UlMeCo AG in brief
We are specialists in business administration with a technical background. UlMeCo AG was founded 2005, taking over all activities of Ulrich Meier Consulting.
We support our clients at the joint of business and technology. We have a track record of several years of successful project management and project management support for large telecom and IT projects.
Our clients are mainly active in areas dealing with electricity in the broadest sense (e.g. telecommunication (GSM, GSM-R, UMTS), information technology or distribution of electrical energy).
We concentrate on telecom operators, banks, utilities, railways and mid-sized companies.
Our home market is the German speaking area of Europe.
We support our clients from strategy (classic management consulting) to implementation (management or functional support).
Our network enables us to fulfil even bigger assignments.
We are specialists in business administration with a technical background. UlMeCo AG was founded 2005, taking over all activities of Ulrich Meier Consulting.
We support our clients at the joint of business and technology. We have a track record of several years of successful project management and project management support for large telecom and IT projects.
Our clients are mainly active in areas dealing with electricity in the broadest sense (e.g. telecommunication (GSM, GSM-R, UMTS), information technology or distribution of electrical energy).
We concentrate on telecom operators, banks, utilities, railways and mid-sized companies.
Our home market is the German speaking area of Europe.
We support our clients from strategy (classic management consulting) to implementation (management or functional support).
Our network enables us to fulfil even bigger assignments.
2UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Company Presentation
Our services cover most issues of managing a company or unit
Strategy Development Market entry strategies Product and Service development
Decision support Market studies, Market estimates Investment decisions (CAPEX) Business planning and modelling Financial models Feasibility studies Sparring partner for ideas, IT-projects, risk-
assessment, IT-security
Industry specific Telecommunication used in the Railway industry Mobile communication infrastructure: Railways,
safety/security authorities and telecom industry
Strategy Development Market entry strategies Product and Service development
Decision support Market studies, Market estimates Investment decisions (CAPEX) Business planning and modelling Financial models Feasibility studies Sparring partner for ideas, IT-projects, risk-
assessment, IT-security
Industry specific Telecommunication used in the Railway industry Mobile communication infrastructure: Railways,
safety/security authorities and telecom industry
Optimising Efficiency increase by optimised processes Optimising combined with migration IT systems Optimisation through reorganising and developing
the organisation Quality cost reduction (Total Quality Management
approach) Incentive systems / Balanced Scorecards Facilitation to optimise processes e.g. during
budgeting or investment processes
Implementation Project management Support to project management / project office /
coaching Capacity / “Body shopping” Interim management Fast-track IT solution to support projects
Optimising Efficiency increase by optimised processes Optimising combined with migration IT systems Optimisation through reorganising and developing
the organisation Quality cost reduction (Total Quality Management
approach) Incentive systems / Balanced Scorecards Facilitation to optimise processes e.g. during
budgeting or investment processes
Implementation Project management Support to project management / project office /
coaching Capacity / “Body shopping” Interim management Fast-track IT solution to support projects
Detailed descriptions are found in the appendix
3UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Company Presentation
Ulrich Meier - more than a decade successful in management consulting
Experience Track record of achieving objectives Several years of experience in project coaching
and project office (including trouble shooting). Lead and worked in several projects at the
interface of technology to business. Worked several years for international
management consultancies, Arthur D. Little and Intercai, mainly in the TIME industry.
Turn-around and management experience in a mid-sized company.
Business focus Small and mid-sized companies: Strategy,
Management and Controlling Business planning / financial modelling for
investments and products/services Total Quality Management
Experience Track record of achieving objectives Several years of experience in project coaching
and project office (including trouble shooting). Lead and worked in several projects at the
interface of technology to business. Worked several years for international
management consultancies, Arthur D. Little and Intercai, mainly in the TIME industry.
Turn-around and management experience in a mid-sized company.
