -$

RFG MTLPT+ & Pitch transition flashing for metal roofing - 26 gauge LF -$ -$ -$ -$

RFG MTLR & Metal roofing - ribbed - 26 gauge - up to 1" SF -$ -$ -$ -$

RFG MTLR- & Metal roofing - ribbed - 29 gauge - up to 1" SF -$ -$ -$ -$

RFG MTLR+ & Metal roofing - ribbed - 24 gauge - up to 1" SF -$ -$ -$ -$

RFG MTLR> & Metal roofing - ribbed - 26 gauge - 1 1/8" to 1 1/2" SF -$ -$ -$ -$

RFG MTLR>+ & Metal roofing - ribbed - 24 gauge - 1 1/8" to 1 1/2" SF -$ -$ -$ -$

RFG MTLRA & Metal roofing - ribbed - 29 gauge - up to 1"- Agricultural SF -$ -$ -$ -$

RFG MTLREC & Ridge end cap for metal roofing EA -$ -$ -$ -$

RFG MTLRJK & Neoprene pipe jack flashing for metal roofing EA -$ -$ -$ -$

RFG MTLRS + Metal roofing - Detach & reset SF -$ -$ -$ -$

RFG MTLRV & Ridge vent - Metal roofing - floating ventilator LF -$ -$ -$ -$

RFG MTLRV- & Ridge vent - Metal roofing - Standard grade LF -$ -$ -$ -$

RFG MTLRV+ & Ridge vent - Metal roofing - High grade LF -$ -$ -$ -$

RFG MTLRVRS + Ridge vent - Metal roofing - Detach & reset LF -$ -$ -$ -$

RFG MTLSHRS + Metal shingle roofing - Detach & reset SQ -$ -$ -$ -$

RFG MTLSW & Sidewall flashing for metal roofing - 29 gauge LF -$ -$ -$ -$

RFG MTLSW+ & Sidewall flashing for metal roofing - 26 gauge LF -$ -$ -$ -$

RFG MTLTRS + Metal roofing trim - Detach & reset LF -$ -$ -$ -$

RFG MTLVF & Valley "W" flashing for metal roofing LF -$ -$ -$ -$

RFG NRP220 & 3 tab 20 yr comp shng. w/felt - per ind. material source SQ -$ -$ -$ -$

RFG NRP220S & 3 tab 20 yr comp shng. w/out felt- per ind material source SQ -$ -$ -$ -$

RFG NRP240 & 3 tab 25 yr comp shng. w/felt - per ind. material source SQ -$ -$ -$ -$

RFG NRP240S & 3 tab 25 yr comp shng. w/out felt- per ind material source SQ -$ -$ -$ -$

RFG NRP300 & Lam. comp shng. w/felt - per ind. material source SQ -$ -$ -$ -$

RFG NRP300S & Lam. comp shng. w/out felt- per ind. material source SQ -$ -$ -$ -$

RFG NRP400 & Lam. High gr. comp shng. w/felt - per ind. material source SQ -$ -$ -$ -$

RFG NRP400S & Lam. High gr. comp shng. w/out felt- per ind. mat. source SQ -$ -$ -$ -$

RFG NRP4OI & Lam. High gr. imp. comp shng w/felt - per ind. mat. source SQ -$ -$ -$ -$

RFG NRP4OIS & Lam. High gr. imp. comp shng w/out felt-per ind mat SQ -$ -$ -$ -$

source

RFG NRP50- & Lam. Premium gr. comp shng. w/felt - per ind. mat. source SQ -$ -$ -$ -$

RFG NRP500 & Lam. Deluxe gr. comp shng. w/felt - per ind. mat. source SQ -$ -$ -$ -$

RFG NRP500S & Lam. Del. gr. comp shng. w/out felt - per ind. mat. source SQ -$ -$ -$ -$

RFG NRP5OI & Lam. Deluxe gr. imp. comp shng w/felt-per ind mat. source SQ -$ -$ -$ -$

RFG NRP5OIS & Lam. Del. gr. imp. comp shng w/out felt-per ind mat source SQ -$ -$ -$ -$

RFG NRP50S- & Lam. Prem. gr. comp shng. w/out felt- per ind. mat. source SQ -$ -$ -$ -$

RFG NRP5HS+ & Lam. Shake Premium comp shng. w/out felt - ind mat SQ -$ -$ -$ -$

source

RFG NRP5LS- & Lam. Slate Standard comp shng. w/out felt - ind mat source SQ -$ -$ -$ -$

RFG NRP5LS+ & Lam. Slate Premium comp shng. w/out felt - ind mat source SQ -$ -$ -$ -$

RFG NRP5SH & Lam. Shake comp shng. w/felt - per ind. material source SQ -$ -$ -$ -$

RFG NRP5SH+ & Lam. Shake Premium comp shng. w/felt- per ind. mat. SQ -$ -$ -$ -$

source

RFG NRP5SHS & Lam. Shake comp shng. w/out felt - ind mat source SQ -$ -$ -$ -$

RFG NRP5SL & Lam. Slate comp sling. w/felt - per ind mat source SQ -$ -$ -$ -$

RFG NRP5SL- & Lam. Slate Standard comp sling. w/felt - per ind mat source SQ -$ -$ -$ -$

RFG NRP5SL+ & Lam. Slate Premium comp sling. w/felt - per ind mat source SQ -$ -$ -$ -$

RFG NRP5SLS & Lam. Slate comp sting. w/out felt - ind mat source SQ -$ -$ -$ -$

RFG NRPFL15 + Roofing felt - 15 lb. - per independent material source SQ -$ -$ -$ -$

RFG NRPFL30 + Roofing felt - 30 lb. - per independent material source SQ -$ -$ -$ -$

RFG NRPRL & Roll roofing - per independent material source SQ -$ -$ -$ -$

RFG NRPRL+ & Roll roofing - 50% overlap - per ind. material source SQ -$ -$ -$ -$

RFG NRPRLHM & Roll roofing - hot mop application - per ind. mat. source SQ -$ -$ -$ -$

Page 134: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

RFG NRPRLS & Roll roofing - w/out felt - per ind. material source SQ -$ -$ -$ -$

RFG NRPRLS+ & Roll roofing - 50% overlap w/out felt per ind. mat. source SQ -$ -$ -$ -$

RFG NRPSH & Sheathing - plywood - 1/2" CDX - per ind. material source SF -$ -$ -$ -$

RFG NRPSH> & Sheathing - plywood - 5/8" CDX - per ind. material source SF -$ -$ -$ -$

RFG NRPSHW & Sheathing - OSB - 1/2" - per independent material source SF -$ -$ -$ -$

RFG NRPSHW> & Sheathing - OSB - 5/8" - per independent material source SF -$ -$ -$ -$

RFG NRPWS & Wood shakes - med hand split - per ind. material source SQ -$ -$ -$ -$

RFG NRPWS+ & Wood shakes - hvy hand split - per ind. material source SQ -$ -$ -$ -$

RFG NRPWSR & Wood shakes- med hand split-fire resist-per ind mat source SQ -$ -$ -$ -$

RFG NRPWSR+ & Wood shakes- hvy hand split-fire resist-per ind mat source SQ -$ -$ -$ -$

RFG NRPWST & Wood shingles - #1 taper sawn - per ind. material source SQ -$ -$ -$ -$

RFG NRPWSTR & Wood shingles #1 taper sawn-fire resist-per ind mat source SQ -$ -$ -$ -$

RFG NRPWSTW & Wood shingles- #1 taper sawn- no felt- per ind. mat source SQ -$ -$ -$ -$

RFG NRPWTRW & Wd shgls taper sawn-fire resist-no felt-per ind mat source SQ -$ -$ -$ -$

RFG PAV & Roof mount power attic vent EA -$ -$ -$ -$

RFG PAV> & Roof mount power attic vent - Large EA -$ -$ -$ -$

RFG PAVC & Power attic vent cover only - metal EA -$ -$ -$ -$

RFG PAVC- & Power attic vent cover only - plastic EA -$ -$ -$ -$

RFG PAVCRS + Power attic vent cover only - Detach & reset EA -$ -$ -$ -$

RFG PAVRS + Roof mount power attic vent - Detach & reset EA -$ -$ -$ -$

RFG PITCHP & Pitch pan / pocket - up to 6" x 6" x 4" - galvanized EA -$ -$ -$ -$

RFG PLSLM + Peel & seal re-roofing material - mobile home SF -$ -$ -$ -$

RFG RENAIL + Re-nailing of roof sheathing - complete re-nail SF -$ -$ -$ -$

RFG RFDCRS + Roof drain cover - Detach & reset EA -$ -$ -$ -$

RFG RIDGC & Ridge cap - composition shingles LF -$ -$ -$ -$

RFG RIDGC+ & Ridge cap - High profile - composition shingles LF -$ -$ -$ -$

RFG RIDGCC & Ridge cap - synthetic composite shingles LF -$ -$ -$ -$

RFG RIDGCCF & Ridge cap - fiber cement composite shingles LF -$ -$ -$ -$

RFG RIDGCI & Ridge cap - impact resistant composition shingles LF -$ -$ -$ -$

RFG RIDGCS & Ridge cap - Standard profile - composition shingles LF -$ -$ -$ -$

RFG RIDGCVC & Ridge cap - venting ridge cap shingles LF -$ -$ -$ -$

RFG RIDGM & Ridge cap - metal roofing LF -$ -$ -$ -$

RFG RIDGT & Ridge / Hip / Rake cap - tile roofing LF -$ -$ -$ -$

RFG RIDGTRS + Ridge / Hip / Rake cap - tile roofing - Detach & reset LF -$ -$ -$ -$

RFG RIDGW & Ridge cap - wood shingles LF -$ -$ -$ -$

RFG RIDGWSH & Ridge cap - wood shake shingles LF -$ -$ -$ -$

RFG RL & Roll roofing SQ -$ -$ -$ -$

RFG RL+ & Roll roofing - 50% overlap SQ -$ -$ -$ -$

RFG RLHM & Roll roofing - hot mop application SQ -$ -$ -$ -$

RFG RLRMV - Tear off, haul and dispose of roll roofing SQ -$ -$ -$ -$

RFG RLRMV+ - Tear off, haul and dispose of high grade roll roofing SQ -$ -$ -$ -$

RFG RLRMVN - Tear off roll roofing (no haul off) SQ -$ -$ -$ -$

RFG RLRMVN+ - Tear off high grade roll roofing (no haul off) SQ -$ -$ -$ -$

RFG RLS & Roll roofing - w/out felt SQ -$ -$ -$ -$

RFG RLS+ & Roll roofing - 50% overlap - w/out felt SQ -$ -$ -$ -$

RFG RUB & Rubber roofing - Mechanically attached - 45 mil SQ -$ -$ -$ -$

RFG RUB+ & Rubber roofing - Mechanically attached - 60 mil SQ -$ -$ -$ -$

RFG RUB++ & Rubber roofing - Mechanically attached - 75 mil SQ -$ -$ -$ -$

RFG RUB+++ & Rubber roofing - Mechanically attached - 90 mil SQ -$ -$ -$ -$

RFG RUBF & Rubber roofing - Fully adhered system - 45 mil SQ -$ -$ -$ -$

RFG RUBF+ & Rubber roofing - Fully adhered system - 60 mil SQ -$ -$ -$ -$

RFG RUBF++ & Rubber roofing - Fully adhered system - 75 mil SQ -$ -$ -$ -$

RFG RUBF+++ & Rubber roofing - Fully adhered system - 90 mil SQ -$ -$ -$ -$

RFG RUBP & Rubber roofing - Perimeter adhered system - 45 mil SQ -$ -$ -$ -$

RFG RUBP+ & Rubber roofing - Perimeter adhered system - 60 mil SQ -$ -$ -$ -$

RFG RUBP++ & Rubber roofing - Perimeter adhered system - 75 mil SQ -$ -$ -$ -$

RFG RUBP+++ & Rubber roofing - Perimeter adhered system - 90 mil SQ -$ -$ -$ -$

RFG RURMV - Tear off, haul and dispose rubber roofing - per adhered SQ -$ -$ -$ -$

RFG RURMV+ - Tear off, haul and dispose rubber roofing - full adhered SQ -$ -$ -$ -$

RFG RURMVN - Tear off rubber roofing - per adhered (no haul off) SQ -$ -$ -$ -$

RFG RURMVN+ - Tear off rubber roofing - full adhered (no haul oft) SQ -$ -$ -$ -$

RFG SCUP & Roof scupper - aluminum EA -$ -$ -$ -$

RFG SH1/2 & Sheathing - plywood - 1/2" CDX SF -$ -$ -$ -$

RFG SH1/2T & Sheathing - plywood - 1/2" - treated SF -$ -$ -$ -$

RFG SH1X6 & Sheathing - spaced 1" x 6" SF -$ -$ -$ -$

Page 135: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

RFG SH1X8 & Sheathing - spaced 1" x 8" SF -$ -$ -$ -$

RFG SH3/8 & Sheathing - plywood - 3/8" CDX SF -$ -$ -$ -$

RFG SH5/8 & Sheathing - plywood - 5/8" CDX SF -$ -$ -$ -$

RFG SH5/8T & Sheathing - plywood - 5/8" - treated SF -$ -$ -$ -$

RFG SHB1/2 & Sheathing system w/ built-in barrier & taped seams - 1/2" SF -$ -$ -$ -$

RFG SHB5/8 & Sheathing system w/ built-in barrier & taped seams - 5/8" SF -$ -$ -$ -$

RFG SHCLIP + Sheathing - additional cost for H-clips SF -$ -$ -$ -$

RFG SHR1/2 & Sheathing - radiant barrier - 1/2" - OSB SF -$ -$ -$ -$

RFG SHR1/2P & Sheathing - radiant barrier - 1/2" - plywood SF -$ -$ -$ -$

RFG SHR5/8 & Sheathing - radiant barrier - 5/8" - OSB SF -$ -$ -$ -$

RFG SHR5/8P & Sheathing - radiant barrier - 5/8" - plywood SF -$ -$ -$ -$

RFG SHSTP & Add charge for sheathing steep roof - 7/12 - 9 /12 slope SF -$ -$ -$ -$

RFG SHSTP> & Add charge for sheathing steep roof - 10/12 - 12/12 slope SF -$ -$ -$ -$

RFG SHSTP>> & Add charge for sheathing steep roof - over 12/12 slope SF -$ -$ -$ -$

RFG SHW1/2 & Sheathing - OSB - 1/2" SF -$ -$ -$ -$

RFG SHW5/8 & Sheathing - OSB - 5/8" SF -$ -$ -$ -$

RFG SLARMV - Tear off, haul and dispose of slate roofing SQ -$ -$ -$ -$

RFG SLARMVN - Tear off slate roofing (no haul off) SQ -$ -$ -$ -$

RFG SLATE & Slate roofing - 12" to 18" tall SQ -$ -$ -$ -$

RFG SLATE+ & Slate roofing - High grade - 18" to 24" tall SQ -$ -$ -$ -$

RFG SLATE++ & Slate roofing - Premium grade - 12" to 24" tall - red SQ -$ -$ -$ -$

RFG SLATERS + Slate roofing - Detach & reset SQ -$ -$ -$ -$

RFG SLATS & Slate roofing - 12" to 18" tall - w/out felt SQ -$ -$ -$ -$

RFG SLATS+ & Slate roofing - High grade - 18" to 24" tall - w/out felt SQ -$ -$ -$ -$

RFG SLATS++ & Slate roofing - Prem grd - 12" to 24" tall/red- w/out felt SQ -$ -$ -$ -$

RFG SLE & Slate roofing - 12" to 18" tall (per SLATE) EA -$ -$ -$ -$

RFG SLE+ & Slate roofing - High grade - 12" to 18" tall (per SLATE) EA -$ -$ -$ -$

RFG SLE++ & Slate roofing - Premium gr. - 12" to 18" tall (per SLATE) EA -$ -$ -$ -$

RFG SLR + Slate ridge or hip - 12" to 18" tall LF -$ -$ -$ -$

RFG SLR+ + Slate ridge or hip - High grade - 18" to 24" tall LF -$ -$ -$ -$

RFG SLR++ + Slate ridge or hip - Premium grade - 18" to 24" tall - red LF -$ -$ -$ -$

RFG SNBR & Snow bar - galvanized - powder coated LF -$ -$ -$ -$

RFG SNBR+ & Snow bar - aluminum - powder coated LF -$ -$ -$ -$

RFG SNBR++ & Snow bar - stainless steel - mill finish LF -$ -$ -$ -$

RFG SNBRRS + Snow bar - Detach & reset LF -$ -$ -$ -$

RFG SNOW & Snow guard/stop EA -$ -$ -$ -$

RFG SNOW- & Snow guard/stop - Standard grade EA -$ -$ -$ -$

RFG SNOW+ & Snow guard/stop - High grade EA -$ -$ -$ -$

RFG SNOW++ & Snow guard/stop - Premium grade EA -$ -$ -$ -$

RFG SNOWHM & Snow guard/stop - shaped on site EA -$ -$ -$ -$

RFG SNOWRS + Snow guard/stop - Detach & reset EA -$ -$ -$ -$

RFG SNPL & Snow panel - aluminum LF -$ -$ -$ -$

RFG SNPLRC & Snow panel rake cap - aluminum EA -$ -$ -$ -$

RFG SPF & Sprayed Polyurethane Foam Roofing (SPF) SF -$ -$ -$ -$

RFG SPFRC + Re-coat with Sprayed Polyurethane Foam Roofing (SPF) SF -$ -$ -$ -$

RFG SPFS + Scarify Sprayed Polyurethane Foam Roofing (SPF) SF -$ -$ -$ -$

RFG SPLY & Single ply membrane - Mechanically attached - 45 mil SQ -$ -$ -$ -$

RFG SPLY+ & Single ply membrane - Mechanically attached - 60 mil SQ -$ -$ -$ -$

RFG SPLYB & Single ply membrane - Mech. att. - 45 mil - fleece back SQ -$ -$ -$ -$

RFG SPLYB+ & Single ply membrane - Mech. att. - 60 mil - fleece back SQ -$ -$ -$ -$

RFG SPLYF & Single ply membrane - Fully adhered system - 45 mil SQ -$ -$ -$ -$

RFG SPLYF+ & Single ply membrane - Fully adhered system - 60 mil SQ -$ -$ -$ -$

RFG SPLYFB & Single ply - Fully adhered system - 45 mil - fleece back SQ -$ -$ -$ -$

RFG SPLYFB+ & Single ply - Fully adhered system - 60 mil - fleece back SQ -$ -$ -$ -$

RFG SPLYP & Single ply membrane - Perimeter adhered system - 45 mil SQ -$ -$ -$ -$

RFG SPLYP+ & Single ply membrane - Perimeter adhered system - 60 mil SQ -$ -$ -$ -$

RFG SPLYPB & Single ply - Per. adhered system - 45 mil - fleece back SQ -$ -$ -$ -$

RFG SPLYPB+ & Single ply - Per. adhered system - 60 mil - fleece back SQ -$ -$ -$ -$

RFG SPRMV - Tear off, haul and dispose membrane roofing - per. adhered SQ -$ -$ -$ -$

RFG SPRMV+ - Tear off, haul and dispose membrane roofing - full adhered SQ -$ -$ -$ -$

RFG SPRMVN - Tear off membrane roofing - perim. adhered (no haul off) SQ -$ -$ -$ -$

RFG SPRMVN+ - Tear off membrane roofing - fully adhered (no haul off) SQ -$ -$ -$ -$

RFG STEEP & Additional charge for steep roof - 7/12 to 9/12 slope SQ -$ -$ -$ -$

RFG STEEP> & Additional charge for steep roof - 10/12 - 12/12 slope SQ -$ -$ -$ -$

RFG STEEP>> & Additional charge for steep roof greater than 12/12 slope SQ -$ -$ -$ -$

Page 136: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

RFG STEP + Step flashing LF -$ -$ -$ -$

RFG STEPC + Step flashing - copper LF -$ -$ -$ -$

RFG STIL & Steel tile/shake - granular coated - with felt SQ -$ -$ -$ -$

RFG STIL+ & Steel tile barrel/mission - granular coated - with felt SQ -$ -$ -$ -$

RFG STILBS + Steel bird stop eave closure strip - granular coated LF -$ -$ -$ -$

RFG STILC & Steel tile/barrel/mission - hip/rake/gable channel LF -$ -$ -$ -$

RFG STILE & Steel tile - granular coated - (per PANEL) EA -$ -$ -$ -$

RFG STILE+ & Steel tile barrel/mission - granular coated - (per PANEL) EA -$ -$ -$ -$

RFG STILF & Steel tile - rake/gable/eave flashing - granular coated LF -$ -$ -$ -$

RFG STILR & Steel tile/shake - ridge or hip - granular coated LF -$ -$ -$ -$

RFG STILR+ & Steel tile/barrel/mission - ridge or hip - granular coated LF -$ -$ -$ -$

RFG STILRS + Steel tile/panel roofing - Detach & reset SQ -$ -$ -$ -$

RFG STILS & Steel tile/shake - granular coated - w/out felt SQ -$ -$ -$ -$

RFG STILS+ & Steel tile barrel/mission - granular coated - w/out felt SQ -$ -$ -$ -$

RFG STIRMV - Tear off, haul and dispose of steel tile SQ -$ -$ -$ -$

RFG STIRMVN - Tear off steel tile (no haul off) SQ -$ -$ -$ -$

RFG STL & Steel panel - tile/shake - mill finish - with felt SQ -$ -$ -$ -$

RFG STL+ & Steel panel - tile/shake - color finish - with felt SQ -$ -$ -$ -$

RFG STLE & Steel panel - tile/shake - mill finish - (per PANEL) EA -$ -$ -$ -$

RFG STLE+ & Steel panel - tile/shake - color finish - (per PANEL) EA -$ -$ -$ -$

RFG STLR & Steel tile/shake - ridge or hip - mill finish LF -$ -$ -$ -$

RFG STLR+ & Steel tile/shake - ridge or hip - color finish LF -$ -$ -$ -$

RFG STLRT & Steel rake/gable trim - mill finish LF -$ -$ -$ -$

RFG STLRT+ & Steel rake/gable trim - color finish LF -$ -$ -$ -$

RFG STLS & Steel panel - tile/shake - mill finish - w/out felt SQ -$ -$ -$ -$

RFG STLS+ & Steel panel - tile/shake - color finish - w/out felt SQ -$ -$ -$ -$

RFG STNB1 + Hip/ridge/rake/eave nailer board - 1x4 LF -$ -$ -$ -$

RFG STNB2 + Hip/ridge/rake/eave nailer board - 2x2 LF -$ -$ -$ -$

RFG STNB2S + Hip/ridge/rake nailer board - 2x2 - stacked LF -$ -$ -$ -$

RFG STNBB2 + Battens - 2x2 - for steel roofing SQ -$ -$ -$ -$

RFG STNBB4 + Battens - 2x4 - for steel roofing SQ -$ -$ -$ -$

RFG STNBC1 + Counter battens - 1x4 - for steel roofing SQ -$ -$ -$ -$

RFG TIL & Tile roofing - Clay - "S" or flat tile SQ -$ -$ -$ -$

RFG TIL- & Tile roofing - Concrete - "S" or flat tile SQ -$ -$ -$ -$

RFG TIL+ & Tile roofing - Clay - Barrel (mission) tile SQ -$ -$ -$ -$

RFG TIL++ & Tile roofing - Glazed - (Barrel or "S" tile) SQ -$ -$ -$ -$

RFG TILBSC + Bird stop - Eave closure strip for tile roofing - clay LF -$ -$ -$ -$

RFG TILBSM + Bird stop - Eave closure strip for tile roofing - metal LF -$ -$ -$ -$

RFG TILC++ & Tile roofing - Commercial - Glazed - (Barrel or "S" tile) SQ -$ -$ -$ -$

RFG TILCLIP + Tile roofing - Hurricane clip & wind lock add-on LF -$ -$ -$ -$

RFG TILCS++ & Tile roofing - Comm - Glzd - (Barrel or "S") - w/out felt SQ -$ -$ -$ -$

RFG TILE & Tile roofing - Clay - "S" or flat (per TILE) EA -$ -$ -$ -$

RFG TILE- & Tile roofing - Concrete - "S" or flat (per TILE) EA -$ -$ -$ -$

RFG TILE+ & Tile roofing - Clay - Barrel (mission) (per TILE) EA -$ -$ -$ -$

RFG TILE++ & Tile roofing - Glazed - Barrel or "S" (per TILE) EA -$ -$ -$ -$

RFG TILMNRP + Tile Roofing Repair - Minimum Charge - Labor and EA -$ -$ -$ -$

Material

RFG TILNBM + Hip & ridge nailer board for tile roofing - channel metal LF -$ -$ -$ -$

RFG TILNBW + Hip & ridge nailer board for tile roofing - wood LF -$ -$ -$ -$

RFG TILRMV - Tear off, haul and dispose of tile roofing SQ -$ -$ -$ -$

RFG TILRMVN - Tear off tile roofing (no haul off) SQ -$ -$ -$ -$

RFG TILRS + Tile roofing - Detach & reset SQ -$ -$ -$ -$

RFG TILS & Tile roofing - Clay - "S" or flat tile - w/out felt SQ -$ -$ -$ -$

RFG TILS- & Tile roofing - Concrete - "S" or flat tile - w/out felt SQ -$ -$ -$ -$

RFG TILS+ & Tile roofing - Clay - Barrel (mission) tile - w/out felt SQ -$ -$ -$ -$

RFG TILS++ & Tile roofing - Glazed - (Barrel or "S" tile) - w/out felt SQ -$ -$ -$ -$

RFG TRAF + Roofing sealer - Traffic coat SF -$ -$ -$ -$

RFG VENT + Apply mastic around vent pipes to repair leakage EA -$ -$ -$ -$

RFG VENTA & Continuous ridge vent - aluminum LF -$ -$ -$ -$

RFG VENTAV & Roof vent - active ventilation EA -$ -$ -$ -$

RFG VENTAV- & Roof vent - active ventilation - Standard grade EA -$ -$ -$ -$

RFG VENTB & Roof vent - turbine type EA -$ -$ -$ -$

RFG VENTB- & Roof vent - turbine type - Standard grade EA -$ -$ -$ -$

RFG VENTD & Roof vent - dormer type - Metal EA -$ -$ -$ -$

RFG VENTE & Exhaust cap - through roof - 6" to 8" EA -$ -$ -$ -$

Page 137: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

RFG VENTE< & Exhaust cap - through roof - up to 4" EA -$ -$ -$ -$

RFG VENTEC5 & Rain cap - 4" to 5" EA -$ -$ -$ -$

RFG VENTEC6 & Rain cap - 6" EA -$ -$ -$ -$

RFG VENTEC8 & Rain cap - 8" EA -$ -$ -$ -$

RFG VENTEF & Exhaust cap - through flat roof EA -$ -$ -$ -$

RFG VENTG & Gravity roof ventilator - 18" EA -$ -$ -$ -$

RFG VENTO2 & Roof vent - off ridge type - 2' EA -$ -$ -$ -$

RFG VENTO4 & Roof vent - off ridge type - 4' EA -$ -$ -$ -$

RFG VENTO6 & Roof vent - off ridge type - 6' EA -$ -$ -$ -$

RFG VENTO8 & Roof vent - off ridge type - 8' EA -$ -$ -$ -$

RFG VENTR & Continuous ridge vent - shingle-over style LF -$ -$ -$ -$

RFG VENTRRS + Continuous ridge vent - Detach & reset LF -$ -$ -$ -$

RFG VENTRS + Roof vent - Detach & reset EA -$ -$ -$ -$

RFG VENTS & Fire/Smoke roof vent - automatic - 48"x48" EA -$ -$ -$ -$

RFG VENTST & Starter eave vent - shingle-over style LF -$ -$ -$ -$

RFG VENTT & Roof vent - turtle type - Metal EA -$ -$ -$ -$

RFG VENTT- & Roof vent - turtle type - Plastic EA -$ -$ -$ -$

RFG VENTTRS + Roof vent - turtle type - Detach & reset EA -$ -$ -$ -$

RFG VENTW & High profile static wind ventilator EA -$ -$ -$ -$

RFG VENTW+ & High profile static wind ventilator - High grade EA -$ -$ -$ -$

RFG VFGN & Flat roof exhaust vent / cap - gooseneck 8" EA -$ -$ -$ -$

RFG VFGN12 & Flat roof exhaust vent / cap - gooseneck 12" EA -$ -$ -$ -$

RFG VMTL & Valley metal LF -$ -$ -$ -$

RFG VMTLC & Valley metal - copper LF -$ -$ -$ -$

RFG VMTLP & Valley metal - painted LF -$ -$ -$ -$

RFG VMTLW & Valley metal - (W) profile LF -$ -$ -$ -$

RFG VMTLWP & Valley metal - (W) profile - painted LF -$ -$ -$ -$

RFG WALK + Roofing - walkway boards SF -$ -$ -$ -$

RFG WB + Water barrier membrane - Mod. bitumen - entire surface SF -$ -$ -$ -$

RFG WBT + Water barrier joint taping - Mod. bitumen - 4" seam tape SF -$ -$ -$ -$

RFG WSHK & Wood shakes - medium (1/2") hand split SQ -$ -$ -$ -$

RFG WSHK+ & Wood shakes - heavy (3/4") hand split SQ -$ -$ -$ -$

RFG WSHKE & Wood shakes - medium (1/2") hand split (per SHAKE) EA -$ -$ -$ -$

RFG WSHKE+ & Wood shakes - heavy (3/4") hand split (per SHAKE) EA -$ -$ -$ -$

RFG WSHKR & Wood shakes - medium (1/2") hand split - fire resistant SQ -$ -$ -$ -$

RFG WSHKR+ & Wood shakes - heavy (3/4") hand split - fire resistant SQ -$ -$ -$ -$

RFG WSHKRE & Wood shakes - medium hand split - fire resist. (per SHAKE) EA -$ -$ -$ -$

RFG WSHKRE+ & Wood shakes - heavy hand split - fire resist. (per SHAKE) EA -$ -$ -$ -$

RFG WSRMV - Tear off, haul and dispose of wood shakes/shingles SQ -$ -$ -$ -$

RFG WSRMVN - Tear off wood shakes/shingles (no haul off) SQ -$ -$ -$ -$

RFG WSTP & Wood shakes/shingles - tapersawn - #1 cedar SQ -$ -$ -$ -$

RFG WSTPE & Wood shakes/shingles - tapersawn - #1 cedar (per EA -$ -$ -$ -$

SHINGLE)

RFG WSTPR & Wood shake/shingles - tapersawn - fire resist. - #1 cedar SQ -$ -$ -$ -$

RFG WSTPRE & Wood shakes/shingles - tapersawn - fire res. (per EA -$ -$ -$ -$

SHINGLE)

RFG WSTPRW & Wood shake/shgles- tapersawn- fire resist-#1 cedar-no felt SQ -$ -$ -$ -$

RFG WSTPW & Wood shakes/shingles - tapersawn - #1 cedar - no felt SQ -$ -$ -$ -$

RFG WSTR + Wood shake/shingle starter LF -$ -$ -$ -$

RFG ZS & Zinc strips - algae/moss prevention LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

