Post on 18-Jul-2015
Ignore Totalis
DecideDefendus
ListenPretendus
ListenSerious
MajorCollaboratus
Evolution of the Public Participation Man
Ignore Totalis
DecideDefendus
ListenPretendus
ListenSerious
MajorCollaboratus
Evolution of the Public Participation Man
„First of all, we need to change the cityin the minds of people“
2009: citizens' think-tank
for urban development in Hamburg, Germany
„First of all, we need to change the cityin the minds of people“
MISSION: To turn participation around
#1 Crowdsourcing of a future agenda
#2 Incubator for citizens' projects
Project objective
To draft a transportation development plan (TDP) for Bremen 2025 based on citizens' knowledge, needs and wishes.
Senator for Environment, Construction and Transport
Goals of the TDP
Analysis of status quo
Development of measures and scenarios
Shaping the target scenario
Draft of the TDP
Citizens' fora
bremen-bewegen.de;citizens' fora
bremen-bewegen.de;citizens' fora
bremen-bewegen.de;citizens' fora
bremen-bewegen.de;citizens' fora
Summer 2012
Winter 2012/13
Summer 2013
Autumn/Winter 2013
Spring2014
Pre-stage
Stage1
Stage2
Stage3
Stage4
Project structure
Enable equal participation of all citizens and city commuters of all kinds
Increase safety
Create and optimise alternative means of transportation city-wide
Improve connectivity of transportation systems and eco-mobility offers between the Bremen city and region
Strengthen the geo-economic position of Bremen through optimisation of trade and economic activity
Reduce effects of transport on people, health and environment significantly and sustainably
Goals of the TDP
contributions
General relevance
Handing over to respective authorities
1.400micro-level contributions
Attribution to TDP goals
Incorporation in the TDP
Filter
Choose measures
Mind budget and effectiveness
Meet the TDP goals Consult the city
Share your scenario
Online
Private vehiclesPrivate vehicles Bikes
Public transport
Localmobility
categories of measures
private vehiclesbikespublic transportlocal mobility
reduced budget static budgetincreased budget
highest prioritymiddle prioritylowest priority
WHAT:priorities
WHEN:budget scenarios
COMES:
Example: bikes
REDUCED BUDGET STATIC BUDGET INCREASED BUDGET
more B+R
more B+R
The network of bike and ride stations will be built at metro and bus stops in Bremen
Example: bikes
“for the Europe-wide best plan for sustainable urban mobility“
23.03.15: European Commission's Award
Summary
Genuine openness of the city authoritiestowards public participation
Doing participation at the very start of the TDP process
Actual building of the TDP based on contributions from the participation
Strong division between different functions in the project and actors contracted by the city authorities
=> Lack of horizontal links => Loss of additional synergies
+
-
contributions
General relevance
Handing over to respective authorities
1.400micro-level contributions
Attribution to TDP goals
Incorporation in the TDP
Filter
contributions
General relevance
Handing over to respective authorities
1.400micro-level contributions
Attribution to TDP goals
Incorporation in the TDP
Filtered
„Cities have the capacity
of providing something for everybody,
only because, and only when,
they are created by everyone.“ (J. Jacobs)
Thank you! wearenext.org bremenbewegen.de stadtmacher.org
„Cities have the capacity
of providing something for everybody,
only because, and only when,
they are created by everyone.“ (J. Jacobs)