Business focus Small and mid-sized companies: Strategy,
Management and Controlling Business planning / financial modelling for
investments and products/services Total Quality Management
Dipl. Elektro-Ingenieur ETH (MSc) focus on energy distribution,
control systems, databases,networks and EMP
lic.oec. HSG (MBA) focus on small and mid-sized
companies, additional topicstotal quality management, marketing and financial auditing
Languages German, English, (French)
Technology focus ICT network infrastructure, IT-Security Relational databases (PostgreSQL, Oracle) Quick-Win IT solutions based on OpenSource
and Linux ICT @Railway: GSM-R EIRENE (SRS, FRS),
ETCS, terminals, network, application infrastructure, technical and administrative roll-out, safety+security regulation
Dipl. Elektro-Ingenieur ETH (MSc) focus on energy distribution,
control systems, databases,networks and EMP
lic.oec. HSG (MBA) focus on small and mid-sized
companies, additional topicstotal quality management, marketing and financial auditing
Languages German, English, (French)
Technology focus ICT network infrastructure, IT-Security Relational databases (PostgreSQL, Oracle) Quick-Win IT solutions based on OpenSource
and Linux ICT @Railway: GSM-R EIRENE (SRS, FRS),
ETCS, terminals, network, application infrastructure, technical and administrative roll-out, safety+security regulation
4UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Selected projects
Quick-Win Tool CAPRI: CArrierProcessInterface to speed up and enhance process quality of all telco-carrier activities of the biggest railway infrastructure operator in Germany. Focus: order processing, billing (design, proof of concent, fast-track implementation, operation, support)
OTRS-based process solution to optimize problem management for telecommunication infrastructure issues for the biggest German railway company. (design, development, operation, migration)
Web-based IT solution (BFMA-Portal) to manage life-cycle issues/decommissioning for existing POTS/ISDN telecommunications infrastructure for the biggest German railway company (requirement specification, software development, operating)
Web-based IT-solution RaFu-Portal manage rollout of GSM-R shunting for a big German railway (processes, system requirements, development, operation, migration)
Web-based IT-solution BO2-Portal to support the GSM-R call center of a big German railway (development, support)
Quick-Win Tool CAPRI: CArrierProcessInterface to speed up and enhance process quality of all telco-carrier activities of the biggest railway infrastructure operator in Germany. Focus: order processing, billing (design, proof of concent, fast-track implementation, operation, support)
OTRS-based process solution to optimize problem management for telecommunication infrastructure issues for the biggest German railway company. (design, development, operation, migration)
Web-based IT solution (BFMA-Portal) to manage life-cycle issues/decommissioning for existing POTS/ISDN telecommunications infrastructure for the biggest German railway company (requirement specification, software development, operating)
Web-based IT-solution RaFu-Portal manage rollout of GSM-R shunting for a big German railway (processes, system requirements, development, operation, migration)
Web-based IT-solution BO2-Portal to support the GSM-R call center of a big German railway (development, support)
Supporting project leader of a large IP/MPLS network project of the biggest German railway company. Special topics: management of regulatory bodies (EBA), IT security (BSI, ITSM,...), safety aspects (CSM, EN50126,...), IT-Security regulation for critical infrastructure (SiG/BSI,...)
Concepts to improve profitability and manageability of a large telecom infrastructure for the biggest German railway company. Goal: Improve quality, efficiency and transparency. Resulting in a carrier concept of a OSI-Layer 3 carrier with new transparent billing (APART) and improved customer care.
Concepts for a new product visual guidance for a leading company in the airfield lighting sector. The project was delivered together with a service provider for innovation projects.
Supporting project leader of a large IP/MPLS network project of the biggest German railway company. Special topics: management of regulatory bodies (EBA), IT security (BSI, ITSM,...), safety aspects (CSM, EN50126,...), IT-Security regulation for critical infrastructure (SiG/BSI,...)
Concepts to improve profitability and manageability of a large telecom infrastructure for the biggest German railway company. Goal: Improve quality, efficiency and transparency. Resulting in a carrier concept of a OSI-Layer 3 carrier with new transparent billing (APART) and improved customer care.
Concepts for a new product visual guidance for a leading company in the airfield lighting sector. The project was delivered together with a service provider for innovation projects.
