Turnkey Contract for Renovation and Modernization of Distribution Sub-
stations and Installation of Distribution Line Equipment in Tripura
VOLUME III
SCHEDULES OF QUANTITIES FOR SUPPLY AND WORKS
TRIPURA STATE ELECTRICITY CORPORATION LIMITED
Item # Schedule Ref. Item Description Unit Qty
1.0 Sch A1 Sch - A1 : R&M of 33/11kV SS Nos 59
2.0 Sch A2 Sch - A2 : 33kV Bay Extensions Nos 7
3.0 Sch A3 Sch - A3 : Suuply and Installation of Autorecloser Nos 100
4.0 Sch A4 Sch -A4 : Supply and Installation of Sectionaliser Nos 200
5.0 Sch A5Sch -A5 : Supply and Installation of Fault Passage Indicator (Set
of 3 per Location)Set 2000
6.0 Sch A6 Sch -A6 : Supply and Installation of Ring Main Units Nos 100
7.0 Sch A7 Sch -A7 : Supply of Vehicle Mounted Cable Fault Locator Nos 1
SUMMARY BOQ
Turnkey Contract for Renovation and Modernization of Distribution Sub-stations and Installation of Distribution
Line Equipment in Tripura
= Subproject Details
Subproject
ReferenceSubstation Name/ Location Scope
SS-001 33/11 kV Rajnagar SS
SS-002 33/11 kV Hrishamukh SS
SS-003 33/11 kV Jolaibari SS
SS-004 33/11 kV Killa SS
SS-005 33/11 kV Mandai SS
SS-006 33/11 kV Takarjala SS
SS-007 33/11 kV Melagarh SS
SS-008 33/11 kV Manu SS
SS-009 33/11 kV ChaManu SS
SS-010 33/11 kV Kadamtalla SS
SS-011 33/11 kV Damchara SS
SS-012 33/11 kV Panisagar SS
SS-013 33/11 kV Rangrung SS
SS-014 33/11 kV Vangmung SS
SS-015 33/11 kV Digalbagh SS
SS-016 Circle No.I, Agartala
SS-017 Circle No.II, Agartala
SS-018 Khowai Circle
SS-019 Ambassa Circle
SS-020 Unakoti Circle
SS-021 Dharmanagar Circle
SS-022 Sepahijala Circle
SS-023 Gomati Circle
SS-024 Belonia Circle
SS-025 33/11 kV Digalbagh SS
SS-026 33/11 kV Charipara SS
SS-027 33/11 kV Adharsha Colony SS
SS-028 33/11 kV Stadium SS
SS-029 33/11 kV Collegetilla SS
SS-030 33/11 kV NRCC SS
SS-031 33/11 kV Tillabazar SS
SS-032 Gomati Electrical Circle
SS-033 Khowai Circle
SS-034 Unakoti Circle
SS-035 Sepahijala Circle
SS-036 Ambassa Circle
SS-037 Electrical Circle-II
SS-038 Belonia Circle
SS-039 Dharmanagar Circle
SS-040 Circle No.I, Agartala
SS-041 Circle No.II, Agartala
SS-042 Khowai Circle
SS-043 Ambassa Circle
SS-044 Unakoti Circle
SS-045 Dharmanagar Circle
SS-046 Sepahijala Circle
SS-047 Gomati Circle
SS-048 Belonia Circle
SS-049 ED-I& ED-CC, Agartala Sch -A6 : Supply and Installation of Ring Main Units
SS-050 ED-CC, Agartala Sch -A7 : Supply of Cable Fault Locatior and Test Van
Sch -A3 : Supply and Installation of Autorecloser and Sch -A4
: Supply and Installation of Sectionalizer / LBS
Sch -A5 : Fault Passage Indicator (Set of 3 per Location)
SUBPROJECT DETAILS
Turnkey Contract for Renovation and Modernization of Distribution Sub-stations and Installation of
Distribution Line Equipment in Tripura
Sch A-1 : R&M of 33/11kV SS
Sch A-2 : 33kV Bay Extensions
Sch-A1
SS-001 SS-002 SS-003 SS-004 SS-005 SS-006 SS-007 SS-008 SS-009 SS-010 SS-011 SS-012
Sl. Item Units33/11 kV
Rajnagar SS
33/11 kV
Hrishamukh
SS
33/11 kV
Jolaibari SS
33/11 kV
Killa SS
33/11 kV
Mandai SS
33/11 kV
Takarjala SS
33/11 kV
Melagarh SS
33/11 kV
Manu SS
33/11 kV
ChaManu SS
33/11 kV
Kadamtalla
SS
33/11 kV
Damchara
SS
33/11 kV
Panisagar SS
1.01 33 KV VCB ( 36KV,1250 A, 25KA) with G.I mounting structure Nos 0 0 0 1 2 0 1 1 1 1 0 0
1.02 33 KV Single Phase Multi Core C.T. 400-200/1-1 A ( for 33 kV Feeders) Nos 0 0 0 0 0 0 0 0 0 0 0 0
1.0333KV Single Phase PT outdoor type oil filled, 33KV/√3 - 110V /√3 ,class-0.2s,
P.05, 20 VANos 0 0 0 0 0 0 0 0 0 0 0 0
1.0433 KV Relay & Control Panel for 33 KV Feeder 110 V DC ( with numeric relay &
static TVM and communication port for SCADA)Nos 0 0 0 0 0 0 0 0 0 0 0 0
1.05 30 kV 10 KA LA station class with surge monitor & G.I mounting structure Nos. 0 0 0 3 6 0 3 3 3 3 0 0
1.06
11 KV Indoor 1250 A VCB Panel with 300-150/1-1 Amp CTs, all controls,
protections and metering including Static TVM (AMR Compatible) and
communication port for SCADA (for O/G feeders)
Nos. 5 5 6 3 4 3 5 1 2 6 1 1
1.07
11 KV Indoor 1250 A VCB Panel with 900-450/1-1-0.577 Amp CT, all controls,
protections and metering including static TVM (AMR Compatible) and
communication port for SCADA compatible (for Incomer)
Nos 2 2 3 2 1 1 2 1 2 1 5 1
1.0811 KV lightning Arrestor (9 kV, 10 kA) line type with GI Structure (for O/G
feeders)Nos 15 15 18 9 12 9 15 3 6 18 3 3
1.09Battery Bank, 110V DC, 240Ah, VRLA type with all accessories and wooden
mounting stand Set 0 0 0 1 1 0 1 1 1 1 0 0
1.10 Battery Charger, 230VAC, 10A dc with DCDB with all accessories Set 0 0 0 1 1 0 1 1 1 1 0 0
1.11Indoor Type heat shrink termination kit for XLPE, 3 core, 240 sqmm power
cable of grade 6.35/11Kv(E) Nos. 5 5 6 3 4 3 5 1 2 6 1 1
1.12Outdoor Type heat shrink termination kit for XLPE, 3 core, 240 sqmm power
cable of grade 6.35/11Kv(E) Nos. 5 5 6 3 4 3 5 1 2 6 1 1
1.13Indoor Type heat shrink termination kit for 1 core, 400 sqmm XLPE insulated
power cable of grade 6.35/11Kv(E) Nos. 6 6 9 6 3 3 6 3 6 3 15 3
1.14Outdoor Type heat shrink termination kit for Single core, 400 sqmm XLPE
insulated power cable of grade 6.35/11Kv(E) Nos. 6 6 9 6 3 3 6 3 6 3 15 3
1.15 11kV XLPE cable, 1 core, 400 Sq.mm. RM 100 100 150 100 50 50 100 50 100 50 250 50
1.16 11kV XLPE cable, 3 core, 240 Sq.mm. RM 250 250 300 150 200 150 250 50 100 300 50 50
1.17 1.1kV grade 2.5 Sqmm 16 core PVC Control Cable RM 0 0 0 0 0 0 0 0 0 0 0 0
1.18 1.1kV grade 2.5 Sqmm 7 core PVC Control Cable RM 0 0 0 0 0 0 0 0 0 0 0 0
1.19 1.1kV grade 2.5 Sqmm 4 core PVC Control Cable RM 0 0 0 0 0 0 0 0 0 0 0 0
1.20 1.1kV grade 2.5 Sqmm 2core PVC Control Cable RM 0 0 0 0 0 0 0 0 0 0 0 0
1.21 LT 10 Sqmm 1 core PVC Copper Cable RM 0 0 0 0 0 0 0 0 0 0 0 0
1.22 Mandatory Spares and Tools (Annexure MS) LS1.23 Other minor items for installation of above items (Sch-A1) LS1.24 Portable CO2 Fire Extinguisher, Class C , 3 kg capacity + Sand Bucket Nos 6 6 6 6 6 6 6 6 6 6 6 6
1.25 Wall Mounted First Aid Box (general purpose) for 1-10 employees Nos 1 1 1 1 1 1 1 1 1 1 1 1
1.26 Water purifier, RO+UV+UF+TDS Control, zero water wastage by re-circulation of
rejected water, Min 9 liters storage capacity, upto 20 LPH purification capacityNos 1 1 1 1 1 1 1 1 1 1 1 1
1.27 Foundation for 33 KV VCB (Sch-C1) Set 0 0 0 1 2 0 1 1 1 1 0 0
1.28 Foundation for 33 kV 10 KA LA (Sch-C4) Set 0 0 0 1 2 0 1 1 1 1 0 0
1.29 Foundation for 33 kV/ 110 V PT (Sch-C2) Set 0 0 0 0 0 0 0 0 0 0 0 0
CIVIL WORKS : Existing foundations to be replaced only if required as per existing condition and
weight of new equipment offered.