SCF BIDITM + Scaffolding (Bid Item) EA -$ -$ -$ -$

SCF BSW + Bosun swing scaffolding HR -$ -$ -$ -$

SCF LAB + Scaffolding Setup & Take down - per hour HR -$ -$ -$ -$

SCF LDR40 + 40' aluminum extension ladder (per day) DA -$ -$ -$ -$

SCF LDR4OW + 40' aluminum extension ladder (per week) WK -$ -$ -$ -$

SCF LI + Two ladders with jacks and plank (per day) DA -$ -$ -$ -$

SCF LJW + Two ladders with jacks and plank (per week) WK -$ -$ -$ -$

SCF MN + Scaffold - Labor Minimum EA -$ -$ -$ -$

SCF PJS + Pump jack system (per day) DA -$ -$ -$ -$

SCF PJSW + Pump jack system (per week) WK -$ -$ -$ -$

SCF RENTD + Scaffold - per section (per day) DA -$ -$ -$ -$

Page 138: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

SCF RENTM + Scaffold - per section (per month) MO -$ -$ -$ -$

SCF RENTW + Scaffold - per section (per week) WK -$ -$ -$ -$

SCF RNII-D + Scaffold - per section - frame only (per day) DA -$ -$ -$ -$

SCF RNTFM + Scaffold - per section - frame only (per month) MO -$ -$ -$ -$

SCF RNTFW + Scaffold - per section - frame only (per week) WK -$ -$ -$ -$

SCF RNTHLD + Fall protection harness and lanyard - per day DA -$ -$ -$ -$

SCF RNTHLW + Fall protection harness and lanyard - per week WK -$ -$ -$ -$

SCF SECT + Labor to set up and take down scaffold - per section EA -$ -$ -$ -$

SCF SWSC + Swing scaffolding - up to a 45' platform MO -$ -$ -$ -$

SCF SWSCS + Swing scaffolding set up and dismantle fee EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

SDG 1X2FR & Siding trim - 1" x 2" fir re-sawn LF -$ -$ -$ -$

SDG 1X4 & Siding - cedar slat, 1" x 4" over plywood (excludes ply) SF -$ -$ -$ -$

SDG 1X4FC & Siding trim - 1" x 4" fiber cement trim board LF -$ -$ -$ -$

SDG 1X4HB & Siding trim - 1" x 4" hardboard trim board LF -$ -$ -$ -$

SDG 1X6FC & Siding trim - 1" x 6" fiber cement trim board LF -$ -$ -$ -$

SDG 1X6HB & Siding trim - 1" x 6" hardboard trim board LF -$ -$ -$ -$

SDG 1X8FC & Siding trim - 1" x 8" fiber cement trim board LF -$ -$ -$ -$

SDG 1X8HB & Siding trim - 1" x 8" hardboard trim board LF -$ -$ -$ -$

SDG ASBRMV - Tear off asbestos siding (no haul off) SF -$ -$ -$ -$

SDG BAB & Siding - board & batten - pine or equal SF -$ -$ -$ -$

SDG BABC & Siding - board & batten - cedar SF -$ -$ -$ -$

SDG BABR & Siding - board & batten - redwood SF -$ -$ -$ -$

SDG BEV & Siding - beveled - pine or equal (clapboard) SF -$ -$ -$ -$

SDG BEVC & Siding - beveled - cedar (clapboard) SF -$ -$ -$ -$

SDG BEVFC & Siding - beveled - fiber-cement (clapboard) SF -$ -$ -$ -$

SDG BEVR & Siding - beveled - redwood (clapboard) SF -$ -$ -$ -$

SDG BIDITM + Siding (Bid Item) EA -$ -$ -$ -$

SDG BOB & Siding - board on board - pine or equal SF -$ -$ -$ -$

SDG BOBC & Siding - board on board - cedar SF -$ -$ -$ -$

SDG BOBR & Siding - board on board - redwood SF -$ -$ -$ -$

SDG CLKS + Caulking - silicone LF -$ -$ -$ -$

SDG COL> & Metal column cover - 18" diameter (w/cap & base) LF -$ -$ -$ -$

SDG COL>> & Metal column cover - 24" diameter (w/cap & base) LF -$ -$ -$ -$

SDG COLCAP & Precast column cap EA -$ -$ -$ -$

SDG COLF & Fiberglass column cover - 12" LF -$ -$ -$ -$

SDG COLF> & Fiberglass column cover - 24" LF -$ -$ -$ -$

SDG CSH & Siding - cedar shingle SF -$ -$ -$ -$

SDG CSH+ & Siding - cedar shingle - fancy cut SF -$ -$ -$ -$

SDG CSHR & Siding - cedar shingle - fire resistant SF -$ -$ -$ -$

SDG CSHR+ & Siding - cedar shingle - fancy cut - fire resistant SF -$ -$ -$ -$

SDG DVNTCRS + Clothes dryer vent cover - Detach & reset EA -$ -$ -$ -$

SDG FCB & Light/outlet block - fiber cement EA -$ -$ -$ -$

SDG FCLP & Fiber cement lap siding - 12" SF -$ -$ -$ -$

SDG FCLP< & Fiber cement lap siding - 8" SF -$ -$ -$ -$

SDG FCLP« & Fiber cement lap siding - 6" SF -$ -$ -$ -$

SDG FCSH & Siding - fiber cement - shingle type panel SF -$ -$ -$ -$

SDG FCVERT & Vertical siding - fiber cement board - sheet SF -$ -$ -$ -$

SDG FLZ & Metal Z flashing / drip cap LF -$ -$ -$ -$

SDG HB & Siding - hardboard - sheet SF -$ -$ -$ -$

SDG HWRAP & House wrap (air/moisture barrier) SF -$ -$ -$ -$

SDG INS1/4 & Fanfold foam insulation board - 1/4" SF -$ -$ -$ -$

SDG LAB + Siding Installer - per hour HR -$ -$ -$ -$

SDG LABL + Siding - General Laborer - per hour HR -$ -$ -$ -$

SDG LOGC & Siding - 2x log - Cedar SF -$ -$ -$ -$

SDG LOGC> & Siding - 3x log - Cedar SF -$ -$ -$ -$

SDG LOGP & Siding - 2x log - Pine SF -$ -$ -$ -$

SDG LOGP> & Siding - 3x log - Pine SF -$ -$ -$ -$

SDG MLAP & Siding - hardboard - lap pattern - 8" SF -$ -$ -$ -$

SDG MLAP< & Siding - hardboard - lap pattern - 6" SF -$ -$ -$ -$

SDG MLAP> & Siding - hardboard - lap pattern - 12" SF -$ -$ -$ -$

SDG MLAPP & Siding - hardboard - lap pattern - 8" - prefinished SF -$ -$ -$ -$

Page 139: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

SDG MLAPP< & Siding - hardboard - lap pattern - 6" - prefinished SF -$ -$ -$ -$

SDG MN + Siding - Labor Minimum EA -$ -$ -$ -$

SDG MTL & Siding - aluminum (.024 thickness) SF -$ -$ -$ -$

SDG MTL- & Siding - aluminum (.019 thickness) - Standard grade SF -$ -$ -$ -$

SDG MTL+ & Siding - steel (29 gauge) SF -$ -$ -$ -$

SDG MTL++ & Siding - steel - Commercial - High grade SF -$ -$ -$ -$

SDG MTLC & Metal outside corner post LF -$ -$ -$ -$

SDG MTLIC & Metal inside corner post LF -$ -$ -$ -$

SDG MTLJ & Metal J trim LF -$ -$ -$ -$

SDG MTLM & Siding - aluminum panel - mobile home SF -$ -$ -$ -$

SDG MTLS & Siding - seamless aluminum (.020 thickness) SF -$ -$ -$ -$

SDG MTLS+ & Siding - seamless steel (29 gauge) SF -$ -$ -$ -$

SDG MVRS + Metal or Vinyl siding - Detach & reset SF -$ -$ -$ -$

SDG NSPBEV & Siding - beveled - wood - per ind. material source SF -$ -$ -$ -$

SDG NSPCSH & Siding - cedar shingle - per independent material source SF -$ -$ -$ -$

SDG NSPFC< & Fiber cement lap siding - 8" - per ind. material source SF -$ -$ -$ -$

SDG NSPFC<< & Fiber cement lap siding - 6" - per ind. material source SF -$ -$ -$ -$

SDG NSPFCLP & Fiber cement lap siding - 12" - per ind. material source SF -$ -$ -$ -$

SDG NSPFCSH & Siding- fiber cement- shngl type panel- per ind mat source SF -$ -$ -$ -$

SDG NSPFCV & Vertical siding- fiber cement brd - sheet - ind mat source SF -$ -$ -$ -$

SDG NSPHB & Siding - hardboard - sheet - per ind. material source SF -$ -$ -$ -$

SDG NSPLOG & Siding - log - per independent material source SF -$ -$ -$ -$

SDG NSPMLAP & Siding - hardboard lap - 8" - per ind. material source SF -$ -$ -$ -$

SDG NSPMLP< & Siding - hardboard lap - 6" - per ind. material source SF -$ -$ -$ -$

SDG NSPMLP> & Siding - hardboard lap -12" - per ind. material source SF -$ -$ -$ -$

SDG NSPMTL & Siding - aluminum/steel - per independent material source SF -$ -$ -$ -$

SDG NSPMTLS & Siding - seamless aluminum/steel - per ind material source SF -$ -$ -$ -$

SDG NSPPNL & Metal wall panel - ribbed/corrugated - per ind mat source SF -$ -$ -$ -$

SDG NSPPNLI & Insulated metal panel - per independent material source SF -$ -$ -$ -$

SDG NSPSHIP & Siding - shiplap - wood - per independent material source SF -$ -$ -$ -$

SDG NSPSTUC & Siding - hardboard - simulated stucco - per ind mat source SF -$ -$ -$ -$

SDG NSPTG & Siding - tongue & groove - wood - per ind. material source SF -$ -$ -$ -$

SDG NSPVIN & Siding - vinyl - per independent material source SF -$ -$ -$ -$

SDG NSPVINS & Siding- vinyl- specialty grade/seamless-per ind mat source SF -$ -$ -$ -$

SDG P1X10 & Siding trim - 1" x 10" PVC trim board LF -$ -$ -$ -$

SDG P1X12 & Siding trim - 1" x 12" PVC trim board LF -$ -$ -$ -$

SDG P1X4 & Siding trim - 1" x 4" PVC trim board LF -$ -$ -$ -$

SDG P1X6 & Siding trim - 1" x 6" PVC trim board LF -$ -$ -$ -$

SDG P1X8 & Siding trim - 1" x 8" PVC trim board LF -$ -$ -$ -$

SDG P5/4X12 & Siding trim - 5/4" x 12" PVC trim board LF -$ -$ -$ -$

SDG P5/4X4 & Siding trim - 5/4" x 4" PVC trim board LF -$ -$ -$ -$

SDG P5/4X6 & Siding trim - 5/4" x 6" PVC trim board LF -$ -$ -$ -$

SDG P5/4X8 & Siding trim - 5/4" x 8" PVC trim board LF -$ -$ -$ -$

SDG PC4 & Siding trim - 5/4" x 4" x 4" PVC corner trim LF -$ -$ -$ -$

SDG PC6 & Siding trim - 5/4" x 6" x 6" PVC corner trim LF -$ -$ -$ -$

SDG PLY & Siding - plywood - fir face SF -$ -$ -$ -$

SDG PLYC & Siding - plywood - cedar face SF -$ -$ -$ -$

SDG PLYR & Siding - plywood - redwood face SF -$ -$ -$ -$

SDG RAINSCN & Rain screen system with 1" x 3" furring strips SF -$ -$ -$ -$

SDG SDRS + Wood siding - Detach & reset SF -$ -$ -$ -$

SDG SHIP & Siding - shiplap - pine or equal SF -$ -$ -$ -$

SDG SHIPC & Siding - shiplap - cedar SF -$ -$ -$ -$

SDG SHIPR & Siding - shiplap - redwood SF -$ -$ -$ -$

SDG SHTR & Shutters - simulated wood (polystyrene) EA -$ -$ -$ -$

SDG SHTR< & Shutters - simulated wood (polystyrene) - Small EA -$ -$ -$ -$

SDG SHTR> & Shutters - simulated wood (polystyrene) - Large EA -$ -$ -$ -$

SDG SHTRA & Shutters - aluminum EA -$ -$ -$ -$

SDG SHTRA< & Shutters - aluminum - Small EA -$ -$ -$ -$

SDG SHTRA> & Shutters - aluminum - Large EA -$ -$ -$ -$

SDG SHTRRS + Shutters - Detach & reset EA -$ -$ -$ -$

SDG SHTRW & Shutters - wood - louvered or paneled EA -$ -$ -$ -$

SDG SHTRW< & Shutters - wood - louvered or paneled - Small EA -$ -$ -$ -$

SDG SHTRW> & Shutters - wood - louvered or paneled - Large EA -$ -$ -$ -$

SDG SHTRWB & Shutters - wood - board & batten EA -$ -$ -$ -$

SDG SHTRWB< & Shutters - wood - board & batten - Small EA -$ -$ -$ -$

Page 140: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

SDG SHTRWB> & Shutters - wood - board & batten - Large EA -$ -$ -$ -$

SDG SHUTA & Security shutter - accordion or folding type SF -$ -$ -$ -$

SDG SHUTM + Motorization for security shutters SF -$ -$ -$ -$

SDG SHUTR & Security/storm shutter - roll-up type SF -$ -$ -$ -$

SDG STUC & Siding - hardboard - simulated stucco SF -$ -$ -$ -$

SDG T111 & Siding - hardboard panel - paint grade SF -$ -$ -$ -$

SDG T111+ & Siding - plywood panel - stain grade SF -$ -$ -$ -$

SDG TG & Siding - tongue & groove - pine or equal SF -$ -$ -$ -$

SDG TGC & Siding - tongue & groove - cedar SF -$ -$ -$ -$

SDG TGR & Siding - tongue & groove - redwood SF -$ -$ -$ -$

SDG VENTG & Attic vent - gable end - vinyl EA -$ -$ -$ -$

SDG VENTG< & Attic vent - gable end - vinyl - Small EA -$ -$ -$ -$

SDG VENTG<- & Attic vent - gable end - vinyl - Small - Standard grade EA -$ -$ -$ -$

SDG VENTG> & Attic vent - gable end - vinyl - Large EA -$ -$ -$ -$

SDG VENTG>+ & Attic vent - gable end - vinyl - Large - High grade EA -$ -$ -$ -$

SDG VENTGM & Attic vent - gable end - metal - 12" x 18" EA -$ -$ -$ -$

SDG VENTGM+ & Attic vent - gable end - metal - 30" x 30" EA -$ -$ -$ -$

SDG VENTGM< & Attic vent - gable end - metal - 12" x 12" EA -$ -$ -$ -$

SDG VENTGM> & Attic vent - gable end - metal - 14" x 24" EA -$ -$ -$ -$

SDG VENTGW & Attic vent - gable end - wood EA -$ -$ -$ -$

SDG VINSP & Siding - vinyl - specialty grade - single color SF -$ -$ -$ -$

SDG VINSP+ & Siding - vinyl - specialty grade - two tone SF -$ -$ -$ -$

SDG VINYL & Siding - vinyl SF -$ -$ -$ -$

SDG VINYL+ & Siding - vinyl - High grade SF -$ -$ -$ -$

SDG VINYL++ & Siding - vinyl - Premium grade SF -$ -$ -$ -$

SDG VINYLB & Light/outlet J-block - vinyl EA -$ -$ -$ -$

SDG VINYLBV & Vinyl J-vent EA -$ -$ -$ -$

SDG VINYLC & Vinyl outside corner post LF -$ -$ -$ -$

SDG VINYLI & Siding - vinyl - insulated SF -$ -$ -$ -$

SDG VINYLIC & Vinyl inside corner post LF -$ -$ -$ -$

SDG VINYLJ & Vinyl J trim LF -$ -$ -$ -$

SDG VINYLS & Siding - vinyl - seamless SF -$ -$ -$ -$

SDG WCOPE & Aluminum wall coping LF -$ -$ -$ -$

SDG WCOPE> & Aluminum wall coping - large LF -$ -$ -$ -$

SDG WCOPEC & Copper wall coping LF -$ -$ -$ -$

SDG WCOPES & Steel wall coping LF -$ -$ -$ -$

SDG WCOPES> & Steel wall coping - large LF -$ -$ -$ -$

SDG WDWRAP & Wrap wood window frame & trim with aluminum sheet EA -$ -$ -$ -$

SDG WDWRAP< & Wrap wood window frame & trim with aluminum sheet - EA -$ -$ -$ -$

Small

SDG WDWRAP> & Wrap wood window frame & trim with aluminum sheet - EA -$ -$ -$ -$

Large

SDG WDWRP>> & Wrap wood window frame & trim with aluminum sheet - EA -$ -$ -$ -$

XLarge

SDG WRAPC & Custom bent aluminum (PER LF) LF -$ -$ -$ -$

SDG WRAPGD & Wrap wood garage door frame & trim with aluminum (PER LF -$ -$ -$ -$

LF)

SDG WRAPP & Wrap wood post with aluminum (PER LF) LF -$ -$ -$ -$

SDG WRAPXD & Wrap wood door frame & trim with aluminum (PER LF) LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

SFG BIDITM + Soffit, Fascia, & Gutter (Bid Item) EA -$ -$ -$ -$

SFG CONHD & Conductor head - aluminum EA -$ -$ -$ -$

SFG CWN & Crown molding - metal - 8" LF -$ -$ -$ -$

SFG CWNW & Crown molding - wood - 3 1/4" LF -$ -$ -$ -$

SFG CWNW5 & Crown molding - wood - 5 1/4" LF -$ -$ -$ -$

SFG DICE & De-icing cable LF -$ -$ -$ -$

SFG DICE+ & De-icing cable - High grade LF -$ -$ -$ -$

SFG DICERS + De-icing cable - Detach & reset LF -$ -$ -$ -$

SFG FACFC4 & Fascia - fiber cement - 4" LF -$ -$ -$ -$

SFG FACFC6 & Fascia - fiber cement - 6" LF -$ -$ -$ -$

SFG FACFC8 & Fascia - fiber cement - 8" LF -$ -$ -$ -$

SFG FACM10 & Fascia - metal - 10" LF -$ -$ -$ -$

Page 141: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

SFG FACM4 & Fascia - metal - 4" LF -$ -$ -$ -$

SFG FACM6 & Fascia - metal - 6" LF -$ -$ -$ -$

SFG FACM8 & Fascia - metal - 8" LF -$ -$ -$ -$

SFG FACMVRS + Fascia - metal/vinyl - Detach & reset LF -$ -$ -$ -$

SFG FACV & Fascia - vinyl coated aluminum - 4" to 6" LF -$ -$ -$ -$

SFG FACV> & Fascia - vinyl coated aluminum - 7" to 10" LF -$ -$ -$ -$

SFG FACVL & Fascia - vinyl - up to 8" LF -$ -$ -$ -$

SFG FACW4 & Fascia - 1" x 4" - #1 pine LF -$ -$ -$ -$

SFG FACW4- & Fascia - 1" x 4" - #2 pine LF -$ -$ -$ -$

SFG FACW4C & Fascia - 1" x 4" - #3 cedar LF -$ -$ -$ -$

SFG FACW6 & Fascia - 1" x 6" - #1 pine LF -$ -$ -$ -$

SFG FACW6- & Fascia - 1" x 6" - #2 pine LF -$ -$ -$ -$

SFG FACW6C & Fascia - 1" x 6" - #3 cedar LF -$ -$ -$ -$

SFG FACW8 & Fascia - 1" x 8" - #1 pine LF -$ -$ -$ -$

SFG FACW8- & Fascia - 1" x 8" - #2 pine LF -$ -$ -$ -$

SFG FACW8C & Fascia - 1" x 8" - #3 cedar LF -$ -$ -$ -$

SFG FACWR4 & Fascia - 2" x 4" - softwood - re-sawn LF -$ -$ -$ -$

SFG FACWR6 & Fascia - 2" x 6" - softwood - re-sawn LF -$ -$ -$ -$

SFG FACWR8 & Fascia - 2" x 8" - softwood - re-sawn LF -$ -$ -$ -$

SFG GRD & Gutter guard/screen LF -$ -$ -$ -$

SFG GRD+ & Gutter guard/screen - High grade LF -$ -$ -$ -$

SFG GRD++ & Gutter guard/screen - Premium grade LF -$ -$ -$ -$

SFG GRD+RS + Gutter guard/screen - High grade - Detach & reset LF -$ -$ -$ -$

SFG GRD1 & Gutter guard - one piece seamless gutter system LF -$ -$ -$ -$

SFG GRDRS + Gutter guard/screen - Detach & reset LF -$ -$ -$ -$

SFG GUTA & Gutter / downspout - aluminum - up to 5" LF -$ -$ -$ -$

SFG GUTA> & Gutter / downspout - aluminum - 6" LF -$ -$ -$ -$

SFG GUTA» & Gutter / downspout - aluminum - 7" to 8" LF -$ -$ -$ -$

SFG GUTAB & Gutter / downspout - box - aluminum - 6" LF -$ -$ -$ -$

SFG GUTAB> & Gutter / downspout - box - aluminum - 7" to 8" LF -$ -$ -$ -$

SFG GUTC & Gutter / downspout - copper - up to 5" LF -$ -$ -$ -$

SFG GUTC> & Gutter / downspout - copper - 6" LF -$ -$ -$ -$

SFG GUTC>> & Gutter / downspout - copper - 7" to 8" LF -$ -$ -$ -$

SFG GUTG & Gutter / downspout - galvanized - up to 5" LF -$ -$ -$ -$

SFG GUTGB & Gutter / downspout - box - galvanized - 6" LF -$ -$ -$ -$

SFG GUTGB> & Gutter / downspout - box - galvanized - 7" to 8" LF -$ -$ -$ -$

SFG GUTGC & Gutter / downspout - galvanized - concealed LF -$ -$ -$ -$

SFG GUTGS & Gutter / downspout - galvanized - soldered - up to 5" LF -$ -$ -$ -$

SFG GUTGS> & Gutter / downspout - galvanized - 6" - soldered LF -$ -$ -$ -$

SFG GUTGS» & Gutter / downspout - galvanized - 7" to 8" - soldered LF -$ -$ -$ -$

SFG GUTHRA & Gutter / downspout - half round - aluminum - 6" LF -$ -$ -$ -$

SFG GUTHRA< & Gutter / downspout - half round - aluminum - up to 5" LF -$ -$ -$ -$

SFG GUTHRC & Gutter / downspout - half round - copper - 6" LF -$ -$ -$ -$

SFG GUTHRC< & Gutter / downspout - half round - copper - up to 5" LF -$ -$ -$ -$

SFG GUTHRC> & Gutter / downspout - half round - copper - 7" to 8" LF -$ -$ -$ -$

SFG GUTHRG & Gutter / downspout - half round - galvanized - 6" LF -$ -$ -$ -$

SFG GUTHRG< & Gutter / downspout - half round - galvanized - up to 5" LF -$ -$ -$ -$

SFG GUTHRG> & Gutter / downspout - half round - galvanized - 7" to 8" LF -$ -$ -$ -$

SFG GUTM & Mini-gutter - metal - mobile home LF -$ -$ -$ -$

SFG GUTMN + Gutter - Labor Minimum EA -$ -$ -$ -$

SFG GUTP & Gutter / downspout - plastic LF -$ -$ -$ -$

SFG GUTRS + Gutter / downspout - Detach & reset LF -$ -$ -$ -$

SFG LAB + Soffit & Fascia Installer - per hour HR -$ -$ -$ -$

SFG LABL + Soffit & Fascia - General Laborer - per hour HR -$ -$ -$ -$

SFG MN + Soffit & Fascia - Labor Minimum EA -$ -$ -$ -$

SFG MTL1 & Soffit & fascia - metal - 1' overhang LF -$ -$ -$ -$

SFG MTL2 & Soffit & fascia - metal - 2' overhang LF -$ -$ -$ -$

SFG MTL3 & Soffit & fascia - metal - 3' overhang LF -$ -$ -$ -$

SFG MTL4 & Soffit & fascia - metal - 4' overhang LF -$ -$ -$ -$

SFG P1X10 & Fascia - 1" x 10" PVC LF -$ -$ -$ -$

SFG P1X12 & Fascia - 1" x 12" PVC LF -$ -$ -$ -$

SFG P1X4 & Fascia - 1" x 4" PVC LF -$ -$ -$ -$

SFG P1X6 & Fascia - 1" x 6" PVC LF -$ -$ -$ -$

SFG P1X8 & Fascia - 1" x 8" PVC LF -$ -$ -$ -$

SFG PCWN4 & Crown molding - 4" PVC LF -$ -$ -$ -$

Page 142: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

SFG PCWN5 & Crown molding - 5" PVC LF -$ -$ -$ -$

SFG PSFT1 & Soffit - PVC - 1" SF -$ -$ -$ -$

SFG PSFT1/2 & Soffit - PVC - 1/2" SF -$ -$ -$ -$

SFG PSFT3/4 & Soffit - PVC - 3/4" SF -$ -$ -$ -$

SFG PSFT3/8 & Soffit - PVC - 3/8" SF -$ -$ -$ -$

SFG PSFT5/8 & Soffit - PVC - 5/8" SF -$ -$ -$ -$

SFG PSFTB & Soffit - PVC - 3/8" - bead board SF -$ -$ -$ -$

SFG PSFTB> & Soffit - PVC - 1/2" - bead board SF -$ -$ -$ -$

SFG PSFTTG & Soffit - PVC - 1/2" x 5" bead board tongue and groove LF -$ -$ -$ -$

SFG SFTFC & Soffit - fiber cement panel SF -$ -$ -$ -$

SFG SFTM & Soffit - metal SF -$ -$ -$ -$

SFG SFTMVRS + Soffit - metal/vinyl - Detach & reset SF -$ -$ -$ -$

SFG SFTV & Soffit - vinyl SF -$ -$ -$ -$

SFG SFTW & Soffit - wood SF -$ -$ -$ -$

SFG SFTWTG & Soffit - wood - tongue & groove SF -$ -$ -$ -$

SFG VENT & Soffit vent EA -$ -$ -$ -$

SFG VENTL + Soffit vent - linear LF -$ -$ -$ -$

SFG WFRM1 & Soffit - box framing - 1' overhang LF -$ -$ -$ -$

SFG WFRM2 & Soffit - box framing - 2' overhang LF -$ -$ -$ -$

SFG WFRM3 & Soffit - box framing - 3' overhang LF -$ -$ -$ -$

SFG WFRM4 & Soffit - box framing - 4' overhang LF -$ -$ -$ -$

SFG WOOD1 & Soffit & fascia - wood - 1' overhang LF -$ -$ -$ -$

SFG WOOD2 & Soffit & fascia - wood - 2' overhang LF -$ -$ -$ -$

SFG WOOD3 & Soffit & fascia - wood - 3' overhang LF -$ -$ -$ -$

SFG WOOD4 & Soffit & fascia - wood - 4' overhang LF -$ -$ -$ -$

SFG WRAPCF & Wrap custom fascia with aluminum (PER LF) LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

SPE AC & Air compressor - 5HP - 2 stage, packaged - w/80 gal. tank EA -$ -$ -$ -$

SPE AC< & Air compressor - 7HP - Light duty - w/hose EA -$ -$ -$ -$

SPE AC> & Air compressor - 10HP - 2 stage, packaged - w/120 gal. EA -$ -$ -$ -$

tank -$ -$ -$ -$

SPE AQ & Aquarium - 72" x 24" x 24" - Built-in EA -$ -$ -$ -$

SPE BBALL & Indoor basketball standard w/wall padding EA -$ -$ -$ -$

SPE BDA + Boat dock - aluminum SF -$ -$ -$ -$

SPE BDGA + Boat dock - gangway - aluminum LF -$ -$ -$ -$

SPE BDGW + Boat dock - gangway - wood LF -$ -$ -$ -$

SPE BDW + Boat dock - wood SF -$ -$ -$ -$

SPE BIDITM + Specialty Items (Bid Item) EA -$ -$ -$ -$

SPE BOWL + Bowling alley - per lane EA -$ -$ -$ -$

SPE BOWLSC & Bowling alley - add for automatic scorer - master control EA -$ -$ -$ -$

SPE BOWLSCL & Bowling alley - add for automatic scorer - lane control EA -$ -$ -$ -$

SPE CLOSC & Closet carousel - motorized - Small EA -$ -$ -$ -$

SPE CLOSC> & Closet carousel - motorized - Large EA -$ -$ -$ -$

SPE CLOSCRS + Closet carousel - Detach & reset EA -$ -$ -$ -$

SPE DUMBAD & Dumbwaiter - add for each additional stop EA -$ -$ -$ -$

SPE DUMBW & Dumbwaiter - two story - motorized EA -$ -$ -$ -$

SPE ELEVR & Elevator - residential - 2 story (small) EA -$ -$ -$ -$

SPE FNTN4 & Landscape fountain - Small (4' diameter) EA -$ -$ -$ -$

SPE FNTN8 & Landscape fountain - Large (8' diameter) EA -$ -$ -$ -$

SPE FP & Fireman's pole - 14' high EA -$ -$ -$ -$

SPE HABITAT & Environmental habitat - enclosure EA -$ -$ -$ -$

SPE MBXP & Mailbox post - wood EA -$ -$ -$ -$

SPE MBXP+ & Mailbox post - aluminum - High grade EA -$ -$ -$ -$

SPE MBXR & Rural mailbox EA -$ -$ -$ -$

SPE MBXR+ & Rural mailbox - High grade EA -$ -$ -$ -$

SPE MBXRS + Mailbox - Detach & reset EA -$ -$ -$ -$

SPE MBXW & Wall mount mailbox EA -$ -$ -$ -$

SPE MBXW+ & Wall mount mailbox - High grade EA -$ -$ -$ -$

SPE MN + Specialty Items - Labor Minimum EA -$ -$ -$ -$

SPE RADF & Radon fan EA -$ -$ -$ -$

SPE RADON + Radon evacuation system - average home EA -$ -$ -$ -$

SPE SAFE & Safe - concealed wall EA -$ -$ -$ -$

Page 143: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

SPE SAFE> & Safe - concealed floor EA -$ -$ -$ -$

SPE SAUNA & Sauna - interior - 4' x 6' EA -$ -$ -$ -$

SPE SAUNAC & Sauna room - Commercial - 8' x 10' EA -$ -$ -$ -$

SPE SCRN & Built-in projection screen - fixed EA -$ -$ -$ -$

SPE SCRN+ & Built-in projection screen - motorized with remote EA -$ -$ -$ -$

SPE SCRN++ & Built-in projection screen - concealed - motorized/remote EA -$ -$ -$ -$

SPE SHOOT & Indoor shooting range - per position EA -$ -$ -$ -$

SPE SL & Spiral slide - floor to floor EA -$ -$ -$ -$

SPE SSA25 + Shelter/safe room - steel - above ground - up to 25 SF SF -$ -$ -$ -$