Company Presentation
5UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Selected projects
GSM-R terminals for the biggest German railway (project management support, technical & commercial task, trouble-shooting,...), multi-year assignment
Web-based IT solution (CARAD) for administration, support and roll-out controlling of GSM-R terminals for the biggest German railway (requirement specification, software development and installation and setup of the server environment, operating), 3 month from concept to an up and running solution
Fast track strategy review of a large Swiss technology company. Responsible for the technology related aspects. (project management)
Subprojects "Procurement" and "Agent work place" in a Call Centre project of a large Swiss bank (project management support)
Project management of a large external communication infrastructure project of a major international bank (project management)
Business Plan for a personal communications portal of a large Swiss telco (financial modelling)
Pre due diligence, red flag analysis of the UMTS business case of a French GSM operator (financial modelling)
Business plan including a financial model for mobile location based service hosting for a large Swiss telco (financial modelling)
GSM-R terminals for the biggest German railway (project management support, technical & commercial task, trouble-shooting,...), multi-year assignment
Web-based IT solution (CARAD) for administration, support and roll-out controlling of GSM-R terminals for the biggest German railway (requirement specification, software development and installation and setup of the server environment, operating), 3 month from concept to an up and running solution
Fast track strategy review of a large Swiss technology company. Responsible for the technology related aspects. (project management)
Subprojects "Procurement" and "Agent work place" in a Call Centre project of a large Swiss bank (project management support)
Project management of a large external communication infrastructure project of a major international bank (project management)
Business Plan for a personal communications portal of a large Swiss telco (financial modelling)
Pre due diligence, red flag analysis of the UMTS business case of a French GSM operator (financial modelling)
Business plan including a financial model for mobile location based service hosting for a large Swiss telco (financial modelling)
Strategic options for GSM-R for a Swiss railway company created by UMTS network roll-out in Switzerland (strategy)
OEM partnership strategy and partner search for a German powerline company (strategy)
Strategy scenarios and valuation for a German mobile telecommunication service provider supporting the management in an M&A transaction (strategy)
Second opinion for a Swiss investor investing in a quality of service technology (market assessment)
Business opportunities for a mobile terminal equipment division in the UMTS market (market assessment, product development)
Analyses of the Wireless Local Loop licensees in Germany to support the selection process for future partnerships of a international communication service provider (market assessment)
Feasibility study for a management buy out of a large network construction department of the leading Swiss telecom provider (market assessment, organisation)
Strategic options for GSM-R for a Swiss railway company created by UMTS network roll-out in Switzerland (strategy)
OEM partnership strategy and partner search for a German powerline company (strategy)
Strategy scenarios and valuation for a German mobile telecommunication service provider supporting the management in an M&A transaction (strategy)
Second opinion for a Swiss investor investing in a quality of service technology (market assessment)
Business opportunities for a mobile terminal equipment division in the UMTS market (market assessment, product development)
Analyses of the Wireless Local Loop licensees in Germany to support the selection process for future partnerships of a international communication service provider (market assessment)
Feasibility study for a management buy out of a large network construction department of the leading Swiss telecom provider (market assessment, organisation)
Company Presentation
6UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
How to contact us ...
by mailUlMeCo AGScheuchzerstrasse 17CH-8006 ZuerichSwitzerland
by phoneMobile +41 (0)79 601 41 69
by Internetwww.ulmeco.chulrich.meier@ulmeco.ch
by mailUlMeCo AGScheuchzerstrasse 17CH-8006 ZuerichSwitzerland
by phoneMobile +41 (0)79 601 41 69
by Internetwww.ulmeco.chulrich.meier@ulmeco.ch
We are officially registered
Register of companies Switzerland: CHE-112.477.817
Value added tax Switzerland: CHE-112.477.817 MWST
Social security, Switzerland 873.109
DUNS-Register 483105628
We are officially registered
Register of companies Switzerland: CHE-112.477.817
Value added tax Switzerland: CHE-112.477.817 MWST
Social security, Switzerland 873.109
DUNS-Register 483105628
Company Presentation
Scheuchzerstrasse 17CH-8006 ZuerichSwitzerlandTel. +41 79 601 41 69
www.ulmeco.ch
UlMeCo AG
UlMeCo AG
Company Presentation -Appendix
Extract from our servicesExtract from our services
8UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Our services cover most issues of managing a company or unit
Strategy Development Market entry strategies Product and Service development
Decision support Market studies, Market estimates Investment decisions (CAPEX) Business planning and modelling Financial models Feasibility studies Sparring partner for ideas, IT-projects, risk-
assessment, IT-security
Industry specific Telecommunication used in the Railway industry Mobile communication infrastructure: Railways,
safety/security authorities and telecom industry
Strategy Development Market entry strategies Product and Service development
Decision support Market studies, Market estimates Investment decisions (CAPEX) Business planning and modelling Financial models Feasibility studies Sparring partner for ideas, IT-projects, risk-
assessment, IT-security
Industry specific Telecommunication used in the Railway industry Mobile communication infrastructure: Railways,
safety/security authorities and telecom industry
Optimising Efficiency increase by optimised processes Optimising combined with migration IT systems Optimisation through reorganising and developing
the organisation Quality cost reduction (Total Quality Management
approach) Incentive systems / Balanced Scorecards Facilitation to optimise processes e.g. during
budgeting or investment processes
Implementation Project management Support to project management / project office /
coaching Capacity / “Body shopping” Interim management Fast-track IT solution to support projects
Optimising Efficiency increase by optimised processes Optimising combined with migration IT systems Optimisation through reorganising and developing
the organisation Quality cost reduction (Total Quality Management
approach) Incentive systems / Balanced Scorecards Facilitation to optimise processes e.g. during
budgeting or investment processes
Implementation Project management Support to project management / project office /
coaching Capacity / “Body shopping” Interim management Fast-track IT solution to support projects
Company Presentation - Appendix A1
9UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Product-/Service development
Indication of the problem Turn-over collapses, new products or
redesigned old products should help new ideas, but which to choose ideas in mind but not specific enough to be
