********************************************************** 01 35 26.pdf · unified facilities guide...

47
************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-01 35 26 (November 2015) Change 6 - 02/18 ----------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 35 26 (February 2012) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated April 2018 ************************************************************************** SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS 11/15 PART 1 GENERAL 1.1 REFERENCES 1.2 DEFINITIONS 1.2.1 Competent Person (CP) 1.2.2 Competent Person, Confined Space 1.2.3 Competent Person, Cranes and Rigging 1.2.4 Competent Person, Excavation/Trenching 1.2.5 Competent Person, Fall Protection 1.2.6 Competent Person, Scaffolding 1.2.7 Competent Person (CP) Trainer 1.2.8 High Risk Activities 1.2.9 High Visibility Accident 1.2.10 Load Handling Equipment (LHE) 1.2.11 Medical Treatment 1.2.12 Near Miss 1.2.13 Operating Envelope 1.2.14 Qualified Person (QP) 1.2.15 Qualified Person, Fall Protection (QP for FP) 1.2.16 USACE Property and Equipment 1.2.17 Load Handling Equipment (LHE) Accident or Load Handling Equipment Mishap 1.3 SUBMITTALS 1.4 MONTHLY EXPOSURE REPORTS 1.5 CONTRACTOR SAFETY SELF-EVALUATION CHECKLIST 1.6 REGULATORY REQUIREMENTS 1.6.1 Subcontractor Safety Requirements 1.6.1.1 Experience Modification Rate (EMR) 1.6.1.2 OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate 1.7 SITE QUALIFICATIONS, DUTIES, AND MEETINGS 1.7.1 Personnel Qualifications 1.7.1.1 Site Safety and Health Officer (SSHO) 1.7.1.1.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties SECTION 01 35 26 Page 1

Transcript of ********************************************************** 01 35 26.pdf · unified facilities guide...

Page 1: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

**************************************************************************USACE / NAVFAC / AFCEC / NASA UFGS- 01 35 26 ( November 2015) Change 6 - 02/ 18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Pr epar i ng Act i v i t y: NAVFAC Super sedi ng UFGS- 01 35 26 ( Febr uar y 2012)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2018**************************************************************************

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 35 26

GOVERNMENTAL SAFETY REQUI REMENTS

11/15

PART 1 GENERAL

1. 1 REFERENCES 1. 2 DEFI NI TI ONS 1. 2. 1 Compet ent Per son ( CP) 1. 2. 2 Compet ent Per son, Conf i ned Space 1. 2. 3 Compet ent Per son, Cr anes and Ri ggi ng 1. 2. 4 Compet ent Per son, Excavat i on/ Tr enchi ng 1. 2. 5 Compet ent Per son, Fal l Pr ot ect i on 1. 2. 6 Compet ent Per son, Scaf f ol di ng 1. 2. 7 Compet ent Per son ( CP) Tr ai ner 1. 2. 8 Hi gh Ri sk Act i v i t i es 1. 2. 9 Hi gh Vi s i bi l i t y Acci dent 1. 2. 10 Load Handl i ng Equi pment ( LHE) 1. 2. 11 Medi cal Tr eat ment 1. 2. 12 Near Mi ss 1. 2. 13 Oper at i ng Envel ope 1. 2. 14 Qual i f i ed Per son ( QP) 1. 2. 15 Qual i f i ed Per son, Fal l Pr ot ect i on ( QP f or FP) 1. 2. 16 USACE Pr oper t y and Equi pment 1. 2. 17 Load Handl i ng Equi pment ( LHE) Acci dent or Load Handl i ng

Equi pment Mi shap 1. 3 SUBMI TTALS 1. 4 MONTHLY EXPOSURE REPORTS 1. 5 CONTRACTOR SAFETY SELF- EVALUATI ON CHECKLI ST 1. 6 REGULATORY REQUI REMENTS 1. 6. 1 Subcont r act or Saf et y Requi r ement s 1. 6. 1. 1 Exper i ence Modi f i cat i on Rat e ( EMR) 1. 6. 1. 2 OSHA Days Away f r om Wor k, Rest r i ct ed Dut y, or Job Tr ansf er

( DART) Rat e 1. 7 SI TE QUALI FI CATI ONS, DUTI ES, AND MEETI NGS 1. 7. 1 Per sonnel Qual i f i cat i ons 1. 7. 1. 1 Si t e Saf et y and Heal t h Of f i cer ( SSHO) 1. 7. 1. 1. 1 Addi t i onal Si t e Saf et y and Heal t h Of f i cer ( SSHO)

Requi r ement s and Dut i es

SECTI ON 01 35 26 Page 1

Page 2: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

1. 7. 1. 2 Compet ent Per son Qual i f i cat i ons 1. 7. 1. 2. 1 Compet ent Per son f or Conf i ned Space Ent r y 1. 7. 1. 2. 2 Compet ent Per son f or Scaf f ol di ng 1. 7. 1. 2. 3 Compet ent Per son f or Fal l Pr ot ect i on 1. 7. 1. 3 Qual i f i ed Tr ai ner Requi r ement s 1. 7. 1. 4 Requi r ement s f or al l Cont r act or Jobsi t e Per sonnel Hol di ng

H- 1B or H- 2B Vi sas: 1. 7. 1. 5 Dr edgi ng Cont r act Requi r ement s 1. 7. 1. 5. 1 Dr edgi ng Saf et y Per sonnel Requi r ement s 1. 7. 1. 5. 2 SSHO Requi r ement s f or Dr edgi ng 1. 7. 1. 5. 3 Col l at er al Dut y Saf et y Of f i cer ( CDSO) Requi r ement s f or

Dredging 1. 7. 1. 5. 4 Saf et y Per sonnel Tr ai ni ng Requi r ement s f or Dr edgi ng 1. 7. 1. 6 Cr ane Oper at or s/ Ri gger s 1. 7. 2 Per sonnel Dut i es 1. 7. 2. 1 Dut i es of t he Si t e Saf et y and Heal t h Of f i cer ( SSHO) 1. 7. 3 Meet i ngs 1. 7. 3. 1 Pr econst r uct i on Conf er ence 1. 7. 3. 2 Saf et y Meet i ngs 1. 8 ACCI DENT PREVENTI ON PLAN ( APP) 1. 8. 1 Names and Qual i f i cat i ons 1. 8. 2 Pl ans 1. 8. 2. 1 Conf i ned Space Ent r y Pl an 1. 8. 2. 2 St andar d Li f t Pl an ( SLP) 1. 8. 2. 3 Cr i t i cal Li f t Pl an - Cr ane or Load Handl i ng Equi pment 1. 8. 2. 3. 1 Cr i t i cal Li f t Pl an Pl anni ng and Schedul e 1. 8. 2. 3. 2 Li f t s of Per sonnel 1. 8. 2. 4 Bar ge Mount ed Mobi l e Cr ane Li f t Pl an 1. 8. 2. 5 Mul t i - Pur pose Machi nes, Mat er i al Handl i ng Equi pment , and

Const r uct i on Equi pment Li f t Pl an 1. 8. 2. 6 Fal l Pr ot ect i on and Pr event i on ( FP&P) Pl an 1. 8. 2. 7 Rescue and Evacuat i on Pl an 1. 8. 2. 8 Hazar dous Ener gy Cont r ol Pr ogr am ( HECP) 1. 8. 2. 9 Excavat i on Pl an 1. 8. 2. 10 Occupant Pr ot ect i on Pl an 1. 8. 2. 11 Lead Compl i ance Pl an 1. 8. 2. 12 Asbest os Hazar d Abat ement Pl an 1. 8. 2. 13 Si t e Saf et y and Heal t h Pl an 1. 8. 2. 14 Pol ychl or i nat ed Bi phenyl s ( PCB) Pl an 1. 8. 2. 15 Si t e Demol i t i on Pl an 1. 9 ACTI VI TY HAZARD ANALYSI S ( AHA) 1. 9. 1 AHA Management 1. 9. 2 AHA Si gnat ur e Log 1. 10 DI SPLAY OF SAFETY I NFORMATI ON 1. 10. 1 Saf et y Bul l et i n Boar d 1. 10. 2 Saf et y and Occupat i onal Heal t h ( SOH) Def i c i ency Tr acki ng Syst em 1. 11 SI TE SAFETY REFERENCE MATERI ALS 1. 12 EMERGENCY MEDI CAL TREATMENT 1. 13 NOTI FI CATI ONS and REPORTS 1. 13. 1 Mi shap Not i f i cat i on 1. 13. 2 Acci dent Repor t s 1. 13. 3 LHE I nspect i on Repor t s 1. 13. 4 Cer t i f i cat e of Compl i ance and Pr e- l i f t Pl an/ Checkl i st f or LHE

and Ri ggi ng 1. 13. 5 Thi r d Par t y Cer t i f i cat i on of Fl oat i ng Cr anes and Bar ge- Mount ed

Mobi l e Cr anes 1. 14 HOT WORK 1. 14. 1 Per mi t and Per sonnel Requi r ement s 1. 14. 2 Wor k Ar ound Fl ammabl e Mat er i al s

SECTI ON 01 35 26 Page 2

Page 3: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

1. 15 RADI ATI ON SAFETY REQUI REMENTS 1. 15. 1 Radi ogr aphy Oper at i on Pl anni ng Wor k Sheet 1. 15. 2 Si t e Access and Secur i t y 1. 15. 3 Loss or Rel ease and Unpl anned Per sonnel Exposur e 1. 15. 4 Si t e Demar cat i on and Bar r i cade 1. 15. 5 Secur i t y of Mat er i al and Equi pment 1. 15. 6 Tr anspor t at i on of Mat er i al 1. 15. 7 Schedul e f or Exposur e or Unshi el di ng 1. 15. 8 Tr ansmi t t er Requi r ement s 1. 16 CONFI NED SPACE ENTRY REQUI REMENTS 1. 16. 1 Ent r y Pr ocedur es 1. 16. 2 For ced Ai r Vent i l at i on 1. 16. 3 Sewer Wet Wel l s 1. 16. 4 Rescue Pr ocedur es and Coor di nat i on wi t h Local Emer gency

Responders 1. 17 GAS PROTECTI ON 1. 17. 1 Gas Test Readi ngs Recor d 1. 17. 2 Speci al Requi r ement s 1. 18 HI GH NOI SE LEVEL PROTECTI ON 1. 19 DI VE SAFETY REQUI REMENTS 1. 20 SEVERE STORM PLAN

PART 2 PRODUCTS

2. 1 CONFI NED SPACE SI GNAGE

PART 3 EXECUTI ON

3. 1 CONSTRUCTI ON AND OTHER WORK 3. 1. 1 Wor ksi t e Communi cat i on 3. 1. 2 Hazar dous Mat er i al Use 3. 1. 3 Hazar dous Mat er i al Excl usi ons 3. 1. 4 Unf or eseen Hazar dous Mat er i al 3. 2 UTI LI TY OUTAGE REQUI REMENTS 3. 3 OUTAGE COORDI NATI ON MEETI NG 3. 4 CONTROL OF HAZARDOUS ENERGY ( LOCKOUT/ TAGOUT) 3. 4. 1 Saf et y Pr epar at or y I nspect i on Coor di nat i on Meet i ng wi t h t he

Gover nment or Ut i l i t y 3. 4. 2 Lockout / Tagout I sol at i on 3. 4. 3 Lockout / Tagout Removal 3. 5 FALL PROTECTI ON PROGRAM 3. 5. 1 Tr ai ni ng 3. 5. 2 Fal l Pr ot ect i on Equi pment and Syst ems 3. 5. 2. 1 Addi t i onal Per sonal Fal l Pr ot ect i on 3. 5. 2. 2 Per sonal Fal l Pr ot ect i on Har nesses 3. 5. 3 Fal l Pr ot ect i on f or Roof i ng Wor k 3. 5. 4 Hor i zont al Li f el i nes ( HLL) 3. 5. 5 Guar dr ai l s and Saf et y Net s 3. 5. 6 Rescue and Evacuat i on Pl an and Pr ocedur es 3. 6 SHI PYARD REQUI REMENTS 3. 7 WORK PLATFORMS 3. 7. 1 Scaf f ol di ng 3. 7. 2 El evat ed Aer i al Wor k Pl at f or ms ( AWPs) 3. 8 EQUI PMENT 3. 8. 1 Mat er i al Handl i ng Equi pment ( MHE) 3. 8. 2 Load Handl i ng Equi pment ( LHE) 3. 8. 3 Machi ner y and Mechani zed Equi pment 3. 8. 4 Base Mount ed Dr um Hoi st s 3. 8. 5 Use of Expl osi ves

SECTI ON 01 35 26 Page 3

Page 4: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

3. 9 EXCAVATI ONS 3. 9. 1 Ut i l i t y Locat i ons 3. 9. 2 Ut i l i t y Locat i on Ver i f i cat i on 3. 9. 3 Ut i l i t i es Wi t hi n and Under Concr et e, Bi t umi nous Asphal t , and

Ot her I mper vi ous Sur f aces 3. 10 ELECTRI CAL 3. 10. 1 Conduct of El ect r i cal Wor k 3. 10. 2 Qual i f i cat i ons 3. 10. 3 Ar c Fl ash 3. 10. 4 Gr oundi ng 3. 10. 5 Test i ng

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 35 26 Page 4

Page 5: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

**************************************************************************USACE / NAVFAC / AFCEC / NASA UFGS- 01 35 26 ( November 2015) Change 6 - 02/ 18 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Pr epar i ng Act i v i t y: NAVFAC Super sedi ng UFGS- 01 35 26 ( Febr uar y 2012)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2018**************************************************************************

SECTI ON 01 35 26

GOVERNMENTAL SAFETY REQUI REMENTS11/15

**************************************************************************NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or saf et y and occupat i onal heal t h r equi r ement s f or t he pr ot ect i on of Cont r act or and Gover nment per sonnel , pr oper t y, and r esour ces.

Thi s gui de speci f i cat i on i s i nt ended f or use i n cont r act s t hat speci f y FAR 52. 236- 13 Acci dent Pr event i on, or i t s Al t er nat e I , t o i ncl ude cont r act s f or const r uct i on, di smant l i ng, r enovat i on and demol i t i on; dr edgi ng; envi r onment al r est or at i on ( i nvest i gat i on, desi gn, r emedi at i on) ; asbest os abat ement or l ead hazar d cont r ol ; pr oj ect s i n t he cont i nent al U. S. and over seas.

The r equi r ement s of t hi s gui de speci f i cat i on suppl ement U. S. Ar my Cor ps of Engi neer s ( USACE) Saf et y and Heal t h Requi r ement s Manual , EM 385- 1- 1, and cl ar i f y saf et y concer ns f or hi gh- r i sk const r uct i on act i v i t i es.

Adher e t o UFC 1- 300- 02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.

Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , af t er consul t i ng wi t h Command Saf et y st af f whet her or not br acket s ar e pr esent .

Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Cr i t er i a Change Request ( CCR) .

**************************************************************************

**************************************************************************NOTE: I ncl ude ot her r ef er enced sect i ons i n t he

SECTI ON 01 35 26 Page 5

Page 6: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

cont r act wher e wor k, such as envi r onment al r est or at i on, asbest os abat ement or l ead hazar d cont r ol , r equi r es addi t i onal saf et y and heal t h pl ans t o be made par t of and appended t o t he APP. These sect i ons i ncl ude Sect i on 01 35 29. 13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMI NATED SI TES f or envi r onment al r est or at i on pr oj ect ; Sect i on 02 82 13. 00 10 ASBESTOS ABATEMENT or 02 82 16. 00 20 ENGI NEERI NG CONTROL OF ASBESTOS CONTAI NI NG MATERI ALS, f or asbest os abat ement ; Sect i on 02 83 19. 13 10 LEAD BASED PAI NT ABATEMENTor 02 83 13. 00 20 LEAD I N CONSTRUCTI ON f or l ead hazar d cont r ol act i v i t i es; and Sect i on 02 85 00. 00 20 MOLD REMEDI ATI ON. For NAVY envi r onment al r est or at i on cont r act s, an APP i s r equi r ed wi t h t he over al l cont r act and a s i t e speci f i c Heal t h and Saf et y Pl an i s r equi r ed f or each t ask or der ( cont act t he FEAD Saf et y Manager f or appl i cabi l i t y) .

Many st at es and muni c i pal i t i es have mor e st r i ngent or addi t i onal r equi r ement s; modi f y t hi s sect i on as r equi r ed t o meet l ocal r equi r ement s and r egul at i ons.

**************************************************************************

PART 1 GENERAL

1. 1 REFERENCES

**************************************************************************NOTE: Thi s par agr aph i s used t o l i s t t he publ i cat i ons c i t ed i n t he t ext of t he gui de speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y and l i s t ed i n t hi s par agr aph by or gani zat i on, desi gnat i on, dat e, and t i t l e.

Use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e when you add a Ref er ence I dent i f i er ( RI D) out s i de of t he Sect i on' s Ref er ence Ar t i c l e t o aut omat i cal l y pl ace t he r ef er ence i n t he Ref er ence Ar t i c l e. Al so use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e t o updat e t he i ssue dat es.

Ref er ences not used i n t he t ext wi l l aut omat i cal l y be del et ed f r om t hi s sect i on of t he pr oj ect speci f i cat i on when you choose t o r econci l e r ef er ences i n t he publ i sh pr i nt pr ocess.

**************************************************************************

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY OF SAFETY ENGI NEERS ( ASSE/ SAFE)

ASSE/ SAFE A10. 22 ( 2007; R 2017) Saf et y Requi r ement s f or Rope- Gui ded and Non- Gui ded Wor ker s’ Hoi st s

ASSE/ SAFE A10. 34 ( 2001; R 2012) Pr ot ect i on of t he Publ i c on

SECTI ON 01 35 26 Page 6

Page 7: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

or Adj acent t o Const r uct i on Si t es

ASSE/ SAFE A10. 44 ( 2014) Cont r ol of Ener gy Sour ces ( Lockout / Tagout ) f or Const r uct i on and Demol i t i on Oper at i ons

ASSE/ SAFE Z244. 1 ( 2003; R 2014) Cont r ol of Hazar dous Ener gy Lockout / Tagout and Al t er nat i ve Met hods

ASSE/ SAFE Z359. 0 ( 2012) Def i ni t i ons and Nomencl at ur e Used f or Fal l Pr ot ect i on and Fal l Ar r est

ASSE/ SAFE Z359. 1 ( 2016) The Fal l Pr ot ect i on Code

ASSE/ SAFE Z359. 11 ( 2014) Saf et y Requi r ement s f or Ful l Body Harnesses

ASSE/ SAFE Z359. 12 ( 2009) Connect i ng Component s f or Per sonal Fal l Ar r est Syst ems

ASSE/ SAFE Z359. 13 ( 2013) Per sonal Ener gy Absor ber s and Ener gy Absor bi ng Lanyar ds

ASSE/ SAFE Z359. 14 ( 2014) Saf et y Requi r ement s f or Sel f - Ret r act i ng Devi ces f or Per sonal Fal l Ar r est and Rescue Syst ems

ASSE/ SAFE Z359. 15 ( 2014) Saf et y Requi r ement s f or Si ngl e Anchor Li f el i nes and Fal l Ar r est er s f or Per sonal Fal l Ar r est Syst ems

ASSE/ SAFE Z359. 2 ( 2017) Mi ni mum Requi r ement s f or a Compr ehensi ve Managed Fal l Pr ot ect i on Program

ASSE/ SAFE Z359. 3 ( 2017) Saf et y Requi r ement s f or Lanyar ds and Posi t i oni ng Lanyar ds

ASSE/ SAFE Z359. 4 ( 2013) Saf et y Requi r ement s f or Assi st ed- Rescue and Sel f - Rescue Syst ems, Subsyst ems and Component s

ASSE/ SAFE Z359. 6 ( 2016) Speci f i cat i ons and Desi gn Requi r ement s f or Act i ve Fal l Pr ot ect i on Systems

ASSE/ SAFE Z359. 7 ( 2011) Qual i f i cat i on and Ver i f i cat i on Test i ng of Fal l Pr ot ect i on Pr oduct s

ASSE/ SAFE Z490. 1 ( 2016) Cr i t er i a f or Accept ed Pr act i ces i n Saf et y, Heal t h, and Envi r onment al Tr ai ni ng

ASME I NTERNATI ONAL ( ASME)

ASME B30. 20 ( 2013; I NT Oct 2010 - May 2012) Bel ow- t he- Hook Li f t i ng Devi ces

ASME B30. 22 ( 2016) Ar t i cul at i ng Boom Cr anes

SECTI ON 01 35 26 Page 7

Page 8: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

ASME B30. 23 ( 2011) Per sonnel Li f t i ng Syst ems Saf et y St andar d f or Cabl eways, Cr anes, Der r i cks, Hoi st s, Hooks, Jacks, and Sl i ngs

ASME B30. 26 ( 2015; I NT Jun 2010 - Jun 2014) Ri ggi ng Hardware

ASME B30. 3 ( 2016) Tower Cr anes

ASME B30. 5 ( 2014) Mobi l e and Locomot i ve Cr anes

ASME B30. 7 ( 2011) Wi nches

ASME B30. 8 ( 2015) Fl oat i ng Cr anes and Fl oat i ng Derricks

ASME B30. 9 ( 2014; I NT Feb 2011 - Nov 2013) Sl i ngs

ASTM I NTERNATI ONAL ( ASTM)

