ALMagd C-86-C Drilling Program v1
13.375 Inter I - 68 ppf
SOP 829-014 Remove the v-Door.
SOP 829-019 Rig Out the Mud Tanks and Pumps.
SOP 829-015 Nipple Down BOPs
SOP 829-004 Raise the Floor and Pin.
9.625 Inter-Prod 53.5 Ppf
SOP 829- 032 Check-Reset KEMS, Crownomatic
Any Year Calendar1
Condensate Loading Cargos From CTP and RPF
06 Wellhead Xmas Tree [Compatibility Mode
Recomended Modification of DCS Screens
PD 2016-2017 PROD BUDGET OPERATING.xlsx
Water Content
Readme
jinuary schedual
Cover Letter
TBA-Chemical Injection Approved Docs
Again