© 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential....

7
© 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential. 1 Energy XXI EMK3 Automation Project Canopy/Wrangler October 2010 delivery excellence Power to diversify and achieve excellence. PetroCanopy LLC / PetroWrangler LLC Canopy For more info, contact jeff[email protected] om www.petrowrangler.com

Transcript of © 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential....

Page 1: © 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential. 1 Energy XXI EMK3 Automation Project Canopy/Wrangler.

1© 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential.

Energy XXI EMK3 Automation Project

Canopy/WranglerOctober 2010

delivery excellencePower to diversify and achieve excellence.

PetroCanopy LLC / PetroWrangler LLC

Canopy

For more info, [email protected]

www.petrowrangler.com

Page 2: © 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential. 1 Energy XXI EMK3 Automation Project Canopy/Wrangler.

Canopy and Wrangler deliver a 1-2 punch!

2

Canopy EMK3

The automation of EMK3 daily uploads is handled using 1. Canopy – a data transport framework used to map the necessary input/output

streams, schedule the tasks, and store the results of the tasks. 2. Wrangler – an information delivery framework to provide all the necessary details

on the scheduled tasks, as well as distributing the information contained in EMK3.

Data Flow Diagram

Scheduler Service

Daily Production

Upload

Initiates scheduled job

Retrieves necessary upload information

WranglerWrangler displays the results of the scheduled jobs, pulling data from EMK3 (failure) and Canopy (success)

monitors database for scheduled jobs

1. uploads data into import tables.2. executes stored procedure

© 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential.

Page 3: © 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential. 1 Energy XXI EMK3 Automation Project Canopy/Wrangler.

Canopy – Automation and Mapping

3

1. EMK3 Canopy project

2. Daily Oil Upload Zipline

3. Daily Oil Map

4. Daily Oil Map Parameters

© 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential.

Page 4: © 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential. 1 Energy XXI EMK3 Automation Project Canopy/Wrangler.

4

Wrangler – Leveraging the value within EMK3!

© 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential.

Wrangler is the perfect tool to leverage EMK3, through the use ofAlerting

Wrangler allows EMK3 admins the ability to be alerted to changes in other systems that affect EMK3, e.g. changes in DOI, new completions, etc.

Monitoring Using Canopy as the automation interface to EMK3, Wrangler easily displays the

necessary information to the EMK3 admins concerning the status of the automation jobs.

Federation of Data Perhaps the most important feature of the Wrangler Information Delivery

Framework, Wrangler provides the ability to use EMK3 as the Master View of information within Energy XXI, without the need to move or store additional data in EMK3. EMK3’s data model provides all the necessary “key” information Wrangler needs to access information across the other system within Energy XXI.

Using the EMK3 database as the Master View for Wrangler greatly increases the value of EMK3, allowing all Energy XXI users the ability to use this valuable information, without the need for additional training on the EMK3 system.

Page 5: © 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential. 1 Energy XXI EMK3 Automation Project Canopy/Wrangler.

5

Wrangler – Alerting Users of Fresh Information

© 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential.

Using Wrangler, EMK3 users can be alerted when EMK3-dependent information changes in other systems, e.g. new completions added to the production system. Using Wrangler’s linking/federation features, all the necessary EMK3 information is readily available.

Page 6: © 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential. 1 Energy XXI EMK3 Automation Project Canopy/Wrangler.

6

Wrangler – Monitoring the results

Using Wrangler, you can view all aspects of the daily upload process, monitoring uploaded records as well as failed records.

© 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential.

successful records

failed records

Page 7: © 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential. 1 Energy XXI EMK3 Automation Project Canopy/Wrangler.

7

Wrangler – Leveraging Data through Federation

© 2010 PetroCanopy LLC / 2009 PetroWrangler LLC. All rights reserved. Proprietary and Confidential.

Link to Production

Using Wrangler, there is no need to move data into EMK3, as EMK3 contains the necessary links to the other systems, e.g. Production, Accounting, AFEMS, etc.