Substations
Sch-A1 : Schedule of meterials and works for R&M of 33/11kV SS
Sch-A1
SS-001 SS-002 SS-003 SS-004 SS-005 SS-006 SS-007 SS-008 SS-009 SS-010 SS-011 SS-012
Sl. Item Units33/11 kV
Rajnagar SS
33/11 kV
Hrishamukh
SS
33/11 kV
Jolaibari SS
33/11 kV
Killa SS
33/11 kV
Mandai SS
33/11 kV
Takarjala SS
33/11 kV
Melagarh SS
33/11 kV
Manu SS
33/11 kV
ChaManu SS
33/11 kV
Kadamtalla
SS
33/11 kV
Damchara
SS
33/11 kV
Panisagar SS
Substations
Sch-A1 : Schedule of meterials and works for R&M of 33/11kV SS
1.30 Foundation for 33 KV CT (Sch-C3) Set 0 0 0 0 0 0 0 0 0 0 0 0
1.31 Cable Trench (750mm x 800mm ) (Sch C-10) RM 0 0 0 50 100 0 50 50 50 50 0 0
Sch-A1
SS-001 SS-002 SS-003 SS-004 SS-005 SS-006 SS-007 SS-008 SS-009 SS-010 SS-011 SS-012
Sl. Item Units33/11 kV
Rajnagar SS
33/11 kV
Hrishamukh
SS
33/11 kV
Jolaibari SS
33/11 kV
Killa SS
33/11 kV
Mandai SS
33/11 kV
Takarjala SS
33/11 kV
Melagarh SS
33/11 kV
Manu SS
33/11 kV
ChaManu SS
33/11 kV
Kadamtalla
SS
33/11 kV
Damchara
SS
33/11 kV
Panisagar SS
Substations
Sch-A1 : Schedule of meterials and works for R&M of 33/11kV SS
ERECTION INCLUDING TESTING AND COMMISIONING
1.323 X 33 kV LA with structures including all accessories for terminal connections,
earthing etc. complete. (Replacement)Set 0 0 0 1 2 0 1 1 1 1 0 0
1.33
33kV, 1250 A, 25kA outdoor VCB with structures, DC supply, control wiring,
surge monitor including all accessories for terminal connections, earthing, etc.
complete. (Replacement)
Nos 0 0 0 1 2 0 1 1 1 1 0 0
1.34
3 x 33kV single phase current transformers 400-200/1/1A (for feeders) with
structures, control, wiring including all accesores for terminal connections,
earthing, etc, complete. (Replacement)
Set 0 0 0 0 0 0 0 0 0 0 0 0
1.35
3 x 33kV single phase potential transformers with structures, control wiring
including all accessories for terminal connections, earthing, etc. complete.
(Replacement)
Set 0 0 0 0 0 0 0 0 0 0 0 0
1.3633 kV C&R panel for feeders with DC supply, control cabling including all
accesores complete. (Replacement)Nos 0 0 0 0 0 0 0 0 0 0 0 0
1.37
11kV VCB panel for outgoing feeder complete - For replacment / Extension in
existing 11 kV feeder panel incuding fitting and fixing, cable terminations, bus
extensions, adopter panel (if required) and including all accessories complete.
Nos 5 5 6 3 4 3 5 1 2 6 1 1
1.38
11kV VCB panel for incomer feeder complete - For replacment / Extension in
existing 11 kV feeder panel including fitting and fixing, cable terminations, bus
extensions and adopter panel (if required) and inlcuding all accessories
complete.
Nos 2 2 3 2 1 1 2 1 2 1 5 1
1.39
3 x 11 KV lightning Arrestor (9 kV, 10 kA) line type with GI Structure (for O/G
feeders) - Fitting and fixing in existing terminal pole structures including cable
terminations, erathing etc.complete
Set 5 5 6 3 4 3 5 1 2 6 1 1
1.40Battery Bank (240 AH, 110 V DC) with mounting stand, cabling including all
accessories complete.Set 0 0 0 1 1 0 1 1 1 1 0 0
1.41Battery Charger with DCDB incluing wiring, fiiting, fixing and including all
accessories complete.Set 0 0 0 1 1 0 1 1 1 1 0 0
1.42Installation/fixing of other supply items including Fire Exinguisher, First Aid box and
Water Purifier, etc.LS
Laying, drawing, termination of 11kV & LT power and control cables ;
1.43 11kV XLPE cable, 1 core, 400 Sq.mm. RM 100 100 150 100 50 50 100 50 100 50 250 50
1.44 11kV XLPE cable, 3 core, 240 Sq.mm. RM 250 250 300 150 200 150 250 50 100 300 50 50
1.45 1.1kV grade 2.5 Sqmm 16 core PVC Control Cable RM 0 0 0 0 0 0 0 0 0 0 0 0
1.46 1.1kV grade 2.5 Sqmm 7 core PVC Control Cable RM 0 0 0 0 0 0 0 0 0 0 0 0
1.47 1.1kV grade 2.5 Sqmm 4 core PVC Control Cable RM 0 0 0 0 0 0 0 0 0 0 0 0
1.48 1.1kV grade 2.5 Sqmm 2core PVC Control Cable RM 0 0 0 0 0 0 0 0 0 0 0 0
1.49 LT 10 Sqmm 1 core PVC Copper Cable RM 0 0 0 0 0 0 0 0 0 0 0 0
Dismantling
1.50
Dismantling and removal of all required equipment / structures / foundations
(if required)/ cables etc. for replacement works and handing over removed
equipment and accesories at site or to designated TSECL warehouse
LS
Sch-A1
Sl. Item Units
1.01 33 KV VCB ( 36KV,1250 A, 25KA) with G.I mounting structure Nos
1.02 33 KV Single Phase Multi Core C.T. 400-200/1-1 A ( for 33 kV Feeders) Nos
1.0333KV Single Phase PT outdoor type oil filled, 33KV/√3 - 110V /√3 ,class-0.2s,
P.05, 20 VANos
1.0433 KV Relay & Control Panel for 33 KV Feeder 110 V DC ( with numeric relay &
static TVM and communication port for SCADA)Nos
1.05 30 kV 10 KA LA station class with surge monitor & G.I mounting structure Nos.
1.06
11 KV Indoor 1250 A VCB Panel with 300-150/1-1 Amp CTs, all controls,
protections and metering including Static TVM (AMR Compatible) and
communication port for SCADA (for O/G feeders)
Nos.
1.07
11 KV Indoor 1250 A VCB Panel with 900-450/1-1-0.577 Amp CT, all controls,
protections and metering including static TVM (AMR Compatible) and
communication port for SCADA compatible (for Incomer)
Nos
1.0811 KV lightning Arrestor (9 kV, 10 kA) line type with GI Structure (for O/G
feeders)Nos
1.09Battery Bank, 110V DC, 240Ah, VRLA type with all accessories and wooden
mounting stand Set
1.10 Battery Charger, 230VAC, 10A dc with DCDB with all accessories Set
1.11Indoor Type heat shrink termination kit for XLPE, 3 core, 240 sqmm power
cable of grade 6.35/11Kv(E) Nos.
1.12Outdoor Type heat shrink termination kit for XLPE, 3 core, 240 sqmm power
cable of grade 6.35/11Kv(E) Nos.
1.13Indoor Type heat shrink termination kit for 1 core, 400 sqmm XLPE insulated
power cable of grade 6.35/11Kv(E) Nos.
1.14Outdoor Type heat shrink termination kit for Single core, 400 sqmm XLPE
insulated power cable of grade 6.35/11Kv(E) Nos.
1.15 11kV XLPE cable, 1 core, 400 Sq.mm. RM1.16 11kV XLPE cable, 3 core, 240 Sq.mm. RM1.17 1.1kV grade 2.5 Sqmm 16 core PVC Control Cable RM1.18 1.1kV grade 2.5 Sqmm 7 core PVC Control Cable RM1.19 1.1kV grade 2.5 Sqmm 4 core PVC Control Cable RM1.20 1.1kV grade 2.5 Sqmm 2core PVC Control Cable RM
1.21 LT 10 Sqmm 1 core PVC Copper Cable RM1.22 Mandatory Spares and Tools (Annexure MS) LS1.23 Other minor items for installation of above items (Sch-A1) LS1.24 Portable CO2 Fire Extinguisher, Class C , 3 kg capacity + Sand Bucket Nos1.25 Wall Mounted First Aid Box (general purpose) for 1-10 employees Nos
1.26 Water purifier, RO+UV+UF+TDS Control, zero water wastage by re-circulation of
rejected water, Min 9 liters storage capacity, upto 20 LPH purification capacityNos
1.27 Foundation for 33 KV VCB (Sch-C1) Set1.28 Foundation for 33 kV 10 KA LA (Sch-C4) Set1.29 Foundation for 33 kV/ 110 V PT (Sch-C2) Set
CIVIL WORKS : Existing foundations to be replaced only if required as per existing condition and
weight of new equipment offered.
