Development Status Report Toowoomba May 2014

Transcript of Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May...

Page 1: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

Development Status Report

Toowoomba May 2014

Page 2: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

2 Development Status Report May 2014

Our region is rich with possibility.

We have thriving agriculture, manufacturing and transport industries...

TABLE OF CONTENTS Project Locations Map 4

Projects Underway 5

Projects Approved & Awaiting Commencement 8

Projects Proposed 10

Projects Recently Completed 13

DEVELOPMENT STATUS REPORT TOOWOOMBA REGIONAL COUNCIL AREA

May 2014

TSBE is the ‘go-to’ organisation that links business with opportunity to achieve sustainable growth and diversity for the region.Toowoomba and the wider Surat Basin is a regional centre experiencing high growth and increased investment generated by an active resource sector, growing infrastructure requirements, seasoned agricultural productivity and many other successful industries. TSBE wholeheartedly supports the sustainable growth and development of our region by being an information centre, advocacy agent for key infrastructure issues and providing vital services to local businesses.

Updated biannually this Development Status Report will equip the reader with knowledge including the costs, locations and estimated completion dates for known developments in the Toowoomba region. It is through providing this complete record that we hope to encourage further investment, lending confidence and providing businesses with the relevant information to make sound business decisions.

This document is compiled by TSBE for its members. Significant care has been taken to confirm the currency and accuracy of the material. TSBE holds no responsibility for errors or omissions and will ensure that any changes in projects are included in subsequent editions.

TSBE would like to thank our key partners and platinum supporters:

Foundation Partner

Platinum Members

Regional PartnersMajor Sponsor

Page 3: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

3 Development Status Report May 2014

The findings of this report are conservative but indicate a total development spend for our region well in excess of $11 billion

image to go here

EXECUTIVE SUMMARYThe following Development Status Report for the Toowoomba region highlights the significant levels of investment within the area. The projects listed within this publication are categorised into four different phases of development. These are Projects Underway, Projects Approved and Awaiting Commencement, Projects Proposed and Projects Recently Completed.

Acknowledged limitations of this report are that it excludes some key information from developments where commercial-in-confidence arrangements currently exist or information was not yet able to be made publically available. These are marked in the report as ‘TBA’. It also excludes a vast number of developments under the $2 million construction cost threshold. Taking into account these limiting factors, the findings of this report are conservative but indicate a total development spend for the region well in excess of $11 billion, more than $5 billion on the indicated spend figure six months ago. Within this figure, $1.66 billion will be spent building the long-awaited Toowoomba Second Range Crossing, with construction to begin in 2015. Other large infrastructure projects, such as the Brisbane West Wellcamp Airport and Interlink SQ, both currently underway, also contributed significantly to development spend in the region. Proposed projects for the region, which include the Melbourne to Brisbane Inland Rail Project and a new Bunnings, totalled more than $5.8 billion, while projects currently underway totalled more than $3.5 billion. Projects approved and awaiting commencement totalled more than $2.1 billion.

The chart below graphically demonstrates the report’s findings:

TSBE would like to thank the companies that contributed information to this document. They are formally acknowledged at the end of the report. Any proponent with information to be included in future editions can contact TSBE on (07) 4639 4600.

Page 4: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

4 Development Status Report May 2014

PROJECT LOCATIONS MAP

Page 5: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

5 Development Status Report May 2014

PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

National Broadband Network 1 Toowoomba Rollout of the NBN in

ToowoombaAustralian Government $246 June 2015

Wellcamp Airport and Business Park 3 Wellcamp

A jet-capable privately owned airport, available for commercial freight and passenger movements. Commercial business park to complement Wellcamp Airport.

Wagners $300 October 2014

Warwick Street 1 ToowoombaExpansion of Stonestreet’s Coaches

Stonestreet’s Coaches $3.5 TBA

Transport Network Reconstruction Program 1

Throughout the Darling Downs and Lockyer Valley

Reconstruction of flood-affected roads on the Main Roads network from devastating natural disaster events of 2011, 2012 and 2013.