SPE SSA25> + Shelter/safe room - steel - above ground - over 25 SF SF -$ -$ -$ -$

SPE SSAC50 + Shelter/safe room - concrete - above ground - up to 50 SF SF -$ -$ -$ -$

SPE SSAC50> + Shelter/safe room - concrete - above ground - over 50 SF SF -$ -$ -$ -$

SPE SSI25 + Shelter/safe room - steel - in-ground - up to 25 SF SF -$ -$ -$ -$

SPE SSI25> + Shelter/safe room - steel - in-ground - over 25 SF SF -$ -$ -$ -$

SPE SSIC50 + Shelter/safe room - concrete - in-ground - up to 50 SF SF -$ -$ -$ -$

SPE SSIC50> + Shelter/safe room - concrete - in-ground - over 50 SF SF -$ -$ -$ -$

SPE SSIF25 + Shelter/safe room - fiberglass - in-ground - up to 25 SF SF -$ -$ -$ -$

SPE SSIF25> + Shelter/safe room - fiberglass - in-ground - over 25 SF SF -$ -$ -$ -$

SPE STRLIFT & Stair Lift - 2 story - straight EA -$ -$ -$ -$

SPE TPROJ & Built-in theater projector - LCD EA -$ -$ -$ -$

SPE TPROJ+ & Built-in theater projector - LCD - Deluxe grade EA -$ -$ -$ -$

SPE TSEAT & Built-in theater seating - per seat EA -$ -$ -$ -$

SPE TSEAT- & Built-in theater seating - per seat - Standard grade EA -$ -$ -$ -$

SPE TSIW & In-wall / In-ceiling speaker EA -$ -$ -$ -$

SPE TSIW- & In-wall / In-ceiling speaker - Standard grade EA -$ -$ -$ -$

SPE TSIW+ & In-wall / In-ceiling speaker - High grade EA -$ -$ -$ -$

SPE TSIW++ & In-wall / In-ceiling speaker - Premium grade EA -$ -$ -$ -$

SPE TSIWRS + In-wall / In-ceiling speaker - Detach & reset EA -$ -$ -$ -$

SPE TSPKR & Built-in theater speaker system EA -$ -$ -$ -$

SPE TSPKR+ & Built-in theater speaker system - Deluxe grade EA -$ -$ -$ -$

SPE WV & Weathervane - copper EA -$ -$ -$ -$

SPE WV+ & Weathervane - copper - High grade EA -$ -$ -$ -$

SPE WWCL & Window well cover locking mechanism EA -$ -$ -$ -$

SPE WWCM2 & Window well cover - Metal - 46" wide by 24" EA -$ -$ -$ -$

SPE WWCM2< & Window well cover - Metal - up to 36" wide by 24" EA -$ -$ -$ -$

SPE WWCM2> & Window well cover - Metal - 64" wide by 24" EA -$ -$ -$ -$

SPE WWCM3 & Window well cover - Metal - 46" wide by 36" EA -$ -$ -$ -$

SPE WWCM3< & Window well cover - Metal - up to 36" wide by 36" EA -$ -$ -$ -$

SPE WWCM3> & Window well cover - Metal - 64" wide by 36" EA -$ -$ -$ -$

SPE WWCP2 & Window well cover - Poly - 46" wide by 24" EA -$ -$ -$ -$

SPE WWCP2< & Window well cover - Poly - up to 36" wide by 24" EA -$ -$ -$ -$

SPE WWCP2> & Window well cover - Poly - 64" wide by 24" EA -$ -$ -$ -$

SPE WWCP3 & Window well cover - Poly - 46" wide by 36" EA -$ -$ -$ -$

SPE WWCP3< & Window well cover - Poly - up to 36" wide by 36" EA -$ -$ -$ -$

SPE WWCP3> & Window well cover - Poly - 64" wide by 36" EA -$ -$ -$ -$

SPE WWCPL & Window well cover - Plastic - up to 42" wide by 19" EA -$ -$ -$ -$

SPE WWELL & Window well - Metal - 46" wide EA -$ -$ -$ -$

SPE WWELL< & Window well - Metal - up to 36" wide EA -$ -$ -$ -$

SPE WWELL> & Window well - Metal - 64" wide EA -$ -$ -$ -$

SPE WWELL>3 & Window well - Metal - 64" wide - 36" projection EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

STJ 08K1 & Steel joist - 8" K Series - under 60' span LF -$ -$ -$ -$

STJ 10CS3 & Steel joist - 10" CS Series - under 60' span LF -$ -$ -$ -$

STJ 10K1 & Steel joist - 10" K Series - under 60' span LF -$ -$ -$ -$

STJ 12CS3 & Steel joist - 12" CS Series - under 60' span LF -$ -$ -$ -$

STJ 12K1 & Steel joist - 12" K1 Series - under 60' span LF -$ -$ -$ -$

STJ 12K3 & Steel joist - 12" K3 Series - under 60' span LF -$ -$ -$ -$

STJ 14CS3 & Steel joist - 14" CS Series - under 60' span LF -$ -$ -$ -$

STJ 14K1 & Steel joist - 14" K1 Series - under 60' span LF -$ -$ -$ -$

STJ 14K3 & Steel joist - 14" K3 Series - under 60' span LF -$ -$ -$ -$

STJ 16CS5 & Steel joist - 16" CS Series - under 60' span LF -$ -$ -$ -$

STJ 16K2 & Steel joist - 16" K2 Series - under 60' span LF -$ -$ -$ -$

Page 144: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

STJ 16K3 & Steel joist - 16" K3 Series - under 60' span LF -$ -$ -$ -$

STJ 18CS5 & Steel joist - 18" CS Series - under 60' span LF -$ -$ -$ -$

STJ 18K3 & Steel joist - 18" K3 Series - under 60' span LF -$ -$ -$ -$

STJ 18K4 & Steel joist - 18" K4 Series - under 60' span LF -$ -$ -$ -$

STJ 18K5 & Steel joist - 18" K5 Series - under 60' span LF -$ -$ -$ -$

STJ 18LH09 & Steel joist - 18" LH Series - up to 144' span LF -$ -$ -$ -$

STJ 20CS5 & Steel joist - 20" CS Series - under 60' span LF -$ -$ -$ -$

STJ 20K7 & Steel joist - 20" K Series - under 60' span LF -$ -$ -$ -$

STJ 20LH10 & Steel joist - 20" LH Series - up to 144' span LF -$ -$ -$ -$

STJ 22CS5 & Steel joist - 22" CS Series - under 60' span LF -$ -$ -$ -$

STJ 22K7 & Steel joist - 22" K Series - under 60' span LF -$ -$ -$ -$

STJ 24CS5 & Steel joist - 24" CS Series - under 60' span LF -$ -$ -$ -$

STJ 24K09 & Steel joist - 24" K9 Series - under 60' span LF -$ -$ -$ -$

STJ 24K12 & Steel joist - 24" K12 Series - under 60' span LF -$ -$ -$ -$

STJ 24LH11 & Steel joist - 24" LH Series - up to 144' span LF -$ -$ -$ -$

STJ 26CS5 & Steel joist - 26" CS Series - under 60' span LF -$ -$ -$ -$

STJ 26K10 & Steel joist - 26" K Series - under 60' span LF -$ -$ -$ -$

STJ 28CS5 & Steel joist - 28" CS Series - under 60' span LF -$ -$ -$ -$

STJ 28K10 & Steel joist - 28" K Series - under 60' span LF -$ -$ -$ -$

STJ 28LH13 & Steel joist - 28" LH Series - up to 144' span LF -$ -$ -$ -$

STJ 30CS5 & Steel joist - 30" CS Series - under 60' span LF -$ -$ -$ -$

STJ 30K11 & Steel joist - 30" K Series - under 60' span LF -$ -$ -$ -$

STJ 32LH15 & Steel joist - 32" LH Series - up to 144' span LF -$ -$ -$ -$

STJ 36LH15 & Steel joist - 36" LH Series - up to 144' span LF -$ -$ -$ -$

STJ 40LH16 & Steel joist - 40" LH Series - up to 144' span LF -$ -$ -$ -$

STJ 44LH17 & Steel joist - 44" LH Series - up to 144' span LF -$ -$ -$ -$

STJ 48LH17 & Steel joist - 48" LH Series - up to 144' span LF -$ -$ -$ -$

STJ 52DLH17 & Steel joist - 52" DLH Series - up to 144' span LF -$ -$ -$ -$

STJ 56DLH17 & Steel joist - 56" DLH Series - up to 144' span LF -$ -$ -$ -$

STJ 60DLH18 & Steel joist - 60" DLH Series - up to 144' span LF -$ -$ -$ -$

STJ 64DLH18 & Steel joist - 64" DLH Series - up to 144' span LF -$ -$ -$ -$

STJ 68DLH19 & Steel joist - 68" DLH Series - up to 144' span LF -$ -$ -$ -$

STJ 72DLH19 & Steel joist - 72" DLH Series - up to 144' span LF -$ -$ -$ -$

STJ BIDITM + Steel Joist Components (Bid Item) EA -$ -$ -$ -$

STJ BRIDG & Steel joist bridging EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

STL BIDITM + Steel Components (Bid Item) EA -$ -$ -$ -$

STL C10X22 & Channel - 10"d. x 3 1/2"w. x 5/16"thick LF -$ -$ -$ -$

STL C12X40 & Channel - 12"d. x 3 7/8"w. x 5/8"thick LF -$ -$ -$ -$

STL C8X8.5 & Channel - 8"d. x 1 7/8"w. x 3/16"thick LF -$ -$ -$ -$

STL COL3P & Column - 3" pipe w/base pl./top bkt. LF -$ -$ -$ -$

STL COL4P & Column - 4" pipe w/base p1./top bkt. LF -$ -$ -$ -$

STL COL4ST & Column - 4" sq. tube w/base p1./top bkt. LF -$ -$ -$ -$

STL COL6P & Column - 6" pipe w/base p1./top bkt. LF -$ -$ -$ -$

STL COL6ST & Column - 6" sq. tube w/base p1./top bkt. LF -$ -$ -$ -$

STL COL8P & Column - 8" pipe w/base p1./top bkt. LF -$ -$ -$ -$

STL COL8ST & Column - 8" sq. tube w/base p1./top bkt. LF -$ -$ -$ -$

STL COLAB & Column anchor bolt - 5/8" x 12" x 2" w/2 nuts & washers EA -$ -$ -$ -$

STL COLAB> & Column anchor bolt - 3/4" x 12" x 2" w/2 nuts & washers EA -$ -$ -$ -$

STL COLAB>> & Column anchor bolt - 1" x 12" x 2" w/2 nuts & washers EA -$ -$ -$ -$

STL COLAD & Adjustable column - 4" pipe w/plates EA -$ -$ -$ -$

STL COLBP + Column base plate - 1" x 12" x 12" EA -$ -$ -$ -$

STL COLTB & Column top bracket - 3/4" bottom & 1/4" sides EA -$ -$ -$ -$

STL CWS + Curtain wall steel framing LB -$ -$ -$ -$

STL DECK & Metal decking, 1 1/2" 16 gauge galvanized - 'B' SF -$ -$ -$ -$

STL DECK+ & Metal decking, 3" 18 gauge - 'B' SF -$ -$ -$ -$

STL EXP & Expanded metal grill - structural SF -$ -$ -$ -$

STL GRF & Steel girder for a floor system (60G10N24K) LF -$ -$ -$ -$

STL GRR & Steel girder for a roof system (48G8N12K) LF -$ -$ -$ -$

STL L1.5 & Angle - L 1 1/2" x 1 1/2" x 1/8" thick LF -$ -$ -$ -$

STL L1.5> & Angle - L 1 1/2" x 1 1/2" x 1/4" thick LF -$ -$ -$ -$

STL L2 & Angle - L 2" x 2" x 3/16" thick LF -$ -$ -$ -$

Page 145: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

STL L2.5 & Angle - L 2 1/2" x 2 1/2" x 1/4" thick LF -$ -$ -$ -$

STL L2> & Angle - L 2" x 2" x 1/4" thick LF -$ -$ -$ -$

STL L3 & Angle - L 3" x 3" x 3/16" thick LF -$ -$ -$ -$

STL L3.5 & Angle - L 3 1/2" x 3 1/2" x 1/4" thick LF -$ -$ -$ -$

STL L3> & Angle - L 3" x 3" x 1/4" thick LF -$ -$ -$ -$

STL L3>> & Angle - L 3" x 3" x 3/8" thick LF -$ -$ -$ -$

STL L3X2 & Angle - L 3" x 2 1/2" x 3/16" thick LF -$ -$ -$ -$

STL L3X2> & Angle - L 3" x 2 1/2" x 1/4" thick LF -$ -$ -$ -$

STL IA & Angle - L 4" x 4" x 1/4" thick LF -$ -$ -$ -$

STL L5X3 & Angle - L 5" x 3 1/2" x 1/4" thick LF -$ -$ -$ -$

STL L5X3> & Angle - L 5" x 3 1/2" x 5/16" thick LF -$ -$ -$ -$

STL L5X3>> & Angle - L 5" x 3 1/2" x 3/8" thick LF -$ -$ -$ -$

STL L6X4 & Angle - L 6" x 4" x 5/16" thick LF -$ -$ -$ -$

STL L6X4> & Angle - L 6" x 4" x 3/8" thick LF -$ -$ -$ -$

STL LAB + Structural Steel Installer - per hour HR -$ -$ -$ -$

STL LABL + Structural Steel - General Laborer - per hour HR -$ -$ -$ -$

STL LADC & Steel ladder with safety cage LF -$ -$ -$ -$

STL MN + Structural Steel - Labor Minimum EA -$ -$ -$ -$

STL MNRP + Structural Steel Repair - Min. Charge - Labor and Equip. EA -$ -$ -$ -$

STL PREF & Prefabricated metal building - per SF SF -$ -$ -$ -$

STL PST2 & Square post - w/base - 2" x 2" x .188 wall thickness LF -$ -$ -$ -$

STL PST5 & Square post - w/base - 5" x 5" x .188 wall thickness LF -$ -$ -$ -$

STL PSTR2 & Round post - w/base - 2" x 2" x .154 wall thickness LF -$ -$ -$ -$

STL PSTR5 & Round post - w/base - 5" x 5" x .258 wall thickness LF -$ -$ -$ -$

STL PURC8 & Steel purlins - C-shape - 8" LF -$ -$ -$ -$

STL PURZ8 & Steel purlins - Z-shape - 8" LF -$ -$ -$ -$

STL R3/4 & Steel Rod - 3/4" diameter LF -$ -$ -$ -$

STL SCB + Structural steel framing - average bldg. - per pound LB -$ -$ -$ -$

STL SCBT + Structural steel framing - high rise bldg. - per ton TN -$ -$ -$ -$

STL SJSF + Steel joist system - floor - per pound LB -$ -$ -$ -$

STL SJSR + Steel joist system - roof - per pound LB -$ -$ -$ -$

STL ST10X6 & Rectangular tube - 10" x 6" x .375 wall thickness - galv. LF -$ -$ -$ -$

STL ST10X6< & Rectangular tube - 10" x 6" x .25 wall thickness - galv. LF -$ -$ -$ -$

STL ST10X6> & Rectangular tube - 10" x 6" x .5 wall thickness - galv. LF -$ -$ -$ -$

STL ST12X6 & Rectangular tube - 12" x 6" x .3125 wall thickness - galv. LF -$ -$ -$ -$

STL ST14X6 & Rectangular tube - 14" x 6" x .3125 wall thickness - galv. LF -$ -$ -$ -$

STL ST3 & Square tube - 3" x 3" x .188 wall thickness LF -$ -$ -$ -$

STL ST4 & Square tube - 4" x 4" x .125 wall thickness - galvanized LF -$ -$ -$ -$

STL ST4> & Square tube - 4" x 4" x .25 wall thickness - galvanized LF -$ -$ -$ -$

STL ST4» & Square tube - 4" x 4" x .3125 wall thickness - galvanized LF -$ -$ -$ -$

STL ST6 & Square tube - 6" x 6" x .25 wall thickness - galvanized LF -$ -$ -$ -$

STL ST6X4 & Rectangular tube - 6" x 4" x .25 wall thickness - galv. LF -$ -$ -$ -$

STL ST8X2 & Rectangular tube - 8" x 2" x .1875 wall thickness - galv. LF -$ -$ -$ -$

STL ST8X6 & Rectangular tube - 8" x 6" x .375 wall thickness - galv. LF -$ -$ -$ -$

STL ST8X6< & Rectangular tube - 8" x 6" x .25 wall thickness - galv. LF -$ -$ -$ -$

STL ST8X6> & Rectangular tube - 8" x 6" x .5 wall thickness - galv. LF -$ -$ -$ -$

STL W10X22 & Wide Flange Beam - 10 1/8"d. x 5 3/4"w. x 1/4"thick LF -$ -$ -$ -$

STL W10X9.9 & Wide Flange Beam - 10"d. x 2 3/4"w. x 3/16"thick LF -$ -$ -$ -$

STL W12X14 & Wide Flange Beam - 11 7/8"d. x 4"w. x 1/4"thick LF -$ -$ -$ -$

STL W12X16 & Wide Flange Beam - 12"d. x 4"w. x 1/4"thick LF -$ -$ -$ -$

STL W12X19 & Wide Flange Beam - 12 1/8"d. x 4"w. x 1/4"thick LF -$ -$ -$ -$

STL W12X22 & Wide Flange Beam - 12 5/16"d. x 4"w. x 1/4"thick LF -$ -$ -$ -$

STL W12X26 & Wide Flange Beam - 12 1/4"d. x 6 1/2"w. x 1/4"thick LF -$ -$ -$ -$

STL W12X30 & Wide Flange Beam - 12 3/8"d. x 6 1/2"w. x 1/4"thick LF -$ -$ -$ -$

STL W14X17 & Wide Flange Beam - 14"d. x 4"w. x 3/16"thick LF -$ -$ -$ -$

STL W14X22 & Wide Flange Beam - 13 3/4"d. x 5"w. x 1/4"thick LF -$ -$ -$ -$

STL W14X26 & Wide Flange Beam - 14"cl. x 5"w. x 1/4"thick LF -$ -$ -$ -$

STL W14X30 & Wide Flange Beam - 13 7/8"d. x 6 3/4"w. x 1/4"thick LF -$ -$ -$ -$

STL W14X34 & Wide Flange Beam - 14"d. x 6 3/4"w. x 1/4"thick LF -$ -$ -$ -$

STL W16X26 & Wide Flange Beam - 15 3/4"d. x 5 1/2"w. x 1/4"thick LF -$ -$ -$ -$

STL W16X31 & Wide Flange Beam - 15 7/8"d. x 5 1/2"w. x 1/4"thick LF -$ -$ -$ -$

STL W18X35 & Wide Flange Beam - 17 3/4"d. x 6"w. x 5/16"thick LF -$ -$ -$ -$

STL W18X40 & Wide Flange Beam - 17 7/8"d. x 6"w. x 5/16"thick LF -$ -$ -$ -$

STL W18X50 & Wide Flange Beam - 18"d. x 7 1/2"w. x 3/8"thick LF -$ -$ -$ -$

STL W18X55 & Wide Flange Beam - 18 1/8"d. x 7 1/2"w. x 3/8"thick LF -$ -$ -$ -$

Page 146: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

STL W18X60 & Wide Flange Beam - 18 1/4"d. x 7 1/2"w. x 7/16"thick LF -$ -$ -$ -$

STL W18X65 & Wide Flange Beam - 18 3/8"d. x 7 5/8"w. x 7/16"thick LF -$ -$ -$ -$

STL W21X44 & Wide Flange Beam - 20 5/8"d. x 6 1/2"w. x 3/8"thick LF -$ -$ -$ -$

STL W21X50 & Wide Flange Beam - 20 7/8"d. x 6 1/2"w. x 3/8"thick LF -$ -$ -$ -$

STL W21X62 & Wide Flange Beam - 21"d. x 8 1/4"w. x 3/8"thick LF -$ -$ -$ -$

STL W21X68 & Wide Flange Beam - 21 1/8"d. x 8 1/4"w. x 7/16"thick LF -$ -$ -$ -$

STL W24X55 & Wide Flange Beam - 23 1/2"d. x 7"w. x 3/8"thick LF -$ -$ -$ -$

STL W24X68 & Wide Flange Beam - 23 3/4"d. x 9"w. x 7/16"thick LF -$ -$ -$ -$

STL W24X76 & Wide Flange Beam - 23 7/8"d. x 9"w. x 7/16"thick LF -$ -$ -$ -$

STL W24X84 & Wide Flange Beam - 24"d. x 9"w. x 1/2"thick LF -$ -$ -$ -$

STL W24X94 & Wide Flange Beam - 24 3/8"d. x 9 1/16"w. x 1/2"thick LF -$ -$ -$ -$

STL W27X84 & Wide Flange Beam - 26 3/4"d. x 10"w. x 1/2"thick LF -$ -$ -$ -$

STL W27X94 & Wide Flange Beam - 27"d. x 10"w. x 1/2"thick LF -$ -$ -$ -$

STL W30X99 & Wide Flange Beam - 29 5/8"d. x 10 7/16"w. x 1/2"thick LF -$ -$ -$ -$

STL W6X9 Wide Flange Beam - 5 7/8"d. x 4"w. x 3/16" thick LF -$ -$ -$ -$

STL W8X10 & Wide Flange Beam - 7 7/8"d. x 4"w. x 1/4"thick LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

STR 3 & Stairway - 3' wide (8' rise plus joist) EA -$ -$ -$ -$

STR 3> & Stairway - 3' 6"wide (8' rise plus joist) EA -$ -$ -$ -$

STR 4 & Stairway - 4' wide (8' rise plus joist) EA -$ -$ -$ -$

STR 4C & Stairway - wood framed - up to 4' wide - curved EA -$ -$ -$ -$

STR 6C & Stairway - wood framed - 6' wide - curved EA -$ -$ -$ -$

STR AV & Stairway - stringers, treads & risers (per tread) EA -$ -$ -$ -$

STR AVR & Stairway - redwood stringers and treads (per tread) EA -$ -$ -$ -$

STR AVT & Stairway - treated stringers and treads (per tread) EA -$ -$ -$ -$

STR BIDITM + Stairs (Bid Item) EA -$ -$ -$ -$

STR DIS & Stairway - disappearing (folding) / attic access ladder EA -$ -$ -$ -$

STR DIS+ & Stairway - disappearing (folding)/attic ladder- High grade EA -$ -$ -$ -$

STR FC & False cap - riser & tread - no return EA -$ -$ -$ -$

STR FC+ & False cap - riser & tread - open tread - with return EA -$ -$ -$ -$

STR FCLAB & False cap - riser & tread - Labor only EA -$ -$ -$ -$

STR FCR + False riser cap - material only EA -$ -$ -$ -$

STR FCT + False tread cap - w/out return - material only EA -$ -$ -$ -$

STR LAB + Carpenter - General Framer - per hour HR -$ -$ -$ -$

STR LABL + Stairway - General Laborer - per hour HR -$ -$ -$ -$

STR LADSHP & Ships ladder (captain's ladder) LF -$ -$ -$ -$

STR LAND + Stairway landing - Metal pan SF -$ -$ -$ -$

STR LND + Stairway - midpoint landing - (enter SF of landing) SF -$ -$ -$ -$

STR MN + Stairway - Labor Minimum EA -$ -$ -$ -$

STR RISER + Stair riser - up to 4' EA -$ -$ -$ -$

STR RISER+ & Stair riser - stain grade softwood - up to 4' EA -$ -$ -$ -$

STR RISER> & Stair riser - greater than 4' up to 8' EA -$ -$ -$ -$

STR RISER>+ & Stair riser - stain grade softwood - greater than 4' to 8' EA -$ -$ -$ -$

STR RISERC & Stair riser - hardwood - curved - up to 4' EA -$ -$ -$ -$

STR RISERC> & Stair riser - hardwood - curved - greater than 4' up to 8' EA -$ -$ -$ -$

STR RISERH & Stair riser - hardwood - up to 4' EA -$ -$ -$ -$

STR RISERH> & Stair riser - hardwood - greater than 4' up to 8' EA -$ -$ -$ -$

STR RISERRS + Stair riser - Detach & reset EA -$ -$ -$ -$

STR RISERT & Stair riser - treated softwood - up to 4' EA -$ -$ -$ -$

STR RISERT> & Stair riser - treated softwood - greater than 4' up to 8' EA -$ -$ -$ -$

STR RISLAB & Stair riser - Labor only EA -$ -$ -$ -$

STR RISRH+ & Stair riser - hardwood - up to 4' - High grade EA -$ -$ -$ -$

STR RISRH>+ & Stair riser - hardwood - greater than 4' to 8' - High gr. EA -$ -$ -$ -$

STR SPIR & Spiral staircase - Wood EA -$ -$ -$ -$

STR SPIRM & Spiral staircase - Metal, 6' diameter EA -$ -$ -$ -$

STR SPIRM< & Spiral staircase - Metal, 5' diameter EA -$ -$ -$ -$

STR STPAN + Stairway - Metal pan - 4' wide (PER FLOOR) EA -$ -$ -$ -$

STR STPFM & Steps (fiberglass w/alum.rail.) 1/2 landing - mobile home EA -$ -$ -$ -$

STR STPFM> & Steps (fiberglass w/alum.rail.) full landing - mobile home EA -$ -$ -$ -$

STR STPM & Steps (extruded aluminum) 1/2 landing - mobile home EA -$ -$ -$ -$

STR STPM> & Steps (extruded aluminum) full landing - mobile home EA -$ -$ -$ -$

STR STPRM & Steps and landing - redwood - 6x8 or smaller - mobile EA -$ -$ -$ -$

Page 147: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

home

STR STR & Stair stringer - softwood LF -$ -$ -$ -$

STR STRC & Stair stringer - curved - exposed LF -$ -$ -$ -$

STR STRE & Stair stringer - engineered wood LF -$ -$ -$ -$

STR STREX & Stair stringer - exposed - clear-grade wood LF -$ -$ -$ -$

STR STRLAB & Stair stringer - Labor only LF -$ -$ -$ -$

STR STRRS + Stair stringer - Detach & reset LF -$ -$ -$ -$

STR STRT & Stair stringer - treated softwood LF -$ -$ -$ -$

STR TRD & Stair tread - up to 4' EA -$ -$ -$ -$

STR TRD+ & Stair tread - stain grade softwood - up to 4' EA -$ -$ -$ -$

STR TRD> & Stair tread - greater than 4' up to 8' EA -$ -$ -$ -$

STR TRD>+ & Stair tread - stain grade softwood - greater than 4' to 8' EA -$ -$ -$ -$

STR TRDDD & Starting step - double end D-step (riser included) - 5' EA -$ -$ -$ -$

STR TRDDD> & Starting step - double end D-step (riser included) - 8' EA -$ -$ -$ -$

STR TRDDF & Starting step - false end D-step (riser included) EA -$ -$ -$ -$

STR TRDDS & Starting step - single end D-step (riser included) - 5' EA -$ -$ -$ -$

STR TRDDS> & Starting step - single end D-step (riser included) - 8' EA -$ -$ -$ -$

STR TRDH & Stair tread - hardwood - up to 4' EA -$ -$ -$ -$

STR TRDH+ & Stair tread - hardwood - up to 4' - High grade EA -$ -$ -$ -$

STR TRDH> & Stair tread - hardwood - greater than 4' up to 8' EA -$ -$ -$ -$

STR TRDH>+ & Stair tread - hardwd - greater than 4' up to 8' - High gr. EA -$ -$ -$ -$

STR TRDHC & Stair tread - hardwood - curved - up to 4' EA -$ -$ -$ -$

STR TRDHC> & Stair tread - hardwood - curved - greater than 4' up to 8' EA -$ -$ -$ -$

STR TRDLAB & Stair tread - Labor only EA -$ -$ -$ -$

STR TRDLAB+ & Stair tread - stain grade - Labor only EA -$ -$ -$ -$

STR TRDM12 + Stair tread - 1-1/8" x 11-1/4" x 12' - material only EA -$ -$ -$ -$

STR TRDMH + Stair tread - hardwood - material only (per LF) LF -$ -$ -$ -$

STR TRDMH+ + Stair tread - hardwood - High gr. - material only (per LF) LF -$ -$ -$ -$

STR TRDMS + Stair tread - softwood - material only (per LF) LF -$ -$ -$ -$

STR TRDR & Stair tread - redwood EA -$ -$ -$ -$

STR TRDRS + Stair tread - Detach & reset EA -$ -$ -$ -$

STR TRDT & Stair tread - treated softwood - up to 4' EA -$ -$ -$ -$

STR TRDT> & Stair tread - treated softwood - greater than 4' up to 8' EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

STU AV & Metal lath & stucco SF -$ -$ -$ -$

STU AV- & Metal lath & stucco - Standard grade SF -$ -$ -$ -$

STU BIDITM + Stucco & Exterior Plaster (Bid Item) EA -$ -$ -$ -$

STU COFFER + Synthetic stucco - Add for coffered ceiling SF -$ -$ -$ -$

STU COLOR + Stucco color coat (Redash) - sand texture SF -$ -$ -$ -$

STU COLOR+ + Stucco color coat (Redash) - coarse texture SF -$ -$ -$ -$

STU COLORS + Stucco color coat (Redash) - Synthetic SF -$ -$ -$ -$

STU EJW + Stucco - expansion joint (metal or plastic) LF -$ -$ -$ -$

STU FOG + Stucco - Fog coat SF -$ -$ -$ -$

STU LAB + Stucco Plasterer - per hour HR -$ -$ -$ -$

STU LABL + Stucco - General Laborer - per hour HR -$ -$ -$ -$

STU MAS2 + Two coat stucco over masonry SF -$ -$ -$ -$

STU MN + Stucco or Exterior Plaster - Labor Minimum EA -$ -$ -$ -$

STU MNRP + Stucco / Ext. Plaster Repair - Min. Charge - Lab. and Mat. EA -$ -$ -$ -$

STU NGS & Stucco - natural gray - sand float SF -$ -$ -$ -$

STU NGT & Stucco - natural gray - troweled SF -$ -$ -$ -$

STU PATCH + Stucco patch / small repair - ready for color EA -$ -$ -$ -$

STU PLAS + Plaster (parget) foundation SF -$ -$ -$ -$

STU RP + Stucco repair around doors, windows, etc - 1st floor LF -$ -$ -$ -$

STU RP2 + Stucco repair around doors, windows, etc - 2nd floor LF -$ -$ -$ -$

STU SYN & Synthetic stucco on 1" polystyrene board SF -$ -$ -$ -$

STU SYN+ & Synthetic stucco on 2" polystyrene board SF -$ -$ -$ -$

STU SYNCR & Synthetic stucco crack repair LF -$ -$ -$ -$

STU SYNH & Synthetic stucco over cement hardcoat SF -$ -$ -$ -$

STU SYNMAS + Synthetic stucco applied to masonry block SF -$ -$ -$ -$

STU SYNRP & Synthetic stucco repair SF -$ -$ -$ -$

STU SYNW & Synthetic stucco on 1" polystyrene board - Water managed SF -$ -$ -$ -$

