Post on 24-Nov-2021
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
PENN ROWING
PHILADELPHIA HISTORICAL COMMISSION SUBMISSION NOVEMBER 05, 2020
Applicant: University of Pennsylvania
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 1
EwingCole Dan Meza, AIA, LEED APProject Manager EMAIL: dmeza@ewingcole.com
TEL: 215.625.4146
Federal Reserve Bank Building, 100 N. 6th Street, Philadelphia, PA 19106-1590
Office of the University Architect Ke FengSenior Architect/PlannerEMAIL: kefeng@upenn.edu
TEL: 215.573.9685
University of Pennsylvania, 3101 Walnut Street, Philadelphia, PA 19104
Facilities & Real Estate Services James Palka, AIA Senior Project Manager EMAIL: palka@upenn.edu
TEL: 215.768.7663
University of Pennsylvania, 3101 Walnut Street, Philadelphia, PA 19104
Structural Engineering:
Keast & Hood Co. Dean Doukakis Senior Principal EMAIL:
DDoukakis@keasthood.com
TEL: 215.625.0099
400 Market St #1250, Philadelphia, PA 19106
Civil Engineering & Landscape Architecture:
PennoniThomas FrieseAssociate Vice President EMAIL:
TFriese@Pennoni.com
TEL: 215.254.7781
1900 Market St Suite #300, Philadelphia, PA 19103
Historic Preservation Consulting:
sbk + partners, LLCSuzanna BaruccoPrincipal EMAIL:
suzannabarucco@gmail.com
TEL: 610.357.9763
805 Clifford Ave. Ardmore, PA 19003
AV/IT/SECURITY:
AcentechPerry Artese, Senior Consultant EMAIL:
partese@acentech.com
TEL: 215.245.5895
8 Interplex Dr #218, Trevose, PA 19053
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 2
◊ Showcase Penn Rowing
◊ Increase Usable Space
◊ Improve Overall Functionality
◊ Bolster recruitment
◊ Expand and Upgrade the Locker Rooms
◊ Remediate Existing Structural Concerns
◊ Improve Training and Team Spaces
◊ Preserve a Historic Landmark
The University of Pennsylvania College Boat Club crew teams have been at the forefront of elite college rowing teams since first rowing under the UPenn banner in 1879. The College Boat Club is recognized for its historical significance at the local and national levels. The site is individually listed in the Philadelphia Historic Register. Below is a timeline of construction:
• 1874-1875 Initial construction of two story, one-bay by three-bay boathouse
• 1920 North gable end extended to north, one story boat bay addition to east (Edward F. Hoffman, Jr., Architect)
• Circa 1930 Second story built over south end of 1920 east addition
• 1980-1983 Two-story west addition, second story over north end of 1920 east addition, new fire stair, all windows replaced (Francis Cauffman Wilkinson & Pepper, Architects).
The College Boat Club as it stands today has a near-center stone gable (the original boathouse) with lower stucco additions to the east and west. The form and height of the additions allow the original building to predominate the composition on the north (Kelly Drive) and south (Schuylkill River) elevations. These relationships will be maintained in the new Project.
The proposed project will retain and restore the original stone boathouse and 1980-83 west addition, including preservation of existing original trim and reconstruction of the original windows and doors on both the north and south elevations, as well as the original south balcony. The east additions are proposed to be demolished (see page 7, Structural Narrative). The first story, built in 1920, will be reconstructed, including the stucco finish, wood trim, windows and doors, all character-defining features of this addition.
PROPOSAL DESCRIPTION
A new second story will be built in the spirit of the existing c. 1930 addition, the principal changes being the addition of larger shed dormers on the south and north elevations, to accommodate new glazed doors onto new balconies. A steep-slope mansard roof, similar to the existing roof, will connect the two gables on the east elevation and mask roof-top HVAC equipment from view. The 1980-1983 west addition will be retained and restored.
Aspects of the boathouse interior that are considered character-defining, and will also be preserved and restored, include the original “members room” on the second floor of the original boathouse, with its decorative exposed truss ceiling and bead-board walls. The character of the 1920 boat bay interior is also worthy of mention, with its exposed wood framing and sawtooth roof and skylights which will be recomposed and define the character of the new Erg Room on the second floor. The interior rehabilitation will also preserve and expose the original exterior stonework at the second floor of the east (side) wall. Second floor windows on this east wall will also be retained, and re-purposed as doorways between the original building and new east addition.
It is a primary objective of this project to provide space and program equity for the men and women crew programs. The original facility, despite multiple additions, has been unable to keep pace with the increased volume of members and program needs. The boathouse footprint is currently maximized relative to its neighbors’, Penn AC and Vesper, property lines; additional space is only available through the construction of a second-floor infill addition over the one-story boat bay as proposed. In addition to programmatic expansions and functional improvements, this project will also upgrade all building systems, including heating, cooling, security, and fire protection. Heavy use of the building, wear and tear, exposure to weather, further compounded by settlement of the building and aging infrastructure, inevitably lead to the need for repairs and restoration of parts of the boathouse.
EXECUTIVE SUMMARYPROJECT GOALS
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 3
EXISTING AND HISTORIC ELEVATIONS
West Elevation , 07.30.2019
Exterior from the Schuylkill, 12.05.2019
Exterior from Schuylkill
Exterior from Kelly Drive, 12.05.2019
Exterior from the Schuylkill c.1930
East Elevation, 07.30.2019
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 4
EXISTING EAST & WEST ELEVATIONS
West Elevation , 07.30.2019
East Elevation 12.05.2019
East Elevation , 03.04.2018
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 5
SITE
Penn Boathouse Existing Aerial View Penn Boathouse Survey & Plan of Properties 1999
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 6
UPENN BOATHOUSEUNIVERSITY OF PENNSYLVANIA
LEVEL 1
1875
1920
19201980
1920
1875
1980
1938
HISTORIC• 1874-1875 Constructed (Cost of $8,000)
• 1920 - Addition• 1938 - Addition• 1980 - Addition
3
BOATHOUSE EVOLUTION/GROWTH
1874-1875 Original Pavilion
1920 - Addition
c.1930 - Addition
1980 - Addition
UPENN BOATHOUSE| SCHEMATIC DESIGN ‘KICK-OFF’ UNIVERSITY OF PENNSYLVANIA
11EwingCole ©2017
LEVEL 1
1875
1920
19201980
HISTORIC• 1874-1875 Constructed (Cost of $8,000)
• 1920 - Addition• 1938 - Addition• 1980 - Addition
19201874-75
1980
c.1930
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 7
Existing Penn Boathouse
REVISED MASSING STUDIES
The addition overbuilds the existing footprint to create additional square footage with a second floor “infill”. The axonometric diagrams above show how the new building massing replicates the existing gables and dormers, preserving the scale and character of the Schuylkill elevation.
ProposedScope
The proposed addition will reflect the existing building’s character and scale, referencing existing details and proportions in the new construction. The material palette is consistent with the original through its use of stone, stucco, wood trim, and roofing composed of synthetic slate and asphalt shingles.
EXISTING/RENOVATION
REBUILD
NEW ADDITION
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 8
STRUCTURAL NARRATIVE
Test Pit TP-1, Footing 20” Below Grade, Geotechnical Report, September 2019
Test Pit TP-2, No Footing Encountered, Geotechnical Report, September 2019
Existing East Wall, August 2019
Structural Diagrams
Roof Above Men’s Boat Bay, July 2019
Ceiling Above Main Entry, July 2019 Existing East Wall, August 2019
The original boathouse was constructed in 1874 with the east and west wings built in 1921 and 1980, respectively. The west wing is a two-story addition constructed of concrete masonry, steel and wood and was built to house the women’s boats. The second floor of the west wing was constructed at a different floor elevation than the floor elevation of the original boathouse. The original east wing was a one-story shed structure that was modified in the early 1930’s to include a small vertical addition on the river side. It currently houses the men’s boats.
The east wing was constructed primarily with dimensional wood construction forming the exterior stud walls on three sides and the roof. These perimeter walls bear on short concrete foundation walls that do not bear on continuous spread footings. This has accounted for some of the settlement that these walls have experienced. The roof, with its multiple roof monitors, is supported at the east perimeter, west original boathouse masonry wall, and at its centerline by several timber columns that bear on shallow spread footings.
A structural condition assessment was completed for the east wing to determine if the structure could support a full overbuild addition. The assessment determined that the existing foundations, roof framing members, and columns have insufficient vertical load capacity and lateral load resistance to support the code required loads for the proposed program designated for the second floor. An attempt to strengthen the existing roof framing would result in a significant loss of vertical height within the boat bay that would severely diminish the vertical space required to maximize boat stacking. Compounding the loss of vertical space would be the additional loss of footprint to introduce supplemental columns. In addition, all of the foundations would need to be underpinned to increase their bearing capacity. This would be a risky operation in soils that are not known for their cohesiveness.
