WP 6 MILESTONES - CURRENT STATUS
Slide No. 4 © RESERVE 2016 All rights reserved.10/4/2017
No Milestone title LeadDue Date
(in months)Status
MS14
Identification of CSR aspects of current and future
energy systems including the energy systems’
infrastructures
CRE 6 Accomplished
MS15 Initial definition of ancillary services and network
codesCRE 18 Ongoing
MS16
Measuring and assessing environmental, societal
and economic consequences of energy system
changes for different stakeholder groups and
assessment of impacts for business models and
energy policies
RWTH 30 Not started yet
WP 6 DELIVERABLES – CURRENT STATUS
Slide No. 5 © RESERVE 2016 All rights reserved.10/4/2017
No Deliverable Title LeadDue Date
(in months)Status
D6.1Regulatory, governance and legal issues of the
transition towards 100% RES, V1CRE 18 Ongoing
D6.2Regulatory, governance and legal issues of the
transition towards 100% RES, V2CRE 36 Not started yet
D6.3 Definitions of ancillary services and network codes V1 CRE 24 Not started yet
D6.4 Definitions of ancillary services and network codes V2 CRE 36 Not started yet
D6.5CSR impact of business models and energy systems
for the transition towards 100% RES, V1RWTH 18 Ongoing
D6.6CSR impact of business models and energy systems
for the transition towards 100% RES, V2RWTH 36 Not started yet
D6.7
Recommendations to policy makers, enterprises
(business models) etc., for designing regulatory
frameworks and incentive systems
RWTH 36Not started yet
• Development of the Table of Contents
• Creation of a timetable for tracking the progress of the
deliverable elaboration up to completion
• Regular WP 6 Coordination Meetings (monthly) with
RESERVE partners
• Participation at EUSEW – Energy Day, organized by CRE in
Bucharest and Brussels (CRE, RWTH and TransE), May 31
• Stakeholders Meeting in Bucharest June 23rd, 2017
• European Utility Week 2017, 3-5 October Amsterdam
• Work on theoretical foundations - information sources and
content elaboration to be integrated in the deliverable:
• Review of current network codes
• New set of network codes from winter package
• Analyze other relevant R&D projects
• Gaps and barriers up to 100% RES
Slide No. 6 © RESERVE 2016 All rights reserved.
WORK PERFORMED ON D 6.1 - UP TO DATE
10/4/2017
• Second draft of the D6.1, integrating the following
information:
Slide No. 7 © RESERVE 2016 All rights reserved.
WORK PERFORMED ON D 6.1 - UP TO DATE (2)
10/4/2017
Slide No. 8 © RESERVE 2016 All rights reserved.
Current status of existing Network Codes and influence
10/4/2017
Network Code
family
Network Codes Status Impact level of RESERVE project on each code
Connection codes
Requirements for Generators Adopted strong
Demand Connection Adopted weak
High Voltage Direct Current Adopted significant
Market codes
Capacity Allocation and Congestion Management
Adopted significant
Forward Capacity Allocation Adopted weak
Electricity Balancing Pending strong
Operation codes
Emergency and Restoration Pending strong
System Operations Guidelines Adopted very strong
RE-SERVE Project Meeting - Bucharest, June 21-22 Slide No. 9 © RESERVE 2016 All rights reserved.10/4/2017
WP6
WP1 WP2 WP5
Regulatory Aspects• EU Policy
• Barriers for harmonization
• Current state of adoption
Technical issues• ENTSO-E
• IEEE, CIGRE …
• Eurelectric, …
Societal aspects• Market
• Acceptance/Awarness
• Energy independence
CREATING THE DELIVERABLES
D6.1
Slide No. 10 © RESERVE 2016 All rights reserved.
EVALUATION CRITERIA
10/4/2017
Slide No. 11 © RESERVE 2016 All rights reserved.
AN EXAMPLE OF EVALUATION RESULTS
10/4/2017
• Deadline for final inputs from WP1-5: 30 Nov 2017
• Create an evaluation team (30 Oct 2017), consisting of representatives of WP6 and WP1-
5
• 2nd draft version for review: 20 Jan 2018
• Final version of D6.1: 20 Feb 2018
Slide No. 12 © RESERVE 2016 All rights reserved.
D6.1 - NEXT STEPS
10/4/2017
Slide No. 13 © RESERVE 2016 All rights reserved.
D 6.5 PLANNING
10/4/2017
• Development of the table of contents
• Creation of a timetable for tracking the progress of the
deliverable elaboration up to completion
• Work on theoretical foundations
• Regular WP 6 coordination meetings (monthly / twice a month)
with RE-SERVE partners
• 1st CSR Workshop in Aachen (introduction to the different
aspects of CSR and their significance in the project / inputs
from stakeholders / detection of connecting factors for future
research)
• Milestone MS 15 delivered – Identification of CSR aspects of
current and future energy systems including the energy
systems’ infrastructure
Slide No. 14 © RESERVE 2016 All rights reserved.
WORK PERFORMED ON D 6.5
– UP TO DATE (1)
10/4/2017
• Information sources and content elaboration:
• Analysing important aspects and assumptions
• Studying deliverables of M12
• Defining important Sector Actors
• Research on Sustainable Business Models
• Participation at Stakeholders meeting in Bucharest: collecting
information on aspects about energy transition (survey)
• Structure of the D.6.5:
1. Introduction
2. Rationale and Methodology of Study
3. Societal, economical, and environmental Consequences of the Transition
towards 100% RES
4. Development of a Measurement System
5. New Business Models and Energy System Designs
6. First Version of CSR Guidelines
7. Conclusion
Slide No. 15 © RESERVE 2016 All rights reserved.
WORK PERFORMED ON D 6.5 – UP TO DATE (2)
10/4/2017
2. Expected work:
• For the next 3 months (Q1, 2nd year)
• RESERVE internal workshop to clarify goals and to harmonize/
correlate the expected results of the work packages – Cork, Oct. 10
• Identification of new stakeholders, scenarios overview and filling in
both deliverables (D6.1 and D6.5)
• Drafting D6.3 - Definitions of ancillary services and network codes
• For the next 6 months (Q2, 2nd year)
• Submission of the D6.1 - Regulatory, governance and legal issues of
the transition towards 100% RES
• CSR Workshop in Brussels on 22. Jan 2018
• 2nd draft of the D6.5 - CSR impact of business models and energy
systems for the transition towards 100% RES
Slide No. 16 © RESERVE 2016 All rights reserved.
CRITICAL ISSUES & SHORT TERM EXPECTED WORK
10/4/2017
1. Critical issue:
Inputs to come
from other
WPs