ASTM F855 ( 2015) St andar d Speci f i cat i ons f or Tempor ar y Pr ot ect i ve Gr ounds t o Be Used on De- ener gi zed El ect r i c Power Li nes and Equipment

I NSTI TUTE OF ELECTRI CAL AND ELECTRONI CS ENGI NEERS ( I EEE)

I EEE 1048 ( 2003) Gui de f or Pr ot ect i ve Gr oundi ng of Power Li nes

I EEE C2 ( 2017; Er r at a 1- 2 2017; I NT 1 2017) Nat i onal El ect r i cal Saf et y Code

NATI ONAL AERONAUTI CS AND SPACE ADMI NI STRATI ON ( NASA)

NASA NPR 8621. 1 ( 2006b; Change 7) NASA Pr ocedur al Requi r ement s f or Mi shap and Cl ose Cal l Repor t i ng, I nvest i gat i ng, and Recor dkeepi ng

NASA NPR 8715. 3 ( 2008c; Change 9) NASA Gener al Saf et y Pr ogr am Requi r ement s

NASA- STD 8719. 12 ( 2011; Change 2) Saf et y St andar d f or Expl osi ves, Pr opel l ant s, and Pyr ot echni cs

NATI ONAL ELECTRI CAL MANUFACTURERS ASSOCI ATI ON ( NEMA)

NEMA Z535. 2 ( 2011) Envi r onment al and Faci l i t y Saf et y Signs

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 10 ( 2018; TI A 18- 1) St andar d f or Por t abl e Fi r e Ext i ngui sher s

NFPA 241 ( 2013; Er r at a 2015) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons

SECTI ON 01 35 26 Page 8

Page 9: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

NFPA 306 ( 2014) St andar d f or Cont r ol of Gas Hazar ds on Vessel s

NFPA 51B ( 2014) St andar d f or Fi r e Pr event i on Dur i ng Wel di ng, Cut t i ng, and Ot her Hot Wor k

NFPA 70 ( 2017; ERTA 1- 2 2017; TI A 17- 1; TI A 17- 2; TI A 17- 3; TI A 17- 4; TI A 17- 5; TI A 17- 6; TI A 17- 7; TI A 17- 8; TI A 17- 9; TI A 17- 10; TI A 17- 11; TI A 17- 12; TI A 17- 13; TI A 17- 14) Nat i onal El ect r i cal Code

NFPA 70E ( 2018; TI A 18- 1; TI A 81- 2) St andar d f or El ect r i cal Saf et y i n t he Wor kpl ace

TELECOMMUNI CATI ONS I NDUSTRY ASSOCI ATI ON ( TI A)

TIA-1019 ( 2012; R 2016) St andar d f or I nst al l at i on, Al t er at i on and Mai nt enance of Ant enna Suppor t i ng St r uct ur es and Ant ennas

TIA-222 ( 2005G; Add 1 2007; Add 2 2009; Add 3 2014; Add 4 2014; R 2014; R 2016) St r uct ur al St andar ds f or St eel Ant enna Tower s and Ant enna Suppor t i ng St r uct ur es

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

10 CFR 20 St andar ds f or Pr ot ect i on Agai nst Radi at i on

29 CFR 1910 Occupat i onal Saf et y and Heal t h St andar ds

29 CFR 1910. 146 Per mi t - r equi r ed Conf i ned Spaces

29 CFR 1910. 147 The Cont r ol of Hazar dous Ener gy ( Lock Out / Tag Out )

29 CFR 1910. 333 Sel ect i on and Use of Wor k Pr act i ces

29 CFR 1915 Conf i ned and Encl osed Spaces and Ot her Danger ous At mospher es i n Shi pyar d Employment

29 CFR 1915. 89 Cont r ol of Hazar dous Ener gy (Lockout/Tags-Plus)

29 CFR 1919 Gear Cer t i f i cat i on

29 CFR 1926 Saf et y and Heal t h Regul at i ons f or Construction

29 CFR 1926. 1400 Cr anes and Der r i cks i n Const r uct i on

29 CFR 1926. 16 Rul es of Const r uct i on

SECTI ON 01 35 26 Page 9

Page 10: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

29 CFR 1926. 450 Scaffolds

29 CFR 1926. 500 Fal l Pr ot ect i on

29 CFR 1926. 552 Mat er i al Hoi st s, Per sonal Hoi st s, and Elevators

29 CFR 1926. 553 Base- Mount ed Dr um Hoi st s

49 CFR 173 Shi pper s - Gener al Requi r ement s f or Shi pment s and Packagi ngs

CPL 02- 01- 056 ( 2014) I nspect i on Pr ocedur es f or Accessi ng Communi cat i on Tower s by Hoi st

CPL 2. 100 ( 1995) Appl i cat i on of t he Per mi t - Requi r ed Conf i ned Spaces ( PRCS) St andar ds, 29 CFR 1910.146

1. 2 DEFINITIONS

1. 2. 1 Compet ent Per son ( CP)

The CP i s a per son desi gnat ed i n wr i t i ng, who, t hr ough t r ai ni ng, knowl edge and exper i ence, i s capabl e of i dent i f y i ng, eval uat i ng, and addr essi ng exi st i ng and pr edi ct abl e hazar ds i n t he wor ki ng envi r onment or wor k i ng condi t i ons t hat ar e danger ous t o per sonnel , and who has aut hor i zat i on t o t ake pr ompt cor r ect i ve measur es wi t h r egar ds t o such hazar ds.

1. 2. 2 Compet ent Per son, Conf i ned Space

The CP, Conf i ned Space, i s a per son meet i ng t he compet ent per son r equi r ement s as def i ned EM 385- 1- 1 Appendi x Q, wi t h t hor ough knowl edge of OSHA’ s Conf i ned Space St andar d, 29 CFR 1910. 146, and desi gnat ed i n wr i t i ng t o be r esponsi bl e f or t he i mmedi at e super vi s i on, i mpl ement at i on and moni t or i ng of t he conf i ned space pr ogr am, who t hr ough t r ai ni ng, knowl edge and exper i ence i n conf i ned space ent r y i s capabl e of i dent i f y i ng, eval uat i ng and addr essi ng exi st i ng and pot ent i al conf i ned space hazar ds and, who has t he aut hor i t y t o t ake pr ompt cor r ect i ve measur es wi t h r egar d t o such hazar ds.

1. 2. 3 Compet ent Per son, Cr anes and Ri ggi ng

The CP, Cr anes and Ri ggi ng, as def i ned i n EM 385- 1- 1 Appendi x Q, i s a per son meet i ng t he compet ent per son, who has been desi gnat ed i n wr i t i ng t o be r esponsi bl e f or t he i mmedi at e super vi s i on, i mpl ement at i on and moni t or i ng of t he Cr ane and Ri ggi ng Pr ogr am, who t hr ough t r ai ni ng, knowl edge and exper i ence i n cr ane and r i ggi ng i s capabl e of i dent i f y i ng, eval uat i ng and addr essi ng exi st i ng and pot ent i al hazar ds and, who has t he aut hor i t y t o t ake pr ompt cor r ect i ve measur es wi t h r egar d t o such hazar ds.

1. 2. 4 Compet ent Per son, Excavat i on/ Tr enchi ng

A CP, Excavat i on/ Tr enchi ng, i s a per son meet i ng t he compet ent per son r equi r ement s as def i ned i n EM 385- 1- 1 Appendi x Q and 29 CFR 1926, who has been desi gnat ed i n wr i t i ng t o be r esponsi bl e f or t he i mmedi at e super vi s i on, i mpl ement at i on and moni t or i ng of t he excavat i on/ t r enchi ng pr ogr am, who t hr ough t r ai ni ng, knowl edge and exper i ence i n excavat i on/ t r enchi ng i s

SECTI ON 01 35 26 Page 10

Page 11: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

capabl e of i dent i f y i ng, eval uat i ng and addr essi ng exi st i ng and pot ent i al hazar ds and, who has t he aut hor i t y t o t ake pr ompt cor r ect i ve measur es wi t h r egar d t o such hazar ds.

1. 2. 5 Compet ent Per son, Fal l Pr ot ect i on

The CP, Fal l Pr ot ect i on, i s a per son meet i ng t he compet ent per son r equi r ement s as def i ned i n EM 385- 1- 1 Appendi x Q and i n accor dance wi t h ASSE/ SAFE Z359. 0, who has been desi gnat ed i n wr i t i ng by t he empl oyer t o be r esponsi bl e f or i mmedi at e super vi s i ng, i mpl ement i ng and moni t or i ng of t he f al l pr ot ect i on pr ogr am, who t hr ough t r ai ni ng, knowl edge and exper i ence i n f al l pr ot ect i on and r escue syst ems and equi pment , i s capabl e of i dent i f y i ng, eval uat i ng and addr essi ng exi st i ng and pot ent i al f al l hazar ds and, who has t he aut hor i t y t o t ake pr ompt cor r ect i ve measur es wi t h r egar d t o such hazar ds.

1. 2. 6 Compet ent Per son, Scaf f ol di ng

The CP, Scaf f ol di ng i s a per son meet i ng t he compet ent per son r equi r ement s in EM 385- 1- 1 Appendi x Q, and desi gnat ed i n wr i t i ng by t he empl oyer t o be r esponsi bl e f or i mmedi at e super vi s i ng, i mpl ement i ng and moni t or i ng of t he scaf f ol di ng pr ogr am. The CP f or Scaf f ol di ng has enough t r ai ni ng, knowl edge and exper i ence i n scaf f ol di ng t o cor r ect l y i dent i f y, eval uat e and addr ess exi st i ng and pot ent i al hazar ds and al so has t he aut hor i t y t o t ake pr ompt cor r ect i ve measur es wi t h r egar d t o t hese hazar ds. CP qual i f i cat i ons must be document ed and i ncl ude exper i ence on t he speci f i c scaf f ol di ng syst ems/ t ypes bei ng used, assessment of t he base mat er i al t hat t he scaf f ol d wi l l be er ect ed upon, l oad cal cul at i ons f or mat er i al s and per sonnel , and er ect i on and di smant l i ng. The CP f or scaf f ol di ng must have a document ed, mi ni mum of 8- hour s of scaf f ol d t r ai ni ng t o i ncl ude t r ai ni ng on t he speci f i c t ype of scaf f ol d bei ng used ( e. g. mast - c l i mbi ng, adj ust abl e, t ubul ar f r ame) , i n accor dance wi t h EM 385- 1- 1 Sect i on 22. B. 02.

1. 2. 7 Compet ent Per son ( CP) Tr ai ner

A compet ent per son t r ai ner as def i ned i n EM 385- 1- 1 Appendi x Q, who i s qual i f i ed i n t he mat er i al pr esent ed, and who possesses a wor ki ng knowl edge of appl i cabl e t echni cal r egul at i ons, st andar ds, equi pment and syst ems r el at ed t o t he subj ect mat t er on whi ch t hey ar e t r ai ni ng Compet ent Per sons. A compet ent per son t r ai ner must be f ami l i ar wi t h t he t ypi cal hazar ds and t he equi pment used i n t he i ndust r y t hey ar e i nst r uct i ng. The t r ai ni ng pr ovi ded by t he compet ent per son t r ai ner must be appr opr i at e t o t hat speci f i c i ndust r y. The compet ent per son t r ai ner must eval uat e t he knowl edge and ski l l s of t he compet ent per sons as par t of t he t r ai ni ng process.

1. 2. 8 Hi gh Ri sk Act i v i t i es

Hi gh Ri sk Act i v i t i es ar e act i v i t i es t hat i nvol ve wor k at hei ght s, cr ane and r i ggi ng, excavat i ons and t r enchi ng, scaf f ol di ng, el ect r i cal wor k, and conf i ned space ent r y.

1. 2. 9 Hi gh Vi s i bi l i t y Acci dent

A Hi gh Vi s i bi l i t y Acci dent i s any mi shap whi ch may gener at e publ i c i t y or hi gh v i s i bi l i t y .

SECTI ON 01 35 26 Page 11

Page 12: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

1. 2. 10 Load Handl i ng Equi pment ( LHE)

LHE i s a t er m used t o descr i be cr anes, hoi st s and al l ot her hoi st i ng equi pment ( hoi st i ng equi pment means equi pment , i nc l udi ng cr ane, der r i cks, hoi st s and power oper at ed equi pment used wi t h r i ggi ng t o r ai se, l ower or hor i zont al l y move a l oad) .

1. 2. 11 Medi cal Tr eat ment

Medi cal Tr eat ment i s t r eat ment admi ni st er ed by a physi c i an or by r egi st er ed pr of essi onal per sonnel under t he st andi ng or der s of a physi c i an. Medi cal t r eat ment does not i ncl ude f i r st ai d t r eat ment even t hr ough pr ovi ded by a physi c i an or r egi st er ed per sonnel .

1. 2. 12 Near Mi ss

A Near Mi ss i s a mi shap r esul t i ng i n no per sonal i nj ur y and zer o pr oper t y damage, but gi ven a shi f t i n t i me or posi t i on, damage or i nj ur y may have occur r ed ( e. g. , a wor ker f al l s of f a scaf f ol d and i s not i nj ur ed; a cr ane swi ngs ar ound t o move t he l oad and nar r owl y mi sses a par ked vehi c l e) .

1. 2. 13 Oper at i ng Envel ope

The Oper at i ng Envel ope i s t he ar ea sur r oundi ng any cr ane or l oad handl i ng equi pment . I nsi de t hi s " envel ope" i s t he cr ane, t he oper at or , r i gger s and cr ane wal ker s, ot her per sonnel i nvol ved i n t he oper at i on, r i ggi ng gear bet ween t he hook, t he l oad, t he cr ane' s suppor t i ng st r uct ur e ( i . e. gr ound or r ai l ) , t he l oad' s r i ggi ng pat h, t he l i f t and r i ggi ng pr ocedur e.

1. 2. 14 Qual i f i ed Per son ( QP)

The QP i s a per son desi gnat ed i n wr i t i ng, who, by possessi on of a r ecogni zed degr ee, cer t i f i cat e, or pr of essi onal st andi ng, or ext ensi ve knowl edge, t r ai ni ng, and exper i ence, has successf ul l y demonst r at ed t hei r abi l i t y t o sol ve or r esol ve pr obl ems r el at ed t o t he subj ect mat t er , t he wor k, or t he pr oj ect .

1. 2. 15 Qual i f i ed Per son, Fal l Pr ot ect i on ( QP f or FP)

A QP f or FP i s a per son meet i ng t he r equi r ement s of EM 385- 1- 1 Appendi x Q, and ASSE/ SAFE Z359. 0, wi t h a r ecogni zed degr ee or pr of essi onal cer t i f i cat e and wi t h ext ensi ve knowl edge, t r ai ni ng and exper i ence i n t he f al l pr ot ect i on and r escue f i el d who i s capabl e of desi gni ng, anal yzi ng, and eval uat i ng and speci f y i ng f al l pr ot ect i on and r escue syst ems.

1. 2. 16 USACE Pr oper t y and Equi pment

I nt er pr et " USACE" pr oper t y and equi pment speci f i ed i n USACE EM 385- 1- 1 as Gover nment pr oper t y and equi pment .

1. 2. 17 Load Handl i ng Equi pment ( LHE) Acci dent or Load Handl i ng Equi pment Mishap

**************************************************************************NOTE: The l ast t wo sent ences ar e t ai l or ed f or NAVY and ARMY, r espect i vel y.

**************************************************************************

A LHE acci dent occur s when any one or mor e of t he ei ght el ement s i n t he

SECTI ON 01 35 26 Page 12

Page 13: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

oper at i ng envel ope f ai l s t o per f or m cor r ect l y dur i ng oper at i on, i nc l udi ng oper at i on dur i ng mai nt enance or t est i ng r esul t i ng i n per sonnel i nj ur y or deat h; mat er i al or equi pment damage; dr opped l oad; der ai l ment ; t wo- bl ocki ng; over l oad; or col l i s i on, i ncl udi ng unpl anned cont act bet ween t he l oad, cr ane, or ot her obj ect s. A dr opped l oad, der ai l ment , t wo- bl ocki ng, over l oad and col l i s i on ar e consi der ed acci dent s, even t hough no mat er i al damage or i nj ur y occur s. A component f ai l ur e ( e. g. , mot or bur nout , gear t oot h f ai l ur e, bear i ng f ai l ur e) i s not consi der ed an acci dent sol el y due t o mat er i al or equi pment damage unl ess t he component f ai l ur e r esul t s i n damage t o ot her component s ( e. g. , dr opped boom, dr opped l oad, or r ol l over ) . Document an LHE mi shap or acci dent usi ng t he NAVFAC pr escr i bed Navy Cr ane Cent er ( NCC) acci dent f or m. Document an LHE mi shap usi ng t he Cr ane Hi gh Hazar d wor ki ng gr oup mi shap r epor t i ng f or m.

1. 3 SUBMITTALS

**************************************************************************NOTE: Revi ew Submi t t al Descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect .

The Gui de Speci f i cat i on t echni cal edi t or s have desi gnat ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y , wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a " G" t o an i t em, i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .

For submi t t al s r equi r i ng Gover nment appr oval on Ar my pr oj ect s, a code of up t o t hr ee char act er s wi t hi n t he submi t t al t ags may be used f ol l owi ng t he " G" desi gnat i on t o i ndi cat e t he appr ovi ng aut hor i t y. Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i c t Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i c t Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy, Ai r For ce, and NASA pr oj ect s.

Use t he " S" c l assi f i cat i on onl y i n SD- 11 Cl oseout Submi t t al s. The " S" f ol l owi ng a submi t t al i t em i ndi cat es t hat t he submi t t al i s r equi r ed f or t he Sust ai nabi l i t y eNot ebook t o f ul f i l l f eder al l y mandat ed sust ai nabl e r equi r ement s i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.

Choose t he f i r st br acket ed i t em f or Navy, Ai r For ce and NASA pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.

**************************************************************************

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on; submi t t al s not havi ng a " G" desi gnat i on ar e [ f or Cont r act or Qual i t y Cont r ol appr oval . ] [ f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he

SECTI ON 01 35 26 Page 13

Page 14: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

" G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . ] Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Acci dent Pr event i on Pl an ( APP) ; G[ , [ _____] ]

SD- 06 Test Repor t s

Mont hl y Exposur e Repor t s

Not i f i cat i ons and Repor t s

Acci dent Repor t s; G[ , [ _____] ]

LHE I nspect i on Repor t s

Gas Pr ot ect i on f or NASA pr oj ect s

SD- 07 Cer t i f i cat es

Cont r act or Saf et y Sel f - Eval uat i on Checkl i st

Cr ane Oper at or s/ Ri gger s

St andar d Li f t Pl an; G[ , [ _____] ]

Cr i t i cal Li f t Pl an ; G[ , [ _____] ]

Naval Ar chi t ect ur e Anal ysi s; G[ , [ _____] ]

Act i v i t y Hazar d Anal ysi s ( AHA)

Conf i ned Space Ent r y Per mi t

Hot Wor k Per mi t

Cer t i f i cat e of Compl i ance

Thi r d Par t y Cer t i f i cat i on of Fl oat i ng Cr anes and Bar ge- Mount ed Mobi l e Cr anes

Li cense Cer t i f i cat es

Radi ogr aphy Oper at i on Pl anni ng Wor k Sheet ; G[ , [ _____] ]

Por t abl e Gauge Oper at i ons Pl anni ng Wor ksheet ; G[ , [ _____] ]

Machi ner y & Mechani zed Equi pment Cer t i f i cat i on For m

1. 4 MONTHLY EXPOSURE REPORTS

Pr ovi de a Mont hl y Exposur e Repor t and at t ach t o t he mont hl y bi l l i ng r equest . Thi s r epor t i s a compi l at i on of empl oyee- hour s wor ked each mont h f or al l s i t e wor ker s, bot h Pr i me and subcont r act or . Fai l ur e t o submi t t he r epor t may r esul t i n r et ent i on of up t o 10 per cent of t he voucher .

SECTI ON 01 35 26 Page 14

Page 15: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

1. 5 CONTRACTOR SAFETY SELF- EVALUATI ON CHECKLI ST

**************************************************************************NOTE: I ncl ude t hi s par agr aph i n NAVY pr oj ect s onl y. Do not use on ARMY pr oj ect s. Thi s par agr aph i s t ai l or ed f or NAVY.

**************************************************************************

Cont r act i ng Of f i cer wi l l pr ovi de a " Cont r act or Saf et y Sel f - Eval uat i on checkl i st " t o t he Cont r act or at t he pr e- const r uct i on conf er ence. Compl et e t he checkl i st mont hl y and submi t wi t h each r equest f or payment voucher . An accept abl e scor e of 90 or gr eat er i s r equi r ed. Fai l ur e t o submi t t he compl et ed saf et y sel f - eval uat i on checkl i st or achi eve a scor e of at l east 90 may r esul t i n r et ent i on of up t o 10 per cent of t he voucher .

1. 6 REGULATORY REQUI REMENTS

**************************************************************************NOTE: Edi t t o i ncl ude any addi t i onal r equi r ement s whi ch appl y t o t he wor k t o be per f or med i ncl udi ng Feder al , st at e and l ocal l aws, r egul at i ons and st at ut es; Host Nat i on r equi r ement s; and NAVY, AI R FORCE and ARMY i nst al l at i on or US Ar my Cor ps of Engi neer s Di st r i c t r equi r ement s by aut hor i t y and document number . Consul t wi t h t he suppor t i ng l ocal saf et y and occupat i onal heal t h of f i ce f or assi st ance i n i dent i f y i ng l ocal r equi r ement s.

