Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Carers Association
Hounslow
£3,150 April 2012 -
March 2013
Carer support Various support for carers - monthly meetings; biannual newsletter;
attendance at events e.g. Carers Rights Day. Representation at strategic
level and input into relevant policy development (e.g. Carer Action Plan).
Number of carers engaged increased over the year and a new support
group was started due to increased demand.
complete
Caribbean and
African Association
in Hounslow
£15,000 April 2012 -
March 2013
Luncheon club and
ancillary services (social
activities, advice and
information) for older
residents, mainly from
Caribbean and African
community
Weekly lunch club (40 weeks) - average attendance is 25 each week.
Advice - approx 300 enquiries in total. Older people's festival - lunch for 50-
60. 60 attended a meal for Black History month. Outcomes not clear and
group advised to consider impact more widely.
Better
outcomes
monitoring
needed
complete
Friends of Cathja £36,000 April 2012 -
March 2013
Support service for people
with Mental Health issues
operating on a barge in
Isleworth (Monday to
Friday). Service operates
on a user led model.
37 people accessed the service over the year, including 5 new people.
Increase in requests for advice requests due to welfare changes and
increased referrals to other organisations. Support for Attend organised
workshops on 'inlcusive volunteering'. Need support in measuring outcomes
Better
outcomes
monitoring
needed
complete
Hogarth Charitable
Trust
£15,000 April 2012 -
March 2013
Youth club based in
Chiswick, operating junior
and senior clubs and
residentials
Various activities throughout the year including: Carol Heap football
tournament was participated in by 58 young people and 25 adults; Open Arts
day attended by 62 people; 19 young people attended residentials in August;
over 20 young people achieved AQAs. Summer programme - 4 days per
week over 4 weeks attracted 110 different young people. Zest for Life Talent
Show - 16 young people participated in 12 workshops to prepare for the
event, 10 young people participated in the event itself and 115 young people
watched the event.
Better
outcomes
monitoring
needed
complete
Hounslow
Community
Association
£15,000 April 2012 -
March 2013
Manages community
building on Montague
Road offering affordable
meeting space for
community groups
providing a range of
services for residents,
including childcare
provision.
50 user groups have used the centre over the year and have provided a
range of services - faith, social activities, classes for adults and children,
residents associations and a range of activities for children, young people,
elderly and vulnerable. Improvement made to building - new heating system,
pointing of brickwork, guttering, new windows and lighting improvements. 6
volunteers engaged directly in delivering the service. Provided support to 4
groups to set up and develop services. 1000 unique services users each
year - people generally attend many times. Grant accounts for approx 50%
of cost of running building.
complete
Hounslow
Pensioner's Forum
£6,000 April 2012 -
March 2013
Represents elderly
residents at range of
forums
6 public meetings during the year attended by 60 - 70 people - speakers on
various topics; day trip to Brighton for 50 people. Outcomes not clear.
Better
outcomes
monitoring
needed
complete
Hounslow PHAB £15,000 April 2012 -
March 2013
Range of youth sessions
for young people with a
disability
Four sessions a week for young people with a disability. Thursday Club for
11 to 25 year olds with average of 30 members and 8 volunteers. Stars on
Saturday attended by 15 members and 8 volunteers. Duke of Edinburgh
Awards undertaken by 8 young people. PHAB Sports Club attended by 8 to
10 young people and 2 volunteers. Bridging the Gap project at Lampton
School attended by 15 to 20 young people. Young people supported to take
part in a wide range of activities; respite provided for families; volunteers
develop a range of skills and experience. Need support to evaluate project
and measure outcomes
Better
outcomes
monitoring
needed
complete
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Millan Women's
Group
April 2012 -
March 2013
Weekly social, exercise
and information sessions
for elderly women
Four events each attended by 120 to 140 women; 3 outings attended by
average of 53 women; weekly 4 hour sessions including lunch, information /
talks and one hour yoga class - average attendance is 60 women. Need
support to measure outcomes.
Better
outcomes
monitoring
needed
complete
Retired Member's
Association
April 2012 -
March 2013
Twice weekly social,
exercise and information
sessions for older, male
Asian residents living in
the Heston area.
4 social functions with 254 attendees in total; 2 trips - 106 participants;
presentation on help and awareness - 36 attended; exercise and yoga
sessions 96 sessions with average of 37 members per session. Survey
conducted with 37 respondents. Increase social circle helping to reduce
isolation and loneliness; increase fitneess and mobility and reduce obesity;
increase awareness of health and wellbeing. Increase of 14.6% of
attendance at project activities over the year. Need support to measure
outcomes. Grant covered 50% of the running costs of the organisation.
Better
outcomes
monitoring
needed
complete
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Hounslow
Community Grant
2012-13 Round 2
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Africa Policy
Research Network
£12,157 August 2012 -
February 2013
Community Arts Project in
West Hounslow. 4
volunteer artists would be
mentored and in turn
organise arts projects.
Aims to address
unemployment,
confidence building, skills,
community pride.
Project completed. 20 Fabric design (painting, embroidery, tiedye -
household items) attended by 46 women - majority from Asian communities,
some African countries and UK. Women acquired skills in fabric design, self
confidence, community cohesion and integration (project attracted women
from different cultures). Also looking at social enterprise / income
generation. Gave women opportunity to discuss issues in common despite
cultural differences. 20 sessions on ceramic painting engaging 144 young
people. Young people gained better team work and communication skills,
and self confidence. Also family project - parents worked with children on
creating an object.
complete
Bereavement
Services for
Hounslow
£10,000.00 August 2012 -
July 2013
Employ professional
psychotherapists to
assess and manage the
counselling offered by
volunteer counsellors;
provide regular training to
volunteers; publicise the
service; contribute to
venue costs
Recruited 4 professional supervisors and 15 new counsellors. 104 referrals
were received to end January 2013. 49 people were assessed, with 43
taking up the service. Publicity was distributed to GPs, undertakers and
other referrals agencies. Assessments were only 41% of the expected
amount for the 6 month period - referrals andtake up were lower than
expected. Service ended due to higher costs and lower take up than
expected. Second grant payment not made.
Closed
midway
through
grant term
Only 50%
of grant
drawn
down
finished
early
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Bounce Theatre £15,000.00 August 2012 -
July 2013
Literature, theatre and
enterprise project allowing
100 6 - 18 year olds to set
up youth theatre
companies and perform in
venues across the
borough
100 young people aged 4 - 17 signed up from 15 different schools; 300
hours of workshops and events; 25 young people signed up for Bronze Arts
Awards (extra funding); 20 young people engaged in 250 volunteering hours;
8 performances; ; mixed media evaluation; 3 young people employed as
trainee facilitators / administrators. Handmade in Hounslow fesitival
engaged 500 young people across 7 days. Funding helps to subsidise
families who otherwise could not participate. Independent evaluation
demonstrated the following outcomes:
Participants; an increase in confidence through the formation of new
friendships, new opportunities and the chance to perform in a working
theatre. Other benefits include an increased ability to read, speak out in
public and in some instances learn other skills such as budgeting finances.
The organisation; the funding provides our company with financial security to
commit to working in the borough for the year. In addition, through the
funding we are able to source additional income – this year we were able to
access a further £12,000 to support the project aswell as offer our time
inkind. The wider community; through the project we have engaged a range
of audiences – some have bought their children to the theatre for the first
time to see a production – this includes parents who access services such
as Homestart and parents who home school their children. Parents have
made new contacts and formed conversation because of the relationship
their children have developed in the youth theatre.
complete
Brentford Toy Library £10,000.00 January 2013 -
December
2013
Employ a qualified play
worker to deliver play
sessions in Brentford for
under 5's.
30 sessions held Jan to end April - average 55 participants, including
average of 1.5 new members per session. Training and induction completed
for staff and volunteers. 5 volunteers recruited from members. 15% increase
in toy borrowing. Final report :59 sessions held May to December, with an
average attendance of 57, including an average of 1.5 new members per
session. 80 over 1's attended the Christmas party. Three new volunteers
were recruited to support the one part-time paid staff member. Toy
borrowing has been extended to schools and other community
organisations.
complete
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Centre for Armenian
Information and
Advice
£4,500.00 October 2012 -
September
2013
Luncheon club and range
of ancilliary support for
older Armenian residents.