Sch-A1 : Schedule of meterials and works for R&M of 33/11kV SS SS-013 SS-014 SS-015 SS-016 SS-017 SS-018 SS-019 SS-020 SS-021 SS-022 SS-023 SS-024
33/11 kV
Rangrung
SS
33/11 kV
Vangmung
SS
33/11 kV
Digalbagh
SS
Circle No.I,
Agartala
Circle No.II,
Agartala
Khowai
Circle
Ambassa
Circle
Unakoti
Circle
Dharmanag
ar Circle
Sepahijala
Circle
Gomati
Circle
Belonia
Circle
1 0 1 2 6 5 3 8 8 5 5 8 59
0 0 0 18
0 0 0 9
0 0 0 6
3 0 3 6 18 15 9 24 24 15 15 24 177
4 2 0 0 0 0 0 0 0 0 0 0 48
1 3 0 0 0 0 0 0 0 0 0 0 27
12 6 0 0 0 0 0 0 0 0 0 0 144
1 0 1 0 0 0 0 0 0 0 0 0 8
1 0 1 0 0 0 0 0 0 0 0 0 8
4 2 0 0 0 0 0 0 0 0 0 0 48
4 2 0 0 0 0 0 0 0 0 0 0 48
3 9 0 0 0 0 0 0 0 0 0 0 81
3 9 0 0 0 0 0 0 0 0 0 0 81
50 150 0 0 0 0 0 0 0 0 0 0 1350
200 100 0 0 0 0 0 0 0 0 0 0 2400
0 0 0 400 1200 1000 600 1600 1600 1000 1000 1600 10000
0 0 0 400 1200 1000 600 1600 1600 1000 1000 1600 10000
0 0 0 400 1200 1000 600 1600 1600 1000 1000 1600 10000
0 0 0 400 1200 1000 600 1600 1600 1000 1000 1600 10000
0 0 0 200 600 500 300 800 800 500 500 800 5000
1
1
6 6 6 150
1 1 1 25
1 1 1 25
1 0 1 2 6 5 3 8 8 5 5 8 59
1 0 1 2 6 5 3 8 8 5 5 8 59
0 0 0 3
10
10
Total Qty.
6
1
Substations Distribution Circles : Additional allocations for other SS to be finalised upon survey.
18
9
3
6
60
Sch-A1
Sl. Item Units
1.01 33 KV VCB ( 36KV,1250 A, 25KA) with G.I mounting structure Nos
Sch-A1 : Schedule of meterials and works for R&M of 33/11kV SS
1.30 Foundation for 33 KV CT (Sch-C3) Set1.31 Cable Trench (750mm x 800mm ) (Sch C-10) RM
SS-013 SS-014 SS-015 SS-016 SS-017 SS-018 SS-019 SS-020 SS-021 SS-022 SS-023 SS-024
33/11 kV
Rangrung
SS
33/11 kV
Vangmung
SS
33/11 kV
Digalbagh
SS
Circle No.I,
Agartala
Circle No.II,
Agartala
Khowai
Circle
Ambassa
Circle
Unakoti
Circle
Dharmanag
ar Circle
Sepahijala
Circle
Gomati
Circle
Belonia
Circle
Total Qty.
Substations Distribution Circles : Additional allocations for other SS to be finalised upon survey.
0 0 0 6
50 0 50 100 300 250 150 400 400 250 250 400 2950
6
Sch-A1
Sl. Item Units
1.01 33 KV VCB ( 36KV,1250 A, 25KA) with G.I mounting structure Nos
Sch-A1 : Schedule of meterials and works for R&M of 33/11kV SS
ERECTION INCLUDING TESTING AND COMMISIONING
1.323 X 33 kV LA with structures including all accessories for terminal connections,
earthing etc. complete. (Replacement)Set
1.33
33kV, 1250 A, 25kA outdoor VCB with structures, DC supply, control wiring,
surge monitor including all accessories for terminal connections, earthing, etc.
complete. (Replacement)
Nos
1.34
3 x 33kV single phase current transformers 400-200/1/1A (for feeders) with
structures, control, wiring including all accesores for terminal connections,
earthing, etc, complete. (Replacement)
Set
1.35
3 x 33kV single phase potential transformers with structures, control wiring
including all accessories for terminal connections, earthing, etc. complete.
(Replacement)
Set
1.3633 kV C&R panel for feeders with DC supply, control cabling including all
accesores complete. (Replacement)Nos
1.37
11kV VCB panel for outgoing feeder complete - For replacment / Extension in
existing 11 kV feeder panel incuding fitting and fixing, cable terminations, bus
extensions, adopter panel (if required) and including all accessories complete.
Nos
1.38
11kV VCB panel for incomer feeder complete - For replacment / Extension in
existing 11 kV feeder panel including fitting and fixing, cable terminations, bus
extensions and adopter panel (if required) and inlcuding all accessories
complete.
Nos
1.39
3 x 11 KV lightning Arrestor (9 kV, 10 kA) line type with GI Structure (for O/G
feeders) - Fitting and fixing in existing terminal pole structures including cable
terminations, erathing etc.complete
Set
1.40Battery Bank (240 AH, 110 V DC) with mounting stand, cabling including all
accessories complete.Set
1.41Battery Charger with DCDB incluing wiring, fiiting, fixing and including all
accessories complete.Set
1.42Installation/fixing of other supply items including Fire Exinguisher, First Aid box and
Water Purifier, etc.LS
Laying, drawing, termination of 11kV & LT power and control cables ;
1.43 11kV XLPE cable, 1 core, 400 Sq.mm. RM1.44 11kV XLPE cable, 3 core, 240 Sq.mm. RM1.45 1.1kV grade 2.5 Sqmm 16 core PVC Control Cable RM1.46 1.1kV grade 2.5 Sqmm 7 core PVC Control Cable RM1.47 1.1kV grade 2.5 Sqmm 4 core PVC Control Cable RM1.48 1.1kV grade 2.5 Sqmm 2core PVC Control Cable RM1.49 LT 10 Sqmm 1 core PVC Copper Cable RM
Dismantling
1.50
Dismantling and removal of all required equipment / structures / foundations
(if required)/ cables etc. for replacement works and handing over removed
equipment and accesories at site or to designated TSECL warehouse
LS
SS-013 SS-014 SS-015 SS-016 SS-017 SS-018 SS-019 SS-020 SS-021 SS-022 SS-023 SS-024
33/11 kV
Rangrung
SS
33/11 kV
Vangmung
SS
33/11 kV
Digalbagh
SS
Circle No.I,
Agartala
Circle No.II,
Agartala
Khowai
Circle
Ambassa
Circle
Unakoti
Circle
Dharmanag
ar Circle
Sepahijala
Circle
Gomati
Circle
Belonia
Circle
Total Qty.
Substations Distribution Circles : Additional allocations for other SS to be finalised upon survey.