**************************************************************************

I n addi t i on t o t he det ai l ed r equi r ement s i ncl uded i n t he pr ovi s i ons of t hi s cont r act , compl y wi t h t he most r ecent edi t i on of USACE EM 385- 1- 1, and t he f ol l owi ng [ f eder al , st at e, and l ocal ] [ host nat i on ] l aws, or di nances, cr i t er i a, r ul es and r egul at i ons. Submi t mat t er s of i nt er pr et at i on of st andar ds t o t he appr opr i at e admi ni st r at i ve agency f or r esol ut i on bef or e st ar t i ng wor k. Wher e t he r equi r ement s of t hi s speci f i cat i on, appl i cabl e l aws, cr i t er i a, or di nances, r egul at i ons, and r ef er enced document s var y, t he most st r i ngent r equi r ement s gover n.

1. 6. 1 Subcont r act or Saf et y Requi r ement s

**************************************************************************NOTE: Use t hi s par agr aph and subsequent par agr aphs f or NAVY pr oj ect s i n CONUS and Hawai i onl y. Par agr aphs ar e t ai l or ed f or NAVY use onl y.

**************************************************************************

For t hi s cont r act , nei t her Cont r act or nor any subcont r act or may ent er i nt o cont r act wi t h any subcont r act or t hat f ai l s t o meet t he f ol l owi ng r equi r ement s. The t er m subcont r act or i n t hi s and t he f ol l owi ng par agr aphs means any ent i t y hol di ng a cont r act wi t h t he Cont r act or or wi t h a subcont r act or at any t i er .

1. 6. 1. 1 Exper i ence Modi f i cat i on Rat e ( EMR)

Subcont r act or s on t hi s cont r act must have an ef f ect i ve EMR l ess t han or equal t o 1. 10, as comput ed by t he Nat i onal Counci l on Compensat i on I nsur ance ( NCCI ) or i f not avai l abl e, as comput ed by t he st at e agency' s r at i ng bur eau i n t he st at e wher e t he subcont r act or i s r egi st er ed, when

SECTI ON 01 35 26 Page 15

Page 16: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

ent er i ng i nt o a subcont r act agr eement wi t h t he Pr i me Cont r act or or a subcont r act or at any t i er . The Pr i me Cont r act or may submi t a wr i t t en r equest f or addi t i onal consi der at i on t o t he Cont r act i ng Of f i cer wher e t he speci f i ed accept abl e EMR r ange cannot be achi eved. Rel axat i on of t he EMR r ange wi l l onl y be consi der ed f or appr oval on a case- by- case basi s f or speci al condi t i ons and must not be ant i c i pat ed as t aci t appr oval . Cont r act or ' s Si t e Saf et y and Heal t h Of f i cer ( SSHO) must col l ect and mai nt ai n t he cer t i f i ed EMR r at i ngs f or al l subcont r act or s on t he pr oj ect and make t hem avai l abl e t o t he Gover nment at t he Gover nment ' s r equest .

1. 6. 1. 2 OSHA Days Away f r om Wor k, Rest r i c t ed Dut y, or Job Tr ansf er ( DART) Rate

Subcont r act or s on t hi s cont r act must have a DART r at e, cal cul at ed f r om t he most r ecent , compl et e cal endar year , l ess t han or equal t o 3. 4 when ent er i ng i nt o a subcont r act agr eement wi t h t he Pr i me Cont r act or or a subcont r act or at any t i er . The OSHA Dar t Rat e i s cal cul at ed usi ng t he f ol l owi ng f or mul a:

( N/ EH) x 200, 000

where:

N = number of i nj ur i es and i l l nesses wi t h days away, r est r i c t ed wor k, or j ob t r ansf er

EH = t ot al hour s wor ked by al l empl oyees dur i ng most r ecent , compl et e cal endar year

200, 000 = base f or 100 f ul l - t i me equi val ent wor ker s ( wor ki ng 40 hour s per week, 50 weeks per year )

The Pr i me Cont r act or may submi t a wr i t t en r equest f or addi t i onal consi der at i on t o t he Cont r act i ng Of f i cer wher e t he speci f i ed accept abl e OSHA Dar t r at e r ange cannot be achi eved f or a par t i cul ar subcont r act or . Rel axat i on of t he OSHA DART r at e r ange wi l l onl y be consi der ed f or appr oval on a case- by- case basi s f or speci al condi t i ons and must not be ant i c i pat ed as t aci t appr oval . Cont r act or ' s Si t e Saf et y and Heal t h Of f i cer ( SSHO) must col l ect and mai nt ai n sel f - cer t i f i ed OSHA DART r at es f or al l subcont r act or s on t he pr oj ect and make t hem avai l abl e t o t he Gover nment at t he Gover nment ' s r equest .

1. 7 SI TE QUALI FI CATI ONS, DUTI ES, AND MEETI NGS

1. 7. 1 Per sonnel Qual i f i cat i ons

1. 7. 1. 1 Si t e Saf et y and Heal t h Of f i cer ( SSHO)

Pr ovi de an SSHO t hat meet s t he r equi r ement s of EM 385- 1- 1 Sect i on 1. The SSHO must ensur e t hat t he r equi r ement s of 29 CFR 1926. 16 ar e met f or t he pr oj ect . Pr ovi de a Saf et y over si ght t eam t hat i nc l udes a mi ni mum of one ( 1) per son at each pr oj ect s i t e t o f unct i on as t he Si t e Saf et y and Heal t h Of f i cer ( SSHO) . The SSHO or an equal l y- qual i f i ed Al t er nat e SSHO must be at t he wor k s i t e at al l t i mes t o i mpl ement and admi ni st er t he Cont r act or ' s saf et y pr ogr am and gover nment - accept ed Acci dent Pr event i on Pl an. The SSHO and Al t er nat e SSHO must have t he r equi r ed t r ai ni ng, exper i ence, and qual i f i cat i ons i n accor dance wi t h EM 385- 1- 1 Sect i on 01. A. 17, and al l associ at ed sub- par agr aphs.

SECTI ON 01 35 26 Page 16

Page 17: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

I f t he SSHO i s of f - s i t e f or a per i od l onger t han 24 hour s, an equal l y- qual i f i ed al t er nat e SSHO must be pr ovi ded and must f ul f i l l t he same r ol es and r esponsi bi l i t i es as t he pr i mar y SSHO. When t he SSHO i s t empor ar i l y ( up t o 24 hour s) of f - s i t e, a Desi gnat ed Repr esent at i ve ( DR) , as i dent i f i ed i n t he AHA may be used i n l i eu of an Al t er nat e SSHO, and must be on t he pr oj ect s i t e at al l t i mes when wor k i s bei ng per f or med. Not e t hat t he DR i s a col l at er al dut y saf et y posi t i on, wi t h saf et y dut i es i n addi t i on t o t hei r f ul l t i me occupat i on.

1. 7. 1. 1. 1 Addi t i onal Si t e Saf et y and Heal t h Of f i cer ( SSHO) Requi r ement s and Duties

**************************************************************************NOTE: Choose t he br acket ed i t ems bel ow when t he pr oj ect al l ows t he SSHO t o ser ve as t he QC Manager or Super i nt endent or bot h. Coor di nat e wi t h Sect i on 01 45 00. 00 10 01 45 00. 00 20 01 45 00. 00 40 QUALI TY CONTROL t o ensur e consi st ency.

**************************************************************************

The SSHO [ may al so] [ may not ] ser ve as t he Qual i t y Cont r ol Manager . The SSHO [ may al so] [ may not ] ser ve as t he Super i nt endent .

**************************************************************************NOTE: Use t hi s par agr aph f or NAVFAC Paci f i c ( Excl udi ng Cont i ngency Engi neer i ng) , Hawai i , and Mar i anas pr oj ect s onl y. Par agr aph i s t ai l or ed f or NAVFAC PAC, HI , and MAR.

**************************************************************************

The SSHO must have compl et ed a 40 hour cont r act saf et y awar eness cour se based on t he cont ent and pr i nci pl es of EM 385- 1- 1, and i nst r uct ed i n accor dance wi t h t he gui del i nes of ASSE/ SAFE Z490. 1, by a t r ai ner meet i ng t he qual i f i cat i ons of par agr aph QUALI FI ED TRAI NER REQUI REMENTS. I f t he SSHO does not have a cur r ent cer t i f i cat i on, cer t i f i cat i on must be obt ai ned wi t hi n 60 days, maxi mum, of cont r act awar d.

1. 7. 1. 2 Compet ent Per son Qual i f i cat i ons

Pr ovi de Compet ent Per sons i n accor dance wi t h EM 385- 1- 1, Appendi x Q and her ei n. Compet ent Per sons f or hi gh r i sk act i v i t i es i ncl ude conf i ned space, cr anes and r i ggi ng, excavat i on/ t r enchi ng, f al l pr ot ect i on, and el ect r i cal wor k. The CP f or t hese act i v i t i es must be desi gnat ed i n wr i t i ng, and meet t he r equi r ement s f or t he speci f i c act i v i t y ( i . e. compet ent per son, f al l protection).

The Compet ent Per son i dent i f i ed i n t he Cont r act or ' s Saf et y and Heal t h Pr ogr am and accept ed Acci dent Pr event i on Pl an, must be on- si t e at al l t i mes when t he wor k t hat pr esent s t he hazar ds associ at ed wi t h t hei r pr of essi onal exper t i se i s bei ng per f or med. Pr ovi de t he cr edent i al s of t he Compet ent Per sons( s) t o t he t he Cont r act i ng Of f i cer f or i nf or mat i on i n consul t at i on wi t h t he Saf et y Of f i ce.

1. 7. 1. 2. 1 Compet ent Per son f or Conf i ned Space Ent r y

Pr ovi de a Conf i ned Space ( CP) Compet ent Per son who meet s t he r equi r ement s of EM 385- 1- 1, Appendi x Q, and her ei n. The CP f or Conf i ned Space Ent r y must super vi se t he ent r y i nt o each conf i ned space i n accor dance wi t h EM 385- 1- 1, Sect i on 34.

SECTI ON 01 35 26 Page 17

Page 18: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

**************************************************************************NOTE: Use t hi s par agr aph f or oper at i ons i nvol v i ng combust i bl e or hazar dous mat er i al s.

**************************************************************************

[ Si nce t hi s wor k i nvol ves oper at i ons t hat handl e combust i bl e or hazar dous mat er i al s, t hi s per son must have t he abi l i t y t o under st and and f ol l ow t hr ough on t he ai r sampl i ng, Per sonal Pr ot ect i ve Equi pment ( PPE) , and i nst r uct i ons of a Mar i ne Chemi st , Coast Guar d aut hor i zed per sons, or Cer t i f i ed I ndust r i al Hygi eni st . Conf i ned space and encl osed space wor k must compl y wi t h NFPA 306, OSHA 29 CFR 1915, Subpar t B, " Conf i ned and Encl osed Spaces and Ot her Danger ous At mospher es i n Shi pyar d Empl oyment , " or as appl i cabl e, 29 CFR 1910. 147 f or gener al i ndust r y.

] 1. 7. 1. 2. 2 Compet ent Per son f or Scaf f ol di ng

Pr ovi de a Compet ent Per son f or Scaf f ol di ng who meet s t he r equi r ement s of EM 385- 1- 1, Sect i on 22. B. 02 and her ei n.

1. 7. 1. 2. 3 Compet ent Per son f or Fal l Pr ot ect i on

Pr ovi de a Compet ent Per son f or Fal l Pr ot ect i on who meet s t he r equi r ement s of EM 385- 1- 1, Sect i on 21. C. 04, 21. B. 03, and her ei n.

1. 7. 1. 3 Qual i f i ed Tr ai ner Requi r ement s

**************************************************************************NOTE: I t em a bel ow wi t h r ef er ence t o NAVFAC I S t ai l or ed f or NAVFAC MAR.

**************************************************************************

I ndi v i dual s qual i f i ed t o i nst r uct t he 40 hour cont r act saf et y awar eness cour se, or por t i ons t her eof , must meet t he def i ni t i on of a Compet ent Per son Tr ai ner , and, at a mi ni mum, possess a wor ki ng knowl edge of t he f ol l owi ng subj ect ar eas: EM 385- 1- 1, El ect r i cal St andar ds, Lockout / Tagout , Fal l Pr ot ect i on, Conf i ned Space Ent r y f or Const r uct i on; Excavat i on, Tr enchi ng and Soi l Mechani cs, and Scaf f ol ds i n accor dance wi t h 29 CFR 1926. 450, Subpar t L.

I nst r uct or s ar e r equi r ed t o:

a. Pr epar e c l ass pr esent at i ons t hat cover const r uct i on- r el at ed saf et y requirements and i ncl udes t opi cs cover ed i n t he NAVFAC Const r uct i on Saf et y Hazar d Awar eness Cour se f or Cont r act or s.

b. Ensur e t hat al l at t endees at t end al l sessi ons by usi ng a c l ass r ost er s i gned dai l y by each at t endee. Mai nt ai n copi es of t he r ost er f or at l east f i ve ( 5) year s. Thi s i s a cer t i f i cat i on c l ass and must be at t ended 100 per cent . I n cases of emer gency wher e an at t endee cannot make i t t o a sessi on, t he at t endee can make i t up i n anot her c l ass sessi on f or t he same subj ect .

c. Updat e t r ai ni ng cour se mat er i al s whenever an updat e of t he EM 385- 1- 1 becomes avai l abl e.

d. Pr ovi de a wr i t t en exam of at l east 50 quest i ons. St udent s ar e r equi r ed t o answer 80 per cent cor r ect l y t o pass.

SECTI ON 01 35 26 Page 18

Page 19: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

e. Request , r ev i ew and i ncor por at e st udent f eedback i nt o a cont i nuous cour se i mpr ovement pr ogr am.

1. 7. 1. 4 Requi r ement s f or al l Cont r act or Jobsi t e Per sonnel Hol di ng H- 1B or H- 2B Vi sas:

**************************************************************************NOTE: Use t hi s par agr aph f or NAVFAC MARI ANAS pr oj ect s onl y. Par agr aph i s t ai l or ed f or NAVFAC MARIANAS.

**************************************************************************

Al l Cont r act or j obsi t e wor ker s hol di ng an H- 1B or H- 2B vi sa must compl et e a mi ni mum 16 hour s of c l assr oom t r ai ni ng on t he r equi r ement s of t he l at est ver si on of EM 385- 1- 1 pr i or t o t hei r f i r st day on t he j obsi t e t o i ncl ude but not l i mi t ed t o t he f ol l owi ng t opi cs: Sani t at i on; Medi cal and Fi r st Ai d Requi r ement s; Tempor ar y Faci l i t i es; Per sonal Pr ot ect i ve Equi pment ; El ect r i cal ; Hand and Power Tool s; Mat er i al Handl i ng and St or age; Mot or Vehi c l es; Fal l Pr ot ect i on; Wor k Pl at f or ms and Scaf f ol di ngs; Demol i t i on; Saf e Access, Ladder s, Fl oor & Wal l Openi ngs, St ai r s and Rai l i ng Syst ems; Excavat i ons and Tr enchi ng; and Conf i ned Spaces, pr i or t o r epor t i ng t o t he jobsite.

Pr ovi de a l i s t of wor ker s who have compl et ed t he t r ai ni ng on t he j obsi t e and have r eadi l y avai l abl e upon r equest by t he Cont r act i ng Of f i cer . Mai nt ai n and updat e t he l i s t as addi t i onal wor ker s ar e avai l abl e. I ncl ude t he name and qual i f i cat i ons of t he qual i f i ed t r ai ner ( s) who pr ovi ded t he t r ai ni ng. Per sonnel who have t aken t he 40 Hour Const r uct i on Saf et y Hazar d Awar eness Tr ai ni ng Cour se f or Cont r act or s or s i mi l ar cour se t hat i ncl udes emphasi s on EM 385- 1- 1 compl i ance, ar e not r equi r ed t o t ake t he 16 hour s of c l assr oom t r ai ni ng on t he r equi r ement s of t he l at est ver si on of t he EM 385- 1- 1. The 16 hour s c l assr oom t r ai ni ng may be pr ovi ded by t he Guam Cont r act or s Associ at i on ( GCA) , t he Guam Tr ades Academy, or ot her qual i f i ed t r ai ner s as out l i ned i n par agr aph QUALI FI ED TRAI NER REQUI REMENTS.

1. 7. 1. 5 Dr edgi ng Cont r act Requi r ement s

**************************************************************************Not e: Dr edgi ng cont r act s may i nc l ude sever al pr oj ect s i t es. Consul t wi t h t he USACE Di st r i c t NAVFAC FEAD or ROI CC t o det er mi ne t he pr oj ect s i t e and SSHO st af f i ng r equi r ement s, consi der i ng s i ze of cont r act , or gani zat i on of dr edgi ng oper at i on r equi r ement s, di sper si on of oper at i ons, and t r avel t i me t o associ at ed s i t es by SSHO. The SSHO must be abl e t o t r avel t o al l ar eas wi t hi n pr oj ect s i t e wi t hi n 45 mi nut es usi ng equi pment mai nt ai ned on- si t e.

**************************************************************************

1. 7. 1. 5. 1 Dr edgi ng Saf et y Per sonnel Requi r ement s

a. Pr ovi de a mi ni mum of [ one] [ _____] [ f ul l t i me ] [ col l at er al dut y ] SSHO assi gned per pr oj ect s i t e f or t he pr i mar y wor ki ng shi f t .

b. For a pr oj ect i nvol v i ng mul t i pl e wor k shi f t s, [ pr ovi de one[ f ul l - t i me] [ or ] [ col l at er al dut y] SSHO f or each addi t i onal shi f t . ] [ pr ovi de one Col l at er al Dut y Saf et y Of f i cer ( CDSO) on a dr edge and one at t he dr edged mat er i al pl acement s i t e. Dur i ng t hese shi f t s, t he SSHO must be avai l abl e at al l t i mes t o assi st wi t h emer gency s i t uat i ons. ]

SECTI ON 01 35 26 Page 19

Page 20: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

c. For i ndi v i dual dr edgi ng pr oj ect s or s i t es wi t h a dr edge cr ew and f i l l cr ew on wat ch of 8 empl oyees or l ess, a CDSO must be appoi nt ed, i nst ead of an SSHO. The CDSO assumes t he same r esponsi bi l i t i es as a f ul l - t i me SSHO.

d. An exampl e of one dr edgi ng pr oj ect s i t e i s r ef l ect ed i n each of t he following:

( 1) a mechani cal dr edge, t ug( s) and scow( s) , scow r out e, and mat er i al pl acement s i t e; or

( 2) a hydr aul i c pi pel i ne dr edge, at t endant pl ant , and mat er i al pl acement s i t e; or ,

( 3) a hopper dr edge ( i ncl ude l and- based mat er i al pl acement s i t e - i f applicable.)

e. For Hopper Dr edges wi t h t he U. S. Coast Guar d, document ed cr ews may desi gnat e an of f i cer as a Col l at er al Dut y Saf et y Of f i cer ( CDSO) i nst ead of havi ng a f ul l - t i me SSHO onboar d i f t he of f i cer meet s t he SSHO t r ai ni ng and exper i ence r equi r ement s.

1. 7. 1. 5. 2 SSHO Requi r ement s f or Dr edgi ng

a. I n addi t i on t o r equi r ement s st at ed el sewher e i n t hi s speci f i cat i on, an i ndi v i dual ser vi ng as a SSHO must be pr esent at t he pr oj ect s i t e, l ocat ed so t hat t hey have f ul l mobi l i t y and r easonabl e access t o al l maj or wor k oper at i ons, f or at l east one shi f t i n each 24 hour per i od when wor k i s bei ng per f or med. The SSHO must be avai l abl e dur i ng t hei r shi f t f or i mmedi at e ver bal consul t at i on and not i f i cat i on, ei t her by phone or r adi o.

b. The SSHO i s a f ul l - t i me, dedi cat ed posi t i on, except as not ed above, who must r epor t t o a seni or pr oj ect ( or cor por at e) of f i c i al . When t he SSHO i s per mi t t ed t o be a col l at er al dut y, t he SSHO i s not per mi t t ed t o be i n anot her posi t i on r equi r i ng cont i nuous mechani cal or equi pment oper at i ons, such as equi pment oper at or s.

c. The SSHO must i nspect al l wor k ar eas and oper at i ons dur i ng i ni t i al set - up and at l east mont hl y obser ve and pr ovi de per sonal over si ght on each shi f t dur i ng dr edgi ng oper at i ons f or pr oj ect s wi t h many wor k s i t es, mor e of t en f or t hose wi t h l ess wor k s i t es.

d. I f t he SSHO i s of f - s i t e f or a per i od l onger t han 24 hour s, anot her qual i f i ed SSHO must be pr ovi ded and f ul f i l l t he same r ol es and r esponsi bi l i t i es as t he SSHO dur i ng t hei r absence.

1. 7. 1. 5. 3 Col l at er al Dut y Saf et y Of f i cer ( CDSO) Requi r ement s f or Dr edgi ng

a. A CDSO i s an i ndi v i dual who i s assi gned col l at er al dut y saf et y r esponsi bi l i t i es i n addi t i on t o t hei r f ul l - t i me occupat i on, and who suppor t s and suppl ement s t he SSHO ef f or t s i n managi ng, i mpl ement i ng and enf or ci ng t he Cont r act or ' s Saf et y and Heal t h Pr ogr am. The assi gned CDSO must be an i ndi v i dual ( s) wi t h wor k over si ght r esponsi bi l i t i es, such as mast er , mat e, f i l l f or eman, or super i nt endent . A CDSO must not be an empl oyee r esponsi bl e f or cont i nuous mechani cal or equi pment oper at i ons, such as an equi pment oper at or .

