Why Schools, Even Green Schools, Need Evaluations

Lindsey‐Steiner Elementary School, New Mexico Public SchoolsLindsey‐Steiner Elementary School, New Mexico Public Schools

Andre A. Larroque, AIA, CSI, CCCA, CCS, CEFPBuilding Standards CoordinatorNew Mexico Public School Facilities Authority

Marcel Harmon, PhD, PE, LEED-AP O+MSr. Associate / Applied AnthropologistM.E. GROUP

Nate Maniktala, LEED-AP BD+C, MBAPrincipal | Vice PresidentM.E. GROUP

• What a comprehensive post occupancy evaluation consists of.

• The financial costs, additional energy/water consumed and impacts on student/teacher performance that go unnoticed without conducting such evaluations.

• The unexpected impacts that well‐intended design concepts and ‘value engineering’ decisions can have on building occupants.

• The overall value of conducting POEs from the educational facility owner’s standpoint.

LEARNING OBJECTIVES

POE PURPOSENMPSFA POE Handbook Draft:

Key Purpose of the POE: “…to investigate, analyze, qualify, and report on the successes and weaknesses of the school and design for future replication or repair.”

POE SCOPENew Mexico Public Schools

Analyze Overall Process and Design Approach

Evaluate Effectiveness of Design Tools & Resources.

Evaluate Impact of Design on Owner/Users

Photo Rights: Patrick Coulie Photography

OCCUPANT SIDE METHODSMethods to Engage the Occupant

Photo Rights: robertoerosalesblog.com

Background Data

Facility Evaluations

Engage Building Populations

Analysis

Results / Recommendations

IMPLEMENTATIONSActions Taken by NMPSFA

• Improve statewide design & sustainability guidelines

• Improve state processes for project delivery & management

• Recommend remedies for specific building deficiencies

• Recommend behavioral changes to improve M&O

4500Person-Hours

28 MillionPerson-Hours

MULTI-PURPOSE CONTROL

Lindsey-Steiner Elementary

GLARE CONTROLV. Sue Cleveland High School

• Estimated quantitative impacts from lack of adequate daylighting control

Estimated Teacher/Staff Annual Productivity Delta Due to Lack of Adequate DaylightingControl ‐$169,000Estimated Impact of Glare on Student Math Scores ‐1.50%Estimated Impact of Glare on Student Reading Scores ‐0.90%

PRODUCTIVITY IMPACTS

DAYLIGHTING CONTROL

Hurley Elementary

Centennial High School

BUILDING SYSTEMSLindsey-Steiner Elementary

DOMINO ISSUESPhoto Rights: Van H. Gilbert Architect PCV. Sue Cleveland High School

SAFETY/SECURITY

Centennial High School

Centennial High School

Mesa Middle School

Lindsey-Steiner Elementary

V. Sue Cleveland High School

School’s proximity (red dashed rectangle) to train tracks (yellow line).

SURROUNDING COMMUNITY IMPACTS

Hurley Elementary

Solar tube diffuser

Solar tube dome

Hurley Elementary

ENERGY PERFORMANCE

32.328.7

59.0

33.0

54.0

0

10

20

30

40

50

60

70

Design (energymodel)

Actual 2012‐2011

Target FinderAverage

Peer GroupBaseline Low

Peer GroupBaseline High

EUI

EUI Comparisons – Hurley, NM

ENERGY PERFORMANCEEUI Comparisons – V. Sue Cleveland High School

32.0

41.0

66.059.0

64.0

0

10

20

30

40

50

60

70

Design(energymodel)

Actual 2012‐2011

Target FinderAverage

Peer GroupBaseline Low

Peer GroupBaseline High

Different factors provide the lens through which we perceive the world around us

Psychological

Physiological

Social/Cultural

PERSPECTIVE

Social/Cultural

GIVING THE OCCUPANTS A VOICE

Edward Gonzales Elementary

Don’t take away control of my environment

GIVING THE OCCUPANTS A VOICE

McKinley Elementary

Um… hello? I’m down here…

Hurley Elementary

GIVING THE OCCUPANTS

A VOICE

Ghost in the Machine

MULTIPLE MEANS OF ENGAGEMENT

Edward Gonzales Elementary

Unintended Consequences 

Interior Classroom Windows

Facilitate Impromptu Teacher Discussions

MULTIPLE MEANS OF ENGAGEMENT

Unintended Consequences 

V. Sue Cleveland High School

FLEXIBILITY

Furniture

Centennial High School

Mesa Middle School

IEQ – THERMAL COMFORT

Survey Responses• Teachers, Staff and Administrators: Spaces only thermally acceptable (ASHRAE definition) during the fall, but close for other seasons

• Students: Not thermally acceptable during any season, and no where near close.

WHY?

Social/Cultural Factors

V. Sue Cleveland High School

Differences in clothing variability between teachers and students

OCCUPANT INERTIA

McKinley Elementary

Ease of Blind Control Access

INCONSISTENT MESSAGES

Consistent Use of Lighting ControlsV. Sue Cleveland High School

Special Education Classroom •without pull down screen or smart board

General Classroom •with pull down screen and smart board

ISSUES OF INEQUITYTechnology

Lindsey-Steiner Elementary

SELF EXPRESSION / SENSE OF OWNERSHIP

Mesa Middle School

BUILDING AS EDUCATION TOOLAre you aware that your school achieved LEED?

68%7%

25%

Teachers/Staff StudentsParents/ Guardians

Neighbors/ Community

V. Sue Cleveland High School

28%

18%

54%45%

18%

37% 43%

18%

39%

Lindsey‐Steiner 

Elementary

Cielo AzulElementary

40%

13%

47%

21%

14%65%

18%

8%

74%

33%

22%

45%

17%

20%63%

33%

0%67%

‐ Yes

‐ No

‐ I don’t know what LEED is

KEY

Mesa Middle School Dashboard – not utilized

Hurley Elementary Solar Dashboard – not working

BUILDING AS EDUCATION TOOL

Lindsey‐Steiner Signage – POE kick‐started this effort

BUILDING AS EDUCATION TOOL

SUMMARYWhy Schools, Even Green Schools, Need Evaluations

V. Sue Cleveland HS

Lindsey Steiner ES

Hurley ES McKinley ESCielo Azul

ES

LEED Certified Gold No No GoldEUI 41.0 34.0 28.7 51.1 54.1

Outperformed Design Model

No Yes Yes Unknown No

Outperformed Peer Group

Yes Yes Yes No No

Teaching Job Performance Rating (1 – 5)

4.42 4.23 3.70 3.72 4.33

CONTACT INFORMATIONAnd Q&A

Andre A. Larroque, AIA, CSI, CCCA, CCS, CEFPBuilding Standards CoordinatorNew Mexico Public School Facilities Authority1312 Basehart Rd. SE, Suite 200Albuquerque, NM 87106-4365 Phone: 505-843-6272Email: alarroque@nmpsfa.org

Marcel Harmon, Ph.D., P.E., LEED-AP O+MAssociate / Applied AnthropologistM.E. GROUP, Inc.7400 College Blvd, #150Overland Park, KS 66210Phone: 913-951-8311Email: marcel.harmon@megroup.com

Nate Maniktala, LEED AP BD+C, MBAPrincipal / Vice PresidentM.E. GROUP, Inc.707 17th Street, Suite 3000Denver, CO 80202Phone: 303-382-1920Email: nate.maniktala@megroup.com