Utah’s Premier Revised

Post on 20-Jun-2015

569 views 0 download

Tags:

description

Utah’s Premier Revised

Transcript of Utah’s Premier Revised

Presented by: Mike Sowby – General

ManagerJason Harr – Project Manager

Jason Denham – Site Manager

Major ProjectsLEED® (Green) Certified Projects

Rooftop Gardens (Vegetated Roof Surfaces)Sub- Surface Drip Irrigation

Intermountain Health Care Hospital - Murray1,100 Trees 67,000 Shrubs

Contract Amount: $2.5 Million

Project under $50,000LEED® (Green) Certified Project

Sub Surface Drip Irrigation

Close to 40 acres of sub-surface drip irrigationContract Amount: $4.5 Million

Rooftop Gardens using Utelite e-soilLEED® (Green) Certified Project

I-215 and Redwood Pleasant Grove Exit

Legacy Parkway

12 Acres of LandscapingTo be completed mid-year 2009

Sample of Current PropertiesWarranty

Owner Relationships

Value EngineeringDesign – Build

Budget Numbers

AP – 300 3” Bronze Ball Valve•$234.48

BV – 300 3” Bronze Ball Valve•$80.57

Hard Hats on every jobBright Safety Vest with Logo

Safety Glasses

We have over 250 years of landscape industry experience within our management team.