rated no common sense about which ideas is to be
the right one
The problem rate the ideas, refine a set of ideas in order to
create a business plan or financial analysis
The approach identify key success factors, derive rating
criteria generate ideas (systematically use creativity) document ideas in a structured way, refine
them pre-rate the ideas within workshops and/or
desk research rate all ideas in a systematic comprehensible
way refine the result in an iterative manner Result: 1-3 ideen to be further investigated
using financial modelling / business planning
Indication of the problem Turn-over collapses, new products or
redesigned old products should help new ideas, but which to choose ideas in mind but not specific enough to be
rated no common sense about which ideas is to be
the right one
The problem rate the ideas, refine a set of ideas in order to
create a business plan or financial analysis
The approach identify key success factors, derive rating
criteria generate ideas (systematically use creativity) document ideas in a structured way, refine
them pre-rate the ideas within workshops and/or
desk research rate all ideas in a systematic comprehensible
way refine the result in an iterative manner Result: 1-3 ideen to be further investigated
using financial modelling / business planning
Our part Method, tools, moderation Support at selecting the team
Your part allow your team to spend time for that task –
meaning, their daily business must be done by others
Benefit short time-to-market reduced risk of a false investment excellent base for getting risk capital due to
comprehensible decision making
References / Experience Telecom equipment producer, UMTS mobile
terminals
Typical duration from 2 und 10 weeks, depending on complexity
and required form of result
Our part Method, tools, moderation Support at selecting the team
Your part allow your team to spend time for that task –
meaning, their daily business must be done by others
Benefit short time-to-market reduced risk of a false investment excellent base for getting risk capital due to
comprehensible decision making
References / Experience Telecom equipment producer, UMTS mobile
terminals
Typical duration from 2 und 10 weeks, depending on complexity
and required form of result
Company Presentation - Appendix A1
10UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Market studies, estimate market size
Indication of the problem business volume reduced New product required? Have basic rules in the market changed?
The problem Which factors and needs define the market,
what business volume can be expected
The approach Definition of the product (set), derive the
relevant market Analyse key success factors (PEST, Porter) und
entry barriers Estimate market size and potential market
share using financial models
Our part Analyses, research, financial models
Your part be our partner for understanding the market,
challenge our understanding Support us at identifying and rating your
competitors, ...
Indication of the problem business volume reduced New product required? Have basic rules in the market changed?
The problem Which factors and needs define the market,
what business volume can be expected
The approach Definition of the product (set), derive the
relevant market Analyse key success factors (PEST, Porter) und
entry barriers Estimate market size and potential market
share using financial models
Our part Analyses, research, financial models
Your part be our partner for understanding the market,
challenge our understanding Support us at identifying and rating your
competitors, ...
Benefit Base for investment decisions, business
planning or financial models Base for realistic turnover targets for
employees Market view to complement a technology or
financial controlling view References / experience
Telecom equipment manufacturer Telecom network construction Market for telecom home installations Market for electric installation
Typical duration depending on required level of detail: from 3
days up to 8 weeks
The challenge identify information relevant for decision, avoid
extensive data gathering
Benefit Base for investment decisions, business
planning or financial models Base for realistic turnover targets for
employees Market view to complement a technology or
financial controlling view References / experience
Telecom equipment manufacturer Telecom network construction Market for telecom home installations Market for electric installation
Typical duration depending on required level of detail: from 3
days up to 8 weeks
The challenge identify information relevant for decision, avoid
extensive data gathering
Company Presentation - Appendix A1
11UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Investment decision
Indication of the problem Decisions based on gut feeling many false investments in the past no systematic process to cross-check large
investment projects Investments are created and signed of within
project work for customers, bypassing controlling
Investment projects with write-offs or missed forecasts
The problem Using a sample issue as a role-model to
implement a new “clearance process”
The approach analyse some past investments, including their
investment release process to identify potential for improvement
analyse the decision making environment, define required quality of decision and required level of details of the process
adapt standard processes and methods to meet the requirements
test the process using a real life example
Indication of the problem Decisions based on gut feeling many false investments in the past no systematic process to cross-check large
investment projects Investments are created and signed of within
project work for customers, bypassing controlling
Investment projects with write-offs or missed forecasts
The problem Using a sample issue as a role-model to
implement a new “clearance process”
The approach analyse some past investments, including their
investment release process to identify potential for improvement
analyse the decision making environment, define required quality of decision and required level of details of the process
adapt standard processes and methods to meet the requirements
test the process using a real life example
Our part Models, adaptation, moderation, tools Support at implementing the process Support at implementing systems to support
decision making
Your part free your mind for new approaches
Benefit Investment decisions are comprehensible arguments to activate investments in balance reduced risk of a false investment entrepreneurial decision is not under mined,
only complemented with a risk analysis
Typical duration Methods: 2 to 3 weeks Process implementation: 2 - 3 month Single decision: 1 day to 3 weeks, depending
on complexity
Our part Models, adaptation, moderation, tools Support at implementing the process Support at implementing systems to support
decision making
Your part free your mind for new approaches
Benefit Investment decisions are comprehensible arguments to activate investments in balance reduced risk of a false investment entrepreneurial decision is not under mined,
only complemented with a risk analysis
Typical duration Methods: 2 to 3 weeks Process implementation: 2 - 3 month Single decision: 1 day to 3 weeks, depending
on complexity
Company Presentation - Appendix A1
12UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Business planning
Indication of the problem in search for funds for a new idea an idea should be refined an existing business should be documented,
eg. due to sale, valuation, handover to next generation,...)
