UAE GO TEAM VISIT 2014
Erwin Lassooij
PBN Programme Manager
30 January 2014
Visit Summary
2
Purpose
• Increase the global implementation of PBN through:
– Improved capability in the use of the PBN concept in planning / designing airspace
– Improved capability in approving PBN Operations (Operations Approvals)
3
ROUTES - WORLD
ConventionalPBN
5
41%
6
MID implementation status
Bahrai
nEg
ypt
Iran
Iraq
Jordan
Kuwait
Leban
onLib
yaOman
Qatar
Saudi A
rabia
Sudan
Syria UAE
Yemen
0
20
40
60
80
100
120
ApproachesSIDsSTARs
Dec 2013
Dec 2014
7
Participation
• Bahrain• Iraq• Sudan• UAE
8
Go-Team Overview
• 10 day PBN Airspace Design Workshop• ICAO Doc 9992: PBN in Airspace Design
– Plan, Design, Validate, Implement– 17 steps
• Integration of ICAO Doc 9931 & 9993: CDO and CCO• ICAO Circ 330: Civil / Miitary Cooperation in ATM• Designed routes and airspace in TMA
– “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 • Routes designed for dual airports
– Phuket / Krabi• Enroute design and multi-TMA integration practice
– Southeast Asia
9
Lessons Learned• Team concept: diverse points of view and sources of information add strength• Setting goals and scope early helps insure success• Smaller projects allow for quick success• Take advantage of RNAV flexibility to design for shortest route• Design routes first then design airspace to contain routes• Design routes to minimize conflicts• Avoid the 100% trap – 80% of something is better than 100% of nothing• Rightsize the airspace according to tasks required • Avoid CDO route shortcuts to the extent possible• Shortcut CCO to the extent possible
10
Next Steps
• Encourage participants to apply lessons learned in adapting PBN plan and Implement PBN targets – Submit PBN plans as per June 2014 (PBN Sub
group)
• ICAO Regional Office – Follow-up with letter to DG on focus points– First level of support
11
Next steps - assistance– ICAO Regional Office with assistance from
experts out of the Region through• Regional Go-Teams 2014
– Oman– Jordan (Ops Approval only)– Qatar– Egypt
– ICAO HQ• Standards and guidance material• Customized Go Teams
12
PBN Productsto help you with implementation
• PBN related Publications and Annexes– Bundled specifically for Stakeholders– Hard and soft copies
• eLibrary Solutions• PBN ikit• CBT Training (iLearn)
13
eLibrary• Built for Stakeholders• Simplifies search for relevant PBN information
– From all ICAO Documentation
• By March, 3 eLibrary based bundles:– PBN for Regulators (PBN_REGS)– PBN for ANSP-Airspace Designers (PBN_ANSP_AD)– PBN for Aircraft Operators (PBN_AC_OPS)
• More stakeholder bundles to follow:– Executives– Manufacturers– ANSPs – Master, AIM/AIS, ATC, Instrument Flight Procedures
Available through ICAO e-store: www.store1.icao.int
14
Documentation Framework• PANS Ops Volume II• PBN Manual (Doc 9613) 4th Edition• RNP AR Procedure Design Manual
(Doc 9905)• PBN Ops Approval Manual (Doc 9997)• Manual on Use of PBN in Airspace
Design (Doc 9992)• CDO Manual (Doc 9931)• CCO Manual (Doc 9993• GNSS Manual (Doc 9849)• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906)
4 th Edition
The Future of PBN GO Teams• One more GO Team visit planned under Phase II
– China (Dates and location TBD)
• Future GO Team Visits will be specific to Region and State requirements for PBN Implementation– On request basis
• Focus/Services provided will be:– PBN Assessments/Gap Analysis– PBN Plans– Training– Implementation Assistance
Completed Global Visits Phase (I and II)
Thailand (2) UAE (2)Mexico KenyaGermany IndiaEcuador RussiaSouth Africa USA (CAR/SAM)
Thank You