STU SYNW+ & Synthetic stucco on 2" polystyrene board - Water managed SF -$ -$ -$ -$

Page 148: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

STU TRIM + Synthetic stucco - additional charge for raised trim LF -$ -$ -$ -$

STU TRQ + Synthetic stucco - additional charge for quoins LF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

TBA BIDITM + Toilet & Bath Accessories (Bid Item) EA -$ -$ -$ -$

TBA DIAPER & Diaper change station - plastic EA -$ -$ -$ -$

TBA FND & Feminine napkin dispenser EA -$ -$ -$ -$

TBA FNDD & Feminine napkin disposal EA -$ -$ -$ -$

TBA GBAR & Handicap grab bar - Stainless steel, 1 1/2" x 30" EA -$ -$ -$ -$

TBA GBAR< & Handicap grab bar - Stainless steel, 1 1/2" x 24" EA -$ -$ -$ -$

TBA GBAR> & Handicap grab bar - Stainless steel, 1 1/2" x 36" EA -$ -$ -$ -$

TBA GBAR>> & Handicap grab bar - Stainless steel, 1 1/2" x 48" EA -$ -$ -$ -$

TBA GBARRS + Handicap grab bar - Detach & reset EA -$ -$ -$ -$

TBA HAND & Hot air hand dryer EA -$ -$ -$ -$

TBA HAND+ & Hot air hand dryer - High grade EA -$ -$ -$ -$

TBA LAB + Toilet & Bath Accessories Installer - per hour HR -$ -$ -$ -$

TBA LABL + Toilet & Bath Accessories - General Laborer - per hour HR -$ -$ -$ -$

TBA MIR & Bathroom mirror - w/metal frame - surface mtd - SF -$ -$ -$ -$

Commercial

TBA MIR- & Bathroom mirror - w/metal frame - surface mtd. - Std grd SF -$ -$ -$ -$

TBA MIRRS + Bathroom mirror - Detach & reset SF -$ -$ -$ -$

TBA MIRS & Bathroom mirror shelf, 24" long EA -$ -$ -$ -$

TBA MN + Toilet & Bath Accessory - Labor Minimum EA -$ -$ -$ -$

TBA PTD & Paper towel dispenser EA -$ -$ -$ -$

TBA PTD+ & Paper towel dispenser with waste receptacle EA -$ -$ -$ -$

TBA SB & Shower bench EA -$ -$ -$ -$

TBA SDISP & Soap dispenser - wall mounted EA -$ -$ -$ -$

TBA SDISP- & Soap dispenser - wall mounted - Standard grade EA -$ -$ -$ -$

TBA SDISP+ & Soap dispenser - wall mounted - High grade EA -$ -$ -$ -$

TBA SDISPRS + Soap dispenser - Detach & reset EA -$ -$ -$ -$

TBA SPD & Soap dispenser - surface mounted EA -$ -$ -$ -$

TBA SPD- & Soap dish - surface mounted - Standard grade EA -$ -$ -$ -$

TBA SPD+ & Soap dispenser - surface mounted - High grade EA -$ -$ -$ -$

TBA TLTP & Toilet partition (plastic laminate or baked enamel steel) EA -$ -$ -$ -$

TBA TLTP+ & Toilet partition - High grade (i.e., phenolic, etc.) EA -$ -$ -$ -$

TBA TLTP++ & Toilet partition - Premium grade (marble or cast stone) EA -$ -$ -$ -$

TBA TLTP> & Toilet partition - oversized/handicap EA -$ -$ -$ -$

TBA TLTP>+ & Toilet partition - oversized/handicap - High grade EA -$ -$ -$ -$

TBA TLTP>++ & Toilet partition - oversized/handicap - Premium grade EA -$ -$ -$ -$

TBA TLTPRS + Toilet partition - Detach & reset EA -$ -$ -$ -$

TBA TLTPS & Toilet partition - stainless steel EA -$ -$ -$ -$

TBA TLTPS> & Toilet partition - stainless steel - oversized/handicap EA -$ -$ -$ -$

TBA TPD & Toilet paper dispenser - single roll EA -$ -$ -$ -$

TBA TPD- & Toilet paper dispenser - single roll - Standard grade EA -$ -$ -$ -$

TBA TPD+ & Toilet paper dispenser - single roll - High grade EA -$ -$ -$ -$

TBA TPD2 & Toilet paper dispenser - double roll EA -$ -$ -$ -$

TBA TPD2- & Toilet paper dispenser - double roll - Standard grade EA -$ -$ -$ -$

TBA TPD2+ & Toilet paper dispenser - double roll - High grade EA -$ -$ -$ -$

TBA TPDRS + Toilet paper dispenser - Detach & reset EA -$ -$ -$ -$

TBA TSCD & Toilet seat cover dispenser EA -$ -$ -$ -$

TBA URS & Urinal partition (plastic laminate or baked enamel steel) EA -$ -$ -$ -$

TBA URS+ & Urinal partition - High grade (solid plastic, phenolic) EA -$ -$ -$ -$

TBA URS++ & Urinal partition - Premium grade (marble) EA -$ -$ -$ -$

TBA URSRS + Urinal partition - Detach & reset EA -$ -$ -$ -$

TBA URSS & Urinal partition - stainless steel EA -$ -$ -$ -$

TBA WR & Waste receptacle - semi-recessed EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

TIL AV & Ceramic/porcelain tile SF -$ -$ -$ -$

TIL AV- & Ceramic tile - Standard grade SF -$ -$ -$ -$

TIL AV-- & Ceramic tile - Economy grade SF -$ -$ -$ -$

Page 149: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

TIL AV+ & Ceramic/porcelain tile - High grade SF -$ -$ -$ -$

TIL AV++ & Ceramic/porcelain tile - Premium grade SF -$ -$ -$ -$

TIL AVB & Ceramic tile - bullnose - 3/4" x 6" LF -$ -$ -$ -$

TIL AVB- & Ceramic tile - bullnose - 3/4" x 6" - Standard grade LF -$ -$ -$ -$

TIL AVB+ & Ceramic tile - bullnose - 3/4" x 6" - High grade LF -$ -$ -$ -$

TIL AVB++ & Ceramic tile - bullnose - 3/4" x 6" - Premium grade LF -$ -$ -$ -$

TIL AVB> & Ceramic tile - bullnose - 2" x 6" LF -$ -$ -$ -$

TIL AVB>- & Ceramic tile - bullnose - 2" x 6" - Standard grade LF -$ -$ -$ -$

TIL AVB>+ & Ceramic tile - bullnose - 2" x 6" - High grade LF -$ -$ -$ -$

TIL AVB>++ & Ceramic tile - bullnose - 2" x 6" - Premium grade LF -$ -$ -$ -$

TIL AVSB & Ceramic tile - surface bullnose - 2" x 6" LF -$ -$ -$ -$

TIL AVSB- & Ceramic tile - surface bullnose - 2" x 6" - Standard grade LF -$ -$ -$ -$

TIL AVSB+ & Ceramic tile - surface bullnose - 2" x 6" - High grade LF -$ -$ -$ -$

TIL AVSB++ & Ceramic tile - surface bullnose - 2" x 6" - Premium grade LF -$ -$ -$ -$

TIL B & Ceramic tile base LF -$ -$ -$ -$

TIL B- & Ceramic tile base - Standard grade LF -$ -$ -$ -$

TIL B+ & Ceramic tile base - High grade LF -$ -$ -$ -$

TIL B++ & Ceramic tile base - Premium grade LF -$ -$ -$ -$

TIL BCEM1/2 & 1/2" Cement board SF -$ -$ -$ -$

TIL BCEM1/4 & 1/4" Cement board SF -$ -$ -$ -$

TIL BENCH + Additional charge to tile a bench seat EA -$ -$ -$ -$

TIL BIDITM + Tile (Bid Item) EA -$ -$ -$ -$

TIL BMUD & Mortar bed for tile SF -$ -$ -$ -$

TIL CTDK & Countertop subdeck - plywood SF -$ -$ -$ -$

TIL CTTL & Countertop - Tile SF -$ -$ -$ -$

TIL CTTL- & Countertop - Tile - Standard grade SF -$ -$ -$ -$

TIL CTTL+ & Countertop - Tile - High grade SF -$ -$ -$ -$

TIL CTTL++ & Countertop - Tile - Premium grade SF -$ -$ -$ -$

TIL CTTLB + Add-on for tile backsplash installation SF -$ -$ -$ -$

TIL DIAGADD + Add-on for diagonal tile installation SF -$ -$ -$ -$

TIL FSTRIP + Add-on for tile feature strip - High grade LF -$ -$ -$ -$

TIL FSTRIP+ + Add-on for tile feature strip - Premium grade LF -$ -$ -$ -$

TIL GROUT + Regrout tile SF -$ -$ -$ -$

TIL GROUTC + Recolor/stain grout in tile SF -$ -$ -$ -$

TIL GT & Glass tile SF -$ -$ -$ -$

TIL GT- & Glass tile - Standard grade SF -$ -$ -$ -$

TIL GT+ & Glass tile - High grade SF -$ -$ -$ -$

TIL GT++ & Glass tile - Premium grade SF -$ -$ -$ -$

TIL JMB & Tile jamb - wrap around LF -$ -$ -$ -$

TIL LAB + Tile / Cultured Marble Installer - per hour HR -$ -$ -$ -$

TIL LABL + Tile / Cultured Marble - General Laborer - per hour HR -$ -$ -$ -$

TIL MBL & Marble or Granite tile SF -$ -$ -$ -$

TIL MBL+ & Marble or Granite tile - High grade SF -$ -$ -$ -$

TIL MN + Tile / Marble - Labor Minimum EA -$ -$ -$ -$

TIL MT & Mosaic - ceramic/porcelain tile SF -$ -$ -$ -$

TIL MT- & Mosaic - ceramic/porcelain tile - Standard grade SF -$ -$ -$ -$

TIL MT+ & Mosaic - ceramic/porcelain tile - High grade SF -$ -$ -$ -$

TIL MT++ & Mosaic - ceramic/porcelain tile - Premium grade SF -$ -$ -$ -$

TIL MTA + Tile - metal trim - aluminum - up to 9/16 LF -$ -$ -$ -$

TIL MTA+ + Tile - metal trim - aluminum - up to 9/16 - High grade LF -$ -$ -$ -$

TIL MTAC + Tile - metal trim - aluminum - corner up to 9/16 EA -$ -$ -$ -$

TIL MTAC+ + Tile - metal trim - aluminum - corner up to 9/16- High grd EA -$ -$ -$ -$

TIL MTS + Tile - metal trim - stainless steel/brass - up to 9/16 LF -$ -$ -$ -$

TIL MTS+ + Tile - metal trim - stainless/brass- to 9/16 - High grade LF -$ -$ -$ -$

TIL MTSC + Tile - metal trim - stainless/brass - corner up to 9/16 EA -$ -$ -$ -$

TIL MTSC+ + Tile - metal trim - stainless/br- corner to 9/16- High grd EA -$ -$ -$ -$

TIL NICHE + Additional charge to tile a wall niche EA -$ -$ -$ -$

TIL PL & Plastic tile SF -$ -$ -$ -$

TIL RADMAT + Radiant heat - wire mat SF -$ -$ -$ -$

TIL SDISH & Tile - soap dish EA -$ -$ -$ -$

TIL SDISH+ & Tile - soap dish - High grade EA -$ -$ -$ -$

TIL SEALG + Seal grout on tile wall SF -$ -$ -$ -$

TIL SEALS + Tile/stone sealer SF -$ -$ -$ -$

TIL SIL4 & Window sill - tile on 2" x 4" wall LF -$ -$ -$ -$

TIL SIL6 & Window sill - tile on 2" x 6" wall LF -$ -$ -$ -$

Page 150: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

TIL SILRE + Window sill - tile - regrout LF -$ -$ -$ -$

TIL SLATE & Slate tile SF -$ -$ -$ -$

TIL SLATE- & Slate tile - Standard grade SF -$ -$ -$ -$

TIL SLATE+ & Slate tile - High grade SF -$ -$ -$ -$

TIL SLATE++ & Slate tile - Premium grade SF -$ -$ -$ -$

TIL SWR & Tile shower - 61 to 100 SF EA -$ -$ -$ -$

TIL SWR+ & Tile shower - 61 to 100 SF - High grade EA -$ -$ -$ -$

TIL SWR< & Tile shower - up to 60 SF EA -$ -$ -$ -$

TIL SWR<+ & Tile shower - up to 60 SF - High grade EA -$ -$ -$ -$

TIL SWR> & Tile shower - 101 to 120 SF EA -$ -$ -$ -$

TIL SWR>+ & Tile shower - 101 to 120 SF - High grade EA -$ -$ -$ -$

TIL SWR>> & Tile shower - 121 to 150 SF EA -$ -$ -$ -$

TIL SWR»+ & Tile shower - 121 to 150 SF - High grade EA -$ -$ -$ -$

TIL SWRCC & Tile concrete shower curb - per LF LF -$ -$ -$ -$

TIL SWRCF & Tile framed shower curb - per LF LF -$ -$ -$ -$

TIL SWRPB & Polystyrene shower floor base SF -$ -$ -$ -$

TIL SWRPC & Polystyrene shower curb - per LF LF -$ -$ -$ -$

TIL SWRPM + Waterproof membrane - tile underlayment SF -$ -$ -$ -$

TIL SWRPMD & Shower drain - for use with waterproof membrane EA -$ -$ -$ -$

TIL SWRRE + Tile shower - regrout EA -$ -$ -$ -$

TIL TBAR & Tile - towel bar EA -$ -$ -$ -$

TIL TBAR+ & Tile - towel bar - High grade EA -$ -$ -$ -$

TIL TP & Tile - toilet paper holder EA -$ -$ -$ -$

TIL TP+ & Tile - toilet paper holder - High grade EA -$ -$ -$ -$

TIL TRAY & Travertine tile SF -$ -$ -$ -$

TIL TRAY- & Travertine tile - Standard grade SF -$ -$ -$ -$

TIL TRAV+ & Travertine tile - High grade SF -$ -$ -$ -$

TIL TRAV++ & Travertine tile - Premium grade SF -$ -$ -$ -$

TIL TUB & Tile tub surround - up to 60 SF EA -$ -$ -$ -$

TIL TUB+ & Tile tub surround - up to 60 SF - High grade EA -$ -$ -$ -$

TIL TUB> & Tile tub surround - 60 to 75 SF EA -$ -$ -$ -$

TIL TUB>+ & Tile tub surround - 60 to 75 SF - High grade EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

TMB BIDITM + Timber Framing (Bid Item) EA -$ -$ -$ -$

TMB BM6X10 & Timber beam, 6x10 LF -$ -$ -$ -$

TMB BM6X8 & Timber beam, 6x8 LF -$ -$ -$ -$

TMB BM8X10 & Timber beam, 8x10 LF -$ -$ -$ -$

TMB BM8X12 & Timber beam, 8x12 LF -$ -$ -$ -$

TMB BM8X14 & Timber beam, 8x14 LF -$ -$ -$ -$

TMB BM8X16 & Timber beam, 8x16 LF -$ -$ -$ -$

TMB GD10X16 & Timber girder, 10x16 LF -$ -$ -$ -$

TMB GD12X12 & Timber girder, 12x12 LF -$ -$ -$ -$

TMB J4X10 & Timber joist, 4x10 LF -$ -$ -$ -$

TMB J4X12 & Timber joist, 4x12 LF -$ -$ -$ -$

TMB LAB + Timber Framing Carpenter - per hour HR -$ -$ -$ -$

TMB LABL + Timber Framing - General Laborer - per hour HR -$ -$ -$ -$

TMB LC1 & Log - chinking - 1" joint LF -$ -$ -$ -$

TMB LC1/2 & Log - chinking - 1/2" joint LF -$ -$ -$ -$

TMB LC2 & Log - chinking - 2" joint LF -$ -$ -$ -$

TMB LD10X10 & Log - exterior wall - D shape - 10" x 10" SF -$ -$ -$ -$

TMB LD6X8 & Log - exterior wall - D shape - 6" x 8" SF -$ -$ -$ -$

TMB LD8X8 & Log - exterior wall - D shape - 8" x 8" SF -$ -$ -$ -$

TMB LOGH + Manufactured log home kit - 6" or 7" logs - per SF SF -$ -$ -$ -$

TMB LOGH> + Manufactured log home kit - 8" or 9" logs - per SF SF -$ -$ -$ -$

TMB LOGH» + Manufactured log home kit - 10" to 12" logs - per SF SF -$ -$ -$ -$

TMB LR10 & Log - exterior wall - round peeled tapered - 10" SF -$ -$ -$ -$

TMB LR12 & Log - exterior wall - round peeled tapered - 12" SF -$ -$ -$ -$

TMB LR13 & Log - exterior wall - round peeled tapered - 13" SF -$ -$ -$ -$

TMB LR14 & Log - exterior wall - round peeled tapered - 14" SF -$ -$ -$ -$

TMB LR7 & Log - exterior wall - round peeled tapered - 7" SF -$ -$ -$ -$

TMB LR8 & Log - exterior wall - round peeled tapered - 8" SF -$ -$ -$ -$

TMB LR9 & Log - exterior wall - round peeled tapered - 9" SF -$ -$ -$ -$

Page 151: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

TMB LSC10 & Log - exterior wall - Swedish cope - 10" SF -$ -$ -$ -$

TMB LSC12 & Log - exterior wall - Swedish cope - 12" SF -$ -$ -$ -$

TMB LSC7 & Log - exterior wall - Swedish cope - 7" SF -$ -$ -$ -$

TMB LSC8 & Log - exterior wall - Swedish cope - 8" SF -$ -$ -$ -$

TMB LSC9 & Log - exterior wall - Swedish cope - 9" SF -$ -$ -$ -$

TMB LTSS + Log - chemical treatment - stain and seal SF -$ -$ -$ -$

TMB MN + Timber Framing - Labor Minimum EA -$ -$ -$ -$

TMB MNRP + Timber Framing Repair - Min. Charge - Labor and Material EA -$ -$ -$ -$

TMB P10X10 + Timber pile - elevated - 10" x 10" LF -$ -$ -$ -$

TMB P8X8 + Timber pile - elevated - 8" x 8" LF -$ -$ -$ -$

TMB PE10 + Timber pile - elevated - 10" LF -$ -$ -$ -$

TMB PE12 + Timber pile - elevated - 12" LF -$ -$ -$ -$

TMB PE14 + Timber pile - elevated - 14" LF -$ -$ -$ -$

TMB PL10 + Timber pile - grade level - 10" LF -$ -$ -$ -$

TMB PL12 + Timber pile - grade level - 12" LF -$ -$ -$ -$

TMB PL14 + Timber pile - grade level - 14" LF -$ -$ -$ -$

TMB PL8 + Timber pile - grade level - 8" LF -$ -$ -$ -$

TMB PLM + Timber pile - equipment mobilization (Bid Item) EA -$ -$ -$ -$

TMB PLT + Timber pile - point or boot EA -$ -$ -$ -$

TMB PRL2X6 & Purlin/girt, 2x6 LF -$ -$ -$ -$

TMB PRL2X6T & Purlin/girt, 2x6 - treated LF -$ -$ -$ -$

TMB PRL2X8 & Purlin/girt, 2x8 LF -$ -$ -$ -$

TMB PRL4X6 & Purlin/girt, 4x6 LF -$ -$ -$ -$

TMB PRL4X8 & Purlin/girt, 4x8 LF -$ -$ -$ -$

TMB PST10 & Timber post, 10x10 LF -$ -$ -$ -$

TMB PST12 & Timber post, 12x12 LF -$ -$ -$ -$

TMB PST6 & Timber post, 6x6 LF -$ -$ -$ -$

TMB PST6X8T & Timber post, 6x8 - treated LF -$ -$ -$ -$

TMB PST8 & Timber post, 8x8 LF -$ -$ -$ -$

TMB RL & Log handrails LF -$ -$ -$ -$

TMB RLB & Log baluster EA -$ -$ -$ -$

TMB RLBAL & Log balustrade LF -$ -$ -$ -$

TMB RLPST & Log post LF -$ -$ -$ -$

TMB TAE + Additional cost for timber embellishments LF -$ -$ -$ -$

TMB TAM + Additional cost for arched timber members LF -$ -$ -$ -$

TMB TFJ + Timber joint - moderate difficulty EA -$ -$ -$ -$

TMB TFJ- + Timber joint - simple EA -$ -$ -$ -$

TMB TFJ+ + Timber joint - difficult EA -$ -$ -$ -$

TMB TFKB & Timber frame knee brace EA -$ -$ -$ -$

TMB TFKB+ & Timber frame knee brace - Decorative EA -$ -$ -$ -$

TMB TFSH + Timber structural/decorative hardware EA -$ -$ -$ -$

TMB TH1010 & Timber truss - 10x10, 10/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH1012 & Timber truss - 10x10, 12/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH106 & Timber truss - 10x10, 6/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH108 & Timber truss - 10x10, 8/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH1210 & Timber truss - 12x12, 10/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH1212 & Timber truss - 12x12, 12/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH126 & Timber truss - 12x12, 6/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH128 & Timber truss - 12x12, 8/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH810 & Timber truss - 8x8, 10/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH812 & Timber truss - 8x8, 12/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH86 & Timber truss - 8x8, 6/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TH88 & Timber truss - 8x8, 8/12 pitch - Hammer beam LF -$ -$ -$ -$

TMB TK1010 & Timber truss - 10x10, 10/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK1012 & Timber truss - 10x10, 12/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK106 & Timber truss - 10x10, 6/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK108 & Timber truss - 10x10, 8/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK1210 & Timber truss - 12x12, 10/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK1212 & Timber truss - 12x12, 12/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK126 & Timber truss - 12x12, 6/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK128 & Timber truss - 12x12, 8/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK810 & Timber truss - 8x8, 10/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK812 & Timber truss - 8x8, 12/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK86 & Timber truss - 8x8, 6/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

TMB TK88 & Timber truss - 8x8, 8/12 pitch - King/Queen/Scissor LF -$ -$ -$ -$

Page 152: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

TMP BIDITM + Temporary Repairs (Bid Item) EA -$ -$ -$ -$

TMP BUP & Board-up windows and doors SF -$ -$ -$ -$

TMP BUPA & Board-up windows and doors - after hours SF -$ -$ -$ -$

TMP BUPP & Board-up windows and doors - polycarbonate SF -$ -$ -$ -$

TMP BUPPA & Board-up windows and doors - polycarbonate - after hours SF -$ -$ -$ -$

TMP BUPR & Board-up roof penetrations SF -$ -$ -$ -$

TMP BUPRA & Board-up roof penetrations - after hours SF -$ -$ -$ -$

TMP BWSU + Barricade and warning device - setup and takedown HR -$ -$ -$ -$

TMP CT + Caution tape LF -$ -$ -$ -$

TMP ESRV + Emergency service call - after business hours EA -$ -$ -$ -$

TMP ESRVD + Emergency service call - during business hours EA -$ -$ -$ -$

TMP FB + Flasher barricade (per day) DA -$ -$ -$ -$

TMP FBMN + Barricade/warning sign/traffic cone - Min. equip. charge EA -$ -$ -$ -$

TMP FEN & Temporary fencing LF -$ -$ -$ -$

TMP GEN + Generator - 6,000 watt - portable (per day) DA -$ -$ -$ -$

TMP GEN10 + Generator - 10-30KW (per day - 8 hour) - no monitoring DA -$ -$ -$ -$

TMP GEN1OT + Generator - 10-30KW (per day - 24 hour) - no monitoring DA -$ -$ -$ -$

TMP GEN1OW + Generator - 10-30KW (per week - 8 hour) - no monitoring WK -$ -$ -$ -$

TMP GEN1OWT + Generator - 10-30KW (per week - 24 hour) - no monitoring WK -$ -$ -$ -$

TMP GEN50 + Generator - 35-90KW (per day - 8 hour) - no monitoring DA -$ -$ -$ -$

TMP GEN5OT + Generator - 35-90KW (per day - 24 hour) - no monitoring DA -$ -$ -$ -$

TMP GEN5OW + Generator - 35-90KW (per week - 8 hour) - no monitoring WK -$ -$ -$ -$

TMP GEN5OWT + Generator - 35-90KW (per week - 24 hour) - no monitoring WK -$ -$ -$ -$

TMP GENC + Generator temporary power cable (per day) DA -$ -$ -$ -$

TMP GENCW + Generator temporary power cable (per week) WK -$ -$ -$ -$

TMP GENERTR + Generator - 10,000 watt - portable (per month) MO -$ -$ -$ -$

TMP GENPB + Power distribution box (per day) DA -$ -$ -$ -$

TMP GENPBW + Power distribution box (per week) WK -$ -$ -$ -$

TMP GN100 + Generator - 100-160KW (per day - 8 hour) - no monitoring DA -$ -$ -$ -$

TMP GN100T + Generator - 100-160KW (per day - 24 hour) - no DA -$ -$ -$ -$

monitoring

TMP GN100W + Generator - 100-160KW (per week - 8 hour) - no WK -$ -$ -$ -$

monitoring

TMP GN100WT + Generator - 100-160KW (per week - 24 hour) - no WK -$ -$ -$ -$

monitoring

TMP GN175 + Generator - 175-250KW (per day - 8 hour) - no monitoring DA -$ -$ -$ -$

TMP GN175T + Generator - 175-250KW (per day - 24 hour) - no DA -$ -$ -$ -$

monitoring

TMP GN175W + Generator - 175-250KW (per week - 8 hour) - no WK -$ -$ -$ -$

monitoring

TMP GN175WT + Generator - 175-250KW (per week - 24 hour) - no WK -$ -$ -$ -$

monitoring

TMP GN300 + Generator - 300-400KW (per day - 8 hour) - no monitoring DA -$ -$ -$ -$

TMP GN300T + Generator - 300-400KW (per day - 24 hour) - no DA -$ -$ -$ -$

monitoring

TMP GN300W + Generator - 300-400KW (per week - 8 hour) - no WK -$ -$ -$ -$

monitoring

TMP GN300WT + Generator - 300-400KW (per week - 24 hour) - no WK -$ -$ -$ -$

monitoring

TMP GN600 + Generator - 410-650KW (per day - 8 hour) - no monitoring DA -$ -$ -$ -$

TMP GN600T + Generator - 410-650KW (per day - 24 hour) - no DA -$ -$ -$ -$

monitoring

TMP GN600W + Generator - 410-650KW (per week - 8 hour) - no WK -$ -$ -$ -$

monitoring

TMP GN600WT + Generator - 410-650KW (per week - 24 hour) - no WK -$ -$ -$ -$

monitoring

TMP HEAT + Temporary heat - usage - per month - Commercial MO -$ -$ -$ -$

TMP HEAT> + Temporary heat - usage - per month - Commercial - L MO -$ -$ -$ -$

TMP HEAT» + Temporary heat - usage - per month - Commercial XL MO -$ -$ -$ -$

TMP HEATRE + Temporary heater - electric - per day DA -$ -$ -$ -$

TMP HEATREW + Temporary heater - electric - per week WK -$ -$ -$ -$

Page 153: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

TMP HEATRP + Temporary heater - propane - per day DA -$ -$ -$ -$

TMP HEATRPW + Temporary heater - propane - per week WK -$ -$ -$ -$

TMP LAB + Temporary Repairs - per hour HR -$ -$ -$ -$

TMP LABA + Temporary Repairs - per hour - after hours HR -$ -$ -$ -$

TMP LABL + Temporary Repairs - General Laborer - per hour HR -$ -$ -$ -$

TMP LABLA + Temporary Repairs - General Laborer - per hour - after hrs HR -$ -$ -$ -$

TMP MN + Temporary Repair & Services - Labor Minimum EA -$ -$ -$ -$

TMP MNRP + Temporary Repair & Services - Min. Charge - Lab. and EA -$ -$ -$ -$

Mat.