Grant contributes to
overall running cost of
service and transport
twice a week for 15 frail /
older LBH residents
38 day centre / lunch club sessions held between October and February -
300 meals provided to LBH residents. 40 LBH residents attended Christmas
party. 10 LBH residents received 230 lifts to centre. 38 drop in advice
sessions and 5 DWP sessions provided. 400 copies of newsletter send to
LBH residents. Key outcomes: reduced social isolation; increased health and
independence; increase awareness of and takeup of benefits. March to
October 2013: Easter Party attended by 50 older Hounslow residents and
carers (120 in total). Day trip to Brighton attended by 25 LBH residents (50 in
total). 62 day centre / lunch sessions held providing 420 meals to 40 LBH
residents (1440 meals to 127 people in total). 276 door to door lifts to 10
older/frail Armenians living in Hounslow. 7 Department of Work and
Pensions information surgeries held - increased referrals to DWP and LBH
Social Servcies and 6 residents helped to claim Attendance Allowance,
Diability Living Allowance and Carers Allowance.
complete
Hillingdon Law
Centre
£50,000.00 August 2012 -
December
2013
Legal representation
service funded from now
closed Welfare Benefit
and Money Advice
Service. Funding to deal
with 100 representations
To beginning May - had 50 referrals with 10 of these awaiting second
hearings. Expecting that referrals will increase due to Welfare Reform and
referrals now also coming from Hounslow Homes. To end July 82 cases
dealt with and 290 hours of support provided. Additonal funding provided in
September to continue the project to spring 2014. Dec update: a total of 116
cases represented with a further 6 pending and 21 duplicate cases, making
149 representations in total. A futher 42 were assessed by were not
represented as they did not pass the merit test. The key outcome was to
maximise income for residents and gains of £852,990 were acheieved
through additional benefit awarded or debt written off.
complete
Hounslow Friends of
Faith
£3,902.00 August 2012 -
July 2013
Contribution towards 6
projects including Inter-
Faith Week events,
Women's Group, 'Sewa
Day' voluntary project and
general overheads of
organisation.
Interfaith events held: 60 participants at the main event - much lower than
previous years, additonal craft session for young people and 30 faith leaders
attended their event at WMUH; Interfaith Walk in June 2013 - 60 people and
6 places of workshop participated; 4 Women's Group sessions with 20
participants (with an average of 13 per sessions); 40 participants at Sewa
Day decorated community centre on Highfields Estate; range of support and
consultancy work undertaken. Key outcomes: more engagement between
communities; growing bond between women from different faith groups;
interest in engaging in other social projects. Significant underspend - over
£1000 - mainly due to other partners contributing to the project and gifts in
kind. Agreed that it would be carried forward (July 13)
Under-
spend due
to gift in
kind and
reduced
costs
complete
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Indian Gymkhana
Club / Healthy Living
Project for Over 50's
£15,000.00 August 2012 -
July 2013
Nine exercise sessions
each week including yoga
and chair based exercises
for over 50's
Volunteer run walk programme, yoga, body conditioning and chair-based
exercise classes. 248 on register (majority 60 to 80 years of age) and
average of 44 to 50 attending each session and many attend 3 sessions a
week; 15 new members since September. Seminars on first aid, road safety
and falls prevention organised. A survey has been undertaken in
collaboration with Age UK and the results are pending.
Better
outcomes
monitoring
complete
The Small Business
Consultancy
£13,543.00 August 2012 -
July 2013
Enterprise and mentoring
project for 15 young
people (NEET or with high
support needs) from
borough
Delays in project due to staff member leaving due to illness. Range of
meetings with partners to agree referral routes and ongoing support and
mentoring. Delivery of sessions started in October but original number of 6
participants dropped to 2. Delivery and funding is being reviewed. Agreed
at CIAP meeting in Nov 2013 that funding would be stopped due to very poor
outputs and project management.
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Hounslow Innovation
Grant
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contact
Home Start Hounslow £ 7,000.00 September 13
- August '14
To implement a paperless
office system helping the
organisation to become
more efficient and reduce
administration time and
increase delivery
Project started in September 2013 once match funding requried had been
confirmed. Initial work has involved planning for the new systems in
particular its ability to cope with the increasing rates of referrals (extra 25%)
the organisation has been receiving over the past year - software and
equipment needs were reassessed as a result. As a result the project is a
little behind schedule. Equipment will be purchased and systems put in
place over the coming months.
too early to
tell
little spend
to date as
just
planning
Final report
Sept 14
Margaret O'Connor
London Sustainability
Exchange
£ 27,098.00 Jan 2013 -
March 2014
Create a social enterprise
programme which would
train 20 local people, set
up self-sustaining
enterprises that would
recover a range of high
value domestic waste,
diverting it from land fill.
Phase 1 with residents started in May 2013. 14 participants with an average
of 12 attending three group training sessions and one to one action planning.
LSx is currently supporting 7 of these to deliver business ideas or gain skills
/qualifications required e.g. driving licence. A further 2 did not continue due
to finding full time employment. Phase 2 involves working with VCS
organisations including a group workshop and surgery support. Six
organisations attended the workshop on the 6th November which also
engaged 10 6th form students at Healthland School looking at a mobile
phone recycling project. This element of the project will culminate in a
Dragons Den style event in spring 2014. Final report: A total of 58 people
received training to explore entrepreneurship opportunities. 15 participants
developed actions plans for businesses with 7 being actively worked on at
the end of the project. Business ideas include: furniture textiles and design
using textiles from clothes swops (representing 10 tonnes pa of CO2
savings); collection of old uniforms fro Heathrow to fund a well in
Mozambique (representing 20 tonnes pa of CO2 saving); collection of scrap
metal from building sites (target of 19 tonnes equating to £11,500). Support
included group training and 1:1 support sessions. 14 people were involved in
the first cohort - 7 developed action plans and 5 continue to engage with the
project. The main reason for others not continuing was finding full time
complete
The Princes Trust £ 15,622.00 Feb 2013 -
March 2014
Employ a young person
who has recently found
employment or entered
further education to work
in the borough to advise,
inpsire and support
unemployed young people
into work and discuss and
help them to overcome
their barriers to education
and employment
Job Ambassador recuited and spent on average 2 days per week in the
borough, supported by 2 other Job Ambassadors for outreach. Links
estabilished with a range of organisations across the borough including Job
Centre Plus, community organisations, schools, youth centres and
Connexions. Regular drop-ins held at Job Centre Plus, attedance at
Community events and a street outreach service on Hounslow High Street.
Those not ready to be signposted to education, training and employment
opportunities / support were signposted to specialist support if relevant e.g.
homeless young people or those with addiction problems. The Job
Ambassador made contact with 723 NEET young people in the borough and
delivered 103 group sessions - 349 were provided with follow up support in
engaging with organisations / services they were signposted to. Referrals
are made to employment programmes, other Princes Trust programmes,
development awards funding to support entry to education and training, and
housing advice and support.
Limited
outcomes
monitoring
complete
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Feltham Arts
Association
£ 31,978.00 Jan 2013 -
March 2014.
Extension to
end May for
Mosaic launch
Increase participation in
the arts by employing a
part-time Outreach
Community Arts Worker to
map borough wide arts
activity / organisations;
develop a Arts Directory;
organise a programme of
arts and artists in
residence.
Outreach worker has been employed to deliver the project. Arts Directory
has been completed mapping arts provision across the borough - 216
organisations are currently listed. It is available on the Feltham Arts website
and will form part of another borough directory. It has also been used to
inform the business plan for the Creative People and Places programme.
Introduction Day for artists to explore opportunities for work - attended by 37.
Production of Arts Facilitators Directory underway. Both directories will be
formally launched in spring 2014. Survey of organisations to establish
potential interest in consortium work / funding bids - this will also help to
shape the directories. Fourteen workshops to build the mosaic delivered
July to December (including 6 Community Fun Days, Edward Pauling House
and 3 schools) engaging approximately 300 residents and 18 regular
volunteers. Further events to complete the mosaic will be held in early 2014.
The mosaic will be installed on Feltham Green as part of the Feltham
Festival in April / May 2014. Workshops are held across the west area and
aim to involve people from across age groups and families. The organisation
has been allocated additional funding of £3,056 to allow it to employ the
outreach worker for the full duration of the project. Final report mid June
post installation of mosaic
Final report
end June 14
Ruth Wood
Thameside Enterprise
Ltd
£ 10,000.00 Jan 2013 - 30
June 14.
Extension
agreed to
endSept 14.
The provision of business
start-up advice and
mentoring service to start-
ups, early stage
businesses and voluntary
and community sector
organisations (focus on
difficult first two years)
Delivery to early June '14: 8 workshops for start up business delivered with
92 attendees (54% BAME; 22% Eastern European; 56% women); 20
businesses started - 11 directly as a result of the workshops. 38 1:1 advice
sessions with existing but new (less than 2 years old) businesses. 12 VCS
organiations have been supported via one to one sessions focusing on non-
grant options to increase sustainability. Extension agreed to Sept 14 to
allow the organisation to provide 3 intensive mentoring sessions with VCs
organisations and provide additional over the phone advice to residents
wishing to start their own businesses.
Final report
end Oct 14
Steve Matthews
Integrated
Neurological Services
£ 20,000.00 December
2012 - March
2014
Pilot 'Living well' 12 week
programmes for people
with long-term
neurological conditions
(stroke, Parkinsons, MS)
and their carers providing
them with advice and
education to live well with
their conditions.
