Post on 17-Aug-2015
MOHAMMAD RIZWANE-Mail: mrizz47@yahoo.com,m.rizz15@yahoo.com
Contact: 00974 33019635(Qatar), 00917762938516(India)
Seeking mid level assignments as E &I QA/QC Engineer with an organisation of high repute,
preferably in Oil & Gas / Petrochemicals / Energy Industry
Professional Preface
A dynamic & competent professional with 12 years of experience in Electrical, Instrumentation & telecommunication construction QA / QC activities in the Middle East in Oil & Gas, Petrochemical and Power Generation sector. Currently working with LARSEN & TOUBRO, RAS LAFFAN, and QATAR. Proficient in handling projects, an effective communicator with excellent management skills, problem solving& organisational abilities.
Academic Credentials & Other
Three years diploma in instrumentation from AL-KABIR POLYTECHNIC, state board of technical education, Jharkhand, INDIA, during the session 1997-2000.
Passed matriculation from BIHAR SCHOOL EXAMINATION BOARD, PATNA in the year of 1996.
Since June’2014 with LARSEN & TOUBRO, RAS LAFFAN, QATAR as Sr. QA/QC Engineer
(Electrical, Instrumentation& Telecommunication for oil and gas sector)
Accountabilities
Extensive inspection experience gained during installation, calibration, testing, Fabrication,
Hook-up, pre-commissioning and commissioning of a comprehensive range of Electrical,
Instrumentation & Telecommunication. In depth knowledge of the various documentation
systems required to certify completion of construction and testing.
Verify, inspect and witness ground installation on tanks and equipments, installation of general
area/street/plant lighting, cable trays, underground cables, conduits, wire ways, certified
equipments for hazardous classified locations and zones, packaged units, heat tracing, MOV’s,
Cathodic protection (CP measurements, anodes, cables, rectifiers and field junction boxes etc.) and
recommend corrective actions.
Verify, inspect and witness of all electrical components in substations (transformers, HV & LV
switchgears, control gears, bus-bars, panels, auto change over switches, voltage regulators, UPS,
distribution panels, MCC panels, DG sets, battery, chargers and associated wirings).
Erection, testing and commissioning of Power Transformers, HT & LT panels, HT & LT motors,
Grounding, installation and commissioning of Lighting fixtures, street lighting, Power & Control
cable Terminations, DG Sets with AMF and Synchronize panels, security systems, Fire fighting
system (Hose reel, Sprinkler Bulb) and Fire Alarm System such as Smoke detectors, Heat
Detectors, Manual Break Glass, Fire Alarm bell and Fire alarm control panel (FACP). Reporting daily
progress to superiors, preparing project reports and as built drawings.
Witness meggering of LV, MV & HV cables, Hi-pot test, generators, MCC, motors etc.
Supervision of execution, of all works, physical surveys, material testing at field and other works as
per requirement of works Contract including Concreting work in 33/11 kV Sub-station, Erecting of
poles for new 11 kV feeders Work with different department heads to implement ISO 9001 and Project Quality
Plan requirements. Perform routine inspection of all completed works with Client against approved drawings, Client
specifications, International codes & standards, HSE regulations etc and perform all relevant QA/QC documentation activities.
Review and Follow up Contractor and Vendor QA/QC Documentation and design deliverables and
confirms accordance with relevant International, Project Specifications and Company Standards.
Review and Ensure timely submission of Project Quality Documents as per the requirements
Organize and Manage Site QAQC team and Monitor Site QAQC activities.
Supervise , monitor and inspect installation of all electrical & instrumentation activities like field
instruments, cable system, junction boxes, lighting systems, motors, transformers, heating
system,
F & G system, tank gauging system, distribution boards, switchgears, lightning and grounding
system, electrical and pneumatic hook ups, fabrication of supports / brackets /stanchions etc.
Plan and Schedule Internal Quality Audit for different processes including sites and sub
contractor audits.
Oversee investigation, root cause analysis and closure of NCR's raised during internal
and external audit.
Follow-up with the different departments and subcontractors for effective implementation
of Corrective and Preventive Actions.
Establish and follow-up Company, Departmental& Project Specific Quality Objectives with
different departments.
Supervise Document Control Team and ensure effective implementation of document control
system.
Ensure that controls for project & site documentation are in place.
Inspection of all completed works to ensure satisfactory workmanship, compliance with all IFC
Documents, International codes & standards and HSE regulations.
Identify the Non conformities and generate NCR and suggest corrective actions.
Liaison with the client and contractor on the work progress.
Conduct regular reviews, evaluation and internal quality audits on the effectiveness of the
Company's Quality Management System and issue corrective actions when required.