The proposed two-story addition would be constructed on the footprint of the current east wing. The structure would consist of a cast-in-place concrete supported second floor overtopped by a structural steel and timber roof structure. The new concrete columns would bear on reinforced concrete pile caps supported by mini-piles. The structure would be designed to conform to flood plain management requirements. Other additions would include an elevator within the footprint of the original boathouse. Overbuild construction or construction of a new floor level will be required at the original boathouse’s second floor to provide a more uniform second floor elevation for ADA accessibility. Decayed framing within the 1921 addition at the front of the original 1874 boathouse would also be repaired and supplemented.
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 9
EXISTING VS PROPOSED PLANS: FLOOR 1
FLOOR 1: PROPOSEDFLOOR 1: EXISTING
VES
PER
BO
AT
CLU
B
PEN
N A
THLE
TIC
CLU
B
PEN
N A
THLE
TIC
CLU
B
VES
PER
BO
AT
CLU
B
12
12
13
14
15
16
12
13
14
15
16
+16.93'
+13.11'+13.31'
+12.37'
+13.30'
+13.05'
+12.01'
+13.28'
+12.09'
REF.
A B C
22'-0" 22'-3"
SHOP
EAST BAYWEST BAY
ENTRY
MECHROOM
TOILET
1879 SF
ERG/EVENTROOM
201
640 SF
WOMEN'SLOCKERS
208
194 SF
WOMEN'STOILETS
211
192 SF
MEN'S TOILETS203
150 SF
MEN'SSHOWERS
204
785 SF
MEN'S LOCKERS202
343 SF
COACHES'213
102 SF
ADA207
A B C
A5.1.11
22'-0" 22'-3"
165 SF
WOMEN'SSHOWERS
210
1329 SF
GRAND HALL200
23 SF
AV211A
15 SF
JCL208A
27 SF
VESTIBULE 02209
53 SF
HALL 02203A
44 SF
HALL 03210A
45 SF
VESTIBULE 01212
82 SF
KITCHEN208B
8 SF
JCL208E
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t9/
4/20
20 1
0:44
:15
AM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A2.1
William McCullough
Dan Meza
FLOOR PLANS
SD
2018
SCALE: 1/8" = 1'-0"1 LEVEL 1 FLOOR PLANSCALE: 1/8" = 1'-0"8 LEVEL 2 FLOOR PLAN
FINISH GROUP DEFINITIONSLEVEL 2
FINISH GROUP DEFINITIONSLEVEL 1
13.0 42" GALVANIZED RAILING; EXTEND 18" PAST SKYLIGHT12.0 ROOF HATCH WITH OSHA APPROVED RAILING11.0 SKYLIGHT; BOD: VELUX NORTHLIGHT MODULAR SKYLIGHT10.0
WHITE EPDM MEMBRANE ROOF; RIGID INSULATION; 1/2" METAL DECK; SEEASSEMBLY DET. FOR ADD'L INFO
9.0WHITE EPDM MEMBRANE ROOF; RIGID INSULATION; 3" NOM. TIMBER ROOFDECKING; SEE ASSEMBLY DETL. FOR ADD'L INFO
8.0 METAL GUARDRAIL WITH CABLE INFILL
7.0CUSTOM WOOD CASEWORK, ANTI-GLARE TEMPERED GLASS SLIDING DOORS,INTERIOR LIGHTING, BLACK STEEL SURROUND
6.0CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; UPPER AND LOWERCABINETS; SEE BUILDING SECTION FOR ADD'L INFO
5.0 CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; 3'-6" TALL4.0 CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; 7'-0" TALL3.0
MACHINE ROOM LESS(MRL) LIMITED USE/LIMITED APPLICATION (LU/LA)ELEVATOR; BOD: SAVARIA ORION, 1400 LB CAPACITY, 2-STOPS, 30 FPM,CMU ENCLOSURE
2.0
STAIR: TREAD:PORCELAIN CERAMIC STAIR TREAD, STONE SOURCE, LANDINGS (TOP, INTER):PORCELAIN CERAMIC TILE, STONE SOURCE,
OTHER:BLACK STEEL FRAME & FITTINGS WITH STAINLESS TENSIONCABLE GUARDRAILS, OAK HANDRAILS
1.0 SOLID CORE WOOD VENEER INTERIOR DOOR AND ASSOCIATED HARDWARE
Item No. NEW WORK KEY NOTES(NOT ALL KEY NOTES WILL APPLY TO ALL SHEETS)
KEY NOTE SCHEDULE
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
2'
SCALE AT FULL SIZE: 1/8" = 1'-0"
0 4' 8' 16' 24'
2'
SCALE AT FULL SIZE: 1/8" = 1'-0"
0 4' 8' 16' 24'
12
12
13
14
15
16
12
13
14
15
16
+16.93'
+13.11'+13.31'
+12.37'
+13.30'
+13.05'
+12.01'
+13.28'
+12.09'
REF.
A B C
22'-0" 22'-3"
SHOP
EAST BAYWEST BAY
ENTRY
MECHROOM
TOILET
1879 SF
ERG/EVENTROOM
201
640 SF
WOMEN'SLOCKERS
208
194 SF
WOMEN'STOILETS
211
192 SF
MEN'S TOILETS203
150 SF
MEN'SSHOWERS
204
785 SF
MEN'S LOCKERS202
343 SF
COACHES'213
102 SF
ADA207
A B C
A5.1.11
22'-0" 22'-3"
165 SF
WOMEN'SSHOWERS
210
1329 SF
GRAND HALL200
23 SF
AV211A
15 SF
JCL208A
27 SF
VESTIBULE 02209
53 SF
HALL 02203A
44 SF
HALL 03210A
45 SF
VESTIBULE 01212
82 SF
KITCHEN208B
8 SF
JCL208E
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t9/
4/20
20 1
0:44
:15
AM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A2.1
William McCullough
Dan Meza
FLOOR PLANS
SD
2018
SCALE: 1/8" = 1'-0"1 LEVEL 1 FLOOR PLANSCALE: 1/8" = 1'-0"8 LEVEL 2 FLOOR PLAN
FINISH GROUP DEFINITIONSLEVEL 2
FINISH GROUP DEFINITIONSLEVEL 1
13.0 42" GALVANIZED RAILING; EXTEND 18" PAST SKYLIGHT12.0 ROOF HATCH WITH OSHA APPROVED RAILING11.0 SKYLIGHT; BOD: VELUX NORTHLIGHT MODULAR SKYLIGHT10.0
WHITE EPDM MEMBRANE ROOF; RIGID INSULATION; 1/2" METAL DECK; SEEASSEMBLY DET. FOR ADD'L INFO
9.0WHITE EPDM MEMBRANE ROOF; RIGID INSULATION; 3" NOM. TIMBER ROOFDECKING; SEE ASSEMBLY DETL. FOR ADD'L INFO
8.0 METAL GUARDRAIL WITH CABLE INFILL
7.0CUSTOM WOOD CASEWORK, ANTI-GLARE TEMPERED GLASS SLIDING DOORS,INTERIOR LIGHTING, BLACK STEEL SURROUND
6.0CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; UPPER AND LOWERCABINETS; SEE BUILDING SECTION FOR ADD'L INFO
5.0 CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; 3'-6" TALL4.0 CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; 7'-0" TALL3.0
MACHINE ROOM LESS(MRL) LIMITED USE/LIMITED APPLICATION (LU/LA)ELEVATOR; BOD: SAVARIA ORION, 1400 LB CAPACITY, 2-STOPS, 30 FPM,CMU ENCLOSURE
2.0
STAIR: TREAD:PORCELAIN CERAMIC STAIR TREAD, STONE SOURCE, LANDINGS (TOP, INTER):PORCELAIN CERAMIC TILE, STONE SOURCE,
OTHER:BLACK STEEL FRAME & FITTINGS WITH STAINLESS TENSIONCABLE GUARDRAILS, OAK HANDRAILS
1.0 SOLID CORE WOOD VENEER INTERIOR DOOR AND ASSOCIATED HARDWARE
Item No. NEW WORK KEY NOTES(NOT ALL KEY NOTES WILL APPLY TO ALL SHEETS)
KEY NOTE SCHEDULE
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
2'
SCALE AT FULL SIZE: 1/8" = 1'-0"
0 4' 8' 16' 24'
2'
SCALE AT FULL SIZE: 1/8" = 1'-0"
0 4' 8' 16' 24'
REBUILT /NEW CONSTRUCTION
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 10
EXISTING VS PROPOSED PLANS: FLOOR 2
FLOOR 2: PROPOSEDFLOOR 2: EXISTING
12
12
13
14
15
16
12
13
14
15
16
+16.93'
+13.11'+13.31'
+12.37'
+13.30'
+13.05'
+12.01'
+13.28'
+12.09'
REF.