This grant allowed INS to pilot some new programme - ove 90% of
participants reported that they were beneficial or very beneficial. Over the
term of the grant 147 clients have benefitted from range of support
programmes put in place including: seated standing exercise programmes at
Sandbanks; short 4 week programmes to help people come to terms with
memory loss and make the most of their abilities; training on how technology
(e.g. IPAD) can aid communication and suppport independent living; 12
week multi-fit programme for clients with any neurological condition aiming
to improve strength, balance and mobility;improving communication skills
training; fatigue management and art therapy. With CPU approval some of
the sessions originally planned were modified /changed to respond to client
feedback, needs and demand.
complete
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Disability Network
Hounslow
£ 15,000.00 May 2013 -
May 2014
a) Volunteer delivered,
home based, advice
service (including legal
advice) for isolated
disabled residents 4 days
per week and b) support
service users with
practical tasks e.g.
shopping, attending
medical appointments.
42 home visits have been carried out since May with 40 people supported.
These visits have lasted for many hours but advisors have been successful
in addressing issues within the one visit. 54 (2 hour) advice sessions have
been held at the Star Centre which has supported an additional 20 clients .
Issues include benefits, welfare rights, tribunal appeals, access to health
services and employment. 12 clients have been supported through the
Home Buddy Service to access services such as housing, social sevices
and visit hairdresser and shops. Clients are supported by a volunteer. Final
report end June 2014.
Final report
end June
John Seear
Hounslow Multi-
Cultural Centre
£ 20,000.00 1/14 - 3/15 Recruit neighbourhood
volunteers to provide a
daily meals service to
residents in their homes
meeting their cultural
preferences and personal
needs. The service would
operate from the Multi-
Cultural Centre and
Wellington Day Centre
Project started in January 2014. First report due 14 June 2014 First report
14 June -
send
reminder if
not yet
received.
Second
instalment
outstanding.
Channi Singh
Action Acton £ 29,925.00 December
2012 -
December
2013
Provide ESOL and
citizenship training,
information, advice and
guidance for third country
national women resident
in the borough. Elements
will include developing
language skills, building
knowledge of local
demoncracy, encouraging
interaction with community
organisations, and
improving skills.
Volunteers will be trained
to cascade information to
other residents and
sustain project.
First report: 21 registered onto programme - 12 participated in e-learning;
15 received IAG support (employability); and 15 passed Edexel accredited
ESOL exam. 5 volunters trained in Introduction to Teaching & Supporting
Learning in the Community. Initial outcomes: better understanding of
citizenship issues, social and economic opportuntities; better skills; improved
language skills and confidence. Final report: 63 Third Country National
women in total registered on the programme which provided ERSOL at two
different levels, employment support and IT courses. 42 participated in e-
learning activities; 56 received employability support; 52 passed an Edexcel
accredited ESOL exam. Participants also took part in cultural activities such
as visits to the British Museum. Eight participants found work. 10 volunteers
were trained in Introduction to Teaching and Suporting Learning in the
Community and are volunteering with a range of organisations including
schools, faith organisations and Action Acton. Outcomes reported: improved
language skills led to increased confidence, autonomy, raised aspirations
and a sense of empowerment.
Complete
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Sparrow Farm
Tenants and
Residents
Association
£ 13,400.00 December
2012 -
December
2013
Programme of activities
with FAA for 6 - 10 year
olds and 11+; 2
community events;
reminiscence group - 2
hrs per month. Also
money advice workshop
and healthy lifestyles
project.
First report: Two newsletters delivered across estate (500 homes). 23 x 2
hour sessions have been held with the Junior and Senior clubs, plus a
community performance day. 22 young people attended the weekly
sessions (17 to all sessions) and 73 residents attended the showcase.
Evaluation underway - report in July. Weekly meetups for elderly residents
(15 attending) and tea party held on March 13th attended by 45 older
residents. 11 people attended Weigh to Loose sessions between Jan and
April. Initial feedback from young people show positive outcomes around
skills, confidence, motivation, learning, team work, community engagement
etc. Reduction in isolation for older residents but evaluation needed.
Participants in Weigh to Loose programme has begun leading a weekly
exercise class for the group to continue their engagement. Final report: 6 x
2 hour workshops on visual arts for 7 - 11 year olds attended by 19 young
people. 6 x 2 hour vocal performance sessions for 11+ attended by 6 young
people. 4 x 4 hour workshops of 'Sharing Stories' - a film documentary
project attended by 9 older residents. Showcase of work at the end of the
project attended by 61 people from the wider community and 23 participants
from across the participant groups. Elderly montly social meetings
continuing post grant with an average of 17 per session. Fitness classes
have been introduced by Hounslow Homes as an extra offer. 45 pensioners
attended the Christmas party. Multi-cultural event in late October attended
by 100+ people. Project to led to significant engagement with the local
community and resulted in different groups working well together. Young
people took a lot of responsibikity and ownership for the project. It address
the low engagement with the arts amongst young people in the area and
helped them to develop skills and confidence. The project also benefited
Feltham Arts staff and the artists engaged - working in a wider range of
disciplines and developing more structured plans. It has also encouraged
FAA to look at programme design options for the future.
Complete
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Bridgelink Centre 22500 (+
£4K from
Hounslow
Homes)
January 2013 -
March 2014
Employ two part-time
advise workers to provide
advise, advocacy and
referrals to families on a
broad range of issues
including housing,
benefits, parenting,
education and
employment
50 clients were supported in the period mid January to mid July. Jan - Mar:
27 individuals - 36 drop-ins plus 60 follow up appoitments for case work.
April to Jul: 34 individuals (23 new) received 124 advice sessions (driop in
and appointment for follow ups). The main areas of support are: utility debt;
housing and other benefits; houisng advice; tax credits and education. A
coffee morning now operates alongside session time to encourage peer
support. Final report: over the 16 months of the project 57 x 2 hour drop-in
advice sessions and 213 1:1 appointments were delivered. The service
provide intensive advocacy and support to 67 families - 50 of which were
Somali, 41 single parent families, 27 had 3+ children, majority had English
as a second language and 44 were from TW7. Issues included housing and
housing benefits, education, immigration, debts, tax credits and council
tax.Outcomes included: professionals report that early intervention helped
avoid the escalation of problems and they noticed an increased engagement
of section of the community e.g. children attending Stay and Play sessions
and homework club.; clients have reported a reduction in anxiety and stress
and improved family relationships. Key difference of this service were:
translations available; informal setting; encouraging peer support; holistic
approach that looked beyond presenting problem to needs of the whole
family; multi-agency approach. The service helped clients recoup just under
£12K in Housing Benefit appeals and Council Tax Support payments, 12
people were suppported to stay in their homes (e.g. agreeing repayment
plans) and 11 homeless clients assisted in securing temporary
accommodation.
complete
TW4 Community
Development Trust
£ 25,025.00 January 2013 -
June 2014.
Extension to
end Oct.
Bring together
communities affected and
/ or displaced by war to
build mutual
understanding and
collaborate on a joint
artistic project
The project has had a slow start due to the length of time taken to engage
the various groups but a revised timetable is in place. Five sessions have
been held with Somali residents and this enabled a trial of session plan/
storytelling format and methods, occurrence of war related memories. Work
will continue with Gurkhas, Army Welfare linked groups and Barrack
families. Update May 14: progress is slower than expected due to
transience of some participants and need to build trust. Extension requested
until end Oct to ensure outcomes can be delivered- approved.
Report now
due end
Nov
Isabel King
Butts Farm Working
Together Group
£ 15,000.00 January 2013 -
August 2014
Volunteer development
programme to include
recruitment of 24 - 30
volunteers, training
(including Adult Ed
course) and support to
work on mini-project. Also
to recruit Volunteer
Trainer (96 hours/month x
2 years)
Phase One has almost been completed. 7 participants recruited (6 living on
the estate; 5 adults, 2 school age) . Participants have supported local
projects and spent 2 months shadowing Richmond Housing Partnership
community based staff. One participant has found work with Age Concern
directly through her involvement with this project. Two people have been
referred to Event 4 Youth project, four have undertaken training as part of
the project (Childminding; Customer Care; MIDAS, Community Drama,
Health and Social Care). Spend is lower than anticipated as many of the
volunteers were eligible for free training. Update report due March 2014: 4 of
Phase 1 participants continue to volunteers on the estate. Two volunteers
have MIDAS training and can drive HCT vehicles for community activities.
Outcomes seen include: employment for 1 volunteer; 3 attending further
education; reduced feelings of isolation. LANTRA still outstanding. PHASE
2 recruitment underway - focus on young people up to 24. Final report due
end September 2014
Final report
due end
Sept
Rin Roche
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Friends of
Beaversfield Park
£ 5,000.00 January 2013 -
April 2014
Improve access to
everyday physical fitness
and attract new users to
Beaversfield Park by
providing a fitness coach
to deliver a range of
weekly activities, train
local people to lead
exercises, and test the
feasibility of a green gym.
