WASHINGTON STREET “COMPLETE STREET”...

Post on 04-Jul-2020

4 views 0 download

Transcript of WASHINGTON STREET “COMPLETE STREET”...

WASHINGTON STREET “COMPLETE STREET” REDESIGN 1 Public Meeting #3| 9.23.2014 HOBOKEN WASHINGTON STREET

WASHINGTON STREET

“COMPLETE STREET” REDESIGN

Public Meeting #3 – 09.23.2014

WASHINGTON STREET “COMPLETE STREET” REDESIGN 2 Public Meeting #3| 9.23.2014

Overview

WASHINGTON STREET “COMPLETE STREET” REDESIGN 3 Public Meeting #3| 9.23.2014

Where Are We Now?

WASHINGTON STREET “COMPLETE STREET” REDESIGN 4 Public Meeting #3| 9.23.2014

Tonight’s Focus

• Final Concept Plan

• Design Details

• Implementation, Phasing & Costs

WASHINGTON STREET “COMPLETE STREET” REDESIGN 5 Public Meeting #3| 9.23.2014

PREFERRED ALTERNATIVE

WASHINGTON STREET “COMPLETE STREET” REDESIGN 6 Public Meeting #3| 9.23.2014

WASHINGTON STREET “COMPLETE STREET” REDESIGN 7 Public Meeting #3| 9.23.2014

Thank you! Questions or Comments?

WASHINGTON STREET “COMPLETE STREET” REDESIGN 8 Public Meeting #3| 9.23.2014

- New traffic signals - Pedestrian countdown signal

heads - Signal heads over protected

bicycle lane - IMPROVED VISIBILITY &

TRAFFIC FLOW - INCREASED PEDESTRIAN SAFETY

WASHINGTON STREET “COMPLETE STREET” REDESIGN 9 Public Meeting #3| 9.23.2014

- New street trees

- New benches

- Updated street lighting

- New solar / smart trash receptacles

- “Better Streets mean Better Business”

- INCREASED AESTHETICS & GREEN INFRASTRUCTURE

- IMPROVED MAINTENANCE

WASHINGTON STREET “COMPLETE STREET” REDESIGN 10 Public Meeting #3| 9.23.2014

- Designated loading zones & times - Numbered parking spaces - IMPROVED OPERATIONS &

CIRCULATION

WASHINGTON STREET “COMPLETE STREET” REDESIGN 11 Public Meeting #3| 9.23.2014

- Protected bicycle lanes (cycle track)

- New customized bicycle racks - Bicycle parking facilities - INCREASED MOBILITY &

ACCESS

WASHINGTON STREET “COMPLETE STREET” REDESIGN 12 Public Meeting #3| 9.23.2014

- New high visibility crosswalks - New gray concrete sidewalks - Roadway resurfacing - IMPROVED VISIBILITY - INCREASED PEDESTRIAN SAFETY - IMPROVED PAVEMENT

CONDITIONS

WASHINGTON STREET “COMPLETE STREET” REDESIGN 13 Public Meeting #3| 9.23.2014

- Redesigned bus shelters - IMPROVED TRANSIT ACCESS

& ECONOMIC BENEFIT

WASHINGTON STREET “COMPLETE STREET” REDESIGN 14 Public Meeting #3| 9.23.2014

Purpose / Goals - Why Are We Here?

Make Washington Street into a

COMPLETE, GREEN &

SMART Street

WASHINGTON STREET “COMPLETE STREET” REDESIGN 15 Public Meeting #3| 9.23.2014

Recap Benefits

of Complete

Streets

Safety, Access & Mobility And beyond…. Public Health Environmental Quality & Sustainability Aesthetics & Livability Economic Vitality &Prosperity

WASHINGTON STREET “COMPLETE STREET” REDESIGN 16 Public Meeting #3| 9.23.2014

Purpose / Goals - Why Are We Here?

“Better Streets Mean Better Business”

(Economic Benefits of Sustainable Streets, NYCDOT)

• Higher Retail Sales • 49% increase in retail sales

on 9th Avenue vs. 3% increase on all of NYC – after installation of bike lanes and trees

• Other Economic Outcomes • Retail/office rents • Increased property values

WASHINGTON STREET “COMPLETE STREET” REDESIGN 17 Public Meeting #3| 9.23.2014

Related Projects

• Frank Sinatra Drive Redesign • Parking & Mobility Master Plan • Observer Highway Resurfacing Project • Redevelopment plans • Utility & Infrastructure Upgrades

WASHINGTON STREET “COMPLETE STREET” REDESIGN 18 Public Meeting #3| 9.23.2014

COMMERCIAL CHARACTER

(Downtown)

WASHINGTON STREET “COMPLETE STREET” REDESIGN 19 Public Meeting #3| 9.23.2014

RESIDENTIAL CHARACTER

(Uptown)

WASHINGTON STREET “COMPLETE STREET” REDESIGN 20 Public Meeting #3| 9.23.2014

Outreach Activities- Who Was Involved?