SECTI ON 01 35 26 Page 20

Page 21: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

b. A CDSO per f or ms saf et y pr ogr am t asks as assi gned by t he SSHO and must r epor t saf et y f i ndi ngs t o t he SSHO. The SSHO must document r esul t s of saf et y f i ndi ngs and pr ovi de i nf or mat i on f or i ncl us i on i n t he CQC r epor t s t o t he Cont r act i ng Of f i cer .

1. 7. 1. 5. 4 Saf et y Per sonnel Tr ai ni ng Requi r ement s f or Dr edgi ng

A SSHO and a CDSO f or dr edgi ng cont r act s must t ake ei t her a f or mal c l assr oom or onl i ne OSHA 30- hour Const r uct i on Saf et y Cour se, or an equi val ent 30 hour s of f or mal c l assr oom or onl i ne saf et y and heal t h t r ai ni ng cover i ng t he subj ect s of t he OSHA 30- hour Cour se i n accor dance with EM 385- 1- 1 Appendi x A, par agr aph 3. d. ( 3) , appl i cabl e t o dr edgi ng wor k, and gi ven by qual i f i ed i nst r uct or s. I n except i on t o EM 385- 1- 1, Sect i on 01. A. 17, compl y wi t h t he f ol l owi ng:

a. The SSHO must mai nt ai n compet ency t hr ough havi ng t aken 8 hour s of f or mal c l assr oom or onl i ne saf et y and heal t h r el at ed cour sewor k ever y year . Hour s spent as an i nst r uct or i n such cour ses wi l l be consi der ed t he same as at t endi ng t hem, but each cour se onl y get s cr edi t once ( f or exampl e, i nst r uct i ng a 1- hour asbest os awar eness cour se 5 t i mes i n a year pr ovi des one hour cr edi t f or t r ai ni ng) .

b. The SSHO and a CDSO must have a mi ni mum of t hr ee year s of exper i ence wi t hi n t he past f i ve year s i n one of t he f ol l owi ng:

( 1) Super vi s i ng/ managi ng dr edgi ng act i v i t i es

( 2) Super vi s i ng/ managi ng mar i ne const r uct i on act i v i t i es

( 3) Super vi s i ng/ managi ng l and- based const r uct i on act i v i t i es

( 4) Wor k managi ng saf et y pr ogr ams or pr ocesses

( 5) Conduct i ng hazar d anal yses and devel opi ng cont r ol s i n act i v i t i es or envi r onment s wi t h s i mi l ar hazar ds

1. 7. 1. 6 Cr ane Oper at or s/ Ri gger s

Pr ovi de Oper at or s, Si gnal Per sons, and Ri gger s meet i ng t he r equi r ement s i n EM 385- 1- 1, Sect i on 15. B f or Ri gger s and Sect i on 16. B f or Cr ane Oper at or s and Si gnal Per sons. Pr ovi de pr oof of cur r ent qual i f i cat i on.

**************************************************************************NOTE: Add t he f ol l owi ng par agr aph f or pr oj ect s i n t he St at e of Hawai i onl y. Par agr aph i s t ai l or ed f or NAVFAC HI .

**************************************************************************

[ Cr ane Oper at or s must al so meet t he cr ane oper at or r equi r ement s of t he St at e of Hawai i f or Cr ane cer t i f i cat i on.

]1. 7. 2 Per sonnel Dut i es

1. 7. 2. 1 Dut i es of t he Si t e Saf et y and Heal t h Of f i cer ( SSHO)

The SSHO must :

a. Conduct dai l y saf et y and heal t h i nspect i ons and mai nt ai n a wr i t t en l og whi ch i ncl udes ar ea/ oper at i on i nspect ed, dat e of i nspect i on, i dent i f i ed

SECTI ON 01 35 26 Page 21

Page 22: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

hazar ds, r ecommended cor r ect i ve act i ons, est i mat ed and act ual dat es of cor r ect i ons. At t ach saf et y i nspect i on l ogs t o t he Cont r act or s ' dai l y pr oduct i on r epor t .

b. Conduct mi shap i nvest i gat i ons and compl et e r equi r ed acci dent r epor t s. Repor t mi shaps and near mi sses.

c. Use and mai nt ai n OSHA' s For m 300 t o l og wor k- r el at ed i nj ur i es and i l l nesses occur r i ng on t he pr oj ect s i t e f or Pr i me Cont r act or s and subcont r act or s, and make avai l abl e t o t he Cont r act i ng Of f i cer upon r equest . Post and mai nt ai n t he For m 300A on t he s i t e Saf et y Bul l et i n Board.

d. Mai nt ai n appl i cabl e saf et y r ef er ence mat er i al on t he j ob s i t e.

e. At t end t he pr e- const r uct i on conf er ence, pr e- wor k meet i ngs i ncl udi ng pr epar at or y meet i ngs, and per i odi c i n- pr ogr ess meet i ngs.

f . Revi ew t he APP and AHAs f or compl i ance wi t h EM 385- 1- 1, and appr ove, s i gn, i mpl ement and enf or ce t hem.

g. Est abl i sh a Saf et y and Occupat i onal Heal t h ( SOH) Def i c i ency Tr acki ng Syst em t hat l i s t s and moni t or s out st andi ng def i c i enci es unt i l resolution.

h. Ensur e subcont r act or compl i ance wi t h saf et y and heal t h r equi r ement s.

i . Mai nt ai n a l i s t of hazar dous chemi cal s on s i t e and t hei r mat er i al Saf et y Dat a Sheet s ( SDS) .

j . Mai nt ai n a weekl y l i s t of hi gh hazar d act i v i t i es i nvol v i ng ener gy, equi pment , excavat i on, ent r y i nt o conf i ned space, and el evat i on, and be pr epar ed t o di scuss det ai l s dur i ng QC Meet i ngs.

k. Pr ovi de and keep a r ecor d of s i t e saf et y or i ent at i on and i ndoct r i nat i on f or Cont r act or empl oyees, subcont r act or empl oyees, and si t e v i s i t or s.

Super i nt endent , QC Manager , and SSHO ar e subj ect t o di smi ssal i f t he above dut i es ar e not bei ng ef f ect i vel y car r i ed out . I f Super i nt endent , QC Manager , or SSHO ar e di smi ssed, pr oj ect wor k wi l l be st opped and wi l l not be al l owed t o r esume unt i l a sui t abl e r epl acement i s appr oved and t he above dut i es ar e agai n bei ng ef f ect i vel y car r i ed out .

1. 7. 3 Meetings

1. 7. 3. 1 Pr econst r uct i on Conf er ence

a. Cont r act or r epr esent at i ves who have a r esponsi bi l i t y or s i gni f i cant r ol e i n acci dent pr event i on on t he pr oj ect must at t end t he pr econst r uct i on conf er ence. Thi s i ncl udes t he pr oj ect super i nt endent , Si t e Saf et y and Occupat i onal Heal t h of f i cer , qual i t y cont r ol manager , or any ot her assi gned saf et y and heal t h pr of essi onal s who par t i c i pat ed i n t he devel opment of t he APP ( i ncl udi ng t he Act i v i t y Hazar d Anal yses ( AHAs) and speci al pl ans, pr ogr am and pr ocedur es associ at ed wi t h i t ) .

b. Di scuss t he det ai l s of t he submi t t ed APP t o i ncl ude i ncor por at ed pl ans, pr ogr ams, pr ocedur es and a l i s t i ng of ant i c i pat ed AHAs t hat wi l l be devel oped and i mpl ement ed dur i ng t he per f or mance of t he cont r act . Thi s l i s t of pr oposed AHAs wi l l be r evi ewed at t he conf er ence and an

SECTI ON 01 35 26 Page 22

Page 23: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

agr eement wi l l be r eached bet ween t he Cont r act or and t he Cont r act i ng Of f i cer as t o whi ch phases wi l l r equi r e an anal ysi s. I n addi t i on, est abl i sh a schedul e f or t he pr epar at i on, submi t t al , and Gover nment r evi ew of AHAs t o pr ecl ude pr oj ect del ays.

c. Def i c i enci es i n t he submi t t ed APP, i dent i f i ed dur i ng t he Cont r act i ng Of f i cer ' s r evi ew, must be cor r ect ed, and t he APP r e- submi t t ed f or r evi ew pr i or t o t he st ar t of const r uct i on. Wor k i s not per mi t t ed t o begi n unt i l an APP i s est abl i shed t hat i s accept abl e t o t he Cont r act i ng Officer.

**************************************************************************NOTE: Use t he f ol l owi ng t ai l or ed par agr aph f or ARMY Desi gn- Bui l d Pr oj ect s onl y. Par agr aph i s t ai l or ed f or ARMY and DESI GN- BUI LD.

**************************************************************************

d. The f unct i ons of a Pr econst r uct i on conf er ence may t ake pl ace at t he Post - Awar d Ki ckof f meet i ng f or Desi gn Bui l d Cont r act s.

1. 7. 3. 2 Saf et y Meet i ngs

Conduct saf et y meet i ngs t o r evi ew past act i v i t i es, pl an f or new or changed oper at i ons, r evi ew per t i nent aspect s of appr opr i at e AHA ( by t r ade) , est abl i sh saf e wor ki ng pr ocedur es f or ant i c i pat ed hazar ds, and pr ovi de per t i nent Saf et y and Occupat i onal Heal t h ( SOH) t r ai ni ng and mot i vat i on. Conduct meet i ngs at l east once a mont h f or al l super vi sor s on t he pr oj ect l ocat i on. The SSHO, super vi sor s, f or emen, or CDSOs must conduct meet i ngs at l east once a week f or t he t r ade wor ker s. Document meet i ng mi nut es t o i ncl ude t he dat e, per sons i n at t endance, subj ect s di scussed, and names of i ndi v i dual ( s) who conduct ed t he meet i ng. Mai nt ai n document at i on on- si t e and f ur ni sh copi es t o t he Cont r act i ng Of f i cer on r equest . Not i f y t he Cont r act i ng Of f i cer of al l schedul ed meet i ngs 7 cal endar days i n advance.

1. 8 ACCI DENT PREVENTI ON PLAN ( APP)

**************************************************************************NOTE: Cont r act s t hat i ncl ude FAR 52. 236- 13 Acci dent Pr event i on r equi r e t he Cont r act or t o pr epar e and execut e a wr i t t en Acci dent Pr event i on Pl an ( APP) i n accor dance wi t h Appendi x A of EM 385- 1- 1 t o i ncl ude Act i v i t y Hazar d Anal yses ( AHA) .

**************************************************************************

**************************************************************************NOTE: I n t hi r d sent ence, i ncl ude br acket ed, t ai l or ed i t em onl y f or NASA pr oj ect s.

**************************************************************************

**************************************************************************NOTE: I n second par agr aph, choi ce of br acket ed opt i ons ar e f or ARMY pr oj ect s onl y.

**************************************************************************

A qual i f i ed per son must pr epar e t he wr i t t en s i t e- speci f i c APP. Pr epar e t he APP i n accor dance wi t h t he f or mat and r equi r ement s of EM 385- 1- 1, Appendi x A, and as suppl ement ed her ei n. Cover al l par agr aph and subpar agr aph el ement s i n EM 385- 1- 1, Appendi x A[ and show compl i ance wi t h NASA NPR 8715. 3] . The APP must be j ob- speci f i c and addr ess any unusual or uni que aspect s

SECTI ON 01 35 26 Page 23

Page 24: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

of t he pr oj ect or act i v i t y f or whi ch i t i s wr i t t en. The APP must i nt er f ace wi t h t he Cont r act or ' s over al l saf et y and heal t h pr ogr am r ef er enced i n t he APP i n t he appl i cabl e APP el ement , and made si t e- speci f i c . Descr i be t he met hods t o eval uat e past saf et y per f or mance of pot ent i al subcont r act or s i n t he sel ect i on pr ocess. Al so, descr i be i nnovat i ve met hods used t o ensur e and moni t or saf e wor k pr act i ces of subcont r act or s. The Gover nment consi der s t he Pr i me Cont r act or t o be t he " cont r ol l i ng aut hor i t y" f or al l wor k s i t e saf et y and heal t h of t he subcont r act or s. Cont r act or s ar e r esponsi bl e f or i nf or mi ng t hei r subcont r act or s of t he saf et y pr ovi s i ons under t he t er ms of t he cont r act and t he penal t i es f or noncompl i ance, coor di nat i ng t he wor k t o pr event one cr af t f r om i nt er f er i ng wi t h or cr eat i ng hazar dous wor ki ng condi t i ons f or ot her cr af t s, and i nspect i ng subcont r act or oper at i ons t o ensur e t hat acci dent pr event i on r esponsi bi l i t i es ar e bei ng car r i ed out . The APP must be s i gned by an of f i cer of t he f i r m ( Pr i me Cont r act or seni or per son) , t he i ndi v i dual pr epar i ng t he APP, t he on- si t e super i nt endent , t he desi gnat ed SSHO, t he Cont r act or Qual i t y Cont r ol Manager , and any desi gnat ed Cer t i f i ed Saf et y Pr of essi onal ( CSP) or Cer t i f i ed Heal t h Physi c i st ( CI H) . The SSHO must pr ovi de and mai nt ai n t he APP and a l og of s i gnat ur es by each subcont r act or f or eman, at t est i ng t hat t hey have r ead and under st and t he APP, and make t he APP and l og avai l abl e on- si t e t o t he Cont r act i ng Of f i cer . I f Engl i sh i s not t he f or eman' s pr i mar y l anguage, t he Pr i me Cont r act or must pr ovi de an interpreter.

Submi t t he APP t o t he Cont r act i ng Of f i cer [ 15] [ _____] cal endar days pr i or t o t he dat e of t he pr econst r uct i on conf er ence f or accept ance. Wor k cannot pr oceed wi t hout an accept ed APP. Once r evi ewed and accept ed by t he Cont r act i ng Of f i cer , t he APP and at t achment s wi l l be enf or ced as par t of t he cont r act . Di sr egar di ng t he pr ovi s i ons of t hi s cont r act or t he accept ed APP i s cause f or st oppi ng of wor k, at t he di scr et i on of t he Cont r act i ng Of f i cer , unt i l t he mat t er has been r ect i f i ed. Cont i nuousl y r evi ew and amend t he APP, as necessar y, t hr oughout t he l i f e of t he cont r act . Changes t o t he accept ed APP must be made wi t h t he knowl edge and concur r ence of t he Cont r act i ng Of f i cer , pr oj ect super i nt endent , SSHO and Qual i t y Cont r ol Manager . I ncor por at e unusual or hi gh- hazar d act i v i t i es not i dent i f i ed i n t he or i gi nal APP as t hey ar e di scover ed. Shoul d any sever e hazar d exposur e ( i . e. i mmi nent danger ) become evi dent , st op wor k i n t he ar ea, secur e t he ar ea, and devel op a pl an t o r emove t he exposur e and cont r ol t he hazar d. Not i f y t he Cont r act i ng Of f i cer wi t hi n 24 hour s of di scover y. El i mi nat e and r emove t he hazar d. I n t he i nt er i m, t ake al l necessar y act i on t o r est or e and mai nt ai n saf e wor ki ng condi t i ons i n or der t o saf eguar d onsi t e per sonnel , v i s i t or s, t he publ i c ( as def i ned by ASSE/ SAFE A10. 34) , and t he environment.

1. 8. 1 Names and Qual i f i cat i ons

Pr ovi de pl ans i n accor dance wi t h t he r equi r ement s out l i ned i n Appendi x A of EM 385- 1- 1, i ncl udi ng t he f ol l owi ng:

a. Names and qual i f i cat i ons ( r esumes i ncl udi ng educat i on, t r ai ni ng, exper i ence and cer t i f i cat i ons) of s i t e saf et y and heal t h per sonnel desi gnat ed t o per f or m wor k on t hi s pr oj ect t o i ncl ude t he desi gnat ed Si t e Saf et y and Heal t h Of f i cer and ot her compet ent and qual i f i ed per sonnel t o be used. Speci f y t he dut i es of each posi t i on.

b. Qual i f i cat i ons of compet ent and of qual i f i ed per sons. As a mi ni mum, desi gnat e and submi t qual i f i cat i ons of compet ent per sons f or each of t he f ol l owi ng maj or ar eas: excavat i on; scaf f ol di ng; f al l pr ot ect i on; hazar dous ener gy; conf i ned space; heal t h hazar d r ecogni t i on, eval uat i on

SECTI ON 01 35 26 Page 24

Page 25: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

and cont r ol of chemi cal , physi cal and bi ol ogi cal agent s; and per sonal pr ot ect i ve equi pment and cl ot hi ng t o i ncl ude sel ect i on, use and maintenance.

1. 8. 2 Plans

Pr ovi de pl ans i n t he APP i n accor dance wi t h t he r equi r ement s out l i ned i n Appendi x A of EM 385- 1- 1, i ncl udi ng t he f ol l owi ng:

1. 8. 2. 1 Conf i ned Space Ent r y Pl an

Devel op a conf i ned or encl osed space ent r y pl an i n accor dance wi t h EM 385- 1- 1, appl i cabl e OSHA st andar ds 29 CFR 1910, 29 CFR 1915, and 29 CFR 1926, OSHA Di r ect i ve CPL 2. 100, and any ot her f eder al , st at e and l ocal r egul at or y r equi r ement s i dent i f i ed i n t hi s cont r act . I dent i f y t he qual i f i ed per son' s name and qual i f i cat i ons, t r ai ni ng, and exper i ence. Del i neat e t he qual i f i ed per son' s aut hor i t y t o di r ect wor k st oppage i n t he event of hazar dous condi t i ons. I ncl ude pr ocedur e f or r escue by cont r act or per sonnel and t he coor di nat i on wi t h emer gency r esponder s. ( I f t her e i s no conf i ned space wor k, i ncl ude a st at ement t hat no conf i ned space wor k exi st s and none wi l l be cr eat ed. )

1. 8. 2. 2 St andar d Li f t Pl an ( SLP)

Pl an l i f t s t o avoi d s i t uat i ons wher e t he oper at or cannot mai nt ai n saf e cont r ol of t he l i f t . Pr epar e a wr i t t en SLP i n accor dance wi t h EM 385- 1- 1, Sect i on 16. A. 03, usi ng For m 16- 2 f or ever y l i f t or ser i es of l i f t s ( i f dut y cycl e or r out i ne l i f t s ar e bei ng per f or med) . The SLP must be devel oped, r evi ewed and accept ed by al l per sonnel i nvol ved i n t he l i f t i n conj unct i on wi t h t he associ at ed AHA. Si gnat ur e on t he AHA const i t ut es accept ance of t he pl an. Mai nt ai n t he SLP on t he LHE f or t he cur r ent l i f t ( s) bei ng made. Mai nt ai n hi st or i cal SLPs f or a mi ni mum of 3 mont hs.

1. 8. 2. 3 Cr i t i cal Li f t Pl an - Cr ane or Load Handl i ng Equi pment

Pr ovi de a Cr i t i cal Li f t Pl an as r equi r ed by EM 385- 1- 1, Sect i on 16. H. 01, usi ng For m 16- 3. I n addi t i on, Cr i t i cal Li f t Pl ans ar e r equi r ed f or t he following:

a. Li f t s over 50 per cent of t he capaci t y of bar ge mount ed mobi l e cr ane' s hoist.

b. When wor ki ng ar ound ener gi zed power l i nes wher e t he wor k wi l l get c l oser t han t he mi ni mum cl ear ance di st ance i n EM 385- 1- 1 Tabl e 16- 1.

c. For l i f t s wi t h ant i c i pat ed bi ndi ng condi t i ons.

d. When er ect i ng cr anes.

1. 8. 2. 3. 1 Cr i t i cal Li f t Pl an Pl anni ng and Schedul e

Cr i t i cal l i f t s r equi r e det ai l ed pl anni ng and addi t i onal or unusual saf et y pr ecaut i ons. Devel op and submi t a cr i t i cal l i f t pl an t o t he Cont r act i ng Of f i cer 30 cal endar days pr i or t o cr i t i cal l i f t . Compl y wi t h l oad t est i ng r equi r ement s i n accor dance wi t h EM 385- 1- 1, Sect i on 16. F. 03.

1. 8. 2. 3. 2 Li f t s of Per sonnel

I n addi t i on t o t he r equi r ement s of EM 385- 1- 1, Sect i on 16. H. 02, f or l i f t s

SECTI ON 01 35 26 Page 25

Page 26: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

of per sonnel , demonst r at e compl i ance wi t h t he r equi r ement s of 29 CFR 1926. 1400 and EM 385- 1- 1, Sect i on 16. T.

1. 8. 2. 4 Bar ge Mount ed Mobi l e Cr ane Li f t Pl an

Pr ovi de a Naval Ar chi t ect ur e Anal ysi s and i ncl ude an LHE Manuf act ur er ' s Fl oat i ng Ser vi ce Load Char t i n accor dance wi t h EM 385- 1- 1, Sect i on 16. L. 03.