Over the entire project 63 sessions were delivered with an average of 20
people attending each session and over 100 individual engaged in total. In
addition to encouraging and supporting participation in regular exercise, the
project organised health checks for participants. The sessions have also
encouraged participants to exercise at home with advice from the instructor.
Key outcomes are increasedmotivation and participation in exercise; greater
awareness of their health and behaviours to improve it; meeting new people,
increased confidence and feeling safer in the park. The project has engaged
residents from the Indian, Pakistani, Caribbean, Arab, Afghani, and
Nepalese communities. 70% are aged 45 - 70 and 60% are female. The
project has been promoted widely locally and in the Hounslow Chronicle.
The group is fundraising to continue the project and are trialling running it at
differnet times to attract other members of the community. The group has
also secured £10K funding from Fields in Trust to install a green gym in the
park in order to develop and expand the programme.
complete
The Mulberry Centre £ 3,265.00 December
2012 -
December
2013
Provide new and existing
volunteers with 5 formal
training sessions focusing
on marketing, event
management and
fundraising skills to help
support the fundraising
work they do for charities.
Sessions would be open
to volunteers from any
charity and would sign
post participants to other
relevant training
Initial report received in June. Two training sessions held, attended by 15
people and two others planned for over the summer. New partnerships with
Adult Education and Feltham Arts Association. Good feedback from
participants on course and interested in being engaged in volunteering and
fundraising. Participants have also volunteered on subsequent workshops.
Final report due 14 Feb 2014. Five training sessions delivered in total to
develop skills in marketing, event management and fundraising for
volunteers or potential volunteers within VCS groups. 33 participants across
the 5 sessions, including volunteers from 7 local organisations. An online
guide (Boost Your Skills booklet) has been created to ensure the longer term
sustainability of the project. A number of partnerships were developed
including with Hounslow Adult Education, Feltham Arts, Age UK Hounslow.
complete
Friends of the River
Crane
£ 3,000.00 December
2012 -
December
2013
Increasing local
awareness of and
engagement with the open
space through enouraging
volunteering (Friends
Group and volunteering
days), information, a
mangement plan and
installing a bench
Capital funding secured for bench and consultation on theme started. Initial
headcount of visitors to begin tracking use. Promotional map / leaflets
produced. Volunteer Day on 10th March with 32 volunteers. Final report
Feb 2014: Bench installed to create a focal point and help link space to
others within the lower Crane corridor - local people contributed to the
design through 3 consultation events in November and December 13.
Information leaflets (4000) including a map has been produced to create
more awareness of the space distributed through local library, summer fairs
etc. Two additional volunteer days in June 2013 -with 40 volunteers
attending all 3 events in total and a Community Education Session was held
in March 2014. Progress has been made in identifying and engaging a
group of people interested in being involved in the park longer term, with the
hope of establishing a constituted Friends of group in the future. They also
hope to develop a management plan for the space. The group has seen
some indication of a growth in the numbers using the park, including a
number of family groups , something not seen previously. Regular counts
complate
$tfeymopb.xlsx
12-13
Hounslow
Community Grant
2012/13 Round 1
Organisation Amount Grant period Project Delivery Outputs Outcomes Project
spend
Status Contacts
Victim Support £ 5,000.00 August 2013 -
July 2014.
Provision of an outreach
and drop-in service (one
day a week x 8 hours) at
West-Mid for people who
have attended A&E as a
result of an injury through
a criminal offense. Provide
emotional and practical
support and advise.
Project start delayed due to changes within West Mid staffing and issues
with access to suitable space. Project started in August 2013 and first report
received early Feb 2014. SLA in place with West Mid hospital and a project
worker has been rectuited. Volunteers are in the process of being recruited
and trained. Meeting with various hospital departments/ leads to raise
awareness of the service and referrals. Monitoring meeting in February -
agreed that the term of the project would be extended to end November
2014 to allow more time to provide the necessary training to volunteers.
Final report due end December 2014.
Report end
Dec
Liz Gaffney
Riana Development
Foundation Network
£ 4,990.00 December
2013 -
December
2014
Practical nutritional
education workshops for
parents and their children
aged 6 - 12 years - budget
management, food
handling and storage,
healthy recipies and
snacks, etc
First course of 10 sessions started in March and was attended by 25
families. Second course of 10 sessions took place over summer and was
attended by 30 families. Four volunteers were engaged throughout the
programme. Seven families were referred to other organisations for
additonal support. Sessions (2 hours) covered nutrition, food handling,
storage and preparation, healthy recipies and portion sizes. The project also
delivered workshops at the Brabazon Estate Fun Day attended by 300
people. A further 10 sessions were held in course 2 between June and
September 2013 attended by 30 families. A further 7 familes attended some
sessions. Outcomes identified include: for participants - increased
knowledge of healthier diets and food hygiene; ability to work as part of a
team; increased awareness of where to access support for families; for the
organisation - increase number of beneficiaries supported and secure
additional external funding; increased collaborative working; supported
organisation to evaluate and focus work. The project has led to the
development of a programme to train young people as peer educators.
complete
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Apple 14,281.25 April 2013 -
March 2014.
Extension to
beginning of
May 14.
Play project 13 open access play sessions delivered between April
and July - 206 play spaces taken up with an average
of between 20 and 26 indivduals per sessions with 42
unique individuals in total. 4 children with special
needs and 29 respite sessions offered. 8 youth
workers received training and work on the project (4
per session = 52 training spaces). 2 young assistants
provided with work experience. Number of participants
is lower than the 30 per session expected and
advertising has been increased for next period. More
respite sessions have been offered. Plan in place to
address lower than expected numbers. Final report:
From October 13 to end April 14 433 play
opportunities were provided for 45 individual children
across 26 (2 hour) sessions. The project has
supported 7 children with special needs including
Asperges, Autism, ADHD and severe medical needs
and parents / carers have benefitted from respite
offered. Children have had the opporunity to direct
their own time and take responsibility and they have
been provided with opportunities to engage in a range
of indoor and outdoor activities including art, cooking,
sport, dance, drama. The project has offered
Young people learn to take
responsibility and direct their own
time; discover and develop
interests, talents and skills; gain
confidence and learn to take
risks; and develop leadership,
team work and social skills.
Assistants and play workers:
management, leadership and
skills development; increase in
confidence - 4 completed their
AQA awards in Leadership Skills
in Working with Children. Benefits
for the organisation in terms of
learning how to beter deliver
tiered, practical, hands-on and
real consultation with participants,
volunteers and families - all of
which has shaped the project.
Complete Joy Goddard
Caribbean and
African
Association in
Hounslow
£10,000 April 2013 -
March 2014
Luncheon club and
ancillary services
(social activities,
advice and
information) for older
residents, mainly from
Caribbean and
African community
Twice -weekly lunch club attended by an average of
25 people. Volunteeers supporting 5 to 10 people
each week on computer use. Three trips arranged
attended by 57 people in total. Speakers from
Diabetes UK and Alzheimers Society and advice on
digital switch over. Older Person's Festival event on
18th September - 80 people attended. Interim report
due in January and final report due end April 2014 -
neither received despite numerous reminders. Final
grant instalment of £2500 still due.
Helps to relieve isolation and
helps participants maintain
independence. Additional work
needed to measure outcomes for
final report. Informed of suitable
training.
Clearer
outcomes
monitoring
needed
waiting on inteim (or
final at this stage)
report and final
payment of £2500
due. Reminder
needed. 2/7/14 - sara
emailed Brenda
asking to complete
and return report as
soon as possible.
Brenda Baptiste
Carers
Association
Hounslow
£5,360 April 2013 -
March 2014
Carer support and
advise; policy work.
2 newsletter distributed to 275 members (each issue);
8 carers meetings held; outreach to 3 community
groups; survey of members - updated profile; info stall
at Carers Week events and info leaflet ('Prepared to
Care'). Projected underspend of approx £2k as admin
person retired at end of April and they have not
rehired. Will be discussing options with us. Service
may be closing at end of Mar 14 and they are in
discussions with other groups to support carers. Final
report: 19 carers meetings have been held in total and
four newsletteers produced and circulated to carers.
Representation on Healthwatch, Health and
WellBeing Board and CCG Patient and Public
Experience Group to ensure carers needs are
considered. In order to ensure that carers knew how
to continue to access support following the groups
closure (end April 2014), it arranged an event to help
carers meet and register with alternative sources of
support.
Peer support for carers,
signposting and information.