Queensland Government (Transport and Main Roads), CGI Consulting and AECOM

$1,055 June 2015

Outer Circulating Road Project 1 Toowoomba

Will consist of a network of roads forming a loop around Toowoomba's city centre

Queensland Government (Royalties for the Regions funding)

$45 Late 2014

Highfields State High School 2 Highfields

New high school to accommodate grades 7 and 8 at the new school, with subsequent year levels added each year to grade 12

Queensland Government $35 Stage 1-2015

Goggs Street Flood Mitigation 1 Toowoomba

A new stormwater network will be installed in Goggs Street, as part of the West Creek channel works. The project will provide flood mitigation for a storm event up to a nominal one in 10-year event.

Toowoomba Regional Council, State Government and Federal Government

$4.5 July 2014

Page 6: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

6 Development Status Report May 2014

PROJECTS UNDERWAY– PROPERTY AND CONSTRUCTION

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

North Highfields Estate Stage 4 2

Kleinton and Meringindan Rds, Highfields

Stage 4 includes 52 residential blocks

Clive Berghofer Group

$2.3 September 2014

Sanctuary Rise Stage 2 1Greenwattle and Barlow Sts, Toowoomba

Stage 2-74 lots residential land subdivision

Consolidated Properties Group

$3 October 2014

Kalimna Park Residential Estate Stage 12 2 Highfields

Residential land subdivision in 12 stages with 1 stage remaining of 36 lots

The QMC Group $3.4 2014

Westbrook Estate Stages 3 and 4

Shoesmith Rd and Gwenda Dr, Westbrook

Stages 3 and 4 includes 46 residential blocks

Clive Berghofer Group

$2 September 2014

Nelson Street Estate Stage 4 1

Nelson and Kearney Sts, Toowoomba

Stage 4 includes 65 residential blocks

Clive Berghofer Group

$3 October 2014

Social Housing Complex 1 Holberton St, Newtown

12 two-bedroom apartments, including four adaptable dwellings on the ground floors for tenants needing wheelchair access

Queensland Government (Housing 2020 Strategy)

$2.6 End of 2014

The Clifton Toowoomba Stage 2 1

Vacy St and Anzac Av, Toowoomba

Stage 2: The Clifton on Vacy and The Clifton on Anzac. The three Clifton sites will offer 43 townhouses.

Thirdi Property Group

$11.6 November 2014

PROJECTS UNDERWAY – MINING AND ENERGY Project Name Map

Position Location Description Proponent Construction

Cost (million)

Estimated Completion

Date

New Acland Mine 4 Acland

Open-cut coal mine employing 300 people and injecting $300 million into the south-east Queensland economy each year

New Hope Group $1,700 2017

Page 7: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

7 Development Status Report May 2014

PROJECTS UNDERWAY– PROPERTY AND CONSTRUCTION CONT.

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

Laguna Serviced Apartments 1

189 Hume St, Toowoomba

Multi-level commercial and retail development. Includes apartments, an underground car park, offices and a cafe

Coffee House Pty Ltd $8 May 2014

Empire Theatre Expansion 1 Neil St, Toowoomba

350-seat Toowoomba Regional Arts and Community Centre

Toowoomba Regional Council

$5.5 July 2014

Centenary Heights State High School 1

Ramsay and South Sts, Toowoomba

Year 7 infrastructure/new 12 space teaching block

Department of Education $4.6 June 2014

Community care unit 1Spring and West Sts, Toowoomba

24-bed residential facility for mental health patients

Queensland Government $11.6 Late 2014

New Toowoomba City Library 1

Herries and Victoria Sts, Toowoomba

6800 square metre facility spread across three storeys. Include the library, as well as an immunisation clinic, local history library and a bicycle drop-off centre. Undercover basement parking for 95 cars also.

Toowoomba Regional Council

$24.5 Mid 2015

Witmack Industrial Park Stage 4 3

Witmack Industrial Park

Industrial Business Park

Witmack Industrial Pty Ltd

$10 2014

Rosemount Downs Retirement Village 1 Glenvale,

Toowoomba

153-home and club estate including country club bar and restaurant, tennis courts, bowling green and pool

Stephen Thomas $80 April 2015

Parkview Estate Stage 3 1Glenvale Rd and Mc Dougall St, Toowoomba

108 residential sites (over 3 stages) and a recreational park

Kevin Carlin $12.5 September 2014

Page 8: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

8 Development Status Report May 2014

PROJECTS UNDERWAY– PROPERTY AND CONSTRUCTION CONT.

