Yellowknife Fieldhouse(a LEED® project)
2CCCE 2011
Why listen to Cam and Adrienne?
• LEED Project involvement:– 30+ projects to date
• 2011– Eastgate Business Park Building, LEED-CS (Edmonton, AB)– South West Police Station, LEED-NC (Edmonton, AB)
• 2010– CMEB (University of Alberta), LEED-NC (Edmonton, AB)– Dundee Office Tower, LEED-NC (Yellowknife, NT)– Atlantic Ave Art Block, LEED-CS (Calgary, AB)– Mustard Seed Residence Building, LEED-NC (Calgary, AB)
• 2009– Grant MacEwan University Administration Bldg, LEED-NC
(Edmonton, AB)– Mother M Mary School, LEED-NC (Edmonton, AB)– Emerald Hills School, LEED-NC (Sherwood Park, AB)– Harvest Ridge School, LEED-NC (Spruce Grove, AB)– Northwest High School, LEED-NC (Calgary, AB)– Yellowknife Fieldhouse, LEED-NC (Yellowknife, NT)– Federal Building Rejuvenation/Restoration, LEED-NC (Edmonton,
AB) – Yellowknife Government Office Tower, LEED-NC (Yellowknife, NT)– Ronald McDonald House, LEED-NC (Calgary, AB)– NAIT CAT Building, LEED-NC (Edmonton, AB) – Edmonton Eskimo’s Field House, LEED-NC (Edmonton, AB)
33CCCE 2011 3
– Robbins Health Learning Centre, LEED-NC (Edmonton, AB)– Animal Services Building, LEED-NC (Edmonton, AB)– Grant MacEwan University Student Residence, LEED-NC
(Edmonton, AB)– AIMCo Tenant Improvements, LEED-CI (Edmonton, AB)– Athabasca University, LEED-NC (Athabasca, AB)
• 2008– Southwest Transit Garage, LEED-NC (Edmonton, AB)– Slave Lake Government Ctre, LEED-NC (Slave Lake, AB)– RCMP Detachment, LEED-NC (Red Deer, AB)– Crop Diversification Greenhouses, LEED-NC (Brooks, AB)– Future Shop, LEED-NC (Edmonton, AB)– Centre in the Park, LEED-NC (Sherwood Park, AB)– Cooling Plant on Campus, LEED-NC (Edmonton, AB)– McKenzie School, LEED-NC (Calgary, AB)
• 2007– 10830 Jasper Ave Redevelopment, LEED-CS (Edmonton,
AB)• 2006
– Boreal Centre for Bird Conservation, LEED-NC (Athabasca, AB)
4
The Phases of a Project
CCCE 2011 4
• Design• Tendering• Construction
5
The Design Phase• Conception:
• What, Where, When
• Project Definition:• What, Where, When
• Budget:• Who• Estimate
• (Ball Park?, Order of Magnitude?, Unit price?)
CCCE 2011 5
6
The Tendering PhaseHow does the owner want to project to turn out?
Owner to General Contractor Tendering• Who, How
• Construction Management• Design Build• Lump Sum• ????
** Invited or Open Market? **
Where does Tendering fit ?• Before or after the Design Phase.• As part of the Design Phase, or• As part of the Construction Phase
Tendering to Sub-contractors• Who are they, why would the owner need to know?• What difference does a sub-contractor make?
CCCE 2011 6
7
The Construction Phase
=
CCCE 2011 7
8
Contractor Involvement
• Responsibilities– The main items that the contractor is responsible for are:
• Review of design information• Shop Drawings• Change orders• Conduit to subs & manufacturers
• The contractor will have to assist on other areas’, mainly in gathering of documentation & participation in meetings
• Oh, yah ….. and to do the building portion!
8CCCE 2011
Project Management• Tender Period to Sub-contractors
• Include LEED information in tendering information to sub-contractors.• Include LEED information in contracts to sub-contractors.• Invite sub-contractors who have completed LEED projects.
– Choose LEED-aware sub-contractors ????– Name an onsite LEED Champion (General Contractor Individual)
• Continuous monitoring and onsite education.• Tracking whether documentation is being kept up-to-date.• Prevent contractors who may,due to force of habit, revert to conventional
methods,which could compromise LEED credits if not noticed and prevented.• Assemble documentation.