A B C
22'-0" 22'-3"
SHOP
EAST BAYWEST BAY
ENTRY
MECHROOM
TOILET
1879 SF
ERG/EVENTROOM
201
640 SF
WOMEN'SLOCKERS
208
194 SF
WOMEN'STOILETS
211
192 SF
MEN'S TOILETS203
150 SF
MEN'SSHOWERS
204
785 SF
MEN'S LOCKERS202
343 SF
COACHES'213
102 SF
ADA207
A B C
A5.1.11
22'-0" 22'-3"
165 SF
WOMEN'SSHOWERS
210
1329 SF
GRAND HALL200
23 SF
AV211A
15 SF
JCL208A
27 SF
VESTIBULE 02209
53 SF
HALL 02203A
44 SF
HALL 03210A
45 SF
VESTIBULE 01212
82 SF
KITCHEN208B
8 SF
JCL208E
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t9/
4/20
20 1
0:44
:15
AM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A2.1
William McCullough
Dan Meza
FLOOR PLANS
SD
2018
SCALE: 1/8" = 1'-0"1 LEVEL 1 FLOOR PLANSCALE: 1/8" = 1'-0"8 LEVEL 2 FLOOR PLAN
FINISH GROUP DEFINITIONSLEVEL 2
FINISH GROUP DEFINITIONSLEVEL 1
13.0 42" GALVANIZED RAILING; EXTEND 18" PAST SKYLIGHT12.0 ROOF HATCH WITH OSHA APPROVED RAILING11.0 SKYLIGHT; BOD: VELUX NORTHLIGHT MODULAR SKYLIGHT10.0
WHITE EPDM MEMBRANE ROOF; RIGID INSULATION; 1/2" METAL DECK; SEEASSEMBLY DET. FOR ADD'L INFO
9.0WHITE EPDM MEMBRANE ROOF; RIGID INSULATION; 3" NOM. TIMBER ROOFDECKING; SEE ASSEMBLY DETL. FOR ADD'L INFO
8.0 METAL GUARDRAIL WITH CABLE INFILL
7.0CUSTOM WOOD CASEWORK, ANTI-GLARE TEMPERED GLASS SLIDING DOORS,INTERIOR LIGHTING, BLACK STEEL SURROUND
6.0CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; UPPER AND LOWERCABINETS; SEE BUILDING SECTION FOR ADD'L INFO
5.0 CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; 3'-6" TALL4.0 CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; 7'-0" TALL3.0
MACHINE ROOM LESS(MRL) LIMITED USE/LIMITED APPLICATION (LU/LA)ELEVATOR; BOD: SAVARIA ORION, 1400 LB CAPACITY, 2-STOPS, 30 FPM,CMU ENCLOSURE
2.0
STAIR: TREAD:PORCELAIN CERAMIC STAIR TREAD, STONE SOURCE, LANDINGS (TOP, INTER):PORCELAIN CERAMIC TILE, STONE SOURCE,
OTHER:BLACK STEEL FRAME & FITTINGS WITH STAINLESS TENSIONCABLE GUARDRAILS, OAK HANDRAILS
1.0 SOLID CORE WOOD VENEER INTERIOR DOOR AND ASSOCIATED HARDWARE
Item No. NEW WORK KEY NOTES(NOT ALL KEY NOTES WILL APPLY TO ALL SHEETS)
KEY NOTE SCHEDULE
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
2'
SCALE AT FULL SIZE: 1/8" = 1'-0"
0 4' 8' 16' 24'
2'
SCALE AT FULL SIZE: 1/8" = 1'-0"
0 4' 8' 16' 24'
12
12
13
14
15
16
12
13
14
15
16
+16.93'
+13.11'+13.31'
+12.37'
+13.30'
+13.05'
+12.01'
+13.28'
+12.09'
REF.
A B C
22'-0" 22'-3"
SHOP
EAST BAYWEST BAY
ENTRY
MECHROOM
TOILET
1879 SF
ERG/EVENTROOM
201
640 SF
WOMEN'SLOCKERS
208
194 SF
WOMEN'STOILETS
211
192 SF
MEN'S TOILETS203
150 SF
MEN'SSHOWERS
204
785 SF
MEN'S LOCKERS202
343 SF
COACHES'213
102 SF
ADA207
A B C
A5.1.11
22'-0" 22'-3"
165 SF
WOMEN'SSHOWERS
210
1329 SF
GRAND HALL200
23 SF
AV211A
15 SF
JCL208A
27 SF
VESTIBULE 02209
53 SF
HALL 02203A
44 SF
HALL 03210A
45 SF
VESTIBULE 01212
82 SF
KITCHEN208B
8 SF
JCL208E
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t9/
4/20
20 1
0:44
:15
AM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A2.1
William McCullough
Dan Meza
FLOOR PLANS
SD
2018
SCALE: 1/8" = 1'-0"1 LEVEL 1 FLOOR PLANSCALE: 1/8" = 1'-0"8 LEVEL 2 FLOOR PLAN
FINISH GROUP DEFINITIONSLEVEL 2
FINISH GROUP DEFINITIONSLEVEL 1
13.0 42" GALVANIZED RAILING; EXTEND 18" PAST SKYLIGHT12.0 ROOF HATCH WITH OSHA APPROVED RAILING11.0 SKYLIGHT; BOD: VELUX NORTHLIGHT MODULAR SKYLIGHT10.0
WHITE EPDM MEMBRANE ROOF; RIGID INSULATION; 1/2" METAL DECK; SEEASSEMBLY DET. FOR ADD'L INFO
9.0WHITE EPDM MEMBRANE ROOF; RIGID INSULATION; 3" NOM. TIMBER ROOFDECKING; SEE ASSEMBLY DETL. FOR ADD'L INFO
8.0 METAL GUARDRAIL WITH CABLE INFILL
7.0CUSTOM WOOD CASEWORK, ANTI-GLARE TEMPERED GLASS SLIDING DOORS,INTERIOR LIGHTING, BLACK STEEL SURROUND
6.0CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; UPPER AND LOWERCABINETS; SEE BUILDING SECTION FOR ADD'L INFO
5.0 CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; 3'-6" TALL4.0 CUSTOM PHENOLIC MILLWORK STORAGE CABINETS; 7'-0" TALL3.0
MACHINE ROOM LESS(MRL) LIMITED USE/LIMITED APPLICATION (LU/LA)ELEVATOR; BOD: SAVARIA ORION, 1400 LB CAPACITY, 2-STOPS, 30 FPM,CMU ENCLOSURE
2.0
STAIR: TREAD:PORCELAIN CERAMIC STAIR TREAD, STONE SOURCE, LANDINGS (TOP, INTER):PORCELAIN CERAMIC TILE, STONE SOURCE,
OTHER:BLACK STEEL FRAME & FITTINGS WITH STAINLESS TENSIONCABLE GUARDRAILS, OAK HANDRAILS
1.0 SOLID CORE WOOD VENEER INTERIOR DOOR AND ASSOCIATED HARDWARE
Item No. NEW WORK KEY NOTES(NOT ALL KEY NOTES WILL APPLY TO ALL SHEETS)
KEY NOTE SCHEDULE
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
2'
SCALE AT FULL SIZE: 1/8" = 1'-0"
0 4' 8' 16' 24'
2'
SCALE AT FULL SIZE: 1/8" = 1'-0"
0 4' 8' 16' 24'
REBUILT /NEW CONSTRUCTION
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 11
Overview
• Overall massing and scale of proposed addition is large compared to the original central pavilion
• Detail at new dormers is not contextually sensitive
PHILADELPHIA HISTORICAL COMMISSION ARCHITECTURAL COMMITTEE COMMENTS
SUMMARY OF DESIGN REVISIONS
Kelly Drive Facade
• Ridge at new addition should be lowered to match existing West Bay ridge
• Dormer scale should be reduced and detail should comport with existing shed dormer details
• Entrance pavilion should respect historic elements
Schuylkill Facade
• Dormers should be reduced in scale, defer to the original central pavilion and should reference existing shed dormer details
• New East & West Bay balconies should be more recessive
• New balconies should not extend beyond cornice and wall below
East Facade
• Scale of main roof gable facing east is large and undifferentiated
• Consider reducing scale and incorporating glazing
Kelly Drive Facade
• Ridge lowered 30” to align with West Bay ridge line
- Concealed flat roof (beyond) and roof top equipment lowered 30”
• Dormer modified - broke into two smaller dormers
- Reduced elevation of eave
- Modified detail to reference existing shed dormers
• Window and door configuration respected and balcony element restored
Schuylkill Facade
• Dormers modified
- Reduced height of dormers and glazing by 24” to match existing West Bay dormer height
- Modified detailing to reflect existing shed dormer details & materials
- Doors of main dormer divided into 3 sections
• Modified balconies
- Reduced projection and scale of balcony elements to be more recessive
- Modified details to be more contextual
- Balconies respect cornice and facade below
East Facade
• Reduced main gable parapet height by 36” and north gable end height by 30”
• Incorporated fenestration consistent with existing
Overview
• Reduced overall massing and scale of second story addition, revised dormers and lowered ridge lines
• Revised detailing to be consistent with existing dormer
11/05/2020
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 12
KELLY DRIVE FACADE/NORTH ELEVATION
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS SET - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t11
/4/2
020
3:05
:59
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.1
William McCullough
Dan Meza
ELEVATIONS NORTH & SOUTH
DD
2018
SCALE: 1/8" = 1'-0"1 NORTH ELEVATION
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATIONSCALE:4 PERSPECTIVE SOUTH ELEVATION A
SCALE:3 PERSPECTIVE NORTH-EAST ELEVATION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B - SCHEMATIC DESIGN SET 01.16.20
KELLY DRIVE FACADE
Ridge at new addition should be lowered to match existing West Bay ridge
KELLY DRIVE FACADE
Ridge lowered 30” to align with West Bay ridge line
Concealed flat roof (beyond) and roof top equipment lowered 30”
Dormer scale should be reduced and detail should comport with existing shed dormer details
Dormer modified - broke into two separate dormers
Reduced elevation of eave
Modified detail to reference existing shed dormers
Restored main entry pavilion with historic balcony and original window and door configuration
REBUILT /NEW CONSTRUCTION
09/14/2020: North Elevation View REVISED: North Elevation View
NORTH ELEVATION REVISED 11/05/2020
ASPHALT SHINGLE(SYNTHETIC SLATE
ALT.)