TMP OFF + Temporary construction office - portable (trailer) MO -$ -$ -$ -$

TMP PADH + Padlock and hasp EA -$ -$ -$ -$

TMP POW + Temporary power usage (per month) MO -$ -$ -$ -$

TMP POWC + Temporary power usage (per month) - Commercial MO -$ -$ -$ -$

TMP POWHU & Temporary power - hookup EA -$ -$ -$ -$

TMP POWOHU & Temporary power - overhead hookup EA -$ -$ -$ -$

TMP TARP & Tarp - all-purpose poly - per sq ft (labor and material) SF -$ -$ -$ -$

TMP TARPA + Tarp - all-purpose poly - per sq ft (lab/mat) - after hrs SF -$ -$ -$ -$

TMP TC + Traffic cones (per unit, per day) DA -$ -$ -$ -$

TMP TLT + Temporary toilet (per month) MO -$ -$ -$ -$

TMP TLTMN + Temporary toilet - Minimum rental charge EA -$ -$ -$ -$

TMP WS + Warning sign, 4' x 4' on a 6' post (per day) DA -$ -$ -$ -$

TMP WTHR + Temporary weatherproofing (Bid Item) EA -$ -$ -$ -$

TMP WTRC + Temporary water - usage - per month - Commercial MO -$ -$ -$ -$

TMP WTRHU + Temporary water - hookup fee - Commercial EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

WDA ALRS + Aluminum window - Detach & reset EA -$ -$ -$ -$

WDA AV & Aluminum window, horiz. slider 12-23 sf EA -$ -$ -$ -$

WDA AV+ & Aluminum window, horiz. slider 12-23 sf (2 pane) EA -$ -$ -$ -$

WDA AV++ & Aluminum window, horiz. slider 12-23 sf (2 pane EA -$ -$ -$ -$

w/thermal)

WDA AV< & Aluminum window, horiz. slider 3-11 sf EA -$ -$ -$ -$

WDA AV<+ & Aluminum window, horiz. slider 3-11 sf (2 pane) EA -$ -$ -$ -$

WDA AV<++ & Aluminum window, horiz. slider 3-11 sf (2 pane w/thermal) EA -$ -$ -$ -$

WDA AV> & Aluminum window, horiz. slider 24-32 sf EA -$ -$ -$ -$

WDA AV>+ & Aluminum window, horiz. slider 24-32 sf (2 pane) EA -$ -$ -$ -$

WDA AV>++ & Aluminum window, horiz. slider 24-32 sf (2 pane EA -$ -$ -$ -$

w/thermal)

WDA AV>> & Aluminum window, horiz. slider 33-40 sf EA -$ -$ -$ -$

WDA AV»+ & Aluminum window, horiz. slider 33-40 sf (2 pane) EA -$ -$ -$ -$

WDA AV>>++ & Aluminum window, horiz. slider 33-40 sf (2 pane EA -$ -$ -$ -$

w/thermal)

WDA AVM & Aluminum window - mobile home, 12-23 sf EA -$ -$ -$ -$

WDA AVM+ & Aluminum window - mobile home, 12-23 sf, double pane EA -$ -$ -$ -$

WDA AVM++ & Aluminum window - mobile home, 12-23 sf, d.p. insulated EA -$ -$ -$ -$

WDA AVM< & Aluminum window - mobile home, 3-11 sf EA -$ -$ -$ -$

WDA AVM<+ & Aluminum window - mobile home, 3-11 sf, double pane EA -$ -$ -$ -$

WDA AVM<++ & Aluminum window - mobile home, 3-11 sf, d.p. insulated EA -$ -$ -$ -$

WDA AVM> & Aluminum window - mobile home, 24-32 sf EA -$ -$ -$ -$

WDA AVM>+ & Aluminum window - mobile home, 24-32 sf, double pane EA -$ -$ -$ -$

WDA AVM>++ & Aluminum window - mobile home, 24-32 sf, d.p. insulated EA -$ -$ -$ -$

WDA AVM>> & Aluminum window - mobile home, 33-40 sf EA -$ -$ -$ -$

WDA AVM>>+ & Aluminum window - mobile home, 33-40 sf, double pane EA -$ -$ -$ -$

WDA AVM>>++ & Aluminum window - mobile home, 33-40 sf, d.p. insulated EA -$ -$ -$ -$

WDA BIDITM + Windows - Aluminum (Bid Item) EA -$ -$ -$ -$

WDA C & Aluminum window - casement, 6-8 sf EA -$ -$ -$ -$

WDA C+ & Aluminum window - casement, 6-8 sf - High grade EA -$ -$ -$ -$

WDA C++ & Aluminum window - casement, 6-8 sf - Premium grade EA -$ -$ -$ -$

WDA C< & Aluminum window - casement, 3-5 sf EA -$ -$ -$ -$

WDA C<+ & Aluminum window - casement, 3-5 sf - High grade EA -$ -$ -$ -$

WDA C<++ & Aluminum window - casement, 3-5 sf - Premium grade EA -$ -$ -$ -$

WDA C> & Aluminum window - casement, 9-13 sf EA -$ -$ -$ -$

WDA C>+ & Aluminum window - casement, 9-13 sf - High grade EA -$ -$ -$ -$

Page 154: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WDA C>++ & Aluminum window - casement, 9-13 sf - Premium grade EA -$ -$ -$ -$

WDA COLOR + Add on for colored frame (i.e., bronze or white) SF -$ -$ -$ -$

WDA GRID + Add on for grid (double or triple glazed windows) SF -$ -$ -$ -$

WDA J & Aluminum window - jalousie, 12-23 sf EA -$ -$ -$ -$

WDA J< & Aluminum window - jalousie, 3-11 sf EA -$ -$ -$ -$

WDA J> & Aluminum window - jalousie, 24-32 sf EA -$ -$ -$ -$

WDA J>> & Aluminum window - jalousie, 33-40 sf EA -$ -$ -$ -$

WDA LAB + Window Installer - per hour HR -$ -$ -$ -$

WDA LABL + Window - General Laborer - per hour HR -$ -$ -$ -$

WDA LAMIR + Add on for impact resistant laminated glass SF -$ -$ -$ -$

WDA LOWE + Add on for "Low E" glass SF -$ -$ -$ -$

WDA MN + Aluminum Window - Labor Minimum EA -$ -$ -$ -$

WDA MULL + Additional charge for aluminum window mullion - per LF LF -$ -$ -$ -$

WDA OBS + Add on for obscure glass SF -$ -$ -$ -$

WDA P & Aluminum window, picture/fixed 12-23 sf EA -$ -$ -$ -$

WDA P+ & Aluminum window, picture/fixed 12-23 sf (2 pane) EA -$ -$ -$ -$

WDA P++ & Aluminum window, picture/fixed 12-23 sf (2 pane EA -$ -$ -$ -$

w/thermal)

WDA P< & Aluminum window, picture/fixed 3-11 sf EA -$ -$ -$ -$

WDA P<+ & Aluminum window, picture/fixed 3-11 sf (2 pane) EA -$ -$ -$ -$

WDA P<++ & Aluminum window, picture/fixed 3-11 sf (2 pane EA -$ -$ -$ -$

w/thermal)

WDA P> & Aluminum window, picture/fixed 24-32 sf EA -$ -$ -$ -$

WDA P>+ & Aluminum window, picture/fixed 24-32 sf (2 pane) EA -$ -$ -$ -$

WDA P>++ & Aluminum window, picture/fixed 24-32 sf (2 pane EA -$ -$ -$ -$

w/thermal)

WDA P>> & Aluminum window, picture/fixed 33-40 sf EA -$ -$ -$ -$

WDA P»+ & Aluminum window, picture/fixed 33-40 sf (2 pane) EA -$ -$ -$ -$

WDA P>>++ & Aluminum window, picture/fixed 33-40 sf (2 pane EA -$ -$ -$ -$

w/thermal)

WDA REFL + Add on for one-way/reflective glass SF -$ -$ -$ -$

WDA RETR+ + Add. charge for a retrofit window, 3-11 sf - difficult EA -$ -$ -$ -$

WDA RETR>+ + Add. charge for a retrofit window, 12-23 sf - difficult EA -$ -$ -$ -$

WDA RETR»+ + Add. charge for a retrofit window, 24-40 sf - difficult EA -$ -$ -$ -$

WDA RETRO + Additional charge for a retrofit window, 3-11 sf EA -$ -$ -$ -$

WDA RETRO> + Additional charge for a retrofit window, 12-23 sf EA -$ -$ -$ -$

WDA RETRO>> + Additional charge for a retrofit window, 24-40 sf EA -$ -$ -$ -$

WDA S & Aluminum window, single hung 9-12 sf EA -$ -$ -$ -$

WDA S+ & Aluminum window, single hung 9-12 sf (2 pane) EA -$ -$ -$ -$

WDA S++ & Aluminum window, single hung 9-12 sf (2 pane w/thermal) EA -$ -$ -$ -$

WDA S< & Aluminum window, single hung 4-8 sf EA -$ -$ -$ -$

WDA S<+ & Aluminum window, single hung 4-8 sf (2 pane) EA -$ -$ -$ -$

WDA S<++ & Aluminum window, single hung 4-8 sf (2 pane w/thermal) EA -$ -$ -$ -$

WDA S> & Aluminum window, single hung 13-19 sf EA -$ -$ -$ -$

WDA S>+ & Aluminum window, single hung 13-19 sf (2 pane) EA -$ -$ -$ -$

WDA S>++ & Aluminum window, single hung 13-19 sf (2 pane EA -$ -$ -$ -$

w/thermal)

WDA S» & Aluminum window, single hung 20-28 sf EA -$ -$ -$ -$

WDA S»+ & Aluminum window, single hung 20-28 sf (2 pane) EA -$ -$ -$ -$

WDA S>>++ & Aluminum window, single hung 20-28 sf (2 pane EA -$ -$ -$ -$

w/thermal)

WDA SPAL & Specialty aluminum window unit EA -$ -$ -$ -$

WDA SPAL< & Specialty aluminum window unit - Small EA -$ -$ -$ -$

WDA SPAL> & Specialty aluminum window unit - Large EA -$ -$ -$ -$

WDA SPAL>> & Specialty aluminum window unit - Extra large EA -$ -$ -$ -$

WDA SPALRS + Specialty aluminum window unit - Detach & reset EA -$ -$ -$ -$

WDA STRMM & Storm window - mobile home, 12-24 sf EA -$ -$ -$ -$

WDA STRMM< & Storm window - mobile home, 3-11 sf EA -$ -$ -$ -$

WDA STRMM> & Storm window - mobile home, 25-32 sf EA -$ -$ -$ -$

WDA STRMM>> & Storm window - mobile home, 33-40 sf EA -$ -$ -$ -$

WDA STRMW & Storm window - aluminum, 12-24 sf EA -$ -$ -$ -$

WDA STRMW< & Storm window - aluminum, 3-11 sf EA -$ -$ -$ -$

WDA STRMW> & Storm window - aluminum, 25-32 sf EA -$ -$ -$ -$

WDA STRMW>> & Storm window - aluminum, 33-40 sf EA -$ -$ -$ -$

WDA STRMWRS + Storm window - Detach & reset EA -$ -$ -$ -$

Page 155: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WDA TEMP + Add on for tempered glass - per pane SF -$ -$ -$ -$

WDA TINT + Add on for tinted glass SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

WDP 10A & 10-0 6-8 alum. sliding patio door - anodized EA -$ -$ -$ -$

WDP 10A+ & 10-0 6-8 alum. sliding patio door - anodized - High grade EA -$ -$ -$ -$

WDP 10A8 & 10-0 8-0 alum. sliding patio door - anodized EA -$ -$ -$ -$

WDP 10A8+ & 10-0 8-0 alum. sliding patio door - anodized - High grade EA -$ -$ -$ -$

WDP 10F & 10-0 6-8 fiberglass sliding patio door EA -$ -$ -$ -$

WDP 10F+ & 10-0 6-8 fiberglass sliding patio door - High grade EA -$ -$ -$ -$

WDP 10F8 & 10-0 8-0 fiberglass sliding patio door EA -$ -$ -$ -$

WDP 10F8+ & 10-0 8-0 fiberglass sliding patio door - High grade EA -$ -$ -$ -$

WDP 10V & 10-0 6-8 vinyl sliding patio door EA -$ -$ -$ -$

WDP 10V+ & 10-0 6-8 vinyl sliding patio door - High grade EA -$ -$ -$ -$

WDP 10V8 & 10-0 8-0 vinyl sliding patio door EA -$ -$ -$ -$

WDP 10V8+ & 10-0 8-0 vinyl sliding patio door - High grade EA -$ -$ -$ -$

WDP 10WD & 10-0 6-8 wood sliding patio door - exterior cladding EA -$ -$ -$ -$

WDP lOWD+ & 10-0 6-8 wood sliding patio door - ext. clad. - High grade EA -$ -$ -$ -$

WDP lOWD8 & 10-0 8-0 wood sliding patio door - exterior cladding EA -$ -$ -$ -$

WDP 1OWD8+ & 10-0 8-0 wood sliding patio door - ext. clad. - High grade EA -$ -$ -$ -$

WDP 12A & 12-0 6-8 alum. sliding patio door - anodized EA -$ -$ -$ -$

WDP 12A+ & 12-0 6-8 alum. sliding patio door - anodized - High grade EA -$ -$ -$ -$

WDP 12A8 & 12-0 8-0 alum. sliding patio door - anodized EA -$ -$ -$ -$

WDP 12A8+ & 12-0 8-0 alum. sliding patio door - anodized - High grade EA -$ -$ -$ -$

WDP 12F & 12-0 6-8 fiberglass sliding patio door EA -$ -$ -$ -$

WDP 12F+ & 12-0 6-8 fiberglass sliding patio door - High grade EA -$ -$ -$ -$

WDP 12F8 & 12-0 8-0 fiberglass sliding patio door EA -$ -$ -$ -$

WDP 12F8+ & 12-0 8-0 fiberglass sliding patio door - High grade EA -$ -$ -$ -$

WDP 12V & 12-0 6-8 vinyl sliding patio door EA -$ -$ -$ -$

WDP 12V+ & 12-0 6-8 vinyl sliding patio door - High grade EA -$ -$ -$ -$

WDP 12V8 & 12-0 8-0 vinyl sliding patio door EA -$ -$ -$ -$

WDP 12V8+ & 12-0 8-0 vinyl sliding patio door - High grade EA -$ -$ -$ -$

WDP 12WD & 12-0 6-8 wood sliding patio door - exterior cladding EA -$ -$ -$ -$

WDP 12WD+ & 12-0 6-8 wood sliding patio door - ext. clad. - High grade EA -$ -$ -$ -$

WDP 12WD8 & 12-0 8-0 wood sliding patio door - exterior cladding EA -$ -$ -$ -$

WDP 12WD8+ & 12-0 8-0 wood sliding patio door - ext. clad. - High grade EA -$ -$ -$ -$

WDP 5A & 5-0 6-8 alum. sliding patio door - anodized EA -$ -$ -$ -$

WDP 5A+ & 5-0 6-8 alum. sliding patio door - anodized - High grade EA -$ -$ -$ -$

WDP 5A8 & 5-0 8-0 alum. sliding patio door - anodized EA -$ -$ -$ -$

WDP 5A8+ & 5-0 8-0 alum. sliding patio door - anodized - High grade EA -$ -$ -$ -$

WDP 5CM & 5-0 6-8 patio door - colored frame - mobile home EA -$ -$ -$ -$

WDP 5CM+ & 5-0 6-8 patio door -colored frm-d.p.insulated -mobile home EA -$ -$ -$ -$

WDP 5F & 5-0 6-8 fiberglass sliding patio door EA -$ -$ -$ -$

WDP 5F+ & 5-0 6-8 fiberglass sliding patio door - High grade EA -$ -$ -$ -$

WDP 5F8 & 5-0 8-0 fiberglass sliding patio door EA -$ -$ -$ -$

WDP 5F8+ & 5-0 8-0 fiberglass sliding patio door - High grade EA -$ -$ -$ -$

WDP 5MM & 5-0 6-8 patio door - mill finish - mobile home EA -$ -$ -$ -$

WDP 5MM+ & 5-0 6-8 patio door -mill finish-d.p insulated -mobile home EA -$ -$ -$ -$

WDP 5V & 5-0 6-8 vinyl sliding patio door EA -$ -$ -$ -$

WDP 5V+ & 5-0 6-8 vinyl sliding patio door - High grade EA -$ -$ -$ -$

WDP 5V8 & 5-0 8-0 vinyl sliding patio door EA -$ -$ -$ -$

WDP 5V8+ & 5-0 8-0 vinyl sliding patio door - High grade EA -$ -$ -$ -$

WDP 5WD & 5-0 6-8 wood sliding patio door - exterior cladding EA -$ -$ -$ -$

WDP 5WD+ & 5-0 6-8 wood sliding patio door - w/ext. clad - High grade EA -$ -$ -$ -$

WDP 5WD8 & 5-0 8-0 wood sliding patio door - exterior cladding EA -$ -$ -$ -$

WDP 5WD8+ & 5-0 8-0 wood sliding patio door - w/ext. clad - High grade EA -$ -$ -$ -$

WDP 6A & 6-0 6-8 alum. sliding patio door - anodized EA -$ -$ -$ -$

WDP 6A+ & 6-0 6-8 alum. sliding patio door - anodized - High grade EA -$ -$ -$ -$

WDP 6A8 & 6-0 8-0 alum. sliding patio door - anodized EA -$ -$ -$ -$

WDP 6A8+ & 6-0 8-0 alum. sliding patio door - anodized - High grade EA -$ -$ -$ -$

WDP 6B & 6-0 6-8 bronze sliding patio door EA -$ -$ -$ -$

WDP 6B2 & 6-0 6-8 bronze sliding patio door insulated (2 panes) EA -$ -$ -$ -$

WDP 6F & 6-0 6-8 fiberglass sliding patio door EA -$ -$ -$ -$

Page 156: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WDP 6F+ & 6-0 6-8 fiberglass sliding patio door - High grade EA -$ -$ -$ -$

WDP 6F8 & 6-0 8-0 fiberglass sliding patio door EA -$ -$ -$ -$

WDP 6F8+ & 6-0 8-0 fiberglass sliding patio door - High grade EA -$ -$ -$ -$

WDP 6M & 6-0 6-8 mill finish sliding patio door EA -$ -$ -$ -$

WDP 6M2 & 6-0 6-8 mill finish sliding patio door insulated (2 panes) EA -$ -$ -$ -$

WDP 6V & 6-0 6-8 vinyl sliding patio door EA -$ -$ -$ -$

WDP 6V+ & 6-0 6-8 vinyl sliding patio door - High grade EA -$ -$ -$ -$

WDP 6V8 & 6-0 8-0 vinyl sliding patio door EA -$ -$ -$ -$

WDP 6V8+ & 6-0 8-0 vinyl sliding patio door - High grade EA -$ -$ -$ -$

WDP 6WD & 6-0 6-8 wood sliding patio door - exterior cladding EA -$ -$ -$ -$

WDP 6WD+ & 6-0 6-8 wood sliding patio door - ext. clad - High grade EA -$ -$ -$ -$

WDP 6WD8 & 6-0 8-0 wood sliding patio door - exterior cladding EA -$ -$ -$ -$

WDP 6WD8+ & 6-0 8-0 wood sliding patio door - w/ext. clad - High grade EA -$ -$ -$ -$

WDP 8A & 8-0 6-8 alum. sliding patio door - anodized EA -$ -$ -$ -$

WDP 8A+ & 8-0 6-8 alum. sliding patio door - anodized - High grade EA -$ -$ -$ -$

WDP 8A8 & 8-0 8-0 alum. sliding patio door - anodized EA -$ -$ -$ -$

WDP 8A8+ & 8-0 8-0 alum. sliding patio door - anodized - High grade EA -$ -$ -$ -$

WDP 8B & 8-0 6-8 bronze sliding patio door EA -$ -$ -$ -$

WDP 8B2 & 8-0 6-8 bronze sliding patio door insulated (2 panes) EA -$ -$ -$ -$

WDP 8F & 8-0 6-8 fiberglass sliding patio door EA -$ -$ -$ -$

WDP 8F+ & 8-0 6-8 fiberglass sliding patio door - High grade EA -$ -$ -$ -$

WDP 8F8 & 8-0 8-0 fiberglass sliding patio door EA -$ -$ -$ -$

WDP 8F8+ & 8-0 8-0 fiberglass sliding patio door - High grade EA -$ -$ -$ -$

WDP 8M & 8-0 6-8 mill finish sliding patio door EA -$ -$ -$ -$

WDP 8M2 & 8-0 6-8 mill finish sliding patio door insulated (2 panes) EA -$ -$ -$ -$

WDP 8V & 8-0 6-8 vinyl sliding patio door EA -$ -$ -$ -$

WDP 8V+ & 8-0 6-8 vinyl sliding patio door - High grade EA -$ -$ -$ -$

WDP 8V8 & 8-0 8-0 vinyl sliding patio door EA -$ -$ -$ -$

WDP 8V8+ & 8-0 8-0 vinyl sliding patio door - High grade EA -$ -$ -$ -$

WDP 8WD & 8-0 6-8 wood sliding patio door - exterior cladding EA -$ -$ -$ -$

WDP 8WD+ & 8-0 6-8 wood sliding patio door - ext. clad - High grade EA -$ -$ -$ -$

WDP 8WD8 & 8-0 8-0 wood sliding patio door - exterior cladding EA -$ -$ -$ -$

WDP 8WD8+ & 8-0 8-0 wood sliding patio door - w/ext. clad - High grade EA -$ -$ -$ -$

WDP AV>RS + Sliding patio door - Large - Detach & reset EA -$ -$ -$ -$

WDP AVRS + Sliding patio door - Detach & reset EA -$ -$ -$ -$

WDP BIDITM + Windows - Sliding Patio Doors (Bid Item) EA -$ -$ -$ -$

WDP GRID + Add on for grid (double or triple glazed) SF -$ -$ -$ -$

WDP LAB + Patio Door Installer - per hour HR -$ -$ -$ -$

WDP LABL + Patio Door - General Laborer - per hour HR -$ -$ -$ -$

WDP LAMIR + Add on for impact resistant laminated glass SF -$ -$ -$ -$

WDP LOWE + Add on for "Low E" glass SF -$ -$ -$ -$

WDP MN + Patio Door - Labor Minimum EA -$ -$ -$ -$

WDP OBS + Add on for obscure glass SF -$ -$ -$ -$

WDP REFL + Add on for one-way/reflective glass SF -$ -$ -$ -$

WDP RETROSL & Additional charge for a retrofit sliding door EA -$ -$ -$ -$

WDP SCRN36 & Patio door screen, 36" wide EA -$ -$ -$ -$

WDP SCRN48 & Patio door screen, 48" wide EA -$ -$ -$ -$

WDP SCRNM & Replacement patio screen door - mobile home EA -$ -$ -$ -$

WDP TINT + Add on for tinted glass SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

WDR 1/4 + Reglaze 1/4" annealed/float glass - 40 sf maximum SF -$ -$ -$ -$

WDR 1/4L + Reglaze 1/4" - 5/16" laminated glass - 40 sf maximum SF -$ -$ -$ -$

WDR 1/4T + Reglaze 1/4" tempered glass - 40 sf maximum SF -$ -$ -$ -$

WDR 1/4W + Reglaze 1/4" polished wire glass - 40 sf maximum SF -$ -$ -$ -$

WDR 1/8 + Reglaze 1/8" annealed/float glass - 40 sf maximum SF -$ -$ -$ -$

WDR 1/8T + Reglaze 1/8" tempered glass - 40 sf maximum SF -$ -$ -$ -$

WDR 3/16 + Reglaze 3/16" annealed/float glass - 40 sf maximum SF -$ -$ -$ -$

WDR 3/16T + Reglaze 3/16" tempered glass - 40 sf maximum SF -$ -$ -$ -$

WDR 3/8 + Reglaze 3/8" annealed/float glass - 40 sf maximum SF -$ -$ -$ -$

WDR BIDITM + Window Reglazing & Repair (Bid Item) EA -$ -$ -$ -$

WDR CLAD & Window cladding - preformed aluminum LF -$ -$ -$ -$

WDR CLADS & Skylight cladding - preformed aluminum LF -$ -$ -$ -$

Page 157: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WDR GBA & Glazing bead - Aluminum LF -$ -$ -$ -$

WDR GBV & Glazing bead - Vinyl LF -$ -$ -$ -$

WDR GLAZ + Reglaze window, 10 - 16 sf EA -$ -$ -$ -$

WDR GLAZ< + Reglaze window, 1 - 9 sf EA -$ -$ -$ -$

WDR GLAZ> + Reglaze window, 17 - 24 sf EA -$ -$ -$ -$

WDR GLAZ>> + Reglaze window, 25 - 30 sf EA -$ -$ -$ -$

WDR GLAZ2 + Reglaze double-pane thermal window unit, 10 - 16 sf EA -$ -$ -$ -$

WDR GLAZ2< + Reglaze double-pane thermal window unit, 1 - 9 sf EA -$ -$ -$ -$

WDR GLAZ2> + Reglaze double-pane thermal window unit, 17 - 24 sf EA -$ -$ -$ -$

WDR GLAZ2» + Reglaze double-pane thermal window unit, 25 - 30 sf EA -$ -$ -$ -$

WDR GRID + Add on for grid (double or triple pane windows) SF -$ -$ -$ -$

WDR HRGRID + Add on for grid in half round window - per window unit EA -$ -$ -$ -$

WDR LAB + Window Glazing/Repair - per hour HR -$ -$ -$ -$

WDR LABL + Window Glazing - General Laborer - per hour HR -$ -$ -$ -$

WDR LAMIR + Add on for impact resistant laminated glass SF -$ -$ -$ -$

WDR LOWE + Add on for "Low E" glass SF -$ -$ -$ -$

WDR MN + Window Reglazing/Repair - Labor Minimum EA -$ -$ -$ -$

WDR OBS + Add on for obscure glass SF -$ -$ -$ -$

WDR RDOR + Lube/recondition sliding glass door EA -$ -$ -$ -$

WDR REFL + Add on for one-way/reflective glass SF -$ -$ -$ -$

WDR RWDW + Lube/recondition operable window EA -$ -$ -$ -$

WDR SCRN & Window screen, 10 - 16 SF EA -$ -$ -$ -$

WDR SCRN< & Window screen, 1 - 9 SF EA -$ -$ -$ -$

WDR SCRN> & Window screen, 17 - 25 SF EA -$ -$ -$ -$

WDR SCRN>> & Window screen, 26 - 32 SF EA -$ -$ -$ -$

WDR SCRNR + Window screen - rescreen, 10 - 16 SF EA -$ -$ -$ -$

WDR SCRNR< + Window screen - rescreen, 1 - 9 SF EA -$ -$ -$ -$

WDR SCRNR> + Window screen - rescreen, 17 - 25 SF EA -$ -$ -$ -$

WDR SCRNR» + Window screen - rescreen, 26 - 32 SF EA -$ -$ -$ -$

WDR SCRNRS + Window screen - Detach & reset EA -$ -$ -$ -$

WDR SKY + Reglaze skylight - 6 to 10 SF EA -$ -$ -$ -$

WDR SKY< + Reglaze skylight - up to 6 SF EA -$ -$ -$ -$

WDR SKY> + Reglaze skylight - 10 to 15 SF EA -$ -$ -$ -$

WDR SKYF + Reglaze flat skylight - laminated glass - 6 to 10 SF EA -$ -$ -$ -$

WDR SKYF< + Reglaze flat skylight - laminated glass - up to 6 SF EA -$ -$ -$ -$

WDR SKYF> + Reglaze flat skylight - laminated glass - 10 to 15 SF EA -$ -$ -$ -$

WDR SWS & Solar window screen, 11 - 25 SF EA -$ -$ -$ -$

WDR SWS< & Solar window screen, 1 - 10 SF EA -$ -$ -$ -$

WDR SWS> & Solar window screen, 26 - 40 SF EA -$ -$ -$ -$

WDR SWS» & Solar window screen, 41 - 64 SF EA -$ -$ -$ -$

WDR TEMP + Add on for tempered glass - per pane SF -$ -$ -$ -$

WDR TINT + Add on for tinted glass SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

WDT BIDITM + Window Treatment (Bid Item) EA -$ -$ -$ -$

WDT BLA1 & Window blind - aluminum - 1" - 7.1 to 14 SF EA -$ -$ -$ -$

WDT BLA1+ & Window blind - aluminum - 1" - 7.1 to 14 SF - High grade EA -$ -$ -$ -$

WDT BLA l< & Window blind - aluminum - 1" - up to 7 SF EA -$ -$ -$ -$

WDT BLA1<+ & Window blind - aluminum - 1" - up to 7 SF - High grade EA -$ -$ -$ -$

WDT BLA1> & Window blind - aluminum - 1" - 14.1 to 20 SF EA -$ -$ -$ -$

WDT BLA1>+ & Window blind - aluminum - 1" - 14.1 to 20 SF - High grade EA -$ -$ -$ -$

WDT BLA1>> & Window blind - aluminum - 1" - 20.1 to 32 SF EA -$ -$ -$ -$

WDT BLA1>>+ & Window blind - aluminum - 1" - 20.1 to 32 SF - High grade EA -$ -$ -$ -$

WDT BLA1X & Window blind - aluminum - 1" - 32.1 to 42 SF EA -$ -$ -$ -$

WDT BLA1X+ & Window blind - aluminum - 1" - 32.1 to 42 SF - High grade EA -$ -$ -$ -$

WDT BLA1X> & Window blind - aluminum - 1" - 42.1 to 56 SF EA -$ -$ -$ -$

WDT BLA1X>+ & Window blind - aluminum - 1" - 42.1 to 56 SF - High grade EA -$ -$ -$ -$

WDT BLA2 & Window blind - aluminum - 2" - 7.1 to 14 SF EA -$ -$ -$ -$

WDT BLA2+ & Window blind - aluminum - 2" - 7.1 to 14 SF - High grade EA -$ -$ -$ -$

WDT BLA2< & Window blind - aluminum - 2" - up to 7 SF EA -$ -$ -$ -$

WDT BLA2<+ & Window blind - aluminum - 2" - up to 7 SF - High grade EA -$ -$ -$ -$

WDT BLA2> & Window blind - aluminum - 2" - 14.1 to 20 SF EA -$ -$ -$ -$

WDT BLA2>+ & Window blind - aluminum - 2" - 14.1 to 20 SF - High grade EA -$ -$ -$ -$

Page 158: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WDT BLA2>> & Window blind - aluminum - 2" - 20.1 to 32 SF EA -$ -$ -$ -$

WDT BLA2>>+ & Window blind - aluminum - 2" - 20.1 to 32 SF - High grade EA -$ -$ -$ -$

WDT BLA2X & Window blind - aluminum - 2" - 32.1 to 42 SF EA -$ -$ -$ -$

WDT BLA2X+ & Window blind - aluminum - 2" - 32.1 to 42 SF - High grade EA -$ -$ -$ -$

WDT BLA2X> & Window blind - aluminum - 2" - 42.1 to 56 SF EA -$ -$ -$ -$

WDT BLA2X>+ & Window blind - aluminum - 2" - 42.1 to 56 SF - High grade EA -$ -$ -$ -$

WDT BLC1 & Window blind - single cell - 7.1 to 14 SF EA -$ -$ -$ -$

WDT BLC1+ & Window blind - single cell - 7.1 to 14 SF - High grade EA -$ -$ -$ -$

WDT BLC1< & Window blind - single cell - up to 7 SF EA -$ -$ -$ -$

WDT BLC1<+ & Window blind - single cell - up to 7 SF - High grade EA -$ -$ -$ -$

WDT BLC1> & Window blind - single cell - 14.1 to 20 SF EA -$ -$ -$ -$

WDT BLC1>+ & Window blind - single cell - 14.1 to 20 SF - High grade EA -$ -$ -$ -$

WDT BLC1>> & Window blind - single cell - 20.1 to 32 SF EA -$ -$ -$ -$

WDT BLC1>>+ & Window blind - single cell - 20.1 to 32 SF - High grade EA -$ -$ -$ -$

WDT BLC1X & Window blind - single cell - 32.1 to 42 SF EA -$ -$ -$ -$

WDT BLC1X+ & Window blind - single cell - 32.1 to 42 SF - High grade EA -$ -$ -$ -$

WDT BLC1X> & Window blind - single cell - 42.1 to 56 SF EA -$ -$ -$ -$

WDT BLC1X>+ & Window blind - single cell - 42.1 to 56 SF - High grade EA -$ -$ -$ -$

WDT BLC2 & Window blind - double cell - 7.1 to 14 SF EA -$ -$ -$ -$

WDT BLC2+ & Window blind - double cell - 7.1 to 14 SF - High grade EA -$ -$ -$ -$

WDT BLC2< & Window blind - double cell - up to 7 SF EA -$ -$ -$ -$

WDT BLC2<+ & Window blind - double cell - up to 7 SF - High grade EA -$ -$ -$ -$

WDT BLC2> & Window blind - double cell - 14.1 to 20 SF EA -$ -$ -$ -$

WDT BLC2>+ & Window blind - double cell - 14.1 to 20 SF - High grade EA -$ -$ -$ -$

WDT BLC2>> & Window blind - double cell - 20.1 to 32 SF EA -$ -$ -$ -$

WDT BLC2>>+ & Window blind - double cell - 20.1 to 32 SF - High grade EA -$ -$ -$ -$

WDT BLC2X & Window blind - double cell - 32.1 to 42 SF EA -$ -$ -$ -$

WDT BLC2X+ & Window blind - double cell - 32.1 to 42 SF - High grade EA -$ -$ -$ -$

WDT BLC2X> & Window blind - double cell - 42.1 to 56 SF EA -$ -$ -$ -$

WDT BLC2X>+ & Window blind - double cell - 42.1 to 56 SF - High grade EA -$ -$ -$ -$

WDT BLF & Window blind - fabric/woven - 7.1 to 14 SF EA -$ -$ -$ -$

WDT BLF+ & Window blind - fabric woven - 7.1 to 14 SF - High grade EA -$ -$ -$ -$

WDT BLF< & Window blind - fabric/woven - up to 7 SF EA -$ -$ -$ -$

WDT BLF<+ & Window blind - fabric/woven - up to 7 SF - High grade EA -$ -$ -$ -$

WDT BLF> & Window blind - fabric/woven - 14.1 to 20 SF EA -$ -$ -$ -$

WDT BLF>+ & Window blind - fabric/woven - 14.1 to 20 SF - High grade EA -$ -$ -$ -$