Proactively participated in achieving the highest possible international standard of HSE
implementation.
Work History and Experience
Year of experience: Over 12 years (7 years abroad) as a Quality Control Inspector/Engineer.
Experience
Company Larsen and toubro limited.
Position Sr.E&I QA/QC ENGINEER.
Place Ras laffan (QATAR)
Duration June 2014 to June 2015.
Client Dolphin energy limited
Project Export Gas Compression Facilities Upgrade Project and
Third party interconnecting facilities QATAR.
Duties and Responsibilities
Preparation & implementation of Project Quality Plans, Procedures, Work Instructions, Inspection & Test Plans, Checklists, Quality records, Preparation of Punch lists & Compilation of Test packs.
Adroit with the concept of inspection on installation of Ex-equipments (Exd, Exe, Exi etc.) and associated accessories in potentially explosive hazardous atmosphere (IEC60079 – 14 & 17).
Generate client Requests for Inspection (RFI) where required providing sufficient notice for Hold, Witness and Inspection points.
Implementing Factory Acceptance Tests (FAT), Site Installation Tests (SIT), Site Acceptance Tests (SAT) and approving check sheet of various components.
Reviewing & approving Sub-Contractor’s / Supplier’s Documents i.e. Purchase Orders (PO), Inspection Test Plans, Inspection Assignment Packages, Quality Procedures, Work Instructions, Method Statements & Inspection Reports.
Oversaw the installation & testing of Electrical/instrument/ Pneumatic Hook-Ups: Cable Routing, Laying, Segregation, Sealing, Termination & Grounding Insulation Resistance & Continuity tests, OTDR Tests (FOC). Installation inspection of impulse tube, air line pneumatic air header as per hook-up and
AFC Drawing & Inspection of pressure. Testing /leak test of all pneumatic lines, impulse lines.
Accountable for witnessing Calibration, Installation, Loop Checking & Functional Tests of Pressure, Flow, Temperature, Level instruments, Analyzers, Control / On-Off Valves, Fire & Gas Instruments, etc.
Witnessing installation of transformer, bus bar, bus duct, switchgear, AC/DC motors, DG, AC/DC distribution boards, battery systems, utility stations, electrical panel boards, lighting, CCTV, HVAC, field instruments & calibration, valves, cable trays, conduits, earthing system, fire-fighting,FO cable laying, OTDR test.
Demonstrated abilities in performing material receiving inspection, handling storage, preservation and ensuring compliance to the requirements.
Conversant with the Project HSES Plan. Proactively participate in achieving the highest possible
International standard of HSES implementation. Participate on Red Card program and adhere to PTW
system.
Perform Quality Control inspection on work packages per subsystem for Mechanical Completion
activities and confirmed/approved the corresponding Inspection & Test Record (ITR) for the particular
work package, where applicable prepare punch list, redline mark-up corresponding drawings and
attached to the work package and submit to ICAPS, for record keeping and soft copy documentation.
Coordinate with the construction, commissioning, safety and other concerned departments for
mechanical completion QC inspection activities.
Perform testing as required on the ITR, like; insulation, continuity and hi potential cable testing, cold
loop checking, earth continuity resistance test , low ohm test for bus bars, bench & field calibration,
leak testing, instrument function test and installation.
Pipeline Cathodic protection Installation, testing and commissioning (temporary anode installation, test
station installation, TRU Installation, Anode ground bed).
Perform pro-active QC inspection to the ongoing construction activities to align/comply all construction
output to the specific project procedures, standards, specifications and ensure that it follows all
relevant approve for construction drawings.
Make a record or report on hard and soft copy of the ITR done each day for the MC QC department ITR
tracking.
Control and Disposition of Non-Conformance. Conduct Daily Surveillance on Site.
Holds the credit of representing the company in final walkthrough, Generation of Punch lists,
expedite timely close out as per A, B and C categories.
Successfully completed and submitted Mechanical Completion Dossiers, As-built drawings and
Instrument Loop test Packages.
Company PUNJ LLOYD LIMITED.
Position E&I QA/QC ENGINEER.
Place United Arab Emirates (DUBAI).
Duration July 2013 to June 2014.
Client Emirates National Oil Company.
Project FALCON, Bulk Liquid Terminal in JAFZA, & Jet Fuel Pipeline to
DIA-Phase-1
Duties and Responsibilities
Preparation & implementation of Project Quality Plans, Procedures, Work Instructions, Inspection & Test Plans, Checklists, Quality records, Preparation of Punch lists & Compilation of Test packs.
Generate client Requests for Inspection (RFI) where required providing sufficient notice for Hold, Witness and Inspection points.