• Stakeholder Interviews

• Project Website http://www.hobokennj.org/washingtonstreet

• Online Community Survey

• Stakeholder Meetings

• Public Workshops

WASHINGTON STREET “COMPLETE STREET” REDESIGN 21 Public Meeting #3| 9.23.2014

Insert outreach photos Public meeting #1

WASHINGTON STREET “COMPLETE STREET” REDESIGN 22 Public Meeting #3| 9.23.2014

Insert outreach photos Public meeting #2

WASHINGTON STREET “COMPLETE STREET” REDESIGN 23 Public Meeting #3| 9.23.2014

Seniors meeting

WASHINGTON STREET “COMPLETE STREET” REDESIGN 24 Public Meeting #3| 9.23.2014

Survey Findings

24

WASHINGTON STREET “COMPLETE STREET” REDESIGN 25 Public Meeting #3| 9.23.2014

Final Concept Plan DESIGN ELEMENTS:

• Traffic Signals

• Crosswalks

• Protected bicycle lane

• Streetscape Elements

– Sidewalks

– Benches

– Bike Racks

– Bus Shelters

– Trash Receptacles

– Tree Pits

– Street Lights

• Curb Extensions

• Parking & loading

• Green Infrastructure & Stormwater Management

WASHINGTON STREET “COMPLETE STREET” REDESIGN 26 Public Meeting #3| 9.23.2014

Street Design Assumptions

• Curb line to remain in place

• Curbside and angled parking to be retained (minimal impact only)

• Costs will be a consideration

• Proposed facilities to comply with current Federal and State standards

WASHINGTON STREET “COMPLETE STREET” REDESIGN 27 Public Meeting #3| 9.23.2014

Final Concept Plan

Traffic Signals

Crosswalks

Cycle Track (Protected Bicycle Lane)

Sidewalks

Loading Parking

Tree Pits

Bus Shelters

Trash Receptacles Curb Extensions

Roadway Resurfacing & Restriping

WASHINGTON STREET “COMPLETE STREET” REDESIGN 28 Public Meeting #3| 9.23.2014

Final Concept Plan DOWNTOWN

UPTOWN

WASHINGTON STREET “COMPLETE STREET” REDESIGN 29 Public Meeting #3| 9.23.2014

Typical Block Downtown

WASHINGTON STREET “COMPLETE STREET” REDESIGN 30 Public Meeting #3| 9.23.2014

Typical Block Uptown

WASHINGTON STREET “COMPLETE STREET” REDESIGN 31 Public Meeting #3| 9.23.2014

Renderings

WASHINGTON STREET “COMPLETE STREET” REDESIGN 32 Public Meeting #3| 9.23.2014

DESIGN DETAILS

WASHINGTON STREET “COMPLETE STREET” REDESIGN 33 Public Meeting #3| 9.23.2014

New & Improved Traffic Signals

New Traffic Signals

Pedestrian Signal Heads

New Light Poles & Fixtures

WASHINGTON STREET “COMPLETE STREET” REDESIGN 34 Public Meeting #3| 9.23.2014

Redesigned Bus Shelters

WASHINGTON STREET “COMPLETE STREET” REDESIGN 35 Public Meeting #3| 9.23.2014

Reconfigured Parking & Loading

Back-in Angle

Parking

Designated Loading Spaces

w/ time restrictions

Parking - Value Pricing

WASHINGTON STREET “COMPLETE STREET” REDESIGN 36 Public Meeting #3| 9.23.2014

Designated Loading Zones and times

- 2 commercial loading zones per block - Loading zone timing: 6am to 2pm - After 2pm open for 30 minute

metered parking - 32 designated loading zones

WASHINGTON STREET “COMPLETE STREET” REDESIGN 37 Public Meeting #3| 9.23.2014

Concrete Curb Extensions

• Improve pedestrian visibility

• Reduce crossing distance

• Provide additional space for pedestrian amenities

• Concrete

26

WASHINGTON STREET “COMPLETE STREET” REDESIGN 38 Public Meeting #3| 9.23.2014

Concrete curb extensions

WASHINGTON STREET “COMPLETE STREET” REDESIGN 39 Public Meeting #3| 9.23.2014

Street Level Cycle Track also known as a

(Two-way Protected Bicycle Lane)

• at street level • physically separated from

motor vehicle traffic through a variety of methods including: • parked vehicles, • pavement markings, • flexposts, bollards, • curbs, plantings, etc.

