1

Workplace Organization “5S’s”

PDM Bridge Palatka, Florida

January 26-27-28-29, 2004

2

Team Members• Jeorge McCartney• Tim Bass • Ronald J. Kowalczyk Jr.• Bobby Alford Sr.• Mark Hull• George Young• Craig Reed Sr.• Will Meyers• Daniel Lakadawala• Arthur Ward Sr.• Ralph White

Prep Bay Area Statistics

• 7560 square feet of space (area)• 150 square feet of available space

(estimated)• 625 Red Tags written• 7 trash dumpsters filled and dumped• 1.5 Large roll off scrap dumpsters

filled

3

SORT

SHINE

SET IN ORDER

STANDARDIZE

SUSTAIN

The 5S System

Before

4

5

6

7

8

9

10

“RED-TAGING”

11

12

13

14

After

15

16

17

18

19

20

21

Things Completed

• Built a Story Board• Swept area• Two machines power washed• Prep Bay Office cleaned• Two tool boards completed, Three in process• Necessary tools and tooling identified for all machines and work

areas• Repairs needed by machine list completed• “To Do List” with tasks, time frames and responsibility completed • Identified scrap removed (most)• Identified trash removed• Almost all remaining “Red-Tagged” items consolidated• Proto-type work center/job placement sign developed• “Report Out Report” completed

22

“To Do List”

Workplace Organization Checklist