Turnpike Mainline (SR 91) Add Lanes from Sawgrass ......415927-1 71 sawg 4159274 ss Expwy. onut...

Post on 28-Sep-2020

1 views 0 download

Transcript of Turnpike Mainline (SR 91) Add Lanes from Sawgrass ......415927-1 71 sawg 4159274 ss Expwy. onut...

July 2020 Information is preliminary and subject to change.

Turnpike Mainline (SR 91)

Add Lanes from Sawgrass Expressway to

Palm Beach County Line

FPID: 415927-4

Project Description

This project is to improve operations by adding north-bound and southbound through travel lanes to the Turn-pike Mainline (SR 91) from north of Sawgrass Express-way (SR 869) to the Palm Beach County Line. This is a Transportation Systems Management and Operations (TSM&O) Project. This project goes with a widening project (FPID 415927-1), to increase the number of tolled lanes from six to ten with one managed lane in each direction.

Project Status

The TSM&O Project is funded for Design in Fiscal Year 2021, with Construction funded in Fiscal Year 2024. The widening project is in Design that will only progress to Phase I to support the TSM&O Project that will be con-structed first. Construction for the widening project is not funded.

Contact Information

Teresa Price, PE

Project Manager / Atkins

Florida’s Turnpike Enterprise

407-264-3440

Teresa.Price@dot.state.fl.us