– Educate about LEED (General Contractor’s Responsibility)• Onsite signage explaining LEED.• A job-site meeting with all contractors explaining how LEED relates to the project.
9CCCE 2011 9
World Saving Time!
CCCE 2011 10
Research and Green Building Institiutes
ATHENA Sustainable Materials Institute USABuilding Integrated Photovoltaics USACentre for Building Studies USABuilding Research Establishment Europe Institute for Research in Construction Canada Quebec Building Envelope Council CanadaCentre for Sustainable Building Rsearch USABuilding Enclosure Technology and Environment Council USA Center for Maximum Potential Building Systems, Inc. USAInternational Initiative for the Sustainable Built Environment CanadaRocky Mountain Institute USAEcological Building Network USASustainable Architecture Buildings and Culture USACommunity Based Social Marketing CanadaCentre for Resourceful Building Technologies USAInstitute for Local Self Reliance USAAdvanced Buildings USADepartment of Energy Green Building Program USASustainable Building Industry Council USASustainable Building Toolkit CanadaArchitectural Green Solar Network Germany
CCCE 2011 11
CCCE 2011 12
And then you add LEED!
LEEDfor Commercial Interiors
LEED-CI
LEEDfor Core & Shell
LEED-CS
LEED - Canada Product Portfolio
Launch 2010
LEEDfor NewConstruction
LEED-NC
LEEDforNeighbourhood Development
LEED-ND
LEEDfor Existing Buildings
LEED-EB
LEEDfor Homes
LEED-H
MURB Application Guide
Campus and Multiple Building Application Guide
Core & Shell and Tenant Space Application Guide
Treated as an application guide under LEED-NC
Launch 2009
CCCE 2011 13
Contractors, Trades, Suppliers and Manufacturers
• What does all this mean to me?
14CCCE 2011 14
Contractor Involvement
• Responsibilities– Most of the credits are not the contractors
responsibility.– The main credits that the contractor is
responsible for are:• Prerequisite 1: Erosion Sedimentation Control• MR - C2: Construction Waste Management• EQ - C3:Construction IAQ Management Plan
• The contractor will have to assist on other credits, mainly in gathering of documentation.
15CCCE 2011 15
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 16
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 17
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 18
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 19
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 20
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 21
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 22
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 23
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 24
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 25
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 26
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 27
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 28
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 29
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 30
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 31
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 32
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 33
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 34
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 35
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 36
Involvement of Contractors and Trades
• Contractor Involvement by Construction Division:
CCCE 2011 37
LEED Benefit• LEED – HOW DO CONTRACTORS BENEFIT?
– risk mitigation through consistent and accurate documentation which is required to be submitted for third party verification.
– integrated design process reduces the risk of errors, deficiencies and project over-runs.
– closer relationships with clients, subtrades and supplies.– financial savings through on-site recycling, improved supply cost and
management of materials (less waste), preference to local suppliers, efficient construction techniques.
– competitive value through leadership in a rapidly expanding field.– improved business efficiency through required diligent paper work and
record keeping.– future construction opportunities.
38CCCE 2011 38
Construction in the North
CCCE 2011 39
Transporting Material up North Can Be Scary
There a few different methods to transport material, equipment, supplies, etc. to sites in YK.
Truck (Ice Roads)FerryHelicopter (Expensive)Plane (Expensive)
CCCE 2011 40
Ice Roads
The ice crossing is normally open to small vehicles in late December, it opens to larger vehicles in mid-January, and closes in mid-April.
CCCE 2011 41
Ice Roads & Ferry Transportation
There is about a 3 month period where it may be difficult to transport material, equipment, supplies, etc. to your project because of ice break-up or freeze-up.
CCCE 2011 42
Ice Break-Up
43
CCCE 2011Mackenzie River, NWT
Ferry Service in the North
CCCE 2011 44
The Ferry Service begins mid- to late May and ends
mid-January.