WDT BLF» & Window blind - fabric/woven - 20.1 to 32 SF EA -$ -$ -$ -$

WDT BLF>>+ & Window blind - fabric/woven - 20.1 to 32 SF - High grade EA -$ -$ -$ -$

WDT BLFX & Window blind - fabric/woven - 32.1 to 42 SF EA -$ -$ -$ -$

WDT BLFX+ & Window blind - fabric/woven - 32.1 to 42 SF - High grade EA -$ -$ -$ -$

WDT BLFX> & Window blind - fabric/woven - 42.1 to 56 SF EA -$ -$ -$ -$

WDT BLFX>+ & Window blind - fabric/woven - 42.1 to 56 SF - High grade EA -$ -$ -$ -$

WDT BENI & Window blind - PVC - 1" - 7.1 to 14 SF EA -$ -$ -$ -$

WDT BENI+ & Window blind - PVC - 1" - 7.1 to 14 SF - High grade EA -$ -$ -$ -$

WDT BENI< & Window blind - PVC - 1" - up to 7 SF EA -$ -$ -$ -$

WDT BLN1<+ & Window blind - PVC - 1" - up to 7 SF - High grade EA -$ -$ -$ -$

WDT BENI> & Window blind - PVC - 1" - 14.1 to 20 SF EA -$ -$ -$ -$

WDT BLN1>+ & Window blind - PVC - 1" - 14.1 to 20 SF - High grade EA -$ -$ -$ -$

WDT BLN1>> & Window blind - PVC - 1" - 20.1 to 32 SF EA -$ -$ -$ -$

WDT BLN1»+ & Window blind - PVC - 1" - 20.1 to 32 SF - High grade EA -$ -$ -$ -$

WDT BLN3 & Window blind - PVC - 3.5" - 7.1 to 14 SF EA -$ -$ -$ -$

WDT BLN3+ & Window blind - PVC - 3.5" - 7.1 to 14 SF - High grade EA -$ -$ -$ -$

WDT BLN3< & Window blind - PVC - 3.5" - up to 7 SF EA -$ -$ -$ -$

WDT BLN3<+ & Window blind - PVC - 3.5" - up to 7 SF - High grade EA -$ -$ -$ -$

WDT BLN3> & Window blind - PVC - 3.5" - 14.1 to 20 SF EA -$ -$ -$ -$

WDT BLN3>+ & Window blind - PVC - 3.5" - 14.1 to 20 SF - High grade EA -$ -$ -$ -$

WDT BLN3>> & Window blind - PVC - 3.5" - 20.1 to 32 SF EA -$ -$ -$ -$

WDT BLN3>>+ & Window blind - PVC - 3.5" - 20.1 to 32 SF - High grade EA -$ -$ -$ -$

WDT BLN3X & Window blind - PVC - 3.5" - 32.1 to 42 SF EA -$ -$ -$ -$

WDT BLN3X+ & Window blind - PVC - 3.5" - 32.1 to 42 SF - High grade EA -$ -$ -$ -$

WDT BLN3X> & Window blind - PVC - 3.5" - 42.1 to 56 SF EA -$ -$ -$ -$

WDT BLN3X>+ & Window blind - PVC - 3.5" - 42.1 to 56 SF - High grade EA -$ -$ -$ -$

WDT BLND & Window blind - PVC - 2" - 7.1 to 14 SF EA -$ -$ -$ -$

WDT BLND+ & Window blind - PVC - 2" - 7.1 to 14 SF - High grade EA -$ -$ -$ -$

WDT BLND< & Window blind - PVC - 2" - up to 7 SF EA -$ -$ -$ -$

Page 159: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WDT BLND<+ & Window blind - PVC - 2" - up to 7 SF - High grade EA -$ -$ -$ -$

WDT BLND> & Window blind - PVC - 2" - 14.1 to 20 SF EA -$ -$ -$ -$

WDT BLND>+ & Window blind - PVC - 2" - 14.1 to 20 SF - High grade EA -$ -$ -$ -$

WDT BEND>> & Window blind - PVC - 2" - 20.1 to 32 SF EA -$ -$ -$ -$

WDT BLND»+ & Window blind - PVC - 2" - 20.1 to 32 SF - High grade EA -$ -$ -$ -$

WDT BLNDRS + Window blind - horizontal or vertical - Detach & reset EA -$ -$ -$ -$

WDT BLNDX & Window blind - PVC - 2" - 32.1 to 42 SF EA -$ -$ -$ -$

WDT BLNDX+ & Window blind - PVC - 2" - 32.1 to 42 SF - High grade EA -$ -$ -$ -$

WDT BLNDX> & Window blind - PVC - 2" - 42.1 to 56 SF EA -$ -$ -$ -$

WDT BLNDX>+ & Window blind - PVC - 2" - 42.1 to 56 SF - High grade EA -$ -$ -$ -$

WDT BLW1 & Window blind - wood - 1" - 7.1 to 14 SF EA -$ -$ -$ -$

WDT BLW1+ & Window blind - wood - 1" - 7.1 to 14 SF - High grade EA -$ -$ -$ -$

WDT BEWl< & Window blind - wood - 1" - up to 7 SF EA -$ -$ -$ -$

WDT BLW1<+ & Window blind - wood - 1" - up to 7 SF - High grade EA -$ -$ -$ -$

WDT BLW1> & Window blind - wood - 1" - 14.1 to 20 SF EA -$ -$ -$ -$

WDT BLW1>+ & Window blind - wood - 1" - 14.1 to 20 SF - High grade EA -$ -$ -$ -$

WDT BLW1>> & Window blind - wood - 1" - 20.1 to 32 SF EA -$ -$ -$ -$

WDT BLW1»+ & Window blind - wood - 1" - 20.1 to 32 SF - High grade EA -$ -$ -$ -$

WDT BLW1X & Window blind - wood - 1" - 32.1 to 42 SF EA -$ -$ -$ -$

WDT BLW1X+ & Window blind - wood - 1" - 32.1 to 42 SF - High grade EA -$ -$ -$ -$

WDT BLW1X> & Window blind - wood - 1" - 42.1 to 56 SF EA -$ -$ -$ -$

WDT BLW1X>+ & Window blind - wood - 1" - 42.1 to 56 SF - High grade EA -$ -$ -$ -$

WDT BLW2 & Window blind - wood - 2" - 7.1 to 14 SF EA -$ -$ -$ -$

WDT BLW2+ & Window blind - wood - 2" - 7.1 to 14 SF - High grade EA -$ -$ -$ -$

WDT BLW2< & Window blind - wood - 2" - up to 7 SF EA -$ -$ -$ -$

WDT BLW2<+ & Window blind - wood - 2" - up to 7 SF - High grade EA -$ -$ -$ -$

WDT BLW2> & Window blind - wood - 2" - 14.1 to 20 SF EA -$ -$ -$ -$

WDT BLW2>+ & Window blind - wood - 2" - 14.1 to 20 SF - High grade EA -$ -$ -$ -$

WDT BLW2» & Window blind - wood - 2" - 20.1 to 32 SF EA -$ -$ -$ -$

WDT BLW2»+ & Window blind - wood - 2" - 20.1 to 32 SF - High grade EA -$ -$ -$ -$

WDT BLW2X & Window blind - wood - 2" - 32.1 to 42 SF EA -$ -$ -$ -$

WDT BLW2X+ & Window blind - wood - 2" - 32.1 to 42 SF - High grade EA -$ -$ -$ -$

WDT BLW2X> & Window blind - wood - 2" - 42.1 to 56 SF EA -$ -$ -$ -$

WDT BLW2X>+ & Window blind - wood - 2" - 42.1 to 56 SF - High grade EA -$ -$ -$ -$

WDT DRAPRH + Window drapery - remove and rehang - per hour HR -$ -$ -$ -$

WDT DRPM & Drapery rod - adaptable controller EA -$ -$ -$ -$

WDT DRPM+ & Drapery rod - motorized - single drape system EA -$ -$ -$ -$

WDT DRPM++ & Drapery rod - motorized - double drape system EA -$ -$ -$ -$

WDT HW & Window drapery - hardware EA -$ -$ -$ -$

WDT HW- & Window drapery - hardware - single rod EA -$ -$ -$ -$

WDT HW< & Window drapery - hardware - Small EA -$ -$ -$ -$

WDT HW<- & Window drapery - hardware - single rod - Small EA -$ -$ -$ -$

WDT HW> & Window drapery - hardware - Large EA -$ -$ -$ -$

WDT HW>- & Window drapery - hardware - single rod - Large EA -$ -$ -$ -$

WDT HW» & Window drapery - hardware - Extra large EA -$ -$ -$ -$

WDT HWRS + Window drapery - hardware - Detach & reset EA -$ -$ -$ -$

WDT LAB + Window Treatments Installer - per hour HR -$ -$ -$ -$

WDT LABL + Window Treatment - General Laborer - per hour HR -$ -$ -$ -$

WDT MN + Window Treatment - Labor Minimum EA -$ -$ -$ -$

WDT RU & Window shade - roll up EA -$ -$ -$ -$

WDT RU< & Window shade - roll up - Small EA -$ -$ -$ -$

WDT RU> & Window shade - roll up - Large EA -$ -$ -$ -$

WDT RU» & Window shade - roll up - Extra large EA -$ -$ -$ -$

WDT RURS + Window shade - roll up - Detach & reset EA -$ -$ -$ -$

WDT SHADM & Motorized shades SF -$ -$ -$ -$

WDT SHADMB 0 & & Motorized blackout screen SF -$ -$ -$ -$

WDT SHTR & Interior window shutters (set) EA -$ -$ -$ -$

WDT SHTR< & Interior window shutters (set) - Small EA -$ -$ -$ -$

WDT SHTR> & Interior window shutters (set) - Large EA -$ -$ -$ -$

WDT SHTR» & Interior window shutters (set) - Extra large EA -$ -$ -$ -$

WDT SHTRRS + Interior window shutters (set) - Detach & reset EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

Page 160: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WDV A & Vinyl window - awning, 7-12 sf EA -$ -$ -$ -$

WDV A+ & Vinyl window - awning, 7-12 sf - High grade EA -$ -$ -$ -$

WDV A< & Vinyl window - awning, 3-6 sf EA -$ -$ -$ -$

WDV A<+ & Vinyl window - awning, 3-6 sf - High grade EA -$ -$ -$ -$

WDV BAY + Additional charge for bay and bow windows LF -$ -$ -$ -$

WDV BIDITM + Windows - Vinyl (Bid Item) EA -$ -$ -$ -$

WDV C & Vinyl window - casement, 6-8 sf EA -$ -$ -$ -$

WDV C+ & Vinyl window - casement, 6-8 sf - High grade EA -$ -$ -$ -$

WDV C++ & Vinyl window - casement, 6-8 sf - Premium grade EA -$ -$ -$ -$

WDV C< & Vinyl window - casement, 3-5 sf EA -$ -$ -$ -$

WDV C<+ & Vinyl window - casement, 3-5 sf - High grade EA -$ -$ -$ -$

WDV C<++ & Vinyl window - casement, 3-5 sf - Premium grade EA -$ -$ -$ -$

WDV C> & Vinyl window - casement, 9-13 sf EA -$ -$ -$ -$

WDV C>+ & Vinyl window - casement, 9-13 sf - High grade EA -$ -$ -$ -$

WDV C>++ & Vinyl window - casement, 9-13 sf - Premium grade EA -$ -$ -$ -$

WDV COLOR + Vinyl window - Add on for premium color frames SF -$ -$ -$ -$

WDV D & Vinyl window - double hung, 9-12 sf EA -$ -$ -$ -$

WDV D+ & Vinyl window - double hung, 9-12 sf - High grade EA -$ -$ -$ -$

WDV D++ & Vinyl window - double hung, 9-12 sf - Premium grade EA -$ -$ -$ -$

WDV D< & Vinyl window - double hung, 4-8 sf EA -$ -$ -$ -$

WDV D<+ & Vinyl window - double hung, 4-8 sf - High grade EA -$ -$ -$ -$

WDV D<++ & Vinyl window - double hung, 4-8 sf - Premium grade EA -$ -$ -$ -$

WDV D> & Vinyl window - double hung, 13-19 sf EA -$ -$ -$ -$

WDV D>+ & Vinyl window - double hung, 13-19 sf - High grade EA -$ -$ -$ -$

WDV D>++ & Vinyl window - double hung, 13-19 sf - Premium grade EA -$ -$ -$ -$

WDV D» & Vinyl window - double hung, 20-28 sf EA -$ -$ -$ -$

WDV D»+ & Vinyl window - double hung, 20-28 sf - High grade EA -$ -$ -$ -$

WDV D»++ & Vinyl window - double hung, 20-28 sf - Premium grade EA -$ -$ -$ -$

WDV GRDN & Vinyl window - Garden, 6-9 sf EA -$ -$ -$ -$

WDV GRDN> & Vinyl window - Garden, 10-12 sf EA -$ -$ -$ -$

WDV GRID + Add on for grid (double or triple glazed windows) SF -$ -$ -$ -$

WDV HO & Vinyl window - hopper/transom, 7-12 sf EA -$ -$ -$ -$

WDV HO< & Vinyl window - hopper/transom, 3-6 sf EA -$ -$ -$ -$

WDV HR24 & Vinyl window - half round, 24" wide EA -$ -$ -$ -$

WDV HR36 & Vinyl window - half round, 36" wide EA -$ -$ -$ -$

WDV HR48 & Vinyl window - half round, 48" wide EA -$ -$ -$ -$

WDV HR60 & Vinyl window - half round, 60" wide EA -$ -$ -$ -$

WDV HR72 & Vinyl window - half round, 72" wide EA -$ -$ -$ -$

WDV HRGRID + Add on for grid in half round window - per window unit EA -$ -$ -$ -$

WDV HS & Vinyl window, horizontal sliding, 12-23 sf EA -$ -$ -$ -$

WDV HS+ & Vinyl window, horizontal sliding, 12-23 sf - High grade EA -$ -$ -$ -$

WDV HS++ & Vinyl window, horizontal sliding, 12-23 sf - Premium EA -$ -$ -$ -$

grade

WDV HS< & Vinyl window, horizontal sliding, 3-11 sf EA -$ -$ -$ -$

WDV HS<+ & Vinyl window, horizontal sliding, 3-11 sf - High grade EA -$ -$ -$ -$

WDV HS<++ & Vinyl window, horizontal sliding, 3-11 sf - Premium grade EA -$ -$ -$ -$

WDV HS> & Vinyl window, horizontal sliding, 24-32 sf EA -$ -$ -$ -$

WDV HS>+ & Vinyl window, horizontal sliding, 24-32 sf - High grade EA -$ -$ -$ -$

WDV HS>++ & Vinyl window, horizontal sliding, 24-32 sf - Premium EA -$ -$ -$ -$

grade

WDV HS» & Vinyl window, horizontal sliding, 33-40 sf EA -$ -$ -$ -$

WDV HS»+ & Vinyl window, horizontal sliding, 33-40 sf - High grade EA -$ -$ -$ -$

WDV HS»++ & Vinyl window, horizontal sliding, 33-40 sf - Premium EA -$ -$ -$ -$

grade

WDV J & Vinyl window - jalousie, 12-23 sf EA -$ -$ -$ -$

WDV J< & Vinyl window - jalousie, 3-11 sf EA -$ -$ -$ -$

WDV J> & Vinyl window - jalousie, 24-32 sf EA -$ -$ -$ -$

WDV J» & Vinyl window - jalousie, 33-40 sf EA -$ -$ -$ -$

WDV LAB + Window Installer - per hour HR -$ -$ -$ -$

WDV LABL + Window - General Laborer - per hour HR -$ -$ -$ -$

WDV LAMIR + Add on for impact resistant laminated glass SF -$ -$ -$ -$

WDV LOWE + Add on for "Low E" glass SF -$ -$ -$ -$

WDV MN + Vinyl Window - Labor Minimum EA -$ -$ -$ -$

WDV MULL + Additional charge for vinyl window mullion - per LF LF -$ -$ -$ -$

WDV OBS + Add on for obscure glass SF -$ -$ -$ -$

Page 161: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WDV OV & Vinyl window - Oval, 36"x 60" EA -$ -$ -$ -$

WDV OV< & Vinyl window - Oval, 24"x 36" EA -$ -$ -$ -$

WDV OV> & Vinyl window - Oval, 48"x 72" EA -$ -$ -$ -$

WDV P & Vinyl window, picture/fixed, 12-23 sf EA -$ -$ -$ -$

WDV P+ & Vinyl window, picture/fixed, 12-23 sf - High grade EA -$ -$ -$ -$

WDV P++ & Vinyl window, picture/fixed, 12-23 sf - Premium grade EA -$ -$ -$ -$

WDV P< & Vinyl window, picture/fixed, 3-11 sf EA -$ -$ -$ -$

WDV P<+ & Vinyl window, picture/fixed, 3-11 sf - High grade EA -$ -$ -$ -$

WDV P<++ & Vinyl window, picture/fixed, 3-11 sf - Premium grade EA -$ -$ -$ -$

WDV P> & Vinyl window, picture/fixed, 24-32 sf EA -$ -$ -$ -$

WDV P>+ & Vinyl window, picture/fixed, 24-32 sf - High grade EA -$ -$ -$ -$

WDV P>++ & Vinyl window, picture/fixed, 24-32 sf - Premium grade EA -$ -$ -$ -$

WDV P» & Vinyl window, picture/fixed, 33-40 sf EA -$ -$ -$ -$

WDV P»+ & Vinyl window, picture/fixed, 33-40 sf - High grade EA -$ -$ -$ -$

WDV P>>++ & Vinyl window, picture/fixed, 33-40 sf - Premium grade EA -$ -$ -$ -$

WDV PST & Stained glass window, picture/fixed, 12-23 sf EA -$ -$ -$ -$

WDV PST< & Stained glass window, picture/fixed, 3-11 sf EA -$ -$ -$ -$

WDV PST> & Stained glass window, picture/fixed, 24-32 sf EA -$ -$ -$ -$

WDV PST>> & Stained glass window, picture/fixed, 33-40 sf EA -$ -$ -$ -$

WDV R24 & Vinyl window - Round/Octagon, 24" EA -$ -$ -$ -$

WDV R36 & Vinyl window - Round/Octagon, 36" EA -$ -$ -$ -$

WDV R48 & Vinyl window - Round/Octagon, 48" EA -$ -$ -$ -$

WDV REFL + Add on for one-way/reflective glass SF -$ -$ -$ -$

WDV RETR+ + Add. charge for a retrofit window, 3-11 sf - difficult EA -$ -$ -$ -$

WDV RETR>+ + Add. charge for a retrofit window, 12-23 sf - difficult EA -$ -$ -$ -$

WDV RETR»+ + Add. charge for a retrofit window, 24-40 sf - difficult EA -$ -$ -$ -$

WDV RETRO + Additional charge for a retrofit window, 3-11 sf EA -$ -$ -$ -$

WDV RETRO> + Additional charge for a retrofit window, 12-23 sf EA -$ -$ -$ -$

WDV RETRO>> + Additional charge for a retrofit window, 24-40 sf EA -$ -$ -$ -$

WDV S & Vinyl window, single hung, 9-12 sf EA -$ -$ -$ -$

WDV S+ & Vinyl window, single hung, 9-12 sf - High grade EA -$ -$ -$ -$

WDV S++ & Vinyl window, single hung, 9-12 sf - Premium grade EA -$ -$ -$ -$

WDV S< & Vinyl window, single hung, 4-8 sf EA -$ -$ -$ -$

WDV S<+ & Vinyl window, single hung, 4-8 sf - High grade EA -$ -$ -$ -$

WDV S<++ & Vinyl window, single hung, 4-8 sf - Premium grade EA -$ -$ -$ -$

WDV S> & Vinyl window, single hung, 13-19 sf EA -$ -$ -$ -$

WDV S>+ & Vinyl window, single hung, 13-19 sf - High grade EA -$ -$ -$ -$

WDV S>++ & Vinyl window, single hung, 13-19 sf - Premium grade EA -$ -$ -$ -$

WDV S>> & Vinyl window, single hung, 20-28 sf EA -$ -$ -$ -$

WDV S»+ & Vinyl window, single hung, 20-28 sf - High grade EA -$ -$ -$ -$

WDV S>>++ & Vinyl window, single hung, 20-28 sf - Premium grade EA -$ -$ -$ -$

WDV STRMW & Storm window - vinyl, 12-24 sf EA -$ -$ -$ -$

WDV STRMW< & Storm window - vinyl, 3-11 sf EA -$ -$ -$ -$

WDV STRMW> & Storm window - vinyl, 25-32 sf EA -$ -$ -$ -$

WDV STRMW>> & Storm window - vinyl, 33-40 sf EA -$ -$ -$ -$

WDV STRMWRS + Storm window - Detach & reset EA -$ -$ -$ -$

WDV TEMP + Add on for tempered glass - per pane SF -$ -$ -$ -$

WDV TINT + Add on for tinted glass SF -$ -$ -$ -$

WDV VNRS + Vinyl window - Detach & reset EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

WDW A & Wood window - awning, 7-12 sf EA -$ -$ -$ -$

WDW A+ & Wood window - awning, 7-12 sf, High grade EA -$ -$ -$ -$

WDW A++ & Wood window - awning, 7-12 sf, Premium grade EA -$ -$ -$ -$

WDW A< & Wood window - awning, 3-6 sf EA -$ -$ -$ -$

WDW A<+ & Wood window - awning, 3-6 sf, High grade EA -$ -$ -$ -$

WDW A<++ & Wood window - awning, 3-6 sf, Premium grade EA -$ -$ -$ -$

WDW BAY + Additional charge for bay and bow windows LF -$ -$ -$ -$

WDW BIDITM + Windows - Wood (Bid Item) EA -$ -$ -$ -$

WDW C & Wood window - casement, 12-23 sf EA -$ -$ -$ -$

WDW C+ & Wood window - casement, 12-23 sf, High grade EA -$ -$ -$ -$

WDW C++ & Wood window - casement, 12-23 sf, Premium grade EA -$ -$ -$ -$

WDW C< & Wood window - casement, 3-11 sf EA -$ -$ -$ -$

Page 162: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WDW C<+ & Wood window - casement, 3-11 sf, High grade EA -$ -$ -$ -$

WDW C<++ & Wood window - casement, 3-11 sf, Premium grade EA -$ -$ -$ -$

WDW C> & Wood window - casement, 24-32 sf EA -$ -$ -$ -$

WDW C>+ & Wood window - casement, 24-32 sf, High grade EA -$ -$ -$ -$

WDW C>++ & Wood window - casement, 24-32 sf, Premium grade EA -$ -$ -$ -$

WDW C» & Wood window - casement, 33-40 sf EA -$ -$ -$ -$

WDW C»+ & Wood window - casement, 33-40 sf, High grade EA -$ -$ -$ -$

WDW C>>++ & Wood window - casement, 33-40 sf, Premium grade EA -$ -$ -$ -$

WDW CS & Replace sash only - casement, 10-15 sf EA -$ -$ -$ -$

WDW CS+ & Replace sash only - casement, 10-15 sf - High grade EA -$ -$ -$ -$

WDW CS++ & Replace sash only - casement, 10-15 sf - Premium grade EA -$ -$ -$ -$

WDW CS< & Replace sash only - casement, 3-9 sf EA -$ -$ -$ -$

WDW CS<+ & Replace sash only - casement, 3-9 sf - High grade EA -$ -$ -$ -$

WDW CS<++ & Replace sash only - casement, 3-9 sf - Premium grade EA -$ -$ -$ -$

WDW CS> & Replace sash only - casement, 16-21 sf EA -$ -$ -$ -$

WDW CS>+ & Replace sash only - casement, 16-21 sf - High grade EA -$ -$ -$ -$

WDW CS>++ & Replace sash only - casement, 16-21 sf - Premium grade EA -$ -$ -$ -$

WDW D & Wood window - double hung, 9-12 sf EA -$ -$ -$ -$

WDW D- & Wood window - double hung, 9-12 sf, Standard grade EA -$ -$ -$ -$

WDW D+ & Wood window - double hung, 9-12 sf, High grade EA -$ -$ -$ -$

WDW D++ & Wood window - double hung, 9-12 sf, Premium grade EA -$ -$ -$ -$

WDW D< & Wood window - double hung, 4-8 sf EA -$ -$ -$ -$

WDW D<- & Wood window - double hung, 4-8 sf, Standard grade EA -$ -$ -$ -$

WDW D<+ & Wood window - double hung, 4-8 sf, High grade EA -$ -$ -$ -$

WDW D<++ & Wood window - double hung, 4-8 sf, Premium grade EA -$ -$ -$ -$

WDW D> & Wood window - double hung, 13-19 sf EA -$ -$ -$ -$

WDW D>- & Wood window - double hung, 13-19 sf, Standard grade EA -$ -$ -$ -$

WDW D>+ & Wood window - double hung, 13-19 sf, High grade EA -$ -$ -$ -$

WDW D>++ & Wood window - double hung, 13-19 sf, Premium grade EA -$ -$ -$ -$

WDW D» & Wood window - double hung, 20-28 sf EA -$ -$ -$ -$

WDW D»- & Wood window - double hung, 20-28 sf, Standard grade EA -$ -$ -$ -$

WDW D»+ & Wood window - double hung, 20-28 sf, High grade EA -$ -$ -$ -$

WDW D>>++ & Wood window - double hung, 20-28 sf, Premium grade EA -$ -$ -$ -$

WDW EXJAM & Window extension jamb - 11/16" x 1-23/32" (4-9/16" wall) LF -$ -$ -$ -$

WDW EXJAM> & Window extension jamb - 11/16" x 2-13/32" (5-1/4" wall) LF -$ -$ -$ -$

WDW EXJAM» & Window extension jamb - 11/16" x 3-23/32" (6-9/16" wall) LF -$ -$ -$ -$

WDW GRID + Add on for grid (double or triple glazed windows) SF -$ -$ -$ -$

WDW HS & Wood window - horizontal sliding, 12-23 sf EA -$ -$ -$ -$

WDW HS- & Wood window - horizontal sliding, 12-23 sf, Std. grade EA -$ -$ -$ -$

WDW HS+ & Wood window - horizontal sliding, 12-23 sf, High grade EA -$ -$ -$ -$

WDW HS++ & Wood window - horizontal sliding, 12-23 sf, Prem. grade EA -$ -$ -$ -$

WDW HS< & Wood window - horizontal sliding, 3-11 sf EA -$ -$ -$ -$

WDW HS<- & Wood window - horizontal sliding, 3-11 sf, Std. grade EA -$ -$ -$ -$

WDW HS<+ & Wood window - horizontal sliding, 3-11 sf, High grade EA -$ -$ -$ -$

WDW HS<++ & Wood window - horizontal sliding, 3-11 sf, Premium grade EA -$ -$ -$ -$

WDW HS> & Wood window - horizontal sliding, 24-32 sf EA -$ -$ -$ -$

WDW HS>- & Wood window - horizontal sliding, 24-32 sf, Std. grade EA -$ -$ -$ -$

WDW HS>+ & Wood window - horizontal sliding, 24-32 sf, High grade EA -$ -$ -$ -$

WDW HS>++ & Wood window - horizontal sliding, 24-32 sf, Prem. grade EA -$ -$ -$ -$

WDW HS» & Wood window - horizontal sliding, 33-40 sf EA -$ -$ -$ -$

WDW HS>>- & Wood window - horizontal sliding, 33-40 sf, Std. grade EA -$ -$ -$ -$

WDW HS>>+ & Wood window - horizontal sliding, 33-40 sf, High grade EA -$ -$ -$ -$

WDW HS>>++ & Wood window - horizontal sliding, 33-40 sf, Prem. grade EA -$ -$ -$ -$

WDW LAB + Window Installer - per hour HR -$ -$ -$ -$

WDW LABL + Window - General Laborer - per hour HR -$ -$ -$ -$

WDW LAMIR + Add on for impact resistant laminated glass SF -$ -$ -$ -$

WDW LOWE + Add on for "Low E" glass SF -$ -$ -$ -$

WDW MN + Wood Window - Labor Minimum EA -$ -$ -$ -$

WDW MULL + Additional charge for wood window mullion - per LF LF -$ -$ -$ -$

WDW OBS + Add on for obscure glass SF -$ -$ -$ -$

WDW P & Wood window - picture (fixed), 24-32 sf EA -$ -$ -$ -$

WDW P- & Wood window - picture (fixed), 24-32 sf, Standard grade EA -$ -$ -$ -$

WDW P+ & Wood window - picture (fixed), 24-32 sf, High grade EA -$ -$ -$ -$

WDW P++ & Wood window - picture (fixed), 24-32 sf, Premium grade EA -$ -$ -$ -$

WDW P< & Wood window - picture (fixed), 12-23 sf EA -$ -$ -$ -$

Page 163: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WDW P<- & Wood window - picture (fixed), 12-23 sf, Standard grade EA -$ -$ -$ -$

WDW P<+ & Wood window - picture (fixed), 12-23 sf, High grade EA -$ -$ -$ -$

WDW P<++ & Wood window - picture (fixed), 12-23 sf, Premium grade EA -$ -$ -$ -$

WDW P« & Wood window - picture (fixed), 3-11 sf EA -$ -$ -$ -$

WDW P«- & Wood window - picture (fixed), 3-11 sf, Standard grade EA -$ -$ -$ -$

WDW P«+ & Wood window - picture (fixed), 3-11 sf, High grade EA -$ -$ -$ -$

WDW P<<++ & Wood window - picture (fixed), 3-11 sf, Premium grade EA -$ -$ -$ -$

WDW P> & Wood window - picture (fixed), 33-44 sf EA -$ -$ -$ -$

WDW P>- & Wood window - picture (fixed), 33-44 sf, Standard grade EA -$ -$ -$ -$

WDW P>+ & Wood window - picture (fixed), 33-44 sf, High grade EA -$ -$ -$ -$

WDW P>++ & Wood window - picture (fixed), 33-44 sf, Premium grade EA -$ -$ -$ -$

WDW P» & Wood window - picture (fixed), 45-55 sf EA -$ -$ -$ -$

WDW P»- & Wood window - picture (fixed), 45-55 sf, Standard grade EA -$ -$ -$ -$

WDW P»+ & Wood window - picture (fixed), 45-55 sf, High grade EA -$ -$ -$ -$

WDW P>>++ & Wood window - picture (fixed), 45-55 sf, Premium grade EA -$ -$ -$ -$

WDW REFL + Add on for one-way/reflective glass SF -$ -$ -$ -$

WDW RETR+ + Add. charge for a retrofit window, 3-11 sf - difficult EA -$ -$ -$ -$

WDW RETR>+ + Add. charge for a retrofit window, 12-23 sf - difficult EA -$ -$ -$ -$

WDW RETR»+ + Add. charge for a retrofit window, 24-40 sf - difficult EA -$ -$ -$ -$

