WIND FARM PROJECT

Post on 22-Jan-2018

197 views 5 download

Transcript of WIND FARM PROJECT

WIND FARMS IN PAKISTAN

WE ARE HEADING TO THE NEW ERA

STARTED FROMWIND FARM PROJECT.

Turbine N100 2.5MW

DESCON WIND FARM PROJECT It is a 150 MW project (METRO, YUNUS, GUL AHMED) with 60 turbines. Each turbine has a capacity of 2.5 MW .

Equipment detail

Stationary equipment N100 R80 MT 5.1

Tower bottom section Height :-16.51 m / Weight :- 63.8 Ton

Tower Mid 0ne section Height :-20.86 m / Weight :- 58.2 Ton

Tower Mid Two section Height :-17.88 m / Weight :- 36.9 Ton

Tower Top section Height :-21.66 m / Weight :- 31.3 Ton

Rotary Equipment

Nacelle (N 100) Weight :- 53 Ton

Drive train Weight :- 41.5 Ton

Hub Weight :- 27.5 Ton

Blades Weight :- 9.8 x 3 = 29.4 Ton

STARTED FROM HERE

02

COMPLETED FOUNDATION WORK

NOW ITS TIME TO MOVE ON TO THE NEXT LEVELTRANSPORTATION OF THE EQUIPMENT

AT PORT QASIM

RECEIVED AT SITE

ERECTION OF PAKISTAN'S FIRST 2.5 MW WIND TURBINEN 100

ERECTION OF TOWER SECTION MID 0NE

ERECTION OF MID 2

ERECTION TOP SECTION

ERECTION OF NACELLE

ERECTION OF DRIVE TRAIN

ASSEMBLING OF STAR

STAR ERECTION

STAR ERECTION

STAR ERECTION

COMPLETED THE ERECTION FIRST TURBINE AT WTG # 17

STILL LONG WAY TO GO

Will be successful

INSHALLAH