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

Crampton Automotive Extension 1

James St, Hume St and Phillip St, Toowoomba

-New Mercedes showroom

-Refurbishment of the existing building for the new Hyundai showroom

-New workshop and parts department

-Drive-through service centre

-New used car operation

-Customer parking area and service storage facility

Crampton Automotive TBA TBA

CBD Hotel Development 1Margaret St, Toowoomba

An 8-storey, 74-room 74-room Quest Serviced Apartments hotel, that will incorporate part of the historical Church of Christ building

FKG TBA Mid 2015

PROJECTS APPROVED AND AWAITING COMMENCEMENT– INFRASTRUCTURE AND SERVICES

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

Redevelopment of Grand Central and Gardentown shopping centres

1 Margaret St, Toowoomba

Integration of Grand Central and Garden Town shopping centres

QIC $350 September 2016

Rail Tunnel Upgrades 1 Toowoomba Range

Expand the capacity of 11 rail tunnels through the Toowoomba Range

Queensland Government $10* TBA

Flood Mitigation Work 1 Toowoomba Toowoomba CBD drainage overhaul

Toowoomba Regional Council

TBA TBA

Toowoomba Second Range Crossing 1 Toowoomba

A bypass route to the north of Toowoomba, approximately 42km in length, running from the Warrego Highway at Helidon in the east to the Gore Highway at Athol

Queensland and Federal Government

$1660 2018

*Estimated figure based on a total project cost of $17 million which includes expanding additional tunnels in the Lockyer Valley to allow rail transport.

Page 9: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

9 Development Status Report May 2014

PROJECTS APPROVED AND AWAITING COMMENCEMENT– INFRASTRUCTURE AND SERVICES

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

Toowoomba Substation 1 Toowoomba

Built as part of the Grand Central redevelopment on former Gardentown shopping centre site. Will use modern technology, including indoor 100kV gas insukated switchgear, to meet future electricity demands.

Queensland Government $74.7 TBA

Toowoomba Anglican College and Preparatory School

1 Toowoomba

Extension of existing Toowoomba Preparatory School to become a Prep to Year 12 facility

Toowoomba Preparatory School

TBA 2018

PROJECTS APPROVED AND AWAITING COMMENCEMENT– PROPERTY AND CONSTRUCTION

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

Brownesholme Village Expansion 2

Highfields Rd, Highfields

Stage 1-96 bed aged care facility to soon be added

Carinity $15.5 May 2015

Eastside Village development 1

Cohoe and Herries Sts, Toowoomba

Proposed fast food precinct development to include a McDonalds and KFC

Kelly Group of Companies $9 TBA

Eastpointe Apartments 1Kitchener St, Toowoomba

11-storey, 48 unit development FKG $45 TBA

Drayton Gym 1 Brisbane St, Drayton

24-hour gym located next to the Drayton Central Shopping Centre, on 350 square metres of floor space. Will also include 15 car parks.

TBA TBA TBA

Worship Centre 1Boundary St and Hursley Rd, Toowoomba

370-seat worship centre with a floor area of just under 2000 square metres over two storeys, as well as a childcare centre, a men’s shed and a caretaker’s residence

Lifeworks Uniting Church

$5 TBA

Page 10: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

10 Development Status Report May 2014

PROJECTS APPROVED AND AWAITING COMMENCEMENT– PROPERTY AND CONSTRUCTION

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

Crows Nest Retirement Facility 8 Crows Nest

98 hectare site to include 204 one, two and three-bedroom residential dwellings, a community centre and convenience store. To be built over six stages.

TBA TBA TBA

PROJECTS PROPOSED– INFRASTRUCTURE AND SERVICES

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

Bulli Creek Solar Farm 735km west of Millmerran

Large-scale solar farm built on up to 13,340 acres of freehold land at Bulli Creek

Solar Choice TBA TBA

Charlton Sports Precinct 3 Charlton

Master plan completed in February 2014 for approximately 44 hectares of land acquired to be developed into major sporting facilities area

Toowoomba Regional Council

TBA TBA

Interlink SQ 3 Charlton

160 hectare Intermodal and Bulk Freight Terminal development for Southern Queensland

Freight Terminals Trust

Stage 1-$30 Total Investment- $160

Stage 1- 2015 Completion- 2025

Education and meditation facility 4

Oakey-Mt Darry Rd, Highland Plains

State-of-the-art education and mediation facility to include classes for Prep to Year 12 students and a prayer hall. The school will be self-sustainable, using solar panels to power its library, dining hall, prayer room, 12-room staff dormitory and 120-plus rooms.

