Waterproofing Expansion Joints at the New Meadowlands

Stadium

10/26/2011

2

• 82,566 seats• $1.6 Billion (1.6 thousand million)• Design/Build: SKANSKA/Ewing

Cole, 360 Architecture, Thornton Thomasetti

• 100% private financing• 50/50 Giants/Jets Ownership

• Sitework began April 2007• 630,000 sf footprint• 2,125 million sf building space

• First Event April 2010• First NFL game: September 12, 2010• Site of 2014 Superbowl

10/26/2011

3

• 4,196 LF EMSEAL SJS SYSTEM w/ 18” wide stainless cover plates• EJ on decks = 2,912.64 (1/2” SS)

• EJ in bowl = 1,283.76 (3/8” SS on treads; ¼” SS on risers)

• 2,149 LF of fire blanket• FB on decks = 1,154.56

• FB in bowl = 995.12

• 429 cubic feet (741,312 cu.ins) elastomeric nosing

• 390 gallons Sika epoxy

Expansion Joint Contract

• Caulking• Deck coating• Split-slab waterproofing• Vertical expansion joints• Field perimeter expansion joint

Related Work Not Included:

10/26/2011

4

• Started August 2008• Substantially Complete Dec. 2009• Punch list complete, June 2010

• Around $3 million in EJ material• Closed out at just under $6 million

or .375% of total construction cost

Expansion Joint Contract, contd…

Structural Expansion Joint Design:

10/26/2011

5

Joints go through everything:

Expansion Joint Design:

10/26/2011

6

Mockup:

Mockup: Measure and Inspect

10/26/2011

7

Mockup Complete:

Problems:

• Different steel contractors for bowl and concourses

• Mockup procedures not communicated to field

• Steel not level, not continuous, etc…

• Concrete not level

10/26/2011

8

10/26/2011

9

10/26/2011

10

10/26/2011

11

“Your stainless steel coverplates are rusting…”

10/26/2011

12

10/26/2011

13

10/26/2011

14

10/26/2011

15

Details by design, and omitted

10/26/2011

16

Fire blankets from below

10/26/2011

17

Concrete sub cuts through SJS-FP waterproofing

10/26/2011

18

Lots of meetings, lots of notes and “love” letters

10/26/2011

19

Punch list…

• 150 leaks at cracked precast

10/26/2011

20

Still friends…

10/26/2011

21

Happy owner, happy fans…