INSULATED ALUM. CLAD WOOD WINDOW SYSTEM
WOOD DOORS
STUCCO
PRESERVE EXISTING EAVES AND SIDING
PRESERVE EXISTING DORMER
ASPHALT SHINGLE(SYNTHETIC SLATE
ALT.)
INSULATED ALUM. CLAD WOOD WINDOW SYSTEM
WOOD DOORS
STUCCO
REPLACE ALL EXISTING WINDOWS W/ INSULATED ALUM. CLAD WOOD
WINDOWS
PRESERVE EXISTING EAVES AND SIDING
PRESERVE EXISTING DORMER
REPLACE ALL EXISTING WINDOWS W/ INSULATED ALUM. CLAD WOOD
WINDOWS
LINE OF 09/14/20RIDGE HEIGHT
LINE OF 09/14/20RIDGE HEIGHT LINE OF NEW
LOWERED RIDGE
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 13
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS SET - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t11
/4/2
020
3:05
:59
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.1
William McCullough
Dan Meza
ELEVATIONS NORTH & SOUTH
DD
2018
SCALE: 1/8" = 1'-0"1 NORTH ELEVATION
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATIONSCALE:4 PERSPECTIVE SOUTH ELEVATION A
SCALE:3 PERSPECTIVE NORTH-EAST ELEVATION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B - SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t9/
30/2
020
3:18
:16
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.1
William McCullough
Dan Meza
ELEVATIONS NORTH & SOUTH
SD
2018
SCALE: 1/8" = 1'-0"1 NORTH ELEVATION
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATIONSCALE:4 PERSPECTIVE SOUTH ELEVATION A
SCALE:3 PERSPECTIVE NORTH-EAST ELEVATION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
SCALE:5 3D View 6
KELLY DRIVE FACADE/NORTH ELEVATION
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
-
---
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS PRINT - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t10
/11/
2020
12:
48:3
7 P
M
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.1
William McCullough
Dan Meza
ELEVATIONS NORTH & SOUTH
DD
2018
SCALE: 1/8" = 1'-0"1 NORTH ELEVATION
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATIONSCALE:4 PERSPECTIVE SOUTH ELEVATION A
SCALE:3 PERSPECTIVE NORTH-EAST ELEVATION
SCALE:5 3D View 6
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
-
---
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS PRINT - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t10
/11/
2020
12:
48:3
7 P
M
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.1
William McCullough
Dan Meza
ELEVATIONS NORTH & SOUTH
DD
2018
SCALE: 1/8" = 1'-0"1 NORTH ELEVATION
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATIONSCALE:4 PERSPECTIVE SOUTH ELEVATION A
SCALE:3 PERSPECTIVE NORTH-EAST ELEVATION
SCALE:5 3D View 6
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
REMOVE EXISTING SHINGLES AND REPLACE TO MATCH NEW TYP. ALL EXIST. SHINGLES
NEW EXTERIORWALL ASSEMBLY
REPLACE ALL EXISTING WINDOWS W/ INSULATED ALUM. CLAD WOOD WIN-
DOWS
ASPHALT SHINGLE(SYNTHETIC ALT.)
PRESERVE EXISTING EAVES AND SIDING
PRESERVE EXISTING DORMER
REBUILT /NEW CONSTRUCTION
REMOVE PORTION OF DORMER
DEMO REMOVE & REPLACE DOORSREMOVE & REPLACE WINDOWS
NEW EXTERIORWALL ASSEMBLY
09/14/2020: North Elevation REVISED: North Elevation
EXISTING: North Elevation
REMOVE EXISTING SHINGLES AND REPLACE TO MATCH NEW TYP. ALL EXIST. SHINGLES
REPLACE ALL EXISTING WINDOWS W/ INSULATED ALUM. CLAD WOOD WIN-
DOWS
ASPHALT SHINGLE(SYNTHETIC SLATE ALT.)
PRESERVE EXISTING EAVES AND SIDING
PRESERVE EXISTING DORMER
6 PANEL ENTRY DOOR
NORTH ELEVATION REVISED 11/05/2020
LINE OF 09/14/20 RIDGE HEIGHT
LINE OF NEW RIDGE LOWERED BY 30”
LINE OF 09/14/20RIDGE HEIGHT
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 14
Revised North Elevation Rendering from Kelly Drive
REVISED KELLY DRIVE FACADE/NORTH ELEVATION
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 15
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
-
---
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t10
/6/2
020
7:45
:25
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.1
William McCullough
Dan Meza
ELEVATIONS NORTH & SOUTH
SD
2018
SCALE: 1/8" = 1'-0"1 NORTH ELEVATION
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATIONSCALE:4 PERSPECTIVE SOUTH ELEVATION A
SCALE:3 PERSPECTIVE NORTH-EAST ELEVATION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
SCALE:5 3D View 6
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS SET - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t11
/2/2
020
5:59
:44
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.1
William McCullough
Dan Meza
ELEVATIONS NORTH & SOUTH
DD
2018
SCALE: 1/8" = 1'-0"1 NORTH ELEVATION
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATIONSCALE:4 PERSPECTIVE SOUTH ELEVATION A
SCALE:3 PERSPECTIVE NORTH-EAST ELEVATION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B - SCHEMATIC DESIGN SET 01.16.20
SCHUYLKILL FACADE
Dormers overwhelm the facade - they should be reduced in scale and character should reference existing shed dormer details
SCHUYLKILL FACADE
Dormers modified
Reduced height of dormers and glazing by 24” to match existing West Bay dormer height
Modified detailing to reflect existing shed dormer details & materials
Modified balconies
Reduced projection and scale of balcony elements to be within cornice and wall below
Modified details to be more contextual
New East & West Bay balconies overwhelm facade
REBUILT /NEW CONSTRUCTION
09/14/2020: South Elevation View REVISED: South Elevation View
SCHUYLKILL FACADE/SOUTH ELEVATION
SOUTH ELEVATION REVISED 11/05/2020
NEW STONE TO MATCH EXISTING
STUCCO
ASPHALT SHINGLE(SYNTHETIC SLATE
ALT.)
INSULATED ALUM. CLAD WOOD WINDOW & DOOR
SYSTEM
NEW BALCONY; PAINTED STEEL GUARDRAIL W/
PICKETS
PRESERVE EXISTING EAVES AND SIDING
NEW STONE TO MATCH EXISTING
STUCCO
ASPHALT SHINGLE(SYNTHETIC SLATE
ALT.)