Additional local metric on the
prioritisation of Carers
Assessments for the Better Care
Fund.
complete but Cherna
will send accounts to
30 April when
complete
Cherna Chrome
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Central Harmony
Community Choir
£4,710 April 2013 -
April 2014
Community choir for adults and families, based in central Hounslow. 15 sessions have been held between April and mid
October with participant numbers increasing from 20
to 27. The choir took part in 3 performances including
at Southbank Centre and Sangerstevne choral festival
in Ealing. Final report: 19 practice sessions held with
32 members (25 adults and 7 children) attending
regularly. Four concerts and performances including
Christmas performance at Paul Robeson; 3 new
families and 2 new senior citizens joined the choir
over the second part of the grant term. Marketing
material distributed to schools, GP surgeries, Age
Concern and online.
Outcomes noted by members
include: health benefits (dealing
with asthma - stamina and
breathing; stress relief); children
feeling more comfortable
engaging with adults and
improving intergenerational
relationships; improved
confidence e.g. children and
adults singing solos in public for
first time; increased skills e.g.
reading music scores; incresed
membership.
complete Apinder Sidhu
Cranford Good
Neighbours
Scheme
£15,000 May 2013 -
April 2014
Luncheon club;
outings, advice and
information for older
residents
26 lunch club sessions held between May and July
(Tuesdays and Thursdays), with an average of 60
people attending. Transport is provided to on average
20 people each week. The service has 13 regular
volunteers but others help when needed. Seven
outings have been held between May and July with
175 attending (bingo, show, BBQ, pub lunches,
afternoon tea). Six bring and buy sales and 1 bingo
session have been held. Members have received two
newsletters during the period and advice and support
has been provided to X members. Entertainment has
not been provided due to funding uncertainty. Lunches
are delivered to members homes if they cannot attend.
Final report end May 2014
Relieves isolation and improves
health and independence of older
residents
Due end May -
reminder needed.
2/7/14 Report
received
Carolyn Wheeler
Diabetes UK
(Hounslow)
£891 April 2013 -
March 2014
Peer support and
advice for people
suffering from
diabetes
Monthly meetings held as planned between April and
July with 195 attendances in these 4 months, an
average of 46 per meeting. Sessions covered
diabetes and its complications, stroke and the after
effects, heart problems and signposting to sources of
support. Diabetes UK and West Mid nurses have
supported sessions. Final report: A further 5 monthly
meetings were held (2 less than planned due to the
closure of Montague Hall). In total 17 specialist
speakers and medical professionals attended offering
advice on subjects related to diabetes, heart, stroke
related health risks, plus healthy eating, losing weight
and exercise. In conjunction wiht Diabetes UK it
carried out a raodshow assessing 232 people over 2
days - 136 were referred to GPs as being at high risk
(a further 5 days of roadshows are scheduled for May
2014 at 5 venues within Hounslow). Average
attendance at meetings was 48 (range from 33 to 62).
Peer support, advice and
information.
complete
Disability Network
Hounslow
£9,000 June 2013 -
June 2014
A range of services
and activites for
residents with
physical and learning
disabilities
A number of events have been held over the past to
end May 14 including: 11 coffee mornings (average
10); 9 crafts café events (average 8); musical event -
Our Big Gig (25 people), Craft Fair, training sessions -
teaching skills including working with people with
physical and sensory impairments, 5 ITclasses, 2
event planning sessions (risk assessments / fire drills)
. DNH attended 5 community events and produced
newsletters and publicity material to promote its
services. Project extended until end November 2014
to include some new elements.
Increasing skills (IT and crafts);
building social networks and
informal support; members taking
a more active role in planning and
delivery of activities.
some elements
delayed
more
measurements
required
Some
underspend at
mid way point
Final report end
November. Send
template at end Oct.
John Seear
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Feltham Police
Community
Boxing Club
£5,000 May 2013 -
April 2014
Boxing club for young
people - junior club
for 9 to 13 yr olds and
senior club for 14+
22 training sessions have been delivered to date. The
junior club numbers have fallen (5 instead of expected
10) and the club are increasing pulicity and liaising
with past participants. The senior club is attended by
20+ people, with a regular group of 15. Three coaches
have attended training to move for Level 1 to Level 2 .
Update Jan 2014: promotional work just before
Christmas has helped increase numbers with a further
3 joining the junior club. Two coaches are receiving
Level 1 training funded by local business sponsorship.
Final report: The grant has allowed the club to
develop from andwindling after school activity into an
ABA affiliated amateur boxing club with members
representing the club at competition level. It has
funded 3 level two and 3 level 1 courses ensuring a
higher standard of teaching and a better coach to
boxer ratio. The senior club now see an average of
18+ members attending each session - 6 have been
registered for competition, 3 have competed with two
wins. Numbers are lower in the junior club with an
average of 6 attending each session. The club aims
to be inclusive with several members with learning
difficulties, female boxers and recreational boxers who
do not wish to compete.
Increase in fitness levels and
concentration levels. Improved
team working. The club has 40
members in total who have shown
increased levels of skill, fitness
and confidence.
complete
Friends of Cathja £15,000 April 2013 -
April 2014
Support service for
people with Mental
Health issues
operating on a barge
in Isleworth (Monday
to Friday). Service
operates on a user
led model.
Sessions are run Monday to Friday providing
therapeutic support through creative projects (art,
wood work) along with advice and support e,g, on
support services, benefits, Three new participants
have engaged in the project in the first half of the year.
Final report end May 2014.
Increased confidence; more
engagement with the wider
community. A postgraduate from
Brunel university is supporting the
group to look at appropriate ways
to measure outcomes.
Clearer
outcomes
monitoring
needed
Due end May -
reminder needed.
2/7/14 sara emailed
asking to complete
report
Carl Kirby /Rin Roche
Hogarth
Charitable Trust
£10,000 August 2013 -
April 2014
Youth club based in
Chiswick, operating
junior and senior
clubs and residentials
Interim report not provided so second instalment not
paid. Report for entire project requested and if
satisfactory the remainder of the grant will be paid
Waiting on mid term
report for several
months - deadlines
repeatedly missed.
Final report now
requested and
second installment
will then be paid
Denny Antony / Tony Heap
Hounslow
Community
Association
£15,000 April 2013 -
April 2014
Manages community
building on Montague
Road offering
affordable meeting
space for community
groups providing a
range of services for
residents, including
childcare provision.
Provides affordable meeting space for VCS groups -
53 groups used the centre in the first half of the grant
period - 4 new ones. Services provided from the
centre include: faith meetings, self-help groups,
education, cultural and language classes. Six
volunteers work with the centre. Final report end May
2014.
Affordable and accessible centre
increases range of services for
residents. Training and
volunteering opportunities helping
volunteers into paid employment.
Due end May.
Reminder needed.
2/7/14 sara emailed
reminder for report
Deva
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Hounslow PHAB £15,000 May 2013 -
May 2014
Range of youth
sessions for young
people with a
disability
The club runs a number of sessions each week for
young people with physical and learning disabilities.
78 sessions in total were delivered over the period
April to September engaging on average 92
participants each week. A week long residential was
arranged for 22 young people. Final report: weekly
groups continued - 82 in total between Oct and March
with average participation per week of 136. A 4 week
bollywood dance and a 6 week drumming workshop
was held in conjuncion with Watermans with an
average of 16 taking part each session. Two events
were held with 25 members attending each one. DoE
members are working towards their gold award.
Residential help increase young
people's confidence and sense of
independence. Participants who
begin volunteer learn new skills
and how to take on more
responsibility.
complele Lorna Stephens / Debbie Barnett
Hounslow Senior
Trust
£11,750 April 2013 -
April 2014
Intergenerational
project focusing on
dance, drama and
singing, engaging
older residents and
children from local
primary schools.
Intended to help
generations better
understand each
other and each
other's cultures
better.
90 students from Alexandra School (Year 5) were
engaged in the project - 30 each in drama, dance and
singing/song writing. 73 older people took part in the
project. Following individual rehearsals all groups met
at Alexandra School for joint dress rehearsals. 15
older people took part in 8 drama workshops, 36 older
people took part in 8 dance workshops, 22 older
people took part in 8 singing/song writing workshops;
30 children took part in 8 drama workshops, 30 in 8
dance workshops, and 30 in 8 singing /song-writing
workshops. The older residents and children came
together for 2 dress rehearsals and 2 performances at
Alexandra School (360 audience members) and 1
performance at the Paul Robeson Theatre (130
audience members).
Older people reported the
following outcomes: got to know
and understand the younger
people and learnt a lot about their
lives; felt that they were able to
contibute to their community
through the project; learnt new
skills and discovered new talents,
had the opportunity to be creative.
Young people also reported
positive experiences about
working with older people
including learning about their lives
and history. Young people also
reported feeling proud of their
involvement in the project, that
they learnt many new things and
that they were more confident.
Project complete.
£101 underspend -
group can either
return it to us or we
can ask them to
suggest an activity in
keeping with the
intended outcomes of
the project that they
could spend it on.