1. 8. 2. 5 Mul t i - Pur pose Machi nes, Mat er i al Handl i ng Equi pment , and Const r uct i on Equi pment Li f t Pl an

Mul t i - pur pose machi nes, mat er i al handl i ng equi pment , and const r uct i on equi pment used t o l i f t l oads t hat ar e suspended by r i ggi ng gear , r equi r e pr oof of aut hor i zat i on f r om t he machi ne OEM t hat t he machi ne i s capabl e of maki ng l i f t s of l oads suspended by r i ggi ng equi pment . Wr i t t en appr oval f r om a qual i f i ed r egi st er ed pr of essi onal engi neer , af t er a saf et y anal ysi s i s per f or med, i s al l owed i n l i eu of t he OEM' s appr oval . Demonst r at e t hat t he oper at or i s pr oper l y t r ai ned and t hat t he equi pment i s pr oper l y conf i gur ed t o make such l i f t s and i s equi pped wi t h a l oad char t .

1. 8. 2. 6 Fal l Pr ot ect i on and Pr event i on ( FP&P) Pl an

The pl an must compl y wi t h t he r equi r ement s of EM 385- 1- 1, Sect i on 21. D and ASSE/ SAFE Z359. 2, be s i t e speci f i c , and addr ess al l f al l hazar ds i n t he wor k pl ace and dur i ng di f f er ent phases of const r uct i on. Addr ess how t o pr ot ect and pr event wor ker s f r om f al l i ng t o l ower l evel s when t hey ar e exposed t o f al l hazar ds above 1. 8 m 6 f eet . A compet ent per son or qual i f i ed per son f or f al l pr ot ect i on must pr epar e and si gn t he pl an document at i on. I ncl ude f al l pr ot ect i on and pr event i on syst ems, equi pment and met hods empl oyed f or ever y phase of wor k, r ol es and r esponsi bi l i t i es, assi st ed r escue, sel f - r escue and evacuat i on pr ocedur es, t r ai ni ng r equi r ement s, and moni t or i ng met hods. Revi ew and r evi se, as necessar y, t he Fal l Pr ot ect i on and Pr event i on Pl an document at i on as condi t i ons change, but at a mi ni mum ever y s i x mont hs, f or l engt hy pr oj ect s, r ef l ect i ng any changes dur i ng t he cour se of const r uct i on due t o changes i n per sonnel , equi pment , syst ems or wor k habi t s. Keep and mai nt ai n t he accept ed Fal l Pr ot ect i on and Pr event i on Pl an document at i on at t he j ob s i t e f or t he dur at i on of t he pr oj ect . I ncl ude t he Fal l Pr ot ect i on and Pr event i on Pl an document at i on i n t he Acci dent Pr event i on Pl an ( APP) .

1. 8. 2. 7 Rescue and Evacuat i on Pl an

Pr ovi de a Rescue and Evacuat i on Pl an i n accor dance wi t h EM 385- 1- 1 Sect i on 21. N and ASSE/ SAFE Z359. 2, and i ncl ude i n t he FP&P Pl an and as par t of t he APP. I ncl ude a det ai l ed di scussi on of t he f ol l owi ng: met hods of r escue; met hods of sel f - r escue; equi pment used; t r ai ni ng r equi r ement ; speci al i zed t r ai ni ng f or t he r escuer s; pr ocedur es f or r equest i ng r escue and medi cal assi st ance; and t r anspor t at i on r out es t o a medi cal f aci l i t y .

1. 8. 2. 8 Hazar dous Ener gy Cont r ol Pr ogr am ( HECP)

Devel op a HECP i n accor dance wi t h EM 385- 1- 1 Sect i on 12, 29 CFR 1910. 147, 29 CFR 1910. 333, 29 CFR 1915. 89, ASSE/ SAFE Z244. 1, and ASSE/ SAFE A10. 44. Submi t t hi s HECP as par t of t he Acci dent Pr event i on Pl an ( APP) . Conduct a pr epar at or y meet i ng and i nspect i on wi t h al l ef f ect ed per sonnel t o coor di nat e al l HECP act i v i t i es. Document t hi s meet i ng and i nspect i on i n accor dance wi t h EM 385- 1- 1, Sect i on 12. A. 02. Ensur e t hat each empl oyee i s f ami l i ar wi t h and compl i es wi t h t hese pr ocedur es.

SECTI ON 01 35 26 Page 26

Page 27: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

1. 8. 2. 9 Excavat i on Pl an

I dent i f y t he saf et y and heal t h aspect s of excavat i on, and pr ovi de and pr epar e t he pl an i n accor dance wi t h EM 385- 1- 1, Sect i on 25. A and Sect i on 31 00 00 EARTHWORK.

[ 1. 8. 2. 10 Occupant Pr ot ect i on Pl an

**************************************************************************NOTE: Thi s par agr aphs cont ai ns t ai l or i ng opt i ons f or ARMY and NAVY UFGS sect i ons.

**************************************************************************

I dent i f y t he saf et y and heal t h aspect s of l ead- based pai nt r emoval , pr epar ed i n accor dance wi t h Sect i on 02 83 19. 13 10 LEAD BASED PAI NT ABATEMENT 02 82 33. 13 20 REMOVAL/ CONTROL AND DI SPOSAL OF PAI NT WI TH LEAD.

] [ 1. 8. 2. 11 Lead Compl i ance Pl an

**************************************************************************NOTE: Thi s par agr aph i s t ai l or ed f or NAVY use onl y.

**************************************************************************

I dent i f y t he saf et y and heal t h aspect s of l ead wor k, and pr epar e i n accor dance wi t h Sect i on 02 83 13. 00 20 LEAD I N CONSTRUCTI ON.

] [ 1. 8. 2. 12 Asbest os Hazar d Abat ement Pl an

**************************************************************************NOTE: Thi s par agr aphs cont ai ns t ai l or i ng opt i ons f or ARMY and NAVY UFGS sect i ons.

**************************************************************************

I dent i f y t he saf et y and heal t h aspect s of asbest os wor k, and pr epar e i n accor dance wi t h Sect i on 02 82 13. 00 10 ASBESTOS ABATEMENT 02 82 16. 00 20 ENGI NEERI NG CONTROL OF ASBESTOS CONTAI NI NG MATERI ALS.

][ 1. 8. 2. 13 Si t e Saf et y and Heal t h Pl an

I dent i f y t he saf et y and heal t h aspect s, and pr epar e i n accor dance wi t h Sect i on 01 35 29. 13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMI NATED SI TES.

][ 1. 8. 2. 14 Pol ychl or i nat ed Bi phenyl s ( PCB) Pl an

I dent i f y t he saf et y and heal t h aspect s of Pol ychl or i nat ed Bi phenyl s wor k, and pr epar e i n accor dance wi t h Sect i ons 02 84 33 REMOVAL AND DI SPOSAL OF POLYCHLORI NATED BI PHENYLS ( PCBs) and 02 61 23 REMOVAL AND DI SPOSAL OF PCB CONTAMI NATED SOI LS.

][ 1. 8. 2. 15 Si t e Demol i t i on Pl an

**************************************************************************NOTE: Use t he l ast t ai l or ed sent ence on NAVY pr oj ect s onl y.

**************************************************************************

I dent i f y t he saf et y and heal t h aspect s, and pr epar e i n accor dance wi t h Sect i on 02 41 00 [ DEMOLI TI ON] [ AND] [ DECONSTRUCTI ON] and r ef er enced sour ces.

SECTI ON 01 35 26 Page 27

Page 28: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

I ncl ude engi neer i ng sur vey as appl i cabl e.

] 1. 9 ACTI VI TY HAZARD ANALYSI S ( AHA)

**************************************************************************NOTE: The choi ce of br acket ed opt i ons ar e t ai l or ed f or use on ARMY pr oj ect s onl y.

**************************************************************************

Bef or e begi nni ng each act i v i t y, t ask or Def i nabl e Feat ur e of Wor k ( DFOW) i nvol v i ng a t ype of wor k pr esent i ng hazar ds not exper i enced i n pr evi ous pr oj ect oper at i ons, or wher e a new wor k cr ew or subcont r act or i s t o per f or m t he wor k, t he Cont r act or ( s) per f or mi ng t hat wor k act i v i t y must pr epar e an AHA. AHAs must be devel oped by t he Pr i me Cont r act or , subcont r act or , or suppl i er per f or mi ng t he wor k, and pr ovi ded f or Pr i me Cont r act or r evi ew and appr oval bef or e submi t t i ng t o t he Cont r act i ng Of f i cer . AHAs must be s i gned by t he SSHO, Super i nt endent , QC Manager and t he subcont r act or For eman per f or mi ng t he wor k. For mat t he AHA i n accor dance wi t h EM 385- 1- 1, Sect i on 1 or as di r ect ed by t he Cont r act i ng Of f i cer . Submi t t he AHA f or r evi ew at least [ 15 ][_____] wor ki ng days pr i or t o t he st ar t of each act i v i t y t ask, or DFOW. The Gover nment r eser ves t he r i ght t o r equi r e t he Cont r act or t o r evi se and r esubmi t t he AHA i f i t f ai l s t o ef f ect i vel y i dent i f y t he wor k sequences, speci f i c ant i c i pat ed hazar ds, s i t e condi t i ons, equi pment , mat er i al s, per sonnel and t he cont r ol measur es t o be i mpl ement ed.

AHAs must i dent i f y compet ent per sons r equi r ed f or phases i nvol v i ng hi gh r i sk act i v i t i es, i ncl udi ng conf i ned ent r y, cr ane and r i ggi ng, excavat i ons, t r enchi ng, el ect r i cal wor k, f al l pr ot ect i on, and scaf f ol di ng.

1. 9. 1 AHA Management

Revi ew t he AHA l i s t per i odi cal l y ( at l east mont hl y) at t he Cont r act or super vi sor y saf et y meet i ng, and updat e as necessar y when pr ocedur es, schedul i ng, or hazar ds change. Use t he AHA dur i ng dai l y i nspect i ons by t he SSHO t o ensur e t he i mpl ement at i on and ef f ect i veness of t he r equi r ed saf et y and heal t h cont r ol s f or t hat wor k act i v i t y.

1. 9. 2 AHA Si gnat ur e Log

Each empl oyee per f or mi ng wor k as par t of an act i v i t y, t ask or DFOW must r evi ew t he AHA f or t hat wor k and si gn a s i gnat ur e l og speci f i cal l y mai nt ai ned f or t hat AHA pr i or t o st ar t i ng wor k on t hat act i v i t y. The SSHO must mai nt ai n a s i gnat ur e l og on s i t e f or ever y AHA. Pr ovi de empl oyees whose pr i mar y l anguage i s ot her t han Engl i sh, wi t h an i nt er pr et er t o ensur e a c l ear under st andi ng of t he AHA and i t s cont ent s.

1. 10 DI SPLAY OF SAFETY I NFORMATI ON

1. 10. 1 Saf et y Bul l et i n Boar d

**************************************************************************NOTE: I n f i r st sent ence, t he br acket ed opt i on al l owi ng a choi ce f or number of days i s t ai l or ed f or ARMY use onl y.

**************************************************************************

Within [ one ][_____] cal endar day( s) af t er commencement of wor k, er ect a saf et y bul l et i n boar d at t he j ob s i t e. Wher e s i ze, dur at i on, or l ogi st i cs of pr oj ect do not f aci l i t at e a bul l et i n boar d, an al t er nat i ve met hod,

SECTI ON 01 35 26 Page 28

Page 29: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

accept abl e t o t he Cont r act i ng Of f i cer , t hat i s accessi bl e and i ncl udes al l mandat or y i nf or mat i on f or empl oyee and vi s i t or r ev i ew, may be deemed as meet i ng t he r equi r ement f or a bul l et i n boar d. I nc l ude and mai nt ai n i nf or mat i on on saf et y bul l et i n boar d as r equi r ed by EM 385- 1- 1, Sect i on 01. A. 07. Addi t i onal i t ems r equi r ed t o be post ed i ncl ude:

a. Conf i ned space ent r y per mi t .

b. Hot wor k per mi t .

1. 10. 2 Saf et y and Occupat i onal Heal t h ( SOH) Def i c i ency Tr acki ng Syst em

Est abl i sh a SOH def i c i ency t r acki ng syst em t hat l i s t s and moni t or s t he st at us of SOH def i c i enci es i n chr onol ogi cal or der . Use t he t r acki ng syst em t o eval uat e t he ef f ect i veness of t he APP. A mont hl y eval uat i on of t he dat a must be di scussed i n t he QC or SOH meet i ng wi t h ever yone on t he pr oj ect . The l i s t must be post ed on t he pr oj ect bul l et i n boar d and updat ed dai l y, and pr ovi de t he f ol l owi ng i nf or mat i on:

a. Dat e def i c i ency i dent i f i ed;

b. Descr i pt i on of def i c i ency;

c. Name of per son r esponsi bl e f or cor r ect i ng def i c i ency;

d. Pr oj ect ed r esol ut i on dat e;

e. Dat e act ual l y r esol ved.

1. 11 SI TE SAFETY REFERENCE MATERI ALS

Mai nt ai n saf et y- r el at ed r ef er ences appl i cabl e t o t he pr oj ect , i ncl udi ng t hose l i s t ed i n par agr aph REFERENCES. Mai nt ai n appl i cabl e equi pment manuf act ur er ' s manual s.

1. 12 EMERGENCY MEDI CAL TREATMENT

Cont r act or s must ar r ange f or t hei r own emer gency medi cal t r eat ment i n accor dance wi t h EM 385- 1- 1. Gover nment has no r esponsi bi l i t y t o pr ovi de emer gency medi cal t r eat ment .

1. 13 NOTI FI CATI ONS and REPORTS

1. 13. 1 Mi shap Not i f i cat i on

**************************************************************************NOTE: Use br acket ed, t ai l or ed i t em i n f i r st sent ence f or NASA pr oj ect s onl y.

**************************************************************************

Not i f y t he Cont r act i ng Of f i cer as soon as pr act i cal , but no mor e t han t went y- f our hour s, af t er any mi shaps, i ncl udi ng r ecor dabl e acci dent s, i nci dent s, and near mi sses, as def i ned i n EM 385- 1- 1 Appendi x Q, any r epor t of i nj ur y, i l l ness, or any pr oper t y damage[ i n accor dance wi t h NASA NPR 8621. 1] . For LHE or r i ggi ng mi shaps, not i f y t he Cont r act i ng Of f i cer as soon as pr act i cal but not mor e t han 4 hour s af t er mi shap. The Cont r act or i s r esponsi bl e f or obt ai ni ng appr opr i at e medi cal and emer gency assi st ance and f or not i f y i ng f i r e, l aw enf or cement , and r egul at or y agenci es. I mmedi at e r epor t i ng i s r equi r ed f or el ect r i cal mi shaps, t o

SECTI ON 01 35 26 Page 29

Page 30: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

i nc l ude Ar c Fl ash; shock; uncont r ol l ed r el ease of hazar dous ener gy ( i ncl udes el ect r i cal and non- el ect r i cal ) ; l oad handl i ng equi pment or r i ggi ng; f al l f r om hei ght ( any l evel ot her t han same sur f ace) ; and under wat er di v i ng. These mi shaps must be i nvest i gat ed i n dept h t o i dent i f y al l causes and t o r ecommend hazar d cont r ol measur es.

Wi t hi n not i f i cat i on i ncl ude Cont r act or name; cont r act t i t l e; t ype of cont r act ; name of act i v i t y, i nst al l at i on or l ocat i on wher e acci dent occur r ed; dat e and t i me of acci dent ; names of per sonnel i nj ur ed; ext ent of pr oper t y damage, i f any; ext ent of i nj ur y, i f known, and br i ef descr i pt i on of acci dent ( f or exampl e, t ype of const r uct i on equi pment used and PPE used) . Pr eser ve t he condi t i ons and evi dence on t he acci dent s i t e unt i l t he Gover nment i nvest i gat i on t eam ar r i ves on- si t e and Gover nment i nvest i gat i on i s conduct ed. Assi st and cooper at e f ul l y wi t h t he Gover nment ' s i nvest i gat i on( s) of any mi shap.

1. 13. 2 Acci dent Repor t s

**************************************************************************NOTE: The sent ences r ef er r i ng t o ESAMS ar e t ai l or ed f or use on NAVY pr oj ect s. The sent ences r ef er r i ng t o USACE For m 3394 ar e t ai l or ed f or use on ARMY and NASA pr oj ect s.

**************************************************************************

a. Conduct an acci dent i nvest i gat i on f or r ecor dabl e i nj ur i es and i l l nesses, pr oper t y damage, and near mi sses as def i ned i n EM 385- 1- 1, t o est abl i sh t he r oot cause( s) of t he acci dent . Compl et e t he appl i cabl e NAVFAC Cont r act or I nci dent Repor t i ng Syst em ( CI RS) , and el ect r oni cal l y submi t v i a t he NAVFAC Ent er pr i se Saf et y Appl i cat i ons Management Syst em ( ESAMS) . Compl et e and submi t an acci dent i nvest i gat i on r epor t i n ESAMS wi t hi n 5 days f or mi shaps def i ned i n EM 385- 1- 1 01. D. 03 and 10 days f or acci dent s def i ned by EM 385- 1- 1 01. D. 05. Compl et e an i nvest i gat i on r epor t wi t hi n 30 days f or t hose mi shaps def i ned by EM 385- 1- 1 01. D. 04. Mi shaps def i ned by EM 385- 1- 1 01. D. 04 and 01. D. 05 must i ncl ude a wr i t t en r epor t submi t t ed as an at t achment i n ESAMS usi ng t he f ol l owi ng out l i ne: ( 1) Mi shap summar y descr i pt i on t o i ncl ude pr ocess, f i ndi ngs and out comes; ( 2) Root Cause; ( 3) Di r ect Fact or s; ( 4) I ndi r ect and Cont r i but i ng Fact or s; ( 5) Cor r ect i ve Act i ons; and ( 6) Recommendat i ons. Compl et e t he appl i cabl e USACE Acci dent Repor t For m 3394, and pr ovi de t he r epor t t o t he Cont r act i ng Of f i cer wi t hi n [ 5] [ _____] cal endar day( s) of t he acci dent . The Cont r act i ng Of f i cer wi l l pr ovi de copi es of any r equi r ed or speci al forms.

**************************************************************************NOTE: The f i r st set of br acket ed opt i ons i s t ai l or ed f or NAVY use, and t he second set i s t ai l or ed f or ARMY use.

**************************************************************************

b. Near Mi sses: [ For Navy Pr oj ect s, compl et e t he appl i cabl e document at i on i n NAVFAC Cont r act or I nci dent Repor t i ng Syst em ( CI RS) , and el ect r oni cal l y submi t v i a t he NAVFAC Ent er pr i se Saf et y Appl i cat i ons Management Syst em ( ESAMS) . ] [ For Ar my pr oj ect s, r epor t al l " Near Mi sses" t o t he GDA, usi ng l ocal mi shap r epor t i ng pr ocedur es, wi t hi n 24 hr s. The Cont r act i ng Of f i cer wi l l pr ovi de t he Cont r act or t he r equi r ed forms.] Near mi ss r epor t s ar e consi der ed posi t i ve and pr oact i ve Cont r act or saf et y management act i ons.

SECTI ON 01 35 26 Page 30

Page 31: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

**************************************************************************NOTE: I ncl ude t he f ol l owi ng par agr aph f or al l NAVY pr oj ect s; par agr aph i s opt i onal f or ARMY pr oj ect s.

**************************************************************************

[ c . Conduct an acci dent i nvest i gat i on f or any l oad handl i ng equi pment acci dent ( i ncl udi ng r i ggi ng acci dent s) t o est abl i sh t he r oot cause( s) of t he acci dent . Compl et e t he LHE Acci dent Repor t ( Cr ane and Ri ggi ng Acci dent Repor t ) f or m and pr ovi de t he r epor t t o t he Cont r act i ng Of f i cer wi t hi n 30 cal endar days of t he acci dent . Do not pr oceed wi t h cr ane oper at i ons unt i l cause i s det er mi ned and cor r ect i ve act i ons have been i mpl ement ed t o t he sat i sf act i on of t he Cont r act i ng Of f i cer . The Cont r act i ng Of f i cer wi l l pr ovi de a bl ank copy of t he acci dent r epor t form.

] 1. 13. 3 LHE I nspect i on Repor t s

Submi t LHE i nspect i on r epor t s r equi r ed i n accor dance wi t h EM 385- 1- 1 and as speci f i ed her ei n wi t h Dai l y Repor t s of I nspect i ons.

[ 1. 13. 4 Cer t i f i cat e of Compl i ance and Pr e- l i f t Pl an/ Checkl i st f or LHE and Rigging

Pr ovi de a FORM 16- 1 Cer t i f i cat e of Compl i ance f or LHE ent er i ng an act i v i t y under t hi s cont r act and i n accor dance wi t h EM 385- 1- 1. Post cer t i f i cat i ons on t he cr ane.

Devel op a St andar d Li f t Pl an ( SLP) i n accor dance wi t h EM 385- 1- 1, Sect i on 16. H. 03 usi ng For m 16- 2 St andar d Pr e- Li f t Cr ane Pl an/ Checkl i st f or each l i f t pl anned. Submi t SLP t o t he Cont r act i ng Of f i cer f or appr oval wi t hi n 15 cal endar days i n advance of pl anned l i f t .

] [ 1. 13. 5 Thi r d Par t y Cer t i f i cat i on of Fl oat i ng Cr anes and Bar ge- Mount ed Mobi l e Cr anes

**************************************************************************NOTE: I ncl ude t hi s t ai l or ed par agr aph f or NAVY pr oj ect s onl y.

**************************************************************************

Cer t i f y f l oat i ng cr anes and bar ge- mount ed mobi l e cr anes i n accor dance wi t h 29 CFR 1919 by an OSHA accr edi t ed per son.

