UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

Post on 28-Jul-2022

25 views 0 download

Transcript of UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS

UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION

PROGRESS

Business Operations and Facilities CommitteeJanuary 16, 2017

Building

Area A – South Classroom wing closest to Doe Run Road

Area B – Administration Suite, Main vestibule

Area C - Gymnasium, Cafeteria, Kitchen

Area D – North Classroom Wing

Exterior views of the building – South Elevation

Exterior views of the building

East Elevation Southwest Elevation

Exterior views of the building

Area B - Roof Area B – South Elevation

Area A - South Classroom wing closest to Doe Run Road

1st Floor Locker framing, Classroom Area A

Typical Classroom, Classroom Area A

Area A - South Classroom wing closest to Doe Run Road

2nd Floor Corridor, Area A, Notice framing for windows

and lockers

2nd Floor Classroom, Classroom Area A

Area A – Large Group Instruction area

Looking into the LGI area in Classroom Area A

Standing inside LGI in Area A

Gymnasium

2nd Floor looking down across Gymnasium

2nd Floor looking across Gym, Stage opening on the right

Cafeteria / Stage

2nd Floor looking down into Café, Kitchen & Serving area.

2nd Floor looking across Café, through stage, and into Gym

Media Center

Media Center - main entrance, Reading area on right

Media Center – Circulation desk on left

Great Views from 2nd Floor!