Marion Pike
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Integrated
Neurological
Services
£ 15,000.00 April 2013 -
April 2014
Volunteer Support
Network for people
with long-term
neurological
conditions and their
carers
A part-time volunteer has been appointed (3 days per
week) and has developed job desciptions and
marketing information to recruit volunteers to the
project. 15 new volunteers have been recruited in the
first 6 months. 13 people receive befriending visits in
their home, while another 63 benefit from long-term
groups for specific conditions. All groups are
supported by at least one volunteer (qualified
professionals or non-clinicial volunteers who have
received specific training). 1054 volunteer hours have
been donated to this project. Final report: 16 new
volunteers recruited in second six month period. A
new induction and training programme was developed
and a Volunteer Thank You event was held in Jan 14.
Volunteer Forums are also being held regularly.
Continued efforts have been made to recruit
volunteers from BAME and more economically
disadvantaged areas of the borough. 10 BAME
volunteers have been recruited so far.Two new
newsletters have been developed- one each for
clients and carers - and issues were circulated in Dec
13 and Mar 14. A total of 36 volunteers now provide
support for weekly / forthnightly group activities which
95 Hounslow residents regularly attend. A further 10
befrienders support 10 Hounslow clients; 9 new clients
Additional volunteers (majority of
new volunteers are from
Hounslow borough) for group
activity session and new
befriending service has allowed
INS to support additional clients
and carers in Hounslow (96 new
clients over the year). Clients
report a reduction in loneliness
and isolation and the ability to
better cope with their condition.
Volunteering opportunities (with
improved induction and support
programmes) offer volunteers the
opportunity to develop skills and
experience useful for
employment. Better relationships
have been established with VCS
groups in Hounslow to raise
awareness of volunteering
opportunities and to help recruit
more volunteers, especially from
BAME communities.
complete
Isleworth
Explorers Club
£ 15,000.00 April 2013 -
April 2014
Youth sessions -
junior and senior
40 junior sessions, 26 senior sessions and 20
sessions for young people with a disability have been
provided to end of September. Four trips and nine
weeks of playscheme were aslo delivered. Final
report end May 2014. 250 young people engaged in
total. The club has seen a 7.5% increase in
attendance by 6 to 12 year older (3023) and a 7.3%
increase for 12 to 18 year olders (1571) and a 25%
increase in attendances to its club for young people
with disabilities (939) from the previous year.
Additional staff and volunteers allowed the club to
offer more sessions / activities.
Stronger communication skills,
respite for parents/carers,
developing friendships and skills.
3 young people with disabilities
supported to access mainstream
sessions. Increased sessions and
attendances, especially by young
people with disabilities. More and
better trained staff and volunteers
has allowed the club to expand its
offer and for staff to offer
increased support and mentoring
for young volunteers. More work
on evaluating outcomes
requested for future.
Project complete.
Regarding final
report - no info on
actual delivery from
Oct to Mar i.e. how
many sessions - can
we request this info.
Limited outcomes
monitoring - if they
are to be awarded
funding in R2 it
shoujld be
conditional on them
putting some
systems in place.
2/7/14 - sara emailed
Steve asking tos
provide the delivery
info for oct-mar.
Mising Information
received. This is now
complete.
Steve Parker (Trustee) - Natasha the
club leader has resigned.
London-Feltham
Warriors
Basketball Club
£ 8,594.00 May 2013 -
May 2014
Basketball sessions
for young people
Between April and September the club delivered 85 x
2 hour sessions in clubs for under 10s, under 13s,
under 14s, under 15s, under 16s and under 18s. Lead
coaches and mentors also provide group and
individual mentoring for young people. An awards
evening and club BBQ were also held. Final report
due mid June 2014.
Participants report improved
confidence and self-esteem.
Parents report that children are
more focused and have greater
confidence.
Due mid June - send
reminder if not
already received
(may have been sent
to community
development inbox).
2/7/14 - sara emailed
report
Lehoma
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Millan Women's
Group
£ 9,000.00 April 2013 -
April 2014
Weekly social,
exercise and
information sessions
for elderly women
Weekly sessions have been held incorporating yoga,
information / talks (crime prevention, healthy eating,
dementia), and lunch. Between 80 and 100 attend
weekly sessions with up to 140 for special events.
Four trips were arranged 52 attending each one. Final
report end May 2014.
Reduce isolation and creates a
sense of belonging for all
communties attending. More
information on outcomes
requested for final report.
better
outcomes
monitoring
needed
receipts received
except rent one (the
group has not
received Jan to Mar
one yet). Report due,
template provided.
Reminder needed
Harbans Singh
Retired Member's
Association
£ 5,000.00 April 2013 -
April 2014
Twice weekly social,
exercise and
information sessions
for older, male Asian
residents living in the
Heston area.
Report 1: Two events held with 134 in attendance; 55
members attended the AGM; 3 excursions to Brighton
(54), Bognor Regis (48) and Bournemouth (54) with
156 attendances in total; 4 information sessions (TV
switchover, safeguarding, personal safety, fire safety)
attended by 156 people; twice weekly physical activity
sessions; 3 x health walks at Kew Gardens attended
by 37 people. Total attendance at twice weekly
sessions and events at centre over 5 months is 1868
and total of 2061 at all activities. Final report: the
following was delivered in the second reporting period -
twice weekly sessions continued; 4 social functions
with 254 participants; 6 sessions of yoga with an
average of 43 participants per session; 3 First Aid
training sessions delivered by Age UK with an
average of 42 particpants per session; 5 sessions with
a dietician from HRCH with average of 38 per session;
and 55 sessions of light exercise / health walks with
an average of 43 per session.
Key outcomes noted from survey
of members(96% response rate):
increase mobility and keep fit
(70%); increase social
network(67%); lower stress levels
(54%) and reduce visits to doctor
/ hospital (43%). Turnout has
increased by 18.8% compared to
2012/13.
complete
Riverside
Vineyard Christian
Fellowship
£ 5,000.00 May 2013 -
May 2014
Food bank 141 families supported between June and September
(closed school summer holiday period) with 363 visits
to the centre. Four housebound clients have been
supported with home deliveries. Café space has been
created to provide a more welcoming atmosphere and
a space for support. Training provided for volunteers.
Final report end June 2014.
Volunteers develop confidence
and team work skills. Residents
provided with support in times of
crisis.
Due end June. 2/7/14
sara emailed asking
to complete report
SFIDA Women's
Group
£ 12,000.00 April 2013 -
April 2014
Employment and
cohesion project
Website updated regularly and range of leaflets etc
produced to publicise programme throughout the year.
April 13 - Welfare Benefits workshop with JCP and HH
attended by 32 people. 4 Employment Tactics
workshops held (May to July 13) plus range of 1:1
support - 85 peopleho received advice and support n
total, plus referrals to other servcies e.g. Pinnacle
People. Helping Hands: 18 young volunteers engaged
in a range of projects and were provided with health
and safety training. 90 people attended 3 information
sessions with various services including Alzheimer's
Society, Age Concern and the Mulberrry Centre.
Information on right and responsibilities provided to 70
people: Oct 13 - workshop held with police to discuss
stop and search and Nov 13 workshop with Hounslow
Race and Equality Council and solicitors to provide
information on migrants rights. Consultation
throughout with service users to shape and evaluate
the project.
Links to Carers services, JCP and
Pinnacle People (including
referrals). 89 CVs produced, 31
job interviews, 8 job offers for
over 30's + 11 young people
gaining apprenticeships or P/T
work in retail. 35 young people
regularly volunteering. 40 new
migrants linked to service
providers. Young people reported
having more confidence and
better team work skills.
complete
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Anti-Tribalism
Movement
£ 15,000.00 August 13 to
March 14
Lead and be led: a
youth training and
mentoring
programme to build
leadership and
decision making skills
in Somali young
people aged 18 to 25.
39 18 to 25 year olds (22 male, 17 female) have
participated in a 7 session course aiming to build
confidence and capacity to be community leaders.
They are all now involved in cascading learning to
their peers and have engaged/ supported a further 70
young people aged 12 to 23. Three participants have
worked with young people in Feltham Young
Offenders with a Southall based organisation, 4 are
training to be lifeguards so that they can run swimming
sessions for local people, 5 have set up an
organisation called Inspire for Change which aims to
support local young people.
An evaluation is currently being
conducted and the results will be
available in July. A report on the
outcomes and successes of the
project will be published in
August. An application has been
submitted to Reaching
Communities to run this project
across the country, Initial
outcomes include: increase in
confidence amongst participants,
including in making difficult
decisions; improved interpersonal
skills; increase in active
citizenship, strenghtening their
local community; practical skills
which will enhance employment.
Queries for Adam: it
was expected that
the participants
would engage 120
other young people -
current number is 70.
is this work ongoing?