INSULATED ALUM. CLAD WOOD WINDOW & DOOR
SYSTEM
NEW BALCONY; PAINTED STEEL GUARDRAIL W/
PICKETS
PRESERVE EXISTING EAVES AND SIDING
LINE OF 09/14/20 EAVE
LINE OF PREVIOUSEAVE
LINE OF NEWEAVE
LINE OF PREVIOUSPARAPET
LINE OF NEWPARAPET
LINE OF 09/14/20PARAPET
SEE EASTELEVATION
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 16
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS SET - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t11
/2/2
020
5:59
:44
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.1
William McCullough
Dan Meza
ELEVATIONS NORTH & SOUTH
DD
2018
SCALE: 1/8" = 1'-0"1 NORTH ELEVATION
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATIONSCALE:4 PERSPECTIVE SOUTH ELEVATION A
SCALE:3 PERSPECTIVE NORTH-EAST ELEVATION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B - SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
FAUX SLATEFAUX SLATE
REMOVE EXISTING SHINGLES AND
REPLACE TO MATCH NEW - TYP. ALL
EXIST. SHINGLES
10'-1
1"2'
-7 1
/2"
-
---
-
---
-
---
-
---
6'-1
0"
-
---
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t9/
30/2
020
1:27
:44
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.1
William McCullough
Dan Meza
ELEVATIONS NORTH & SOUTH
SD
2018
SCALE: 1/8" = 1'-0"1 NORTH ELEVATION
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATIONSCALE:4 PERSPECTIVE SOUTH ELEVATION A
SCALE:3 PERSPECTIVE NORTH-EAST ELEVATION
FAUX SLATE FAUX SLATE
FAUX SLATE
INSULATED ALUM. CLAD WOOD WINDOW & DOOR
ASSEMBLY
STUCCO
WOOD DOORS
PAINTED STEELGUARDRAIL W/ TENSION
STAINLESS STEELCABLE
FAUX SLATE FAUX SLATE INSULATED ALUM. CLAD WOOD WINDOW & DOOR
ASSEMBLY
STUCCO
WOOD DOORS
PAINTED STEELGUARDRAIL W/ PICKETS
STAINLESS STEELFAUX SLATE
STUCCONEW STONE TO MATCH EXISTING
REPLACE ALL EXISTING WINDOWS W/INSULATED WOOD CLAD ALUM. WINDOWS
POWERWASH ENTIRE ELEVATIONPATCH REPAIR EXIST. STUCCO
REPLACE ALL SEALANTS &PREP TO RECEIVE NEW PAINT
REPLACE ALL EXISTING WINDOWS W/
INSULATED WOOD CLAD ALUM. WINDOWS
POWERWASH ENTIRE ELEVATIONPATCH REPAIR EXIST. STUCCO
REPLACE ALL SEALANTS &PREP TO RECEIVE NEW PAINT
NEW EXTERIORWALL ASSEMBLY
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
SCALE:5 3D View 6
SCHUYLKILL FACADE/SOUTH ELEVATIONREBUILT /NEW CONSTRUCTION
DEMO
REMOVE & REPLACE DOORS REMOVE & REPLACE DOORS
REMOVE & REBUILD DORMER
09/14/2020 South Elevation REVISED: South Elevation
EXISTING: South ElevationSOUTH ELEVATION REVISED 11/05/2020
NEW BALCONY; REBUILD TO MATCH 1875 BALCONY
NEW BALCONY; REBUILD TO MATCH 1875 BALCONY
ASPHALT SHINGLE(SYNTHETIC SLATE ALT.)
ASPHALT SHINGLE(SYNTHETIC SLATE ALT.)
NEW STONE BASE TO MATCH EXISTING
NEW STONE BASE TO MATCH EXISTING
INSULATED ALUM. CLAD WOOD DOOR SYSTEMNEW BALCONY; PAINTED STEEL GUARDRAIL W/ PICKETS
INSULATED ALUM. CLAD WOOD DOOR SYSTEMNEW BALCONY; PAINTED STEEL GUARDRAIL W/ PICKETS
LINE OF 09/14/20 EAVE
LINE OF NEW LOWERED EAVE
LINE OF 09/14/20EAVE
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 17
REVISED SCHUYLKILL FACADE/SOUTH ELEVATION
Revised South Elevation Rendering
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 18
REVISED SCHUYLKILL FACADE/SOUTH ELEVATION
Revised View from the Schuylkill
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 19
EAST FACADE
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
1'-1
"10
'-11"
2'-7
1/2
"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS SET - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t11
/4/2
020
3:15
:38
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.2
William McCullough
Dan Meza
ELEVATIONS EAST & WEST
DD
2018
SCALE: 1/8" = 1'-0"1 EAST ELEVATION
SCALE: 1/8" = 1'-0"2 WEST ELEVATION
SCALE:4 EAST ELEVATION PERSPECTIVE
SCALE:3 WEST ELEVATION PERSPECTIVE
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B - SCHEMATIC DESIGN SET 01.16.20
EAST FACADE
Facade scale is too large and undifferentiated (looks like a “billboard”)
Facade should reference existing facade - reduce scale, incorporate glazing
EAST FACADE
Reduced parapet height by 36” and north gable end by 30”
Incorporated fenestration consistent with existing, including rounds and double-hungs
REBUILT /NEW CONSTRUCTION
09/14/2020 East Elevation View REVISED: East Elevation View
EAST ELEVATION REVISED 11/05/2020
ASPHALT SHINGLE(SYNTHETIC SLATE ALT.)
INSULATED ALUM. CLAD WOOD WINDOW
STUCCO
INSULATED ALUM. CLAD WOOD WINDOW
INSULATED ALUM. CLAD WOOD WINDOW
PRESERVE EXISTING EAVES AND SIDING ASPHALT SHINGLE
(SYNTHETIC SLATE ALT.)
INSULATED ALUM. CLAD WOOD WINDOW
STUCCO
INSULATED ALUM. CLAD WOOD WINDOW
INSULATED ALUM. CLAD WOOD WINDOW
PRESERVE EXISTING EAVES AND SIDING
LINE OF 09/14/20PARAPET & RIDGE
NEW PARAPET HEIGHT
LINE OF 09/14/20PARAPET & RIDGE
EAST FACADEUNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 20
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
1'-1
"10
'-11"
2'-7
1/2
"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t8/
28/2
020
11:5
5:11
AM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.2
William McCullough
Dan Meza
ELEVATIONS EAST & WEST
SD
2018
SCALE: 1/8" = 1'-0"1 EAST ELEVATION
SCALE: 1/8" = 1'-0"2 WEST ELEVATION
SCALE:4 EAST ELEVATION PERSPECTIVE
SCALE:3 WEST ELEVATION PERSPECTIVE
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
6'-0
"
LEVEL 116' - 11 1/4"
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
1'-1
"10
'-11"
2'-7
1/2
"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t10
/6/2
020
10:0
3:34
AM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.2
William McCullough
Dan Meza
ELEVATIONS EAST & WEST
SD
2018
SCALE: 1/8" = 1'-0"1 EAST ELEVATION
SCALE: 1/8" = 1'-0"2 WEST ELEVATION
SCALE:4 EAST ELEVATION PERSPECTIVE
SCALE:3 WEST ELEVATION PERSPECTIVE
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
1'-1
"10
'-11"
2'-7
1/2
"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS SET - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t11
/2/2
020
6:02
:20
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.2
William McCullough
Dan Meza
ELEVATIONS EAST & WEST
DD
2018
SCALE: 1/8" = 1'-0"1 EAST ELEVATION
SCALE: 1/8" = 1'-0"2 WEST ELEVATION
SCALE:4 EAST ELEVATION PERSPECTIVE
SCALE:3 WEST ELEVATION PERSPECTIVE
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B - SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
10'-1
1"2'
-7 1
/2"
LEVEL 116' - 11 1/4"
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
1'-1
"10
'-11"
2'-7
1/2
"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS PRINT - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t10
/11/
2020
5:0
2:57
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.1.2
William McCullough
Dan Meza
ELEVATIONS EAST & WEST
DD
2018
SCALE: 1/8" = 1'-0"1 EAST ELEVATION
SCALE: 1/8" = 1'-0"2 WEST ELEVATION
SCALE:4 EAST ELEVATION PERSPECTIVE
SCALE:3 WEST ELEVATION PERSPECTIVE
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
REBUILT /NEW CONSTRUCTION
PREVIOUS: East Elevation REVISED: East Elevation
EXISTING: East ElevationEAST ELEVATION REVISED 11/05/2020
ASPHALT SHINGLE(SYNTHETIC SLATE
LINE OF NEW PARAPET LOWERED BY 36”
LINE OF 09/14/20RIDGE HEIGHT
LINE OF 09/14/20PARAPET HEIGHT
LINE OF NEW RIDGE LOWERED BY 30”
LINE OF 09/14/20 PARAPET & RIDGE
LINE OF LOWERED ROOF ABOVE LOCKERS
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 21
EAST FACADE
Current View from the Schuylkill River Trail 07.30.2019
Rendering from the Schuylkill River Trail: Lowered Ridge & Equipment to Align with West Bay
SIGHTLINE STUDIES
The revised design consists of a lowered ridge line of the Kelly Drive facade by 30”, and lowered parapet of the East Elevation by 36”. In order to reduce equipment visibility, the roof area hosting the equipment was also lowered by 30”.
