© 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Electric … · 2013....

25
1 © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company LLC Westinghouse SMR AP1000 ® is a trademark or registered trademark in the United States of Westinghouse Electric Company LLC, its subsidiaries and/or its affiliates. This mark may also be used and/or registered in other countries throughout the world. All rights reserved. Unauthorized use is strictly prohibited. Other names may be trademarks of their respective owners. © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3 Thomas Kindred P.E. W-SMR Primary Systems

Transcript of © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Electric … · 2013....

  • 1

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Westinghouse Electric Company LLC Westinghouse SMR

    AP1000® is a trademark or registered trademark in the United States of

    Westinghouse Electric Company LLC, its subsidiaries and/or its affiliates. This

    mark may also be used and/or registered in other countries throughout the world.

    All rights reserved. Unauthorized use is strictly prohibited. Other names may be

    trademarks of their respective owners.

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Thomas Kindred P.E.

    W-SMR Primary Systems

  • 2

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Westinghouse— The World’s Nuclear Technology Leader • More than 60 years of nuclear experience

    • Dedicated experts in all aspects of reactor design, licensing, operations and plant maintenance

    • AP1000® plant design: The first and only U.S. licensed large passive safety reactor

    • State-of-the-art patented technologies and proprietary passive safety systems and technology

  • Dallas, TX

    Glen Rose, TX

    Windsor, CT

    Newington, NH

    Charlotte, NC

    Chattanooga, TN

    Nivelles, Belgium

    Cranberry Twp., PA

    Monroeville, PA

    Churchill, PA

    Blairsville, PA

    Madison, PA

    New Stanton, PA

    San Jose, CA

    Seattle, WA

    Richland, WA

    Lake Bluff, IL

    Burr Ridge, IL

    Spartanburg, SC

    Rock Hill, SC

    Columbia, SC

    Rockville, MD

    Washington, DC

    Shoreview, MN

    Västerås, Sweden

    Täby, Sweden

    Madrid, Spain

    Terragona, Spain

    Metz, France

    Orsay, France

    Lyon, France

    Marseille, France

    Hamburg, Germany

    Mannheim, Germany

    Pretoria, Republic of South Africa

    Cape Town, Republic of South Africa

    Tokyo, Japan

    Kobe, Japan

    Tokai, Japan

    Kumatori, Japan

    February 2012

    Scottsdale, AZ

    Ogden, UT

    Springfields, United Kingdom

    Elektrána Temelin Czech Republic

    Moscow, Russia

    Seoul, South Korea

    Beijing, China

    Shanghai, China

    Sofia, Bulgaria

    Kiev, Ukraine

    Kharkov, Ukraine

    Mumbai, India

    Today’s Westinghouse Electric Company

    More than 14,000 People in 17 Countries Around the World

    Toronto, Canada

    Rio de Janeiro, Brazil

  • 4

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    SMR Program Goals and Objectives

    Advancing the President’s agenda for U.S. economic growth and clean energy.

    The Westinghouse design team is unmatched in their ability to: 1) certify their design with the NRC, 2) obtain a COL, and 3) achieve SMR commercialization and generate greater exports to the world.

  • 5

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    The Westinghouse-Ameren Vision

    • We will be the first to deploy a 100% American-made, safe, and economic SMR that will produce cleaner energy, enhance our country’s energy security and

    capitalize on a transformational economic development opportunity to create sustainable clean energy jobs.