Witnessing installation of transformer, bus bar, bus duct, switchgear, AC/DC motors, DG, AC/DC distribution boards, battery systems, utility stations, electrical panel boards, lighting, CCTV, HVAC, field instruments & calibration, valves, cable trays, conduits, earthing system, fire-fighting,FO cable laying, OTDR test.
Conversant with the Project HSES Plan. Proactively participate in achieving the highest possible
International standard of HSES implementation. Participate on Red Card program and adhere to PTW
system. Adroit with the concept of inspection on installation of Ex-equipments (Exd, Exe, Exi etc.) and
associated accessories in potentially explosive hazardous atmosphere (IEC60079 – 14 & 17). Generate client Requests for Inspection (RFI) where required providing sufficient notice for Hold,
Witness and Inspection points. Implementing Factory Acceptance Tests (FAT), Site Installation Tests (SIT), Site Acceptance Tests
(SAT) and approving check sheet of various components. Iinstrumental in reviewing & approving Sub-Contractor’s / Supplier’s Documents i.e.
Purchase Orders (PO), Inspection Test Plans, Inspection Assignment Packages, Quality Procedures, Work Instructions, Method Statements & Inspection Reports.
Ensured that proper control and monitoring of project expenditure on electrical, instrumentation,
telecom, fire & gas installations were effectively carried out within budget, especially the construction
activities man-hours.
Allocated and managed E&I inspectors during routine installation and testing activities.
Coordinated the resources and liaised with construction management and supervised to ensure
adequate inspection coverage of all E&I ongoing construction & completion activities.
Provided inspection techniques and expertise to construction supervisors to aid and expedite
compliance with specified quality and technical requirements.
Ensured continuous accurate QC records maintenance by E&I inspection personnel.
Liaised with Completions department, Senior Certification Engineer & Construction departments to
ensure seamless transfer of QC records and knowledge transfer between disciplines. Witnessing installation of transformer, bus bar, bus duct, switchgear, AC/DC motors, DG, AC/DC
distribution boards, battery systems, utility stations, electrical panel boards, lighting, CCTV, HVAC, field instruments & calibration, valves, cable trays, conduits, earthing system, fire-fighting, FO cable laying, OTDR test.
Pipeline Cathodic protection Installation, testing and commissioning (temporary anode installation, test
station installation, TRU Installation, Anode ground bed).
Performed inspection duties as required to verify compliance to project stipulated procedures,
specifications and noted standards and verify the test results.
Successfully completed and submitted Mechanical Completion Dossiers, As-built drawings and
Instrument Loop test Packages.
Company CONTROL AND APPLICATION EMIRATES
Position E&I QA/QC INSPECTOR.
Place United Arab Emirates (ABU DHABI).
Duration Aug 2012 to June 2013
Client ADGAS
Project Integrated Gas Development Project (IGD) Das Island,
OFFSHORE
Duties and Responsibilities
Directly reporting to the Project Manager for all the QA/QC related matters and managing all aspects of QA/QC for the multi- discipline construction, mechanical completion and pr-commissioning.
Adroit with the concept of inspection on installation of Ex-equipments (Exd, Exe, Exi etc.) and associated accessories in potentially explosive hazardous atmosphere (IEC60079 – 14 & 17).
Generate client Requests for Inspection (RFI) where required providing sufficient notice for Hold, Witness and Inspection points.
Witnessing installation of transformer, bus bar, bus duct, switchgear, AC/DC motors, DG, AC/DC
distribution boards, battery systems, utility stations, electrical panel boards, lighting, CCTV,
HVAC, field instruments & calibration, valves, cable trays, conduits, earthing system, fire-
fighting, FO cable laying, OTDR test.
Pipeline Cathodic protection Installation, testing and commissioning (temporary anode installation, test
station installation, TRU Installation, Anode ground bed). Implementing Factory Acceptance Tests (FAT), Site Installation Tests (SIT), Site Acceptance Tests
(SAT) and approving check sheet of various components. Iinstrumental in reviewing & approving Sub-Contractor’s / Supplier’s Documents i.e.
Purchase Orders (PO), Inspection Test Plans, Inspection Assignment Packages, Quality Procedures, Work Instructions, Method Statements & Inspection Reports.
Prepare all quality related procedure and processes, management of QA/QC department and control the day to day inspection, Join the critical inspections along with client.