The view to the left shows the current visibility of the East Facade with boat racks adjacent to the facade. The images below, show the previous design with higher ridge line and steeper slopes on the left, and on the right a revised design showing reduced slopes and lowered ridge.
EXISTING
PREVIOUS DESIGN REVISED DESIGN
Rendering from the Schuylkill River Trail: Raised Roof Parapet to Conceal Roof Equipment
09/14/20SECTION PROFILE
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 22
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
1 3 4 5 62
1165 SF
SHOP103448 SF
ENTRY100
15'-10 11/16" 2'-4 5/16" 18'-3" 10'-3 3/8" 6'-3 1/4" 16'-0"
3.9 4.4 5.1
2'-0 15/16" 11'-8 9/16"
1'-6 1/8"
1329 SF
GRAND HALL200
1.8
10'-1
1"2'
-7 1
/2"
4.9
LEVEL 116' - 11 1/4"
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456
11'-3"
OA
R R
AC
KS
STO
RA
GE
STO
RA
GE
12'-0
"
2
10'-1
1"2'
-7 1
/2"
14'-0
"
1879 SF
ERG/EVENT ROOM201
3738 SF
EAST BAY101
150 SF
MEN'S SHOWERS204
791 SF
MEN'S LOCKERS202
3738 SF
EAST BAY101
16'-0" 1'-11 7/8" 8'-2 9/16" 6'-3 1/4"2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
----
----
3.94.4 1.8
4'-1
0 3/
4"
3'-0"
14'-0
"
9'-0
"
12'-0
"
6" 1'-7"
7'-1"
1'-7" 5"
1'-1
1"
4.9
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
4
A3.3.1
A B C
1879 SF
ERG/EVENT ROOM201
194 SF
WOMEN'S TOILETS211
1719 SF
WEST BAY102
1165 SF
SHOP103
3738 SF
EAST BAY101
3738 SF
EAST BAY101
13'-6
1/2
"12
'-11"
1'-1
"
22'-0" 22'-3"
----
1329 SF
GRAND HALL200
4'-1
0 3/
4"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456 23.95.1
1329 SF
GRAND HALL200
1165 SF
SHOP103
1165 SF
SHOP103
1165 SF
SHOP103
448 SF
ENTRY100
16'-0"
1'-6 1/8"
17'-11 13/16" 2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
1.8
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t8/
26/2
020
4:05
:51
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.3.1
William McCullough
Dan Meza
BUILDING SECTIONS
SD
2018
SCALE: 1/8" = 1'-0"1 N-S SECTION 1SCALE: 1/8" = 1'-0"2 N-S SECTION 2
SCALE: 1/8" = 1'-0"3 W-E SECTION 2SCALE: 1/8" = 1'-0"4 S-N SECTION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"APRON L114' - 3 3/4"
Historical L226' - 7 1/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
1 3 4 5 62
1149 SF
SHOP103438 SF
ENTRY100
15'-10 11/16" 2'-4 5/16" 18'-3" 10'-3 3/8" 6'-3 1/4" 16'-0"
3.9 4.4 5.1
2'-0 15/16" 11'-8 9/16"
1'-6 1/8"
1328 SF
GRAND HALL200
1.8
10'-1
1"2'
-7 1
/2"
4.9
8'-1
1"DISPLAY DISPLAY DISPLAY
-
---
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Historical L226' - 7 1/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456
OA
R R
AC
KS
STO
RA
GE
STO
RA
GE
2
1865 SF
ERG/EVENT ROOM201
3751 SF
EAST BAY101
152 SF
MEN'S SHOWERS204
760 SF
MEN'S LOCKERS202
3751 SF
EAST BAY101
16'-0" 1'-11 7/8" 8'-2 9/16" 6'-3 1/4"2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
3.94.4 1.84.9
2'-6
"
LEVEL 228' - 11 1/4"
Men's Bay L227' - 10 1/4"
4
A3.3.1
A B C
1865 SF
ERG/EVENT ROOM201
184 SF
WOMEN'S TOILETS211
1719 SF
WEST BAY102
1149 SF
SHOP103
3751 SF
EAST BAY101
3751 SF
EAST BAY101
12'-1
1"1'
-1"
22'-0" 22'-3"
----
1328 SF
GRAND HALL200 12
'-11"
9'-0
"
-
---
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456 23.95.1
1328 SF
GRAND HALL200
1149 SF
SHOP103
1149 SF
SHOP103
1149 SF
SHOP103
438 SF
ENTRY100
16'-0"
1'-6 1/8"
17'-11 13/16" 2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
1.8
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS SET - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t11
/2/2
020
9:45
:19
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.3.1
William McCullough
Dan Meza
BUILDING SECTIONS
DD
2018
SCALE: 1/8" = 1'-0"1 N-S SECTION 1SCALE: 1/8" = 1'-0"2 N-S SECTION 2
SCALE: 1/8" = 1'-0"3 W-E SECTION 2SCALE: 1/8" = 1'-0"4 S-N SECTION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B - SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
1 3 4 5 62
1165 SF
SHOP103448 SF
ENTRY100
15'-10 11/16" 2'-4 5/16" 18'-3" 10'-3 3/8" 6'-3 1/4" 16'-0"
3.9 4.4 5.1
2'-0 15/16" 11'-8 9/16"
1'-6 1/8"
1329 SF
GRAND HALL200
1.8
10'-1
1"2'
-7 1
/2"
4.9
LEVEL 116' - 11 1/4"
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456
11'-3"
OA
R R
AC
KS
STO
RA
GE
STO
RA
GE
12'-0
"
2
10'-1
1"2'
-7 1
/2"
14'-0
"
1879 SF
ERG/EVENT ROOM201
3738 SF
EAST BAY101
150 SF
MEN'S SHOWERS204
791 SF
MEN'S LOCKERS202
3738 SF
EAST BAY101
16'-0" 1'-11 7/8" 8'-2 9/16" 6'-3 1/4"2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
----
----
3.94.4 1.8
4'-1
0 3/
4"
3'-0"
14'-0
"
9'-0
"
12'-0
"
6" 1'-7"
7'-1"
1'-7" 5"
1'-1
1"
4.9
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
4
A3.3.1
A B C
1879 SF
ERG/EVENT ROOM201
194 SF
WOMEN'S TOILETS211
1719 SF
WEST BAY102
1165 SF
SHOP103
3738 SF
EAST BAY101
3738 SF
EAST BAY101
13'-6
1/2
"12
'-11"
1'-1
"
22'-0" 22'-3"
----
1329 SF
GRAND HALL200
4'-1
0 3/
4"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456 23.95.1
1329 SF
GRAND HALL200
1165 SF
SHOP103
1165 SF
SHOP103
1165 SF
SHOP103
448 SF
ENTRY100
16'-0"
1'-6 1/8"
17'-11 13/16" 2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
1.8
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t8/
26/2
020
4:05
:51
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.3.1
William McCullough
Dan Meza
BUILDING SECTIONS
SD
2018
SCALE: 1/8" = 1'-0"1 N-S SECTION 1SCALE: 1/8" = 1'-0"2 N-S SECTION 2
SCALE: 1/8" = 1'-0"3 W-E SECTION 2SCALE: 1/8" = 1'-0"4 S-N SECTION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
1 3 4 5 62
1165 SF
SHOP103448 SF
ENTRY100
15'-10 11/16" 2'-4 5/16" 18'-3" 10'-3 3/8" 6'-3 1/4" 16'-0"
3.9 4.4 5.1
2'-0 15/16" 11'-8 9/16"
1'-6 1/8"
1329 SF
GRAND HALL200
1.8
10'-1
1"2'
-7 1
/2"
4.9
LEVEL 116' - 11 1/4"
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456
11'-3"
OA
R R
AC
KS
STO
RA
GE
STO
RA
GE
12'-0
