Week 13 Deliverables
Team Highlander
Modifications from last Mock-Up
• Lever assembly is offset from walker• Ski assembly is now solid• Levers swing upward
Working shots
Working Shots
Working Shots
Reasons why old design is better
• Less footprint area• Less parts• More aesthetically pleasing• Handle rotation in constrained by frame; less
complex• No drilling through frame required• Able to collapse
To do list for next week
• Contact REAR (Rehabilitation Engineering and Applied Research lab) about design
• Machine the pieces needed for welding (water jet); this includes all the pivot joints
• Begin machining the stopper legs using wood• Finalize CAD drawings