PREPARED FOR
1201 WESTERN AVENUE, SUITE 200SEATTLE, WASHINGTON 98101-2953T 206.624.7850 GLOSTEN.COM
INNOVATIVE MARINE SOLUTIONS
PREPARED CHECKED APPROVED
WSF MEDIUM VOLTAGE SHORE POWER
FEASIBILITY STUDY
SEATTLE, WASHINGTON WASHINGTON STATE FERRIES
8 February 2018FILE NO. 17122.01
REV. –
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
SAMANTHA J. GRISWOLD SEAN A. CAUGHLAN, PE DAVID W. LARSEN, PEPROJECT ENGINEER PROJECT MANAGER PRINCIPAL-IN-CHARGE
Digitally Signed 09-Feb-2018
Shore Power Technology Assessment at U.S. Ports
Parainen-Nauvo,
Electrifying Finnish ferry service ,
Automatic Plug-in System (APS) System Flyer,
Cavotec is changing the ferry industry!,
FerryCHARGER Charging World’s Seaside, asiflex.no, Faiveley Stemmann-Technik a Wabtec Company,
ABB to power world’s largest emission-free electric ferries and deliver first automated shore-side charging station,
HH Ferries – Zero Emission operation,
Water-Cooled Batteries Ensure Fast Charging of Electric Ferries Across Øresund,
Another world’s first for Wärtsilä – wireless charging for hybrid coastal ferry successfully tested,
Hybrid technology for new emerging markets – inductive charging,
The evolution of wireless charging,
Making the transition to shore power,
Automatic Plug-in System by Cavotec SA,
Cavotec extends its leadership in automated mooring and charging for E-Ferries,
First Polish built hybrid ferry delivered,
Nå lader batterifergen mer enn hun trenger,
World’s First All-Electric Battery-Powered Ferry,
Denne fergen er revolusjonerende. Men passasjerene merker det knapt,
The world’s first ferry with inductive charging,
Time-lapse: Constructing the Maritime Industry’s First Robotic Charging Arm,
WSF Terminal Design Manual,
Advanced Clean Transit Battery Cost for Heavy-Duty Electric Vehicles,
Lifecycle Cost Estimating Manual for the Federal Energy Management Program,
Energy Price Indices and Discount Factors for Life-Cycle Cost Analysis -2017,
Jumbo Mark II Class Hybrid System Integration Study
OPS “Onshore Power Supply”
Elektra Ampere Folgefonn
Elektra
PuyallupTacoma Wenatchee
(1) Includes predicted sea level rise
TacomaPuyallup
and
and
15 minutes
or
Ampere Elektra.
Aurora Tycho Brahe
Folgefonn
M/V Ampere,
Cavotec
Cavotec
ABB
Wärtsilä
Stemmann-Technik
(USD$/kWh) (USD$/kW) (USD$/month) (USD$/month) --
are
PREPARED FOR
1201 WESTERN AVENUE, SUITE 200SEATTLE, WASHINGTON 98101-2953T 206.624.7850 GLOSTEN.COM
INNOVATIVE MARINE SOLUTIONS
PREPARED CHECKED APPROVED
WSF MEDIUM VOLTAGE SHORE POWER
FEASIBILITY STUDY
SEATTLE, WASHINGTON WASHINGTON STATE FERRIES
8 February 2018FILE NO. 17122.01
REV. –
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
SAMANTHA J. GRISWOLD SEAN A. CAUGHLAN, PE DAVID W. LARSEN, PEPROJECT ENGINEER PROJECT MANAGER PRINCIPAL-IN-CHARGE
Digitally Signed 09-Feb-2018
PREPARED FOR
1201 WESTERN AVENUE, SUITE 200SEATTLE, WASHINGTON 98101-2953T 206.624.7850 GLOSTEN.COM
INNOVATIVE MARINE SOLUTIONS
PREPARED CHECKED APPROVED
WSF MEDIUM VOLTAGE SHORE POWER
FEASIBILITY STUDY
SEATTLE, WASHINGTON WASHINGTON STATE FERRIES
8 February 2018FILE NO. 17122.01
REV. –
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
SAMANTHA J. GRISWOLD SEAN A. CAUGHLAN, PE DAVID W. LARSEN, PEPROJECT ENGINEER PROJECT MANAGER PRINCIPAL-IN-CHARGE
Digitally Signed 09-Feb-2018
PREPARED FOR
1201 WESTERN AVENUE, SUITE 200SEATTLE, WASHINGTON 98101-2953T 206.624.7850 GLOSTEN.COM
INNOVATIVE MARINE SOLUTIONS
PREPARED CHECKED APPROVED
WSF MEDIUM VOLTAGE SHORE POWER
FEASIBILITY STUDY
SEATTLE, WASHINGTON WASHINGTON STATE FERRIES
8 February 2018FILE NO. 17122.01
REV. –
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
Digitally Signed 09-Feb-2018
SAMANTHA J. GRISWOLD SEAN A. CAUGHLAN, PE DAVID W. LARSEN, PEPROJECT ENGINEER PROJECT MANAGER PRINCIPAL-IN-CHARGE
Digitally Signed 09-Feb-2018
WSF Medium Voltage Shore PowerFeasibility Study
F- 9 February 2018Job 17122.01, Rev. -
WSF Medium Voltage Shore PowerFeasibility Study
F-3 9 February 2018Job 17122.01, Rev. -