evidence that an existing business has fundamental problems (cost structure, revenue,...)
a team should be united on one single idea
The problem structure documentation of a business idea
(product or service), documentation of relevant market and needs, organisation, processes on a high level, risk assessment and financial model of the business
The approach within a series of workshops, all elements of a
business plan are created a business plan will be derived based on the
results of these workshops
Indication of the problem in search for funds for a new idea an idea should be refined an existing business should be documented,
eg. due to sale, valuation, handover to next generation,...)
evidence that an existing business has fundamental problems (cost structure, revenue,...)
a team should be united on one single idea
The problem structure documentation of a business idea
(product or service), documentation of relevant market and needs, organisation, processes on a high level, risk assessment and financial model of the business
The approach within a series of workshops, all elements of a
business plan are created a business plan will be derived based on the
results of these workshops
Our part proven financial model Market analyses, organisation und prozesse Moderation
Your part small team of experts one coach for the idea
Benefit Documentation common understanding on the idea
References / experience Business plans for several Internet Portals and
mobile activities of telecom operators Audit/reviews of business plans of mobile
telecom operators (UMTS, GSM)
Typical duration depending on complexity and level of
documentation: 2 weeks to 6 month
Our part proven financial model Market analyses, organisation und prozesse Moderation
Your part small team of experts one coach for the idea
Benefit Documentation common understanding on the idea
References / experience Business plans for several Internet Portals and
mobile activities of telecom operators Audit/reviews of business plans of mobile
telecom operators (UMTS, GSM)
Typical duration depending on complexity and level of
documentation: 2 weeks to 6 month
Company Presentation - Appendix A1
13UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Sparring-partner for testing ideas (2nd opinion)
Indication of the problem no competent person available within the
organisation which has no hidden agenda decision makers are isolated in their role decisions are take dogmatic, based on
prejudice decision makers too weak or saturated or
dominated by one person sensitive decisions (personnel, strategic) participative leadership, owner is overruled or
many decisions in the past were wrong
The problem no open-minded decision making
The approach Second opinion, generated by discussion based
on “challenge everything”
Our part / role We challenge your idea, we ask the
uncomfortable questions We focus on every point, even personal
aspects On request we support the decision making We are bound to absolute secrecy
Indication of the problem no competent person available within the
organisation which has no hidden agenda decision makers are isolated in their role decisions are take dogmatic, based on
prejudice decision makers too weak or saturated or
dominated by one person sensitive decisions (personnel, strategic) participative leadership, owner is overruled or
many decisions in the past were wrong
The problem no open-minded decision making
The approach Second opinion, generated by discussion based
on “challenge everything”
Our part / role We challenge your idea, we ask the
uncomfortable questions We focus on every point, even personal
aspects On request we support the decision making We are bound to absolute secrecy
Your part You are ready to be challenged and criticised
even on your personal behaviour Your are prepared to listen to the opinion of
another person Your are willing to communicate open and
frank with us Your avoid to guide the decision making by
withholding information
Benefit Risk of being professionally blinkered reduced Issues are talked about, hence blocking points
are identified and can be handled
References / experience Electrical installation industry (bulding), retail,
trade, GSM-R project at Deutschen Bahn
Typical duration no project, this is a relation which has to
develop and may last over years
Your part You are ready to be challenged and criticised
even on your personal behaviour Your are prepared to listen to the opinion of
another person Your are willing to communicate open and
frank with us Your avoid to guide the decision making by
withholding information
Benefit Risk of being professionally blinkered reduced Issues are talked about, hence blocking points
are identified and can be handled
References / experience Electrical installation industry (bulding), retail,
trade, GSM-R project at Deutschen Bahn
Typical duration no project, this is a relation which has to
develop and may last over years
Company Presentation - Appendix A1
14UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Efficiency improvement by process optimisation
Indication of the problem IT system should be migrated, optimising
processes as a side-effect expected cost reduction is not visible,
processes generate cost above expectations processes generate not the expected results,
this affects customer satisfaction process control becomes an end in it self (e.g.