Control of non-conformances and liaise with the clients for all QA/QC related issues. Established mechanical fabrication shop and Instrument calibration Lab as per ADGAS standard
for the fabrication of E & I supports. Conduct the welding inspection with client. Inspection of installation of Cathodic protection Cable
bonding, Thermite welding, anode and Reference cell. Installation it’s cabling and testing. Final Inspection of Field Instrument Calibration, its installation, Cable Glanding and Termination
work along with client (ADGAS). Monitoring and witnessing continuity and meggering inspection works for cables. Monitoring cable laying works in trenches, through ducts and on cable trays.
Inspection of installation and testing of instrument tubing works. Testing of cable meggering and HI – POT test.
Successfully completed and submitted Mechanical Completion Dossiers, As-built drawings and
Instrument Loop test Packages.
Company BOC GASES
Position E&I QA/QC INSPECTOR.
Place INDIA (Jamshedpur)
Duration February 2011 to August 2012
Duties and Responsibilities
Deals with reviewing of all ITP's/QCP/Method Statement/ Material Approval prior for project plan
preparation.
Coordinating with Construction Engineer project plan drawing review-having AFC drawing officially
approved documentation.
Represent Company during weekly meeting concerning schedule plan activity and project plan on all
tools and equipment needed for construction.
Assigned to Review all Subcontractor Technical Documentation Circulation prior approval to all
concerned lead official.
Ensured instrument equipment works complied with project specifications, company procedures,
method statements and quality assurance and controls documentation .Supervised and monitoring the
flow of inspection on-site and calibration prior to meet the project deadline.
Tasks to monitor all subcontractor activity priors for deadline start of Instrumentation Workload.
Company KENTZ ENGINEERS & CONSTRUCTORS.
Position E&I QA/QC INSPECTOR.
Place Ras Laffan (QATAR)
Duration May 2009 to September 2010
Client SHELL
Project PEARL SHELL GTL
Duties and Responsibilities
Preparation & implementation of Project Quality Plans, Procedures, Work Instructions, Inspection & Test Plans, Checklists, Quality records, Preparation of Punch lists & Compilation of Test packs.
Generate client Requests for Inspection (RFI) where required providing sufficient notice for Hold, Witness and Inspection points.
Witnessing installation of transformer, bus bar, bus duct, switchgear, AC/DC motors, DG, AC/DC
distribution boards, battery systems, utility stations, electrical panel boards, lighting, CCTV,
HVAC, field instruments & calibration, valves, cable trays, conduits, earthing system, fire-
fighting,FO cable laying, OTDR test.
Pipeline Cathodic protection Installation, testing and commissioning (temporary anode installation, test
station installation, TRU Installation, Anode ground bed). Adroit with the concept of inspection on installation of Ex-equipments (Exd, Exe, Exi etc.) and
associated accessories in potentially explosive hazardous atmosphere (IEC60079 – 14 & 17). Generate client Requests for Inspection (RFI) where required providing sufficient notice for Hold,
Witness and Inspection points. Implementing Factory Acceptance Tests (FAT), Site Installation Tests (SIT), Site Acceptance Tests
(SAT) and approving check sheet of various components.
Iinstrumental in reviewing & approving Sub-Contractor’s / Supplier’s Documents i.e. Purchase Orders (PO), Inspection Test Plans, Inspection Assignment Packages, Quality Procedures, Work Instructions, Method Statements & Inspection Reports.
Inspect and approve Electrical Installation on site. Witness and verify Continuity, Merger, HI-POT and component testing for Medium voltage & Low
voltage equipment. Inspection of Connection and Installation switch gear and MCC panel. Expedite materials for construction and issue field instruction to contractor. Supervise and Inspect
Subcontractor construction activities. Witness Pre commissioning and commissioning activates Review all test packages.
Successfully completed and submitted Mechanical Completion Dossiers, As-built drawings and
Instrument Loop test Packages.
Company IMCO
Position E&I QA/QC INSPECTOR.
Place SHUIABA (KUWAIT)
Duration July 2007 to 0ctober 2008
Client FLOUR
Project Olefins II (EQUATE-2)
Duties and Responsibilities
Preparation & implementation of Project Quality Plans, Procedures, Work Instructions, Inspection & Test Plans, Checklists, Quality records, Preparation of Punch lists & Compilation of Test packs.
Witnessing installation of transformer, bus bar, bus duct, switchgear, AC/DC motors, DG, AC/DC distribution boards, battery systems, utility stations, electrical panel boards, lighting, CCTV, HVAC, field instruments & calibration, valves, cable trays, conduits, earthing system, fire-fighting,FO cable laying, OTDR test.
Performing as a QA/QC Engineer and inspecting erection and pre- commissioning activities. Witnessing installation of transformer, bus bar, bus duct, switchgear, AC/DC motors, DG, AC/DC
distribution boards, battery systems, utility stations, electrical panel boards, lighting, CCTV, HVAC, field instruments & calibration, valves, cable trays, conduits, earthing system, fire-fighting,FO cable laying, OTDR test.