"
2
10'-1
1"2'
-7 1
/2"
14'-0
"
1879 SF
ERG/EVENT ROOM201
3738 SF
EAST BAY101
150 SF
MEN'S SHOWERS204
791 SF
MEN'S LOCKERS202
3738 SF
EAST BAY101
16'-0" 1'-11 7/8" 8'-2 9/16" 6'-3 1/4"2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
----
----
3.94.4 1.8
4'-1
0 3/
4"
3'-0"
14'-0
"
9'-0
"
12'-0
"
6" 1'-7"
7'-1"
1'-7" 5"
1'-1
1"
4.9
LEVEL 228' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
4
A3.3.1
A B C
1879 SF
ERG/EVENT ROOM201
194 SF
WOMEN'S TOILETS211
1719 SF
WEST BAY102
1165 SF
SHOP103
3738 SF
EAST BAY101
3738 SF
EAST BAY101
13'-6
1/2
"12
'-11"
1'-1
"
22'-0" 22'-3"
----
1329 SF
GRAND HALL200
4'-1
0 3/
4"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456 23.95.1
1329 SF
GRAND HALL200
1165 SF
SHOP103
1165 SF
SHOP103
1165 SF
SHOP103
448 SF
ENTRY100
16'-0"
1'-6 1/8"
17'-11 13/16" 2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
1.8
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE B - SCHEMATIC DESIGN SET - 16 JANUARY 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t8/
26/2
020
4:15
:46
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.3.1
William McCullough
Dan Meza
BUILDING SECTIONS
SD
2018
SCALE: 1/8" = 1'-0"1 N-S SECTION 1SCALE: 1/8" = 1'-0"2 N-S SECTION 2
SCALE: 1/8" = 1'-0"3 W-E SECTION 2SCALE: 1/8" = 1'-0"4 S-N SECTION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
PROPOSED SECTIONS
LEVEL 116' - 11 1/4"
TOP OF JOIST38' - 11 1/4"
LEVEL 450' - 10 1/2"
BASEMENT10' - 3 1/2"
ROOF LEVEL65' - 10 1/2"
APRON L114' - 3 3/4"
Historical L226' - 7 1/4"
Men's Bay L227' - 10 1/4"
Landing223' - 1"
3
A3.3.1
1 3 4 5 62
1141 SF
SHOP103450 SF
ENTRY100
15'-10 11/16" 2'-4 5/16" 18'-3" 10'-3 3/8" 6'-3 1/4" 16'-0"
3.9 4.4 5.1
2'-0 15/16" 11'-8 9/16"
1'-6 1/8"
1330 SF
GRAND HALL200
1.8
10'-1
1"2'
-7 1
/2"
4.9-
---
-
---
-
----
---
11"
7'-1"8'-1
1"
2'-2
"
1'-7"1'-7"
3" 3'-6"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Historical L226' - 7 1/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456
OA
R R
AC
KS
STO
RA
GE
STO
RA
GE
2
1926 SF
ERG/EVENT ROOM201
3734 SF
EAST BAY101
150 SF
MEN'S SHOWERS204
765 SF
MEN'S LOCKERS202
3734 SF
EAST BAY101
16'-0" 1'-11 7/8" 8'-2 9/16" 6'-3 1/4"2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
3.94.4 1.84.9
2'-6
"
LEVEL 228' - 11 1/4"
Men's Bay L227' - 10 1/4"
4
A3.3.1
A B C
1926 SF
ERG/EVENT ROOM201
194 SF
WOMEN'S TOILETS211
1719 SF
WEST BAY102
1141 SF
SHOP103
3734 SF
EAST BAY101
3734 SF
EAST BAY101
12'-1
1"1'
-1"
22'-0" 22'-3"
----
1330 SF
GRAND HALL200
7'-1
"
-
----
---
9'-0
"
1'-4
"3'
-8"
-
---
-
---
-
---
-
---
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456 2
EaEbEcEdEeEf
3.9
4.4
5.1
1330 SF
GRAND HALL200
1141 SF
SHOP103
1141 SF
SHOP103
1141 SF
SHOP103
450 SF
ENTRY100
16'-0"
1'-6 1/8"
17'-11 13/16" 2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
1.8
10'-1
1"2'
-7 1
/2"
4.9
-
---
-
---
-
----
---
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS PRINT - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t10
/11/
2020
8:1
4:48
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.3.1
William McCullough
Dan Meza
BUILDING SECTIONS
DD
2018
SCALE: 1/8" = 1'-0"1 N-S SECTION 1SCALE: 1/8" = 1'-0"2 N-S SECTION 2
SCALE: 1/8" = 1'-0"3 W-E SECTION 2SCALE: 1/8" = 1'-0"4 S-N SECTION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"
TOP OF JOIST38' - 11 1/4"
LEVEL 450' - 10 1/2"
BASEMENT10' - 3 1/2"
ROOF LEVEL65' - 10 1/2"
APRON L114' - 3 3/4"
Historical L226' - 7 1/4"
Men's Bay L227' - 10 1/4"
Landing223' - 1"
3
A3.3.1
1 3 4 5 62
1141 SF
SHOP103450 SF
ENTRY100
15'-10 11/16" 2'-4 5/16" 18'-3" 10'-3 3/8" 6'-3 1/4" 16'-0"
3.9 4.4 5.1
2'-0 15/16" 11'-8 9/16"
1'-6 1/8"
1330 SF
GRAND HALL200
1.8
10'-1
1"2'
-7 1
/2"
4.9-
---
-
---
-
----
---
11"
7'-1"8'-1
1"
2'-2
"
1'-7"1'-7"
3" 3'-6"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Historical L226' - 7 1/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456
OA
R R
AC
KS
STO
RA
GE
STO
RA
GE
2
1926 SF
ERG/EVENT ROOM201
3734 SF
EAST BAY101
150 SF
MEN'S SHOWERS204
765 SF
MEN'S LOCKERS202
3734 SF
EAST BAY101
16'-0" 1'-11 7/8" 8'-2 9/16" 6'-3 1/4"2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
3.94.4 1.84.9
2'-6
"
LEVEL 228' - 11 1/4"
Men's Bay L227' - 10 1/4"
4
A3.3.1
A B C
1926 SF
ERG/EVENT ROOM201
194 SF
WOMEN'S TOILETS211
1719 SF
WEST BAY102
1141 SF
SHOP103
3734 SF
EAST BAY101
3734 SF
EAST BAY101
12'-1
1"1'
-1"
22'-0" 22'-3"
----
1330 SF
GRAND HALL200
7'-1
"
-
----
---
9'-0
"
1'-4
"3'
-8"
-
---
-
---
-
---
-
---
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456 2
EaEbEcEdEeEf
3.9
4.4
5.1
1330 SF
GRAND HALL200
1141 SF
SHOP103
1141 SF
SHOP103
1141 SF
SHOP103
450 SF
ENTRY100
16'-0"
1'-6 1/8"
17'-11 13/16" 2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
1.8
10'-1
1"2'
-7 1
/2"
4.9
-
---
-
---
-
----
---
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS PRINT - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t10
/11/
2020
8:1
4:48
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.3.1
William McCullough
Dan Meza
BUILDING SECTIONS
DD
2018
SCALE: 1/8" = 1'-0"1 N-S SECTION 1SCALE: 1/8" = 1'-0"2 N-S SECTION 2
SCALE: 1/8" = 1'-0"3 W-E SECTION 2SCALE: 1/8" = 1'-0"4 S-N SECTION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"
TOP OF JOIST38' - 11 1/4"
LEVEL 450' - 10 1/2"
BASEMENT10' - 3 1/2"
ROOF LEVEL65' - 10 1/2"
APRON L114' - 3 3/4"
Historical L226' - 7 1/4"
Men's Bay L227' - 10 1/4"
Landing223' - 1"
3
A3.3.1
1 3 4 5 62
1141 SF
SHOP103450 SF
ENTRY100
15'-10 11/16" 2'-4 5/16" 18'-3" 10'-3 3/8" 6'-3 1/4" 16'-0"
3.9 4.4 5.1
2'-0 15/16" 11'-8 9/16"
1'-6 1/8"
1330 SF
GRAND HALL200
1.8
10'-1
1"2'
-7 1
/2"
4.9-
---
-
---
-
----
---
11"
7'-1"8'-1
1"
2'-2
"
1'-7"1'-7"
3" 3'-6"