WDW RETRO + Additional charge for a retrofit window, 3-11 sf EA -$ -$ -$ -$

WDW RETRO> + Additional charge for a retrofit window, 12-23 sf EA -$ -$ -$ -$

WDW RETRO» + Additional charge for a retrofit window, 24-40 sf EA -$ -$ -$ -$

WDW S & Wood window - single hung, 9-12 sf EA -$ -$ -$ -$

WDW S- & Wood window - single hung, 9-12 sf, Standard grade EA -$ -$ -$ -$

WDW S+ & Wood window - single hung, 9-12 sf, High grade EA -$ -$ -$ -$

WDW S++ & Wood window - single hung, 9-12 sf, Premium grade EA -$ -$ -$ -$

WDW S< & Wood window - single hung, 4-8 sf EA -$ -$ -$ -$

WDW S<- & Wood window - single hung, 4-8 sf, Standard grade EA -$ -$ -$ -$

WDW S<+ & Wood window - single hung, 4-8 sf, High grade EA -$ -$ -$ -$

WDW S<++ & Wood window - single hung, 4-8 sf, Premium grade EA -$ -$ -$ -$

WDW S> & Wood window - single hung, 13-19 sf EA -$ -$ -$ -$

WDW S>- & Wood window - single hung, 13-19 sf, Standard grade EA -$ -$ -$ -$

WDW S>+ & Wood window - single hung, 13-19 sf, High grade EA -$ -$ -$ -$

WDW S>++ & Wood window - single hung, 13-19 sf, Premium grade EA -$ -$ -$ -$

WDW S» & Wood window - single hung, 20-28 sf EA -$ -$ -$ -$

WDW S»- & Wood window - single hung, 20-28 sf, Standard grade EA -$ -$ -$ -$

WDW S»+ & Wood window - single hung, 20-28 sf, High grade EA -$ -$ -$ -$

WDW S>>++ & Wood window - single hung, 20-28 sf, Premium grade EA -$ -$ -$ -$

WDW SP & Specialty wood window unit, 12-23 sf EA -$ -$ -$ -$

WDW SP< & Specialty wood window unit, 3-11 sf EA -$ -$ -$ -$

WDW SP> & Specialty wood window unit, 24-32 sf EA -$ -$ -$ -$

WDW SP>> & Specialty wood window unit, 33-40 sf EA -$ -$ -$ -$

WDW SSH & Replace sash only - double hung, 9-12 sf EA -$ -$ -$ -$

WDW SSH+ & Replace sash only - double hung, 9-12 sf, High grade EA -$ -$ -$ -$

WDW SSH++ & Replace sash only - double hung, 9-12 sf, Premium grade EA -$ -$ -$ -$

WDW SSH< & Replace sash only - double hung, 4-8 sf EA -$ -$ -$ -$

WDW SSH<+ & Replace sash only - double hung, 4-8 sf, High grade EA -$ -$ -$ -$

WDW SSH<++ & Replace sash only - double hung, 4-8 sf, Premium grade EA -$ -$ -$ -$

WDW SSH> & Replace sash only - double hung, 13-19 sf EA -$ -$ -$ -$

WDW SSH>+ & Replace sash only - double hung, 13-19 sf, High grade EA -$ -$ -$ -$

WDW SSH>++ & Replace sash only - double hung, 13-19 sf, Prem. grade EA -$ -$ -$ -$

WDW SSH>> & Replace sash only - double hung, 20-28 sf EA -$ -$ -$ -$

WDW SSH>>+ & Replace sash only - double hung, 20-28 sf, High grade EA -$ -$ -$ -$

WDW SSH>>++ & Replace sash only - double hung, 20-28 sf, Prem. grade EA -$ -$ -$ -$

WDW STRMW & Storm window - wood, 12 - 24 sf EA -$ -$ -$ -$

WDW STRMW< & Storm window - wood, 3 - 11 sf EA -$ -$ -$ -$

WDW STRMW> & Storm window - wood, 25 - 32 sf EA -$ -$ -$ -$

WDW STRMW>> & Storm window - wood, 33 - 40 sf EA -$ -$ -$ -$

WDW STRMWRS + Storm window - Detach & reset EA -$ -$ -$ -$

WDW TEMP + Add on for tempered glass - per pane SF -$ -$ -$ -$

WDW TINT + Add on for tinted glass SF -$ -$ -$ -$

WDW WDRS + Wood window unit - Detach & reset EA -$ -$ -$ -$

Page 164: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

WPR AV & Wallpaper SF -$ -$ -$ -$

WPR AV- & Wallpaper - Standard grade SF -$ -$ -$ -$

WPR AV+ & Wallpaper - High grade SF -$ -$ -$ -$

WPR AV++ & Wallpaper - Premium grade SF -$ -$ -$ -$

WPR AVRL & Wallpaper (per roll) RL -$ -$ -$ -$

WPR AVRL- & Wallpaper - Standard grade (per roll) RL -$ -$ -$ -$

WPR AVRL+ & Wallpaper - High grade (per roll) RL -$ -$ -$ -$

WPR AVRL++ & Wallpaper - Premium grade (per roll) RL -$ -$ -$ -$

WPR BIDITM + Wallpaper (Bid Item) EA -$ -$ -$ -$

WPR BORDR & Wallpaper border LF -$ -$ -$ -$

WPR BORDR- & Wallpaper border - Standard grade LF -$ -$ -$ -$

WPR BORDR+ & Wallpaper border - High grade LF -$ -$ -$ -$

WPR BORDR++ & Wallpaper border - Premium grade LF -$ -$ -$ -$

WPR FABRIC & Wallcovering - fabric SF -$ -$ -$ -$

WPR FOIL & Wallpaper - foil SF -$ -$ -$ -$

WPR FOIL+ & Wallpaper - foil - High grade SF -$ -$ -$ -$

WPR FOIL++ & Wallpaper - foil - Premium grade SF -$ -$ -$ -$

WPR GRASS & Wallpaper - grass cloth SF -$ -$ -$ -$

WPR GRASS+ & Wallpaper - grass cloth - High grade SF -$ -$ -$ -$

WPR GRASS++ & Wallpaper - grass cloth - Premium grade SF -$ -$ -$ -$

WPR LAB + Wallpaper Hanger - per hour HR -$ -$ -$ -$

WPR MN + Wallpaper - Labor Minimum EA -$ -$ -$ -$

WPR OS + Additional labor charge to cover outlet/switch plates EA -$ -$ -$ -$

WPR PREP + Prep wall for wallpaper SF -$ -$ -$ -$

WPR REG + Additional labor charge to cover wall registers/grills EA -$ -$ -$ -$

WPR REG> + Additional labor charge to cover wall reg./grills - Large EA -$ -$ -$ -$

WPR RMV - Additional charge to remove non-strippable wallpaper SF -$ -$ -$ -$

WPR SISAL & Wallcovering - Sisal (woven) SF -$ -$ -$ -$

WPR V & Vinyl wall covering SF -$ -$ -$ -$

WPR V+ & Vinyl wall covering - High grade SF -$ -$ -$ -$

WPR V++ & Vinyl wall covering - Premium grade SF -$ -$ -$ -$

WPR WCPT & Wallcovering - Carpet SF -$ -$ -$ -$

WPR WCPT+ & Wallcovering - Carpet - High grade SF -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

WTR ACT - Remove wet ceiling tile & drywall and bag for disposal SF -$ -$ -$ -$

WTR ACT3 - Remove wet ceiling tile & drywall and bag - Cat 3 SF -$ -$ -$ -$

WTR ACT3A - Remove wet ceiling tile & drywall and bag - Cat 3 aft hrs SF -$ -$ -$ -$

WTR ACTA - Remove wet ceiling tile & drywall, bag for disp. after hrs SF -$ -$ -$ -$

WTR ACTAS - Remove wet ceiling tile w/staples - bag for disposal SF -$ -$ -$ -$

WTR ACTAS3 - Remove wet ceiling tile w/staples - bag Cat 3 SF -$ -$ -$ -$

WTR ACTAS3A - Remove wet ceiling tile w/staples - bag Cat 3 - aft hrs SF -$ -$ -$ -$

WTR ACTASA - Remove wet ceiling tile w/staples, bag for disp. - aft hrs SF -$ -$ -$ -$

WTR ACTS - Remove wet suspended ceiling tile and bag for disposal SF -$ -$ -$ -$

WTR ACTSA - Remove wet susp. ceiling tile, bag for disp. - after hrs SF -$ -$ -$ -$

WTR ACTSS - Remove wet suspended ceiling tile and bag - Cat 3 SF -$ -$ -$ -$

WTR ACTSSA - Remove wet suspended ceiling tile and bag - Cat 3 aft hrs SF -$ -$ -$ -$

WTR BAG + Plastic bag - used for disposal of contaminated items EA -$ -$ -$ -$

WTR BARR + Containment Barrier/Airlock/Decon. Chamber SF -$ -$ -$ -$

WTR BARRA + Containment Barrier/Airlock/Decon. Chamber - after hours SF -$ -$ -$ -$

WTR BARRP + Containment Barrier - tension post - per day DA -$ -$ -$ -$

WTR BARRZ + Peel & seal zipper EA -$ -$ -$ -$

WTR BARRZ+ + Peel & seal zipper - heavy duty EA -$ -$ -$ -$

WTR BARRZA + Peel & seal zipper - after business hours EA -$ -$ -$ -$

WTR BARRZA+ + Peel & seal zipper - heavy duty - after business hours EA -$ -$ -$ -$

WTR BASE - Tear out baseboard LF -$ -$ -$ -$

WTR BASEA - Tear out baseboard - after business hours LF -$ -$ -$ -$

WTR BASEB - Tear out baseboard and bag for disposal - up to Cat 3 LF -$ -$ -$ -$

WTR BASEBA - Tear out baseboard and bag for disp. - up to Cat 3 aft hrs LF -$ -$ -$ -$

WTR BASED + Baseboard - Detach LF -$ -$ -$ -$

WTR BASED> + Baseboard - Detach - oversized or multi-member LF -$ -$ -$ -$

Page 165: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WTR BASEDA + Baseboard - Detach - after business hours LF -$ -$ -$ -$

WTR BASEDA> + Baseboard - Detach - oversized or multi-member-after LF -$ -$ -$ -$

hours

WTR BASERS + Baseboard - Detach & reset LF -$ -$ -$ -$

WTR BASERS> + Baseboard - Detach & reset - oversized or multimember LF -$ -$ -$ -$

WTR BIDITM + Water Extraction & Remediation (Bid Item) EA -$ -$ -$ -$

WTR BLK + Block and pad furniture in room EA -$ -$ -$ -$

WTR BLK< + Block and pad furniture in room - Small amount EA -$ -$ -$ -$

WTR BLK> + Block and pad furniture in room - Large amount EA -$ -$ -$ -$

WTR BLKA + Block and pad furniture in room - after hours EA -$ -$ -$ -$

WTR BLKA< + Block and pad furniture in room - Small amount - after hrs EA -$ -$ -$ -$

WTR BLKA> + Block and pad furniture in room - Large amount - after hrs EA -$ -$ -$ -$

WTR BLKHR + Block and pad furniture - hourly charge HR -$ -$ -$ -$

WTR BLKHRA + Block and pad furniture - hourly charge - after hours HR -$ -$ -$ -$

WTR CABFH - Tear out cabinetry - full height unit LF -$ -$ -$ -$

WTR CABFHA - Tear out cabinetry - full height unit - after hours LF -$ -$ -$ -$

WTR CABFHD + Cabinet - full height unit - Detach LF -$ -$ -$ -$

WTR CABFHDA + Cabinet - full height unit - Detach - after business hours LF -$ -$ -$ -$

WTR CABLOW - Tear out cabinetry - lower (base) units LF -$ -$ -$ -$

WTR CABLOWA - Tear out cabinetry - lower (base) units - after hours LF -$ -$ -$ -$

WTR CABLWD + Cabinet - lower (base) unit - Detach LF -$ -$ -$ -$

WTR CABLWDA + Cabinet - lower (base) unit - Detach - after hours LF -$ -$ -$ -$

WTR CABUP - Tear out cabinetry - upper (wall) units LF -$ -$ -$ -$

WTR CABUPA - Tear out cabinetry - upper (wall) units - after hours LF -$ -$ -$ -$

WTR CABUPD + Cabinet - upper (wall) unit - Detach LF -$ -$ -$ -$

WTR CABUPDA + Cabinet - upper (wall) unit - Detach - after hours LF -$ -$ -$ -$

WTR CABVAN - Tear out cabinetry - vanity LF -$ -$ -$ -$

WTR CABVANA - Tear out cabinetry - vanity - after business hours LF -$ -$ -$ -$

WTR CABVNC - Tear out cabinetry - vanity and countertop LF -$ -$ -$ -$

WTR CABVNCA - Tear out cabinetry - vanity and countertop - after hours LF -$ -$ -$ -$

WTR CABVND + Cabinet - vanity unit - Detach LF -$ -$ -$ -$

WTR CABVNDA + Cabinet - vanity unit - Detach - after hours LF -$ -$ -$ -$

WTR CALC + Calcium Chloride moisture test - per sample EA -$ -$ -$ -$

WTR CSV - Remove polyethylene vapor barrier SF -$ -$ -$ -$

WTR CTFBSD + Backsplash - flat laid/solid surface - Detach LF -$ -$ -$ -$

WTR CTFBSDA + Backsplash - flat laid/solid surface - Detach- after hours LF -$ -$ -$ -$

WTR CTFL - Tear out countertop - flat laid plastic laminate LF -$ -$ -$ -$

WTR CTFLA - Tear out countertop - flat laid plastic lam. - after hours LF -$ -$ -$ -$

WTR CTFLD + Countertop - flat laid plastic laminate - Detach LF -$ -$ -$ -$

WTR CTFLDA + Countertop - flat laid plastic lam. - Detach - after hours LF -$ -$ -$ -$

WTR CTPF - Tear out countertop - post formed plastic laminate LF -$ -$ -$ -$

WTR CTPFA - Tear out countertop - post formed plastic lam. - after hrs LF -$ -$ -$ -$

WTR CTPFD + Countertop - post formed plastic laminate - Detach LF -$ -$ -$ -$

WTR CTPFDA + Countertop - post formed plastic lam. - Detach - after hrs LF -$ -$ -$ -$

WTR CTSS - Tear out countertop - solid surface/granite SF -$ -$ -$ -$

WTR CTSSA - Tear out countertop - solid surface/granite - after hours SF -$ -$ -$ -$

WTR CTSSD + Countertop - solid surface/granite - Detach SF -$ -$ -$ -$

WTR CTSSDA + Countertop - solid surface/granite - Detach - after hours SF -$ -$ -$ -$

WTR DHM + Dehumidifier (per 24 hour period) - No monitoring EA -$ -$ -$ -$

WTR DHM> + Dehumidifier (per 24 hour period) - Large - No monitoring EA -$ -$ -$ -$

WTR DHM» + Dehumidifier (per 24 hour period) - XLarge - No EA -$ -$ -$ -$

monitoring

WTR DHM>» + Dehumidifier (per 24 hour period) - XXLarge- No EA -$ -$ -$ -$

monitoring

WTR DHMAC + Dehumidifier w/environmental control - per 24 hrs EA -$ -$ -$ -$

WTR DHMB + Dehumidifier booster (per 24 hour period) - No monitoring EA -$ -$ -$ -$

WTR DHMD + Dehumidifier (per 24 hour period) - Desiccant - No monit. EA -$ -$ -$ -$

WTR DHMD< + Dehumidifier (per 24 hr period) -Small-Desiccant-No EA -$ -$ -$ -$

monit.

WTR DHMD> + Dehumidifier (per 24 hr period) -Large-Desiccant-No EA -$ -$ -$ -$

monit.

WTR DHMDT2K + Trailer-mount dehumidifier - 2000 CFM- per 24 hr EA -$ -$ -$ -$

WTR DHMDT3K + Dehumidifier - Desiccant -3000-4000 CFM No monit.-per EA -$ -$ -$ -$

24hr

WTR DHMDT5K + Dehumidifier - Desiccant -4500-7500 CFM No monit.-per EA -$ -$ -$ -$

Page 166: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

24hr

WTR DHMDT9K + Dehumidifier - Desiccant-8500-15000 CFM No monit.-per EA -$ -$ -$ -$

24hr

WTR DISC + Discounts (Bid Item) EA -$ -$ -$ -$

WTR DORSLD + Interior door slab only - Detach EA -$ -$ -$ -$

WTR DORSLDA + Interior door slab only - Detach - after business hours EA -$ -$ -$ -$

WTR DRY + Air mover (per 24 hour period) - No monitoring EA -$ -$ -$ -$

WTR DRY- + Mini air mover (per 24 hour period) - No monitoring EA -$ -$ -$ -$

WTR DRY+ + Air mover axial fan (per 24 hour period) - No monitoring EA -$ -$ -$ -$

WTR DRY++ + Axial fan air mover - 1 HP (per 24 hr period)-No monit. EA -$ -$ -$ -$

WTR DRY1 + Structural drying per sf of floor area- Class 1 (Bid Item) SF -$ -$ -$ -$

WTR DRY2 + Structural drying per sf of floor area- Class 2 (Bid Item) SF -$ -$ -$ -$

WTR DRY3 + Structural drying per sf of floor area- Class 3 (Bid Item) SF -$ -$ -$ -$

WTR DRY4 + Structural drying per sf of floor area- Class 4 (Bid Item) SF -$ -$ -$ -$

WTR DRYC + Struct. drying per sf of floor- Climate controlled (Bid) SF -$ -$ -$ -$

WTR DRYCN + Struct. drying per sf of floor- Non-climate cont. (Bid) SF -$ -$ -$ -$

WTR DRYED + Dryer - electric - Detach EA -$ -$ -$ -$

WTR DRYEDA + Dryer - electric - Detach - after business hours EA -$ -$ -$ -$

WTR DRYGD + Dryer - gas - Detach EA -$ -$ -$ -$

WTR DRYGDA + Dryer - gas - Detach - after business hours EA -$ -$ -$ -$

WTR DRYMA + Multi-port air mover adapter (per 24 hr period)- No monit. EA -$ -$ -$ -$

WTR DRYN - Tear out wet drywall, no bagging SF -$ -$ -$ -$

WTR DRYN4 - Tear out wet drywall, no bagging, per LF - up to 4' tall LF -$ -$ -$ -$

WTR DRYN4A - Tear out wet drywall, no bagging, per LF - 4' aft hrs LF -$ -$ -$ -$

WTR DRYN4S - Tear out wet drywall, no bagging, per LF - to 4' - Cat 3 LF -$ -$ -$ -$

WTR DRYN4SA - Tear out wet drywall, no bagging, LF - 4' Cat 3 aft hrs LF -$ -$ -$ -$

WTR DRYNA - Tear out wet drywall, no bagging - after business hours SF -$ -$ -$ -$

WTR DRYNI - Tear out wet drywall, no bagging, per LF - up to 4" tall LF -$ -$ -$ -$

WTR DRYNIA - Tear out wet drywall, no bagging, per LF - 4" aft hrs LF -$ -$ -$ -$

WTR DRYNIS - Tear out wet drywall, no bagging, per LF - to 4" - Cat 3 LF -$ -$ -$ -$

WTR DRYNISA - Tear out wet drywall, no bagging, LF - 4" Cat 3 aft hrs LF -$ -$ -$ -$

WTR DRYNLF - Tear out wet drywall, no bagging, per LF - up to 2' tall LF -$ -$ -$ -$

WTR DRYNLFA - Tear out wet drywall, no bagging, per LF - 2' aft hrs LF -$ -$ -$ -$

WTR DRYNLS - Tear out wet drywall, no bagging, per LF - to 2' - Cat 3 LF -$ -$ -$ -$

WTR DRYNLSA - Tear out wet drywall, no bagging, LF - 2' Cat 3 aft hrs LF -$ -$ -$ -$

WTR DRYNS - Tear out wet drywall, no bagging - Cat 3 SF -$ -$ -$ -$

WTR DRYNSA - Tear out wet drywall, no bagging - Cat 3 - after hours SF -$ -$ -$ -$

WTR DRYSA + Air mover snout adapter 48" (per 24 hr period) - No monit. EA -$ -$ -$ -$

WTR DRYW - Tear out wet drywall, cleanup, bag for disposal SF -$ -$ -$ -$

WTR DRYW4 - Tear out wet drywall, cleanup, bag, per LF - up to 4' tall LF -$ -$ -$ -$

WTR DRYW4A - Tear out wet drywall, cleanup, bag, per LF - 4' aft hrs LF -$ -$ -$ -$

WTR DRYW4S - Tear out wet drywall, cleanup, bag, per LF - to 4' - Cat 3 LF -$ -$ -$ -$

WTR DRYW4SA - Tear out wet drywall, cleanup, bag, LF - 4' Cat 3 aft hrs LF -$ -$ -$ -$

WTR DRYWA - Tear out wet drywall, cleanup, bag - after business hours SF -$ -$ -$ -$

WTR DRYWG - Add-on cost for tearing out glued-on drywall SF -$ -$ -$ -$

WTR DRYWGA - Add-on cost for tearing out glued-on drywall - after hours SF -$ -$ -$ -$

WTR DRYWI - Tear out wet drywall, cleanup, bag, per LF - up to 4" tall LF -$ -$ -$ -$

WTR DRYWIA - Tear out wet drywall, cleanup, bag, per LF - 4" aft hrs LF -$ -$ -$ -$

WTR DRYWIS - Tear out wet drywall, cleanup, bag, per LF - to 4" - Cat 3 LF -$ -$ -$ -$

WTR DRYWISA - Tear out wet drywall, cleanup, bag, LF - 4" Cat 3 aft hrs LF -$ -$ -$ -$

WTR DRYWLF - Tear out wet drywall, cleanup, bag, per LF - up to 2' tall LF -$ -$ -$ -$

WTR DRYWLFA - - Tear out wet drywall, cleanup, bag, per LF - 2' aft hrs LF -$ -$ -$ -$

WTR DRYWLS - Tear out wet drywall, cleanup, bag, per LF - to 2' - Cat 3 LF -$ -$ -$ -$

WTR DRYWLSA - - Tear out wet drywall, cleanup, bag, LF - 2' Cat 3 aft hrs LF -$ -$ -$ -$

WTR DRYWS - Tear out wet drywall, cleanup, bag - Cat 3 SF -$ -$ -$ -$

WTR DRYWSA - Tear out wet drywall, cleanup, bag - Cat 3 - after hours SF -$ -$ -$ -$

WTR DUCT6 + Ducting - flexible - 6" round LF -$ -$ -$ -$

WTR DUCTLF + Ducting - lay-flat LF -$ -$ -$ -$

WTR DUCTLF> + Ducting - lay-flat - Large LF -$ -$ -$ -$

WTR DWD + Dishwasher - Detach EA -$ -$ -$ -$

WTR DWDA + Dishwasher - Detach - after business hours EA -$ -$ -$ -$

WTR EQ + Equipment setup, take down, and monitoring (hourly HR -$ -$ -$ -$

charge)

WTR EQA + Equip. setup, take down & monitoring - after hrs HR -$ -$ -$ -$

WTR EQD + Equipment decontamination charge - per piece of EA -$ -$ -$ -$

Page 167: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

equipment

WTR EQDH + Equipment decontamination charge - HVY, per piece of EA -$ -$ -$ -$

equip

WTR ESRV + Emergency service call - after business hours EA -$ -$ -$ -$

WTR ESRVD + Emergency service call - during business hours EA -$ -$ -$ -$

WTR EXT + Water extraction from carpeted floor SF -$ -$ -$ -$

WTR EXT+ + Water extraction from carpeted floor - Heavy SF -$ -$ -$ -$

WTR EXTA + Water extraction from carpeted floor- after business hours SF -$ -$ -$ -$

WTR EXTA+ + Water extraction from carpeted floor - Heavy - aft bus hrs SF -$ -$ -$ -$

WTR EXTDMP + Contaminated water dump fee - (Bid Item) EA -$ -$ -$ -$

WTR EXTG + Water extraction from carpeted floor - Category 2 water SF -$ -$ -$ -$

WTR EXTG+ + Water extraction from carpeted floor - Cat 2 water - Heavy SF -$ -$ -$ -$

WTR EXTGA + Water extract from carpeted floor - Cat 2 wtr- aft bus hrs SF -$ -$ -$ -$

WTR EXTGA+ + Water extract carpeted flr - Cat 2 wtr - Hvy- aft bus. hrs SF -$ -$ -$ -$

WTR EXTH + Water extraction from hard surface floor SF -$ -$ -$ -$

WTR EXTHA + Water extraction from hard surface floor - after bus. hrs SF -$ -$ -$ -$

WTR EXTHG + Water extraction from hard surface floor - Cat 2 water SF -$ -$ -$ -$

WTR EXTHGA + Water extract from hrd surf flr - Cat 2 wtr - aft bus hrs SF -$ -$ -$ -$

WTR EXTHS + Water extraction from hard surface floor - Cat 3 water SF -$ -$ -$ -$

WTR EXTHSA + Water extract from hard surf flr - Cat 3 wtr - aft bus hrs SF -$ -$ -$ -$

WTR EXTS + Water extraction from carpeted floor - Category 3 water SF -$ -$ -$ -$

WTR EXTS+ + Water extraction from carpeted floor - Cat 3 water - Heavy SF -$ -$ -$ -$

WTR EXTSA + Water extract from carpeted floor - Cat 3 wtr- aft bus hrs SF -$ -$ -$ -$

WTR EXTSA+ + Water extract carpeted floor - Cat 3 wtr- Hvy- aft bus hrs SF -$ -$ -$ -$

WTR EXTW + Water extraction from floor - Weight-assisted SF -$ -$ -$ -$

WTR EXTWA + Water extraction floor - Weight-assisted - after bus. hrs. SF -$ -$ -$ -$

WTR EXTWP + Pumping & hauling of standing Category 3 water GL -$ -$ -$ -$

WTR EXTWPA + Pumping & hauling of standing Cat 3 water - after bus. hrs GL -$ -$ -$ -$

WTR EXTWPC + 2" Submersible pump with hose (per hour) HR -$ -$ -$ -$

WTR EXTWPT + 2" Submersible trash pump with hose (per hour) HR -$ -$ -$ -$

WTR EXTWPTM + + Pumping of standing water - truck mounted (per hour) HR -$ -$ -$ -$

WTR FCC - Tear out wet non-salvageable carpet, cut & bag for disp. SF -$ -$ -$ -$

WTR FCCA - Tear out wet non-salvage cpt, cut/bag - after business hrs SF -$ -$ -$ -$

WTR FCCGD - Tear out wet non-salvageable glue down carpet, cut/bag SF -$ -$ -$ -$

WTR FCCGDA - Tear out wet non-salv. gluedn. cpt, cut/bag- aft. bus. hrs SF -$ -$ -$ -$

WTR FCCGDN - Tear out wet non-salvageable glue down carpet, no bagging SF -$ -$ -$ -$

WTR FCCGDNA - Tear out wet non-salt'. gluedn. cpt, no bag - aft. bus. hrs SF -$ -$ -$ -$

WTR FCCGDS - Tear out wet non-salt'. gluedn. cpt, cut/bag - Cat 3 water SF -$ -$ -$ -$

WTR FCCGDSA - Tear out wet non-salv.gluedn.cpt,cut/bg-Cat 3 wtr-aft. hrs SF -$ -$ -$ -$

WTR FCCGSN - Tear out wet non-salv. glue down cpt, no bag - Cat 3 water SF -$ -$ -$ -$

WTR FCCGSNA - Tear out wet non-salv.gluedn.cpt,no bag-Cat 3 wtr-aft. hrs SF -$ -$ -$ -$

WTR FCCN - Tear out wet non-salvageable carpet, no bagging SF -$ -$ -$ -$

WTR FCCNA - Tear out wet non-salvage carpet, no bag-after business hrs SF -$ -$ -$ -$

WTR FCCS - Tear out wet non-salvageable carpet, cut/bag - Cat 3 water SF -$ -$ -$ -$

WTR FCCSA - Tear out wet non-salv. cpt, cut/bag-Cat 3 wtr-aft bus. hrs SF -$ -$ -$ -$

WTR FCCSN - Tear out wet non-salvageable carpet, no bag - Cat 3 water SF -$ -$ -$ -$

WTR FCCSNA - Tear out wet non-salv. cpt, no bag -Cat 3 wtr-aft bus. hrs SF -$ -$ -$ -$

WTR FCT - Tear out non-salvageable tile floor & bag for disposal SF -$ -$ -$ -$

WTR FCTA - Tear out non-salv. tile floor & bag for disposal after hrs SF -$ -$ -$ -$

WTR FCTS - Tear out non-salvageable tile floor & bag - Cat 3 water SF -$ -$ -$ -$

WTR FCTSA - Tear out non-salv. tile floor & bag - Cat 3 water-aft hrs SF -$ -$ -$ -$

WTR FCV - Tear out non-salvageable vinyl, cut & bag for disposal SF -$ -$ -$ -$

WTR FCVA - Tear out non-salvageable vinyl, cut & bag - after hrs SF -$ -$ -$ -$

WTR FCVL - Tear out non-salv vinyl, cut & bag - additional layer SF -$ -$ -$ -$

WTR FCVLA - Tear out non-salv vinyl, cut & bag - add'l layer after hrs SF -$ -$ -$ -$

WTR FCVS - Tear out non-salv vinyl, cut & bag - Category 3 water SF -$ -$ -$ -$

WTR FCVSA - Tear out non-salv vinyl, cut & bag - Cat 3 water-after hrs SF -$ -$ -$ -$

WTR FCVSL - Tear out non-salv vinyl, cut & bag - Cat 3 wtr - add'l lyr SF -$ -$ -$ -$

WTR FCVSLA - Tear out non-salv vinyl, cut & bag - Cat 3 add'l lyr a/hrs SF -$ -$ -$ -$

WTR FCVT - Tear out non-salvageable vinyl tile, cut & bag for disp. SF -$ -$ -$ -$

WTR FCVTA - Tear out non-salv. vinyl tile, cut & bag for disp. Aft hrs SF -$ -$ -$ -$

WTR FCVTS - Tear out non-salv. vinyl tile, cut & bag for disp. Cat 3 SF -$ -$ -$ -$

WTR FCVTSA - Tear out non-salv. vinyl tile, cut & bag Cat 3 - aft. hrs SF -$ -$ -$ -$

WTR FCVUV - Tear out non-salv. vinyl & underlay, cut & bag for disp. SF -$ -$ -$ -$

WTR FCVUVA - Tear out vinyl & underlay, bag for disp. - after hours SF -$ -$ -$ -$

Page 168: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WTR FCVUVS - Tear out vinyl & underlay, bag for disp. - Cat 3 water SF -$ -$ -$ -$

WTR FCVUVSA - Tear out vinyl & underlay & bag. - Cat 3 water - after hrs SF -$ -$ -$ -$

WTR FCW - Tear out non-salv solid/eng. wood flr & bag for disposal SF -$ -$ -$ -$

WTR FCWA - Tear out non-salv solid/eng. wood flr & bag - after hrs SF -$ -$ -$ -$

WTR FCWGC - Add for tear out wd flr glued down over concrete substrate SF -$ -$ -$ -$

WTR FCWGCA - Add for tear out wd flr glued down over concrete-after hrs SF -$ -$ -$ -$