1 0 1 2 6 5 Dharmanagar Circle 8 8 5 5 8 56
1 0 1 2 6 5 3 8 8 5 5 8 59
0 0 0 6
0 0 0 3
0 0 0 6
4 2 0 0 0 0 0 0 0 0 0 0 48
1 3 0 0 0 0 0 0 0 0 0 0 27
4 2 0 0 0 0 0 0 0 0 0 0 48
1 0 1 0 0 0 0 0 0 0 0 0 8
1 0 1 0 0 0 0 0 0 0 0 0 8
1
50 150 0 0 0 0 0 0 0 0 0 0 1350
200 100 0 0 0 0 0 0 0 0 0 0 2400
0 0 0 400 1200 1000 600 1600 1600 1000 1000 1600 10000
0 0 0 400 1200 1000 600 1600 1600 1000 1000 1600 10000
0 0 0 400 1200 1000 600 1600 1600 1000 1000 1600 10000
0 0 0 400 1200 1000 600 1600 1600 1000 1000 1600 10000
0 0 0 200 600 500 300 800 800 500 500 800 5000
1
6
6
3
Sch-A2
SS-025 SS-026 SS-027 SS-028 SS-029 SS-030 SS-031
Sl. Item Units33/11 kV
Digalbagh SS
33/11 kV
Charipara SS
33/11 kV
Adharsha
Colony SS
33/11 kV
Stadium SS
33/11 kV
Collegetilla
SS
33/11 kV
NRCC SS
33/11 kV
Tillabazar SS
1.01 33 KV VCB ( 36KV,1250 A, 25KA) with G.I mounting structure Nos 1 1 1 1 1 1 1 7
1.0233 KV Single Phase Multi Core C.T. 400-200/1-1 A with mounting structure ( for
Feeders)Nos 3 3 3 3 3 3 3 21
1.0333KV Single Phase PT outdoor type oil filled, 33KV/√3 - 110V /√3 ,class-0.2s,
P.05, 20 VA with mountring structureNos 3 3 3 3 3 3 3 21
1.0433 KV , 800 Amp Isolators triple pole single throw manually operated without
earth Blade/switch including mounting & operating mechanismSet 1 1 1 1 1 1 1 7
1.0533 KV , 800 Amp Isolators triple pole single throw manually operated with
earth Blade/switch including mounting & operating mechanismSet 1 1 1 1 1 1 1 7
1.06 30 kV 10 KA LA station class with surge monitor & G.I mounting structure Nos 3 3 3 3 3 3 3 21
1.07 33 KV G.O./D.O. fuse unit 200 A/400 A with mounting structure Set 1 1 1 1 1 1 1 7
1.0833 KV Relay & Control Panel for 33 KV Feeder 110 V DC ( with numeric relay &
static TVM and communication port for SCADA)Nos 1 1 1 1 1 1 1 7
1.09 1.1kV grade 2.5 Sqmm 16 core Control Cable Mtr 200 200 200 200 200 200 200 1400
1.10 1.1kV grade 2.5 Sqmm 4 core Control Cable Mtr 200 200 200 200 200 200 200 1400
1.11 LT 10 Sqmm 1 core PVC Copper Cable Mtr. 150 150 150 150 150 150 150 1050
1.12Switchyard Support Structure (G.I. lattice structure) with fdn bolts including
Nut & boltsMT 8 8 8 8 8 8 8 56
1.13 UPG Clamp for wolf conductor Nos 12 12 12 12 12 12 12 84
1.14 ACSR Wolf Conductor Mtr 200 200 200 200 200 200 200 1400
1.15 33 kV Disc Insulator 70 KN Nos 36 36 36 36 36 36 36 252
1.16 Hardware fittings with Tension Clamp for wolf Nos 12 12 12 12 12 12 12 84
1.17 Earth Mat Materials (Annexure ES) SqM 100 100 100 100 100 100 100 700
1.18 Other minor items for installation of above items (Sch A2) LS 1
Civil Works
1.19 Foundation for 33 KV VCB (Sch-C1) Set 1 1 1 1 1 1 1 7
1.20 Foundation for 33 kV/ 110 volt PT (Sch-C2) Set 1 1 1 1 1 1 1 7
1.21 Foundation for 33 KV CT (Sch-C3) Set 1 1 1 1 1 1 1 7
1.22 Foundation for 33 kV 10 KA LA (Sch-C4) Set 1 1 1 1 1 1 1 7
1.23 Foundation for 33 KV Isolator (Sch-C5) Set 2 2 2 2 2 2 2 14
1.24 Foundation for Tower Structure (Sch-C7)Set Per
tower7 7 7 7 7 7 7 49
1.25 Site Levelling (Sch-C9) cum 500 500 500 500 500 500 500 3500
1.26 Switchyard PCC & Gravelling (Sch-C6) cum 500 500 500 500 500 500 500 3500
1.27 Cable trench (450mm x 500mm ) (Sch C-11) LM 30 30 30 30 30 30 30 210
ERECTION INCLUDING TESTING AND COMMISIONING
1.28 Survey, design and preperation of layout drawings for 33 kV Feeder Bays LS 1
1.29 Earth Mat Installation sqm 100 100 100 100 100 100 100 700
1.303 X 33 kV LA with structures including all accessories for terminal connections,
earthing etc. complete.Set 1 1 1 1 1 1 1 7
Sch - A2 : 33 kV Bay Extensions
Total Qty.
Sch-A2
SS-025 SS-026 SS-027 SS-028 SS-029 SS-030 SS-031
Sl. Item Units33/11 kV
Digalbagh SS
33/11 kV
Charipara SS
33/11 kV
Adharsha
Colony SS
33/11 kV
Stadium SS
33/11 kV
Collegetilla
SS
33/11 kV
NRCC SS
33/11 kV
Tillabazar SS
Sch - A2 : 33 kV Bay Extensions
Total Qty.
1.3133 kV Isolators, 800 A with structures including all accessories for terminal
connections, earthing etc. complete.Nos 2 2 2 2 2 2 2 14
1.32
3 x 33 kV single phase current transformers 400-200/1/1A (for feeders) with
structures, control, wiring including all accesores for terminal connections,
earthing, etc. complete.
Set 1 1 1 1 1 1 1 7
1.333 x 33kV single phase potential transformers with structures, control wiring
including all accessories for terminal connections, earthing, etc. completeSet 1 1 1 1 1 1 1 7
1.34
33kV, 1250 A, 25kA outdoor VCB with structures, DC supply, control wiring,
surge monitor including all accessories for terminal connections, earthing, etc.
complete.
Nos 1 1 1 1 1 1 1 7
1.35
33 KV G.O./D.O. fuse unit 200 A/400 A with mounting structure including
fitting and fixing on existing terminal pole structure and all accessories for
terminal connections, earthing, etc. complete.
Nos 1 1 1 1 1 1 1 7
1.3633 kV C&R panel for feeders with DC supply, control cabling including all
accesores complete..Nos 1 1 1 1 1 1 1 7
1.37Erection of G.I Lattice structure for 33 kV bay including all materials and PCC
grouting MT 8 8 8 8 8 8 8 56
1.38Fitting and fixing and stringing of 33kV busbar with fitting of disc/post
insulators, all types of hardwares, all types of clamps etc. complete.Lot 1 1 1 1 1 1 1 7
Sch-A3
SS-032 SS-033 SS-034 SS-035 SS-036 SS-037 SS-038 SS-039
Sl. Item UnitsGomati
Circle
Khowai
Circle
Unakoti
Circle
Sepahijala
Circle
Ambassa
Circle
Electrical
Circle-II
Belonia
Circle
Dharmanagar
Circle
1.01
Three Phase outdoor 12 kV pole mounted Automatic Circuit Recloser (Auto-
Recloser), 630 A, 12.5 KA, self powered through auxiliary supply VT or by other
means complete with Controller Unit, battery and charging system, software,
Auxilliary Supply VT, with pole mounting brackets, surge arrestor brackets, B&N
and connectors.
Nos 20 15 3 15 4 16 17 10 100
1.0211 kV Lightning Arrestor with earth lead disconnector (Distribution Class), 9 kV,
10 KA, mounting brackets, earth bar and B&NNos 120 90 18 90 24 96 102 60 600
1.03 UPG Clamp for ACSR conductor (50-100 Sqmm) Nos 120 90 18 90 24 96 102 60 600
1.04 G.I. Earth pipe, 40mm dia x 1mt. Long with earth conductor clamp Nos. 60 45 9 45 12 48 51 30 300
1.05 G.I. Wire 8 SWG for earthing Kg 180 135 27 135 36 144 153 90 900
MANDATORY SPARE PARTS
1.06 Control Unit for Auto-Recloser Nos 1 1 0 1 0 1 1 0 5
1.07 Auxilliary Supply VT with a pole mounting bracket Nos 1 1 0 1 0 1 1 0 5
ERECTION INCLUDING TESTING AND COMMISIONING
1.08
Installation of Auto-Recloser, Control Unit and all accessories on existing poles
including all settings for protections and proper coordination with other
upstream and downstrem protection devices
Nos 20 15 3 15 4 16 17 10 100
1.09Installation of lightning arrestors on both source and load sides of auto-recloser
incluing earthing using GI wire and earth pipes. (set of 3 Nos)Set 40 30 6 30 8 32 34 20 200
1.10 Earthing of auto-recloser body / structures using GI wire and earth pipes. Set 20 15 3 15 4 16 17 10 100
1.11 Provision of training on auto-recloser and sectionalizer / LBS as per specification LS 1
Sch -A3 : Supply and Installation of Autorecloser
Total Qty.
Sch-A4
SS-032 SS-033 SS-034 SS-035 SS-036 SS-037 SS-038 SS-039
Sl. Item UnitsGomati
Circle
Khowai
Circle
Unakoti
Circle
Sepahijala
Circle
Ambassa
Circle
Electrical
Circle-II
Belonia
Circle
Dharmanagar
Circle
1.01
Three Phase outdoor 12 kV pole mounted Automatic Sectionalizer / LBS, 630 A,
12.5 KA, self powered through auxiliary supply VT or by other means complete
with Controller Unit, battery and charging system, software, Auxilliary Supply
VT, with pole mounting brackets, surge arrestor brackets, B&N and connectors.
Nos 38 32 6 30 7 32 34 21 200
1.0211 kV Lightning Arrestor with earth lead disconnector (Distribution Class), 9 kV,
10 KA, mounting brackets, earth bar and B&NNos 228 192 36 180 42 192 204 126 1200
1.03 UPG Clamp for ACSR conductor (50-100 Sqmm) Nos 228 192 36 180 42 192 204 126 1200
1.04 G.I. Earth pipe, 40mm dia x 1mt. Long with earth conductor clamp Nos. 114 96 18 90 21 96 102 63 600
1.05 G.I. Wire 8 SWG for earthing Kg 342 288 54 270 63 288 306 189 1800
MANDATORY SPARE PARTS
1.06 Control Unit for Sectionalizer / LBS Nos 2 1 1 1 1 1 2 1 10
1.07 Auxilliary Supply VT with a pole mounting bracket Nos 2 1 1 1 1 1 2 1 10
ERECTION INCLUDING TESTING AND COMMISIONING
1.08
Installation of Sectionalizer, Control Unit and all accessories on existing poles
including all settings for fault sensing and proper coordination with upstream
Auto-recloser.
