Zolna murray nov 2013 v2

Post on 05-Dec-2014

325 views 3 download

Tags:

description

 

Transcript of Zolna murray nov 2013 v2

1

Reg/Snr Architect PM/DM with over 25 years of experienceof designing, coordinating, overseeing the construction and generally the creation of AEC projects, of varied types and sizes, globally;

Zolna Murray

What?

MSc

2

Architect MSc (graduate followinga construction technician qualification)(studying and learning in Europe)

1982 - 1989

31990 - 1993

Architect MSc (graduate)(early work in design and construction management)

41992 - 2009

Architect MSc (registered in 2000)(living and working in New Zealand)

(own Business)

5

Design, coordination, contract administration, overseeing

construction

Residential work(small to mediumScale)

6

Design, coordination, contract administration,

overseeing construction

Residential work(new houses x 3)

7Residential work(medium/large scale)

Design, coordination, contract administration, overseeing construction

8Commercial work(medium/large scale)

Design, coordination, contract administration, overseeing construction

9

One of the significant number of clients with returning commissions

10Architect MSc

(contractedTo other s first,Set up own busFrom 2004)

Documentation, coordination, Detailed design,

Construction support

11

Documentation, coordination, Modeling, Detail design,

Construction support

Commercial / industrial work(medium/large scale)

12

Documentation, coordination, Modeling, Detail design,

Commercial / industrial / fit-out and interior work (medium/large scale)

13

Long term construction support through DM/coordination, shop drawings

and logisticsCommercial / industrial / fit-out and interior work (medium/large scale)

142010 moved to GCC

14

15

DM/PM support,Auditing consultants’ documents,

strategic planning

Numerous Mixed-use Developments (all large scale)

16

33 x

DM/PM/BIM support,Auditing consultants’ documents,

strategic planning

Institutional development (large scale)

New York University in Abu Dhabi UAE

17

The UAE Pavilion of EXPO 2010 Was disassembled and relocated to Saadiyat Island, Abu Dhabi.

DM/PM/BIM support,Auditing consultants’ documents,

strategic planning

Cultural developments

UAE Pavilion, relocation to Abu Dhabi, UAE

18

DM/PM/BIM support,Auditing consultants’ documents,

strategic planning

Mixed use developments (all large scale)

Saadiyat IslandApartments and Villas

19

DM/PM/BIM support,Auditing consultants’ documents,

strategic planning

Entertainment development (large scale)

Yas, WaterworldAbu Dhabi, UAE

20Full design and documentation

For DB proposal

Airport ExtensionAbu Dhabi, UAE

21

DM/PM/BIM support for bids,Auditing consultants’ documents,

strategic planning

Mixed use, cultural, civil and institutional developments (all large scale)

Midfield Airport Terminal Qatar Rail – New Metro lines (x2)

World Island - Development

BIDDING STAGE

22

DM/PM/BIM support for bids,Auditing consultants’ documents,

strategic planning

Mixed use, cultural, civil and institutional developments (medium to large scale)

ADCO Shah - Development

Royal Palaces

BIDDING STAGE

23

DM/PM/BIM support for bids,Auditing consultants’ documents,

strategic planning

Healthcare developments (all large scale)

Al Ain Hospital

Security Hospital

BIDDING STAGE

24

DM/PM/BIM support for bids,Auditing consultants’ documents,

strategic planning

Dubai Tower (Doha), various Hotels(all large scale)

BIDDING STAGE

25

DM/PM/BIM support for construction

Auditing consultants’ documents, Shop drawings

ADIB Headquarters, Abu Dhabi

CONSTRUCTION STAGE

26

DM/PM/BIM support for construction

Auditing consultants’ documents, Shop drawings

Mafraq Hospital, Abu Dhabi

CONSTRUCTION STAGE

27

DM/PM/BIM support for construction

Auditing consultants’ documents, Shop drawings

ADCO developmentQusahwira

CONSTRUCTION STAGE

28

DM/PM/BIM support for construction

Auditing consultants’ documents, strategic planning;

Habtoor PalaceDubai

CONSTRUCTION STAGE

29

DM/PM/BIM for claim support Auditing consultants’ documents,

Claims and Shop drawings

Al Bustan developmentAbu Dhabi

POSTCONSTRUCTION STAGE (CLAIMS)

30

DM/PM/BIM for claim support Auditing consultants’ documents,

Claims and Shop drawings

Al Bustan developmentAbu Dhabi

POSTCONSTRUCTION STAGE (CLAIMS)