IS 9000) Process documentation becomes excessive and
hinders (e.g. ITIL)
The problem An existing process must be analysed and
tuned for better performance measured on efficiency and effectiveness.
The approach Analyse of process environment (company,
required process results, connecting processes / customer needs)
Analyse of the process itself (steps, tasks, timing, ...)
Generate improvement proposals within structured workshops
Monitor realising of selected improvements
Indication of the problem IT system should be migrated, optimising
processes as a side-effect expected cost reduction is not visible,
processes generate cost above expectations processes generate not the expected results,
this affects customer satisfaction process control becomes an end in it self (e.g.
IS 9000) Process documentation becomes excessive and
hinders (e.g. ITIL)
The problem An existing process must be analysed and
tuned for better performance measured on efficiency and effectiveness.
The approach Analyse of process environment (company,
required process results, connecting processes / customer needs)
Analyse of the process itself (steps, tasks, timing, ...)
Generate improvement proposals within structured workshops
Monitor realising of selected improvements
Our part Analyses and basic solutions Prepare, lead and guide the workshop to
generate the improvement proposals Follow-up monitoring
Your part Give us access to information, process
documentation, decision makers relevant to the process
small, motivated team to support us Coach us for and guide us through the
“unwritten rules” of the company Benefit
reduced process costs result of the process secured improved believe in the process
References / experience Improve the process connecting the product
development with its outsource production (quality feedback loop to reduce production const and improve production quality)
Typical duration 4 weeks up to 1 year
Our part Analyses and basic solutions Prepare, lead and guide the workshop to
generate the improvement proposals Follow-up monitoring
Your part Give us access to information, process
documentation, decision makers relevant to the process
small, motivated team to support us Coach us for and guide us through the
“unwritten rules” of the company Benefit
reduced process costs result of the process secured improved believe in the process
References / experience Improve the process connecting the product
development with its outsource production (quality feedback loop to reduce production const and improve production quality)
Typical duration 4 weeks up to 1 year
Company Presentation - Appendix A1
15UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Optimising combined with IT system migration
Indication of the problem IT system should be migrated IT system is out-dated and does not reflect to
current process landscape maintenance and operations can be done only
be one (external) person or yearly costs are exploding
uncontrolled growth of small tools – MS Excel sheets and MS Access databases
The problem The process landscape has to be documented,
special focus on informal process interfaces Requirements for the new IT system to be
checked for conformance with new processes
The approach Analysing the processes around the IT system
(processes, process interfaces, data, contribution to client needs,…)
Identifying critical issues
Indication of the problem IT system should be migrated IT system is out-dated and does not reflect to
current process landscape maintenance and operations can be done only
be one (external) person or yearly costs are exploding
uncontrolled growth of small tools – MS Excel sheets and MS Access databases
The problem The process landscape has to be documented,
special focus on informal process interfaces Requirements for the new IT system to be
checked for conformance with new processes
The approach Analysing the processes around the IT system
(processes, process interfaces, data, contribution to client needs,…)
Identifying critical issues
Our part Data gathering and analyse Prepare, lead and guide workshops Identification of critical issues
Your part Give us access to information, process
documentation, decision makers relevant to the process
small, motivated team to support us Coach us for and guide us through the
“unwritten rules” of the company Benefit
processes optimised as a side-effect of IT migration
IT system matches the new processes changes to processes with the inherent
necessity of a new IT system References / experience
Electrical engineering company (200 employees)
TOSCA (wood merchant) Typical duration
4 weeks up to 1 year
Our part Data gathering and analyse Prepare, lead and guide workshops Identification of critical issues
Your part Give us access to information, process
documentation, decision makers relevant to the process
small, motivated team to support us Coach us for and guide us through the
“unwritten rules” of the company Benefit
processes optimised as a side-effect of IT migration
IT system matches the new processes changes to processes with the inherent
necessity of a new IT system References / experience
Electrical engineering company (200 employees)
TOSCA (wood merchant) Typical duration
4 weeks up to 1 year
Company Presentation - Appendix A1
16UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Program- / project support: team, coaching, project office
Indication of the problem Project managers are visibly not up to the job all of a sudden a project changes from „green“
to „red” there are not up to date project plans, no
project internal reporting...
The problem Setup a project office and support project
management by using the project office as staff
The approach apply the basics of project management (Body
of Knowledge) relive project manager from project
administration support project manager taking decisions
Our part coaching of project manager 2nd opinion during decision making run the project office
Indication of the problem Project managers are visibly not up to the job all of a sudden a project changes from „green“
to „red” there are not up to date project plans, no
project internal reporting...