Nos 38 32 6 30 7 32 34 21 200
1.09Installation of lightning arrestors on both source and load sides of Sectionalizer / LBS
incluing earthing using GI wire and earth pipes. (set of 3 Nos)Set 76 64 12 60 14 64 68 42 400
1.10 Earthing of Sectionalizer / LBS body / structures using GI wire and earth pipes. Set 38 32 6 30 7 32 34 21 200
Sch -A4 : Supply and Installation of Sectionalizer / LBS
Total Qty.
Sch-A5
SS-040 SS-041 SS-042 SS-043 SS-044 SS-045 SS-046 SS-047 SS-048
Sl. Item UnitsCircle No.I,
Agartala
Circle No.II,
Agartala
Khowai
Circle
Ambassa
Circle
Unakoti
Circle
Dharmana
gar Circle
Sepahijala
Circle
Gomati
Circle
Belonia
Circle
1.01
Medium Voltage Overhead Line Fault Passage Indicator (FPI),
1-phase, conductor mounting type suitable for upto 36 KV,
ACSR conductors for sizes upto Wolf as per specification (3
Units per Set/Location )
Set 149 249 146 216 116 328 150 334 312 2000
1.02Telescopic insulated hot stick for installation of FPI on
overhead lines upto 33 kVNos 2 2 2 2 1 3 2 3 3 20
ERECTION INCLUDING TESTING AND COMMISIONING
1.03
Installation of FPI on 33 kV and 11 kV lines with all prior
configuration settings to match line parameters and load
conditions of the existing line and installation on overhead
conductors using hot stick or other manufacturer
recommended tools (Set of 3 per location)
Set 149 249 146 216 116 328 150 334 312 2000
1.04 Provision of training on FPI as per specification LS 1
Sch -A5 : Fault Passage Indicator (Set of 3 per Location)
Total Qty.
Sch -A6
SS-049
Sl. Item UnitsED-I & ED-
CC, Agartala
12 kV Motorized Ring Main Unit, self-powered type with CPT or by other means,
Solid or SF6 Insulation, outdoor enclosure, FPI, battery and charging system,
software, all accessories and tools as indicated (Sch A6 -1).
1.01 3 Way RMU Type : SBS Nos 20 20
1.02 4 Way RMU Type : SBSS Nos 25 25
1.03 5 Way RMU Type : SBBSS Nos 25 25
1.04 6 Way RMU Type : SBBBSS Nos 30 30
1.05 Earth Mat Materials for 3 Way RMU Lot 20 20
1.06 Earth Mat Materials for 4 Way RMU Lot 25 25
1.07 Earth Mat Materials for 5 Way RMU Lot 25 25
1.08 Earth Mat Materials for 6 Way RMU Lot 30 30
1.09 11kV XLPE cable, 3 core, 240 Sq.mm. m 2000 2000
1.1 11kV XLPE cable, 3 core, 95 Sq.mm. m 9250 9250
1.11Outdoor Type heat shrink termination / joint kit for 3 core, 240 sqmm XLPE
insulated power cable of grade 6.35/11Kv(E) Nos 280 280
1.12Outdoor Type heat shrink termination kit for 3 core, 95 sqmm XLPE insulated
power cable of grade 6.35/11Kv(E) Nos 185 185
MANDATORY SPARE PARTS1.13 Interface type C insulated cable connectors (3 Nos per set) Set 5 5
1.14 Battery charges Nos 5 5
1.15 Motor and gear units Set 5 5
1.16 Manual operating handles Set 5 5
Civil Works
Foundation and Earth Mat for RMU as per approved design including site levelling
/ preparation1.17 3 Way RMU Set 20 20
1.18 4 Way RMU Set 25 25
1.19 5 Way RMU Set 25 25
1.20 6 Way RMU Set 30 30
ERECTION INCLUDING TESTING AND COMMISSIONING
1.21Design of foundations and earth mat for RMU as per manufacturer
recommendationsLot 1 1
Erection of RMU on the plinth foundation including enclosure and all accessories ,
cable connections for ring feeders and distribution transformers with
terminations and joints, earth mesh and all earthing connections, complete.
1.22 3 Way RMU Type : SBS Nos 20 20
1.23 4 Way RMU Type : SBSS Nos 25 25
1.24 5 Way RMU Type : SBBSS Nos 25 25
1.25 6 Way RMU Type : SBBBSS Nos 30 30
1.26 Provision of training on RMU as per specification Lot 1 1
# Item UnitQty for each
RMU
i Set of interface type C insulated cable connectors for each functional unit Lot 1
ii Operating handles Lot 1
iii Padlocks and keys Lot 1
iv Earthing cables and connectors Lot 1
v CTF injection fingers to connect with cable test equipment leads (if required) Set 1
Sch -A6 : Supply and Installation of Ring Main Units
Total Qty.
Sch -A6 -1 : Accessories and Tools to be supplied with each RMU
Sch-A7
SS-050
Sl. Item Units ED-CC, Agartala
1.01
Cable Fault Locatior and Test Van for low /medium voltage power cables up to
33 KV for Fault Identification, Pre-location, Fault Conditioning, Pinpointing,
Cable Tracing, Cable Identification and Testing as per specified methods
complete with vehicle, all test instruments, euipment, power supply, control
system, software, portable field devices, sefety equipment, all tools as
specified.
Nos 1 1
ERECTION INCLUDING TESTING AND COMMISIONING
1.02 Provision of training on cable fault location and testing as per specification Lot 1 1
1.03Provsion of tranied staff (2 persons) to carry out cable fault location and testing
and to provide on-the job training to TSECL field staffs.
Person-
months24 24
Sch -A7 : Supply of Cable Fault Locatior and Test Van
Total Qty.
Annexure ES
SN Item Description Unit
For 450 sqm
switchyard area.
For propotionate
quantities shall be
taken
1Supply of GI flat, 50x6mm for earthmat in the swithyard and for
raisers in the area etcRM 600
2Supply of GI flat, 30X5mm for connectint of earthmat to terminal
equipments and structures.RM 150
3Supply of 3 m long, 32mm dia MS rod as earth electrodes with
suitable chemical back fill compond (BFC)No 40
4Suply of bentonite clay for filling in (OR charcoal salt etc as the case
may be and as directed by MepdcL).Kg 6000
5Boring/Drilling of 200mm dia pits for earth electrode of 3.0 Meter
deep with boring machines etc, complete.Rm 120
6Back filling of bored pit of earth electrodes with chemicals/back fill
compound, bentonite clay, charcoal salt/suitable soil etc.Cum 5
7Earth work for excavation of trench for burrying of earthmat
including earth excavation in all types of soilsCum 168
8
Earth work in filling of trench for earthmat including back filling with
available excavated earth/borrowed
soil/chemical/charcoal/bentonite clay etc. Complete.
Cum 168
9
Labor cost for Laying, welding of GI flat, 50x6mm for earthmat in the
swithyard area including welding of raisers, cost of welding
electrodes etc complete
Rm 600
10
Labor cost for Llying, welding of GI flat, 30*5mm for terminal
equipments and structures to eathmat including cost of welding
electrodes etc complete
Rm 150
11
Earthwork in filling with available/borrowed soil (if required)
(excluding rock) in layers not exceeding 20 cm thick including
breaking clods consolidating each layer by ramming and watering,
lead upto 50m and lift upto 1.50m.(In the Switchyard area which shall
be raised to a minimun of 600mm above original ground level/ etc.
complete).
Cum 500
Supply items for Earthmat Switchyard of 450 SQM Area (Annexure ES )
Annexure MS
Mandatory Spare Parts and Tools for substation equipment
SN Item Description Unit Total Qty
1.0 Spare Parts for 33kV VCBs
1.1 Vaccum Interrupter Bottle Nos 6
1.2 Spring Changing Motor Nos 6
1.3 Auxilary Switch Nos 6
1.4 Accessories of Auxilary Switch Nos 6
1.5 Driving Mechanism Nos 6
1.6 Pole Rod Nos 6
1.7 Support Bushing Nos 6
1.8 Trip Coil Nos 6
1.9 Closing Coil Nos 6
1.10 Numerical Rely(Earth fault/over current) Nos 6
2.0 Spare Parts for 11kV VCBs
2.1 Vaccum Interrupter Bottle Nos 8
2.2 Spring Changing Motor Nos 8
2.3 Auxilary Switch Nos 8
2.4 Accessories of Auxilary Switch Nos 8
2.5 Driving Mechanism Nos 8
2.6 Support Insulator Nos 8
Annexure MS - Mandatory Spare Parts and Tools
Sch-C1
(B) Hard soil or soil mixed with moorum, gravel,
boulder upto one-man sized (above 0.03 cum
each).
