Post on 15-Oct-2020
Your Trusted Partner
COMPANY PROFILE AND
PRE-QUALIFICATION
About Us
OBBA started on 1995 as sales representative for the world leader manufactures in the fields of Heat Treatment units and furnaces as well as NDT equipments
We provide Heat treatment service, full consultancy, operation, hiring of heat treatment units and Holding a stock of all heat treatment consumable and auxiliary items
We provide full consultancy services to help our customers achieve the most appropriate equipments and machines selection and engineering objectives, within budget and on time.
Our objective is to become your number one trusted partner with providing a wide range of advanced and durable product solution and innovative thinking combined with a wealth of industry experience.
Your Trusted Partner
Heat Treatment Service Provider
Pre-heat & PWHT
OBBA representing Messrs’
Stork Technical Services UK .
Our technical Engineer was trained in Messrs’ Stork for the heat treatment process techniques:
Thermal equipments, Spherical tanks
& Furnace operations”.
Also attending several training curses in QC / QA in international companies such as Messrs’ GE General
Electric , Krautkramer and TesTex.
Pre-Heat & PWHT Capabilities
• Thermal Pre-Heat & PWHT
70 KVA 6 channels (Stork Technical Services - Cooperheat) units with 6 units 3 advantage programmer / controllers
12 channels temperature recorders Varieties of sizes 30 volt, 60 volt and 80 volt Ceramic Pad Heaters
Elements to covers all work pieces dimensions Availabilities of all consumables and auxiliary items Furnaces design and power calculations Burners and combustion systems (under preparation)
Pre-Heat & PWHT Flexibility
Providing complete Pre-Heat & PWHT services with our local 70 KVA Thermal heat treatment units along with all required consumables and our well trained technicians and supervisors.
Hiring of 70 KVA heat treatment units along with cables and splitters .
Hiring of Ceramic Pad Heating Elements. Providing of well trained Heat Treatment Technicians and
Supervisors.
Pre-Heating And PWHT Service Providing References
Only for example
• Heat Treatment of Slug Catcher Pressure Container ( 2007)
Petrojet main work shop (with Mannings -TRS Heat Treatment provider UK)
• Heat Treatment of Spherical Tanks (2015)
Methanol Project (under Petrojet and Stork Technical Services technicians UK)
• Pre-Heat & PWHT Service Provider for :
Orascom (Siemens) - New capital Power Plant
Mega - South Helwan Power Plant
Mega (Siemens) - Burullus Power Plant
Technint Ismailia - Shabab Power Plant
Technint South Helwan Power Plant
E.R.C Project (GS- Argus) – ERC Refinery Mostorad
Arcons (ERAM - Siemens) - Burullus Power Plant
PSC (PSP -Siemens) - Beni Sueif Power plant
NSF (Orascom) – Factory Jobs
Argus (ERC – Project) – 10th Ramadan Fabrication yard.
Heat Treatment Technical Service References
Only for example • OBBA provided Technical Services and calibration for the heat treatment
units to the following companies :
NEM
Kahromica
IEMSA company
Memphis Egytest
Nasr petroleum Company
Project service company (P.S.C)
Al Hashemiah contracting company
TECHINT engineering and consultation co
Inspecta middle east
Al Nour contracting company
Heat Treatment Supplying References Only for example
• Supplying of Heat treatment units or consumable items NEM Project service company (P.S.C) Petrojet Orascom contracting Kahromica IEMSA company Al Hashemiah contracting company Memphis Egytest Inspecta middle east Nasr petroleum Company Al Nour contracting company SA International company
Heat Treatment Modules
70 KVA
6 Output Channels Suitable for 24 Heaters
65 KVA
6 Output Channels Suitable for 24 Heaters
Temperature Recorder
Analogue Digital
Auxiliary Items
Site Photos ERC – Argus work shop in 10th Ramadan city 2016
Site Photos
Beni Sueif Power Plant 2017
Contact
15 Road 306 New Maadi
Cairo - Egypt.
Tel. +20 2 25183752
Fax. +20 2 25184633
Mobile: +20 100 9990499
Direct: +20 106 5538111
e-mail: omar@obbaegypt.net
www.obbaegypt.net