] 1. 14 HOT WORK

1. 14. 1 Per mi t and Per sonnel Requi r ement s

Submi t and obt ai n a wr i t t en per mi t pr i or t o per f or mi ng " Hot Wor k" ( i . e. wel di ng or cut t i ng) or oper at i ng ot her f l ame- pr oduci ng/ spar k pr oduci ng devi ces, f r om t he [ Fi r e Di v i s i on] [ _____] . A per mi t i s r equi r ed f r om t he Expl osi ves Saf et y Of f i ce f or wor k i n and ar ound wher e expl osi ves ar e pr ocessed, st or ed, or handl ed. CONTRACTORS ARE REQUI RED TO MEET ALL CRI TERI A BEFORE A PERMI T I S I SSUED. Pr ovi de at l east t wo 9 kg 20 pound 4A: 20 BC r at ed ext i ngui sher s f or nor mal " Hot Wor k" . The ext i ngui sher s must be cur r ent i nspect i on t agged, and cont ai n an appr oved saf et y pi n and t amper r esi st ant seal . I t i s al so mandat or y t o have a desi gnat ed FI RE WATCH f or any " Hot Wor k" done at t hi s act i v i t y. The Fi r e Wat ch must be t r ai ned i n accor dance wi t h NFPA 51B and r emai n on- s i t e f or a mi ni mum of one hour af t er

SECTI ON 01 35 26 Page 31

Page 32: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

compl et i on of t he t ask or as speci f i ed on t he hot wor k per mi t .

When st ar t i ng wor k i n t he f aci l i t y , r equi r e per sonnel t o f ami l i ar i ze t hemsel ves wi t h t he l ocat i on of t he near est f i r e al ar m boxes and pl ace i n memor y t he emer gency [ Fi r e Di v i s i on] [ _____] phone number . REPORT ANY FI RE, NO MATTER HOW SMALL, TO THE RESPONSI BLE [ FI RE DI VI SI ON] [ _____] I MMEDI ATELY.

1. 14. 2 Wor k Ar ound Fl ammabl e Mat er i al s

Obt ai n per mi t appr oval f r om a NFPA Cer t i f i ed Mar i ne Chemi st f or " HOT WORK" wi t hi n or ar ound f l ammabl e mat er i al s ( such as f uel syst ems or wel di ng/ cut t i ng on f uel pi pes) or conf i ned spaces ( such as sewer wet wel l s, manhol es, or vaul t s) t hat have t he pot ent i al f or f l ammabl e or expl osi ve atmospheres.

Whenever t hese mat er i al s, except ber yl l i um and chr omi um ( VI ) , ar e encount er ed i n i ndoor oper at i ons, l ocal mechani cal exhaust vent i l at i on syst ems t hat ar e suf f i c i ent t o r educe and mai nt ai n per sonal exposur es t o wi t hi n accept abl e l i mi t s must be used and mai nt ai ned i n accor dance wi t h manuf act ur er ' s i nst r uct i on and suppl ement ed by except i ons not ed i n EM 385- 1- 1, Sect i on 06. H

1. 15 RADI ATI ON SAFETY REQUI REMENTS

**************************************************************************NOTE: Use t ai l or ed, br acket ed i t em f or NAVY pr oj ect s onl y.

**************************************************************************

Submi t Li cense Cer t i f i cat es, empl oyee t r ai ni ng r ecor ds, and Leak Test Repor t s f or r adi at i on mat er i al s and equi pment t o t he Cont r act i ng Of f i cer and Radi at i on Saf et y Of f i ce ( RSO) [ , and Cont r act i ng Over si ght Techni c i an ( COT) ] f or al l speci al i zed and l i censed mat er i al and equi pment pr oposed f or use on t he const r uct i on pr oj ect ( excl udes por t abl e machi ne sour ces of i oni z i ng r adi at i on i ncl udi ng moi st ur e densi t y and X- Ray Fl uor escence ( XRF) ) . Mai nt ai n on- si t e r ecor ds whenever l i censed r adi ol ogi cal mat er i al s or i oni z i ng equi pment ar e on gover nment pr oper t y.

Pr ot ect wor ker s f r om r adi at i on exposur e i n accor dance wi t h 10 CFR 20, ensur i ng any per sonnel exposur es ar e mai nt ai ned As Low As Reasonabl y Achievable.

1. 15. 1 Radi ogr aphy Oper at i on Pl anni ng Wor k Sheet

**************************************************************************NOTE: Use br acket ed opt i on f or NAVY pr oj ect s onl y.

**************************************************************************

Submi t a Gamma and X- Ray Radi ogr aphy Oper at i on Pl anni ng Wor k Sheet t o Cont r act i ng Of f i cer 14 days pr i or t o commencement of oper at i ons i nvol v i ng r adi oact i ve mat er i al s or r adi at i on gener at i ng devi ces. For por t abl e machi ne sour ces of i oni z i ng r adi at i on, i ncl udi ng moi st ur e densi t y and XRF, use and submi t t he Por t abl e Gauge Oper at i ons Pl anni ng Wor ksheet i nst ead. The Cont r act i ng Of f i cer [ and COT] wi l l r evi ew t he submi t t ed wor ksheet and pr ovi de quest i ons and comment s.

Cont r act or s must use pr i mar y dosi met er s pr ocess by a Nat i onal Vol unt ar y Labor at or y Accr edi t at i on Pr ogr am ( NVLAP) accr edi t ed l abor at or y.

SECTI ON 01 35 26 Page 32

Page 33: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

1. 15. 2 Si t e Access and Secur i t y

**************************************************************************NOTE: Use br acket ed, t ai l or ed opt i ons f or NAVY pr oj ect s onl y.

**************************************************************************

Coor di nat e s i t e access and secur i t y r equi r ement s wi t h t he Cont r act i ng Officer [ and COT] f or al l r adi ol ogi cal mat er i al s and equi pment cont ai ni ng i oni z i ng r adi at i on t hat ar e pr oposed f or use on a gover nment f aci l i t y . For gamma r adi ogr aphy mat er i al s and equi pment , a Gover nment escor t i s r equi r ed f or any t r avel s on t he I nst al l at i on. The [ Navy COT or ] Government aut hor i zed r epr esent at i ve wi l l meet t he Cont r act or at a desi gnat ed l ocat i on out s i de t he I nst al l at i on, ensur e saf et y of t he mat er i al s bei ng t r anspor t ed, and wi l l escor t t he Cont r act or f or gamma sour ces ont o t he I nst al l at i on, t o t he j ob s i t e, and of f t he I nst al l at i on. For por t abl e machi ne sour ces of i oni z i ng r adi at i on, i ncl udi ng moi st ur e densi t y and XRF, t he [ Navy COT or ]Gover nment aut hor i zed r epr esent at i ve wi l l meet t he Cont r act or at t he j ob site.

Pr ovi de a copy of al l cal i br at i on r ecor ds, and ut i l i zat i on r ecor ds[ t o t he COT] f or r adi ol ogi cal oper at i ons per f or med on t he s i t e.

1. 15. 3 Loss or Rel ease and Unpl anned Per sonnel Exposur e

Loss or r el ease of r adi oact i ve mat er i al s, and unpl anned per sonnel exposur es must be r epor t ed i mmedi at el y t o t he Cont r act i ng Of f i cer , RSO, and Base Secur i t y Depar t ment Emer gency Number .

1. 15. 4 Si t e Demar cat i on and Bar r i cade

**************************************************************************NOTE: Add any appl i cabl e I nst r uct i ons or l ocal r equi r ement s t o f i r st sent ence.

**************************************************************************

Pr oper l y demar k and bar r i cade an ar ea sur r oundi ng r adi ol ogi cal oper at i ons t o pr ecl ude per sonnel ent r ance, i n accor dance wi t h EM 385- 1- 1, Nucl ear Regul at or y Commi ssi on, and Appl i cabl e St at e r egul at i ons and l i cense r equi r ement s, and i n accor dance wi t h r equi r ement s est abl i shed i n t he accept ed Radi ogr aphy Oper at i on Pl anni ng Wor k Sheet .

Do not c l ose or obst r uct st r eet s, wal ks, and ot her f aci l i t i es occupi ed and used by t he Gover nment wi t hout wr i t t en per mi ssi on f r om t he Cont r act i ng Officer.

1. 15. 5 Secur i t y of Mat er i al and Equi pment

Pr oper l y secur e t he r adi ol ogi cal mat er i al and i oni z i ng r adi at i on equi pment at al l t i mes, i ncl udi ng keepi ng t he devi ces i n a pr oper l y mar ked and l ocked cont ai ner , and secondar i l y l ocki ng t he cont ai ner t o a secur e poi nt i n t he Cont r act or ' s vehi c l e or ot her appr oved st or age l ocat i on dur i ng t r anspor t at i on and whi l e not i n use. Whi l e i n use, mai nt ai n a cont i nuous v i sual obser vat i on on t he r adi ol ogi cal mat er i al and i oni z i ng r adi at i on equi pment . I n i nst ances wher e r adi ogr aphy i s schedul ed near or adj acent t o bui l di ngs or ar eas havi ng l i mi t ed access or one- way door s, make no assumpt i ons as t o bui l di ng occupancy. Wher e necessar y, t he Cont r act i ng Of f i cer wi l l di r ect t he Cont r act or t o conduct an act ual bui l di ng ent r y, sear ch, and al er t . Wher e r emoval of per sonnel f r om such a bui l di ng cannot

SECTI ON 01 35 26 Page 33

Page 34: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

be accompl i shed and i t i s ot her wi se saf e t o pr oceed wi t h t he r adi ogr aphy, posi t i on a f ul l y i nst r uct ed empl oyee i nsi de t he bui l di ng or ar ea t o pr event exi t i ng whi l e ext er nal r adi ogr aphi c oper at i ons ar e i n pr ocess.

1. 15. 6 Tr anspor t at i on of Mat er i al

Compl y wi t h 49 CFR 173 f or Tr anspor t at i on of Regul at ed Amount s of Radi oact i ve Mat er i al . Not i f y Local Fi r e aut hor i t i es and t he s i t e Radi at i on Saf et y of f i cer ( RSO) of any Radi oact i ve Mat er i al use.

1. 15. 7 Schedul e f or Exposur e or Unshi el di ng

Act ual exposur e of t he r adi ogr aphi c f i l m or unshi el di ng t he sour ce must not be i ni t i at ed unt i l af t er 5 p. m. on weekdays.

1. 15. 8 Tr ansmi t t er Requi r ement s

Adher e t o t he base pol i cy concer ni ng t he use of t r ansmi t t er s, such as r adi os and cel l phones. Obey Emi ssi ons cont r ol ( EMCON) r est r i c t i ons.

1. 16 CONFI NED SPACE ENTRY REQUI REMENTS

**************************************************************************NOTE: Use l ast sent ence f or NAVY onl y as appl i cabl e. Sent ence i s t ai l or ed f or NAVY.

**************************************************************************

Conf i ned space ent r y must compl y wi t h Sect i on 34 of EM 385- 1- 1, OSHA 29 CFR 1926, OSHA 29 CFR 1910, OSHA 29 CFR 1910. 146, and OSHA Di r ect i ve CPL 2. 100. Any pot ent i al f or a hazar d i n t he conf i ned space r equi r es a per mi t syst em t o be used. [ Cont r act or s ent er i ng and wor ki ng i n conf i ned spaces whi l e per f or mi ng shi pyar d i ndust r y wor k ar e r equi r ed t o f ol l ow t he r equi r ement s of OSHA 29 CFR 1915 Subpar t B. ]

1. 16. 1 Ent r y Pr ocedur es

Pr ohi bi t ent r y i nt o a conf i ned space by per sonnel f or any pur pose, i ncl udi ng hot wor k, unt i l t he qual i f i ed per son has conduct ed appr opr i at e t est s t o ensur e t he conf i ned or encl osed space i s saf e f or t he wor k i nt ended and t hat al l pot ent i al hazar ds ar e cont r ol l ed or el i mi nat ed and document ed. Compl y wi t h EM 385- 1- 1, Sect i on 34 f or ent r y pr ocedur es. Hazar ds per t ai ni ng t o t he space must be r evi ewed wi t h each empl oyee dur i ng r evi ew of t he AHA.

1. 16. 2 For ced Ai r Vent i l at i on

For ced ai r vent i l at i on i s r equi r ed f or al l conf i ned space ent r y oper at i ons and t he mi ni mum ai r exchange r equi r ement s must be mai nt ai ned t o ensur e exposur e t o any hazar dous at mospher e i s kept bel ow i t s act i on l evel .

1. 16. 3 Sewer Wet Wel l s

Sewer wet wel l s r equi r e cont i nuous at mospher e moni t or i ng wi t h audi bl e al ar m f or t oxi c gas det ect i on.

1. 16. 4 Rescue Pr ocedur es and Coor di nat i on wi t h Local Emer gency Responder s

Devel op and i mpl ement an on- si t e r escue and r ecover y pl an and pr ocedur es. The r escue pl an must not r el y on l ocal emer gency r esponder s f or r escue f r om

SECTI ON 01 35 26 Page 34

Page 35: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

a conf i ned space.

1. 17 GAS PROTECTI ON

**************************************************************************NOTE: I ncl ude t hi s par agr aph f or NASA pr oj ect s onl y. Thi s par agr aph i s t ai l or ed f or NASA.

**************************************************************************

Pr ovi de one or mor e empl oyees, pr oper l y t r ai ned and exper i enced i n oper at i on and cal i br at i on of gas t est i ng equi pment and f or mal l y qual i f i ed as gas i nspect or s, on dut y dur i ng t i mes wor ker s ar e i n conf i ned spaces. Thei r pr i mar y f unct i ons ar e t o t est f or gas and oper at e t est i ng equi pment . Unl ess equi pment of const ant super vi sor y t ype wi t h aut omat i c al ar m i s empl oyed, pr ovi de gas t est s at l east ever y 2 hour s, or mor e of t en when char act er of gr ound or exper i ence i ndi cat es gas may be encount er ed. Af t er an i dl e per i od exceedi ng one- hal f hour , per f or m a gas t est bef or e per mi t t i ng wor ker s t o ent er t he excavat i on.

1. 17. 1 Gas Test Readi ngs Recor d

Per manent l y r ecor d r eadi ngs dai l y ; i ndi cat e t he concent r at i on of gas, poi nt of t est , and t i me of t est . Submi t copi es of t he gas t est r eadi ngs t o t he Cont r act i ng Of f i cer at t he end of each wor k day.

1. 17. 2 Speci al Requi r ement s

Speci al r equi r ement s, coor di nat i on, and pr ecaut i ons wi l l appl y t o ar eas t hat cont ai n a hazar dous at mospher e or , by v i r t ue of t hei r use or physi cal char act er , may be oxygen def i c i ent . A check by Gover nment i s r equi r ed pr i or t o ent er i ng conf i ned space. Sur vei l l ance and moni t or i ng ar e r equi r ed i n t hese t ypes of wor k spaces by bot h Cont r act or and Gover nment per sonnel .

1. 18 HI GH NOI SE LEVEL PROTECTI ON

**************************************************************************NOTE: I ncl ude t he t hi s par agr aph f or NASA pr oj ect s onl y. Thi s par agr aph i s t ai l or ed f or NASA.

**************************************************************************

Schedul e oper at i ons t hat i nvol ve t he use of equi pment wi t h out put of hi gh noi se l evel s ( i . e. j ackhammer s, ai r compr essor s, and expl osi ve- act uat ed devi ces) f or [ weekends] [ af t er dut y wor ki ng hour s] dur i ng t he hour s [ _____] at [ _____] . Use of any such equi pment must be appr oved i n wr i t i ng by t he Cont r act i ng Of f i cer pr i or t o commencement of wor k.

1. 19 DI VE SAFETY REQUI REMENTS

Devel op a Di ve Oper at i ons Pl an, AHA, emer gency management pl an, and per sonnel l i s t t hat i ncl udes qual i f i cat i ons, f or each separ at e di v i ng oper at i on. Submi t t hese document s t o t he Di st r i c t Di ve Coor di nat or ( DDC) f or r evi ew and accept ance at l east [ 15] [ _____] wor ki ng days pr i or t o commencement of di v i ng oper at i ons. These document s must be at t he di v i ng l ocat i on at al l t i mes. Pr ovi de each of t hese document s as a par t of t he pr oj ect f i l e.

1. 20 SEVERE STORM PLAN

I n t he event of a sever e st or m war ni ng, t he Cont r act or must :

SECTI ON 01 35 26 Page 35

Page 36: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

a. Secur e out s i de equi pment and mat er i al s and pl ace mat er i al s t hat coul d be damaged i n pr ot ect ed ar eas.

b. Check sur r oundi ng ar ea, i ncl udi ng r oof , f or l oose mat er i al , equi pment , debr i s, and ot her obj ect s t hat coul d be bl own away or agai nst exi st i ng facilities.

c. Ensur e t hat t empor ar y er osi on cont r ol s ar e adequat e.

PART 2 PRODUCTS

**************************************************************************NOTE: Use t hi s t ai l or ed par agr aph f or ARMY and NASA pr oj ect s onl y.

**************************************************************************

Not used.

2. 1 CONFI NED SPACE SI GNAGE

**************************************************************************NOTE: Use t hi s t ai l or ed par agr aph f or NAVY pr oj ect s only.

**************************************************************************

Pr ovi de per manent s i gns i nt egr al t o or secur el y at t ached t o access cover s f or new per mi t - r equi r ed conf i ned spaces. Si gns f or conf i ned spaces must compl y wi t h NEMA Z535. 2. Si gns wor di ng: " DANGER- - PERMI T- REQUI RED CONFI NED SPACE, DO NOT ENTER" i n bol d l et t er s a mi ni mum of 25 mm one i nch i n hei ght and const r uct ed t o be c l ear l y l egi bl e wi t h al l pai nt r emoved. The si gnal wor d " DANGER" must be r ed and r eadabl e f r om 1520 mm 5 f eet .

PART 3 EXECUTI ON

3. 1 CONSTRUCTI ON AND OTHER WORK

Compl y wi t h EM 385- 1- 1, NFPA 70, NFPA 70E, NFPA 241, t he APP, t he AHA, Feder al and St at e OSHA r egul at i ons, and ot her r el at ed submi t t al s and act i v i t y f i r e and saf et y r egul at i ons. The most st r i ngent st andar d pr evai l s.

PPE i s gover ned i n al l ar eas by t he nat ur e of t he wor k t he empl oyee i s per f or mi ng. Use per sonal hear i ng pr ot ect i on at al l t i mes i n desi gnat ed noi se hazar dous ar eas or when per f or mi ng noi se hazar dous t asks. Saf et y gl asses must be wor n or car r i ed/ avai l abl e on each per son. Mandat or y PPE includes:

a. Har d Hat

b. Long Pant s

c. Appr opr i at e Saf et y Shoes

d. Appr opr i at e Cl ass Ref l ect i ve Vest s

3. 1. 1 Wor ksi t e Communi cat i on

Empl oyees wor ki ng al one i n a r emot e l ocat i on or away f r om ot her wor ker s must be pr ovi ded an ef f ect i ve means of emer gency communi cat i ons ( i . e. ,

SECTI ON 01 35 26 Page 36

Page 37: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

cel l ul ar phone, t wo- way r adi os, l and- l i ne t el ephones or ot her accept abl e means) . The sel ect ed communi cat i on must be r eadi l y avai l abl e ( easi l y wi t hi n t he i mmedi at e r each) of t he empl oyee and must be t est ed pr i or t o t he st ar t of wor k t o ver i f y t hat i t ef f ect i vel y oper at es i n t he ar ea/ envi r onment . An empl oyee check- i n/ check- out communi cat i on pr ocedur e must be devel oped t o ensur e empl oyee saf et y.

3. 1. 2 Hazar dous Mat er i al Use

**************************************************************************NOTE: Use t hi s t ai l or ed par agr aph f or NAVY pr oj ect s only.

**************************************************************************

Each hazar dous mat er i al must r ecei ve appr oval f r om t he Cont r act i ng Of f i ce or t hei r desi gnat ed r epr esent at i ve pr i or t o bei ng br ought ont o t he j ob s i t e or pr i or t o any ot her use i n connect i on wi t h t hi s cont r act . Al l ow a mi ni mum of 10 wor ki ng days f or pr ocessi ng of t he r equest f or use of a hazar dous mat er i al .

3. 1. 3 Hazar dous Mat er i al Excl usi ons

Not wi t hst andi ng any ot her hazar dous mat er i al used i n t hi s cont r act , r adi oact i ve mat er i al s or i nst r ument s capabl e of pr oduci ng i oni z i ng/ non- i oni z i ng r adi at i on ( wi t h t he except i on of r adi oact i ve mat er i al and devi ces used i n accor dance wi t h EM 385- 1- 1 such as nucl ear densi t y met er s f or compact i on t est i ng and l abor at or y equi pment wi t h r adi oact i ve sour ces) as wel l as mat er i al s whi ch cont ai n asbest os, mer cur y or pol ychl or i nat ed bi phenyl s, di - i socyanat es, l ead- based pai nt , and hexaval ent chr omi um, ar e pr ohi bi t ed. The Cont r act i ng Of f i cer , upon wr i t t en r equest by t he Cont r act or , may consi der except i ons t o t he use of any of t he above excl uded mat er i al s. Low mer cur y l amps used wi t hi n f l uor escent l i ght i ng f i x t ur es ar e al l owed as an except i on wi t hout f ur t her Cont r act i ng Of f i cer appr oval . Not i f y t he Radi at i on Saf et y Of f i cer ( RSO) pr i or t o except ed i t ems of r adi oact i ve mat er i al and devi ces bei ng br ought on base.

