© 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP...
Transcript of © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP...
![Page 1: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/1.jpg)
© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2016 HDR, Inc., all rights reserved.
![Page 2: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/2.jpg)
© 2016 HDR, Inc., all rights reserved.
The Winston-Salem Program Management Approach
Achieving Best in Class Performance for Collection Systems
![Page 3: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/3.jpg)
Background………………………………………………. Where are we and How did we get here? Initial “Quick Assessment”…………………………………………………. Where do we want to be? Fast Start & Strategic Planning-…………………………..How do we get to where we want to be? Year 1 -What was planned and what was accomplished……………………………….…And go! Year 2 – What’s next?
Contents
![Page 4: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/4.jpg)
It all starts with a request from EPAo 308 data request lettero Data scrubbing and response assistanceo The Results- a LOV letter
Rapid Assessment of Opportunitieso Master plan reviewo Operational gap analysis
• Interviews• Document Review• Report out
City of Winston-Salem decision to avoid Compliance Action
Transition to the CSIP format
Background
![Page 5: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/5.jpg)
Continuation of Rapid Assessmento Designed to identify immediate ROI activities
• Assess the state of the collection system• Near Term Condition • Discover Known Operational issues• Develop an understanding of IT related issues
o Key Performance Indicators Concurrent with Strategic Planning process• Perform a SWOC or “WS”-OC• Incorporate previous Master Planning and PAS 55
Assessments• Review known KPI’s
CSIP Program “Quick Start” Approach
![Page 6: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/6.jpg)
VisionWe will be a top-performing utility supported by a trained, knowledgeable, and proactive staff, dependable equipment, efficient processes, effective information management, and fair and affordable rates.
Mission and VisionMissionTo improve collection and conveyance of wastewater while protecting the environment and community we serve by complying with all regulatory requirements.
![Page 7: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/7.jpg)
Ownership and Accountability Team Integration Knowledge Transfer Operational Optimization Condition and Capacity Assessment Design and Delivery of Construction
Solutions
Overarching Concepts of the Program
![Page 8: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/8.jpg)
Sewer Cleaning Data Collection (SOPs) Sewer Cleaning Frequency Optimization
(Tools)o Dynamic Risk based modelo Tools and training
Identify and Implement right level of cleaning effort
Quick Start Components (Accomplishments)
![Page 9: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/9.jpg)
Near Term Condition Assessment Supporto Desk Top Assessmento Develop a 4S sampling approacho Prioritize Repairso Inform Capital Budgets
Quick Start Components (Accomplishments)
![Page 10: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/10.jpg)
SSO Responseo Training on data collectiono Updated SOP’so SSO Review Meeting
Enhancementso Root Cause Determination
Approach
Quick Start Components (Accomplishments)
![Page 11: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/11.jpg)
Deep Dive Operational Gap Assessmento Develop an Optimization Plan (5 year Road
map) Based on gaps identified• Management• Condition and Capacity Assessment• Cleaning Optimization, Root Control, and
Easement Management• Construction and Repair• Lift Station Operations• FOG Programs• SSO Response• Planning and Scheduling• Information Systems Support• Staff Augmentation
Quick Start Components (Accomplishments)
![Page 12: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/12.jpg)
TIER 1 HEADERFirst Name Last Name
Business Title
TIER 2 HEADER
First Name Last NameBusiness Title
First Name Last NameBusiness Title
First Name Last NameBusiness Title
First Name Last NameBusiness Title
First Name Last NameBusiness Title
First Name Last NameBusiness Title
![Page 13: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/13.jpg)
Ownership and Accountability (Through Chartering)o Agree on Purpose of the program and each
initiativeo Agree on Roles of participantso Develop the Mission and Vision statementso Integrate with strategic planningo Integrate Consulting Knowledge with
Operational Knowledge
Overarching Concepts
![Page 14: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/14.jpg)
Overarching ConceptsIntegration and Knowledge Transfer(Ownership and Accountability)o Road Map Initiatives have
• Client Lead• Client Vice -Lead• Client Champion• Consultant Lead• Milestones• Challenges and mitigations
o Goals• Get the right staff in the right place with the right
tools• Working the consultant out of a job
![Page 15: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/15.jpg)
Overarching Concepts
Operational Optimizationo Follow the road mapo Change Course when Necessary
• Adapt the plan to the things discovered along the way» “Definition of an SSO”» Tying back to Strategic Planning Strategic Communications Leadership Training
![Page 16: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/16.jpg)
Condition and Capacity Assessmento 4S- Statistically Significant Sample Seto Field Verification and Micro Calibrationo Optimization of Capital Dollarso Red Flags!!!!!
Overarching Concepts
![Page 17: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/17.jpg)
Design and Delivery of Construction Solutionso IDIQ (~45 defects under review or
construction as we speak)o Progressive Design Buildo Traditional SSES and Repair
Overarching Concepts
![Page 18: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/18.jpg)
Year 1 Outcomes Annual Report
![Page 19: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/19.jpg)
Year 1 Outcomes – KPI’s
![Page 20: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/20.jpg)
Year 2 Outcomes – KPI’s
![Page 21: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/21.jpg)
Capital Planning SSO progress to Date Cleaning to date
Year 2 Upcoming Goals and Objectives
![Page 22: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/22.jpg)
TIER 1 HEADERFirst Name Last Name
Business Title
TIER 2 HEADER
First Name Last NameBusiness Title
First Name Last NameBusiness Title
First Name Last NameBusiness Title
First Name Last NameBusiness Title
First Name Last NameBusiness Title
First Name Last NameBusiness Title
![Page 23: © 2014 HDR Architecture, Inc., all rights reserved.© 2016 ... · HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan; Monday @ 4:30. Special Topics; Change Management](https://reader035.fdocuments.in/reader035/viewer/2022081600/60833b3d84eb67425f16fb18/html5/thumbnails/23.jpg)
Monday @ 9:30 Policy and Management
Winston-Salem CSIP- Achieving Best in Class Performance Through an Integrated Team program Management Approach
David Saunders,Courtney Driver,Damon Dequenne
Monday @ 10:05 Policy and Management
Statistically Significant Sample Set: A Streamlined Approach to Condition Assessment for the City/County Utilities Commission
Erich Scherch,Alex Palmatier, Michael Stover
Monday @ 10:40 Policy and Management
To Build or not to Build-: Field Verification Methods for Capital Planning
Tina Whitfield, Michael Stover
Monday @ 1:45 Collection and Distribution
Setting Sewer Maintenance Crews up for Success HDR Subcontractors for W-S CSIP Steve Tilson, Laurie Chase, Kim Duncan
Monday @ 4:30 Special Topics Change Management and the I of the Pyramid HDR Subcontractors for W-S CSIP John Evans ( Blue Cypress) and Damon Dequenne
Tuesday @ 10:45 Special Topics The Project Delivery Side of the Winston-Salem Collection System Improvement Program: Using Progressive Design B8uild to Deliver Capital Projects
Chris Brown
Tuesday @ 2:15 Collection and Distribution
Risk Based Predictive maintenance Solutions for Cleaning Sewer Mains
Alex Palmatier, Kim Duncan
Tuesday @ 3:55 Special Topics To Know or not to Know- An actionable Approach to Performance Management
Elizabeth Lowell,Mike Koivisto