Generate client Requests for Inspection (RFI) where required providing sufficient notice for Hold, Witness and Inspection points.
Adroit with the concept of inspection on installation of Ex-equipments (Exd, Exe, Exi etc.) and associated accessories in potentially explosive hazardous atmosphere (IEC60079 – 14 & 17).
Generate client Requests for Inspection (RFI) where required providing sufficient notice for Hold, Witness and Inspection points.
Implementing Factory Acceptance Tests (FAT), Site Installation Tests (SIT), Site Acceptance Tests (SAT) and approving check sheet of various components.
Reviewing & approving Sub-Contractor’s / Supplier’s Documents i.e. Purchase Orders (PO), Inspection Test Plans, Inspection Assignment Packages, Quality Procedures, Work Instructions, Method Statements & Inspection Reports.
Oversaw the installation & testing of Electrical/instrument/ Pneumatic Hook-Ups: Cable Routing, Laying, Segregation, Sealing, Termination & Grounding Insulation Resistance & Continuity tests, OTDR Tests (FOC). Installation inspection of impulse tube, air line pneumatic air header as per hook-up and
AFC Drawing & Inspection of pressure. Testing /leak test of all pneumatic lines, impulse lines.
Successfully completed and submitted Mechanical Completion Dossiers, As-built drawings and
Instrument Loop test Packages.
Company BOC GASES
Position E&I QA/QC INSPECTOR.
Place INDIA (Jamshedpur)
Duration May 2003 to March 2006
Duties and Responsibilities
Attend all necessary inspections as identified in the approved Inspection and Test Plan (ITP). Coordinate with the client representatives to ensure that inspections are carried out expediently. Generate client Requests for Inspection (RFI) where required providing sufficient notice for Hold,
Witness and Inspection points. Review the calibration status of any test equipment being utilized on the project ensuring the
equipment is within calibration prior to use. Complete plan and schedule for Electrical and Instrumentation Inspection and Testing. Issue of Field Design Modification and Field Instructions (FI) to Construction and ensure that all
Modified Contract Engineering Design Sheets are entered on original documents.
Prepare & submit daily and weekly accomplishment report to department manager for section work
accomplishments/evaluations.
Company USHA MARTIN INDUSTRIES LTD
Position Instrument Technician
Place INDIA (Jamshedpur)
Duration February 2001 to March 2003
Duties and Responsibilities
Responsible for Day to Preventive, Corrective/Breakdown, Shutdown maintenance, scheduling and modification work of all types of field instruments such as Pressure, flow, temperature, level, Vibration, gauges, transmitters, flame detectors, Analyzers, control valves.
Primary responsibilities involved troubleshooting, calibration and functional check on different control loops. Ensures that such work is performed in accordance with the Refineries standards, codes and practices.
Troubleshooting and rectification with minimum down time. Responsible for preparation and execution of preventive & corrective, breakdown and shutdown
maintenance work and handling on/off control, PID control, cascade control, ratio control, feedback control, feed forward control, differential gap control, anti surge control.
Tuning of PID parameter in control loop on DCS console and pneumatic controller in field according to process requirement.
Panel wiring, relay logic, interlocks checking in control loop during shutdown as per schedule. Knowledge of FF and HART communicator. Installations and commissioning, testing of Instrument systems and equipments. Responsible for
Erection and commissioning activities like cable lying, loop checking, start-up. Able to read and implement P&ID drawing, hook-up drawing, loop drawing.
IT SKILLS
Auto CAD & the internet - Expert. MS Word, Excel, Power point,photoshop Interpersonal and communication skills-Expert. Creative skills Expert.
Personal Portfolio
NAME MOHAMMAD RIZWAN
DATE OF BIRTH 10th may 1982
PLACE OF BIRTH Jamshedpur
NATIONALITY Indian
MARITAL STATUS Single
RELIGION Islam
LANGUAGE KNOWN English, Arabic, Hindi, Urdu
Passport Detail
OLD PASSPORT DETAILS
PASSPORT NUMBER F-6063887.
DATE OF ISSUE 09.06.2006.
DATE OF EXPIRY 08.06.2016.
PLACE OF ISSUE RANCHI.
NEW PASSPORT DETAILS
PASSPORT NUMBER L-9461219
DATE OF ISSUE 19.05.2014.
DATE OF EXPIRY 18.05.2024.
PLACE OF ISSUE DUBAI.
Declaration
The details furnished above are true to the best of my knowledge and belief.
MOHAMMAD RIZWAN