York County Sewer Authority Capstone Turbine Installation

Post on 23-Feb-2016

34 views 1 download

Tags:

description

York County Sewer Authority Capstone Turbine Installation. Central Pennsylvania AEE Meeting January 26, 2012. Old Technology - IC Engine System. High Maintenance High Emissions Loud Antiquated Controls Waste Disposal (engine oil every 4 months). - PowerPoint PPT Presentation

Transcript of York County Sewer Authority Capstone Turbine Installation

York County Sewer AuthorityCapstone Turbine Installation

Central Pennsylvania AEE MeetingJanuary 26, 2012

Old Technology - IC Engine System

High MaintenanceHigh EmissionsLoudAntiquated ControlsWaste Disposal (engine oil every 4

months)

New Technology – “Jet Engine” Capstone Turbines

All American Made EquipmentSimple InstallationLow MaintenanceLow EmissionsQuiet

Installation

ResultsOld System New System 1,530 kW of IC engines

Produced 80 kW /1000 CF

Lack of control of electric production Couldn’t load follow

Saved money but not as much as the turbines

Produced 80 Tons of NOx/CO/VOC

1,600 kW of microturbines

Produces 120 kW / 1000 CF

Has tighter control Can load follow

Generates an additional $40,000 in revenue

Produces <1 Ton of NOx/CO/VOC