3. 1. 4 Unf or eseen Hazar dous Mat er i al

Cont r act document s i dent i f y mat er i al s such as PCB, l ead pai nt , and f r i abl e and non- f r i abl e asbest os and ot her OSHA r egul at ed chemi cal s ( i . e. 29 CFR Par t 1910. 1000) . I f mat er i al ( s) t hat may be hazar dous t o human heal t h upon di st ur bance ar e encount er ed dur i ng const r uct i on oper at i ons, st op t hat por t i on of wor k and not i f y t he Cont r act i ng Of f i cer i mmedi at el y. Wi t hi n [ 14] [ _____] cal endar days t he Gover nment wi l l det er mi ne i f t he mat er i al i s hazar dous. I f mat er i al i s not hazar dous or poses no danger , t he Gover nment wi l l di r ect t he Cont r act or t o pr oceed wi t hout change. I f mat er i al i s hazar dous and handl i ng of t he mat er i al i s necessar y t o accompl i sh t he wor k, t he Gover nment wi l l i ssue a modi f i cat i on pur suant t o FAR 52. 243- 4 Changes and FAR 52. 236- 2 Di f f er i ng Si t e Condi t i ons.

3. 2 UTI LI TY OUTAGE REQUI REMENTS

**************************************************************************NOTE: Consul t wi t h l ocal I nst al l at i on on not i ce r equi r ed f or ut i l i t y out age.

**************************************************************************

Appl y f or ut i l i t y out ages at l east [ _____] days i n advance. At a mi ni mum, t he wr i t t en r equest must i ncl ude t he l ocat i on of t he out age, ut i l i t i es

SECTI ON 01 35 26 Page 37

Page 38: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

bei ng af f ect ed, dur at i on of out age, any necessar y sket ches, and a descr i pt i on of t he means t o f ul f i l l ener gy i sol at i on r equi r ement s i n accor dance wi t h EM 385- 1- 1, Sect i on 11. A. 02 ( I sol at i on) . Some exampl es of ener gy i sol at i on devi ces and pr ocedur es ar e hi ghl i ght ed i n EM 385- 1- 1, Sect i on 12. D. I n accor dance wi t h EM 385- 1- 1, Sect i on 12. A. 01, wher e out ages i nvol ve Gover nment or Ut i l i t y per sonnel , coor di nat e wi t h t he Gover nment on al l act i v i t i es i nvol v i ng t he cont r ol of hazar dous ener gy.

These act i v i t i es i ncl ude, but ar e not l i mi t ed t o, a r evi ew of HECP and HEC pr ocedur es, as wel l as appl i cabl e Act i v i t y Hazar d Anal yses ( AHAs) . I n accor dance wi t h EM 385- 1- 1, Sect i on 11. A. 02 and NFPA 70E, wor k on ener gi zed el ect r i cal c i r cui t s must not be per f or med wi t hout pr i or gover nment aut hor i zat i on. Gover nment per mi ssi on i s consi der ed t hr ough t he per mi t pr ocess and submi ssi on of a det ai l ed AHA. Ener gi zed wor k per mi t s ar e consi der ed onl y when de- ener gi z i ng i nt r oduces addi t onal or i ncr eased hazar d or when de- ener gi z i ng i s i nf easi bl e.

3. 3 OUTAGE COORDI NATI ON MEETI NG

**************************************************************************NOTE: For br acket ed i t ems, choose r epr esent at i ve r equi r ed f or t he I nst al l at i on.

**************************************************************************

Af t er t he ut i l i t y out age r equest i s appr oved and pr i or t o begi nni ng wor k on t he ut i l i t y syst em r equi r i ng shut - down, conduct a pr e- out age coor di nat i on meet i ng i n accor dance wi t h EM 385- 1- 1, Sect i on 12. A. Thi s meet i ng must i ncl ude t he Pr i me Cont r act or , t he Pr i me and subcont r act or s per f or mi ng t he wor k, t he Cont r act i ng Of f i cer , and t he[ I nst al l at i on r epr esent at i ve] [ Publ i c Ut i l i t i es r epr esent at i ve] . Al l par t i es must f ul l y coor di nat e HEC act i v i t es wi t h one anot her . Dur i ng t he coor di nat i on meet i ng, al l par t i es must di scuss and coor di nat e on t he scope of wor k, HEC pr ocedur es ( speci f i cal l y , t he l ock- out / t ag- out pr ocedur es f or wor ker and ut i l i t y pr ot ect i on) , t he AHA, assur ance of t r ade per sonnel qual i f i cat i ons, i dent i f i cat i on of compet ent per sons, and compl i ance wi t h HECP t r ai ni ng i n accor dance wi t h EM 385- 1- 1, Sect i on 12. C. Cl ar i f y when per sonal pr ot ect i ve equi pment i s r equi r ed dur i ng swi t chi ng oper at i ons, i nspect i on, and verification.

3. 4 CONTROL OF HAZARDOUS ENERGY ( LOCKOUT/ TAGOUT)

Pr ovi de and oper at e a Hazar dous Ener gy Cont r ol Pr ogr am ( HECP) i n accor dance with EM 385- 1- 1 Sect i on 12, 29 CFR 1910. 333, 29 CFR 1915. 89, ASSE/ SAFE A10. 44, NFPA 70E, and par agr aph HAZARDOUS ENERGY CONTROL PROGRAM (HECP).

3. 4. 1 Saf et y Pr epar at or y I nspect i on Coor di nat i on Meet i ng wi t h t he Gover nment or Ut i l i t y

For el ect r i cal di st r i but i on equi pment t hat i s t o be oper at ed by Gover nment or Ut i l i t y per sonnel , t he Pr i me Cont r act or and t he subcont r act or per f or mi ng t he wor k must at t end t he saf et y pr epar at or y i nspect i on coor di nat i on meet i ng, whi ch wi l l al so be at t ended by t he Cont r act i ng Of f i cer ' s Repr esent at i ve, and r equi r ed by EM 385- 1- 1, Sect i on 12. A. 02. The meet i ng wi l l occur i mmedi at el y pr ecedi ng t he st ar t of wor k and f ol l owi ng t he compl et i on of t he out age coor di nat i on meet i ng. Bot h t he saf et y pr epar at or y i nspect i on coor di nat i on meet i ng and t he out age coor di nat i on meet i ng must occur pr i or t o conduct i ng t he out age and commenci ng wi t h l ockout / t agout procedures.

SECTI ON 01 35 26 Page 38

Page 39: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

3. 4. 2 Lockout / Tagout I sol at i on

Wher e t he Gover nment or Ut i l i t y per f or ms equi pment i sol at i on and l ockout / t agout , t he Cont r act or must pl ace t hei r own l ocks and t ags on each ener gy- i sol at i ng devi ce and pr oceed i n accor dance wi t h t he HECP. Bef or e any wor k begi ns, bot h t he Cont r act or and t he Gover nment or Ut i l i t y must per f or m ener gy i sol at i on ver i f i cat i on t est i ng whi l e wear i ng r equi r ed PPE det ai l ed i n t he Cont r act or ' s AHA and r equi r ed by EM 385- 1- 1, Sect i ons 05. I and 11. B. I nst al l per sonal pr ot ect i ve gr ounds, wi t h t ags, t o el i mi nat e t he pot ent i al f or i nduced vol t age i n accor dance wi t h EM 385- 1- 1, Sect i on 12.E.06.

3. 4. 3 Lockout / Tagout Removal

Upon compl et i on of wor k, conduct l ockout / t agout r emoval pr ocedur e i n accor dance wi t h t he HECP. I n accor dance wi t h EM 385- 1- 1, Sect i on 12. E. 08, each l ock and t ag must be r emoved f r om each ener gy i sol at i ng devi ce by t he aut hor i zed i ndi v i dual or syst ems oper at or who appl i ed t he devi ce. Pr ovi de f or mal not i f i cat i on t o t he Gover nment ( by compl et i ng t he Gover nment f or m i f pr ovi ded by Cont r act i ng Of f i cer ' s Repr esent at i ve) , conf i r mi ng t hat st eps of de- ener gi zat i on and l ockout / t agout r emoval pr ocedur e have been conduct ed and cer t i f i ed t hr ough i nspect i on and ver i f i cat i on. Gover nment or Ut i l i t y l ocks and t ags used t o suppor t t he Cont r act or ' s wor k wi l l not be r emoved unt i l t he aut hor i zed Gover nment empl oyee r ecei ves t he f or mal not i f i cat i on.

3. 5 FALL PROTECTI ON PROGRAM

Est abl i sh a f al l pr ot ect i on pr ogr am, f or t he pr ot ect i on of al l empl oyees exposed t o f al l hazar ds. Wi t hi n t he pr ogr am i ncl ude company pol i cy, i dent i f y r ol es and r esponsi bi l i t i es, educat i on and t r ai ni ng r equi r ement s, f al l hazar d i dent i f i cat i on, pr event i on and cont r ol measur es, i nspect i on, st or age, car e and mai nt enance of f al l pr ot ect i on equi pment and r escue and evacuat i on pr ocedur es i n accor dance wi t h ASSE/ SAFE Z359. 2 and EM 385- 1- 1, Sect i ons 21. A and 21. D.

3. 5. 1 Training

I nst i t ut e a f al l pr ot ect i on t r ai ni ng pr ogr am. As par t of t he Fal l Pr ot ect i on Pr ogr am, pr ovi de t r ai ni ng f or each empl oyee who mi ght be exposed t o f al l hazar ds. Pr ovi de t r ai ni ng by a compet ent per son f or f al l pr ot ect i on i n accor dance wi t h EM 385- 1- 1, Sect i on 21. C. Document t r ai ni ng and pr act i cal appl i cat i on of t he compet ent per son i n accor dance wi t h EM 385- 1- 1, Sect i on 21. C. 04 and ASSE/ SAFE Z359. 2 i n t he AHA.

3. 5. 2 Fal l Pr ot ect i on Equi pment and Syst ems

Enf or ce use of per sonal f al l pr ot ect i on equi pment and syst ems desi gnat ed ( t o i ncl ude f al l ar r est , r est r ai nt , and posi t i oni ng) f or each speci f i c wor k act i v i t y i n t he Si t e Speci f i c Fal l Pr ot ect i on and Pr event i on Pl an and AHA at al l t i mes when an empl oyee i s exposed t o a f al l hazar d. Pr ot ect empl oyees f r om f al l hazar ds as speci f i ed i n EM 385- 1- 1, Sect i on 21.

Pr ovi de per sonal f al l pr ot ect i on equi pment , syst ems, subsyst ems, and component s t hat compl y wi t h EM 385- 1- 1 Sect i on 21. I , 29 CFR 1926. 500 Subpar t M, ASSE/ SAFE Z359. 0, ASSE/ SAFE Z359. 1, ASSE/ SAFE Z359. 2, ASSE/ SAFE Z359. 3, ASSE/ SAFE Z359. 4, ASSE/ SAFE Z359. 6, ASSE/ SAFE Z359. 7, ASSE/ SAFE Z359. 11, ASSE/ SAFE Z359. 12, ASSE/ SAFE Z359. 13, ASSE/ SAFE Z359. 14, and ASSE/ SAFE Z359. 15.

SECTI ON 01 35 26 Page 39

Page 40: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

3. 5. 2. 1 Addi t i onal Per sonal Fal l Pr ot ect i on

I n addi t i on t o t he r equi r ed f al l pr ot ect i on syst ems, ot her pr ot ect i on such as saf et y ski f f s , per sonal f l oat at i on devi ces, and l i f e r i ngs, ar e r equi r ed when wor ki ng above or next t o wat er i n accor dance wi t h EM 385- 1- 1, Sect i ons 21. O t hr ough 21. O. 06. Per sonal f al l pr ot ect i on syst ems and equi pment ar e r equi r ed when wor ki ng f r om an ar t i cul at i ng or ext endi bl e boom, swi ng st ages, or suspended pl at f or m. I n addi t i on, per sonal f al l pr ot ect i on syst ems ar e r equi r ed when oper at i ng ot her equi pment such as sci ssor l i f t s . The need f or t y i ng- of f i n such equi pment i s t o pr event ej ect i on of t he empl oyee f r om t he equi pment dur i ng r ai s i ng, l ower i ng, t r avel , or whi l e per f or mi ng wor k.

3. 5. 2. 2 Per sonal Fal l Pr ot ect i on Har nesses

Onl y a f ul l - body har ness wi t h a shock- absor bi ng l anyar d or sel f - r et r act i ng l anyar d i s an accept abl e per sonal f al l ar r est body suppor t devi ce. The use of body bel t s i s not accept abl e. Har nesses must have a f al l ar r est at t achment af f i xed t o t he body suppor t ( usual l y a Dor sal D- r i ng) and speci f i cal l y desi gnat ed f or at t achment t o t he r est of t he syst em. Snap hooks and car abi ner s must be sel f - c l osi ng and sel f - l ocki ng, capabl e of bei ng opened onl y by at l east t wo consecut i ve del i ber at e act i ons and have a mi ni mum gat e st r engt h of 1633 kg 3, 600 l bs i n al l di r ect i ons. Use webbi ng, st r aps, and r opes made of synt het i c f i ber . The maxi mum f r ee f al l di st ance when usi ng f al l ar r est equi pment must not exceed 1. 8 m 6 f eet , unl ess t he pr oper ener gy absor bi ng l anyar d i s used. Al ways t ake i nt o consi der at i on t he t ot al f al l di st ance and any swi ngi ng of t he wor ker ( pendul um- l i ke mot i on) , t hat can occur dur i ng a f al l , when at t achi ng a per son t o a f al l ar r est syst em. Al l f ul l body har nesses must be equi pped wi t h Suspensi on Tr auma Pr event er s such as st i r r ups, r el i ef st eps, or s i mi l ar i n or der t o pr ovi de shor t - t er m r el i ef f r om t he ef f ect s of or t host at i c i nt ol er ance i n accor dance wi t h EM 385- 1- 1, Sect i on 21. I . 06.

3. 5. 3 Fal l Pr ot ect i on f or Roof i ng Wor k

I mpl ement f al l pr ot ect i on cont r ol s based on t he t ype of r oof bei ng const r uct ed and wor k bei ng per f or med. Eval uat e t he r oof ar ea t o be accessed f or i t s st r uct ur al i nt egr i t y i ncl udi ng wei ght - bear i ng capabi l i t i es f or t he pr oj ect ed l oadi ng.

a. Low Sl oped Roof s:

( 1) For wor k wi t hi n 1. 8 m 6 f eet of an edge, on a r oof havi ng a s l ope l ess t han or equal t o 4: 12 ( ver t i cal t o hor i zont al ) , pr ot ect per sonnel f r om f al l i ng by use of per sonal f al l ar r est / r est r ai nt syst ems, guar dr ai l s , or saf et y net s. A saf et y moni t or i ng syst em i s not adequat e f al l pr ot ect i on and i s not aut hor i zed. Pr ovi de i n accor dance wi t h 29 CFR 1926. 500.

( 2) For wor k gr eat er t han 1. 8 m 6 f eet f r om an edge, er ect and i nst al l war ni ng l i nes i n accor dance wi t h 29 CFR 1926. 500 and EM 385- 1- 1, Sect i on L.

b. St eep- Sl oped Roof s: Wor k on a r oof havi ng a s l ope gr eat er t han 4: 12 ( ver t i cal t o hor i zont al ) r equi r es a per sonal f al l ar r est syst em, guar dr ai l s wi t h t oe- boar ds, or saf et y net s. Thi s r equi r ement al so appl i es t o r esi dent i al or housi ng t ype const r uct i on.

SECTI ON 01 35 26 Page 40

Page 41: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

3. 5. 4 Hor i zont al Li f el i nes ( HLL)

Pr ovi de HLL i n accor dance wi t h EM 385- 1- 1, Sect i on 21. I . 08. d. 2. Commer ci al l y manuf act ur ed hor i zont al l i f el i nes ( HLL) must be desi gned, i nst al l ed, cer t i f i ed and used, under t he super vi s i on of a qual i f i ed per son, f or f al l pr ot ect i on as par t of a compl et e f al l ar r est syst em whi ch mai nt ai ns a saf et y f act or of 2 ( 29 CFR 1926. 500) . The compet ent per son f or f al l pr ot ect i on may ( i f deemed appr opr i at e by t he qual i f i ed per son) super vi se t he assembl y, di sassembl y, use and i nspect i on of t he HLL syst em under t he di r ect i on of t he qual i f i ed per son. Local l y manuf act ur ed HLLs ar e not accept abl e unl ess t hey ar e cust om desi gned f or l i mi t ed or s i t e speci f i c appl i cat i ons by a Regi st er ed Pr of essi onal Engi neer who i s qual i f i ed i n desi gni ng HLL syst ems.

3. 5. 5 Guar dr ai l s and Saf et y Net s

Desi gn, i nst al l and use guar dr ai l s and saf et y net s i n accor dance wi t h EM 385- 1- 1, Sect i on 21. F. 01 and 29 CFR 1926 Subpar t M.

3. 5. 6 Rescue and Evacuat i on Pl an and Pr ocedur es

When per sonal f al l ar r est syst ems ar e used, ensur e t hat t he mi shap vi ct i m can sel f - r escue or can be r escued pr ompt l y shoul d a f al l occur . Pr epar e a Rescue and Evacuat i on Pl an and i ncl ude a det ai l ed di scussi on of t he f ol l owi ng: met hods of r escue; met hods of sel f - r escue or assi st ed- r escue; equi pment used; t r ai ni ng r equi r ement ; speci al i zed t r ai ni ng f or t he r escuer s; pr ocedur es f or r equest i ng r escue and medi cal assi st ance; and t r anspor t at i on r out es t o a medi cal f aci l i t y . I ncl ude t he Rescue and Evacuat i on Pl an wi t hi n t he Act i v i t y Hazar d Anal ysi s ( AHA) f or t he phase of wor k, i n t he Fal l Pr ot ect i on and Pr event i on ( FP&P) Pl an, and t he Acci dent Pr event i on Pl an ( APP) . The pl an must compl y wi t h t he r equi r ement s of EM 385- 1- 1, ASSE/ SAFE Z359. 2, and ASSE/ SAFE Z359. 4.

[ 3. 6 SHI PYARD REQUI REMENTS

**************************************************************************NOTE: Use t hi s par agr aph f or pr oj ect s at t he Nor f ol k Naval Shi pyar d ( NNSY) and Por t smout h Naval Shi pyar d ( PNSY) onl y. Thi s par agr aph i s t ai l or ed f or NAVFAC MIDLANT.

**************************************************************************

Al l per sonnel who ent er t he Cont r ol l ed I ndust r i al Ar ea ( CI A) must wear mandat or y per sonal pr ot ect i ve equi pment ( PPE) at al l t i mes and compl y wi t h PPE post i ngs of shops bot h i nsi de and out s i de t he CI A.

] 3. 7 WORK PLATFORMS

3. 7. 1 Scaffolding

Pr ovi de empl oyees wi t h a saf e means of access t o t he wor k ar ea on t he scaf f ol d. Cl i mbi ng of any scaf f ol d br aces or suppor t s not speci f i cal l y desi gned f or access i s pr ohi bi t ed. Compl y wi t h t he f ol l owi ng r equi r ement s:

a. Scaf f ol d pl at f or ms gr eat er t han 6 m 20 f eet i n hei ght must be accessed by use of a scaf f ol d st ai r syst em.

b. Ladder s commonl y pr ovi ded by scaf f ol d syst em manuf act ur er s ar e

pr ohi bi t ed f or accessi ng scaf f ol d pl at f or ms gr eat er t han 6 m 20 f eet

SECTI ON 01 35 26 Page 41

Page 42: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

maxi mum i n hei ght .

c. An adequat e gat e i s r equi r ed.

d. Empl oyees per f or mi ng scaf f ol d er ect i on and di smant l i ng must be qualified.

e. Scaf f ol d must be capabl e of suppor t i ng at l east f our t i mes t he maxi mum i nt ended l oad, and pr ovi de appr opr i at e f al l pr ot ect i on as del i neat ed i n t he accept ed f al l pr ot ect i on and pr event i on pl an.

f . St at i onar y scaf f ol ds must be at t ached t o st r uct ur al bui l di ng component s t o saf eguar d agai nst t i ppi ng f or war d or backwar d.

g. Speci al car e must be gi ven t o ensur e scaf f ol d syst ems ar e not overloaded.

h. Si de br acket s used t o ext end scaf f ol d pl at f or ms on sel f - suppor t ed scaf f ol d syst ems f or t he st or age of mat er i al ar e pr ohi bi t ed. The f i r st t i e- i n must be at t he hei ght equal t o 4 t i mes t he wi dt h of t he smal l est di mensi on of t he scaf f ol d base.

i . Scaf f ol di ng ot her t han suspended t ypes must bear on base pl at es upon wood mudsi l l s ( 51 mm x 254 mm x 203 mm2 i n x 10 i n x 8 i n mi ni mum) or ot her adequat e f i r m f oundat i on.

j . Scaf f ol d or wor k pl at f or m er ect or s must have f al l pr ot ect i on dur i ng t he er ect i on and di smant l i ng of scaf f ol di ng or wor k pl at f or ms t hat ar e mor e t han 1. 83 met er s 6 f eet .

k. Del i neat e f al l pr ot ect i on r equi r ement s when wor ki ng above 1. 83 met er s 6 f eet or above danger ous oper at i ons i n t he Fal l Pr ot ect i on and Pr event i on ( FP&P) Pl an and Act i v i t y Hazar d Anal ysi s ( AHA) f or t he phase of wor k.