Change of delivery?
Also ask Adam to
send us the results of
outcomes monitoring
(expected in July)
and the report
(August)
Adam Matan
Urban Youth
Network
£ 14,500.00 October 2013
to April 2014
Narrowing The Gap -
project for Somali
young people and
families attending 4
schools in the
borough to support
learning and
increased
engagement with
schools.
Homework sessions started in November due to
unavailability of venue and so will continue until the
end of May. 32 sessions have been held to date with
approximately 20 students per sessiom. Students from
Norwood Green, Green Dragon, Ivybridge and
Cranford have been engaged, and the project has
supported a number of communities, other than
Somali. Demand for the project has exceeded
expectation - to date they have worked with 80
students aged 6 to 10 (total for the project was 100).
Eight volunteers have been recruited and mentoring
will begin shortly. 82 parents have been supported
across the 4 schools advising parents on the school
system and how to engage in it, the transfer to
secondary schools and adult education courses
available to them. Final report sent 15 April, due 19
May
A report showing progress
against baseline infromation will
be available at the end of Janaury
2013.
Some
underspend
at mid way
point
Due 19th May.
Reminder needed.
2/7/14 sara emailed
asking to complete
report
Ali Sharmake
Action Acton £ 15,000.00 October 2013
to September
2014
Welfare Reform
Advice for Hounslow
Residents: providing
indepth training and
advice to Hounslow
residents to help
mitigate the impact of
welfare reforms.
Particularly targeting
those with ESOL and
IT support needs.
21 clients and 109 rhours of support to date - lower
than expected but sessions have been modified to suit
clients (full days too much so now shorter half day or
two hour sessions). Referrals numbers are lower than
expected from some sources but working on this. Age
range of clients is from mid -20s to mid 60's. Clients
supported to date with intensive one to one support
around employability skills and infromation and
guidance. ICT training is a big need. Update
requested 28th May. Final report Oct 14.
More indepth knowledge of
welfare reform and how it affects
them. Improved knowledge on
job searches.
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Alzheimer's
Society
£ 14,996.33 November
2013 to Oct
2014
Connecting Hounslow
Communities - raising
awareness of
dementia amongst
BAME communities
and encouraging
increased take up of
services
Over the first period of delivery the project has
engaged with the following communities - Albanian,
Kosovan, Macedonian, Polish. 12 new volunteers
have been recruited from the Spanish, Bangladeshi,
Pakastani and Afghan communities to help support
engagement here. Training and support has been
provided and more is planned. There has also been
outreach to Hindu and Muslim communities through
faith centres. Four new community champions have
been recruited and 304 people have been engaged
with via 11 community events. Setting up the BME
Dementia Action Group is in progress. Final report
Nov 14
Too early to report on outcomes Waiting on letter from
HR to evidence
spend on salary -
Lisa Gatward
Lisa Gatward
Bounce Theatre £ 7,500.00 September
2013 to May
2014
Homegrown and
Handmade in
Hounslow - youth
theatre programme
Young people were offered 50 hours of rehearsal time
in the first half of the project, building skills in creative
writing, presentation skills, listening, leadership and
groups work. Successful in attracting an additional
£15,600 in grants that will help support the work of the
theatre. Eight performance of Cinderella in December
attracted 800 audience members - 50% greater than
any previousproductions by the group. Older
rmembers of the group offered 100 hours of
volunteering time to run 'front-of-house'. Young
people will be offered the opportunity to perform in the
National Theatre Festival in April 2014. Final report
end June 2014.
Initial outcomes: improved
confidence, creativity, memory,
focus and time management.
Over 100 hours of volunteering
time by young people. Grant
helps provide places for young
people who cannot afford to pay
the £25 per term fee.
Due end June - send
template. 2/7/14 sara
emailed report
Louise Pendry
Centre for
Armenian
Information &
Advice
£4,953 October 2013
to September
2014
Supporting vulnerable
Armenian
older/disabled people
& carers of Hounslow
Oct 13 to Feb 14: 38 sessions of the lunch club/day
centre - 30 LBH residents attended 261 times (118
participants in total). 13 exercise sessions were held
as part of the twice weekly day centre sessions. 42
Hounslow residents attended the Christmas Party on
13th December (95 participants in total). 10 residents
benefitted from the door to door transport service 220
times via CAIA's own minibus. 38 drop in advice
sessions were held - 23 LBH residents benefitted. In
addition a montly DWP surgery was held. 39
Hounslow residents benefitted from the Health
Advocacy and Outreach service. 400 copies of its
newsletter was posted to Hounslow addresses. Final
report due end Oct 14.
Due end Oct Misak
Hounslow Asian
and African Youth
Association
£ 14,981.35 August 2013 -
March 2014.
Requested
extension to
June.
Hands-on Youth: train
and support young
people to become
more involved in their
local communities
including accrediated
training and
fundraising initiatives.
25 participants recruited with 16 completing accredited
courses (OCN Organising a Public Meeting and AQA
Events Management). A further 8 have expressed an
interest in engaging in the second stage of the
programme. Five Local Funding Initiative teams have
been set up, each with between 4-6 members. The
five teams have embarked on different projects
including a football tournament, bi-weekly fundraising
via bucket collections, cake sales, Cultural Musical
Festival and a PlayStation tournament. Final report
end May 2014 - extension requested date to be
confirmed.
To date feedback indicates that
the all 28 participants feel they
are gaining very valuable
experience and skills. The
monitoring of the outcomes has
been done via informal group
circles, questionnaires and
observations. A report will be
produced on outcomes.
Due end May.
Reminder needed
Suhel Miah
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Hounslow Friends
of Faith
£ 1,735.00 September
2013 to
August 2014.
Extension to
end of
November
agreed
HFOF Calendar of
Events 2013-14
including volunteering
days, liaision and joint
projects with various
faith groups,
education and
awareness events.
Good progress in delivery actions within the project
including: Good Neighbour Days (250 people attended
open days at 5 faith organisations), Faith and End of
Life conference (50 attended from a range of faiths
and resulted in new training materials and need for
more accessible information being made available),
SEWA Day (40 volunteers worked on 3 community
garden sites), and Women's Group (4 sessions held
with an average of 13 participants discussing a range
of faith based topics with the aim of building
understanding and friendship amongst women from
different faith communities. Extension of grant to end
November with some additional activities to use small
projected underspend. Final report end December
2014
Improved access by service
providers to faith communities;
new training materials on end of
life and need for more accessible
information recognised; improved
relationships by members of
different faith communities
working on a range of projects
together; mutual respect and
understanding developed.
Due end Dec 14 Bessie White
Hounslow Multi-
Cultural Centre
£ 12,354.00 August 2013 -
July 2014
Providing a
subsidised lunch club
for elderly and
vulnerable residents
A total of 2522 subsidised meals were served
between Ausgust 2013 and 10 January 2014. Meals
are served 4 days a week to an average of 29 people
elderly people each day. The transport service will not
start until February 2014 due to delays recruiting and
training volunteers. Final report end August 2014.
Initial outcomes expected - but
which need to be measured - are:
improved health and quality of
life; ability to maintain
indepdendence and reduce
depression; increased experience
for volunteers
Due end August.
Send template report
in July. 2/7/14 sara
emailed report
Channi Singh
ILAYS £ 12,562.00 September
2013 to
August 2014
The Empowering the
Excluded Project:
range of support for
women, new migrants
and young people
including one to one
mentoring, drop in
sessions and
workshops
Monitoring meeting on 4th February. First report: 10
young people have received 1:1 mentoring and
support in the following areas (job search skills; CVs;
contacting employers; interview techniques);
volunteering opportunities; housing issues; and
signposting to services. 37 women from single
parent families have been supported through 20
employment related sessions including CV writing,
interview techniques, confidence building. They were
also advised and supported to access other services.
Three staff and volunteers have undertaken training
with CAB through the Transition Fund to support the
provision of advice and ensure that appropriate
systems are in place. Two workshops have been
held - one on welfare benefits and changes supported
by Hounslow Homes (attended by 15 women), the
other with the police (attended by 20 young people).
20 drop-in sessions for women have been held at the
Hub (TW4) and 65 individuals supported on issues
around housing and homelessness, employment,
benefits and debt. Final report end Sept
Single parents: 5 women have
been supported into paid
employment and 1 has found a
voluntary placement, reducing
welfare dependency. Participants
also report reduced social
exclusion and increased
confidence. Young people: 2
young people are receiving
training as Gateway Assessors
for CAB; 3 have been supported
into paid employment; 1 is
volunteering with Ilays; young
people report increased
confidence and self-esteem.
Due end Sept Hasan Hussein
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Outside Chance £ 11,860.00 October 2013
to July 2014
It's YOUR Choice!
