Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/20081
Undulator Week 3
Magnet Power Supplies
Phase 4 Installation
Antonio de Lira
Kristi Luchini
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/20082
Undulator Magnet PS Phase 4 InstallationAgenda
Installation Program - Scope
Rack Profiles & System Characteristics
Overall Schedule
Open Items
Magnet PS ControlsBy Kristi Luchini
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/20083
Undulator Magnet PS – PH4 Installation ProgramOriginal Scope
B913 – UND 54 MCORs
18 QUAD – MCOR6
36 X/YCOR – MCOR1 – Not part of Phase IV
B921 – UND + DUMP 45 MCORs
15 QUAD – MCOR6
30 X/YCOR – MCOR1 – Not part of Phase IV
03 Intermediate PS – DUMP
06 MCORs – DUMP
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/20084
Undulator Magnet PS - PH4 Installation Program
54 MCORs - UND 18 QUAD – Phase IV 36 X/YCOR (?)
B913 B921
45 MCORs – UND 15 QUAD – Phase IV 30 X/YCOR (?)03 Intermediate PS – DUMP06 MCORs – DUMP
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/20085
Undulator Magnet PS Installation Program - B913
54 MCORs
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/20086
Undulator Magnet PS Installation Program – B921
03 Intermediate
45 MCORs – UND
06 MCORs - DUMP
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/20087
Undulator Magnet PS – Electrical Interconnections
Undulator magnet PS are NOT interlocked(except for GND fault)
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/20089
Overall ScheduleMagnet PS Cable Plant (Phase 4)
Ponce Rodriguez – This review
01/30/08 Site Visit
02/19/08 Bid Opening
03/04/08 Award
04/01/08 Installation Start
10/31/08 Installation Complete
Schedule
Detailed schedule Integrated with Project Office’s Installation Schedule
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200810
Schedule – B913
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200811
Schedule – B921
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200812
Equipment Status / Rack Readiness
B913 B921
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200813
Open Items
66 MCORs for UND correctors MCOR modules to come from PEP
MCOR modules have been requested already
D. MacNair has a new design for a MCOR1
No performance requirements document PCD will assume 25 ppm/C is fineNote: Support buildings will have temperature control: 75 ± 5F
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200814
Undulator Magnet PS - Controls
Magnet PS Control Systems Kristi Luchini
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200815
Magnet PS ControlsProcurement Status
Description % Received
VME Crate and I/O 100
PLC Crates and I/O 100
* Terminal Servers 100
Cat6 Patch Panels 100
Cat6 Intra-rack cables 100
MCOR to VME Intra-rack cables 100
* Equipment within PS racks
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200816
System Architecture
OPI OPI
EPICS IOC
VME Crate
Bulk PS
PLC PS Protection
System MCOR
16 Magnets@6 Amps max
Note: configure for 1 or 6 A
Ethernet
Terminal Server
Timing (Fiber Optic)
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200817
Software
IP Addresses Network Nodes – DoneSoftware – Done (for 10Hz feedback)Databases - April 28 to May 10, 2008
polynomials (I vs B) as magnets are measured. Displays
B913: Complete May 5, 2008 B921: Complete May 10, 2008
Pre-Installation checkout in B15B913: May 10-15, 2008B921: May 15-20, 2008
System Checkout - Network checkout and system integrationB913: Oct 31 - Nov 11, 2008 (54 MCORs), Install racks July 10-15B921: Oct 29 – Dec 4, 2008 (45 MCORs), Install racks July 22-30
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200818
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200819
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200820
A. de Lira & K. Luchini
Undulator Week 3 – Magnet PS delira@slac.stanford.edu
Tue, 4/29/200822