3. 7. 2 El evat ed Aer i al Wor k Pl at f or ms ( AWPs)

Wor ker s must be anchor ed t o t he basket or bucket i n accor dance wi t h manuf act ur er ' s speci f i cat i ons and i nst r uct i ons ( anchor i ng t o t he boom may onl y be used when al l owed by t he manuf act ur er and per mi t t ed by t he CP) . Lanyar ds used must be suf f i c i ent l y shor t t o pr ohi bi t wor ker f r om cl i mbi ng out of basket . The cl i mbi ng of r ai l s i s pr ohi bi t ed. Lanyar ds wi t h bui l t - i n shock absor ber s ar e accept abl e. Sel f - r et r act i ng devi ces ar e not accept abl e. Tyi ng of f t o an adj acent pol e or st r uct ur e i s not per mi t t ed unl ess a saf e devi ce f or 100 per cent t i e- of f i s used f or t he t r ansf er .

Use of AWPs must be oper at ed, i nspect ed, and mai nt ai ned as speci f i ed i n t he oper at i ng manual f or t he equi pment and del i neat ed i n t he AHA. Oper at or s of AWPs must be desi gnat ed as qual i f i ed oper at or s by t he Pr i me Cont r act or . Mai nt ai n pr oof of qual i f i cat i ons on s i t e f or r evi ew and i ncl ude i n t he AHA.

3. 8 EQUIPMENT

3. 8. 1 Mat er i al Handl i ng Equi pment ( MHE)

a. Mat er i al handl i ng equi pment such as f or k l i f t s must not be modi f i ed wi t h wor k pl at f or m at t achment s f or suppor t i ng empl oyees unl ess speci f i cal l y del i neat ed i n t he manuf act ur er ' s pr i nt ed oper at i ng i nst r uct i ons. Mat er i al handl i ng equi pment f i t t ed wi t h per sonnel wor k pl at f or m

SECTI ON 01 35 26 Page 42

Page 43: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

at t achment s ar e pr ohi bi t ed f r om t r avel i ng or posi t i oni ng whi l e per sonnel ar e wor ki ng on t he pl at f or m.

b. The use of hooks on equi pment f or l i f t i ng of mat er i al must be i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst r uct i ons. Mat er i al Handl i ng Equi pment Oper at or s must be t r ai ned i n accor dance wi t h OSHA 29 CFR 1910, Subpar t N.

c. Oper at or s of f or k l i f t s or power i ndust r i al t r ucks must be l i censed i n accor dance wi t h OSHA.

3. 8. 2 Load Handl i ng Equi pment ( LHE)

The f ol l owi ng r equi r ement s appl y. I n except i on, t hese r equi r ement s do not appl y t o commer ci al t r uck mount ed and ar t i cul at i ng boom cr anes used sol el y t o del i ver mat er i al and suppl i es ( not pr ef abr i cat ed component s, st r uct ur al st eel , or component s of a syst ems- engi neer ed met al bui l di ng) wher e t he l i f t consi st s of movi ng mat er i al s and suppl i es f r om a t r uck or t r ai l er t o t he gr ound; t o cr anes i nst al l ed on mechani cs t r ucks t hat ar e used sol el y i n t he r epai r of shor e- based equi pment ; t o cr ane t hat ent er t he act i v i t y but ar e not used f or l i f t i ng; nor t o ot her machi nes not used t o l i f t l oads suspended by r i ggi ng equi pment . However , LHE acci dent s occur r i ng dur i ng such oper at i ons must be r epor t ed.

a. Equi p cr anes and der r i cks as speci f i ed i n EM 385- 1- 1, Sect i on 16.

**************************************************************************NOTE: I n t he f ol l owi ng i t em, t he second and t hi r d sent ences f or a Cr ane Access Per mi t ar e t ai l or ed f or NAVY pr oj ect s onl y. Choose br acket ed i t em f or host count r y as appl i cabl e t o pr oj ect l ocat i on.

**************************************************************************

b. Not i f y t he Cont r act i ng Of f i cer 15 wor ki ng days i n advance of any LHE ent er i ng t he act i v i t y, i n accor dance wi t h EM 385- 1- 1, Sect i on 16. A. 02, so t hat necessar y qual i t y assur ance spot checks can be coor di nat ed. Pr i or t o cr anes ent er i ng f eder al act i v i t i es, a Cr ane Access Per mi t must be obt ai ned f r om t he Cont r act i ng Of f i cer . A copy of t he per mi t t i ng pr ocess wi l l be pr ovi ded at t he Pr econst r uct i on Conf er ence. Cont r act or ' s oper at or must r emai n wi t h t he cr ane dur i ng t he spot check. Ri ggi ng gear must compl y wi t h OSHA, ASME B30. 9 St andar ds[ and host count r y] saf et y st andar ds.

c. Compl y wi t h t he LHE manuf act ur er ' s speci f i cat i ons and l i mi t at i ons f or er ect i on and oper at i on of cr anes and hoi st s used i n suppor t of t he wor k. Per f or m er ect i on under t he super vi s i on of a desi gnat ed per son ( as def i ned i n ASME B30. 5) . Per f or m al l t est i ng i n accor dance wi t h t he manuf act ur er ' s r ecommended pr ocedur es.

d. Compl y wi t h ASME B30. 5 f or mobi l e and l ocomot i ve cr anes, ASME B30. 22 f or ar t i cul at i ng boom cr anes, ASME B30. 3 f or const r uct i on t ower cr anes, ASME B30. 8 f or f l oat i ng cr anes and f l oat i ng der r i cks, ASME B30. 9 f or slings, ASME B30. 20 f or bel ow t he hook l i f t i ng devi ces and ASME B30. 26 f or r i ggi ng har dwar e.

e. When oper at i ng i n t he v i c i ni t y of over head t r ansmi ssi on l i nes, oper at or s and r i gger s must be al er t t o t hi s speci al hazar d and f ol l ow t he r equi r ement s of EM 385- 1- 1 Sect i on 11, and ASME B30. 5 or ASME B30. 22 as appl i cabl e.

SECTI ON 01 35 26 Page 43

Page 44: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

f . Do not use cr ane suspended per sonnel wor k pl at f or ms ( basket s) unl ess t he Cont r act or pr oves t hat usi ng any ot her access t o t he wor k l ocat i on woul d pr ovi de a gr eat er hazar d t o t he wor ker s or i s i mpossi bl e. Do not l i f t per sonnel wi t h a l i ne hoi st or f r i c t i on cr ane. Addi t i onal l y, submi t a speci f i c AHA f or t hi s wor k t o t he Cont r act i ng Of f i cer . Ensur e t he act i v i t y and AHA ar e t hor oughl y r evi ewed by al l i nvol ved per sonnel .

g. I nspect , mai nt ai n, and r echar ge por t abl e f i r e ext i ngui sher s as speci f i ed i n NFPA 10, St andar d f or Por t abl e Fi r e Ext i ngui sher s.

h. Al l empl oyees must keep cl ear of l oads about t o be l i f t ed and of suspended l oads, except f or empl oyees r equi r ed t o handl e t he l oad.

i . Use cr i bbi ng when per f or mi ng l i f t s on out r i gger s.

j . The cr ane hook/ bl ock must be posi t i oned di r ect l y over t he l oad. Si de l oadi ng of t he cr ane i s pr ohi bi t ed.

k. A physi cal bar r i cade must be posi t i oned t o pr event per sonnel access wher e accessi bl e ar eas of t he LHE' s r ot at i ng super st r uct ur e poses a r i sk of st r i k i ng, pi nchi ng or cr ushi ng per sonnel .

l . Mai nt ai n i nspect i on r ecor ds i n accor dance by EM 385- 1- 1, Sect i on 16. D, i ncl udi ng shi f t , mont hl y, and annual i nspect i ons, t he s i gnat ur e of t he per son per f or mi ng t he i nspect i on, and t he ser i al number or ot her i dent i f i er of t he LHE t hat was i nspect ed. Recor ds must be avai l abl e f or r evi ew by t he Cont r act i ng Of f i cer .

m. Mai nt ai n wr i t t en r epor t s of oper at i onal and l oad t est i ng i n accor dance with EM 385- 1- 1, Sect i on 16. F, l i s t i ng t he l oad t est pr ocedur es used al ong wi t h any r epai r s or al t er at i ons per f or med on t he LHE. Repor t s must be avai l abl e f or r evi ew by t he Cont r act i ng Of f i cer .

n. Cer t i f y t hat al l LHE oper at or s have been t r ai ned i n pr oper use of al l saf et y devi ces ( e. g. ant i - t wo bl ock devi ces) .

o. Take st eps t o ensur e t hat wi nd speed does not cont r i but e t o l oss of cont r ol of t he l oad dur i ng l i f t i ng oper at i ons. At wi nd speeds gr eat er t han 9 m/ s 20 mph, t he oper at or , r i gger and l i f t super vi sor must cease al l cr ane oper at i ons, eval uat e condi t i ons and det er mi ne i f t he l i f t may pr oceed. Base t he det er mi nat i on t o pr oceed or not on wi nd cal cul at i ons per t he manuf act ur er and a r educt i on i n LHE r at ed capaci t y i f appl i cabl e. I nc l ude t hi s maxi mum wi nd speed det er mi nat i on as par t of t he act i v i t y hazar d anal ysi s pl an f or t hat oper at i on.

**************************************************************************NOTE: Use t he f ol l owi ng t ai l or ed i t em f or NAVY pr oj ect s onl y.

**************************************************************************

p. On mobi l e cr anes, l i f t s wher e t he l oad wei ght i s gr eat er t han 90 per cent of t he equi pment ' s capaci t y ar e pr ohi bi t ed.

3. 8. 3 Machi ner y and Mechani zed Equi pment

a. Pr oof of qual i f i cat i ons f or oper at or must be kept on t he pr oj ect s i t e f or r evi ew.

SECTI ON 01 35 26 Page 44

Page 45: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

b. Manuf act ur e speci f i cat i ons or owner ' s manual f or t he equi pment must be on- si t e and r evi ewed f or addi t i onal saf et y pr ecaut i ons or r equi r ement s t hat ar e somet i mes not i dent i f i ed by OSHA or USACE EM 385- 1- 1. I ncor por at e such addi t i onal saf et y pr ecaut i ons or r equi r ement s i nt o t he AHAs.

**************************************************************************NOTE: I ncl ude t he f ol l owi ng t ai l or ed i t em i n NAVFAC Mar i anas pr oj ect s onl y.

**************************************************************************

[ c . Submi t a Machi ner y & Mechani zed Equi pment Cer t i f i cat i on For m t o t he Cont r act i ng Of f i cer pr i or t o bei ng pl aced i nt o use.

] 3. 8. 4 Base Mount ed Dr um Hoi st s

a. Oper at i on of base mount ed dr um hoi st s must compl y wi t h EM 385- 1- 1 and ASSE/ SAFE A10. 22.

b. Ri ggi ng gear must compl y wi t h appl i cabl e ASME/ OSHA st andar ds

c. When used on t el ecommuni cat i on t ower s, base mount ed dr um hoi st s must compl y wi t h TIA-1019 , TIA-222 , ASME B30. 7, 29 CFR 1926. 552, and 29 CFR 1926. 553.

d. When used t o hoi st per sonnel , t he AHA must i nc l ude a wr i t t en st andar d oper at i ng pr ocedur e. Oper at or s must have a physi cal exami nat i on i n accor dance wi t h EM 385- 1- 1 Sect i on 16. B. 05 and t r ai ned, at a mi ni mum, i n accor dance wi t h EM 385- 1- 1 Sect i on 16. U and 16. T. The base mount ed dr um hoi st must al so compl y wi t h OSHA I nst r uct i on CPL 02- 01- 056 and ASME B30. 23.

e. Mat er i al and per sonnel must not be hoi st ed s i mul t aneousl y.

f . Per sonnel cage must be mar ked wi t h t he capaci t y ( i n number of per sons) and l oad l i mi t i n kg pounds.

g. Const r uct i on equi pment must not be used f or hoi st i ng mat er i al or per sonnel or wi t h t r ol l ey/ t ag l i nes. Const r uct i on equi pment may be used f or t owi ng and assi st i ng wi t h anchor i ng guy l i nes.

3. 8. 5 Use of Expl osi ves

**************************************************************************NOTE: Use t ai l or ed, l ast sent ence f or NASA pr oj ect s only.

**************************************************************************

Expl osi ves must not be used or br ought t o t he pr oj ect s i t e wi t hout pr i or wr i t t en appr oval f r om t he Cont r act i ng Of f i cer . Such appr oval does not r el i eve t he Cont r act or of r esponsi bi l i t y f or i nj ur y t o per sons or f or damage t o pr oper t y due t o bl ast i ng oper at i ons.

St or age of expl osi ves, when per mi t t ed on Gover nment pr oper t y, must be onl y wher e di r ect ed and i n appr oved st or age f aci l i t i es. These f aci l i t i es must be kept l ocked at al l t i mes except f or i nspect i on, del i ver y, and wi t hdr awal of expl osi ves. Per f or m expl osi ve wor k i n accor dance wi t h NASA- STD 8719. 12. Thi s document i s avai l abl e at :

SECTI ON 01 35 26 Page 45

Page 46: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

http://www.hq.nasa.gov/office/codeq/doctree/871912.htm

3. 9 EXCAVATIONS

Soi l c l assi f i cat i on must be per f or med by a compet ent per son i n accor dance with 29 CFR 1926 and EM 385- 1- 1.

3. 9. 1 Ut i l i t y Locat i ons

Pr ovi de a t hi r d par t y, i ndependent , pr i vat e ut i l i t y l ocat i ng company t o posi t i vel y i dent i f y under gr ound ut i l i t i es i n t he wor k ar ea i n addi t i on t o any st at i on l ocat i ng ser vi ce and coor di nat ed wi t h t he st at i on ut i l i t y department.

3. 9. 2 Ut i l i t y Locat i on Ver i f i cat i on

Physi cal l y ver i f y under gr ound ut i l i t y l ocat i ons, i ncl udi ng ut i l i t y dept h, by hand di ggi ng usi ng wood or f i ber gl ass handl ed t ool s when any adj acent const r uct i on wor k i s expect ed t o come wi t hi n 1 met er 3 f eet of t he under gr ound syst em.

3. 9. 3 Ut i l i t i es Wi t hi n and Under Concr et e, Bi t umi nous Asphal t , and Ot her I mper vi ous Sur f aces

Ut i l i t i es l ocat ed wi t hi n and under concr et e s l abs or pi er st r uct ur es, br i dges, par ki ng ar eas, and t he l i ke, ar e ext r emel y di f f i cul t t o i dent i f y. Whenever cont r act wor k i nvol ves chi ppi ng, saw cut t i ng, or cor e dr i l l i ng t hr ough concr et e, bi t umi nous asphal t or ot her i mper vi ous sur f aces, t he exi st i ng ut i l i t y l ocat i on must be coor di nat ed wi t h st at i on ut i l i t y depar t ment s i n addi t i on t o l ocat i on and dept h ver i f i cat i on by a t hi r d par t y, i ndependent , pr i vat e l ocat i ng company. The t hi r d par t y, i ndependent , pr i vat e l ocat i ng company must l ocat e ut i l i t y dept h by use of Gr ound Penet r at i ng Radar ( GPR) , X- r ay, bor e scope, or ul t r asound pr i or t o t he st ar t of demol i t i on and const r uct i on. Out ages t o i sol at e ut i l i t y syst ems must be used i n c i r cumst ances wher e ut i l i t i es ar e unabl e t o be posi t i vel y i dent i f i ed. The use of hi st or i cal dr awi ngs does not al l evi at e t he Cont r act or f r om meet i ng t hi s r equi r ement .

3. 10 ELECTRICAL

Per f or m el ect r i cal wor k i n accor dance wi t h EM 385- 1- 1, Appendi x A, Sect i ons 11 and 12.

3. 10. 1 Conduct of El ect r i cal Wor k

As del i neat ed i n EM 385- 1- 1, el ect r i cal wor k i s t o be conduct ed i n a de- ener gi zed st at e unl ess t her e i s no al t er nat i ve met hod f or accompl i shi ng t he wor k. I n t hose cases obt ai n an ener gi zed wor k per mi t f r om t he Cont r act i ng Of f i cer . The ener gi zed wor k per mi t appl i cat i on must be accompani ed by t he AHA and a summar y of why t he equi pment / c i r cui t needs t o be wor ked ener gi zed. Under gr ound el ect r i cal spaces must be cer t i f i ed saf e f or ent r y bef or e ent er i ng t o conduct wor k. Cabl es t hat wi l l be cut must be posi t i vel y i dent i f i ed and de- ener gi zed pr i or t o per f or mi ng each cut . At t ach t empor ar y gr ounds i n accor dance wi t h ASTM F855 and I EEE 1048. Per f or m al l hi gh vol t age cabl e cut t i ng r emot el y us i ng hydr aul i c cut t i ng t ool . When r acki ng i n or l i ve swi t chi ng of c i r cui t br eaker s, no addi t i onal per son ot her t han t he swi t ch oper at or i s al l owed i n t he space dur i ng t he act ual oper at i on. Pl an so t hat wor k near ener gi zed par t s i s mi ni mi zed t o t he f ul l est ext ent possi bl e. Use of el ect r i cal out ages c l ear of any

SECTI ON 01 35 26 Page 46

Page 47: ********************************************************** 01 35 26.pdf · unified facilities guide specifications ... asme international (asme) asme b30.20 (2013; int oct 2010 ...

ener gi zed el ect r i cal sour ces i s t he pr ef er r ed met hod.

When wor ki ng i n ener gi zed subst at i ons, onl y qual i f i ed el ect r i cal wor ker s ar e per mi t t ed t o ent er . When wor k r equi r es wor k near ener gi zed c i r cui t s as def i ned by NFPA 70, hi gh vol t age per sonnel must use per sonal pr ot ect i ve equi pment t hat i ncl udes, as a mi ni mum, el ect r i cal har d hat , saf et y shoes, i nsul at i ng gl oves and el ect r i cal ar c f l ash pr ot ect i on f or per sonnel as r equi r ed by NFPA 70E. I nsul at i ng bl anket s, hear i ng pr ot ect i on, and swi t chi ng sui t s may al so be r equi r ed, dependi ng on t he speci f i c j ob and as del i neat ed i n t he Cont r act or ' s AHA. Ensur e t hat each empl oyee i s f ami l i ar wi t h and compl i es wi t h t hese pr ocedur es and 29 CFR 1910. 147.

3. 10. 2 Qualifications

El ect r i cal wor k must be per f or med by QP per sonnel wi t h ver i f i abl e cr edent i al s who ar e f ami l i ar wi t h appl i cabl e code r equi r ement s. Ver i f i abl e cr edent i al s consi st of St at e, Nat i onal and Local Cer t i f i cat i ons or Li censes t hat a Mast er or Jour neyman El ect r i c i an may hol d, dependi ng on wor k bei ng per f or med, and must be i dent i f i ed i n t he appr opr i at e AHA. Jour neyman/ Appr ent i ce r at i o must be i n accor dance wi t h St at e, Local [ and Host Nat i on] r equi r ement s appl i cabl e t o wher e wor k i s bei ng per f or med.

3. 10. 3 Ar c Fl ash

Conduct a hazar d anal ysi s/ ar c f l ash hazar d anal ysi s whenever wor k on or near ener gi zed par t s gr eat er t han 50 vol t s i s necessar y, i n accor dance wi t h NFPA 70E.

Al l per sonnel ent er i ng t he i dent i f i ed ar c f l ash pr ot ect i on boundar y must be QPs and pr oper l y t r ai ned i n NFPA 70E r equi r ement s and pr ocedur es. Unl ess per mi t t ed by NFPA 70E, no Unqual i f i ed Per son i s per mi t t ed t o appr oach near er t han t he Li mi t ed Appr oach Boundar y of ener gi zed conduct or s and ci r cui t par t s. Tr ai ni ng must be admi ni st er ed by an el ect r i cal l y qual i f i ed sour ce and document ed.

3. 10. 4 Grounding

Gr ound el ect r i cal c i r cui t s, equi pment and encl osur es i n accor dance wi t h NFPA 70 and I EEE C2 t o pr ovi de a per manent , cont i nuous and ef f ect i ve pat h t o gr ound unl ess ot her wi se not ed by EM 385- 1- 1.

Check gr oundi ng c i r cui t s t o ensur e t hat t he c i r cui t bet ween t he gr ound and a gr ounded power conduct or has a r esi st ance l ow enough t o per mi t suf f i c i ent cur r ent f l ow t o al l ow t he f use or c i r cui t br eaker t o i nt er r upt t he cur r ent .

3. 10. 5 Testing

Tempor ar y el ect r i cal di st r i but i on syst ems and devi ces must be i nspect ed, t est ed and f ound accept abl e f or Gr ound- Faul t Ci r cui t I nt er r upt er ( GFCI ) pr ot ect i on, pol ar i t y, gr ound cont i nui t y, and gr ound r esi st ance bef or e i ni t i al use, bef or e use af t er modi f i cat i on and at l east mont hl y. Mont hl y i nspect i ons and t est s must be mai nt ai ned f or each t empor ar y el ect r i cal di st r i but i on syst em, and si gned by t he el ect r i cal CP or QP.

- - End of Sect i on - -

SECTI ON 01 35 26 Page 47