Pure Land Learning College

TBA TBA

Page 11: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

11 Development Status Report May 2014

PROJECTS PROPOSED– INFRASTRUCTURE AND SERVICES CONT.

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

Sewerage Network Enabling Project 3 Charlton

Sewerage Network Enabling Project at the Charlton Wellcamp Enterprise Area. Covering 2000 hectares, this area will provide much-needed industrial land for the region.

Toowoomba Regional Council and Industry

$9 TBA

Steger Road Upgrade 3 Charlton

Upgrade of Steger Road at Charlton Wellcamp Enterprise Area. Covering 2000 hectares, this area will provide much-needed industrial land for the region.

Toowoomba Regional Council and Industry

$7 TBA

O’Mara Road Upgrade Stage 1A 3 Charlton

Upgrade of O’Mara Rd at Charlton Wellcamp Enterprise Area. Covering 2000 hectares, this area will provide much-needed industrial land for the region.

Toowoomba Regional Council, State Government and Federal Government

$21 TBA

West Creek Railway Bridge 1 West Creek

Toowoomba

The project will construct a new three span railway bridge over West Creek near Dent and Herries Streets, to increase flood immunity in the Toowoomba CBD and avoid road closures in the west season.

State Government and Federal Government

$5 TBA

Mary Mackillop Catholic High School 2 Highfields

Extension of existing Mary Mackillop Primary School to become a preschool to year 12 campus

Mary Mackillop Primary School

$30 2016

Melbourne to Brisbane Inland Rail Project 1 Toowoomba

A proposed rail link, to run from the Port of Melbourne to the Port of Brisbane and traverse through Toowoomba with the construction of a tunnel through the Toowoomba Range

Australian Government and private investors

$4,700 2020

Page 12: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

12 Development Status Report May 2014

PROJECTS PROPOSED – MINING AND ENERGY Project Name Map

Position Location Description Proponent Construction

Cost (million)

Estimated Completion

Date

New Acland Coal Mine Stage 3 (revised project) 4 Acland

Continuation of the existing New Acland open-cut coal mine, boosting employment to 435 people at its peak, and contributing almost $6.6 billion over the life of the mine in direct operating costs.

New Hope Group $896 2029

PROJECTS PROPOSED – PROPERTY AND CONSTRUCTIONProject Name Map

Position Location Description Proponent Construction

Cost (million)

Estimated Completion

Date

Bunnings Warehouse 1 Ruthven St, Toowoomba

18,130 square metre site to include Bunnings Warehouse and 480 parking spaces. To be built on former Foundry site.

Bunnings $43 2018

Charlton shopping centre 3Warrego Highway, Charlton

A shopping centre to be built over 4700 square metres, to have a gross floor area of 1025 square metres.

Range Manufacturing TBA TBA

Hooper Centre Plan 1 Hume St, Toowoomba

300 square metre-tenanted retail building in the existing car park of the Hooper Centre

HCPT Pty Ltd TBA TBA

Westbrook Motel 6 Main St, Westbrook

27-unit motel to be built next door to existing shopping centre

TBA TBA TBA

Anzac Avenue Super Centre Shopping Complex 1 Anzac Av,

ToowoombaShopping complex including furniture and retail outlets

Wagners $4.5 TBA

Toowoomba Rail Yards Precinct Redevelopment 1

Bridge, Ruthven, Russell, Railway and Bellevue Sts, Toowoomba

This area is proposed to become an urban village with green, residential and retail spaces and an indoor marketplace

Toowoomba Regional Council/Queensland Government

TBA TBA

The Intersection 1

Ruthven and Alderley Sts, Toowoomba

Fast food retail site on 700 square metres

Bruntnell Developments $4.5 TBA

Page 13: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

13 Development Status Report May 2014

PROJECTS RECENTLY COMPLETED (LAST 12 MONTHS)Project Name Map

Position Location Description Proponent Construction

Cost (million)