In footing: 1 x 1.4 x 0.9 x 1.1 x 2 = 2.77
Total 1 2.77
In footing m³ 1 x 4.6 x 0.2 x 1 x 2 = 1.84
Total m³ 1 1.84
Footing m² 1 x 1.4 x 0.9 x 2 = 2.52
Total m² 1 2.52
Net Total m² 1 2.52
5/2.6 In footing: m³ 1 x 1 x 0.5 x 1.1 x 2 = 1.1
Total m³ 1.1
12 mm dia.
Column Vertical Rm 1 x 1.1 x 20 x 2 = 44
Total Rm 44
kg per Rm. Kg @ 0.9 39.16
Total qtls 0.39
10mm dia.
Jalli Rm 1 x 10 x 0.5 = 5
Jalli Rm 1 x 5 x 1 = 5
Total Rm 10
kg per Rm.= Kg @ 0.6 6.2
Total qtls 0.06
Total qtls 0.45
Add 5% extra for lapping and wastage qtls 0.02
Net Total qtls 0.48
6mm dia.
Column Rm 1 x 7 x 3.2 x 2 = 44.8
Total 44.8
6/6.1 Providing mild steel reinforcement for RCC
work….as stirrups…complete
6/6.2 ( a) Providing T/s reinforcement in R.C.C. works
including cuting bending……complete
Total
1/1.1(a). Earth work in excavation in foundation trenches,
including dressing of sides and ramming of the
bottom including staking of servicable stone, disposal
and removal of excavated earth within a lead of 50m
and lift of 1.5m complete.
3/1.3(a) Earth work in filling with available excavated
earth,…complete as directed.
3/4.5 Providing 100mm thick soling with approved quality
of stones including carriage ramming consolidating
and filling the interstices with stone aggregates
complete.
Providing and laying c.c in prop. 1:1.5:3
coresponding to M200………complete
Construction of One set of 33 KV vacuum Circuit Breaker Foundation (Sch - C1)
Sl/Item No. Description of work Particulars of work UnitNo.
Length B/W Height
Sch-C1
Total
Construction of One set of 33 KV vacuum Circuit Breaker Foundation (Sch - C1)
Sl/Item No. Description of work Particulars of work UnitNo.
Length B/W Height
kg per Rm.= Kg @ 0.4 17.47
Total qtls 0.17
(c) Prop. 1:4 (ii) cement procured by contractor
Wall:
Outside wall m² 1 x 3 x 0.1 x 2 = 0.6
Floor m² 1 x 1 x 0.5 x 2 = 1
Total m² 1 1.6
Net Total m² 1 1.6
Column: m² 1 x 3 x 1.1 x 2 x = 6.6
Total m² 1 6.6
21/2.9 (a) Providing shuttering including centering for flat
surface such as ………..directed
6/6.1 Providing mild steel reinforcement for RCC
work….as stirrups…complete
8/4.1 Providing 12 mm thick cement plaster i/c cleaning the
surface ………..complete
Sch-C2
(B) Hard soil or soil mixed with moorum, gravel,
boulder upto one-man sized (above 0.03 cum
each).In footing: 3 0.95 0.95 0.9 = 2.44
Total 3 2.44
3/1.3(a) Earth work in filling with available excavated
earth,……….complete as directed.
In footing m³ 3 0.95 4 0.85 = 1.94
Total m³ 3 1.94
Footing m² 3 0.95 0.95 = 2.71
Total m² 3 2.71
Deduction: m² 3
Total 3 0
Net Total m² 3 2.71
5/2.6 Providing and laying c.c in prop. 1:1.5:3 coresponding to
M200……………………complete
In footing: m³ 3 0.75 0.75 1 = 1.69
Total m³ 1.69
12 mm dia.
Column Vertical Rm 3 4 1.1 = 13.2
Total Rm 13.2
kg per Rm. Kg @ 0.89 11.75
Total qtls 0.12
10mm dia.
Jalli Rm 3 6.33 0.95 = 18.05
Jalli Rm 3 6.33 0.95 = 18.05
Total Rm 36.1
kg per Rm.= Kg @ 0.62 22.38
Total qtls 0.22
Total qtls 0.34
Add 5% extra for lapping and wastage qtls 0.02
Net Total qtls 0.36
6mm dia.
Column Rm 3 6.67 3.8 = 76
Providing 100mm thick soling with approved quality of
stones including carriage ramming consolidating and
filling the interstices with stone aggregates complete.
6/6.1 Providing mild steel reinforcement for RCC work….as
stirrups…complete
6/6.2 ( a) Providing T/s reinforcement in R.C.C. works including
cuting bending……complete
1/1.1(a). Earth work in excavation in foundation trenches,
including dressing of sides and ramming of the bottom
including staking of servicable stone, disposal and
removal of excavated earth within a lead of 50m and lift
of 1.5m complete.
3/4.5
Construction of one set of PT Foundation (Sch-C2)
Sl/Item No. Description of work Particulars of work Unit No. Length B/W Height Total
Sch-C2
Construction of one set of PT Foundation (Sch-C2)
Sl/Item No. Description of work Particulars of work Unit No. Length B/W Height Total
Total 76
kg per Rm.= Kg @ 0.39 29.64
Total qtls 0.3
(c) Prop. 1:4 (ii) cement procured by contractor
Outside wall m² 3 3 0.1 = 0.9
Floor m² 3 0.75 0.75 = 1.69
Total m² 3 2.59
Net Total m² 3 2.59
Column: m² 3 0.75 0.9 4 = 8.1
Total m² 3 8.1
21/ 2.9(a) Providing shuttering including centering for flat surface
such as ……………..directed
6/6.1 Providing mild steel reinforcement for RCC work….as
stirrups…complete
8/4.1 Providing 12 mm thick cement plaster i/c cleaning the
surface ………..complete
Sch-C3
(B) Hard soil or soil mixed with moorum, gravel,
boulder upto one-man sized (above 0.03 cum each).
In footing: 3 0.95 0.95 0.9 = 2.44
Total 3 2.44
3/1.3(a) Earth work in filling with available excavated
earth,……….complete as directed.
In footing m³ 3 0.95 4 0.85 = 1.94
Total m³ 3 1.94
Footing m² 3 0.95 0.95 = 2.71
Total m² 3 2.71
Deduction: m² 3
Total 3 0
Net Total m² 3 2.71
5/2.6 Providing and laying c.c in prop. 1:1.5:3 coresponding to
M200……………………complete
In footing: m³ 3 0.75 0.75 1 = 1.69
Total m³ 1.69
12 mm dia.
Column Vertical Rm 3 4 1.1 = 13.2
Total Rm 13.2
kg per Rm. Kg @ 0.9 11.75
Total qtls 0.12
10mm dia.
Jalli Rm 3 6.33 0.95 = 18.05
Jalli Rm 3 6.33 0.95 = 18.05
Total Rm 36.1
kg per Rm.= Kg @ 0.6 22.38
Total qtls 0.22
Total qtls 0.34
Add 5% extra for lapping and wastage qtls 0.02
Net Total qtls 0.36
6mm dia.
Column Rm 3 6.67 3.8 = 76
Providing 100mm thick soling with approved quality of
stones including carriage ramming consolidating and filling
the interstices with stone aggregates complete.
6/6.1 Providing mild steel reinforcement for RCC work….as
stirrups…complete
6/6.2 ( a) Providing T/s reinforcement in R.C.C. works including cuting
bending……complete
1/1.1(a). Earth work in excavation in foundation trenches, including
dressing of sides and ramming of the bottom including
staking of servicable stone, disposal and removal of
excavated earth within a lead of 50m and lift of 1.5m
complete.
3/4.5
Construction of one set of CT Foundation (Sch-C3)
Sl/Item No. Description of work Particulars of work Unit No. Length B/W Height Total
Sch-C3
Construction of one set of CT Foundation (Sch-C3)
Sl/Item No. Description of work Particulars of work Unit No. Length B/W Height Total
Total 76
kg per Rm.= Kg @ 0.4 29.64
Total qtls 0.3
(c) Prop. 1:4 (ii) cement procured by contractor
Outside wall m² 3 3 0.1 = 0.9
Floor m² 3 0.75 0.75 = 1.69
Total m² 3 2.59
Net Total m² 3 2.59
Column: m² 3 0.75 0.9 4 = 8.1
Total m² 3 8.1
21/ 2.9(a) Providing shuttering including centering for flat surface such
as ……………..directed
6/6.1 Providing mild steel reinforcement for RCC work….as
stirrups…complete
8/4.1 Providing 12 mm thick cement plaster i/c cleaning the surface
………..complete
Sch-C4
(B) Hard soil or soil mixed with moorum,
gravel, boulder upto one-man sized (above
0.03 cum each).In footing: 3 x 0.95 x 0.95 x 0.9 = 2.44
Total 3 2.44
3/1.3(a) Earth work in filling with available
excavated earth,……….complete as
directed.