The problem Setup a project office and support project
management by using the project office as staff
The approach apply the basics of project management (Body
of Knowledge) relive project manager from project
administration support project manager taking decisions
Our part coaching of project manager 2nd opinion during decision making run the project office
Your part You do not expect miracles – the project is still
lead by your project manager You accept that learning takes time You accept that we are a loyal part of the
project - we do not act as “indirect controllers” and informants
Benefit Project managers is supported effectively Project risks will be visible
References / experience Terminals and data applications within a
specific mobile network with railway application (GSM-R, ETCS, EBuLa Funk)
Implementation of a new call centre infrastructure of a bank
Implementation of an IT-security communication infrastructure of a bank
Typical duration few month up to several years
Your part You do not expect miracles – the project is still
lead by your project manager You accept that learning takes time You accept that we are a loyal part of the
project - we do not act as “indirect controllers” and informants
Benefit Project managers is supported effectively Project risks will be visible
References / experience Terminals and data applications within a
specific mobile network with railway application (GSM-R, ETCS, EBuLa Funk)
Implementation of a new call centre infrastructure of a bank
Implementation of an IT-security communication infrastructure of a bank
Typical duration few month up to several years
Company Presentation - Appendix A1
17UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Our project support IT system can support project implementation and prevent uncontrolled growth of small tools
Project management can be supported by IT systems. Good solutions are widely available for project planning and schedule control.
Often the existing IT tools are not prepared to fulfil the needs of a project. Reasons are: the need is pure project related, hence
not part of the IT portfolio. it takes more time than expected to
adapt the existing tool or the roll-out is too far into the future.
the existing tools can only be adapted with high cost or are too complex to use
organisational obstacles slow down or make it impossible to use it
This results in many small little tools mainly based on MS Excel or MS Access. To migrate them into long-term stable IT systems is often impossible or very cost intensive.
Project management can be supported by IT systems. Good solutions are widely available for project planning and schedule control.
Often the existing IT tools are not prepared to fulfil the needs of a project. Reasons are: the need is pure project related, hence
not part of the IT portfolio. it takes more time than expected to
adapt the existing tool or the roll-out is too far into the future.
the existing tools can only be adapted with high cost or are too complex to use
organisational obstacles slow down or make it impossible to use it
This results in many small little tools mainly based on MS Excel or MS Access. To migrate them into long-term stable IT systems is often impossible or very cost intensive.
We use our own web portal to support project processes, project data administration and to integrate different IT data sources into one view.
The system is build using Web/Internet technology. It is based upon Debian Linux, Apache2, PHP5, PostgreSQL. Other databases like MySQL or Oracle are possible. The hardware requirements are low, often a simply office PC is enough. We offer as well to use our server using an OpenVPN connection.
Most of the requirements can be met within a few hours of configuration. To expand, programming with PHP within our framework is easy and cost effective.
Data migration is possible – all data is already stored in normalised databases
Examples: fill out of questionnaires, surveys, roll-out tracking of mounting devices into locomotives, inventory management of cab radios, integration of an Oracle data base with data from the local data base.
We use our own web portal to support project processes, project data administration and to integrate different IT data sources into one view.
The system is build using Web/Internet technology. It is based upon Debian Linux, Apache2, PHP5, PostgreSQL. Other databases like MySQL or Oracle are possible. The hardware requirements are low, often a simply office PC is enough. We offer as well to use our server using an OpenVPN connection.
Most of the requirements can be met within a few hours of configuration. To expand, programming with PHP within our framework is easy and cost effective.
Data migration is possible – all data is already stored in normalised databases
Examples: fill out of questionnaires, surveys, roll-out tracking of mounting devices into locomotives, inventory management of cab radios, integration of an Oracle data base with data from the local data base.