    New applications for nuclear…

    Aging Fossil Plants District Heating

    Remote Markets Small Grid Markets

    Desalination Process Heat

    • Creating Sustainable Clean Energy Jobs – SMR component manufacturing

    – Plant construction

    – Engineering, design and training

    • Working within constraints – Land, grid, cooling water, financing, distributed service

    territory

    • Offering clean energy – Offset owner costs for infrastructure development:

    land, cooling, T&D

    – Generation diversity

    – Operational flexibility

    • Providing project certainty – Reduced licensing risk

    – Short-construction duration

    – Cost predictability and certainty

  • 6

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    DOE Investment Fund Announcement

    • On March 22, the DOE announced $452 million in potential investment funds to support design and commercialization of American-made SMRs

    • On April 19, Westinghouse, Ameren Missouri and state of Missouri announced an alliance to partner for DOE investment funds

    – Initiative for U.S. to become the world leader in design, development and manufacturing of SMR technology for export to the world with components sourced completely in the United States

    – Investment funds may be awarded to up to two SMR technology vendors and utility alliances

    – 50/50 cost sharing for design certification and obtaining a COL from the NRC

    – Requires applicants to include a plan with a plant in-service date in 2022 timeframe

    • Westinghouse application was submitted May 18th (deadline May 21st)

    • Expected DOE decision – August – December 2012

  • 7

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Planning for the DOE’s Schedule of Accelerated SMR Deployment by 2022

    • Westinghouse will submit the Design Certification application for its SMR in the third quarter of 2013

    • Westinghouse SMR technology based on the already-licensed AP1000® plant technology

    – Expeditious review cycle for NRC personnel

    • Ameren Missouri will submit a COL for five Westinghouse SMRs at the Callaway Energy Center in second quarter 2014

    – Previous NRC docketed COLA for a large single unit at the Callaway site facilitates the development of the reference COL for the Westinghouse SMR

  • 8

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Strong Support for Westinghouse’s Application to DOE

    Product Development Team

    Customer Support Team

    • NexStart SMR Alliance was announced on May 17th

    NexStart SMR Alliance will ensure that a license moves forward

  • 9

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Westinghouse SMR Product Philosophy

    Best opportunity for cost competitiveness

    • Most power with the least amount of material

    • Fully modular design

    • Plant modules are installed, not constructed

    • Rail and truck transportable

    Speed to market

    • Proven ability to design, license & deploy reactors

    • Existing supply chain, technical skills & licensed technologies

    • Eliminates supply chain bottlenecks

    • Leveraging AP1000 plant experience and lessons learned

  • 10

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Westinghouse SMR Product Features

    225+ MWe capacity

    • All the advancements of the AP1000 reactor

    – Passive safety system – Simplicity – Standardization & modularization

    • An integral, standalone PWR

    • Compact design, proven components

    Highest levels of safety with fewer accident scenarios

    • 7 days of passive heat removal with onsite inventory

    • 100% reliance on natural forces

    Most Economic SMR

  • 11

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    W-SMR Integral Reactor Vessel

    What It Is…

    • An integral pressurized water reactor—single 225 MWe reactor (standalone plant design)