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Historical L226' - 7 1/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456
OA
R R
AC
KS
STO
RA
GE
STO
RA
GE
2
1926 SF
ERG/EVENT ROOM201
3734 SF
EAST BAY101
150 SF
MEN'S SHOWERS204
765 SF
MEN'S LOCKERS202
3734 SF
EAST BAY101
16'-0" 1'-11 7/8" 8'-2 9/16" 6'-3 1/4"2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
3.94.4 1.84.9
2'-6
"
LEVEL 228' - 11 1/4"
Men's Bay L227' - 10 1/4"
4
A3.3.1
A B C
1926 SF
ERG/EVENT ROOM201
194 SF
WOMEN'S TOILETS211
1719 SF
WEST BAY102
1141 SF
SHOP103
3734 SF
EAST BAY101
3734 SF
EAST BAY101
12'-1
1"1'
-1"
22'-0" 22'-3"
----
1330 SF
GRAND HALL200
7'-1
"
-
----
---
9'-0
"
1'-4
"3'
-8"
-
---
-
---
-
---
-
---
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456 2
EaEbEcEdEeEf
3.9
4.4
5.1
1330 SF
GRAND HALL200
1141 SF
SHOP103
1141 SF
SHOP103
1141 SF
SHOP103
450 SF
ENTRY100
16'-0"
1'-6 1/8"
17'-11 13/16" 2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
1.8
10'-1
1"2'
-7 1
/2"
4.9
-
---
-
---
-
----
---
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS PRINT - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t10
/11/
2020
8:1
4:48
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.3.1
William McCullough
Dan Meza
BUILDING SECTIONS
DD
2018
SCALE: 1/8" = 1'-0"1 N-S SECTION 1SCALE: 1/8" = 1'-0"2 N-S SECTION 2
SCALE: 1/8" = 1'-0"3 W-E SECTION 2SCALE: 1/8" = 1'-0"4 S-N SECTION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' - 11 1/4"APRON L114' - 3 3/4"
Historical L226' - 7 1/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
1 3 4 5 62
1149 SF
SHOP103438 SF
ENTRY100
15'-10 11/16" 2'-4 5/16" 18'-3" 10'-3 3/8" 6'-3 1/4" 16'-0"
3.9 4.4 5.1
2'-0 15/16" 11'-8 9/16"
1'-6 1/8"
1328 SF
GRAND HALL200
1.8
10'-1
1"2'
-7 1
/2"
4.9
8'-1
1"DISPLAY DISPLAY DISPLAY
-
---
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Historical L226' - 7 1/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456
OA
R R
AC
KS
STO
RA
GE
STO
RA
GE
2
1865 SF
ERG/EVENT ROOM201
3751 SF
EAST BAY101
152 SF
MEN'S SHOWERS204
760 SF
MEN'S LOCKERS202
3751 SF
EAST BAY101
16'-0" 1'-11 7/8" 8'-2 9/16" 6'-3 1/4"2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
3.94.4 1.84.9
2'-6
"
LEVEL 228' - 11 1/4"
Men's Bay L227' - 10 1/4"
4
A3.3.1
A B C
1865 SF
ERG/EVENT ROOM201
184 SF
WOMEN'S TOILETS211
1719 SF
WEST BAY102
1149 SF
SHOP103
3751 SF
EAST BAY101
3751 SF
EAST BAY101
12'-1
1"1'
-1"
22'-0" 22'-3"
----
1328 SF
GRAND HALL200 12
'-11"
9'-0
"
-
---
LEVEL 116' - 11 1/4"
APRON L114' - 3 3/4"
Men's Bay L227' - 10 1/4"
3
A3.3.1
13456 23.95.1
1328 SF
GRAND HALL200
1149 SF
SHOP103
1149 SF
SHOP103
1149 SF
SHOP103
438 SF
ENTRY100
16'-0"
1'-6 1/8"
17'-11 13/16" 2'-0 15/16" 10'-3 3/8" 18'-3" 2'-4 5/16" 15'-10 11/16"
1.8
10'-1
1"2'
-7 1
/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BY DATE
SCALE
DRAWING NO.
NO. BY DESCRIPTION DATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C - DESIGN DEVELOPMENT PROGRESS SET - 16 OCTOBER 2020
1/8" = 1'-0"
C:\R
evit
Loca
l File
s\20
1905
50_A
18_C
EN
TRA
L_nb
rono
la. rv
t11
/2/2
020
9:45
:19
PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.3.1
William McCullough
Dan Meza
BUILDING SECTIONS
DD
2018
SCALE: 1/8" = 1'-0"1 N-S SECTION 1SCALE: 1/8" = 1'-0"2 N-S SECTION 2
SCALE: 1/8" = 1'-0"3 W-E SECTION 2SCALE: 1/8" = 1'-0"4 S-N SECTION
A EC DRAFT SD PRICING SET 11.11.19B EC ISSUE B - SCHEMATIC DESIGN SET 01.16.20
LEVEL 116' -11 1/4"
APRON L114' -3 3/4"
Historical L226' -7 1/4"
Men's Bay L227' -10 1/4"
3
A3.3.1
13456 2
1149 SF
SHOP103 438 SF
ENTRY100
15'-10 11/16"2'-4 5/16"18'-3"10'-3 3/8"6'-3 1/4"16'-0"
3.94.45.1
2'-0 15/16"11'-8 9/16"
1'-6 1/8"
1328 SF
GRAND HALL200
1.8
10'-11"
2'-7 1/2"
4.9
8'-11" DISPLAY DISPLAY DISPLAY
-
---
LEVEL 116' -11 1/4"
APRON L114' -3 3/4"
Historical L226' -7 1/4"
Men's Bay L227' -10 1/4"
3
A3.3.1
1 3 4 5 6
OAR RACKS
STORAGE
STORAGE
2
1865 SF
ERG/EVENT ROOM201
3751 SF
EAST BAY101
152 SF
MEN'S SHOWERS204
760 SF
MEN'S LOCKERS202
3751 SF
EAST BAY101
16'-0"1'-11 7/8"8'-2 9/16"6'-3 1/4"2'-0 15/16"10'-3 3/8"18'-3"2'-4 5/16"15'-10 11/16"
3.9 4.41.8 4.9
2'-6"
LEVEL 228' -11 1/4"
Men's Bay L227' -10 1/4"
4
A3.3.1
ABC
1865 SF
ERG/EVENT ROOM201
184 SF
WOMEN'S TOILETS211
1719 SF
WEST BAY102
1149 SF
SHOP103
3751 SF
EAST BAY101
3751 SF
EAST BAY101
12'-11"
1'-1"
22'-0"22'-3"
----
1328 SF
GRAND HALL20012
'-11"
9'-0"
-
---
LEVEL 116' -11 1/4"
APRON L114' -3 3/4"
Men's Bay L227' -10 1/4"
3
A3.3.1
1 3 4 5 62 3.9 5.1
1328 SF
GRAND HALL200
1149 SF
SHOP103
1149 SF
SHOP103
1149 SF
SHOP103
438 SF
ENTRY100
16'-0"
1'-6 1/8"
17'-11 13/16"2'-0 15/16"10'-3 3/8"18'-3"2'-4 5/16"15'-10 11/16"
1.8
10'-11"
2'-7 1/2"
Federal Reserve Bank Building100 North 6th Street
Philadelphia, PA 19106-1590Tel: 215-923-2020 Fax: 215-574-0952
CONSULTANTS
KEY PLAN
REVISIONS
DRAWING NAME
FLOOR/SECTION
PROJECT NO.
DRAWN BYDATE
SCALE
DRAWING NO.
NO.BYDESCRIPTIONDATE
PRINCIPAL
PROJECT MANAGER
PHASE
Copyright © by EWINGCOLE
ISSUE C -DESIGN DEVELOPMENT PROGRESS SET -16 OCTOBER 2020
1/8" = 1'-0"
C:\Revit Local Files\20190550_A18_CENTRAL_nbronola.rvt
11/2/2020 9:45:19 PM
UNIVERSITY OF PENNRENOVATION / ADDITION TO THE PENN
BOAT HOUSE11 Boathouse Row, Philadelphia, PA 19130
Author
20190550
A3.3.1
William McCullough
Dan Meza
BUILDING SECTIONS
DD
2018
SCALE: 1/8" = 1'-0" 1N-S SECTION 1SCALE: 1/8" = 1'-0" 2N-S SECTION 2
SCALE: 1/8" = 1'-0" 3W-E SECTION 2SCALE: 1/8" = 1'-0" 4S-N SECTION
AECDRAFT SD PRICING SET11.11.19BECISSUE B - SCHEMATIC DESIGN SET01.16.20
REVISED 11/05/2020
REBUILT /NEW CONSTRUCTION
1 2
3
4
UNIVERSITY OF PENNSYLVANIA BOATHOUSE
11 Boathouse Row, Philadelphia, PA 19130 RENOVATION & ADDITION TO THE PENN BOATHOUSE
Page 23
View of the East Elevation from Kelly Drive
North Elevation Rendering from Kelly Drive South Elevation Rendering
View from the Schuylkill
REVISED EXTERIOR VIEWS