Company Presentation A1
18UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Temporary Workforce (staff level)
Indication of the problem tight job market prevents recruiting the job is only temporary the job asks for high flexibility (time,
knowledge) which a common employee will not be able or willing to accept
The problem find and staff suitable person
The approach „Body Shopping“
Our part we “have” this person we support in search of the long-term staffing
Your part support the integration into the current
working environment create an environment positive about “body
shopping”
Indication of the problem tight job market prevents recruiting the job is only temporary the job asks for high flexibility (time,
knowledge) which a common employee will not be able or willing to accept
The problem find and staff suitable person
The approach „Body Shopping“
Our part we “have” this person we support in search of the long-term staffing
Your part support the integration into the current
working environment create an environment positive about “body
shopping”
Benefit de-couple workforce from labour legislation higher qualified person, hence enhanced
flexibility for further jobs and better performance
References / experience Assistant CEO Specification of GSM-R terminals and add-on
devices Specification of database and build of an
interim solution for management of GSM-R terminals configuration and maintenance (CARAD)
Financial administration Construction management Electrical planning
Typical duration weeks up to years
The challenge clever internal communication to avoid wage
increase and disrupted working time environment
Benefit de-couple workforce from labour legislation higher qualified person, hence enhanced
flexibility for further jobs and better performance
References / experience Assistant CEO Specification of GSM-R terminals and add-on
devices Specification of database and build of an
interim solution for management of GSM-R terminals configuration and maintenance (CARAD)
Financial administration Construction management Electrical planning
Typical duration weeks up to years
The challenge clever internal communication to avoid wage
increase and disrupted working time environment
Company Presentation - Appendix A1
19UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Interim management (management level)
Indication of the problem change in personal required, no suitable
candidate job requires actions not suitable for long-term
staff, no one will take this job
The problem Leadership for a specified time or to reach a
defined state
The approach interim management
Our part we “have” this person if required we support in search of the long-
term staffing
Indication of the problem change in personal required, no suitable
candidate job requires actions not suitable for long-term
staff, no one will take this job
The problem Leadership for a specified time or to reach a
defined state
The approach interim management
Our part we “have” this person if required we support in search of the long-
term staffing
Your part you support us in every way you give us all required competences
Benefit a situation is cleared depending on the job, a “scapegoat” is defined
References / experience CFO (active board member) of a 250 people
construction business
Typical duration several month up to two years
Your part you support us in every way you give us all required competences
Benefit a situation is cleared depending on the job, a “scapegoat” is defined
References / experience CFO (active board member) of a 250 people
construction business
Typical duration several month up to two years
Company Presentation - Appendix A1
20UlMeCoAG_CorpPres_en_160606.pptxUlMeCo AG
Fast-track IT solutions – quick solution to do the job and gain time for evaluating and building the final solution
Indication of the problem A (project related) task needs a specific IT
application to be done efficiently: the existing IT systems can not be adapted
fast enough or are not in production state solutions based on Excel, Access,... are not
reliable enough (access rights, security,...) or are too slow
The problem Build a temporary IT solution to tackle the
issue
The approach specification of the minimum requirements building a simple web interface (HTML, PHP)
and a corresponding database (e.g. PostgreSQL under Linux)
implement and roll-out the functionality step by step as soon as they are available
run the system on client or on our infrastructure
Our part „the solution“ including training, maintenance,
operations and if required migration
Indication of the problem A (project related) task needs a specific IT
application to be done efficiently: the existing IT systems can not be adapted
fast enough or are not in production state solutions based on Excel, Access,... are not
reliable enough (access rights, security,...) or are too slow
The problem Build a temporary IT solution to tackle the
issue
The approach specification of the minimum requirements building a simple web interface (HTML, PHP)
and a corresponding database (e.g. PostgreSQL under Linux)
implement and roll-out the functionality step by step as soon as they are available
run the system on client or on our infrastructure
Our part „the solution“ including training, maintenance,
operations and if required migration
Your part you integrate us into the project, this way we
learn the real user needs without time-consuming requirement specification
you help us to “sell” the approach of rapid prototyping to perfectionists
you mandate us with clear, precise goal and avoid the detailed specs (always incomplete) common within IT projects
Benefit fast-track to a sufficient, not perfect, system depending on project organisation, changed
requirements flow into the realisation quick and efficient
References / experience GSM-R project of Deutsche Bahn: Cabradio
Database (CARAD) GSM-R project of Deutsche Bahn: RaFu-Portal
(Information and controlling platform for roll-out of “GSM-R shunting”)
GSM-R project of Deutsche Bahn: BO2-Portal (Support system for GSM-R subscriber management call centre and back office)
Typical duration Build: one to four month Operation: up to two years
Your part you integrate us into the project, this way we
learn the real user needs without time-consuming requirement specification
you help us to “sell” the approach of rapid prototyping to perfectionists
you mandate us with clear, precise goal and avoid the detailed specs (always incomplete) common within IT projects
Benefit fast-track to a sufficient, not perfect, system depending on project organisation, changed
requirements flow into the realisation quick and efficient
References / experience GSM-R project of Deutsche Bahn: Cabradio
Database (CARAD) GSM-R project of Deutsche Bahn: RaFu-Portal
(Information and controlling platform for roll-out of “GSM-R shunting”)
GSM-R project of Deutsche Bahn: BO2-Portal (Support system for GSM-R subscriber management call centre and back office)
Typical duration Build: one to four month Operation: up to two years
Company Presentation - Appendix A1