Merv Hardie Ferry
Ferry / Ice Road Crossing
45
CCCE 2011
Extreme WeatherMust be
Considered
CCCE 2011 46
•Piling•Concrete Pouring•Site Work•Landscaping
Weather Trending
47
CCCE 2011
Yellowknife’s New Fieldhouse
48
CCCE 2011
CCCE 2011
Pre-Engineered Buildings
A large number of the buildings in the North are Pre-Eng because;•Short Construction Season•Lower Construction Cost•Durability & Weather Resistant
CCCE 2011 49
LEE
D C
heck
list
CCCE 2011
50
51
LEE
D C
heck
list
CCCE 2011
Erosion and Sedimentation Control
52CCCE 2011 52
ESC Onsite
CCCE 2011 53
54CCCE 2011 54
55CCCE 2011 55
CCCE 2011 56
Construction Waste Management
57CCCE 2011 57
CCCE 2011 58
CCCE 2011 59
Indoor Air Quality
60CCCE 2011 60
CCCE 2011 61
CCCE 2011 62
CCCE 2011 63
CCCE 2011 64
Risk Mitigation StrategiesRisks in a project are always present. It is identifying them up front and taking proactive measures to mitigate the negative effects on the project that requires a systematic approach to risk management such as:
•Identify and quantify
•By making them explicit they are easier to manage
•Have a plan to deal with each one, control them and thus minimize potential damage
•Identify risks as part of value management
•Ensure good Health and Safety Management plans are in effect
•Maximize and pre-qualify major subtrades for quality, performance and fiscal responsibility
Contracts
CCCE 2011 66
67
IPD
• What is “it”?– Tool?– Methodology?– Management
Structure?– Software? (BIM)
CCCE 2011
68
Build
ing
with
pur
pose
What is IPD?
“Integrated Project Delivery (IPD), is a collaborative alliance of people,
systems, business structures and practices into a process that harnesses
the talents and insights of all participants to optimize project results,
increase value to the owner, reduce waste, and maximize efficiency through all phases of design,
fabrication, and construction.”
CCCE 2011
69
Shift the traditional view of design/construction
From this…. DESIGN CONSTRUCTION
To this …… DESIGN / CONSTRUCTIONCCCE 2011
70
Canadian Construction Documents Committee
CCDC 14 – 2000: Design-Build Stipulated Price ContractCCDC 5B – 2010: Construction Management Contract – For Services and Construction
American Institute of Architects
AIA C191 – 2009: Standard Form Multi-Party Agreement for Integrated project DeliveryAIA E202 – 2008: Building Information Modeling Protocol Exhibit
ConsensusDOCS
ConcencusDOCS 300: Standard Form Tri-Party Agreement for Integrated Project DeliveryConcensusDOCS 301: Building Information Modeling (BIM) Addendum
CCCE 2011
Manufacturers
• Most of the manufacturers have already put together the required LEED documentation
71CCCE 2011 71
Associations
72
• Canada Green Building Council (Provincial Chapters and EGB’s)– US Green Building Council (US)
• Construction Specifications Canada– Construction Specifications Institute (US)
• Canadian Construction Association (BCCASSN, ACA, SCA, WCA, etc)– Associated Builders & Contractors (US)
• Canadian Construction Documentation Committee• CanBIM• ASHRAE• Cascadia Green Building Council• CCPE (APEGBC, APEGGA, APEGS, APEGM, etc)
CCCE 2011 72
The Business Case: Cost benefits of green building:
Hard Numbers
• Operating costs decrease 8-9%• Building value increases 7.5%• Return on investment improves 6.6%• Occupancy ratio increases 3.5%• Rent ratio increases 3%In comparison to the average commercial building:
» Green buildings consume 26% less energy» Green buildings have 13% lower maintenance costs» Green buildings have 27% higher occupant
satisfaction» Green buildings have 33% less greenhouse gas
emissions
CCCE 2011 73
Resources & Thanks• Lloyd Sadd• Clark Builders• Canadian Green Building Council
(CaGBC)• BuildSmart• Manasc Isaac• Stantec• Cohos Evamy• EcoAmmo• Chandos• IBI Group• Construction Specifications Canada
(CSC)• USGBC• Arndt Tkalcic• ACI • Enermodal
And numerous other companies and people over the years!
74CCCE 2011 74
Thank YouCam Munro, LEED® AP, CTR
Senior Sustainable Innovation SpecialistClark Builders
Director / TreasurerAlberta Chapter, Canada Green Building Council