In footing m³ 3 x 0.95 x 4 x 0.2 x 0.85 = 1.94
Total m³ 3 1.94
Footing m² 3 x 0.95 x 0.95 = 2.71
Total m² 3 2.71
Deduction: m² 3
Total 3 0
Net Total m² 3 2.71
5/2.6 Providing and laying c.c in prop. 1:1.5:3
coresponding to
M200……………………complete
In footing: m³ 3 x 0.75 x 0.75 x 1 = 1.69
Total m³ 1.69
12 mm dia.
Column Vertical Rm 3 x 4 x 1.1 = 13.2
Total Rm 13.2
kg per Rm. Kg @ 0.89 11.75
Total qtls 0.12
10mm dia.
Jalli Rm 3 x 6.33 x 0.95 = 18.05
Jalli Rm 3 x 6.33 x 0.95 = 18.05
Total Rm 36.1
kg per Rm.= Kg @ 0.62 22.38
Total qtls 0.22
Providing 100mm thick soling with
approved quality of stones including
carriage ramming consolidating and filling
the interstices with stone aggregates
complete.
6/6.2 ( a) Providing T/s reinforcement in R.C.C. works
including cuting bending……complete
1/1.1(a). Earth work in excavation in foundation
trenches, including dressing of sides and
ramming of the bottom including staking of
servicable stone, disposal and removal of
excavated earth within a lead of 50m and
lift of 1.5m complete.
3/4.5
Construction of one set of LA Foundation (Sch-C4)
Sl/Item No. Description of work Particulars of work UnitNo.
Length B/W Height Total
Sch-C4
Construction of one set of LA Foundation (Sch-C4)
Sl/Item No. Description of work Particulars of work UnitNo.
Length B/W Height Total
Total qtls 0.34
Add 5% extra for lapping and wastage qtls 0.02
Net Total qtls 0.36
6mm dia.
Column Rm 3 x 6.67 x 3.8 = 76
Total 76
kg per Rm.= Kg @ 0.39 29.64
Total qtls 0.3
(c) Prop. 1:4 (ii) cement procured by
contractorOutside wall m² 3 x 3 x 0.1 = 0.9
Floor m² 3 x 0.75 x 0.75 = 1.69
Total m² 3 2.59
Net Total m² 3 2.59
Column: m² 3 x 0.75 x 0.9 x 4 = 8.1
Total m² 3 8.1
21/ 2.9(a) Providing shuttering including centering for
flat surface as directed
6/6.1 Providing mild steel reinforcement for RCC
work….as stirrups…complete
8/4.1 Providing 12 mm thick cement plaster i/c
cleaning the surface ………..complete
6/6.2 ( a) Providing T/s reinforcement in R.C.C. works
including cuting bending……complete
Sch-C5
Sl/Item No. Description of work Particulars of work Unit No. LengthB/W Height Total
1/1.1(a). Earth work in excavation in foundation trenches,
including dressing of sides and ramming of the bottom
including staking of servicable stone, disposal and
removal of excavated earth within a lead of 50m and
lift of 1.5m complete.
(B) Hard soil or soil mixed with moorum, gravel, boulder upto
one-man sized (above 0.03 cum each).
In footing: 1 x 1.4 x 0.9 x 1.1 x 2 = 2.77Total 1 2.77
3/1.3(a) Earth work in filling with available excavated
earth,……….complete as directed.
In footing m³ 1 x 4.6 x 0.2 x 1 x 2 = 1.84
Total m³ 1 1.843/4.5 Providing 100mm thick soling with approved quality of
stones including carriage ramming consolidating and
filling the interstices with stone aggregates complete.
Footing m² 1 x 1.4 x 0.9 x 2 = 2.52
Total m² 1 2.52Net Total m² 1 2.52
5/2.6 Providing and laying c.c in prop. 1:1.5:3 coresponding
to M200……………complete
In footing: m³ 1 x 1 x 0.5 x 1.1 x 2 = 1.1
Total m³ 1.16/6.2 ( a) Providing T/s reinforcement in R.C.C. works including
cuting bending……complete
12 mm dia.
Column Vertical Rm 1 x 1.1 x 20 x 2 = 44Total Rm 44kg per Rm. Kg @ 0.9 39.16Total qtls 0.3910mm dia.Jalli Rm 1 x 10 x 0.5 = 5Jalli Rm 1 x 5 x 1 = 5Total Rm 10kg per Rm.= Kg @ 0.6 6.2Total qtls 0.06Total qtls 0.45Add 5% extra for lapping and wastage qtls 0.02Net Total qtls 0.48
6/6.1 Providing mild steel reinforcement for RCC work….as
stirrups…complete
6mm dia.
Column Rm 1 x 7 x 3.2 x 2 = 44.8Total 44.8kg per Rm.= Kg @ 0.4 17.47Total qtls 0.17
8/4.1 Providing 12 mm thick cement plaster i/c cleaning the
surface ………..complete
(c) Prop. 1:4 (ii) cement procured by contractor
Wall:Outside wall m² 1 x 3 x 0.1 x 2 = 0.6
Construction of One set of 33 KV and 11 Kv Isolator Foundation (Sch-C5)
Sch-C5
Sl/Item No. Description of work Particulars of work Unit No. LengthB/W Height Total
Construction of One set of 33 KV and 11 Kv Isolator Foundation (Sch-C5)
Floor m² 1 x 1 x 0.5 x 2 = 1Total m² 1 1.6Net Total m² 1 1.6
21/2.9 (a) Providing shuttering including centering for flat surface
as ……………..directed
Column: m² 1 x 3 x 1.1 x 2 x = 6.6
Total m² 1 6.6
Sch-C6
SL NO. Description of items Unit Length (m)Breadth
(m)
Thickness
(m)
1 PCC (1:4:8) Cum 25 20 0.05
2 Stone Aggregate/River Pebbles Cum 25 20 0.05
SWITCHYARD PCC & Gravelling - 500 Sqm (Sch-C6)
Sch-C7
Sl.
NoItem Description Quantity Units
1
Earthwork in excavation in foundation trenches, including dressing of sides and
ramming of the bottom including stacking of serviceable stones, disposal and
removal of excavated earth within a lead of 50 m and lift of 1.50 m complete as
directed.
b) Hard soil or soil mixed with moorun, gravel, boulder upto one-man size
(above 0.03 cum each).
2.94 m3
2
Providing 100 mm thick soling with approved quality of stones including
carriage, ramming, consolidating and filling the interstices with stone aggregates
complete.
1.96 m2
3
Providing and laying cement concrete in proportion 1:4:8 corresponding to M50
(1-cement, 4-sand, 8-stone aggregates of 40 mm and down graded) including
necessary curing complete excluding shuttering.
(b) Cement procured by contractor
0.2 m2
4
(a) Providing tor steel reinforcement in RCC work including cutting, bending,
cranking and tying in position with binding wire, 20 gauge, as shown in
drawings, complete upto floor two level.
(ii) Steel procured by contractor
0.69 Qtl.
5
Providing mild steel reinforcements for RCC work including cutting, bending,
cranking and tying in position with binding wire, 20 gauge, as shown in
drawings complete upto floor two level.
(i) Steel procured by contractor
0.0222 Qtl.
6
(a) Providing shuttering including centering for flat surface such as slabs,
shelves, chajja and for vertical faces such as columns, walls, ends of beams etc
with dressed plank not less than 25 cm thick firmly fixed etc complete as
directed (applicable upto 3.30 m height)
10.32 m2
7
Providing and laying cement concrete in proportion 1:2:4 corresponding to
M200 (1-cement, 1.5 sand, 3-stone aggregates of 20mm and down graded)
including necessary curing complete, excluding shuttering, in foundation and
below plinth and in septic tank, inspection pits etc, complete.
(b) Cement procured by contractor
1.96 m3
8
Earthwork in filling with available excavated earth (excluding rock) in trenches,
plinth, sides of foundation etc. in layers not exceeding 20 cm thick including
breaking clods consolidating each layer by ramming and watering, lead upto
50m and lift upto 1.50m.
8.23 m3
9
Providing 12mm thick cement plaster including cleaning the surface and curing
complete as directed.
(b) Proportion 1:3
(ii) Cement procured by contractor
4.68 m2
10
Colour washing with pigment of any shade to give a clean and smooth finished
surface complete as directed.
(b) Two coats
4.68 m2
Construction of 1 No Tower TA/TC/TB at 33/11 KV s/s (Sch-C7)
Sch -C8
(a) In ordinary soil.
Plinth Wall ( Fencing Gate) m³
Cable Trench m³ 1 x 1 x 1.1 x 0.5 = 0.55
Total m³ 0.55
Cable Trench m² 1 x 1 x 1.1 = 1.1
Total m² 1.1
Net Total m² 1.1
(ii) cement procured by contractor
Cable Trench m³ 1 x 1 x 1.1 x 0.1 = 0.11
Total m³ 0.11
Trench cover m³ 1 x 1 x 1.1 x 0.1 = 0.11
Total m³ 0.11
10mm dia.
