With the renovation work moving to the side of the ...

Post on 18-Dec-2021

3 views 0 download

Transcript of With the renovation work moving to the side of the ...

Parking

Construction Area

6

1

2

Pedestrian entry point

Bus Route

Kiss and Ride Route

Faculty & Bus Only

Entrance

With the renovation work moving to the side of the building facing Rolling Road, we will be changing our Kiss and Ride entrance and pattern when we resume school on January 30th. Vehicles will enter and leave via the entrance on Tuttle Road.

6 5

4 3

7

8 9

10

11

14

13

12

Faculty

Kiss & Ride

Entrance