What are Complete Streets? · Street Design Policy and Guidelines • Intended to work alongside...

Post on 07-Aug-2020

0 views 0 download

Transcript of What are Complete Streets? · Street Design Policy and Guidelines • Intended to work alongside...

6/14/2016

1

North Central Texas Council of GovernmentComplete Streets Workshop

June 9 & 10, 2016

What are Complete Streets?

• Streets that are safe and comfortable for everyone: allages and abilities; motorists and bicyclists; pedestriansand wheelchair users; bus and train riders alike.

• Streets that are designed for all modes of travelincluding pedestrians, cyclists, public transit,automobiles, freight, emergency and private vehicles.

• To design the entire right of way to suit thesurrounding neighborhood character based on publicinput.

2

6/14/2016

2

What Complete Streets are not?

• One size fits all strategy for all streets;

• A design prescription, it’s flexible and dependent on the adjacent context;

• A mandate for immediate retrofit of all roads;

• A policy to repair potholes

3

4

Background 2006 ‐ forwardDallas! 

recommendation: Develop a “context sensitive street design manual”

2011‐2012 ‐ Council Strategic Action Plan objective: “Bring a citywide complete street vision to reality”

2011 ‐ Transportation and Community and System Preservation (TCSP) grant awarded to Dallas to develop a Complete Streets Design Manual

2011 ‐2013 – Community engagement, pilot and demonstration projects, and drafting of design manual

6/14/2016

3

Key Progress Milestones

• 2011 Bike Plan marked a significant shift in bike policy

• 2011 Federal grant awarded to develop complete streets policy

• 2012 Bond Program included targeted funding for Complete Street projects

• Since 2012 – Annual funding commitment to on‐street bike lane striping

5

6

Complete Streets Design ManualAdopted by City Council – January 27, 2016

JANUARY 27, 2016

6/14/2016

4

Complete StreetsWhy Do They Matter?

• Complete Streets help our streets become more livable and walkable;

• Complete Streets have potential to be Economic Development catalysts;

• Complete Streets have the opportunity to transform areas by providing connectivity.

7

Complete Streets: A Community Engagement Tool

8

6/14/2016

5

Complete Streets Project Implementation with 

Public Involvement

9

Community Workshops Eight interactive workshops held July through December, 2011

Over 600 participants citywide

10

6/14/2016

6

Knox Street Demonstration

Four‐day installation from Katy Trail to McKinney Ave

New design concept tested in real conditions with community feedback and technical evaluation

11

Complete Approach, Different OutcomesOne size/design does not fit all

Keller Springs Roundabout

McKinney Avenue 12

6/14/2016

7

Moving Forward with Implementation of Individual Projects

• Complete Streets Design Manual provides policy guidance to inform the design process

• Street improvement project funding prompts public engagement in identifying priorities, making trade‐offs and recommending a conceptual design

• Thoroughfare Plan Amendments may be necessary towards the end of the public engagement process to accommodate the conceptual design

13

Trade‐Offs: Greenville Avenue

• Indented parallel parking replaced angled parking to allow more space for outdoor patios

• Reduced traffic lanes enabled wider sidewalks and street furniture

• Neighborhood input on making the tradeoff decisions

Before

After 14

6/14/2016

8

New Policy DevelopmentComplete Streets Design Manual

• Street design policies and guidelines

• Multi‐disciplinary project planning and implementation process

• Complete Street Vision Map overlay

15

Street Design Policy and Guidelines

• Intended to work alongside the DallasThoroughfare Plan and the Dallas DevelopmentCode to provide the policy framework for streetdesign

• All new projects that impact the street right‐of‐way will consider the context of the roadway,community design priorities, the roadway’sfunctional classification, and the drainage needs

16

6/14/2016

9

Multi‐Disciplinary Planning and Implementation

17

Departments/Agencies Involved in Roadway Planning and Construction

‐ City Attorney’s Office

‐ Code Compliance

‐ Dallas Area Rapid Transit

‐ Dallas Police Department

‐ Delivery Companies and Valet Companies

‐ Dallas Water Utilities

‐ Dallas Fire Rescue

‐ Housing and Community Services

‐ Office of Economic Development

18

6/14/2016

10

Departments/Agencies Involved in Roadway Planning and Construction‐Continued

‐ Public Works ‐ Planning and Urban Design‐ Sanitation‐ Sustainable Development and Construction

• Arborist, Building Inspection, Current Planning, Engineering, Real Estate Division, Strategic Planning

‐ Street Services‐ Trinity Watershed Management‐ Utility Companies

• Atmos, Verizon, ATT, Oncor19

20

6/14/2016

11

*Minor Streets are not mapped 21

Complete Streets Typology

• Complete Streets Typology considers classifying streets based on their context and function and seeks to accommodate all modes.

• Complete Streets Typologies include:

1. Mixed‐Use Streets

2. Commercial Streets

3. Residential Streets

4. Industrial Streets

5. Parkways

22

6/14/2016

12

Mixed‐Use StreetsMixed‐Use streets serve a diverse mix of land use types, including Downtownand Main Streets.

Example: McKinney Avenue

Context Design Emphasis

• Design for slower speeds

• Design that supports high levels of walking, bicycling and transit

• Accommodates some on‐street parking

23

Commercial Streets

Context Design Emphasis

• Maintain automobile capacity

• Manage egress and ingress

• Design to serve faster movingvehicles

• Provide for pedestrian safety atintersections and throughlandscaping buffers betweenpedestrian and moving traffic

• Less use of on‐street parking

Commercial Streets serve mostly commercial areas with lower densities.

Examples: Preston Road at shopping centers and Harry Hines

24

6/14/2016

13

Residential Streets

Residential streets serve residential land uses as well as schools, churches, andbusinesses within residential neighborhoods.

Examples: Winnetka Avenue, Royal Lane from Inwood to Marsh

Context Design Emphasis

• Safety for pedestrians and bicyclists

• Design for slower speeds to encourage

walking and cycling

• Provide increased sidewalk buffering

from traffic through on‐street parking,

bicycle lanes, and landscaping

25

Industrial StreetsServe industrial corridors and are built to accommodate trucks and largervehicles.

Examples: Bonnie View Road and Singleton fromWestmoreland to Loop 12

Key Features

• Emphasis on managing large truck traffic

• Ability to safely mix industrial traffic with vehicular and pedestrian traffic

26