Trench cover Rm 1 x 10 x 0.8 = 8
Trench cover Rm 1 x 8 x 1 = 8
Total Rm 16
kg per Rm.= Kg @ 0.62 9.92
Total qtls 0.10
Total qtls 0.10
Add 5% extra for lapping and wastage qtls 0.005
Net Total qtls 0.104
(a) Below plinth
In trenches m³ 1 x 1 x 0.3 x 0.3 x 2 = 0.18
Total m³ 0.18
(c) Prop. 1:4 (ii) cement procured by contractor
Wall:
Trench wall m² 1 x 1 x 1 = 1
Total m² 1
Net Total m² 1
In Trench m² 1 x 1 x 0.45 = 0.45
Total m² 0.45
Net Total m² 0.45
7/3.9 Providing first class brick in required thickness in cement
mortar 1:6 …complete
8/4.1 Providing 12 mm thick cement plaster i/c cleaning the
surface ………..complete
9/4.7 Providing c.c floor 65 mm thick ………………..complete.
Earth work in excavation in foundation trenches,
including dressing of sides and ramming of the bottom
including staking of servicable stone, disposal and
removal of excavated earth within a lead of 50m and lift
of 1.5m complete.
4/2.2 Providing and laying c.c in prop. 1:3:6 coresponding to
M100 (1-cement, 3-sand, 6-stone aggregate of 40mm
and down graded) including necessary curing complete.
6/6.2 ( a) Providing T/s reinforcement in R.C.C. works including
cuting bending……complete
3/4.5 Providing 100mm thick soling with approved quality of
stones including carriage ramming consolidating and
filling the interstices with stone aggregates complete.
1/1.1(a).
Construction of Power/Control Cable Trench 01 RM (450x500 mm) (Sch-C8)
Sl/Item No. Description of work Particulars of work UnitNo.
Length B/W Height Total
Sch -C8
Construction of Power/Control Cable Trench 01 RM (450x500 mm) (Sch-C8)
Sl/Item No. Description of work Particulars of work UnitNo.
Length B/W Height Total
400mm x 500mm kg 1 x 1 x 2 x 5.68 = 11.4
250mm x 500mm kg 1 x 1 x 2 x 5.68 = 11.4
50mm x 50mm x 6mm kg 1 x 0.85 x 3 x 5.07 = 12.9
kg 35.6
Total Qntl. 0.36
19/6.3 Providing Steel works in tees, flates, angles and chenels
including cutting and bending..etc. (50mm x 50mm x
6mm for cable support and supporting chequred plates)
@ 0.5 mm c/c
Sch-C9
Sl. No. Description of work Units Qnty
Earth work in excavation by mechanical means over areas
(exceeding 30cm in depth, 1.5m in width as well as 10sqm on
plan) including disposal of excavated earth, lead upto 50m and
lift upto 1.5m, disposed earth to be levelelled and nearly
dressed.
(a) Ordinary Soil:
50 x 50 x 1 = 2500 m3 m3 2500.00
SITE LEVELLING - Land development & site preparation /earth cutting (Sch-C9)
1
(a)
Sch C-10
(a) In ordinary soil.
Plinth Wall ( Fencing Gate) m³
Cable Trench m³ 1 x 1 x 1.4 x 0.8 = 1.12
Total m³ 1.12
Cable Trench m² 1 x 1 x 1.4 = 1.4
Total m² 1.4
Net Total m² 1.4
(ii) cement procured by
contractor
Cable Trench m³ 1 x 1 x 1.4 x 0.1 = 0.14
Total m³ 0.14
5/2.6 Providing and laying c.c in prop. 1:1.5:3 coresponding to M200……complete Trench cover m³ 1 x 1 x 1.4 x 0.1 = 0.14
Total m³ 0.14
10mm dia.
Trench cover Rm 1 x 10 x 1.1 = 11
Trench cover Rm 1 x 11 x 1 = 11
Total Rm 22
kg per Rm.= Kg @ 0.6 13.64
Total qtls 0.136
Total qtls 0.136
Add 5% extra for lapping and
wastage
qtls 0.007
Net Total qtls 0.14
(a) Below plinth
In trenches m³ 1 x 1 x 0.3 x 0.6 x 2 = 0.36
Total m³ 0.36
(c) Prop. 1:4 (ii) cement
procured by contractor
Wall:
Trench wall m² 1 x 1 x 1.6 = 1.6
Total m² 1.6
Net Total m² 1.6
7/3.9 Providing first class brick in required thickness in cement mortar 1:6 …….complete
8/4.1 Providing 12 mm thick cement plaster i/c cleaning the surface ………..complete
Earth work in excavation in foundation trenches, including dressing of sides and ramming of
the bottom including staking of servicable stone, disposal and removal of excavated earth
within a lead of 50m and lift of 1.5m complete.
4/2.2 Providing and laying c.c in prop. 1:3:6 coresponding to M100 (1-cement, 3-sand, 6-stone
aggregate of 40mm and down graded) including necessary curing complete.
6/6.2 ( a) Providing T/s reinforcement in R.C.C. works including cuting bending……complete
3/4.5 Providing 100mm thick soling with approved quality of stones including carriage ramming
consolidating and filling the interstices with stone aggregates complete.
1/1.1(a).
Construction of Power/ Control Cable Trench 01 RM (750x800 mm) (Sch C-10)
Sl/Item
No.Description of work Particulars of work Unit No. Length B/W Height Total
Sch C-10
Construction of Power/ Control Cable Trench 01 RM (750x800 mm) (Sch C-10)
Sl/Item
No.Description of work Particulars of work Unit No. Length B/W Height Total
9/4.7 Providing c.c floor 65 mm thick ………………..complete. In Trench m² 1 x 1 x 0.8 = 0.8
Total m² 0.8
Net Total m² 0.8
800mm x 500 mm kg 1 x 1 x 2 x 5.7 = 11.4
300mm x 500mm kg 1 x 1 x 2 x 5.7 = 11.4
50mm x 50mm x 6mm kg 1 x 1.3 x 3 x 5.1 = 19.8
kg 42.5
Total Qntl. 0.42
19/6.3 Providing Steel works in tees, flates, angles and chenels including cutting and bending..etc.
(50mm x 50mm x 6mm for cable support and supporting chequred plates) @ 0.5 mm c/c
Sch C-11
(a) In ordinary soil.
Plinth Wall ( Fencing Gate) m³
Cable Trench m³ 1 x 1 x 1.1 x 0.5 = 0.55
Total m³ 0.55
Cable Trench m² 1 x 1 x 1.1 = 1.1
Total m² 1.1
Net Total m² 1.1
(ii) cement procured by contractor
Cable Trench m³ 1 x 1 x 1.1 x 0.1 = 0.11
Total m³ 0.11
Trench cover m³ 1 x 1 x 1.1 x 0.1 = 0.11
Total m³ 0.11
10mm dia.
Trench cover Rm 1 x 10 x 0.8 = 8
Trench cover Rm 1 x 8 x 1 = 8
Total Rm 16
kg per Rm.= Kg @ 0.62 9.92
Total qtls 0.10
Total qtls 0.10
Add 5% extra for lapping and wastage qtls 0.005
Net Total qtls 0.104
(a) Below plinth
In trenches m³ 1 x 1 x 0.3 x 0.3 x 2 = 0.18
Total m³ 0.18
(c) Prop. 1:4 (ii) cement procured by contractor
Wall:
Trench wall m² 1 x 1 x 1 = 1
Total m² 1
Net Total m² 1
In Trench m² 1 x 1 x 0.45 = 0.45
Total m² 0.45
Net Total m² 0.45
7/3.9 Providing first class brick in required thickness in cement
mortar 1:6 …complete
8/4.1 Providing 12 mm thick cement plaster i/c cleaning the
surface ………..complete
9/4.7 Providing c.c floor 65 mm thick ………………..complete.
Earth work in excavation in foundation trenches,
including dressing of sides and ramming of the bottom
including staking of servicable stone, disposal and
removal of excavated earth within a lead of 50m and lift
of 1.5m complete.
4/2.2 Providing and laying c.c in prop. 1:3:6 coresponding to
M100 (1-cement, 3-sand, 6-stone aggregate of 40mm
and down graded) including necessary curing complete.
6/6.2 ( a) Providing T/s reinforcement in R.C.C. works including
cuting bending……complete
3/4.5 Providing 100mm thick soling with approved quality of
stones including carriage ramming consolidating and
filling the interstices with stone aggregates complete.
1/1.1(a).
Construction of Power/Control Cable Trench 01 RM (450x500 mm) (Sch C-11)
Sl/Item No. Description of work Particulars of work UnitNo.
Length B/W Height Total
Sch C-11
Construction of Power/Control Cable Trench 01 RM (450x500 mm) (Sch C-11)
Sl/Item No. Description of work Particulars of work UnitNo.
Length B/W Height Total
400mm x 500mm kg 1 x 1 x 2 x 5.68 = 11.4
250mm x 500mm kg 1 x 1 x 2 x 5.68 = 11.4
50mm x 50mm x 6mm kg 1 x 0.85 x 3 x 5.07 = 12.9
kg 35.6
Total Qntl. 0.36
19/6.3 Providing Steel works in tees, flates, angles and chenels
including cutting and bending..etc. (50mm x 50mm x
6mm for cable support and supporting chequred plates)
@ 0.5 mm c/c