Anti-crime, anti-gang
workshops for young
people
333 young people have attended x workshops to date
from HAAYA, Butts Farm Working Together Group,
Victoria Junior School, St Michael and St Martin P.S.,
Beavers Community P.S., Green Dragon P.S., Crane
Park P.S., and Woodbridge Park Educational Service
(KS3 and 4). A further 265 are booked into
workshops between now and the end of July (Grove
Park P.S., William Hogarth P.S., Gunnersbury Catolic
School, and Grove Road P.S.) and an additional 400
are expected to be seen by the end of the project.
Observed session at Crane Park Primary School on
9th January - very well received by young people and
teacher and feedback from other schools is really
positive. Final report end August 2014.
Feedback from schools indicate
that between 85% and 100% feel
they understand a lot or quite a bit
more about how young people get
involved in crime, what happens
when they get caught, the
impications of a criminal record,
what it would like to be in prison.
Due end
August.Send
template in July.
2/7/14 - sara emailed
report
Ian Ross
The Mulberry
Centre
£ 14,172.00 October 2013
to September
2014
Provision of
complementary
therapies for people
who come to The
Mulberry Centre for
support
468 therapy sessions delivered in 5 months between
October 13 and February 14. Promotions has
continued by visiting 14 GP practices and HEAT
events (x2). 5 new volunteer therapists were
recruited. Final report end Oct
100% of those who completed
feedback forms rated the service
4 or 5 out of 5.
slightly below
expectations
Due end Oct Emma Cartwright
The Phoenix
Support and
Information
Project
£ 14,950.00 September
2013 to
August 2014
Peer Support Service
for people with mental
health support needs
12 volunteers recruited - all DBS and reference
checked. They have received a full induction,
including completing a skills assessment form. It
revised it training programme and reference manuals
and 7.5 days of training was delivered in total for the
volunteers. Volunteers are supported on an ongoing
basis through twice monthly meetings and clinicla
supervision. Initial interviews have been carried out
with 38 potential clients to help ascertain needs and
goals and help match them to volunteers. These
clients are now enageged in an 18 week support
programme (once a week). Final report end Sept
Training has equipped volunteers
with active listening, mentoring,
befriending, and counselling skills
allowing them to deliver more
effective peer support sessions.
Health and safety and equalities
issues were also addressed.
Outcomes reported to date by
project beneficiaries: increased
engagement in meaningful
activities (93%); voluntary work
(22%); finding anfd sustaining
part/full time paid work (16%);
finding and/ or sustaining training
/ education (32%); improved
ability to cope wiht trauma (87%);
gaining emotional relief through
support of volunteers (100%) and
feeling more positive in the face
of adversity (74%)
Due end Sept Marion O'Brien
TW4CDT £ 14,850.00 April 2013 to
July 2014
To support a range of
community
development work in
the TW4 area,
supporting local
people to take part,
access servcies and
improve their area
Report received but more information requested: a
number of funding bids have been made to support
the work of TW4 CDT in the local area. Significant
engagement in the development of the Creative
People and Place Business Plan. Supported cultural
festival attended by 300 people (venue: The Hub).
Update May 14: some delays in deliverying some
outputs / numbers but organisation feels that they
should be on track to deliver key outcomes by end of
prioject.
Initial outcomes - raising
awareness of facilitiess and
activities in the area. Enabled
volunteers to take more
leadership in working with
stakeholders
Final report due end
August - send
template in July.
2/7/14 sara emailed
report
Isabel King
The Conservation
Volunteers
£1,993 November
2013 to
February 2014
Volunteer delivered
hedge laying project
at Pevensey Road
Open Space
Two days hedge laying with over 10 metres of hedges
laid. Promotion of the project in the local area and via
other local projects - 8 volunteers engaged (majority
within a 3 mile radius of the site). One day coppicing
workshop in Croydon attended by 4 people.
Highlights the difference that
volunteers can make. The project
aims to increase use of the space
by addressing concerns of
residents (unusable pavements;
park shut off by high hedges) but
it is too early to measure this
difference.
complete
Innovation Grant
13-14
$tfeymopb.xlsx
13-14
Organisation Amount Grant period Project Delivery Outcomes seen Outputs Outcomes Project
spend Status
Key contact
HCG Round 1
Beanstalk £ 15,264.00
1/2/14 -
31/1/15
Volunteer delivered
reading support
project for primary
school children First report due end Sept due 30/9/14
Hestia Housing
and Support £ 39,042.00
28.2.14 -
28.2.15
Support programme
for homeless people
discharged from West
Mid hospital and
Lakeside Mental
Health Unit First report due mid August due 15.08.14. 2/7/14 sara emailed report
Hounslow Action
for Youth £6,500
1.2.14 -
30.09.14
Additional support
work, including
residential and trips,
for up to 8 families
engaged in the Junior
Youth Incusion
Project.
Report 1 (April 14): 8 families engaged involving 24
parents and children. Initial work with families has
taken place (scoping needs and potential outcomes)
and the 3 day residential has been booked for late
July. Three to four family days out will also be
organised.
Too early - base point
ascertained.
no grant
spend to
date - all for
residential
and trips Final report due end OctBijal Karavadra
Thameside
Enterprise £ 31,900.00
16/1/13 -
6/3/15
Leadership
programme including
business planning
and outcomes
measurement for
VCS organisations First report mid September due 12.09.14 Steve Matthews
Support for Living £ 38,383.00
1/2/14 -
30/6/15
A volunteer led
support project for
residents with
learning disabilities First report end September due 26.09.14 Hajnalka
Spark £ 40,000.00
Dec 14 - Sept
15
Enterprise
programme for
secondary school
students First report end September due 30.09.14 Andrew Dakers
The Shelter
Project Hounslow £ 40,000.00
1.12.13 -
05.15
Support project for
homeless people
including night shelter
and advocacy First report mid August due 15.08.14 Andree Lee
$tfeymopb.xlsx
14-15
Organisation Amount Grant period Project Delivery Outcomes
seen
Beneficiaries -
number
Target group Outputs Outcomes Project spend
Status
Key contact
HCG Round 1
Brent Bereavement Service 12,446.00£
May 2014 - April 2015
To provide bereavement counselling for
Hounslow residents (1:1 and phone) and to
recruit and train Hounslow residents as volunteers to help deliver the service. Paulo Pimentel
Cranford Good Neighbours 15,000.00£
April 2014 -
March 2015
To offer services and activities for older
residents, including a lunch club, social activities
and outings, support and transport as set out in
Schedule 3. Lyn Hanlon
Cultivate London 15,000.00£
April 2014 -
March 2015
To deliver a training and apprenticeship
programme for NEET young people , as set out
in Schedule 3. Adrienne Attorp
Defuse Citizens Training 12,600.00£
May 2014 -
October 2015
To deliver a training and support programme toyoung people and teachers and youth workers
to help manage confrontations and volatile
situations, as set out in Schedule 3. Matt Overd
Green Corridor 14,847.00£
May 2014 - May
2015
To offer a land based training programme for
NEET young people aged 14 to 24 providingopportunities for skills development,
accreditation and routes into employment or
further training. Jean Rolfe
Hillingdon Law Centre 14,500.00£
April 2013 -
March 2015
To provide a free, confidential, specialist
immigration advice service for LB Hounslow
residents both from its Hillingdon office and an outreach location in the borough Mike Wakeman
Hounlsow Community Association 15,000.00£
April 2013 - March 2014
To deliver well managed, good quality andaffordable facilities for rent by communitygroups and others as set out in Schedule 3. Deva Mareemootoo
Hounslow Phab 15,000.00£
May 2014 - May 2015
To deliver a range of activities for young people
with disabilities as outlined in Schedule 3Lorna Stephens
Indian Gymkhana Club 13,400.00£ April 2014 - March 2015
To deliver 9 – 10 weekly exercise sessions forthe Over 50s Club, in addition to regular blood
and weight monitoring and monthly healthyliving and eating workshops. The project willalso develop a booklet to share the learning andexperiences of members.
Smita Patel
Millan Asian Women's Group 9,000.00£
April 2014 - March 2015
To deliver a weekly social group for women,including provision of a lunch and exercise andhealth and other relevant information, as set outin Schedule 3. Harbans Singh
Petal of Life Voluntary Group 14,990.00£
April 2014 -
March 2015
To deliver a volunteering and skillsenhancement project to include UK Online ICTtraining and Information and Guidance Support
to BAME communities as set out in Schedule 3. Mary Dervish
Retired Member's Association 5,000.00£
April 2014 -
March 2015
To offer a range of activities as outlined in
Schedule 3 to older residents in the Heston areaBhagat Singh Rupal
Together We Create 2,500.00£
6 May 2014 - 26
Sept 2014
To deliver creative animation workshops to
schools and youth clubs in Hounslow Borough
as set out in Schedule 3. Sarah Hoyle
West Play 14,970.00£
May 2014 -
October 2014To deliver play services in Heston and Brentford