WTR FCWGW - Add for tear out wood floor glued down over wood SF -$ -$ -$ -$

substrate

WTR FCWGWA - Add for tear out wood floor glued down over wood-after SF -$ -$ -$ -$

hrs

WTR FCWL - Tear out non-salv floating floor & bag for disposal SF -$ -$ -$ -$

WTR FCWLA - Tear out non-salv floating floor & bag - after hrs SF -$ -$ -$ -$

WTR FCWLS - Tear out non-salv floating floor & bag - Category 3 water SF -$ -$ -$ -$

WTR FCWLSA - Tear out non-salv floating floor & bag- Cat 3 wtr-aft hrs SF -$ -$ -$ -$

WTR FCWS - Tear out non-salv wood floor & bag - Category 3 water SF -$ -$ -$ -$

WTR FCWSA - Tear out non-salv wood floor & bag - Cat 3 water - aft hrs SF -$ -$ -$ -$

WTR FCWSC + Screen wood floor SF -$ -$ -$ -$

WTR FHEPA + Add for HEPA filter (for negative air exhaust fan) EA -$ -$ -$ -$

WTR FHEPA< + Add for HEPA filter (for canister/backpack vacuums) EA -$ -$ -$ -$

WTR FHEPA« + Add for HEPA filter (for upright vacuums) EA -$ -$ -$ -$

WTR FHEPA> + Add for HEPA filter (for neg. air machine/vacuum - Large) EA -$ -$ -$ -$

WTR FHEPAC + Add for HEPA filter - large cylinder EA -$ -$ -$ -$

WTR FLCHM + Chemical gas and odor neutralization cartridge - 16" x 16" EA -$ -$ -$ -$

WTR FLCHM> + Chemical gas and odor neutralization cartridge - 24" x 24" EA -$ -$ -$ -$

WTR FLVAP + Carbon vapor filter (for air scrubber) - 16" x 16" EA -$ -$ -$ -$

WTR FLVAP> + Carbon vapor filter (for air scrubber) - 24" x 24" EA -$ -$ -$ -$

WTR FURN + Drying furnace - ind. fired heater w/ducting - 85 kBtuh DA -$ -$ -$ -$

WTR FURN10 + Drying furnace - ind. fired heater w/ducting - 100 kBtuh DA -$ -$ -$ -$

WTR FURN17 + Drying furnace - ind. fired heater w/ducting - 170 kBtuh DA -$ -$ -$ -$

WTR FURN25 + Drying furnace - ind. fired heater w/ducting - 250 kBtuh DA -$ -$ -$ -$

WTR FURN40 + Drying furnace - ind. fired heater w/ducting - 400 kBtuh DA -$ -$ -$ -$

WTR GRM + Apply anti-microbial agent to {V} SF -$ -$ -$ -$

WTR GRMA + Apply anti-microbial agent to {V} - after hours SF -$ -$ -$ -$

WTR GRMB + Apply plant-based anti-microbial agent to {V} SF -$ -$ -$ -$

WTR GRMBA + Apply plant-based anti-microbial agent to {V} - after hrs SF -$ -$ -$ -$

WTR GRMBIO + Apply biological cleaning agent (spore-based) to {V} SF -$ -$ -$ -$

WTR GRMBIOA + Apply bio cleaning agent (spore-based) to {V) - after hrs SF -$ -$ -$ -$

WTR HBAG + Plastic bag - for hazardous material cleanup - Medium EA -$ -$ -$ -$

WTR HBAG< + Plastic bag - for hazardous material cleanup - Small EA -$ -$ -$ -$

WTR HBAG> + Plastic bag - for hazardous material cleanup - Large EA -$ -$ -$ -$

WTR HBOX + Box and liner - for hazardous material cleanup - Medium EA -$ -$ -$ -$

WTR HBOX< + Box and liner - for hazardous material cleanup - Small EA -$ -$ -$ -$

WTR HBOX> + Box and liner - for hazardous material cleanup - Large EA -$ -$ -$ -$

WTR HC14 + Plastic container - hazardous material cleanup - 14 gl EA -$ -$ -$ -$

WTR HC30 + Plastic container - hazardous material cleanup - 30 gl EA -$ -$ -$ -$

WTR HC60 + Plastic container - hazardous material cleanup - 60 gl EA -$ -$ -$ -$

WTR HCON + Plastic container - hazardous material cleanup - Medium EA -$ -$ -$ -$

WTR HCON< + Plastic container - hazardous material cleanup - Small EA -$ -$ -$ -$

WTR HCON> + Plastic container - hazardous material cleanup - Large EA -$ -$ -$ -$

WTR HDRY + Hang dry carpet in plant SF -$ -$ -$ -$

WTR HDRY+ + Hang dry custom oriental rug in plant SF -$ -$ -$ -$

WTR HEAT + Heat drying - hydronic boiler/power unit - 200 kBtu DA -$ -$ -$ -$

WTR HEAT> + Heat drying - hydronic boiler/power unit - 250 kBtu DA -$ -$ -$ -$

WTR HEAT» + Heat drying - hydronic boiler/power unit - 300 kBtu DA -$ -$ -$ -$

WTR HEATA + Heat drying - ducted air - 200 kBtu - 2300+ cfm DA -$ -$ -$ -$

WTR HEATA> + Heat drying - ducted air - 400 kBtu - 5200+ cfm DA -$ -$ -$ -$

WTR HEATX + Heat drying - thermal exchanger with air mover - 50 kBtu DA -$ -$ -$ -$

WTR HEATX> + Heat drying - thermal exchanger with air mover - 80 kBtu DA -$ -$ -$ -$

WTR HEPAVAC + HEPA Vacuuming - hourly charge HR -$ -$ -$ -$

WTR HEPAVAL + HEPA Vacuuming - Light - (PER SF) SF -$ -$ -$ -$

WTR HEPAVAS + HEPA Vacuuming - Detailed - (PER SF) SF -$ -$ -$ -$

WTR HTAM + Heat drying - thermal air mover - Electric DA -$ -$ -$ -$

WTR HTAM> + Heat drying - thermal air mover - Electric - Large DA -$ -$ -$ -$

WTR HTAMB + Booster for thermal air mover/exchange system DA -$ -$ -$ -$

WTR HTBL + Drying blanket/mat (per 24 hr period) - No monitoring EA -$ -$ -$ -$

Page 169: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WTR HTSC + Sensored control system for electric heat drying (24 hr) EA -$ -$ -$ -$

WTR HTX + Heat drying - thermal air exchanger DA -$ -$ -$ -$

WTR INS - Tear out and bag wet insulation SF -$ -$ -$ -$

WTR INSA - Tear out and bag wet insulation - after hours SF -$ -$ -$ -$

WTR INSC - Tear out and bag wet insulation in confined space SF -$ -$ -$ -$

WTR INSCA - Tear out and bag wet insulation in confined space- aft hrs SF -$ -$ -$ -$

WTR INSCN - Tear out wet insulation in confined space, no bagging SF -$ -$ -$ -$

WTR INSCNA - Tear out wet insul. confined space, no bagging - aft hrs SF -$ -$ -$ -$

WTR INSCS - Tear out and bag wet insulation in confined space - Cat 3 SF -$ -$ -$ -$

WTR INSCSA - Tear out and bag wet insul. confined space- Cat 3- aft hrs SF -$ -$ -$ -$

WTR INSCSN - Tear out wet insul. in confined space, no bagging - Cat 3 SF -$ -$ -$ -$

WTR INSCSNA - Tear out wet insul. conf space, no bagging- Cat 3- aft hrs SF -$ -$ -$ -$

WTR INSN - Tear out wet insulation, no bagging SF -$ -$ -$ -$

WTR INSNA - Tear out wet insulation, no bagging - after hours SF -$ -$ -$ -$

WTR INSS - Tear out and bag wet insulation - Category 3 water SF -$ -$ -$ -$

WTR INSSA - Tear out and bag wet insulation - Category 3 - after hours SF -$ -$ -$ -$

WTR INSSN - Tear out wet insulation, no bagging - Category 3 water SF -$ -$ -$ -$

WTR INSSNA - Tear out wet insulation, no bagging - Cat 3 - after hours SF -$ -$ -$ -$

WTR LAB + Water Extraction & Remediation Technician - per hour HR -$ -$ -$ -$

WTR LABA + Water Extraction & Remediation Technician - after hours HR -$ -$ -$ -$

WTR LABC + Cleaning Technician - per hour HR -$ -$ -$ -$

WTR LABCA + Cleaning Technician - after business hours HR -$ -$ -$ -$

WTR LABS + Cleaning & Remediation - Supervisory - per hr HR -$ -$ -$ -$

WTR LABSA + Cleaning & Remediation - Supervisory - after hrs. HR -$ -$ -$ -$

WTR LIFT + Lift carpet for drying SF -$ -$ -$ -$

WTR LIFTA + Lift carpet for drying - after hours SF -$ -$ -$ -$

WTR MA5 + Adapter for ducted drying- 5 ports (per 24 hrs)- No monit. EA -$ -$ -$ -$

WTR MA9 + Adapter for ducted drying- 9 ports (per 24 hrs)- No monit. EA -$ -$ -$ -$

WTR MASKFL + Floor protection - self-adhesive plastic film SF -$ -$ -$ -$

WTR MASKFLA + Floor protection - self-adhesive plastic film - after hrs SF -$ -$ -$ -$

WTR MASKFLP + Floor protection - cloth - skid resistant leak proof SF -$ -$ -$ -$

WTR MASKFP+ + Floor prot. - cloth - skid resist, leak proof, cleanable SF -$ -$ -$ -$

WTR MASKFPB + Floor protection - cloth - skid resistant, breathable SF -$ -$ -$ -$

WTR MASKV + Mask and cover register / air return EA -$ -$ -$ -$

WTR MASKV> + Mask and cover register / air return - Large EA -$ -$ -$ -$

WTR MN + Water Extraction & Remediation - Labor Minimum EA -$ -$ -$ -$

WTR MR + Per job charge for 3rd party monitoring/review (Bid Item) EA -$ -$ -$ -$

WTR MUCK - Muck-out/Flood loss cleanup SF -$ -$ -$ -$

WTR MUCK- - Muck-out/Flood loss cleanup - Light SF -$ -$ -$ -$

WTR MUCK+ - Muck-out/Flood loss cleanup - Heavy SF -$ -$ -$ -$

WTR MUCKHR - Muck-out/Flood loss cleanup - per hour (Labor only) HR -$ -$ -$ -$

WTR NAFAN + Negative air fan/Air scrubber (24 hr period) - No monit. DA -$ -$ -$ -$

WTR NAFAN> + Neg. air fan/Air scrub.-Large (per 24 hr period)-No monit. DA -$ -$ -$ -$

WTR NAFAN» + Neg. air fan/Air scrub.-XLrg (per 24 hr period)-No monit. DA -$ -$ -$ -$

WTR PAD - Tear out wet carpet pad and bag for disposal SF -$ -$ -$ -$

WTR PADA - Tear out wet carpet pad, cut/bag - after business hours SF -$ -$ -$ -$

WTR PADN - Tear out wet carpet pad, no bagging SF -$ -$ -$ -$

WTR PADNA - Tear out wet carpet pad, no bagging - after business hours SF -$ -$ -$ -$

WTR PADS - Tear out wet carpet pad, cut/bag - Category 3 water SF -$ -$ -$ -$

WTR PADSA - Tear out wet carpet pad, cut/bag - Cat 3 wtr - aft.bus.hrs SF -$ -$ -$ -$

WTR PADSN - Tear out wet carpet pad, no bagging - Category 3 water SF -$ -$ -$ -$

WTR PADSNA - Tear out wet carpet pad, no bag - Cat 3 wtr - aft.bus.hrs SF -$ -$ -$ -$

WTR PLA - Tear out wet plaster, cleanup, bag for disposal SF -$ -$ -$ -$

WTR PLAA - Tear out wet plaster, cleanup, bag - after business hours SF -$ -$ -$ -$

WTR PLAS - Tear out wet plaster, cleanup, bag - Category 3 water SF -$ -$ -$ -$

WTR PLASA - Tear out wet plaster, cleanup, bag - Cat 3 - after hours SF -$ -$ -$ -$

WTR PLYTK - Tear out toe kick and bag for disposal LF -$ -$ -$ -$

WTR PLYTKA - Tear out toe kick and bag for disposal - after bus. hours LF -$ -$ -$ -$

WTR PLYTKS - Tear out toe kick and bag for disposal - Category 3 LF -$ -$ -$ -$

WTR PLYTKSA - Tear out toe kick and bag for disposal - Cat 3 - aft hrs LF -$ -$ -$ -$

WTR PNL - Tear out wet paneling, bag for disposal SF -$ -$ -$ -$

WTR PNLA - Tear out wet paneling, bag for disposal - after hours SF -$ -$ -$ -$

WTR PNLS - Tear out wet paneling, bag for disposal - Cat 3 SF -$ -$ -$ -$

WTR PNLSA - Tear out wet paneling, bag for disp. - Cat 3 - after hours SF -$ -$ -$ -$

WTR POWD + Power distribution box DA -$ -$ -$ -$

Page 170: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WTR PPE + Add for personal protective equipment (hazardous cleanup) EA -$ -$ -$ -$

WTR PPE+ + Add for personal protective equipment - Heavy duty EA -$ -$ -$ -$

WTR PPEB + Boots - waterproof latex - Disposable (per pair) EA -$ -$ -$ -$

WTR PPEE + Eye protection - plastic goggles - Disposable EA -$ -$ -$ -$

WTR PPEG6 + Personal protective gloves - Disposable (per pair) EA -$ -$ -$ -$

WTR PPEGHD + Personal protective gloves - Heavy duty (per pair) EA -$ -$ -$ -$

WTR PPER + Disposable rain suit EA -$ -$ -$ -$

WTR PPERC + Respirator cartridge - HEPA only (per pair) EA -$ -$ -$ -$

WTR PPERCM + Respirator cartridge - HEPA & vapor & gas (per pair) EA -$ -$ -$ -$

WTR PPERCP + PAPR cartridge - HEPA only (single cartridge) EA -$ -$ -$ -$

WTR PPERCPM + PAPR cartridge - HEPA & vapor & gas (single cartridge) EA -$ -$ -$ -$

WTR PPERCPV + PAPR cartridge - vapor only (single cartridge) EA -$ -$ -$ -$

WTR PPERCV + Respirator cartridge - organic vapor & acid gas (per pair) EA -$ -$ -$ -$

WTR PPERF + Respirator - Full face - multi-purpose resp. (per day) DA -$ -$ -$ -$

WTR PPERH + Respirator - Half face - multi-purpose resp. (per day) DA -$ -$ -$ -$

WTR PPPAPR + Powered Air-Purifying Respirator (PAPR) - per day DA -$ -$ -$ -$

WTR PPSAR + Supply Air Respirator (SAR) - per day DA -$ -$ -$ -$

WTR PROT + Protect - Cover with plastic SF -$ -$ -$ -$

WTR PROTA + Protect - Cover with plastic - after hours SF -$ -$ -$ -$

WTR RFD + Refrigerator - Detach EA -$ -$ -$ -$

WTR RFDA + Refrigerator - Detach - after business hours EA -$ -$ -$ -$

WTR RGED + Range - freestanding - electric - Detach EA -$ -$ -$ -$

WTR RGEDA + Range - freestanding - electric - Detach - after hours EA -$ -$ -$ -$

WTR RGGD + Range - freestanding - gas - Detach EA -$ -$ -$ -$

WTR RGGDA + Range - freestanding - gas - Detach - after hours EA -$ -$ -$ -$

WTR RM + Remote monitoring sys. w/up to 10 sensors (per 24 hr prd) DA -$ -$ -$ -$

WTR RMG + Remote monitoring - additional gateway (per 24 hr period) DA -$ -$ -$ -$

WTR RMS + Remote monitoring - each additional sensor (per 24 hr prd) DA -$ -$ -$ -$

WTR SANDF + Sand exposed framing - Floor SF -$ -$ -$ -$

WTR SANDW + Sand exposed framing - Walls SF -$ -$ -$ -$

WTR SFSL - Tear out subfloor, sleepers & bag for disposal SF -$ -$ -$ -$

WTR SFSLA - Tear out subfloor, sleepers & bag for disposal - after hrs SF -$ -$ -$ -$

WTR SFSLS - Tear out subflr, sleepers & bag for disposal - Category 3 SF -$ -$ -$ -$

WTR SFSLSA - Tear out subflr, sleepers & bag for disp - Cat 3 - aft hrs SF -$ -$ -$ -$

WTR SNKD + Sink - single bowl - Detach EA -$ -$ -$ -$

WTR SNKDA + Sink - single bowl - Detach - after hours EA -$ -$ -$ -$

WTR SNKDD + Sink - double bowl - Detach EA -$ -$ -$ -$

WTR SNKDDA + Sink - double bowl - Detach - after hours EA -$ -$ -$ -$

WTR SNKPD + Pedestal sink - Detach EA -$ -$ -$ -$

WTR SNKPDA + Pedestal sink - Detach - after hours EA -$ -$ -$ -$

WTR SSWR + Temporary safety shower EA -$ -$ -$ -$

WTR TACK - Tear out tackless strip and bag for disposal LF -$ -$ -$ -$

WTR TACKA - Tear out tackless strip and bag for disposal - after hours LF -$ -$ -$ -$

WTR TACKG + Tackless strip guard LF -$ -$ -$ -$

WTR TACKGA + Tackless strip guard - after hours LF -$ -$ -$ -$

WTR TACKS - Tear out tackless strip and bag for disposal - Category 3 LF -$ -$ -$ -$

WTR TACKSA - Tear out tackless strip and bag for disp - Cat 3 - aft hrs LF -$ -$ -$ -$

WTR TEST + Contamination - air or surface testing & lab analysis EA -$ -$ -$ -$

WTR TEST+ + Contamination - pre & post test - full service (Bid Item) EA -$ -$ -$ -$

WTR TESTATP + Contamination - on-site ATP testing EA -$ -$ -$ -$

WTR THERM + Thermal imaging - (Bid Item) EA -$ -$ -$ -$

WTR TLTD + Toilet - Detach EA -$ -$ -$ -$

WTR TLTDA + Toilet - Detach - after hours EA -$ -$ -$ -$

WTR TRAN + Transport carpet for drying SF -$ -$ -$ -$

WTR TRI - Tear out trim LF -$ -$ -$ -$

WTR TRIA - Tear out trim - after business hours LF -$ -$ -$ -$

WTR TRIM - Tear out trim and bag for disposal - up to Cat 3 LF -$ -$ -$ -$

WTR TRIMA - Tear out trim and bag for disposal - up to Cat 3 - aft hrs LF -$ -$ -$ -$

WTR TRIMT - Add-on for tearing out trim/base from tile/grout LF -$ -$ -$ -$

WTR TRIMTA - Add-on for tear out trim/base from tile/grout - after hrs LF -$ -$ -$ -$

WTR ULAY - Tear out non-salv underlayment & bag for disposal SF -$ -$ -$ -$

WTR ULAYA - Tear out non-salv underlayment & bag - after business hrs SF -$ -$ -$ -$

WTR ULAYN - Tear out non-salv underlayment, no bagging SF -$ -$ -$ -$

WTR ULAYNA - Tear out non-salv underlayment, no bagging - after hours SF -$ -$ -$ -$

WTR ULAYS - Tear out non-salv underlayment & bag - Category 3 water SF -$ -$ -$ -$

Page 171: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

WTR ULAYSA - Tear out non-salv underlayment & bag - Cat 3 wtr - aft.hrs SF -$ -$ -$ -$

WTR WALL + Wall cavity drying-Inj. type (per 24 hr period) No monit. DA -$ -$ -$ -$

WTR WALLD + Wall cavity drying-Dctd type (per 24 hr period) No monit. DA -$ -$ -$ -$

WTR WALLF + Fill holes created by wall cavity drying EA -$ -$ -$ -$

WTR WALLH + Drill holes for wall cavity drying EA -$ -$ -$ -$

WTR WALLHA + Drill holes for wall cavity drying - after hrs EA -$ -$ -$ -$

WTR WFD + Wood flr drying - subfloor air flow (per 24 hr) No monit DA -$ -$ -$ -$

WTR WFDAD + Wood floor drying add-on kit (per 24 hr period) No monit. DA -$ -$ -$ -$

WTR WET + Wood floor drying extraction mat (per 24 hr prd) No monit. DA -$ -$ -$ -$

WTR WSHD + Washing machine - Detach EA -$ -$ -$ -$

WTR WSHDA + Washing machine - Detach - after business hours EA -$ -$ -$ -$

CAT SEL ACT DESCRIPTION UNIT REPLACE REMOVE RESET REMOVE &

REPLACE

XST BIDITM + Exterior Structures (Bid Item) EA -$ -$ -$ -$

XST CANCOL & 8" x 8" steel canopy column LF -$ -$ -$ -$

XST CANCOV & Canopy cover SF -$ -$ -$ -$

XST CANCOVC & Canopy cover - Commercial SF -$ -$ -$ -$

XST CANFTG + 5' x 5' x 5' canopy footing EA -$ -$ -$ -$

XST CANPNL & 36" wide steel canopy panel LF -$ -$ -$ -$

XST GRNAV & Greenhouse metal framing package SF -$ -$ -$ -$

XST GRNHB & Greenhouse bench - steel - fixed (4' x 12') EA -$ -$ -$ -$

XST GRNHGH & Greenhouse - Ground heating system SF -$ -$ -$ -$

XST GRNHVE + Greenhouse - Fans/Louvers - ends EA -$ -$ -$ -$

XST GRNHVS + Greenhouse - Motorized side roll-ups EA -$ -$ -$ -$

XST GRNRF & Greenhouse Covering - Roof (6 mil greenhouse film- SF -$ -$ -$ -$

double)

XST GRNWL & Greenhouse Covering - Walls (polycarbonate) SF -$ -$ -$ -$

XST GZDOV + Gazebo - Double Roof - Octagon - Vinyl - Add on EA -$ -$ -$ -$

XST GZDOV> + Gazebo - Double Roof - Octagon - Vinyl - Large - Add on EA -$ -$ -$ -$

XST GZDOV» + Gazebo - Double Roof - Octagon - Vinyl - XLg - Add on EA -$ -$ -$ -$

XST GZDOW + Gazebo - Double Roof - Octagon - Cedar/Treated - Add on EA -$ -$ -$ -$

XST GZDOW> + Gazebo - Double Roof - Octagon - Cedar/Trtd - Lrg - Add EA -$ -$ -$ -$

on

XST GZDOW» + Gazebo - Double Roof - Octagon - Cedar/Trtd - XLg - Add EA -$ -$ -$ -$

on

XST GZDRV + Gazebo - Double Roof - Oval/Rect. - Vinyl - Add on SF SF -$ -$ -$ -$

GZDRW + Gazebo - Double Roof - Oval/Rect. - Cedar/Trtd - Add on SF -$ -$ -$ -$

SF

XST GZOC & Gazebo - Pre-manuf. Kit - Octagon - Cedar - Medium EA -$ -$ -$ -$

XST GZOC< & Gazebo - Pre-manuf. Kit - Octagon - Cedar - Small EA -$ -$ -$ -$

XST GZOC> & Gazebo - Pre-manuf. Kit - Octagon - Cedar - Large EA -$ -$ -$ -$

XST GZOT Gazebo - Pre-manuf. Kit - Octagon - Treated Pine - EA -$ -$ -$ -$

Medium

XST GZOT< & Gazebo - Pre-manuf. Kit - Octagon - Treated Pine - Small EA -$ -$ -$ -$

XST GZOT> & Gazebo - Pre-manuf. Kit - Octagon - Treated Pine - Large EA -$ -$ -$ -$

XST GZOT» & Gazebo - Pre-manuf. Kit - Octagon - Treated Pine - XLarge EA -$ -$ -$ -$

XST GZOV & Gazebo - Pre-manuf. Kit - Octagon - Vinyl - Medium EA -$ -$ -$ -$

XST GZOV< & Gazebo - Pre-manuf. Kit - Octagon - Vinyl - Small EA -$ -$ -$ -$

XST GZOV> & Gazebo - Pre-manuf. Kit - Octagon - Vinyl - Large EA -$ -$ -$ -$

XST GZOV>> & Gazebo - Pre-manuf. Kit - Octagon - Vinyl - XLarge EA -$ -$ -$ -$

XST GZRC & Gazebo - Pre-manuf. Kit - Oval/Rect. - Cedar - Medium EA -$ -$ -$ -$

XST GZRC< & Gazebo - Pre-manuf. Kit - Oval/Rect. - Cedar - Small EA -$ -$ -$ -$

XST GZRC> & Gazebo - Pre-manuf. Kit - Oval/Rect. - Cedar - Large EA -$ -$ -$ -$

XST GZRC>> & Gazebo - Pre-manuf. Kit - Oval/Rect. - Cedar - XLarge EA -$ -$ -$ -$

XST GZRT & Gazebo - Pre-manuf. Kit - Oval/Rect. - Treated Pine - Med. EA -$ -$ -$ -$

XST GZRT< & Gazebo - Pre-manuf. Kit - Oval/Rect. - Treated Pine -Small EA -$ -$ -$ -$

XST GZRT> & Gazebo - Pre-manuf. Kit - Oval/Rect. - Treated Pine -Large EA -$ -$ -$ -$

XST GZRT>> & Gazebo - Pre-manuf. Kit - Oval/Rect. - Treated Pine - XLg EA -$ -$ -$ -$

XST GZRV & Gazebo - Pre-manuf. Kit - Oval/Rect. - Vinyl - Medium EA -$ -$ -$ -$

XST GZRV< & Gazebo - Pre-manuf. Kit - Oval/Rect. - Vinyl - Small EA -$ -$ -$ -$

XST GZRV> & Gazebo - Pre-manuf. Kit - Oval/Rect. - Vinyl - Large EA -$ -$ -$ -$

XST GZRV>> & Gazebo - Pre-manuf. Kit - Oval/Rect. - Vinyl - XLarge EA -$ -$ -$ -$

XST HP & Hoop Building kit (4400 sf or less) SF -$ -$ -$ -$

Page 172: ** CONFIDENTIAL PRICE LIST PRINTOUT ** Price List: IBTS NC … · 2018-06-19 · ACC LAB + Mobile Home Repair - per hour HR $ - $ - $ - $ - ACC LABL + Mobile Home - General Laborer

XST HP> & Hoop Building kit (4401 sf or greater) SF -$ -$ -$ -$

XST HPEP & Hoop Bldg. - End Panel (36' to 60' width) EA -$ -$ -$ -$

XST HPEP< & Hoop Bldg. - End Panel (35' or less width) EA -$ -$ -$ -$

XST HPEP> & Hoop Bldg. - End Panel (61' or greater width) EA -$ -$ -$ -$

XST HPEPS & Hoop Bldg. - End Panel Support kit (36' to 60' width) EA -$ -$ -$ -$

XST HPEPS> & Hoop Bldg. - End Panel Support kit (61' or greater width) EA -$ -$ -$ -$

XST LAB + Exterior Structure Installer - per hour HR -$ -$ -$ -$

XST LABL + Exterior Structure - General Laborer - per hour HR -$ -$ -$ -$

XST MN + Exterior Structures - Labor Minimum EA -$ -$ -$ -$

XST PGA & Pergola - Pre-manufactured Kit - Aluminum SF -$ -$ -$ -$

XST PGC & Pergola - Pre-manufactured Kit - Cedar SF -$ -$ -$ -$

XST PGV & Pergola - Pre-manufactured Kit - Vinyl SF -$ -$ -$ -$

XST PSM & Picnic shelter - Metal (401-800 sf) SF -$ -$ -$ -$

XST PSM< & Picnic shelter - Metal (400 sf or smaller) SF -$ -$ -$ -$

XST PSM> & Picnic shelter - Metal (801-1200 sf) SF -$ -$ -$ -$

XST PSM>> & Picnic shelter - Metal (1200 sf or larger) SF -$ -$ -$ -$

XST PSW & Picnic shelter - Wood (401-800 sf) SF -$ -$ -$ -$

XST PSW< & Picnic shelter - Wood (400 sf or smaller) SF -$ -$ -$ -$

XST PSW> & Picnic shelter - Wood (801-1200 sf) SF -$ -$ -$ -$

XST PSW>> & Picnic shelter - Wood (1201-1800 sf) SF -$ -$ -$ -$

XST PSW>>> & Picnic shelter - Wood (1801 sf or larger) SF -$ -$ -$ -$

XST PSWW & Picnic shelter - Wood - 40'+ wide (1801 sf or larger) SF -$ -$ -$ -$

XST QU & Quonset Bldg. kit (2801 sf - 5000 sf) SF -$ -$ -$ -$

XST QU< & Quonset Bldg. kit (2800 sf or less) SF -$ -$ -$ -$

XST QU> & Quonset Bldg. kit (5001 sf or greater) SF -$ -$ -$ -$

XST QUEPO & Quonset Bldg. - End Panel - open SF -$ -$ -$ -$

XST QUEPS & Quonset Bldg. - End Panel - solid SF -$ -$ -$ -$

XST QUSP & Quonset Bldg. - Skylight panels EA -$ -$ -$ -$

XST SHEDMB & Storage shed - Metal - Barn type (gambrel) - 10' x 14' EA -$ -$ -$ -$

XST SHEDMB< & Storage shed - Metal - Barn type (gambrel) - 10' x 8' EA -$ -$ -$ -$

XST SHEDMG & Storage shed - Metal - Gable type - 10' x 8' EA -$ -$ -$ -$

XST SHEDMG< & Storage shed - Metal - Gable type - 8' x 6' EA -$ -$ -$ -$

XST SHEDMG> & Storage shed - Metal - Gable type - 10' x 12' EA -$ -$ -$ -$

XST SHEDV & Storage shed - Vinyl - Gable type - 10' x 8' EA -$ -$ -$ -$

XST SHEDV< & Storage shed - Vinyl - Gable type - 8' x 6' EA -$ -$ -$ -$

XST SHEDV> & Storage shed - Vinyl - Gable type - 10' x 13' EA -$ -$ -$ -$

XST SHEDVRS + Storage shed - Vinyl - Detach & reset EA -$ -$ -$ -$

XST SMG1017 & Storage shed - Metal - Gable type - 10' x 17' EA -$ -$ -$ -$

XST SMG1021 & Storage shed - Metal - Gable type - 10' x 21' EA -$ -$ -$ -$

XST SMG1025 & Storage shed - Metal - Gable type - 10' x 25' EA -$ -$ -$ -$

XST SW10X12 & Storage shed - Wood - 10' x 12' EA -$ -$ -$ -$

XST SW10X14 & Storage shed - Wood - 10' x 14' EA -$ -$ -$ -$

XST SW12X14 & Storage shed - Wood - 12' x 14' EA -$ -$ -$ -$

XST SW12X16 & Storage shed - Wood - 12' x 16' EA -$ -$ -$ -$

XST SW8X10 & Storage shed - Wood - 8' x 10' EA -$ -$ -$ -$

XST SW8X6 & Storage shed - Wood - 8' x 6' EA -$ -$ -$ -$