Estimated Completion

Date

Saxon Energy Services 3Witmack Industrial Park, Wellcamp

Industrial workshop/warehouse with office

Witmack Industrial Pty Ltd

$3 April 2013

Wellcamp Business Park-Trunk Water Supply 3 Wellcamp

5.3km of 300mm diameter trunk water supply main for proposed Business Park under construction

Wagners $2 June 2013

Nufarm Warehouse 3Heinemann Transport Park

Workshop and office Janflow Pty Ltd $3.5 June 2013

7 Springs Health + Dental 1 Ruthven St Toowoomba

Medical complex with a general practice, dental surgery, pathology suite, x-ray service, physiotherapist, podiatrist, psychologist and cafe

Private investment $8 August 2013

FKG Office Stage 2 1275 McDougall St, Toowoomba

Workshop FKG $4 November 2013

Toowoomba Turf Club Track Restoration Project 1 Toowoomba

Reinstatement of a turf track at Clifford Park

Toowoomba Turf Club $7 December

2013

Toowoomba Gas and Coke Remediation Works 1 Chalk Dr,

ToowoombaUp to 100,000 tonnes of contaminated soil removed

Energex and Thiess TBA December

2013

Highfields Village Shopping Centre Expansion

2 Highfields

Expansion and upgrade of existing Woolworths supermarket, Woolworths petrol station, car park sail and additional specialty shops

Lauder Pty Ltd $7 December

2013

Ironbark Ridge Residential Estate 6 Westbrook

Stage 3 was the final 33 lots of a 99-lot residential land subdivision that was undertake in 3 stages

Ridgewood Properties $2.2 December

2013

Drayton Shopping Centre 1 Brisbane St, Drayton

Shopping centre that includes Woolworths, bottle shop, pharmacy and

Chris Hughes $20 January 2014

Page 14: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

14 Development Status Report May 2014

PROJECTS RECENTLY COMPLETED (LAST 12 MONTHS) CONT.

Project Name Map Position Location Description Proponent

Construction Cost

(million)

Estimated Completion

Date

Northpoint Shopping Centre 1 North

Toowoomba

Shopping complex that includes Coles, Aldi, a medical centre, pharmacy, newsagent and 20 specialty shops

Hallmark Property $25 March 2014

The Vault on Ruthven 1 Ruthven St, Toowoomba

Adult entertainment venue within the old Commonwealth Bank building. A total of 960sq metres was refurbished

Private investors $2.5 March 2014

Westbrook Stages 1 and 2 6 Westbrook50 residential blocks, selling from April 2014.

Clive Berghofer Group

$2.2 March 2014

Blue Care Refurbishment 1 Stenner St, Toowoomba

Refurbishment and new build within existing Blue Care facility

Blue Care $6.5 March 2014

Sanctuary Rise Residential Estate Stage 1 1

Greenwattle and Barlow Sts, Toowoomba

68 lots (of a total 311 lots, in 5 stages) residential land subdivison

Consolidated Properties Group

$6 April 2014

Heritage Bank Refurbishment 1

400 Ruthven St, Toowoomba

Refurbishment which includes a complete makeover of rear courtyard and Heritage Plaza arcade, upper tower repainted and new tiles on exterior areas around the building.

Heritage Bank $3 April 2014

Redevelopment of Chronicle Building 1 Ruthven St,

Toowoomba

4000 square metres of office and retail. Major tenant-Power Tynan

Argyle Investments $4 April 2014

Page 15: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

15 Development Status Report May 2014

A BIG THANK YOU TO OUR GENEROUS CONTRIBUTORS:

Page 16: Developmentmedia2.apnonline.com.au/img/media/...status-report... · 5 Development Status Report May 2014 PROJECTS UNDERWAY– INFRASTRUCTURE AND SERVICES Project Name Map Position

TOOWOOMBA AND SURAT BASIN ENTERPRISE

Street Address Suite 13, Level 2, Central Plaza Apartments, 532 Ruthven Street, Toowoomba QLD 4350

Postal Address PO Box 658, Toowoomba QLD 4350

P 07 4639 4600 F 07 4639 3416 E [email protected] W www.tsbe.com.au