    • Innovative packaging of proven components

    • The highest levels of safety with fewer accident scenarios

    • Industry-proven system designs

    • Compact reactor coolant system and containment

    • An engineered solution for today’s clean energy challenges

    The Most Economic SMR Design

  • 12

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Coolant Flow Path Flow Turn

    Hot Leg

    Cold Leg

    Reactor Vessel Internals

    Downcomer

  • 13

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Steam Generator System

    SG Internals External Steam Drum

    Hot Leg

    Wrapper

    Transition Cone /

    Cold Leg

    Tubesheet

    Tubes

    Tube supports

    Recirculation

    Nozzle

    Feedwater

    Nozzle

    Primary

    Separators

    Secondary

    Separators

    Wet Steam

    Nozzle

    Co

    nta

    inm

    en

    t W

    all

    Steam Nozzle

    to Turbine

    Sludge

    Collector

    Steam and

    Feed Nozzles

  • 14

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    A B C D E F G H J K L

    1

    2 R R R

    3 R R R R

    4 R R R R R

    5 R R R R

    6 R R R R R

    7 R R R R R Rodded Location

    8 R R R R R Feed in Cycle N

    9 R R R R Feed in Cycle N-1

    10 R R R Disc. at EOC1 (from SFP)

    11 Feed in Cycle N-2

    AP1000® plant/WSMR Fuel Comparison

    AP1000 plant •157 Fuel Assemblies

    •17 x 17 RFA

    •14 ft. Active Length

    •18 Month Fuel Cycle

    SMR •89 Fuel Assemblies

    •17 x 17 RFA

    •8 Ft. Active Length

    •24 Month Fuel Cycle

    A B C D E F G H J K L

    1

    2 R R R

    3 R R R R

    4 R R R R R

    5 R R R R

    6 R R R R R

    7 R R R R R Rodded Location

    8 R R R R R Feed in Cycle N

    9 R R R R Feed in Cycle N-1

    10 R R R Disc. at EOC1 (from SFP)

    11 Feed in Cycle N-2

  • 15

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Reactor Coolant Pumps Overview

    • Seal-less pump design • Driven with variable

    frequency drives (VFD) • Mounted horizontally to

    reactor vessel below closure flange

    • Internally circulating reactor coolant removes pump heat via heat exchanger to plant component cooling water system

    Core

    Barrel

    Downcomer

    Reactor

    Internals

    RCP

    Downcomer

    RCP

    Inlet

    Flow

    Reactor

    Vessel

  • 16

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Pressurizer Overview

    SMR PRZ

    Heater

    Location

    Standard

    electrical heaters

    Spray Line From CMT

    connection

    Surge Line Pressurizer Plate

  • 17

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Internal CRDM Design

    • Latch assemblies, controls, and interfaces with fuel are all based on existing, proven designs

    • Three-coil magnetic jack based AP1000® plant design with modifications

    – High-temperature coil winding design

    – Sealed, stainless steel coil stack housing

    – Sealed power conduit with leak detection

    • Testing program under way

  • 18

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Grade

    Access Corridor

    SMR Plant Layout

  • 19

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Westinghouse Plant Design

    • Single reactor site (standalone) • Fuel – Modification of standard Westinghouse product (17x17 RFA) • Forced flow with 8 reactor coolant pumps • Internal control rod drive mechanisms • Compact/high pressure containment vessel below grade • Recirculating straight tube steam generator with

    steam drum location outside containment vessel

    • Nuclear Island is 110’x110’

    • Embedment is 105’ deep

    • 24-month cycle length • Load follow capability • Total site area: >15 acres

  • 20

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    • 7 days of Passive Heat Removal during Station Blackout event

    – Capability to add additional inventory to UHS tanks for indefinite cooling

    • 100% reliance on natural forces

    – Evaporation, condensation, gravity

    SMR Safety

  • 21

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Safety Video

  • 22

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    How Small is Small?

    25 Westinghouse SMR Containment Vessels fit in a single AP1000 Plant Containment Vessel

    Westinghouse SMR NSSS island fits in the AP1000 plant shield

    building

    Shield Building

    AP1000® plant Containment

    SMR Containment

    SMR NSSS Island

  • 23

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Westinghouse Project Certainty

    • Product Design – Leveraging more than 60 years of nuclear design & operating plant experience

    – Most power with the least amount of material

    – Simplified modular design with less on-site assembly

    – Shortened installation duration – 18-24 months

    • Licensing Experience – 3 certified ALWR designs, licensed fuel designs

    – Regulatory requirements understood, multitude of licensed topical reports

    – Valued relationships with U.S. NRC

    • Project Implementation – Continuous, successful reactor

    deployment experience

    – Established resources and organization for deployment

  • 24

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    2011-2013 2013 2013-2017 2010 2018

    WSMR Conceptual Design Anticipated WSMR DCD Submittal

    WSMR DCD Development Anticipated NRC Review of WSMR DCD

    WSMR Design Certification

    (Anticipated)

    Westinghouse Small Modular Reactor Licensing Timeline

    Utility NRC Approval Timeline (Anticipated)

    2014 2018

    COL Preparation NRC Review of COL Application

    COL Submittal Start of nuclear construction

    2012-2014 2014-2018

    Small Break LOCA PIRT Review Meeting

    Security Review Meeting

  • 25

    © 2012 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse Non-Proprietary Class 3

    Questions?