© 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster...

32
14- 1 © 2007 Pearson Education Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools

Transcript of © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster...

Page 1: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 1© 2007 Pearson Education

Managing QualityIntegrating the Supply Chain

S. Thomas Foster

Chapter 14Six-Sigma Management and Tools

Page 2: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 2© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsChapter 14

What is Six-Sigma?Organizing Six-SigmaDMAIC overviewDMAIC phasesThe Taguchi methodDesign for Six-SigmaUsing Six-Sigma from a contingency perspective

Page 3: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 3© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsWhat is Six-Sigma

Sigma () is a greek letter used to designate a standard deviation (SD) in statisticsSix refers to the number of SD’s from the specialized limit to the mean.Six-Sigma: about 0.5% of products will not meet specification

Page 4: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 4© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsWhat is Six-Sigma

* ppm = Parts Per Million

Sigma Level Long-term ppm* defects

1 691,462

2 308,538

3 66,807

4 6,210

5 233

6 3.4

Page 5: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 5© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsWhat is Six-Sigma

Six-Sigma is … designed to handle the most difficult quality problems.

% Quality Problems

Techniques

90% Basic tools of Quality

< 10% Six-Sigma

< 1% Outside specialists

Page 6: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 6© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsOrganizing Six-Sigma

The key playersChampion. Work with black belts to identify possible projectsMaster Black Belts. Work with and train new black beltsBlack Belts. Committed full time to completing cost-reduction projectsGreen Belts. Trained in basic quality tools

Page 7: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 7© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsOrganizing Six-Sigma

In a company with 100 employees there might be: One black beltSixty green beltsSome companies have yellow belts, employees familiar with improvement processes

Page 8: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 8© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Overview

Stands for: DefineMeasureAnalyzeImproveControl

Page 9: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 9© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Define Four Phases:

1. Develop the business case2. Project evaluation3. Pareto analysis4. Project definition

Page 10: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 10© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Define Developing the Business

Case:1. Identify a group of possible

projects2. Writing the business case3. Stratifying the business

case into problem statement and objective statement

Page 11: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 11© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Define RUMBA is used to check the

efficacy of the business case 1. Realistic2. Understandable3. Measurable4. Believable5. Actionable

Page 12: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 12© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Measure Two major steps:

1. Select process outcomes2. Verifying measurements

Page 13: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 13© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Measure Two major steps:

1. Select process outcomes Tools Used:

Process may XY matrix FMEA Gauge R&R Capability Assessment.

Page 14: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 14© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Measure Two major steps:

2. Verifying measurements Tools Used:

Use gauges, calipers and other tools.

Management System Analysis (MSA) is used to determine if measurements are consistent

Page 15: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 15© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Measure Two major steps:

2. Verifying measurements Gauge R&R

Most commonly used MSA Determine the accuracy and

precision of your measurements

Page 16: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 16© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Analyze Three major steps:

1. Define your performance objectives (X’s)

2. Identify independent variables

3. Analyze sources of variability

Page 17: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 17© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Analyze Three major steps:

1. Define your performance objectives (X’s)  Identify the independent

variables where data will be gathered

  Process maps, XY matrices brainstorming and FMEA’s are the tools used

Page 18: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 18© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Analyze Three major steps:

1. Analyze sources of variability  Use visual and statistical

tools to better understand the relationships between dependent and independent variables

Page 19: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 19© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Improve Off-line experimentation

ANOVA Taguchi

Page 20: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 20© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsDMAIC Phases

Control Manage the improved processes

using control charts

Page 21: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 21© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools The Taguchi method

Design of Experiment (DOE) Robust design - designed

so that they are inherently defect free Concept Design Parameter Design Tolerance Design

Page 22: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 22© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools The Taguchi method

The Taguchi Method provides:

1. A basis for determining the functional relationship between controllable factors

Page 23: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 23© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools The Taguchi method

The Taguchi Method provides:

2. A basis for determining the functional relationship between controllable factors

Page 24: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 24© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools The Taguchi method

The Taguchi Method provides:

3. A procedure for examining the relationship between random noise … and product or service variability

Page 25: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 25© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools The Taguchi method

Design of Experiment (DOE) Robust design - designed

so that they are inherently defect free Concept Design - examining

competing technologies

Page 26: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 26© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools The Taguchi method

The Taguchi Process1. Problem identification2. Brainstorming session3. Experimental design4. Experimentation5. Analysis6. Confirming experiment

Page 27: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 27© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools Design for Six-Sigma (DFSS)

Used in designing new products with high performance Instead of DMAIC

1.DMADV2.IDOV

Page 28: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 28© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools Design for Six-Sigma (DFSS)

Used in designing new products with high performance DMADV

1.Design2.Measure3.Analyze4.Design5.Verify

Page 29: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 29© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools Design for Six-Sigma (DFSS)

Used in designing new products with high performance IDOV

1.Identify2.Design3.Optimize4.Verity

Page 30: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 30© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools failure Six-Sigma from a Contingency Perspective

Reasons for Six-Sigma failure:1. Lack of leadership by

champions2. Misunderstood roles and

responsibility3. Lack of appropriate

culture for improvement

Page 31: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 31© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and Tools failure Six-Sigma from a Contingency Perspective

Reasons for Six-Sigma failure:4. Resistance to change and

the Six-Sigma structure5. Faulty strategies for

deployment6. Lack of data

Page 32: © 2007 Pearson Education 14- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 14 Six-Sigma Management and Tools.

14- 32© 2007 Pearson Education

Strategic Quality PlanningSix-Sigma Management and ToolsSummary

The process for Six-Sigma is define, measure, analyze, improve and control

Keys to Six-Sigma success are skilled management, leadership and long-term commitment