WASHINGTON STREET “COMPLETE STREET” REDESIGN 40 Public Meeting #3| 9.23.2014

Downtown Bike Facility Two-way Protected Bicycle Lane

(2-Way Cycle Track)

WASHINGTON STREET “COMPLETE STREET” REDESIGN 41 Public Meeting #3| 9.23.2014

Downtown Bike Facility Two-way Protected Bicycle Lane

(2-Way Cycle Track)

N

WASHINGTON STREET “COMPLETE STREET” REDESIGN 42 Public Meeting #3| 9.23.2014

Uptown Bike Facility Protected Bicycle Lane

(1-Way Cycle Track and Shared Lane)

WASHINGTON STREET “COMPLETE STREET” REDESIGN 43 Public Meeting #3| 9.23.2014

Uptown Bike Facility Protected Bicycle Lane

(One-Way Cycle Track & Shared Lane)

N

WASHINGTON STREET “COMPLETE STREET” REDESIGN 44 Public Meeting #3| 9.23.2014

Transit Stop Bike Racks

WASHINGTON STREET “COMPLETE STREET” REDESIGN 45 Public Meeting #3| 9.23.2014

Customized Bike Racks

Custom Bike Hitch by DERO

- Encourage bicycling - Better for business - Preserves pedestrian right-of-way - 90 individual bike racks proposed - 180 bicycle parking spots - Opportunities for multi-bike parking / bicycling corrals

Multi-Bike Parking dimensions

WASHINGTON STREET “COMPLETE STREET” REDESIGN 46 Public Meeting #3| 9.23.2014

New Bike Racks Custom to Hoboken

WASHINGTON STREET “COMPLETE STREET” REDESIGN 47 Public Meeting #3| 9.23.2014

Streetscape Elements

• Curb Extensions

• Sidewalks

• Benches

• Bus Shelters

• Trash Receptacles

• Street Lights

• Street Trees

WASHINGTON STREET “COMPLETE STREET” REDESIGN 48 Public Meeting #3| 9.23.2014

Concrete Curb Extensions

Standard Green

Enhanced Seating Green + Enhanced Seating

Downtown

WASHINGTON STREET “COMPLETE STREET” REDESIGN 49 Public Meeting #3| 9.23.2014

Concrete Curb Extensions

Standard Green

Enhanced Seating Green + Enhanced Seating

Uptown

WASHINGTON STREET “COMPLETE STREET” REDESIGN 50 Public Meeting #3| 9.23.2014

New Sidewalks & Crosswalks

New Sidewalks - Gray concrete

- Replace old, worn and inconsistent sidewalks

- 5’ x 5’ squares grid - Reconstruct curb ramps

High Visibility Striped Crosswalks

- high skid-resistant - retroreflective

- preformed - white thermoplastic

WASHINGTON STREET “COMPLETE STREET” REDESIGN 51 Public Meeting #3| 9.23.2014

Sleek/Modern Benches

Powder coated aluminum

Backless

Shown: MultipliCITY by Landscape Forms ®

- Face sidewalks instead of the existing street-facing benches

- Multiple bench configuration options - Wood is elastic, soft and durable/replaceable

& available domestically - 8-16 per block

Shown: MultipliCITY by Landscape Forms ®

Black Locust

WASHINGTON STREET “COMPLETE STREET” REDESIGN 52 Public Meeting #3| 9.23.2014

Portal Style Bus Shelters

52

- Allows pedestrians to pass through - Opportunities for advertising, wi-fi,

wayfinding maps, etc. - Black powder coated steel /

aluminum frame - Opaque structural glass canopy

WASHINGTON STREET “COMPLETE STREET” REDESIGN 53 Public Meeting #3| 9.23.2014

Smart / Solar Trash Receptacles

WASHINGTON STREET “COMPLETE STREET” REDESIGN 54 Public Meeting #3| 9.23.2014

Updated & New Street Lights

- Maintain and reuse existing lighting poles - Integrate new 25’ arm-mounted fixtures - New pole top fixtures

WASHINGTON STREET “COMPLETE STREET” REDESIGN 55 Public Meeting #3| 9.23.2014

New Street Trees - Hoboken Shade Tree Commission

specifications - 4’ x 10’ tree pits - Iron tree pit guards

Photo: City of Hoboken Facebook

WASHINGTON STREET “COMPLETE STREET” REDESIGN 56 Public Meeting #3| 9.23.2014

Green Infrastructure Stormwater Delay Tree Pit

Curb Extension Planter

WASHINGTON STREET “COMPLETE STREET” REDESIGN 57 Public Meeting #3| 9.23.2014

Wayfinding

WASHINGTON STREET “COMPLETE STREET” REDESIGN 58 Public Meeting #3| 9.23.2014

Implementation & Phasing

• Pre-Design Phase

(3-4 months)

• Coordination with utility upgrades • PSE&G lighting coordination • Geotechnical Investigations • Stormwater / Drainage Analysis

• Final Survey / Preliminary & Final Engineering Design & Construction Plans

(6-8 months)

• Construction (12 months)

WASHINGTON STREET “COMPLETE STREET” REDESIGN 59 Public Meeting #3| 9.23.2014

Cost Estimate

TOTAL COST: Approx. $ 14 million

WASHINGTON STREET “COMPLETE STREET” REDESIGN 60 Public Meeting #3| 9.23.2014

Next Steps - Moving Forward • Evaluation of tonight’s feedback

• Present Final Concept Plan to Council

WASHINGTON STREET “COMPLETE STREET” REDESIGN 61 Public Meeting #3| 9.23.2014

Thank you!